You are on page 1of 4

SHIFT B Handover

Date:

Time:

B
AC G
F

CONSUMPTION
READING
STORAGE / INTERNET SERVER MONITORING FOR LEAKS
GF
FF

1 2 3 4 5 6
SUMP PIT

LEGEND: X NO / Not Normal


/ YES / Normal

Checked by:

Comments:
Planned Preventive Maintenance
LOW CURRENT

Note: Please ensure that Standard Operating Procedures are followed while carrying out PPM activities. Fill up the checklist and
tick (X) for uncompliance or note necessary parameter needed.

Low Current
Monthly/Quarterly
Date
Asset;
Location/Project

1. CCTV (Closed Circuit Television System) Preventive Maintenance Checklist


a. Check the history of CCTV system from the last maintenance service Remarks
b. Visual Inspection of all major CCTV components including cabling snd
connections for signs of distortion or damage.
c. Check all CCTV control equipments. (Monitor, Driver,CPU, etc)
d. Check and cleaned cameras lenses and housing as necessary
e. Check all lenses for correct fields of view and adjust if necessary
f.Check pictures for correct field of view and adjust if necessary
g. Check and adjust all signaling equipment (where fitted)
h. Check recording and playback quality
i. Check the satisfactory transmission of image to remote centre (if applicable)
j. Repair faults if necessary
k.Retrain the users on the CCTV system (If required)
l. log all test results
j. Return the CCTV to normal operationa status.
2. Camera and Housing
f.Check
operation
a. Camera/lens focus and auto eris adjusted properly?
of pan tilt field of view adjusted to customers requirements.
b. Camera
and zoom
c. Camera
focus. Use housing viewing window is cleaned inside and out?
controller
d. Is camera lens dust free?
in control
e. Is interior of camera enclosure cleaned and dry?
room to
checkk all
functions.

d. Cables
3. Wirings and
Switchers
a. Check wiring and cable harness, for wear
allow
proper
b. Checked all cables connection, if loss or detached
sequencin
c. Check connectors and cables entry pointa for loose wiring connection
g and call
d.
up.Is coaxial cable transmitting an adequate video signal to control room.
Multiplex
e. Signal shall be free from distortion.
ers are
f. Make sure all coaxial connectors are insulated from one end to the other end.
properly
e. Clean
encoding
all
and
4. Control Equipment
monitor
decoding.
a. Monitor are free from any distortion
screens,
Matrix
control
b. Monitors must have proper contrast and brightness
switchers
panels
keyboards
c.
andAll control system is operational
are fully
keyboards
operation
with
al
diluted
cleaning
solutions.
f. Check all coaxial connectors on the back panels for loose connections.
g. Check all power connections to ensure AC plugs are not loose
Remarks/Comments