You are on page 1of 26

PIPING WORK PACKAGE #8 EARLY TANK

TEST PACKAGE NO.

333-AG-FW-0001
SYSTEM : Fire Water

SUB SYSTEM :

RELEASED FOR TEST

HYDROSTATIC TEST PNEUMATIC TEST VISUAL TEST

PREPARED BY REVIEWED BY APPROVED BY

Date Date Date


Remarks :
TABLE OF CONTENTS

Piping Work Package #8 Early


Project : Package No : 333-AG-FW-0001
Tank

Subcon : PT. Yasa Industri Nusantara System No : 333

Sub-system No : 333-0001

No Document Description YES NO Remarks

1 Pressure Test Cover Sheet 

2 Plot Plan (Marking Area) 

3 Marked-up P&ID / Test Block Diagram 

4 Line List 

5 Isometric Drawings 

6 Pressure Test Package Welding Summary 

7 Punch List 

8 Pre-Test Check List 

9 Water Analysis Report 

10 Calibration Report for Test (Pressure Gauge, Relief Valve) 

11 Pressure Test Report 

12 Drain & Dry Report 

13 Line Reinstatement Report 

14 Flange Joint Report 

15 Orifice Flange Inside Inspection (If Required) 

16 NDT Report 

17

Note:

Inspection Result : □ Accept □ As noted □ Reject

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date

Form No. : ITR-PI-007


KARANGANYAR
SPBU
NEW BRIDGE &
EXIST.
CONSTRUCTION ACCESS GATE
POLICLINIC

WAREHOUSE
PHASE 2

GREEN VILLAGE
WAREHOUSE

CAR PARKING
WAREHOUSE
PHASE 2

PIPE TRENCH

PARKING ACCESS RAMP & GATE


SCHOOL AREA
NEW HSSE
BUILDING

PARKING
"LOT A"
130000
RE-LOCATED
JL. YOS SOEDARSO ( JL. MINYAK )

NEW OCR SUMP PIT 95500

EXIST. MOSQUE
PEN/TEK PEN
OVER FLOW WEIR
94000 V-3
RELOCATED OUTFALL V-6

35000
V-5 P-5
CONSTRUCTION
LAYDOWN AREA V-4
V-7
KARANGANYAR

JL. BON
DRAINAGE
SPBU

NEW BRIDGE &

GAS
CONSTRUCTION ACCESS GATE
EXIST. EXIST.
CHURCH SCHOOL EPC SITE OFFICES G-320-25A/B/C
NEW DIESEL TRANSFER PUMPS

GREEN VILLAGE D-320-12


WAREHOUSE NEW MAKE-UP HYDROGEN
CAR PARKING

COMPRESSOR (K-3-02D/E)
PIPE TRENCH

ACCESS RAMP & GATE FUTURE VACUUM RESIDUE TANKS (PHASE 2)


D-20-08 R-9 R-6 R-3 D-20-07A D-20-07B D-20-07C (EXIST. LOCATION OF TANKS O-15 TO 0-20)
NEW HSSE
BUILDING
FUTURE VACUUM RESIDUE TANKS (PHASE 2)
PARKING
"LOT A"
130000

R-8 R-5 R-2 FUTURE VACUUM RESIDUE PUMPS (PHASE 2) (EXIST. LOCATION OF TANKS O-09 TO 0-14)
NEW OCR SUMP PIT 95500
D-320-02B
PEN/TEK PEN
OVER FLOW WEIR
94000 V-3
RELOCATED OUTFALL V-6
35000

P-5 R-10 R-7 R-4 R-1


V-5 V-4
V-7
320
DRAINAGE NEW OCR SUMP PIT
341-SS-114

D-320-12
NEW MAKE-UP HYDROGEN
COMPRESSOR (K-3-02D/E) P-32
341-MCR-001 (MAIN CONTROL BUILDING) D-320-02A
RELOCATED FOAM TANK WEST OF PRE-FLASH

DIESEL BLENDING
P-31
FUTURE VACUUM RESIDUE TANKS (PHASE 2) RELOCATED OUTFALL

EA
(EXIST. LOCATION OF TANKS O-09 TO 0-14) SS-76
D-320-02B
D-20-11

AR
NEW LABORATORY BUILDING RELOCATED SMOOTH

T
EN
320
NEW CFR ENGINE ROOM
FLUID LOADING POWER STATION

TM
P-8 P-2
NEW OCR SUMP PIT SHIFT DINING ROOM (TO BE RELOCATED BY REFINERY)
P-4 P-3 (EXIST. INSPECTION SHOP) - GTG (PHASE 2)

VE
D-320-10
P-7 P-1 NEW SS-1

RE
D-320-02A
NEW SATELITE FIRE HOUSE

RELOCATED OUTFALL 00
R600
EA

D-20-11 0-22 D-320-11C


AR

D-20-12
RELOCATED SMOOTH D-320-11A
T
EN

FLUID LOADING POWER STATION 0-23


214500
0-21
TM

- GTG (PHASE 2) PERTAMINA MAIN OFFICE


VE

D-320-11D NEW SITE


RE

OFFICE
331
83000

UP V
001(R)
C-20-01A/B
D-320-11A D-20-18 D-20-03 D-320-11B
50000
321

321

331
35000

341-SS-107

40000
D-320-11B 341-ISH-107
006
D-20-17 331
331
341-OP-010
R30

R 30
00

19111
00

00
0

0
0

00
30

R 15

341-ISH-101
R

0
00
R 15

39000
ISH
37000

61708

94580 HELICOPTER
78000 SITE
DESULFURIZATION UNIT

75000 13000 75000

341-OP-08
341-SS-101
341-OP-009
321
HVU-III

341-OP-017 341-SS-109
257000

341-OP-005 341-ISH-109 (ABOVE)

33B
321

33A
24A

24B

PROCESS COOLING TOWER

37A
RESIDUE

002 341-SS-106/108 341-OP-012


255500

054
181000

181000

083
201500

341-ISH-106/108 (ABOVE)
EXISTING SS-4
NEW SHIFT DINING ROOM (RU-V) TO BE DEMOLISHED
125000 30000 341-ISH-110
341-OP-015
341-SS-110
12000

321
LPG & PROPYLENE
337 STORAGE SPHERES

36
97500 17000 54000 30000 70000 30000 70000 30000 80000 30000 80000 30000 135000
CPI

55A

128500

082 GASOLINE BLENDING (R90 & R92)


334

10009 174933 14813


160
335
83000

332 G-320-20A/B
28B

325 064 G-320-16A/B G-320-22A/B


127000

321

0
28A

G-320-13A/B

700
321
E XIS T. CONTRO L ROOM
173000

247000
160000

065

R10
321

060 059
32A
210000

320
NO.73
SS#

067 321
IT CENTRAL
337 25000 A-28
NO.70

334 0
SS#

079 321 321 00 A-26


R 30

BOILER 0
00

SRU - PHASE 1
R6 A-24
0

319 JAL
TRAIN-A
49500

167 320 A-22 NEW AN


321

065 GASOLINE YO
R 60

29
313000 TANK S SU

19
A-27 DA

00
069 SULFUR RS

0
A-25 A-33 O

67000
SRU - PHASE 1 RECOVERY - PHASE 2 A-23
TRAIN-B
A21
15000

BALIKPAPAN 1 321
A-31
CONSTRUCTION JETTY

15000
HYDROCARBON A-7
FLARE V-219-01 341-OP-014 T-202
RPAL EXISTING 341-OP-006 G-320-19 T-201 NEW TEMPORARY ROAD
CW OUTFALL

RECEIVER 341-SS-105 SULFUR HANDLING G-320-18A/B A-20


341-ISH-105 (ABOVE) FOAM & GATE 2A (BY EPC)
EXISTING & STORAGE TANK G-320-09A/B A-19
EXISTING

321 T-203
OUTFALL G-320-08A/B A-18 A-32
U-23
RELOCATED A-17
BUNKER FUEL TANK 321
EXIST.

341-SS-115 321
341-ISH-115 (ABOVE) V-1 E-3 341-SS-113
EXISTING FW E-5
RELOCATED SUPPLY TANK A-16 A-6 E-7 341-OP-016
BERTH 8 EXISTING DITCH FOR JOCKEY PUMPS E-2
E-4
E

A-15 A-5
E

V-2
WAREHOUS
EXISTING

WAREHOUS

E-6
EXISTING

EXISTING CW & FW A-4


PUMP HOUSE INTERMEDIATE FLARE METERING (NEW) E-1
KO DRUM FOR HH ROAD CROSSING LPG, COMPACT PROVER
PROPYLENE, GASOLINE & PROPYLENE

CONSTRUCTION JETTY
A-3
SPACE A-2 D-320-07A
NEW RDMP HCC FLARE NEW RDMP RFCC FLARE RESEVED FOR BERTH 5A
A-1
(NEW BPP-II & HCC) (RFCC) AMINE HANDLING
BERTH 7 D-320-07B
SS-71
NEW GA
SOUTH ACID GAS SULFUR JETTY SUB SO LI
OIL MOVEMENT NE D-320-07C
NEW 24" SUBSEA PIPELINE FLARE K.O. DRUM BERTH 6A STN TAN
ROOM K
(NAT. GAS FROM FSRU) EXISTING NEW SOUTH ACID GAS
FLARE STACK BERTH 5C
SEA WATER INTAKE SEA WATER INTAKE

BERTH 5B
NEW 20" SUBSEA PIPELINE
(CRUDE FROM LAWE-LAWE)
BERTH 5

BERTH 4

BERTH 3

BERTH 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

LEGENDS

FIRE WATER HEADER


HEADER
TO/FROM FIRE WATER

TO FROM EXISTING
FIRE WATER

FIRE WATER
13074

12849
333-ARV-021 333-ARV-022
000

M6-333-00017
A 000 A
000
333-FHF-012
333-FHF-015

-
AG UG 6" NOTE 19 NOTE 19
000 6"
333
333-FHF-181 AG AG 2" 2" TP
6" SLUDGE POND 049
6" UG UG UG AG
333-FW-162-12"-12LC2T21-NI
6"
6"
333-FW-201-12"-12LC2T21-NI 333-FHF-005 NO
333-FHF-001 12" LO 16"
333-FHF-017 12" 000

P
NOTE 3 333-FW-183-2"-12CG2T01-NI 333-FW-186-2"-12CG2T01-NI AG
AG
B 16" B
000 UG UG UG AG
16"x12" 333-FW-001-12"-12LC2T21-NI 333
333-FW-182-3"-12CG2T01-NI 333-FW-185-3"-12CG2T01-NI
TP
050
333-FW-072-4"-12CG2T01-NI 333-FW-077-4"-12CG2T01-NI 333-FW-126-6"-12CG2T01-NI
333-FW-125-6"-12CG2T01-NI 6"x4" BY F/F VENDOR
AG UG FC
6" 4"
NOTE 11
6"
12" 333-FW-073-4"-12CG2T01-NI 3"
333-FC-013~017 6"x3"
D 3/4" 16"
10"x6" 6"x4" 333-FW-078-4"-12CG2T01-NI
333-FW-406-4"-12CG2T01-NI 3"
333-FHF-002 333-FW-424-6"-12CG2T01-NI

333-FW-018-16"-12LC2T21-NI
6"x4" 10"x6"
333-FW-038-10"-12CG2T01-NI 6"x4"
C FOAM CHAMBER LINE No. 333-FW-407-4"-12CG2T01-NI C
D
333-FC-001 333-FW-203-8"-12CG2T01-NI 000 BY VENDOR 6"x4" D NOTE 13
333 3/4"
333-FC-002 333-FW-343-8"-12CG2T01-NI NOTE 18 16"
PRV +

NC NOTE 12 BY VENDOR 3/4" 333


333-FC-003 333-FW-344-8"-12CG2T01-NI 0005 D-320-12 333-FW-425-6"-12CG2T01-NI NC NOTE 12 TP
333-FC-004 333-FW-204-8"-12CG2T01-NI 3" 053
3"
333-FC-005 333-FW-345-8"-12CG2T01-NI BUNDWALL 333
333-FC-006 333-FW-346-8"-12CG2T01-NI PRV +

333-ARV-023
333-FC-007 333-FW-205-8"-12CG2T01-NI AG UG 16"x10" 333-FW-050-10"-12CG2T01-NI 16"x10" 0006
TST 16"
333-FC-008 333-FW-347-8"-12CG2T01-NI 001
12" TST
333-FC-009 333-FW-348-8"-12CG2T01-NI
333-SP
002 NOTE 19
333-FHF-007
D 333-FC-010 333-FW-206-8"-12CG2T01-NI 12CG2T01 16"x10" 333-SP
D
16"x10"
333-FC-011 333-FW-349-8"-12CG2T01-NI 12LC2T01 NOTE 7 12CG2T01
12LC2T01 NOTE 13 2"
333-FC-012 333-FW-350-8"-12CG2T01-NI 12LC2T21 12LC2T01 333-FW-071-10"-12LC2T01-NI NOTE 7
333-FC-013 333-FW-079-6"-12CG2T01-NI UG AG
333-FW-070-16"-12LC2T01-NI 333-FW-076-10"-12LC2T01-NI
333-FC-014 333-FW-351-6"-12CG2T01-NI

P
LO 333-FW-181-2"-12CG2T01-NI 333-FW-177-2"-12CG2T01-NI NO
333-FC-015 333-FW-352-6"-12CG2T01-NI
333-FHF-009 LO
333-FC-016 333-FW-080-6"-12CG2T01-NI 16"
333-FC-017 333-FW-353-6"-12CG2T01-NI 12" 333-FW-180-3"-12CG2T01-NI 333-FW-176-3"-12CG2T01-NI

CONT. NOTES : 333-FW-179-4"-12CG2T01-NI


AG

333-FW-175-4"-12CG2T01-NI
UG

E 5. THE SECTIONAL VALVE FOR FIRE WATER MAIN SHALL BE GATE VALVE WITH POST 8"x4" 8"x4" E
INDICATOR SHOWING CLOSED OR OPEN STATUS OF THE VALVE. WHERE 333-FW-011-6"-12CG2T01-NI 333-FW-013-6"-12CG2T01-NI
INSTALLED IN UNDERGROUND FIRE WATER MAIN. THE SECTIONAL VALVE SHALL 333-FW-178-8"-12CG2T01-NI 333-FW-174-8"-12CG2T01-NI
8"x6" 8"x6"
BE DIRECTLY BURIED AND THE STEM OF SECTIONAL VALVE SHALL BE EXTENDED BY F/F VENDOR
SO THAT THE INDICATOR IS POSITION AT APPROX. 900MM ABOVE THE FINAL 8" FC 8" NOTE 11
GRADE. 333-FW-010-6"-12CG2T01-NI
6. EXISTING FIRE WATER LINE (AREA TANK 0-25) IS LOCATED ABOVE GROUND. 8"x6" 333-FC-001 ~006 8"x6" 8"x3" 3"
D 3/4"
7. THE SYSTEM ACTUATION VALVE FOR WATER SPRAY SHALL BE MANUAL VALVE
I

333-FW-408-4"-12CG2T01-NI 333-FW-012-6"-12CG2T01-NI
-N

AND SHALL BE LOCATED 1D FROM PROTECTED TANK OR AT LEAST 15 M AWAY 12"x8" 3"
1
T2

8"x6"
C2

FROM THE PROTECTED EQUIPMENT. 333-FW-426-8"-12CG2T01-NI 8"x4"


2L

8. DETAILS FOR UL LISTED AND/OR FM APPROVED FOR ALL FIREFIGHTING 333-FW-409-4"-12CG2T01-NI 12"x8"
"-1

D
-16

F AND SAFETY EQUIPMENT REFER TO DATA SHEET FOR FIRE AND SAFETY 3/4" NOTE 13 F
333 8"x4"
18

EQUIPMENT (26071-100-U0D-000-00001). 3/4" BY VENDOR


NOTE 18
W-0

000 PRV +

NOTE 12 D NOTE 12
9. HOSE REEL POSITION SHALL BE MIN 15 M FROM PUMP. 0003 NC BY VENDOR NC 333
3-F

10. THE BREAKING PRESSURE OF BREAK GLASS IN FOAM CHAMBER IS 2.8 KG/CM2.G. D-320-02B 333-FW-427-8"-12CG2T01-NI
TP
33

3" 3" 051


11. FOAM CHAMBER IS TYPICAL AND THE LINE NUMBER REFER TO TABLE. 333 333-ARV-024
333-FHF-003 12" 333-FW-051-12"-12CG2T01-NI BUNDWALL
12. QUICK COUPLING CONNECTION PROVIDED BY F/F VENDOR FOR FLUSHING ONLY. 333-FW-053-12"-12CG2T01-NI PRV
+

18"x16" 0004
13. BUTTERFLY VALVE FOR ACTIVATION WATER SPRAY SYSTEM AND 16"x12" 16"x12"
AG

FOAM STATION SHALL BE LOCATED IN SAME FIRE SCREEN/FIREWALL. TST TST


003 004 NOTE 19
UG

14. THE APPROPRIATE TACTIC SHALL BE USED TO AVOID THE POSSIBILITY OF 333-SP 333-SP

"SLOPOVER" WHEN FOAM ADDED TO TANK. 16"x12" 16"x12"


12LC2T21 12LC2T01 12CG2T01 12CG2T01
2"
15. STEEL PIPE FOR FIRE WATER MAIN SHALL BE CONCRETE LINED TO UG AG NOTE 7 12LC2T01 NOTE 13
12LC2T01
I
-N

ENSURE INTERNAL CORROSION RESISTANCE AND GREATLY LESSENED NOTE 7 16"


333-FW-124-12"-12LC2T01-NI 333-FW-007-16"-12LC2T01-NI 333-FW-127-12"-12LC2T01-NI
21

G G
FRICTION LOSS. BURIED STEEL PIPE SHALL BE SUITABLY COATED AND
C 2T

WRAPPED AND HAVE CATHODIC PROTECTION FOR CORROSION PROTECTION. LO


2L

333-FW-173-2"-12CG2T01-NI 333-FW-169-2"-12CG2T01-NI NO
8"-1

16. CONNECTION FOR HCFM USE 12" STAND PIPE HYDRANT. THE DETAIL OF HCFM IS LO
-1

PROVIDED BY HCFM VENDOR P&ID.


02

000 333-FW-172-3"-12CG2T01-NI
-0

17. FOR DETAILS REGARDING FIRE WATER DEMAND, FOAM, SPRAY NOZZLE, TYPICAL 333-FW-168-3"-12CG2T01-NI
-FW

DETAILS DELUGE VALVE,HYDRANT, MONITORS, ETC. REFER TO THE DOCUMENTS &


3
33

DRAWINGS LISTED IN THE REFERENCE SECTION. 333-FW-171-4"-12CG2T01-NI 8"x4"


333-FW-167-4"-12CG2T01-NI
18. THE NUMBER OF QUICK COUPLING FOR FOAM CHAMBER SHALL 2 COUPLING
8"x4"
FOR 1 FOAM CHAMBER. 333-FW-015-6"-12CG2T01-NI 8"x6" 333-FW-166-8"-12CG2T01-NI
333-FW-017-6"-12CG2T01-NI
19. ARV SHALL BE INSTALLED AT HIGHEST POINT. 333-FW-170-8"-12CG2T01-NI BY F/F VENDOR
8"x6"
8" FC 8"
H 333-FW-014-6"-12CG2T01-NI NOTE 11 H

16" EXISTING FW HEADER


000
8"x6" 8"x6" 8"x3" 3"
333-FC-007 ~012
D 3/4"
333-FW-016-6"-12CG2T01-NI
000 12"x8" 3"
333-FW-410-4"-12CG2T01-NI
8"x6"
333-FHF-004 333-FW-428-8"-12CG2T01-NI
8"x4" 333-FW-411-4"-12CG2T01-NI 12"x8"
3/4" D NOTE 13 REFERENCE DRAWINGS
12" 8"x4"
333 BY VENDOR
PRV D 3/4" NOTE 12 NOTE 18
NOTE 12
+

NC BY VENDOR NC
0001
AG

UG
3"
D-320-02A 333-FW-429-8"-12CG2T01-NI 3"
000 16 Sept 20 ISSUED FOR CONSTRUCTION BSN MJB ADN
333 333-ARV-001 333-ARV-025
I 333-FW-054-12"-12CG2T01-NI 333-FW-055-12"-12CG2T01-NI PRV
+ REV DATE DESCRIPTION DRAWN CHK'D APP'D
I
000 BUNDWALL
P

0002 THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR
16"x12" TST 16"x12" 333 THE MATERIAL DESCRIBED THEREON MY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO
12" 18" TST NOTE 19 NOTE 19 TP
333-FHF-006 006 THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES,
NOTE 3 005 333-SP 052 OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN
333-SP
ANY MANNER EXCEPT AS EXPRESSLY PERMITTED BY PT PERTAMINA (PERSERO)

16"x12" 12CG2T01 16"x12"


12LC2T21 12LC2T01 12CG2T01 333
AG

333-FHF-008 NOTE 13
12LC2T01 PG 2" 2" PROJECT:
UG

UG AG 12LC2T01 NOTE 7
12" 333-FHF-010 12" NOTE 7 0001

18"x16" AG AG 333-FW-128-12"-12LC2T01-NI 333-FW-008-16"-12LC2T01-NI 333-FW-131-12"-12LC2T01-NI NO RDMP RU V BALIKPAPAN


UG UG LO LO
333-FW-006-16"-12LC2T21-NI 333-FW-006-16"-12LC2T21-NI
CONTRACTOR:
LONO
UG
J 6"x4" UG AG
333 RDMP BALIKPAPAN JO J

NOTE 6
NOTE 3 AG
P

AG UG 16" TP
16" CONT. LEGENDS 054
333-FHF-013 NOTE 3 UG AG
6" SYMBOL DESCRIPTION QTY SIZE OWNER:
6"
333-FW-005-16"-12LC2T21-NI
333-FW-004-16"-12LC2T21-NI 333-FHF-014
12"
333-FW-009-4"-12LC2T01-NI 16" PT. PERTAMINA
6"
6" AIR RELEASE VALVE 6 2" BALIKPAPAN, INDONESIA

FIRE WATER HEADER


TO/FROM FIRE WATER

TO/FROM FIRE WATER

TO/FROM EXISTING
FIRE WATER

HEADER

FIRE WATER

HEADER

FIRE WATER
333-FHF-011 PERTAMINA
12857

12856

12848
TITLE:
4"x1-1/2" 4"x1-1/2" TEST BLOCK DIAGRAM
PRESSURE REGULATOR VALVE 6 12" REKIND FIRE WATER SYSTEM
M6-333-00002

M6-333-00002

VENDOR
K RFCC FEED TANK COOLING WATER, K
333-HR-036 333-HR-037

-
10
10"(2), 12"(4) UTILITY BOILER & STEAM GENERATION
BUTTERFLY VALVE 8"(4) CONT. REFERENCE DRAWING PERTAMINA DRAWING NO. REV.
26071-100-U1C-000-10001 HYDRAULIC CALCULATION REPORT FOR FIRE WATER SYSTEM NONE 26071 26071-TB-333-AG-FW-0001 /
G-320-21A/B 000
SCALE JOB NO. DOCUMENT NO. SHT NO.
A1 (841X594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
LINE LIST
Volume
Length Volume Temperature Temperature Design Test Press Test
Test Package Iso Drawing Line No PID Dia (in) Total TEST
(m) (m3) (m3)
Operation © Design © (kg/cm2[g]) (kg/cm2[g])

333TIE-FW-001-01 333-FW-001-16"-12LC2T01-NI 26071-203-M6-333-00001 16.00 0.61 0.08 37.00 65 17 25.5 HYDROTEST


333TIE-FW-006-01 333-FW-006-16"-12LC2T01-NI 26071-203-M6-333-00001 16.00 0.61 0.08 37.00 65 17 25.5 HYDROTEST
333-AG-FW-0001 333TIE-FW-007-01 333-FW-007-16"-12LC2T01-NI 26071-203-M6-333-00001 16.00 0.61 0.08 0.4 37.00 65 17 25.5 HYDROTEST
333TIE-FW-008-01 333-FW-008-16"-12LC2T01-NI 26071-203-M6-333-00001 16.00 0.61 0.08 37.00 65 17 25.5 HYDROTEST
333TIE-FW-070-01 333-FW-070-16"-12LC2T01-NI 26071-203-M6-333-00001 16.00 0.61 0.08 37.00 65 17 25.5 HYDROTEST

Inspection by Subcontractor Contractor IPMT


Name

signature

Date
PIPING WORK PACKAGE # 8 EARLY TANK

SPOOL DRAWING LIST


333-AG-FW-0001
NO. SPOOL DWG NO : SHEET REV LINE NO :
1 333TIE-FW-001-01 1 0 333-FW-001-16"-12LC2T01-NI
2 333TIE-FW-006-01 1 0 333-FW-006-16"-12LC2T01-NI
3 333TIE-FW-007-01 1 0 333-FW-007-16"-12LC2T01-NI
4 333TIE-FW-008-01 1 0 333-FW-008-16"-12LC2T01-NI
5 333TIE-FW-070-01 1 0 333-FW-070-16"-12LC2T01-NI
ISO DWG NO. SHT REV. BILL OF MATERIALS

N SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS

1 RED TEE, CS A234-WPB-SMLS CEMENT LINED 16X12 I110745569 1 12LC2T01


BE B16.9 per AWWA C205 NORMALIZED S-STD
x S-STD
2 WN FLG, CS A105 FF B16.5 CL150 CEMENTED 12 I112374144 1 12LC2T01
LINED per AWWA C205 NORMALIZED S-STD

CONT. ON
333U01-FW-001
SHT:01
E 2620.163M
N 3080.692M

356
EL +100.266M

5
SPINDLE EAST

1 E 2620.468M

408
N 3080.692M
EL +99.499M

234 333
TP
12"NS 1 50B
333TIE-FW-001-01-SPL001
16X12"NS
E 2619.858M EL +99.499M
N 3080.692M FIELD MATERIALS
EL +99.499M
PT SIZE MATERIAL MAT'L
305 NO DESCRIPTION (IN) CODE QTY CLASS

333 305 3 GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 12 I122047719 1 12LC2T01
TP FULL FACE FOR CEMENT LINED
050A 4 BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 7/8 I145555240 12 12LC2T01
GR B7 W/A194 GR 2H PTFE COATED
B18.31.2/B18.2.2 W/2 WASHER, 140MM BOLT
LENGTH
5 (VG1DF301) GATE VA FLGD, DI A536 GR. 12 I135414567 1 12LC2T01
65-45-12 EPDM TRIM - DI + EPDM CL150 FF
FP RESILIENT WEDGE BB IS-NRS AWWA-C515
B16.42 EPOXY LINED & COATED HW

CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2 WELD NO N.S WELD TYPE WELD CAT WELD LOC
1 12" BW SHOP 2-1

LEGEND
00 SHOP WELD

00 FIELD WELD

00 SHOP THD.

00 FIELD THD.
PREP BM
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
<00> CUT PIECES NO. DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
CHKD KWN OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
00 MATERIAL NO. BY PT PERTAMINA (PERSERO).
DATE PROJECT
00 SPOOL NO.
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
ISSUED FOR CONSTRUCTION KWN Ai/STN IP AREA NO. UNIT NO. SUB-UNIT NO. CA NO.
P&ID NO. LINE NO.
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. ISO DWG NO. SHT REV.
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
ISO DWG NO. SHT REV. BILL OF MATERIALS

N SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS

1 TEE, CS A234-WPB-SMLS CEMENT LINED BE 16X16 I110681969 1 12LC2T01


B16.9 per AWWA C205 NORMALIZED S-STD
2 WN FLG, CS A105 FF B16.5 CL150 CEMENTED 16 I112374211 1 12LC2T01
LINED per AWWA C205 NORMALIZED S-STD

5
CONT. ON
SPINDLE EAST
333U01-FW-006
ORIENT HANDLE NORTH

406
SHT:01
E 2221.400M
N 3077.746M
EL +99.588M
1

430
E 2221.705M
N 3077.746M
234 EL +98.749M

333
333TIE-FW-006-01-SPL001 16"NS 1 TP
054B
16X16"NS
333
TP EL +98.749M
054A FIELD MATERIALS

PT SIZE MATERIAL MAT'L


E 2221.095M 305 NO DESCRIPTION (IN) CODE QTY CLASS
N 3077.746M
305 3 GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 I122047721 1 12LC2T01
EL +98.749M
FULL FACE FOR CEMENT LINED
4 BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 I119784463 16 12LC2T01
GR B7 W/A194 GR 2H PTFE COATED
B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT
LENGTH
5 (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 I135426988 1 12LC2T01
65-45-12 EPDM TRIM - DI + EPDM CL150 FF
FP RESILIENT WEDGE BB IS-NRS AWWA-C515
B16.42 EPOXY LINED & COATED GO

CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2 WELD NO N.S WELD TYPE WELD CAT WELD LOC
1 16" BW SHOP 2-1

LEGEND
00 SHOP WELD

00 FIELD WELD

00 SHOP THD.

00 FIELD THD.
PREP BM
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
<00> CUT PIECES NO. DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
CHKD KWN OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
00 MATERIAL NO. BY PT PERTAMINA (PERSERO).
DATE PROJECT
00 SPOOL NO.
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
ISSUED FOR CONSTRUCTION KWN Ai/STN IP AREA NO. UNIT NO. SUB-UNIT NO. CA NO.
P&ID NO. LINE NO.
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. ISO DWG NO. SHT REV.
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
ISO DWG NO. SHT REV. BILL OF MATERIALS

N SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS

1 TEE, CS A234-WPB-SMLS CEMENT LINED BE 16X16 I110681969 1 12LC2T01


B16.9 per AWWA C205 NORMALIZED S-STD
2 WN FLG, CS A105 FF B16.5 CL150 CEMENTED 16 I112374211 1 12LC2T01
LINED per AWWA C205 NORMALIZED S-STD

CONT. ON
333A01-FW-007 5
SPINDLE WEST
SHT:06
ORIENT HANDLE NORTH

406
E 2247.105M
N 3077.748M
EL +99.428M

430
E 2247.410M
N 3077.748M
234 EL +98.589M

333
333TIE-FW-007-01-SPL001 16"NS 1 TP
052B
16X16"NS
333 EL +98.589M
TP
FIELD MATERIALS
052A
PT SIZE MATERIAL MAT'L
E 2246.800M 305 NO DESCRIPTION (IN) CODE QTY CLASS
N 3077.748M
305 3 GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 I122047721 1 12LC2T01
EL +98.589M
FULL FACE FOR CEMENT LINED
4 BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 I119784463 16 12LC2T01
GR B7 W/A194 GR 2H PTFE COATED
B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT
LENGTH
5 (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 I135426988 1 12LC2T01
65-45-12 EPDM TRIM - DI + EPDM CL150 FF
FP RESILIENT WEDGE BB IS-NRS AWWA-C515
B16.42 EPOXY LINED & COATED GO

CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2 WELD NO N.S WELD TYPE WELD CAT WELD LOC
1 16" BW SHOP 2-1

LEGEND
00 SHOP WELD

00 FIELD WELD

00 SHOP THD.

00 FIELD THD.
PREP BM
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
<00> CUT PIECES NO. DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
CHKD KWN OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
00 MATERIAL NO. BY PT PERTAMINA (PERSERO).
DATE PROJECT
00 SPOOL NO.
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
ISSUED FOR CONSTRUCTION KWN Ai/STN IP AREA NO. UNIT NO. SUB-UNIT NO. CA NO.
P&ID NO. LINE NO.
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. ISO DWG NO. SHT REV.
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
ISO DWG NO. SHT REV. BILL OF MATERIALS

N SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS

1 TEE, CS A234-WPB-SMLS CEMENT LINED BE 16X16 I110681969 1 12LC2T01


B16.9 per AWWA C205 NORMALIZED S-STD
2 WN FLG, CS A105 FF B16.5 CL150 CEMENTED 16 I112374211 1 12LC2T01
LINED per AWWA C205 NORMALIZED S-STD

CONT. ON
333A01-FW-008 5
SPINDLE WEST
SHT:06
ORIENT HANDLE NORTH

406
E 2552.902M
N 3078.543M
EL +100.099M

430
E 2553.207M
N 3078.543M
EL +99.259M
234 333
16"NS TP
1 053B
333TIE-FW-008-01-SPL001
16X16"NS
E 2552.597M EL +99.259M
N 3078.543M FIELD MATERIALS
EL +99.259M
PT SIZE MATERIAL MAT'L
305 NO DESCRIPTION (IN) CODE QTY CLASS
333
TP 305 3 GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 I122047721 1 12LC2T01
053A FULL FACE FOR CEMENT LINED
4 BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 I119784463 16 12LC2T01
GR B7 W/A194 GR 2H PTFE COATED
B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT
LENGTH
5 (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 I135426988 1 12LC2T01
65-45-12 EPDM TRIM - DI + EPDM CL150 FF
FP RESILIENT WEDGE BB IS-NRS AWWA-C515
B16.42 EPOXY LINED & COATED GO

CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2 WELD NO N.S WELD TYPE WELD CAT WELD LOC
1 16" BW SHOP 2-1

LEGEND
00 SHOP WELD

00 FIELD WELD

00 SHOP THD.

00 FIELD THD.
PREP BM
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
<00> CUT PIECES NO. DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
CHKD KWN OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
00 MATERIAL NO. BY PT PERTAMINA (PERSERO).
DATE PROJECT
00 SPOOL NO.
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
ISSUED FOR CONSTRUCTION KWN Ai/STN IP AREA NO. UNIT NO. SUB-UNIT NO. CA NO.
P&ID NO. LINE NO.
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. ISO DWG NO. SHT REV.
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
ISO DWG NO. SHT REV. BILL OF MATERIALS

N SHOP MATERIALS

PT SIZE MATERIAL MAT'L


NO DESCRIPTION (IN) CODE QTY CLASS

1 TEE, CS A234-WPB-SMLS CEMENT LINED BE 16X16 I110681969 1 12LC2T01


B16.9 per AWWA C205 NORMALIZED S-STD
2 WN FLG, CS A105 FF B16.5 CL150 CEMENTED 16 I112374211 1 12LC2T01
LINED per AWWA C205 NORMALIZED S-STD

CONT. ON
333A01-FW-070 5
SPINDLE WEST
SHT:08
ORIENT HANDLE NORTH

406
E 2343.161M
N 3077.755M
EL +99.941M

430
E 2343.466M
N 3077.755M
EL +99.101M
234 333
16"NS TP
1 051B
333TIE-FW-070-01-SPL001
16X16"NS
E 2342.856M EL +99.101M
N 3077.755M FIELD MATERIALS
EL +99.101M
PT SIZE MATERIAL MAT'L
305 NO DESCRIPTION (IN) CODE QTY CLASS
333
TP 305 3 GSKT, NEOPRENE FF B16.21 CL150 3.2MM THK 16 I122047721 1 12LC2T01
051A FULL FACE FOR CEMENT LINED
4 BOLT/NUTS, STUD BOLT W/H HEX NUT AS A193 1 I119784463 16 12LC2T01
GR B7 W/A194 GR 2H PTFE COATED
B18.31.2/B18.2.2 W/2 WASHER, 160MM BOLT
LENGTH
5 (VG1DF301G) GATE VA FLGD, DI A536 GR. 16 I135426988 1 12LC2T01
65-45-12 EPDM TRIM - DI + EPDM CL150 FF
FP RESILIENT WEDGE BB IS-NRS AWWA-C515
B16.42 EPOXY LINED & COATED GO

CUT PIECES NO. N.S LENGTH (mm) END PREP. 1 END PREP. 2 WELD NO N.S WELD TYPE WELD CAT WELD LOC
1 16" BW SHOP 2-1

LEGEND
00 SHOP WELD

00 FIELD WELD

00 SHOP THD.

00 FIELD THD.
PREP BM
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
<00> CUT PIECES NO. DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
CHKD KWN OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
00 MATERIAL NO. BY PT PERTAMINA (PERSERO).
DATE PROJECT
00 SPOOL NO.
RDMP RU V BALIKPAPAN
OPER. DESIGN TEST INSULATION CONTRACTOR
NPS MAT'L PAINT
PRESS. TEMP. PRESS. TEMP. PRESS. PWHT NDE
CLASS
(kg/cm2[g]) (° C) (kg/cm2[g]) (° C) (kg/cm2[g]) TYPE CODE TH'K (mm) CODE
RDMP BALIKPAPAN JO
OWNER
PT PERTAMINA
BALIKPAPAN, INDONESIA
ISSUED FOR CONSTRUCTION KWN Ai/STN IP AREA NO. UNIT NO. SUB-UNIT NO. CA NO.
P&ID NO. LINE NO.
REV. DATE DESCRIPTION DRAWN CHECK'D APPR'D
STRESS PKG. NO. ISO DWG NO. SHT REV.
ISOMETRIC ID : EXTRACTION DATE :
SUB SYSTEM NO : EXTRACTION NO : TOTAL SHEET :
PIPING WORK PACKAGE #8 EARLY TANK

OWNER : PT PERTAMINA
PROJECT TITLE : Piping Work Package #8 Early Tank
JOB NO. : 26071
AREA/UNIT/SECTION : 9
TEST PACKAGE NO. : 333-AG-FW-0001
NDT REQUIREMENT : 5%

SUMMARY NDT RECORD

SUMMARY

1. TOTAL JOINT BUTT WELD : JOINT


2. TOTAL JOINT SOCKET WELD : JOINT
3. TOTAL JOINT THREADED : JOINT
4. TOTAL JOINT RT : JOINT
5. TOTAL JOINT PAUT : JOINT
6. TOTAL JOINT PT : JOINT
7. TOTAL JOINT PWHT : JOINT
8. TOTAL JOINT HARDNESS TEST : JOINT
9. TOTAL JOINT PMI TEST : JOINT

YES NO
NDT RELEASED :

PREPARED BY, REVIEWED BY, APPROVED BY,


SUBCONTRACTOR CONTRACTOR OWNER

DATE : DATE : DATE :


WELDING HISTORY SHEET

Project : Piping Work Package #8 Early Tank Subcon : PT. Yasa Industri Nusantara Date :
Report No : Location :
Paint Hard Remark
No Area ISO DWG Rev Spool No Size Class code Joint No Report No. NDE PWHT ness PMI Paint

1 333TIE-FW-001-01 0
2 333TIE-FW-006-01 0
3 333TIE-FW-007-01 0
4 333TIE-FW-008-01 0
5 333TIE-FW-070-01 0

Inspection by Issued by Received by Approved by


Name
Signature
Date
ITR-PI-004
PUNCH LIST

Project : Piping Work Package #8 Early Tank Package No : 333-AG-FW-0001 Test Type : Hydrotest

No ISO DWG Description Category Issue by Issue Date Clear Date Sub-con Contractor Owner Remark

1 333TIE-FW-001-01

2 333TIE-FW-006-01

3 333TIE-FW-007-01

4 333TIE-FW-008-01

5 333TIE-FW-070-01

Category Legend : A – Before Test B – After Test

ITR-PI-008
PIPING WORK PACKAGE #8 EARLY TANK

PRE-TEST CHECKLIST

PIPING (BEFORE PRESSURE TEST)

OWNER : PT. PERTAMINA TEST PACKAGE NO. : 333-AG-FW-0001


SERVICE NAME : FIRE WATER AND FOAM :
REF. DWG. NO. :
UNIT : 333 P&ID DWG. NO. : 26071-203-M6-333-00001
: :
:

No. Description ACC REJ NA Comments


1 Check system complies with P&ID's and isometrics.
2 Check that all NDT / Stress relieving requirements as per
specification have been met and recorded and all welded
attachments installed.
3 Check that correct bolts and gaskets are installed at all
mechanical joints.
4 Check that all vents and drains are installed (Add
temporary vents and drains for testing as required).
5 Check piping for correct schedule and type and ratings of
forged steel fittings and reinforcement is correct.
6 Check valve materials, use spec. ref. in piping material
specification, tags and nameplates.
7 Check that all pressure connections are installed correctly
as per specification and all thermowells are installed.

8 Check for correct direction of flow through filters and


strainers, traps, check valves, globe valves and control
valves.
9 Check orifice valve tap orientation and that taps and
plugs have been seal welded and unused tapped holes
area plugged and welded.
10 Check that instrument connections installed and any
delicate in line instrument excluded from test.
11 Check all pipe supports are correctly installed - all
temporary pipe supports removed and any additional
suports fitted.
12 Check all relief valves, bursting discs and specified
control valves have been removed.
13 Check that gags on spring supports and expansion joints
are in position.
14 Check that all chainwheels and extended spindles and
locking devices required for specified valves have been
installed.
15 Check that there is no spring in pipework affecting
pumps and vessel.
16 Check that all sprinkler heads, rosettes and nozzles have
been removed and connections plugged.

Note : (Tick as Applicable), ACC = Acceptable REJ = Rejected


NA = Not Applicable

Prepare by Checked by Approved by Reviewed/Witnessed by


Name: Name: Name: Name:

Date: Date: Date: Date:


Subcontractor Construction Contractor Owner
Doc. No. : 26071-203-V21A-000-00064

Job No. : 26071 Rev.000

RESULT OF WATER TEST


FOR HYDROTEST

PROJECT : Engineering, Procurement and Construction (EPC) Inside


Battery Limits (ISBL) and Outside Battery Limits (OSBL) for
the Refinery Development Master Plan (RDMP) Project
RU V Balikpapan
LOCATION : Refinery Unit V Balikpapan, East Kalimantan,Indonesia
OWNER : PT PERTAMINA (Persero)
PO NO. : 26071-203-HCA-PP00-00021

000 10-Jun-2020 ISSUED FOR INFORMATION RENDY MUJIB AHDAN B.

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

PT.YASA INDUSTRI NUSANTARA


Doc. No. : 26071-203-V21A-000-00064

Job No. : 26071 Rev.000

REVISION LOG

REV. NO. DATE PAGE DESCRIPTION

000 10-Jun-2020 - ISSUED FOR INFORMATION


PRESSURE TEST REPORT

Piping Work Package #8 Early


Project : Package No : 333-AG-FW-0001
Tank

Subcon : PT. Yasa Industri Nusantara System No : 333

Area : Sub-system No : 333-0001

Pressure Gauge Details Type of Test


Instrument Instrument No. Calibrated On Calibration Due Date Hydrostatic
Gauge No.1 Pneumatic
Gauge No.2 In-Service
Gauge No.3 Visual
Others Other ( )
Test Pressure Test Medium Holding Time (Required time: )
Design Test Start Time Date Finish Time Date

No ISO DWG No P-Partial / F-Full Remark


1 333TIE-FW-001-01
2 333TIE-FW-006-01
3 333TIE-FW-007-01
4 333TIE-FW-008-01
5 333TIE-FW-070-01

For detail guidance to control of pressure gauge, refer to 26071-100-GQI-GAQ-00004 Inspection, Measuring and testing
Equipment Control Procedure.

Inspection Result : □ Accept □ Reject

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date
Form No. : ITR-PI-009
DRYING REPORT

Piping Work Package #8 Early


Project : Package No : 333-AG-FW-0001
Tank

Date : System No : 333

Area : Sub-system No : 333-0001

Drying Method

Dry Air Dry Gas Vacuum Drying Others

Data

Test Medium Test Date

Inspection Result : □ Accept □ Reject

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date

Form No. : ITR-PI-010


LINE REINSTATEMENT REPORT

Piping Work Package #8 Early


Project : Package No : 333-AG-FW-0001
Tank

Date : System No : 333

Area : Sub-system No : 333-0001

No Description Accept Reject N/A Remark

1 Drain & Drying completed

2 Gasket & Bolts Installed

3 All Instruments and valves reinstalled

4 Temporary blind flanges removed

5 Temporary pipes removed

6 Test gauges and fitting removed

7 Blind flanges Installed as per latest P&ID

8 Bolt torqueing done

9 Spring supports adjusted to cold position

10 Vents and drains plugged as specified

11 Conformance with final P&ID ensured


Filters, strainers, traps, check valves, globe valves
12 & control valves Installed for correct flow and
orientation
13

14

15

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date

Form No. : ITR-PI-011


FLANGE JOINT

Piping Work Package #8 Early


Project : Report No :
Tank

Package No : 333-AG-FW-0001 Date :

Area : System No : 333

Gasket / Flange Bolt Tightening


No ISO DWG Rev Joint Remarks
Req. Act.
Type Size Rating Sign
Value Value
1 333TIE-FW-001-01 0
2 333TIE-FW-006-01 0
3 333TIE-FW-007-01 0
4 333TIE-FW-008-01 0
5 333TIE-FW-070-01 0

Note:

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date

Form No. : ITR-PI-006


ORIFICE FLANGE INSIDE INSPECTION REPORT

Piping Work Package #8 Early


Project : Report No :
Tank

Package No : 333-AG-FW-0001 Date :

Area : System No : 333

Result
No ISO DWG Rev Joint Tag No Size Remark
ACC REJ

1 333TIE-FW-001-01 0
2 333TIE-FW-006-01 0
3 333TIE-FW-007-01 0
4 333TIE-FW-008-01 0
5 333TIE-FW-070-01 0

Inspection by Subcontractor Contractor (QC) IPMT

Name

Signature

Date
Form No. : ITR-PI-003
F-NDT-006
PT RADIANT UTAMA INTERINSCO Tbk

LIQUID PENETRANT EXAMINATION REPORT

CLIENT : REPORT NO. :


JOB : DATE :
LOCATION : SHEET NO. : of

ITEM NO. : MATERIAL : S O P NO. :


LINE/DWG NO. : TEMP. : CRITERION :

SURFACE PREPARATION : AS - WELDED AS - ROLLED AS - FORGED


GRINDING MACHINING AS - CAST

STAGE OF EXAMINATION : BEFORE/AFTER PWHT BEFORE/AFTER LOAD TEST AFTER WELDED

TECHNIQUE TYPE

COLOR CONTRAST FLUORESCENT SOLVENT REMOVAL

MATERIALS PRODUCT MANUFACTURER DWELL TIME

CLEANER : PENETRANT : MINUTES


PENETRANT : DEVELOPER : MINUTES
DEVELOPER :

PENETRANT APPLICATION BLACK LIGHT INTENSITY : W/cm²


LIGHT INTENSITY : Lux
SPRAYING BRUSHING LIGHTMETER S/N :

PART SIZE (mm) RESULT PART SIZE (mm) RESULT


WELDER IND. WELDER IND.
OR OR
STAMP NO. STAMP NO.
WELD ROUNDED LINEAR ACC REJ WELD ROUNDED LINEAR ACC REJ

EXAMINER QA/QC INSPECTOR AUTHORIZED INSPECTOR CLIENT'S REP.

DATE : DATE : DATE : DATE :