You are on page 1of 1

MATARBARI USCCF POWER PLANT

ENGINEERING DOCUMENT REVIEW FORM

WORK REQUEST NO: 500


REVIEW FORM FOR CONTRACTOR’S DOCUMENT: STATUS:
Cover Letter No.: Approved:
Transmittal No.: MAT-STIC-MJVC-00-T-G-00002 Approved as noted: √
Drawing Title: General Rules for Valve Naming Rev 0 Disapproved:
Drawing No: MAT-STIC-CO-G-A-00014 Information

Contractor is requested to respond to Comments/Recommendations identified below by:

No. Consultant’s Comments / Recommendation Contractor’s Response Resolution


Status
1 This proposal is in principle acceptable. Please proceed to Engineering and
design.
2 Final approval will be done depended on the design and engineering of piping
with valve arrangement drawings.
3

Commented by: S Fujimagari


Date: 08/April/2018
Comment reviewed by: J Kepple
Date: 08/April/2018
For CPGCBL:
Date:
NOTES:
1. Contractor shall provide his response within fourteen (14) days from the date he receives this form.
2. The comments provided in this transmittal shall not relieve the Contractor of any of its obligations to meet all the requirements of
the Contract or relieve the Contractor of the responsibility for the correctness of his drawings/documents. The Contractor shall
make any changes that are necessary to make the work confirm to the provisions and intent of the Contract.
3. Contractor to ensure that procurement of all equipment / components meets the requirements of the Contract.