Professional Documents
Culture Documents
Document number: R U C P 2 H I B 0 0 0 D O C E H T L M Q 1 3 1 7 A
Internal Document number: QC2-HI-1317
Transmitter : Contractor/CP2 Type of Document: MQ
CONTRACTOR: CONSULANT:
MODIFICATIONS TABLE
Abbreviations:-
Date 18/02/23
Internal Nº QC2-HI-1317
Page 4 of page 5
Quality Assurance Plan (QAP) for Insulators,Clamp Connectors
SR. ITEM /COMPONENTS NATURE OF QUANTUM REFERENCE / ACCEPTANCE RECORD INSPECTION AGENCY REMARKS
NO. AND CHARACTERISTICS CHECKS OF CHECKS DOCUMENTS / NORMS FORMAT Perform Witness Verify
Electromechanical load Electro/ As per IEC IEC 60383 / Approved docu- JIR V HIN Client
2.4
test mechanical ments
2.5 Puncture test As per IEC IEC 60383 / Approved docu- JIR V HIN Client
Electrical
(if applicable) ments
2.6 Porosity test As per IEC IEC 60383 / Approved docu- JIR V HIN Client
Mechanical
(if applicable) ments
2.7 As per IEC IEC 60383 / Approved docu- JIR V HIN Client
Galvanizing test Galvanizing
ments
2.8 As per IEC IEC 60383 / Approved docu- JIR V HIN Client
Test as locking system Mechanical
ments
C FINAL STAGE TEST ON CLAMP AND CONNECTORS
1 ROUTINE TEST
Physical examination Visual As per Approved drawings, TC V Client
1.1 standard BS :159/IS 5561 & HIN
Verifications of Measurement As per Approved drawings, TC V Client
1.2
dimensions standard BS :159/IS 5561 & HIN
Proof load test Mechanical As per Approved drawings, TC V Client
1.3
standard BS :159/IS 5561 & HIN
Date 18/02/23
Internal Nº QC2-HI-1317
Page 5 of page 5