Item Doc No. Document Title Rev. Stage of Issue Comments Status

1 81A1-T-P34-23-0000-00-038 Fire Protection System Specification A0 IFR CM

Originator Authorized by : Monenco Iran


Signature : M. Parchekani

* After Reply Sheet Cycle, is Filled by Consultant


(A): Document Status Filled by Consultant: RJ: Rejected CM: Commented AN: Approved as Noted AP: Approved AC: Approved for Construction NC: No Comment (For “FI”
Class )

(B): Clarification Status Filled by Contractor: A: Accepted and will be implemented. M: Need Meeting. N: Not Accepted

(C): Clarification Final Status Filled by Consultant: A: Contractor's Clarification Accepted N: Contractor's Clarification Not Accepted and should be Applied in next revision

Comment Sheet: Prepared by: Confirmed by: Authorized by:

Reply Sheet Prepared by: Confirmed by: Authorized by:

.‫ باید از طریق واحد برنامه ریزی مدیریت طرح پیگیری و اجرا گردد‬،‫ عبارات و کدهای ارائه شده در این فرم نمی باشد و هرگونه تغییر درخواستی‬،‫• هیچ یک از ارکان پروژه مجاز به اعمال هیچ تغییری در ساختار‬
National Iranian Copper Industries Company

Contract No.: 1099136 Project Title: Bandar-Abbas Phosphoric Acid Plant Project Page 1 of 1

Doc No.: 81A1-T-P34-23-0000-00-038 Ref. Transmittal No. : 81A1-CT-ST-T-0102


Comment/Reply Sheet
Doc Rev.: A0 Reply sheet No (if any):

Comment Sheet No: 81A1-ST-CT-C-0102 Document Title: Fire Protection System Specification Date: 9/21/2021

*Final Document Status: CM

Item Comment (By Consultant) Clarification (By Contractor) Final Stat. ©


All calculation and designs must be based on IPS, and wherever it does not cover, the priority is with the relevant international standards not Chinease or
1
Egiptian standards.

2 What is Egiptian code and Egiptian laws in this document?!

3 Fire water tanks that are mentioned in this document, don't exist in layout.

4 All utilities, including electricity, water, natural gas, steam and compressed air, should be considered and designed by the consortium not by client.

5 Final product concentration should be ≥54%wt

6 Amount of chloride and silica in phosphate rock should be corrected in design.

7 Please clarify the role El Wady Company in this project!

8 Motor above 200 KW shall be MV motor base on IPS.

9 Specification fire pumps shall be specified. Starting condition, winding types and other things for example.

10 For each space shall be specified fire protction system type (water, foam, CO2 , etc).

11 Please clarify WAPHCO!

* After Reply Sheet Cycle, is Filled by Consultant


(A): Document Status Filled by Consultant: RJ: Rejected CM: Commented AN: Approved as Noted AP: Approved AC: Approved for Construction NC: No Comment (For “FI”
Class )
(B): Clarification Status Filled by Contractor: A: Accepted and will be implemented. M: Need Meeting. N: Not Accepted

(C): Clarification Final Status Filled by Consultant: A: Contractor's Clarification Accepted N: Contractor's Clarification Not Accepted and should be Applied in next revision

Comment Sheet: Prepared by: Confirmed by: Authorized by:

Reply Sheet Prepared by: Confirmed by: Authorized by:

.‫ باید از طریق واحد برنامه ریزی مدیریت طرح پیگیری و اجرا گردد‬،‫ عبارات و کدهای ارائه شده در این فرم نمی باشد و هرگونه تغییر درخواستی‬،‫* هیچ یک از ارکان پروژه مجاز به اعمال هیچ تغییری در ساختار‬

You might also like