You are on page 1of 1

LAND KEY :

PROPOSED BOUNDARY
WALL

PROPOSED ADMIN. & CONTROL


ROOM
PROPOSED BOUNDARY WALL
WITH DECORATIVE STEEL PROPOSED GATE

GENERAL NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT SITE LAYOUT AND
LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.
2. DRAWINGS SHALL NOT BE SCALED. ANY DISCREPANCIES
BETWEEN THE DRAWINGS & WRITTEN DIMENSIONS,
THE WRITTEN DIMENSIONS SHALL GOVERN.

ARCHITECT :
ABEIR ELEZABI 050-3384030
STRUCTURAL ENGINEER :
MOHAMED MAGDELDIN 055-5500645
00 ISSUED FOR APPROVAL 22/03/2020

REV. NO.
DESCRIPTION Date
EMPLOYER:

PLOT LIMIT
3597 6170 6170 6170 6170 6170 6170 6170 6170 6170 3597 PLOT LIMIT

AL AIN CITY MUNICIPALITY

C2 C1
C1 C1 C1 C1 C1 C1 C1 C1 C1 C2
4441

4439
F2
F2

OWNER:
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1

DEPARTMENT OF
MUNICIPALITIES AND
C1

F1

C1
F1
TRANSPORT
AL AIN CITY MUNICIPALITY

THE CONTRACTOR HAS TO CLOSE ANY GAP BETWEEN PRECAST PANEL BOTTOM AND GROUND LEVEL

6165
6170

WITH SOLID BLOCK TO BE FINISHED WITH BITUMINOUS MATERIAL AS PER SPECIFICATION


CONSULTANT :

TECHNICAL ENGINEERING & SCIENTIFIC STUDIES Co. (Ltd)


SEE ADMIN & CONTROL ROOM DETAILS
DWG. S-003 AL AIN -TEL : 7629920 - P.O.BOX : 16420 - FAX :
7629906 ABU DHABI -TEL : 6313513 - FAX: 6313342
C1

F1

C1
F1
TESSCO

F1 F1 F1 F1 F1 F1 F1 F1
PROJECT NAME :
4436

4443
F2

F2
CONNECTION BETWEEN
PRECAST PANEL & FOOTING REHABILITATION OF BOUNDARY
C2 C1 C1 C1 C1
C4 C3
BY THE SPECIALIST C1 C1 C1 C2 WALLS OF GRAVES IN AL AIN

F2
ZONE :
3910 6170 6170 6170 6020 500 4000 500 1250 5700 6085 6170 6170 3910
PLOT LIMIT PLOT LIMIT AL KHRAIR

SECTOR NO :
PLOT NO :
03
22-03-801-104

PROJECT DESCRIPTION :

REHABILITATION OF BOUNDARY
WALLS OF GRAVES IN AL AIN

DRAWING TITLE :

Structural General Notes PROPOSED BOUNDARY WALL LAYOUT

- All dimensions in millimeters.


(All Footings are centered with columns UNO.)
- No of floors = ONE FLOOR .
DRAWING NO :
REVISION NO:
- Proposed Design Bearing capacity = 200 kN\m2 S-001
to be verified with the final soil investigation report that 00

must be done before execution start by the contractor.


SUBMISSION DATE :
SCALE :
- Foundation level is @ 1.00m below ZERO level, (as
22/03/2020
per required excavation depth depth below EGL.), GL.), 1:100
to be verified with the final soiloil investigation
stigation report
port that
must be done before execu i sta t y th ont ctor.
PROJECT ID :
tion start by the contra PLAN ID :
B2N-2019-006477
- The Ground Water table is n give t B2N-2019-006477
ot given yet,
to be verified with the final so oil investigation
st g on report r that
OFFICE USE ONLY :
must be done before execu io tion start art by
by the
th contra
ntractor.

- The foundation ground shall be proof rolled with vibratory


compactor to confirm that any loose materials are compacted
to not less than 95% of max. dry density.

-All Pre-cast Boundary Wall with (Admin


and Control Rooms) drawings,
are indicative to tendering purpose only, so,
shop drawings and structural calculation
should be submitted by specialist sub-contractor to the
authorities approval before execution start at site.