Professional Documents
Culture Documents
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
Page 1 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
4.2 Bevel Preparation and Bevel Preparation as per As per WPS,DEP As per WPS,DEP As Per WPS Supervisor/QC
Visual check of Existing WPS and absence of any 31.38.01.31-Gen 31.38.01.31-Gen Inspector
Pipe with Flange bevels surface defects during H S
visual check
4.3 Fit up of Pipe with Flange As per the approved ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
Drawing. Qualified Qualified (Form No. MSF- Inspector
Welders,WPS , Shell DEP Welders,WPS , Shell DEP 178)
31.38.01.31-Gen 31.38.01.31-Gen H S
Page 2 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
4.4 Welding of Pipe with Welding parameters as per List of Qualified List of Qualified Daily welding report Supervisor/QC
Flange WPS,interpass cleaning, Welders,WPS, Welders,WPS, (Form No. MSF- Inspector
Interpass temperature. Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- 178) ,Weld History
Gen,API RP Gen,API RP Sheet H S
582,MG/QSP/MQP-03 582,MG/QSP/MQP-03
4.5 Visual & Dimensional Absence of any surface ASME B 31.3 ASME B 31.3 Daily welding report QC Inspector
Inspection on all defects & Dimension as per Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- MSF-178 H S
completed welds approved Drawing Gen. Gen.
PWHT and Hardness To verify thermocouple B 31.3 , Shell DEP B 31.3 , Shell DEP PWHT/Hardness Report Supervisor/QC
Testing of completed locations,rate of 30.10.16.18-Gen,QIS/ 30.10.16.18-Gen,QIS/ Inspector
welds cooling/rate of heating and NDT/PWHT-01,QIS/NDT/ NDT/PWHT-01,QIS/NDT/
Holding time at HT-01,WPS HT-01,WPS
temperature and hardness H R
values within the Range of
Specification
4.6 ASR RT-100% of all Butt Absence of any defects ASME SEC V ,B 31.3 , ASME SEC V ,B 31.3 , NDT Reports QC Inspector
Weld Joints Shell DEP 31.38.01.31- Shell DEP 31.38.01.31-
Gen,QIS /NDT/RT -01 Gen,QIS /NDT/RT -01 H R
6.0 Surface preparation and Painting of welded joints - QSGTL Civil Scope
7.0 Completion of Scope of Work
7.1 Submission of final Dossier All welding,NDT, Contractual Final completion Final completion H R
Testing reports. requirements Reports. Reports.
Page 3 of 21
DOC NO.MG-QSP-ITP-90024703
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:20-Jun-11
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Scope of Work: Cut and Removal of Existing 3" Elbow and Installation & Testing of New Elbow with Flange
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Scope of Work: Cut and Removal of Existing 3" Elbow and Installation & Testing of New Elbow with Flange
4 Marking & Cutting of Existing 3" Elbow DEP 31.38.01.31 Para 3.2 As per Approved Drawing H S
Bevel Preparation & Fitup of new Elbow and Flange
Daily Welding Report
5 (FW-01,FW-02,FW-03) DEP 31.38.01.31 Para 3.2/3.3 H S
(MSF-178)
Welding of New 2" Pipe spool/Supports DEP 31.38.01.31 Para Daily Welding Report
6 H S
(FW-01,FW-02,FW-03) 3.2/3.3/MG/QSP/MQP-03 (MSF-178)
Daily Welding Report
7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S
(MSF-178)
QSGTL Scope for
8 100% PT and RT-1 No.Joint of Completed welds DEP 31.38.01.31 Para 4.2.3 NDT Reports W/R
Field NDT
Scope of Work: Cutting and Removal of Existing 4 "Pipe Spool with Flange Nippolet and Fabrication ,Welding ,Testing and Installation of New 4"Pipe spool with Existing
Flange Nippolet of 0P-0156A/B N2 connection
Prepared Reviewed Approved Reviewed & Accepted Reviewed & Accepted
(Madina) (Madina) (Madina) TPI (PEARL GTL)
Sign : Sign : Sign : Sign : Sign :
Name : G.Bargunan Name : Vijai Anand Name : Vijai Anand Name : Name :
Date : Date : Date : Date : Date :
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
Page 9 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
4.2 Bevel Preparation and DP Bevel Preparation as per As per As per DP Reports Supervisor/QC
check of Existing Pipe WPS and absence of any WPS/QIS/NDT/PT-01 WPS/QIS/NDT/PT-01 Inspector
spool bevels and Support surface defects during DP H S
pads check
4.3 Fit up of Pipe and Supports As per the approved ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
,RF Pads Drawing. Qualified Welders,WPS Qualified Welders,WPS (Form No. MSF- Inspector
178)
H S
Page 10 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
4.4 Welding of Pipe and Welding parameters as per ASME B 31.3 List of ASME B 31.3 List of Daily welding report Supervisor/QC
Supports/RF Pads. WPS,interpass cleaning, Qualified Welders,WPS, Qualified Welders,WPS, (Form No. MSF- Inspector
Interpass temperature. Shell DEP Shell DEP 178)
31.38.01.31-Gen,API RP 31.38.01.31-Gen,API RP H S
582 582
4.5 Visual & Dimensional Absence of any surface ASME B 31.3 ASME B 31.3 Daily welding report QC Inspector
Inspection on all defects & Dimension as per Shell DEP 31.38.01.31- Shell DEP 31.38.01.31- MSF-178 H S
completed welds approved Drawing Gen. Gen.
4.6 RT-100% of all Butt Weld Absence of any defects ASME SEC V ,B 31.3 , ASME SEC V ,B 31.3 , NDT Reports QC Inspector
Joints Shell DEP 31.38.01.31- Shell DEP 31.38.01.31-
PT- 100% of all Gen,QIS NDT procedures Gen,QIS NDT procedures H R
completed welds
6.2 Final Coat as per LS1-N Surface As per Drawing, As per Drawing, As per Drawing, Painting H R
System. temperature,humidity, Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Shell DEP 30.48.00.31- Supervisor/QC
WFT,DFT,Manufacture Data Gen. Gen. Gen. Inspector
sheet.
Page 11 of 21
Madina INSPECTION AND TEST PLAN Doc No. MG-QSP-ITP-90024703 REV.0
Characteristic to be
Sl.No Quality Control Activity Controlling documents Acceptance Criteria Verifying Documents Responsibility MG QSGTL Remarks
Verified
7.1 Submission of final Dossier All welding,NDT, Contractual Final completion Final completion H R
Testing reports. requirements Reports. Reports.
Page 12 of 21
DOC NO.MG-QSP-ITP- 090062918
REV.0
PEARL GTL INSPECTION AND TEST PLAN DATE:15-Nov-11
Scope of Work: Cut and Removal of Existing 2" Pipe spool and Fabrication and Testing of New Spool
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Scope of Work: Cut and Removal of Existing 2" Pipe spool and Fabrication and Testing of New Spool
As per Approved
4 Marking & Cutting of Existing 2" Pipe spool DEP 31.38.01.31 Para 3.2 H S
Drawing
Bevel Preparation & Fitup of new pipe spool/Supports
Daily Welding Report
5 (FW-01,FW-02,FW- DEP 31.38.01.31 Para 3.2/3.3 H S
(MSF-178)
03,FW-04)
Welding of New 2" Pipe spool/Supports DEP 31.38.01.31 Para Daily Welding Report
6 H S
(FW-01,FW-02,FW-03,FW-04) 3.2/3.3/MG/QSP/MQP-03 (MSF-178)
Daily Welding Report
7 Visual Inspection of Completed Joints DEP 31.38.01.31 Para 4.2.1/4.2.2 H S
(MSF-178)
QSGTL Scope for
8 100% PT and RT-1 No.Joint of Completed welds DEP 31.38.01.31 Para 4.2.3 NDT Reports W/R
Field NDT
Scope of Work: Destruct Existing 1" SW Equal Tee and Welding of 1" new butt weld tee on steam leak location near OT-0300A West side
Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91
4 Marking & Cutting of Existing 1" SW Equal Tee DEP 31.38.01.31 Para 3.2 H S
Scope of Work: Repair Weld Leak on 3/4" Steam Line 20-OSO-10844-11011-G at Common Pipe Rack Near UNIT -600(OSBL)
Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91
4 Marking & Cutting of Existing 3/4" SW Coupling DEP 31.38.01.31 Para 3.2 H S
5 Fitup of New 3/4" coupling with pupe DEP 31.38.01.31 Para 3.2/3.3 H S
Scope of Work: Destruct Existing 1" SW Equal Tee and Welding of 1" new butt weld tee on steam leak location near OT-0300A West side
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Scope of Work: Destruct 11/2" Elbow with Pinhole Leak and Weld New 11/2 " Sch 80 Elbow on Line 40-ISO-20542-11261-H1
Procedure Review(WPS/PQR/WPQR)
2 Madina /QSGTL Approved WPS/Welder Register R R
WPS- 91
4 Marking & Cutting of Existing 11/2" Elbow DEP 31.38.01.31 Para 3.2 H S
8 Radiography testing of completed joints (FW-01,FW-02) DEP 31.38.01.31 Para 4.2.3 QSGTL Scope for Field
NDT
Scope of Work: Destruct 11/2" Elbow with Pinhole Leak and Weld New 11/2 " Sch 80 Elbow on Line 40-ISO-20542-11261-H1
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required
Scope of Work: Repair Weld Leak on 3/4" Steam Line 20-OSO-10844-11011-G at Common Pipe Rack Near UNIT -600(OSBL)
All the identified Madina QC Inspector Authorized Inspector TPI FOR CLIENT
Inspection Sign : Sign : Sign : Sign :
points are Inspected & Name : Name : Name : Name :
accepted by Date : Date : Date : Date :
Review (R) : Where Review points are defined as specific stages PEARL GTL will require inspection and test documentation to be
presented for review and endorsement.
Surveillance(S) :
Monitoring of work activities. No report required