You are on page 1of 3

INSPECTION TEST PLAN PROCEDURE

FITTING & ACCESSORIES

PROJECT : PEKERJAAN PEMBANGUNAN T/L 150 KV GI. KENDARI - GI. ANDOOLO


(SECTION 1 : GI KENDARI - TIP115)
NO. KONTRAK : 053.PJ/KON.02.02/UIPSULBAGSEL/2018

CLIENT : PT. PERUSAHAAN LISTRIK NEGARA (PERSERO)


UNIT INDUK PEMBANGUNAN SULAWESI BAGIAN SELATAN

LOCATION : SULAWESI TENGGARA

DOCUMENT NO. : 053.KDI-ADL/BAND-QAQC-006

OWNER :

PT. PLN (PERSERO)


UNIT INDUK PEMBANGUNAN SULAWESI BAGIAN SELATAN
JL. Letjend Hertasning, Panakkukang, Makassar 90222

CONSULTANT QA/QC

PT. PLN (PERSERO)


PUSAN MANAJEMEN PROYEK
JL. Gajah Mungkur – Semarang 50232

1 ISSUED FOR APPROVAL 06-06-20 YH YH AD


0 ISSUED FOR APPROVAL 11-03-20 MRS MRS AD
REV. DESCRIPTION DATE PREPARED CHECKED APVD.
LABORATORY AND TESTING DOCUMENTS
No.Doc.053.KDI-ADL/BAND-QAQC-006 Date. 06-06-2020 Issue : 001 Page 1 of 2

INSPECTION TEST PLAN PROCEDURE

TEST ITEM – SAMPLE TEST OF BS 3288-1.

Project : PENGADAAN MATERIAL FITTING DAN ACCESSORIES TERKAIT PEKERJAAN


PEMBANGUNAN TL 150 kV GI Kendari – GI ANDOOLO Sec.1: GI. KENDARI -
– TIP.115
Contract No. : 053.PJ/KON.02.02/UIPSULBAGSEL/2018
Contac Date : 28 DESEMBER 2018

1. TEST ON FITTINGS.

Insulator set Fittings and earth wire fittings


SOCKET BALL BOW
YOKE PLATE SAG LINK
Item test CLEVIS CLEVIS SHACKLE
Visual Examination X X X X X
Dimension Material X X X X X
Verification
Hot Dip Galvanizing X X X X X

Mechanical test
Test Damage and failure
X X X X X
load test

Insulator set Fittings and earth wire fittings

Item test TWIST BALL EYE SHACKLE SOCKET


Visual Examination X X X
Dimension Material X X X
Verification
Hot Dip Galvanizing X X X

Mechanical test
Test Damage and failure
X X X
load test a)

LABORATORY AND TESTING 1


LABORATORY AND TESTING DOCUMENTS
No.Doc.053.KDI-ADL/BAND-QAQC-006 Date. 06-06-2020 Issue : 001 Page 2 of 2

INSPECTION TEST PLAN

2. FITTINS ACESSORRIES TRANSMITION LINE

ACCEPTANCE VERIFYING INSPECTION POINT


DESCRIPTION STANDARD
CRITERIA DOCUMENT MANUFACTURE CONTRACTOR PLN
BS3288 Part 1
Complying
1. Dimension (1997) clause Factory
with FAT
and 6.3.1 Acceptance Verification witness witness
Procedure
Appearance IEC-61284 (1997) Test Report
/Standard
clause 7 & 8
AS/NZ 4680:1999 Complying
Factory
clause 8.2 with FAT
2. Galvanizing Acceptance verification witness witness
IEC-61284 (1997) Procedure
Test Report
clause 10 /Standard
BS 3288 Part 1 Complying
Factory
3. Mechanical (1997) Clause 6.4 with FAT
Acceptance verification witness witness
Test IEC-61284 (1997) Procedure
Test Report
clause 11 /Standard

3. TESTING EQUIPMENT.

Calibration
NO Reg No Serial NO Name
No Date
1 QA-225 020482-1 Horizontal testing machine 500KN S-20010188 14/02/2020
2 QA-784 B18184310 Digital Calliper (0-200mm) DIM-2004- 003 20/ 04/2020
3 QA-779 UC19639 Elcometer Thickness gauge (0-1500µm) C270040-20 09/20/2019

LABORATORY AND TESTING