Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : E-242 VALVE INSTALLATION Scope of Work : E-242 Valve Installation

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

Page 1 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : E-242 VALVE INSTALLATION Scope of Work : E-242 Valve Installation

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

1.0 Drawings Approved Drawings Issued by QSGTL


2.0 Procedure Review : To Verify base and Filler MADINA/QSGTL MADINA/QSGTL MADINA/QSGTL Supervisor/
(WPS/PQR/WPQR) material and thickness Approved WPS/Welder Approved WPS/Welder Approved WPS/Welder QC Inspector
WPS-78 Range ,preheat and Register/ASME Sec IX Register Register R R
interpass temperature

3.0 Material Control


3.1 Raw material Inspection : To Verify Correct size with Approved Approved Approved Supervisor/QC
QSGTL Free bill of material list and Drawings ,Welding Drawings ,Welding Drawings ,Welding Inspector
Issue Materials condition of Material Consumable Certificates Consumable Certificates Consumable
Welding Consumable Certificates H S
Supplied by Madina -
ER 70S6

4.0 Field Activities


4.1 Cut and removal of As per the approved As per the approved As per the approved As per the approved Fabricator/
Existing 6" ,8"pipe with Drawing. Drawing. Drawing. Drawing. Supervisor
Flange to provide space for H S
Valve Installation

4.2 Bevel Preparation and Bevel Preparation as per As per WPS,DEP As per WPS,DEP As Per WPS Supervisor/QC
Visual check of Existing WPS and absence of any 31.38.01.31-Gen 31.38.01.31-Gen Inspector
Pipe with Flange bevels surface defects during H S
visual check

4.3 Fit up of Pipe with Flange As per the approved ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
Drawing. Qualified Qualified (Form No. MSF- Inspector
Welders,WPS , Shell DEP Welders,WPS , Shell DEP 178)
31.38.01.31-Gen 31.38.01.31-Gen H S

Page 2 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : E-242 VALVE INSTALLATION Scope of Work : E-242 Valve Installation

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

4.4 Welding of Pipe with Welding parameters as per List of Qualified List of Qualified Daily welding report Supervisor/QC
Flange WPS,interpass cleaning, Welders,WPS, Welders,WPS, (Form No. MSF- Inspector
Interpass temperature. Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- 178) ,Weld History
Gen,API RP Gen,API RP Sheet H S
582,MG/QSP/MQP-03 582,MG/QSP/MQP-03

4.5 Visual & Dimensional Absence of any surface ASME B 31.3 ASME B 31.3 Daily welding report QC Inspector
Inspection on all defects & Dimension as per Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- MSF-178 H S
completed welds approved Drawing Gen. Gen.

PWHT and Hardness To verify thermocouple B 31.3 , Shell DEP B 31.3 , Shell DEP PWHT/Hardness Report Supervisor/QC
Testing of completed locations,rate of 30.10.16.18-Gen,QIS/ 30.10.16.18-Gen,QIS/ Inspector
welds cooling/rate of heating and NDT/PWHT-01,QIS/NDT/ NDT/PWHT-01,QIS/NDT/
Holding time at HT-01,WPS HT-01,WPS
temperature and hardness H R
values within the Range of
Specification

4.6 ASR RT-100% of all Butt Absence of any defects ASME SEC V ,B 31.3 , ASME SEC V ,B 31.3 , NDT Reports QC Inspector
Weld Joints Shell DEP 31.38.01.31- Shell DEP 31.38.01.31-
Gen,QIS /NDT/RT -01 Gen,QIS /NDT/RT -01 H R

5.0 Pressure Test of Spool.


5.1 Pressure testing of Any Drop in pressure As per Drawing As per Drawing Pressure Test QC Inspector H W/R
completed Spool Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- reports(MSF-44,MSF-
Gen.ASME Gen.ASME 45), Pressure gauge
B31.3,MG/QSP/MQP-01 B31.3,MG/QSP/MQP-01 calibration Report.

6.0 Surface preparation and Painting of welded joints - QSGTL Civil Scope
7.0 Completion of Scope of Work
7.1 Submission of final Dossier All welding,NDT, Contractual Final completion Final completion H R
Testing reports. requirements Reports. Reports.

Page 3 of 21
DOC NO.MG-QSP-ITP-90024703
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:20-Jun-11

Work pack No. : 090024703 Drawing /LineNo. : T-4.093.931/25579-06-QSH-RM


Area : FGP Unit-100 Equip.Tag.No : NA
Contract No : MDMSC-CPI-0952A Discipline : MECHANICAL

Scope of Work: E-242 VALVE INSTALLATION

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-90024703 Page 1 of 3


DOC NO.MG-QSP-ITP- 090064057
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-Nov-11

Work pack No. : 090064057 Drawing /LineNo. : 80-2PO40004-13012-QV-G


Area : FGP Unit-400 String-2 Equip.Tag.No : NA
Contract No : MDMSC-CPI-0952A Discipline : MECHANICAL

Scope of Work: Cut and Removal of Existing 3" Elbow and Installation & Testing of New Elbow with Flange

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-90064057 Page 1 of 2


DOC NO.MG-QSP-ITP- 090064057
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-Nov-11

Work pack No. : 090064057 Dr 80-2PO40004-13012-QV-G


Area : FGP Unit-400 String-2 Eq NA

Scope of Work: Cut and Removal of Existing 3" Elbow and Installation & Testing of New Elbow with Flange

Sl No Activity Reference Documents Verifying Documents MG QSGTL REMARKS

1 Design: QSGTL Approved Drawing R R

Procedure Review(WPS/PQR/WPQR) Madina /QSGTL Approved Madina/QSGTL Approved


2 R R
WPS- MG/QSP/WPS-20 WPS/Welder Register WPS/Welder Register

Materials:QSGTL Free issue Materials (To verify Correct Approved


Approved Drawings,Welding
3 Size with Bill of Materials list and condition of Materials) Drawings,Welding H S
Consumable Certificate(MTC)
Welding Consumable - ER 347 Consumable Certificate

4 Marking & Cutting of Existing 3" Elbow DEP 31.38.01.31 Para 3.2 As per Approved Drawing H S
Bevel Preparation & Fitup of new Elbow and Flange
Daily Welding Report
5 (FW-01,FW-02,FW-03) DEP 31.38.01.31 Para 3.2/3.3 H S
(MSF-178)
Welding of New 2" Pipe spool/Supports DEP 31.38.01.31 Para Daily Welding Report
6 H S
(FW-01,FW-02,FW-03) 3.2/3.3/MG/QSP/MQP-03 (MSF-178)
Daily Welding Report
7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S
(MSF-178)
QSGTL Scope for
8 100% PT and RT-1 No.Joint of Completed welds DEP 31.38.01.31 Para 4.2.3 NDT Reports W/R
Field NDT

Pressure Test reports


DEP 31.38.01.31 Para
9 Hydrotesting of pipe spool (MSF-44,MSF-45,Pressure H W/R
4.4/MG/QSP/MQP-01
Gauge Calibration Report

9 Painting of completed spool(if applicable)


QSGTL Civil Scope

Form No:MSF/011 Rev 0 MG-QSP-ITP-090064057 Page 2 of 2


10 As Built Documents and Records Contractual Requirements Final Completion Reports H R

Form No:MSF/011 Rev 0 MG-QSP-ITP-090064057 Page 2 of 2


DOC NO.MG-QSP-ITP-90024703
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:20-Jun-11

Work pack No. : 090024703 Drawing /LineNo. : T-4.093.931/25579-06-QSH-RM


Area : FGP Unit-100 Equip.Tag.No : NA
Contract No : MDMSC-CPI-0952A Discipline : MECHANICAL

Scope of Work: Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing
Flange Nippolet of 0P-0156A/B N2 connection
Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted
(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-90024703 Page 1 of 3


Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : Repair of Nipple Outlet 0P-0156A/B Scope of Work : Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing Flange Nippolet of 0P-0156A/B N2 connection.

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

Page 9 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : Repair of Nipple Outlet 0P-0156A/B Scope of Work : Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing Flange Nippolet of 0P-0156A/B N2 connection.

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

1.0 Design: QSGTL Approved Drawing


2.0 Procedure Review : To Verify base and Filler MADINA/QSGTL MADINA/QSGTL MADINA/QSGTL Supervisor/
(WPS/PQR/WPQR) material and thickness Approved WPD/Welder Approved WPD/Welder Approved WPD/Welder QC Inspector
WPS-78 Range ,preheat and Register/ASME Sec IX Register Register
interpass temperature R R

3.0 Material Control


3.1 Raw material Inspection : To Verify Correct size with Approved Approved Approved Supervisor/QC
QSGTL Free bill of material list and Drawings ,Welding Drawings ,Welding Drawings ,Welding Inspector
Issue Materials condition of Material Consumable Certificates Consumable Certificates Consumable
Welding Consumable Certificates H S
Supplied by Madina -
ER NiCrMo-3

4.0 Fabrication Activity


4.1 Cut and removal of As per the approved As per the approved As per the approved As per the approved Fabricator/
Existing 4 " pipe spool Drawing. Drawing. Drawing. Drawing. Supervisor
with flange nippolet H S

4.2 Bevel Preparation and DP Bevel Preparation as per As per As per DP Reports Supervisor/QC
check of Existing Pipe WPS and absence of any WPS/QIS/NDT/PT-01 WPS/QIS/NDT/PT-01 Inspector
spool bevels and Support surface defects during DP H S
pads check

4.3 Fit up of Pipe and Supports As per the approved ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
,RF Pads Drawing. Qualified Welders,WPS Qualified Welders,WPS (Form No. MSF- Inspector
178)
H S

Page 10 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : Repair of Nipple Outlet 0P-0156A/B Scope of Work : Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing Flange Nippolet of 0P-0156A/B N2 connection.

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

4.4 Welding of Pipe and Welding parameters as per ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
Supports/RF Pads. WPS,interpass cleaning, Qualified Welders,WPS, Qualified Welders,WPS, (Form No. MSF- Inspector
Interpass temperature. Shell DEP Shell DEP 178)
31.38.01.31-Gen,API RP 31.38.01.31-Gen,API RP H S
582 582

4.5 Visual & Dimensional Absence of any surface ASME B 31.3 ASME B 31.3 Daily welding report QC Inspector
Inspection on all defects & Dimension as per Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- MSF-178 H S
completed welds approved Drawing Gen. Gen.

4.6 RT-100% of all Butt Weld Absence of any defects ASME SEC V ,B 31.3 , ASME SEC V ,B 31.3 , NDT Reports QC Inspector
Joints Shell DEP 31.38.01.31- Shell DEP 31.38.01.31-
PT- 100% of all Gen,QIS NDT procedures Gen,QIS NDT procedures H R
completed welds

5.0 Pressure Test of Spool.


5.1 Pressure testing of Any Drop in pressure As per Drawing As per Drawing Pressure Test QC Inspector H W/R
completed Spool at Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- reports(MSF-44,MSF-
33 BarG. Gen.ASME Gen.ASME 45), Pressure gauge
B31.3,MG/QSP/MQP-01 B31.3,MG/QSP/MQP-01 calibration Report.

6.0 Surface preparation and Painting of Spool


6.1 Surface preparation & The Surface roughness As per Drawing, As per Drawing, As per Drawing, Painting H R
Primer coat as per LS1-N profile,abrasive Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Supervisor/QC
System. types,surface Gen. Gen. Gen. Inspector
cleanliness.Surface
temperature,humidity,Man
ufacture Data sheet.

6.2 Final Coat as per LS1-N Surface As per Drawing, As per Drawing, As per Drawing, Painting H R
System. temperature,humidity, Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Supervisor/QC
WFT,DFT,Manufacture Data Gen. Gen. Gen. Inspector
sheet.

7.0 Completion of Scope of Work

Page 11 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0

Client: Pearl GTL Clients Ref:MDMSC-CPI-0952A


PROJECT : Repair of Nipple Outlet 0P-0156A/B Scope of Work : Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing Flange Nippolet of 0P-0156A/B N2 connection.

Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified

7.1 Submission of final Dossier All welding,NDT, Contractual Final completion Final completion H R
Testing reports. requirements Reports. Reports.

Page 12 of 21
DOC NO.MG-QSP-ITP- 090062918
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:15-Nov-11

Work pack No. : 090062918 Drawing /LineNo. : 50-OPO43003-13012-G


Area : FGP Unit-400 String-3 Equip.Tag.No : NA

Scope of Work: Cut and Removal of Existing 2" Pipe spool and Fabrication and Testing of New Spool

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-090062918 Page 1 of 2


DOC NO.MG-QSP-ITP- 090062918
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:15-Nov-11

Work pack No. : 090062918 Dr 50-OPO43003-13012-G


Area : FGP Unit-400 String-3 Eq NA

Scope of Work: Cut and Removal of Existing 2" Pipe spool and Fabrication and Testing of New Spool

Sl No Activity Reference Documents Verifying Documents MG QSGTL REMARKS

1 Design: QSGTL Approved Drawing R R


Madina/QSGTL
Procedure Review(WPS/PQR/WPQR) Madina /QSGTL Approved
2 Approved WPS/Welder R R
WPS- MG/QSP/WPS-20 WPS/Welder Register
Register
Materials:QSGTL Free issue Materials (To verify Correct Approved
Approved Drawings,Welding
3 Size with Bill of Materials list and condition of Materials) Drawings,Welding H S
Consumable Certificate(MTC)
Welding Consumable - ER 347 Consumable Certificate

As per Approved
4 Marking & Cutting of Existing 2" Pipe spool DEP 31.38.01.31 Para 3.2 H S
Drawing
Bevel Preparation & Fitup of new pipe spool/Supports
Daily Welding Report
5 (FW-01,FW-02,FW- DEP 31.38.01.31 Para 3.2/3.3 H S
(MSF-178)
03,FW-04)
Welding of New 2" Pipe spool/Supports DEP 31.38.01.31 Para Daily Welding Report
6 H S
(FW-01,FW-02,FW-03,FW-04) 3.2/3.3/MG/QSP/MQP-03 (MSF-178)
Daily Welding Report
7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S
(MSF-178)
QSGTL Scope for
8 100% PT and RT-1 No.Joint of Completed welds DEP 31.38.01.31 Para 4.2.3 NDT Reports W/R
Field NDT

Pressure Test reports


DEP 31.38.01.31 Para (MSF-44,MSF- Testing to be done
9 Hydrotesting of pipe spool at 5.25 barg H W/R
4.4/MG/QSP/MQP-01 45,Pressure Gauge with DM water
Calibration Report

9 Painting of completed spool(if applicable)


QSGTL Civil Scope

Form No:MSF/011 Rev 0 MG-QSP-ITP-090062918 Page 2 of 2


10 As Built Documents and Records Contractual Requirements Final Completion Reports H R

Form No:MSF/011 Rev 0 MG-QSP-ITP-090062918 Page 2 of 2


DOC NO.MG-QSP-ITP- 090035074
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-Sep-11

Work pack No. : 090035074 Drawing /LineNo. 25-OSO-30451-1101-G


Area : FGP Unit-300 Equip.Tag.No NA

Scope of Work: Destruct Existing 1" SW Equal Tee and Welding of 1" new butt weld tee on steam leak location near OT-0300A West side

Sl No Activity Reference Documents MG QSGTL REMARKS

1 Design: QSGTL Approved Drawing R R

Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91

Materials:QSGTL Free issue Materials (To verify Correct


Approved Drawings,Welding Consumable
3 Size with Bill of Materials list and condition of Materials) H S
Certificate(MTC)
Welding Consumable - ER 70S6

4 Marking & Cutting of Existing 1" SW Equal Tee DEP 31.38.01.31 Para 3.2 H S

Bevel Preparation & Fitup


5 DEP 31.38.01.31 Para 3.2/3.3 H S
(FW-01,FW-02,FW-03)
Welding of Butt Joints
6 DEP 31.38.01.31 Para 3.2/3.3 H S
(FW-01,FW-02,FW-03)

7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S

8 Service Test DEP 31.38.01.31 Para 4.4 H W/R

9 Painting & Insulation


QSGTL Civil Scope

10 As Built Documents and Records H R

Form No:MSF/011 Rev 0 MG-QSP-ITP-090034739 Page 2 of 2


DOC NO.MG-QSP-ITP- 090034739
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-SEP-11

Work pack No. : 090034739 Drawing /LineNo. 20-ISO-10844-11011-G


Area : FGP Unit-600 Equip.Tag.No NA

Scope of Work: Repair Weld Leak on 3/4" Steam Line 20-OSO-10844-11011-G at Common Pipe Rack Near UNIT -600(OSBL)

Sl No Activity Reference Documents MG QSGTL REMARKS

1 Design: QSGTL Approved Drawing R R

Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91

Materials:QSGTL Free issue Materials (To verify Correct


Approved Drawings,Welding Consumable
3 Size with Bill of Materials list and condition of Materials) H S
Certificate(MTC)
Welding Consumable - ER 70S6

4 Marking & Cutting of Existing 3/4" SW Coupling DEP 31.38.01.31 Para 3.2 H S

5 Fitup of New 3/4" coupling with pupe DEP 31.38.01.31 Para 3.2/3.3 H S

Welding of New 3/4" SW Coupling with Pipe


6 DEP 31.38.01.31 Para 3.2/3.3 H S

7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S

8 Service Test DEP 31.38.01.31 Para 4.4 H W/R

9 Painting & Insulation


QSGTL Civil Scope

10 As Built Documents and Records H R

Form No:MSF/011 Rev 0 MG-QSP-ITP-090034739 Page 2 of 2


DOC NO.MG-QSP-ITP- 090035074
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-Sep-11

Work pack No. : 090035074 Drawing /LineNo. : 25-OSO-30451-1101-G


Area : FGP Unit-300 Equip.Tag.No : NA

Scope of Work: Destruct Existing 1" SW Equal Tee and Welding of 1" new butt weld tee on steam leak location near OT-0300A West side

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-090035074 Page 1 of 2


DOC NO.MG-QSP-ITP- 090037135
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:21-Nov-11

Work pack No. : 090037135 Drawing /LineNo. 40-ISO-20462-20542-11261-H1


Area : FGP Unit-200 Equip.Tag.No NA

Scope of Work: Destruct 11/2" Elbow with Pinhole Leak and Weld New 11/2 " Sch 80 Elbow on Line 40-ISO-20542-11261-H1

Sl No Activity Reference Documents MG QSGTL REMARKS

1 Design: QSGTL Approved Drawing H R

Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91

Materials:QSGTL Free issue Materials (To verify Correct


Approved Drawings,Welding Consumable
3 Size with Bill of Materials list and condition of Materials) H S
Certificate(MTC)
Welding Consumable - ER 70S6

4 Marking & Cutting of Existing 11/2" Elbow DEP 31.38.01.31 Para 3.2 H S

Fitup of New 11/2" Elbow with Pipe


5 DEP 31.38.01.31 Para 3.2/3.3 H S
FW-01 FW-02
Welding of New 11/2" Elbow with Pipe
6 DEP 31.38.01.31 Para 3.2/3.3 H S
FW-01 FW-02

7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S

8 Radiography testing of completed joints (FW-01,FW-02) DEP 31.38.01.31 Para 4.2.3 QSGTL Scope for Field
NDT

8 Service Test DEP 31.38.01.31 Para 4.4 H W/R

9 Painting & Insulation


QSGTL Civil Scope

10 As Built Documents and Records H R

Form No:MSF/011 Rev 0 MG-QSP-ITP-090034739 Page 2 of 2


DOC NO.MG-QSP-ITP- 090037135
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:21-Nov-11

Work pack No. : 090037135 Drawing /LineNo. : 40-ISO-20462-20542-11261-H1


Area : FGP Unit-200 Equip.Tag.No : NA

Scope of Work: Destruct 11/2" Elbow with Pinhole Leak and Weld New 11/2 " Sch 80 Elbow on Line 40-ISO-20542-11261-H1

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-090035074 Page 1 of 2


DOC NO.MG-QSP-ITP- 090034739
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:27-Sep-11

Work pack No. : 090034739 Drawing /LineNo. : 20-OSO-10844-1101-G


Area : FGP Unit-600 Equip.Tag.No : NA

Scope of Work: Repair Weld Leak on 3/4" Steam Line 20-OSO-10844-11011-G at Common Pipe Rack Near UNIT -600(OSBL)

Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted


(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :

All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :

Hold Point (H) :


Mandatory stage clearance - work may not proceed until inspection activity has been signed off by relevant parties.

Witness Point (W) :


Inspection activity may proceed if inspection parties not available after providing adequate inspection notice

Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.

Surveillance(S) :
Monitoring of work activities. No report required

Form No:MSF/011 Rev 0 MG-QSP-ITP-090034739 Page 1 of 2

You might also like