Project Name: RAS MARKAZ CRUDE OIL Vendor / Sub-Contractor: P.O.No: W1 - W2 Witness Inspection
PARK PROJECT(PHASE 1) AL MAWKAB NATIONAL TRADING &
S Surveillance Inspection
CONSTRUCTION COMPANY L.L.C.
H Hold Point .
ITP No.: MNT/QA QC/ITP-001 ITP Revision Number: A1 Date: 28.04.2020 T/C Test Certificate Required
R1-R2: Review of Documentation
M Monitoring 1 = 100% 2 = 10%
Intervention Points.
SL. Activity Description Reference Document Acceptance Criteria Verifying Document Sub-Contractor Third Party
CPP Company Remarks
/ Vendor Inspector
1. Contract Review / Drawings , ITP and Procdures Approval / Raw Material Inspection including connection bolts and nuts
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
As per MTC / Scope of work/Client
Procure & Verification of Raw 9686-8320-SP-000-4502, MTC Conforming to BS EN
1.1 Approved Design Drawing & Related H R1-R2 R1-R2 R1-R2
Material Identifcation 9686-8330-DB-000-4501, 10204
international standard
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
Cold Rolled As per MTC / Scope of work/Client
9686-8320-SP-000-4502, MTC Conforming to BS EN
1.2 Sections(Thickness,Dimensions,P Approved Design Drawing & Related H R1-R2 R1-R2 R1-R2
9686-8330-DB-000-4501, 10204
rofile,Cracks) international standard
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
As per MTC / Scope of work/Client
Review of Raw Material Test 9686-8320-SP-000-4502, MTC Conforming to BS EN
1.3 Approved Design Drawing & Related R1-R2 R1-R2 R1-R2 R1-R2
certificates 9686-8330-DB-000-4501, 10204
international standard
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
As per MTC / Scope of work/Client
Supply andd Receving Inspection 9686-8320-SP-000-4502, MTC Conforming to BS EN
1.4 Approved Design Drawing & Related H R1-R2 W1-W2 R1-R2
of Bought Out 9686-8330-DB-000-4501, 10204
international standard
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
9686-8320-SP-000-4502, Batch Test certificates As per MTC /Scope of Work/ Related
1.5 Weld Consumables M1 R1-R2 S R1-R2
9686-8330-DB-000-4501, conforming to BS EN 10204 international Material standard
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
BS EN 287, BS EN ISO 15609- Welding Procedure qualification
9686-8320-SP-000-4502,
2.1 WPS/PQR/WQTR 1, BS EN ISO 15614 & BS EN Records/Specification & Welder H R1-R2 H R1-R2
9686-8330-DB-000-4501,
ISO 14732 Qualification
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
9686-8320-SP-000-4502,
2.2 NDE Procedures BS EN ISO 17635 NDE Procedures for UT & VI H R1-R2 R1-R2 R1-R2
9686-8330-DB-000-4501,
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-QAQC-FRM-0009 Rev 01 1
PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
Project Name: RAS MARKAZ CRUDE OIL Vendor / Sub-Contractor: P.O.No: W1 - W2 Witness Inspection
PARK PROJECT(PHASE 1) AL MAWKAB NATIONAL TRADING &
S Surveillance Inspection
CONSTRUCTION COMPANY L.L.C.
H Hold Point .
ITP No.: MNT/QA QC/ITP-001 ITP Revision Number: A1 Date: 28.04.2020 T/C Test Certificate Required
R1-R2: Review of Documentation
M Monitoring 1 = 100% 2 = 10%
Intervention Points.
SL. Activity Description Reference Document Acceptance Criteria Verifying Document Sub-Contractor Third Party
CPP Company Remarks
/ Vendor Inspector
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
9686-8320-SP-000-4502,
3.2 Welding & Monitoring BS EN 1090-2 Inspection Records: MNT H R1-R2 R1-R2 R1-R2
9686-8330-DB-000-4501,
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501,
9686-8320-SP-000-4502,
3.3 Visual Inspection of Welds BS EN 1090-2 Inspection Records: MNT H R1-R2 R1-R2 R1-R2
9686-8330-DB-000-4501,
9686-8320-39-000-4502,
9686-8330-SW-000-4514
9686-8320-SP-000-4503,
9686-8320-DB-000-4501, 100 % UT of CJP Butt welds for Primary Load bearing
9686-8320-SP-000-4502, BS EN ISO 17635/ BS EN 1090- Members.
3.4 NDE Testing (UT) Testing Report H R1-R2 W1-W2 R1-R2
9686-8330-DB-000-4501, 2 10% of UT for CJP Butt Welds for Secondary Members/Per
9686-8320-39-000-4502, day Production (Randomly Selected)
9686-8330-SW-000-4514
Hard Punch
3.5 As per Shop Drawings Shop Drawing N/A H S M2
Marking/Identification
9686-QAQC-FRM-0009 Rev 01 2
PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
Project Name: RAS MARKAZ CRUDE OIL Vendor / Sub-Contractor: P.O.No: W1 - W2 Witness Inspection
PARK PROJECT(PHASE 1) AL MAWKAB NATIONAL TRADING &
S Surveillance Inspection
CONSTRUCTION COMPANY L.L.C.
H Hold Point .
ITP No.: MNT/QA QC/ITP-001 ITP Revision Number: A1 Date: 28.04.2020 T/C Test Certificate Required
R1-R2: Review of Documentation
M Monitoring 1 = 100% 2 = 10%
Intervention Points.
SL. Activity Description Reference Document Acceptance Criteria Verifying Document Sub-Contractor Third Party
CPP Company Remarks
/ Vendor Inspector
6.2 Release of Shipment Nill Approved check list Shipping Release Note H R1-R2 W1-W2 R1-R2
9686-QAQC-FRM-0009 Rev 01 3