Field Installation, Inspection and Test Plan.

Storage Tank
INSPECTION TEST PLAN
TANK STORAGE

Project : DEMIN PLANT Doc No : PD2-HT-ITP-TANK-001


Client : PT. PINDO DELI 2 MILL Revision :0
Contractor : CV. HASTEK Date : 29 Juni 2020
Legend :
H : Hold Point M : Monitoring
W : Witness R : Document Review
SW : Spot Witness V : Document / Data Verification
A : Document Approval P : Perform / Prepare

Acceptance Verifying Inspection Level


No Description of Inspection Reference Document Remarks
Criteria Document C TPI Owner

As per Applicable Drawing &


1 Kick of Meeting Spec. MOM H - H
Spesification

As per Applicable Drawing &


2 Procedure
Spesification
Welding Procedure Spesification (WPS) /
a. Welding Procedure ASME Sec. IX Report P - R
Procedure Qualification Record (PQR)
Welder & Welding Operators Qualification
b. Welding Procedure ASME Sec. IX Report P - R
Record (WPQR)

c. Welders and Welding Operators Qualification Test Welding Procedure ASME Sec. IX Report P - R

d. Nondestructive Test (NDT) NDT Procedure ASME Sec. VIII Report P - R


Drawing & Installation
e. Forming API 650 Report P - W
Procedure
f. Equipment Package Packing List Spec. Report P - R

As per Applicable Drawing &


3 Material Supply
Spesification
a. Material Certificates of Plate Drawing & Specification ASME Sec. II Certificate P - R
b. Material Certificates of Pipe, Flange, Etc Drawing & Specification ASME Sec. II Certificate P - R
c. Visual & Dimensional Test Packing List ASME Sec. II Report - - W

As per Applicable Drawing &


4 Fabrication
Spesification
As per Applicable Drawing &
a. Preparataion Check API 650 - P - R
Spesification
As per Applicable Drawing &
b. Cutting Check API 650 - P - R
Spesification
c. Fit up Drawing, WPS & Specification API 650 Report P - R/A
d. Welding Drawing, WPS & Specification API 650 Report P - R/A
e. Visual Drawing, WPS & Specification API 650 Report P - R/A
f. NDT Specification API 650 Report P - R/A

As per Applicable Drawing &


5 Tank Foundation
Spesification
a. Plumbness Drawing & Specification API 650 Report P - R/A
b. Roundness Drawing & Specification API 650 Report P - R/A
c. Peaking & Bending Drawing & Specification API 650 Report P - R/A

As per Applicable Drawing &


6 Sandblast & Painting
Spesification
a. Surface Preparation Drawing & Specification API 650 Report P - M
b. Visual Inspection Drawing & Specification API 650 Report P - M
c. Thickness Check (DFT) Drawing & Specification API 650 Report P - R/A

As per Applicable Drawing &


7 Hydrostatic Test
Spesification
a. Verification of Test Package Drawing & Specification API 650 Report P - R
b. Filling Water (Water Level) Drawing & Specification API 650 Report P - M
c. Hydrostatic Test Drawing & Specification API 650 Report P - R/A
d. Water discharge Drawing & Specification API 650 Report P - M
e. Cleaning Check Drawing & Specification API 650 Report P - M
0 27/6/2020 SETIAWAN NUR HUDA FOR APPROVAL
REV DATE PREPARED CHECKED APPROVED STATUS

Owner

Contractor

Project

DEMIN PLANT - POWER PLANT PT. PINDO DELI 2 MILL

Document Title

INSPECTION TEST PLAN STORAGE TANK

Document No

PD2-HT-ITP-TANK-001