Comments on the below Document / Drawings which have received by Transmittal No. :
Item Doc No. Document Title Rev. Stage of Issue Comments Status
(B): Clarification Status Filled by Contractor: A: Accepted and will be implemented. M: Need Meeting. N: Not Accepted
(C): Clarification Final Status Filled by Consultant: A: Contractor's Clarification Accepted N: Contractor's Clarification Not Accepted and should be Applied in next revision
. باید از طریق واحد برنامه ریزی مدیریت طرح پیگیری و اجرا گردد، عبارات و کدهای ارائه شده در این فرم نمی باشد و هرگونه تغییر درخواستی،• هیچ یک از ارکان پروژه مجاز به اعمال هیچ تغییری در ساختار
National Iranian Copper Industries Company
Contract No.: 1099136 Project Title: Bandar-Abbas Phosphoric Acid Plant Project Page 1 of 1
Comment Sheet No: 81A1-ST-CT-C-0102 Document Title: Fire Protection System Specification Date: 9/21/2021
3 Fire water tanks that are mentioned in this document, don't exist in layout.
4 All utilities, including electricity, water, natural gas, steam and compressed air, should be considered and designed by the consortium not by client.
9 Specification fire pumps shall be specified. Starting condition, winding types and other things for example.
10 For each space shall be specified fire protction system type (water, foam, CO2 , etc).