You are on page 1of 1

PREVAILING WIND

DIRECTION
TRUE
NORTH

PLANT
NORTH

DIESEL TANK
AIR COMPRESSOR

GENERATOR
BOP SKID
POWER SWIVEL
TANK COOLANT KOOMEY

Cat walk Carrier


Rig Floor

STORAGE TANK #1
MUD TANK #1 MUD TANK #2 MUD TANK #3
STORAGE TANK #1
MUD TANK #4

DIESEL TANK DIESEL TANK

MUD TANK #3

MUD TANK #4

MUD TANK #3

MUD TANK #4
KOOMEY

KOOMEY
GENERATOR GENERATOR

AIR COMPRESSOR AIR COMPRESSOR

TANK COOLANT

TANK COOLANT
BOP SKID BOP SKID

Carrier

Carrier
MUD TANK #2

MUD TANK #2
Rig Floor

Rig Floor
POWER SWIVEL POWER SWIVEL

MUD TANK #1

MUD TANK #1
Cat walk

Cat walk
STORAGE TANK #1

STORAGE TANK #1

STORAGE TANK #1

STORAGE TANK #1
TRUE
NORTH

PREVAILING WIND
DIRECTION
WP-B : 21 Wells

WATER LINE

EXISTING SOC FACILITIES

18" TRUNKLINE FROM


WP-02 TO FCP

WP-D : 26 Wells
363706

505577

588377

225175

225175

174510

140734

562937 140734

247692

315245 132290

562937

PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) WELLPAD


MODIFICATION PROJECT (PHASE 1) FOR PETRONAS CARIGALI IRAQ HOLDING B.V.’S GARRAF OPERATION

PLOT PLAN FOR


WELL PAD - E

GF-GEN-WPE-J-32-3345 04/05 2