Inspection Test Plan

Client AL-Adat
Project 75000 Diesel fuel tank
Drawing NP0120BX055
CODE UL-142
Steel Code ST-37

No. QC Plan Description Reference Verification record Intervention Points


NCS Client TPI
1 Drawings UL-142 Contract Review Documents R
2 Inspection & test plan UL-142 &drawings Approvals H A
3 WPS,PQR,WQT ASME Sec IX Ed 2019 Approvals H A
4 Material
4.1 Visual inspection, dimensions ,material UL-142 Contract Review Documents H A
5 Fabrication
5.1 Cutting and preparation Drawings QC plan M M
5.2 Rolling , fit up , nozzles, manway Drawings QC plan M M
5.3 Contaminated tank fit up Drawings QC plan M M
5.4 welding WPS TPI H R
6 Tests
6.1 Welding test MPI Drawings &UL-142 TPI H W
6.2 Hydro test Drawings &UL-142 TPI H W
6.3 Lifting eye test Drawings &UL-142 TPI H W
7 Accessories fitting Drawings QC plan W R
8 Marking and Name plate Drawings TPI W R
9 Final inspection WS/QC QC plan R/W H R
Check All QC Documentation Is In
Order, Prepare Completed
Contract QC Pack. Submit To
10 Documentation QC Client For Acceptance H/R R/A R
Key
A Approval
H Hold. Process / activity should cease until instructed by QC department.
M Monitor. Review processes / activities periodically to ensure progress.
MPI Magnetic particle inspection
NCS Nippur Construction Solution.
PQR Procedure qualification record
QC Quality control
R Review. Compare data record with Third Party specified acceptance criteria.
TPI Third Party Inspection
W Witness. Process / activity to be witnessed, documented and maintained.
W.S Workshop Supervisor
WPS welding procedure specification
WQT Welder Qualification Test

Note : 1- Test reports signed and stamped by TPI , 2- WPS,PQR,WQT reports stamped and signed by QC manager