The contents of the Contract Documents including Technical Data Sheet (TDS) shall be read in conjuction with this SQCP.
Abbreviations:
R = 100 % Review of documents, T = Test (Controls including Visual, Dimensional, Destructive or Non Destructive Test), W = Witness point, H = Hold point
Man = Fitting Manufacturer and/or Supplier, TPIA = Third Party Inspection Agency, ADWEA = Abu Dhabi Water & Electricity Authority / Affiliated Company, ADWEA/Consultant = Consultant
Company delegated by ADWEA for the specific project, Client/Owner: ADWEA, Cont.: Contractor.
Manufacturer inspection frequency : The actual inspection frequency shall be as stated in this document, but in any case not less than what is specified in the contract documents.
Witnessing/reviewing by TPIA : All quantified measurement checks/tests carried out shall be recorded on the applicable Manufacturer’s Quality control sheets for witnessing/reviewing
by the TPIA in line with this SQCP requirements.
IMPORTANT
NO CHANGES, WAIVER OR CONCESSIONS SHALL BE MADE IN THIS SQCP AND ITS REQUIREMENTS
BY ANY INDIVIDUAL OR PARTY UNLESS EXPLICIT PERMISSION IS GIVEN IN WRITING BY ADWEA.
Prepared by Reviewed by Approved by
b) Any modification for non-compliance if required, shall be as per the contract documents inclusive of the specifications, knowing that in case of conflict
between the QCP and the Contract, The Contract shall prevail.
c) SQCP activity No. 13 Factory Release Certificate ( FRC ) covers the final checking stage prior to dispatch from the manufacturing site
and is a “ Hold” point for each CONTRACTOR/TPIA and ADWEA/ TPIA.
A Common FRC shall be initiated by the Manufacturer and shall be issued for each batch of the product. The FRC shall be signed by CONTRACTOR/TPIA and ADWEA/ TPIA
Any deviation to this “Hold Point” shall render release of materials as void. The FRC shall be signed and issued only when
the items are loaded on the vehicle at the manufacturing plant ready to be transported to the exit port. At the release for shipment stage and, following the transportation
of fittings from the factory to ship / vessel loading point, Acceptance Certificate ( AC ) is required and shall be issued as per contract requirements. The activity of
loading fittings and storage within the Ship / Vessel shall form a “ Hold” point for CONTRACTOR/ TPIA and “Review” point for ADWEA/TPIA. ADWEA/TPIA may elect to
witness any or all of the activities including the transportation and handling between factory and vessel.
ADWEA / TPIA observation shall be attended to by Contractor/Supplier in line with the contract objectives and at no additional cost to ADWEA.
d) Manufacturer shall devise for approval by ADWEA, a system to trace defective Fittings with cement mortar lining cube test failure.
The quantity in question includes production from the date of sampling to the date of successive successful sample testing.
e) The processing of inspection or test by ADWEA/TPIA in accordance with this SQCP shall take place without delaying the production rate.
For this purpose, it is agreed that production of one day, offered for release shall be inspected by ADWEA/TPIA in one day. The unique serial number
of the part shall be given after acceptable coating and will be available for the TPIA on a daily basis to permit the release.
f) Prior to dispatching from manufacturing and prior to loading into the vessel CONTRACTOR/TPIA shall ensure that there are no Fittings requiring any repairs.
Repairs, if any, shall be carried out at the manufacturing site.
g) Frequency and control items of ADWEA's TPIA may be increased or decreased depending on the results obtained. These modifications are to be agreed between
ADWEA and ADWEA/TPIA prior to implementation.
h) Non toxicity certificate to be provided for all materials in contact with potable water at 60°C max. (ADWEA circular no. 5 of year 2000).
i) Inspection / Test frequency (intervention) indicated in this SQCP under Contractor/TPIA and ADWEA/TPIA columns may be invoked, waived, changed, increased or
decreased depending on ADWEA’s individual contract requirement or, when non-conformities are found or reported.
* Deployment of ADWEA's TPIA shall be at ADWEA's descretion and Deployment of Contractor's TPIA shall be as agreed / indicated in the Contract.
Doc Title Doc. No.
Date Sep-15
STANDARD QUALITY CONTRROL PLAN FOR W-P-QCP-011
DUCTILE IRON FITTINGS Rev 1
Page 2/16
ADWEA STANDARD QUALITY CONTROL PLAN (SQCP)
Inspection / Test
No. Inspection Item Inspection Method Acceptance Criteria Manufacturer Contractor ADWEA Remarks
Type Frequency TPIA * TPIA *
0 PRE-INSPECTION ADWEA / TPIA interventions,
- List and characteristics R R R See note (i) on page 2
of products of the order
- Packing and marking Acknowledgement of Order R R R * See note on page 2 of 17
instructions Review of Documents Every Order
- Applicable standards R R R
- Chemical Analysis Analysis of cast iron before Production tables T Manufacturing R R The chemical composition is
Process Control adjusted in order to satisfy the
casting (ladle or channel
material characteristics and all
furnace analysis) requirements according to EN
545 / ISO 2531
- Brinell Hardness (HB) Tests in accordance with ≤ 250 HB T W (15%) R Higher HB is allowed in heat
EN ISO 6506-1 effected areas of welded
components.
4 METALLIC ZINC OR ZINC
EN 545, sec 4.5
RICH PAINT APPLICATION
- Zinc Material :
Metallic Zinc Check material type 99.99% purity for metallic zinc R Each Batch R R Metallic Zinc coating (ISO 8179-1):
Zinc Rich Paint Check Certification >85% zinc content in dry film for R Each Batch R R mean mass ≥ 200 g/m2
Check pot life & shelf life zinc rich paints local min. ≥ 180 g/m2
- Water Potability analysis or Supplier ISO 4179 § 3.3 once every 3 months, or
T evidence that water used W (15%) R See Attachment 2
analysis
is potable water supplied
- S, C, W process control (weight) ISO 4179 § 3.4
by local water authority /
- S/C process control (weight) ISO 4179 § 3.4 , S/C ≤ 3.5 (by mass) utility.
- W/C process control (weight) ISO 4179 § 3.4 , W/C ≤ 0.45 (by Manufacturer to specify W/C ratio
mass) to be used.
Doc Title Doc. No.
Date Sep-15
STANDARD QUALITY CONTRROL PLAN FOR W-P-QCP-011
DUCTILE IRON FITTINGS Rev 1
Page 6/16
ADWEA STANDARD QUALITY CONTROL PLAN (SQCP)
Inspection / Test
No. Inspection Item Inspection Method Acceptance Criteria Manufacturer Contractor ADWEA Remarks
Type Frequency TPIA * TPIA *
6.2 Surface preparation Visual Sect. 4.1 ISO 4179 T Each Piece W (15%) W (15%)
(Interior surface before Free from all foreign
application of lining) bodies, loose scale, other
materials and any metal
projections likely to protrude
beyond 50% of the thickness of the
lining.
6.3 Curing Visual As per curing tables T Process Control W (15%) W (15%)
(duration according to
temperature)
6.4 Compression strength Test according to EN 545 ≥ 50 Mpa T 1 / month of effective W (100%) W (100%) Frequency can be increased in
A representative sample EN 545, 4.4.3.2 production, or every cases where defects are
shall be taken accordingly change in the mix detected. Refer to item d, page 2
design or the mortar of 15.
materials used.
6.5 Laitance Visual Lining free of non adhesive laitance T Each Piece W (100%) W (100%)
(NAL).
6.6 Lining Thickness According to Contract T Sampling as per W (15%) W (15%) Average is the mean of 3 or more
fabrication table readings on one piece.
depending on DN
DN Min. at
Min.
Nominal any
average point
Dry lining method : 80 – 600 5 4.5 3.5
magnetic gauge, 200 mm 700 – 1200 6 5.5 4.5
from the end face. 1400 – 2000 9 8 7
2200 – 2600 12 10 7
ADWEA w-p-ss-001,
6.7 Mortar Lining appearance / Visual EN 545 T Each Piece W (100%) W (100%) Repair procedure to be included
adhesion / cracks inspection Cracks : and described in Material
Max. crack width Submittal
DN
(mm)
40-300 0.4 Cement mortar lining shall not
have a sealing coat
350–600 0.5
700-1200 0.6
1400-2000 0.8
- Longit. Length ≤ 100% DN.
(e.g. 1200 mm for DN 1200)
- Circumf. length ≤ 50 % of
circumference
(e.g.1885 mm for DN 1200)
6.8 Radial displacement Visual No disbondment in the factory T Each Piece W (100%) W (100%)
- Dry Film Thickness (DFT) Myler Token/Magnetic gauge Mean average DFT ≥ 120 µm (100 T 1 / spray gun / shift W (15%) W (15%) Average DFT is the mean of 10 or
(combined : Zinc + final coating) (Bituminous + Zinc coating)
µm DFT min. at any point) and 1/15 fittings for more readings on one fitting
≥ 1000
- Appearance Visual No coating defects T Each Piece W (15%) W (15%)
7.1.2 Fitting ends ( Internal Socket Same coating type as 7.1 ADWEA W-P-SS-001,
& External Spigot) above OR non-toxic solvent Mean average DFT ≥ 120 µm
free two part epoxy coating (combined DFT of Zinc + Bitumen) T 1 / 10 W (15%) Average DFT is the mean of 10 or
with thickness ≥ 300 µm (100 µm DFT min. at any point) more readings on one fitting
- Non Toxicity confirm that used material is Compliance with material T Each Product / Coating R
not toxic certification
Doc Title Doc. No.
Date Sep-15
STANDARD QUALITY CONTRROL PLAN FOR W-P-QCP-011
DUCTILE IRON FITTINGS Rev 1
Page 9/16
ADWEA STANDARD QUALITY CONTROL PLAN (SQCP)
Inspection / Test
No. Inspection Item Inspection Method Acceptance Criteria Manufacturer Contractor ADWEA Remarks
Type Frequency TPIA * TPIA *
7.2 Fusion Bonded Epoxy EN 14901 with the exception of : FBE coating process to be
coated fittings - Maximum water temperature shall be considered as 60 oC (ADWEA circular No. 5, year 2000) included and described in material
- The minimum thickness at any point, the minimum mean average thickness & max. thickness are as per submittal
figures below (7.2.2)
7.2.1 Performance / Type test
- Impact Resistance Drop Weight as per EN No Electrical puncture permitted T At start of production, R R
14901 Sect. 7.2.2 then upon change of
Non porosity test certificate
epoxy coat supplier or
according to EN 14901, 7.2.4 application process.
Also, applicable to
suspicious fittings.
- Indentation resistance Penetrometer as per EN Indentation depth measured after T At start of production, R R
14901 Sect. 7.2.3 48 h ≤ 30% of the initial coating then upon change of
thickness Measured. epoxy coat supplier or
application process.
EN 14901 Sect. 6.3
Also, applicable to
suspicious fittings.
- Cross Linkage Methyl Iso-Butyl Ketone Limits of change as defined by T At start of production, then R R
(MIBK) test as per EN 14901 coating material manufacturer. upon change of epoxy coat
Sect. 7.1.5 supplier or application
process. Also, applicable to
suspicious fittings.
- Heat ageing Resistance Hot air ageing of bent test No electrical puncture EN 14901 T At start of production, then R R
plates EN 14901 Sect. 7.2.5.1 Sect. 6.6.1 upon change of epoxy coat
in air.
supplier or application
process. Also, applicable to
suspicious fittings.
- Adhesion test "Pull off test" according to EN Min. single value = 6 Mpa Once / Three months
ISO 4624. (EN 14901, 7.1.3) T W (15%) W (15%)
Min. Ave. value = 8 Mpa according to EN 14901,
Annex A.
- Dry Coating thickness NDT instrument using Min. at any point = 300 µm T 1 / Shift W (15%) W (15%) Average DFT is the mean of 10 or
magnetic or electro-magnetic Average DFT = 350 µm more readings on one fitting.
principle. Max. average thickness shall be
Maximum allowable DFT average = within a 40% above the min. DFT
EN 14901, 7.1.4 420 µm (EN 14901, sec 7.1.4)
The coating thickness on designated zones i.e. Bolt holes, ribs, joints, edges & markings shall be ≥ 150 µm
- Cross linking - Methyl Iso-Butyl Ketone No deviation against reference test T 1 / shift W (15%) W (15%)
As per EN 14901, 7.1.5 (MIBK) test sample
- Non Porosity (Holidays) - High voltage detector, No holidays T Each R R Except in gasket chamber
in coating
As per EN 14901, 7.2.4 2.2 kV
- Impact Strength Test Dropping weight / Hight voltage 8 j/mm PU-coated pipe barrel 5 T Type Test
test Clauses 6.2 & 7.2.2, Table j/mm EP-coated spigot end (EN 14901)
A.1
R R
- Indentation Resistance Indentation Test Less than 10% at 10 Mpa T Type Test
Clauses 6.3 & 7.2.3, Table A.1
- Elongation at Break Tensile Test : < 10% at 10MPa > 2.5 % T Type Test
Clauses 6.4 & 7.2.4, Table A.1
- Specific Coating Resistance, Resistivity Test : Towel method > 108 Ωm2 . Clauses 6.5 & 7.2.5, Table Type Test
0.1 M Na Cl solution or Vessel method
A.1
- Coating Resistance Ratio Res. 100 d / Res. 70 d > 0.8 Type Test
Clauses 6.5 & 7.2.5, Table A.1
7.3.3 Fitting ends ( Internal Socket Magnetic or Electro-Mag. Test Mean average DFT : T Each Piece W (15%) W (15%) This applies to the external spigot end
& External Spigot ) Non-toxic solvent free two part surface at a min. length of 250 mm
from face and the internal socket end
epoxy coating with DFT ≥ 300 µm
surface which may have direct contact
- Non Toxicity confirm that used material is Compliance with mat. Certification T Each Product / Coating R R with potable water.
not toxic
8 ACCESSORIES Conformity verification as specified in relevant documents R Each Piece W (15%) W (15%)
- Non toxicity Confirm the used material Compliance with material cert. T R R
11 FINAL INSPECTION by Visual According to TDS and QCP All Fittings W (100%) W (100%)
CONTRACTOR/ TPIA
Rubber Stamp of Inspector Logo All Fittings W (100%) W (100%)
(If required by ADWEA) Stamping on each controlled Fitting
3.1 Cement
The cement used for the lining shall comply with EN 197-1 or be sulphate resisting
3.2 Sand
The sand used shall have a controlled granulometric distribution from fine to coarser elements; it shall be clean and shall be composed of inert, hard, strong and stable granular particles. The
granulometric curve for the sand shall be appropriate to the lining method, the lining thickness and the surface conditions required in Clause 6 of ISO 4179. Sampling shall be carried out in
accodance with national standards for the testing of construction materials. The cleanliness of the sand shall be evaluated in terms of organic impurities and clay-bearing substance according to the
methods described in ISO 4179. The test for organic impurities shall be carried out by a colorimetric method in accordance with the standards in force in the producing country. The sand shall not
produce any coloration darker than that of the reference solution. The determination of the content of clay-bearing substances in the sand (having dimensions less than 63 microns to 93 microns
depending on the country) shall be carried out in accordance with the standards in force in the producing country; it shall not exceed 2% by mass.
3.4 Mortar
The fresh mortar of the lining shall be composed of cement, sand and water complying with 3.1, 3.2 and 3.3 respectively.
Additives may be used, provided that :-
— they do not prejudice the quality of the lining and that of the transported water.
— they comply with the hygienic requirements of the country where the fittings are to be installed.
— the lining remains in accordance with all the requirements of ISO 4179.
The mortar shall contain at least one part of cement to 3.5 parts of sand by mass (i.e. S/C ≤ 3.5 by mass in the mortar). The respective proportions of sand and water to cement (S/C and W/C) shall
be selected and controlled by the manufacturer in order to achieve compliance with this QCP. The methods of determination of the ratios S/C and W/C shall be specified by the manufacturer.