REVIEW FORM FOR CONTRACTOR’S DOCUMENT: STATUS: Cover Letter No.: Approved: Transmittal No.: MAT-STIC-MJVC-00-T-G-00002 Approved as noted: √ Drawing Title: General Rules for Valve Naming Rev 0 Disapproved: Drawing No: MAT-STIC-CO-G-A-00014 Information
Contractor is requested to respond to Comments/Recommendations identified below by:
Status 1 This proposal is in principle acceptable. Please proceed to Engineering and design. 2 Final approval will be done depended on the design and engineering of piping with valve arrangement drawings. 3
Commented by: S Fujimagari
Date: 08/April/2018 Comment reviewed by: J Kepple Date: 08/April/2018 For CPGCBL: Date: NOTES: 1. Contractor shall provide his response within fourteen (14) days from the date he receives this form. 2. The comments provided in this transmittal shall not relieve the Contractor of any of its obligations to meet all the requirements of the Contract or relieve the Contractor of the responsibility for the correctness of his drawings/documents. The Contractor shall make any changes that are necessary to make the work confirm to the provisions and intent of the Contract. 3. Contractor to ensure that procurement of all equipment / components meets the requirements of the Contract.