GENERAL NOTES:

LEGEND
ROOM FINISH SCHEDULE
CEILING
FLOOR BASE WALLS CEILING REMARKS
HEIGHT

SUSPENDED ACOUSTICAL TILE 600x600

SUSPENDED METAL TILE 600x600


SUSPENDED GYPSUM BOARD
GYPSUM BOARD PARTITION
RAISED FLOORING SYSTEM
PORCELAIN TILES 300x300
PORCELAIN TILES 600x600

EXPOSED CONSTRUCTION
PORCELAIN TILE 200x300
CONCRETE BLOCK (CMU)

VINYL WALL COVERING

EXPOSED CONCRETE
PORCELAIN 100mm
ROOM NUMBER

GLASS PARTITION
GRANITE 100mm
GRANITE TILES
VINYL TILE

PAINTED

PAINTED
PLASTER
CARPET

WOOD
VINYL
GROUND FLOOR
G01 PRAYER ROOM 2800mm
G02 DRIVER LOUNGE 2800mm
G03 LOBBY 2800mm
G04 STAIR NONE
G05 TOILET PROJECT NAME:
2500mm
G06 JAN. 2500mm CONSTRUCTION OF CUSTOMS
BUILDINGS IN THE SHIPPING
FIRST FLOOR YARD
F01 TRAINING HALL 2800mm PROJECT NO: BUILDING NO : 126

F02 STAIR NONE CLIENT:

F03 KITCHEN 2500mm


F04 FEMALE TOILET 2500mm

F05 MALE TOILET 2500mm


CONSULTANT:
F06 CORRIDOR NONE

CONTRACTOR:

DRAWING TITLE:

MATERIAL FINISHING SCHEDULE

DRAWN BY: DESIGN BY APPROVED BY:


ENG. AHMED ENG.SOLIMAN .....................................

SIZE:
DRAWING NO:
A2
AB-ARCH-104
REV:
SCALE: 1 : 100 DATE: 01/12/2021 00