SAFARI FACILITIES MANAGEMENT Ba
ae
SAFARI (flaws
nagemene gait
Date | 18/10/2022 ae KFCA_SAFARI_SA_TR #032
Discipline:
Civil Telecom Electrical Mechanical 'Safety/General
Formation Of Moisture Inside the Main Distribution Panel
1711012022 10:50 AM
‘SA-06 Civil Defense Building
> TWAS NOTED OURING OUR WEEKLY PREVENTIVE MAINTENANCE THAT THERE WAS & FORMATION OF MOISTURE INSIDE THE MAIN
m5 DOOR BECAUSE OF THE HOT WEATER CONDITIONS.
> _ DUE TO THE EXCESSIVE WATER INSIDE PANEL CAN RESULT INTO THE DAMAGE OF PANEL BODY
IT IS OBSERVED THAT IN THE SA-06 CORRIDER OUTER SIDE OF THE PANEL VIHERE THE TENPERATURE IS COLD DUE TO AC AND
INNER SIDE IS HOT. DUE TO THIS THERE IS A FORMATION OF MOISTURE INSIDE THE PANEL.
TIS RECOMMENDED TO PROVIDE THE PROPER CIRCULATION OF THE AIR INSIDE THE PANEL SO AS TO AVOID ANY
HEAT EXCHANGE AND THE FORMATION OF THE MOISTUREINSIDE THE PANEL.
MOHAMMAD AARIZ CHRISTIAN BAIN ATEYAH AL,
Name Name fr Name THAGAFT
Tile ELECTRICAL | Title PRovect | Tite SR. PROJECT
ENGINEER MANAGER MANAGER
Signature Md. POF | Signature 10, Signature
Date: page Date: 18/ipfab22 Date: 10/2022
__ Page 1SS
Rixe eeatsem sey Rose MSnogemene ait
‘ATTACHMENT
SAFARI FACILITIES MANAGEMENT
Page 2 sas