Professional Documents
Culture Documents
: 615/PPK-
REV
MAF/-1.799.21
RENCANA INSPEKSI & PENGUJIAN DI LAPANGAN DOC. NO.: 1
BRDF-QAC-PCD-100.007
(FIELD ITP) UNTUK PEKERJAAN PERPIPAAN DATE BY CHKD APVD
6-Jun-22 CPI CPI CPI
RESPONSIBILITY
METODE
No. AKTIVITAS INSPEKSI DOKUMEN REFERENSI DOKUMEN VERIFIKASI KET
INSPEKSI Subkon KONT PEMILIK
1.3 WELDING
a. WPS & PQR Review and Performance Review ASME Sec.IX WPS / PQR P P/R R
b. Welders Performance Qualification Test Visual & Review ASME Sec.IX Welder Certificate M W SW
c. Consumable Control Review ASME SEC.II C/Mfd. standard QI-G.02 M SW R
d. Preheat ( if req. ) Visual & Review ASME B31.3 QI-L-02 M SW R
e. Complete Weld Visual ASME B31.3 QI-L-02 M W SW
f. Visual Inspection Visual ASME B31.3 QI-L-02 M W R
g. Weld Travel Sheet Review Drawing Approved QI-L-05 P R R
1.4 INSTALLATION
Piping works Installation Check List
a. Visual Project Spec. Drawing Approved QI-L.09 M W SW
(Under Ground Piping)
Piping works Installation Check List
b. Visual Project Spec. Drawing Approved QI-L.08 M W SW
(Above Ground Piping)
c. Punchlist Visual Drawing Approved Punch List M W SW
Contract No. : 615/PPK-
REV
MAF/-1.799.21
RENCANA INSPEKSI & PENGUJIAN DI LAPANGAN DOC. NO.: 1
BRDF-QAC-PCD-100.007
(FIELD ITP) UNTUK PEKERJAAN PERPIPAAN DATE BY CHKD APVD
6-Jun-22 CPI CPI CPI
RESPONSIBILITY
METODE
No. AKTIVITAS INSPEKSI DOKUMEN REFERENSI DOKUMEN VERIFIKASI KET
INSPEKSI Subkon KONT PEMILIK
RESPONSIBILITY
METODE
No. AKTIVITAS INSPEKSI DOKUMEN REFERENSI DOKUMEN VERIFIKASI KET
INSPEKSI Subkon KONT PEMILIK
RESPONSIBILITY
METODE
No. AKTIVITAS INSPEKSI DOKUMEN REFERENSI DOKUMEN VERIFIKASI KET
INSPEKSI Subkon KONT PEMILIK
a. Check Permanent Pipings components and accessories Visual Drawing Approved QI - L.10 M W SW
b. Check Permanent Piping and Instruments Visual Drawing Approved QI - L.10 M W SW
c. Check Permanent Gaskets Visual Drawing Approved QI - L.10 M W SW
d. Bolts Tigtening
- Manual Tigtening Visual Engineering Specification QI - G.01.01 M SW R
- Hydraulics Bolt Tensioning Visual Engineering Specification QI - G.01/Subcont Report M SW R
e. Final Punch list Visual Drawing Approved Punch list report M W SW
8.0 FINAL DOCUMENT / REPORTING ACTIVITIES Review Procedure Approved Report Dossier P R R
Legend :
Subkont : Subkontraktor P : Issued / Provided Document
KONT : KONTRAKTOR, ADHI-JAKON KSO M : Mandatory, Subcont Inspection/Test performed by
PEMILIK : PEMDA DKI the Subcont at site
R : Review
W : Witness Point
SW : Spot Witness Point
CONTRACT NO. :
REV
06/V00000/2018-S0
FIELD INSPECTION AND TEST PLAN DOC. NO.:
001
26072-203-GQI-GCQ-G0015
FOR PIPING WORKS DATE BY CHKD APVD
2-Dec-19 GAM CPI IFN
RESPONSIBILITY
METHOD OF LEVEL OF ACCEPTANCE /
No. INSPECTION ACTIVITY/TEST ITEM VERIFYING DOCUMENT REMARKS
INSPECTION REFERENCE S/C CONT. OWNER MIGAS
2.4 INSTALLATION
RESPONSIBILITY
METHOD OF LEVEL OF ACCEPTANCE /
No. INSPECTION ACTIVITY/TEST ITEM VERIFYING DOCUMENT REMARKS
INSPECTION REFERENCE S/C CONT. OWNER MIGAS
RESPONSIBILITY
METHOD OF LEVEL OF ACCEPTANCE /
No. INSPECTION ACTIVITY/TEST ITEM VERIFYING DOCUMENT REMARKS
INSPECTION REFERENCE S/C CONT. OWNER MIGAS
RESPONSIBILITY
METHOD OF LEVEL OF ACCEPTANCE /
No. INSPECTION ACTIVITY/TEST ITEM VERIFYING DOCUMENT REMARKS
INSPECTION REFERENCE S/C CONT. OWNER MIGAS
8.0 INSULATION
a. Procedure Review Review Procedure Approved Manufacture Std P R R
b. Material Check & Data Sheet (MSDS) Visual Manufacturer's Spec Manufacture Std P/M SW R
c. Surface preparation cleaning Visual 26072-3SS-P34-G0005 QI-N.02 M SW R
d. Jacketing installed and sealed per specification Visual 26072-3SS-P34-G0005 QI-N.02/QI-N.02.01 M SW R
e. Visual Inspection Visual 26072-3SS-P34-G0005 QI-N-02 M W SW
SIGNATURE
NAME
DATE
FORM NO. QI-PI.04
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL REPORT NO :
SIGNATURE
NAME
DATE
FORM NO. DATE
BANGGAI AMMONIA PLANT Ql-PI.04.01
PROJECT Report No.
RESULT
No. INSPECTION/TEST ITEM SIGNATURE DATE REMARKS
YES N/A
1 MATERIAL :
2 PRE-JOINT INSPECTION :
b. Hydro test
Remarks :
Signature
Date
`
: 15-8803
REMARKS
Date :
FORM NO. QI - M0.01
RELOKASI FLARE BPP II & NEW FLARE HCC
RU V PERTAMINA BALIKPAPAN Report No. : Page :
of
MATERIALS DETAIL
DESCRIPTION OF MATERIAL :
QUANTITY :
RESULT RESULT
YES NO YES NO
Remarks :
Signature
Date
PEMBANGUNAN FASILITAS PENGOLAHAN FORM NO. QI-G.01
REPORT NO. :
SAMPAH LANDFILL MINING DAN RDF PLANT DATE :
(RANCANG DAN BANGUN)
DRAWING
LINE NUMBER : LINE NUMBER :
DRAWING NO. :
PIPING MATERIAL CLASS :
DRAWING NO :
MATERIALS
DESCRIPTION FLANGE BOLT GASKET
Diameter (inch)
Rating # (Lb)
Thickness (mm)
Material Type
Length (mm)
Quantity (pcs)
Bolt Torque Value (lbf.ft/Psi)
PRESSURE GAUGE
SERIAL/TAG NO. CALIBRATION CERTIFICATE VALIDITY MAXIMUM TORQUE CAPACITIES
SIGNATURE
NAME
DATE
FORM NO. QI-G.01.01
PEMBANGUNAN FASILITAS PENGOLAHAN
SAMPAH LANDFILL MINING DAN RDF PLANT DATE :
(RANCANG DAN BANGUN)
JOB NO. :
SUBJECT : BOLT TORQUING INSPECTION REPORT (Manual Tightening Bolt)
EQUIPMENT NO: LINE NO. :
TESTPACK No. : ISOMETRIC NO :
Engineering Data:
Results :
JOINT NO: BOLT SIZE QTY TORQUE READINGS (Nm) JOINT NO: BOLT SIZE QTY TORQUE READINGS (Nm)
Remarks:
SIGNATURE
NAME
DATE
FORM NO : QI -G.02
JOB NO :
PROJECT TITLE :
CONTRACTOR :
OWNER :
LOCATION :
ELECTRODE QUANTITY BATCH / SERIAL TIME BAKING INSPECTION CHECK
DATE SIZE REMARKS
BRAND ( KG ) NO. IN OUT TEMP. (OC) CONTRACTOR OWNER
Date :
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL MINING
QI-L.02
DAN RDF PLANT (RANCANG DAN BANGUN) Page :
Note : SW : Shop weld BW : Butt weld SOF : Slip on Flange Final vis : Final visual
FW : Field weld FW : Fillet Weld SOB : Stub on Branch LET : Sockolet
SIGNATURE
NAME
DATE
PROJECT TITLE : JOB NO :
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL
MINING DAN RDF PLANT (RANCANG DAN BANGUN)
QI-L.05
TEST PACKAGE NO. PAGE : OF
NOTE : RT ( Radiography Test ), UT ( Ultrasonic Test ), PT ( Penetrant Test ), MT ( Magnetic Test ), SW ( Shop Weld ), BW ( Butt Weld ), FW ( Fillet Weld ), BC ( Branch Connection Weld ), TRD ( Thread Connection ), G ( GTAW ), S (SMAW),
FINAL ACCEPTANCE
SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGN
DATE
QI-L.06
Project Title :
Job No. :
Area :
Reference No. :
Document No. :
Test Package No. :
P & ID. NO :
Yes N/A
RECORDING INST. / PRESSURE GAUGE : CHECK CALIBRATION
Yes N/A
ATTACHED :
Remarks :
Signature
Date
FORM NO. QI - L.07.01
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL MINING
DAN RDF PLANT (RANCANG DAN BANGUN)
Project : Location :
P & ID Dwg. No. : Isometric Dwg. No. :
RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A
1 PRE-FABRICATION
a. Material
b. WPS & PQR
c. Welder
d. Preparation to Weld
e. Inspection of Welds / Visual
f. Radiography Interpretation
2 INSTALLATION
a. Support, pipe rack
b. W.P.S
c. Welder
d. Preparation to Weld
e. Inspection of Welds
f. Radiography Interpretation
g. Hydrostatic Test
h. Surface Preparation
I. Painting
j. Insulation
Comment :
1 FABRICATION
a. Material Specification
b. WPS & PQR
c. Welder
d. Preparation to Weld
e. Inspection of Welds / Visual
f. Radiography
2 INSTALLATION
a. Trench & Bed Condition
b. WPS & PQR
c. Welder
d. Preparation to Weld
e. Inspection of Welds
f. Radiography
g. Hydrostatic Test
h. Surface Preparation
I. Outer Tape Wrap
j. Holiday Test
k. Backfilling
Comment :
RESULT
No. INSPECTION/TEST ITEM SIGNATURE DATE REMARKS
YES N/A
Check that flushing have been satisfactory
1
completed and recorded
Check that all pipe cleaning and pickling has been
2 satisfactory completed and recorded
Remarks :
Job No. :
SUBJECT : MECHANICAL COMPLETION OF PIPING WORK
ORIGIN : TERMINATION :
TEST CIRCUIT : TEST PRESSURE :
RESULT
TEST / INSPECTION ITEMS YES N/A
Project Title:
Line No. :
Spool No. :
Magnetizing Technique
Water Magnetizing Current Amp
Prod Spacing
Magnetizing
Directing of Magnetizing
Location Examined
Unsatisfactory
Project Title:
Line No. :
Spool No. :
Water-Washable Penetrants
Dry Developer
Removal Post-Emulsifying Penetrants Developing
Location Examined
Unsatisfactory
Project Title:
Line No. :
Spool No. :
Source Film
Equipment Equipment No. Film Mask Technique
Location Examined (Isometric Drawing No. and Joint No.) Total Welds are examined:
Line No. :
Spool No. :
Type of Equipment
Scaning
Location Examined
Unsatisfactory
WELD NOS.
PLATE PIPE
PIPING CLASS CHART NO LENGTH DIA.
THK. THK.
SPECIFICATION
EQUIPMENT
DESCRIPTION
DATE OF
RECORDER No. CALIBRATION
SIGNATURE
NAME
DATE
Date :
RELOKASI FLARE BPP II & NEW QI-L.17 Page :
FLARE HCC RU V PERTAMINA
BALIKPAPAN Report No. Project No. :
Location :
Date
The lines noted below have been visually examined and are now ready for hardness testing.
Scaffolding is required and has been erected.
These lines will be postweld heat treated and will require testing before relocating equipment.
SUPERVISOR
HARDNESS TESTING
Location of point measurement:
The line noted above has been Hardness Tested and was ( not ) acceptable.
NDT EXAMINER
General Parts
Surface Preparation :
Painting System :
Material Spec. :
Primer / 1st Coat Intermediate/2nd Coat Finish/Top Coat
Product No.
Product Name
Paint Type
Color / Musel No.
Batch No.
Methode
Dry Film Thickness
Total Dry Film Thickness
Appearance :
Remarks :
Test Result
Acceptable
Not Acceptance
Signature
Date
Date
RELOKASI FLARE BPP II & NEW QI - N.02
FLARE HCC RU V PERTAMINA
Doc. No. Page
BALIKPAPAN
Subject : INSULATION INSPECTION RECORD Project No :
Project : RELOKASI FLARE BPP II & NEW FLARE HCC Location :
Equipment No. : Reference Drawing :
RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A
MATERIALS
1 Materials specification conforms to the requirements.
2 Material thickness as specified or insulation system
3 Fasteners conform to the specification requirements.
APPLICATION
1 Piping or Equipment system released for insulation and
accepted.
2 Surface preparation checked.
3 Primer specified and accepted.
4 Insulation distance and / or support rings correctly
instlalled.
5 All gaps filled with insulating cement.
6 Spacing and fitting of clips and pins per specification.
7 Jacketing installed and sealed per specification.
8 Banding and screws installed per specification.
9 Insulation expansion joints correctly installed.
10 Completed work is acceptable in terms of existing
specification and standard.
Remarks :
Name of equipment
and Identification No. :
SYSTEM : AREA :
P&I D DRAWING NO. : ISOMETRIC DWG NO. :
RESULT
No. INSPECTION/TEST ITEM SIGNATURE DATE REMARKS
YES N/A
1. Check material accepted
6. Check Overlap
7. Check Visual
Remarks :
Print Name
Signature
Date
`
Date :
PEMBANGUNAN FASILITAS PENGOLAHAN
SAMPAH LANDFILL MINING DAN RDF PLANT
(RANCANG DAN BANGUN)
QI-N.03.01 Page :
Inspection
No No. Joint Surface Preparation Holiday Test Remark
Visual Check
Check Kv Result
Remarks:
INDEX OF CONTENT :
YES N/Y N/A
5. SUMMARY NDT
Project Title : RELOKASI FLARE BPP II & NEW FLARE HCC Unit / Facility : Test Package No. :
JOB No. : Area :
PRINT NAME
SIGNATURE
Note Category Description :
SIGNATURE
A fter : Item shall be corrected After Mechanical Completion
B efore : Item shall be corrected before Mechanical Completion
DATE