Project: DUNGQUAT REFINERY (DQR) PROJECT Quality Control Form: QCF304
Client: VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) Report No.: Project No.: 8474L Date: Drawing No.: Page: Line No.: MPI Method : Material Type : Procedure No.: Acceptance Poles Spacing : Standard : Equipment Magnetic Current: Surface Condition : Serial No.: Magnetic Particle: Background: Date of inspection :
Stage of Examination: Prepared Edge After Repair Before/After P.W.H.T
As Welded As Rolled Before/After Hydro Test
Weld No./ Type of Defect Defect Result No. Size/ Length Welder No. Interpretation material Identification Defect Location length ACC/REJ
SKETTCH
NOTE: ACC : Accepted REJ : Rejected
C : Crack U: Undercut LP : Lack of Penetration
CP : Cluster Porosity CR: Crater crack P : Porosity LF: Lack of Fusion OL: Overlap SI : Slag Inclusion