Ears | Bip | Lash oie py
Request form: Service/ Maintenances /Projects
8\(Other)
o
aH clay! (Main data)
]
vsilirax) | abs(Letter) senl(Mail) daa ul iy
oO | oO 2 _Method of Receiving
0567606911 (Phone) iil! OBM Unit Manager :(Department) 5)! 44 Sah 454 /\iall : pail (Palace)
Sl plays gl Lite pul (Name of the applicant)
ow
a0 / 11/08 bate. Signature) es
seihe} Ginsks (Request Information)
]
s8i(Other) (Maintenance-out of contract ) 440i (Amendment) ase (New) all
pe Request
mee [oO 2
daa! alls ino Description of Work) |
Sally Jal sy Aga Jalil gle li NS 5
HAL al gb iy Syl gad JAS 8 yal SOD asa y Jal MASI
Salil le de 3ye gay Las 5 lla Lasse 55 Ge Atay
BL ysl 05 ite Ue
B2 706 celts ae
B2 spl O1 ie ake
2 jy ial ie ae
Ls 05 Gelade
ae ‘yall y.56 (Report of the maintenance) z me
ae i a Cy A ol, gl 5 Sy
Attached the report yall» 3 Gi» Oo O&M report
Abdullh al hal (Chief Engineer) |
ES sh (Signature)
2021/11/03 :&
n/a / Sh / TH / yal) 5 Js] Ga GAN AE} (Approval)
> ale Approve |
41 Reason Cit 28 Not approve
Name)
.: gi (Signature)
~ Comments / iis
ala SAL 6551 gh 9 yall BJ Se gy SIN 39D ASD Alp
La ja ange ally Sa gy
(MaDe fay AL JN a gl ep Agi ly dh
Det yoy ial Es aol 3 9s
9) ga pel Spd a AS Say ly Sad saa Se staal Ul aban 36)ai
Ra iy ad a
05
er
dry oe
SERVICE ZONE& Royal zone saa
a cin UD ls gl
SAME D RD had LUD be Abi,
A had by RE Nad JAS Aad DD Daly Saad at
AAD Said gle be ip gia § Len Nase 95 Goleta
BL 2205 ayn AL
B2 59506 athe
Sipe aie
cnlgalaSIE "a
Lm ot one Goa
SAUDI BINLADIN GROUP
‘Grenmrone wimraunce a
2021/10/31 Gi)
Asha) Just
Bakaly Byles Shall Matted asbial) phe AUB SF oll Alay Alb ode! ¢ gula yall coll SLEYL:
Fyhad) peal pb Ady Shpall Aqllaad als pUbaiy 8 pubecall DU lasieal 9 uadicall og) AS
PAWN) Jada) gle Hej ge ooh g Abi 5 lead! nse 9 5 Guae Altay
B1 252!) 05 (sips Aude «1
B2 255! 06 paisa Alas -2
B2 sil) O1 prise Ae -3
2 gal) Abita) (pipe Addie 4
129805 Glas Ade -5
ins pl
Olde Oly loReda Al Sheikh Est. For Contracting
Mga Ge Lay ae
FeCl Contos Econ Wats
RAS) Ay 4 Slay Mal
FOR LAUNDERIES
Date: 27.10.2021
On checking the water that is serving the laundries, we found that there is no
water softner installed due to which the laundries were receiving hard water and
these hard water use to contain magnesium and calcium
To remove these magnesium and calcium from the water and make the water
soft we propose to install the softener in the water line to make it soft.
The soft water makes the cloth softer without hard materials trapped in the
fabric.
Fabrics last longer and whites stay whiter
Without the dingy gray caused by hard water.
The soft water preserves the life of all Laundry Equipment's.
Thanking you, we remain
Best Regards,
Eng. Esmail
‘Sis Ai, 5 Tota une Cover Tata tana rae Be PH Joh 212, Tel OF 68H CR: ESET COIN: TEReda Al Sheikh Est. For Contracting > OY gla Geil Lay Al
Fer Gone Contacts Eecromechanical Warts AAs Ay ft Slay Ml AL
Quotation No.: 03061021,
Date: 06.10.2021
Royal Private Affairs
Makkah Al Mukarrama
‘Attn.: Dr. Abdul Mohsin
Dear Sir,
Subject: Supply and Installation of water softner for the laundries at Building 05-06, Diwan & Kitchen
at Safa Palace.
Further to the discussion and site inspection we had with your goodself regarding the above mentioned
subject, we are pleased to present our offer for the same with terms and condition as stated hereunder.
SCOPE OF WORK:
1. Supply and installation, testing and commissioning of fully automatic regeneration water,
Softner model EWS $132 manufactured by ECO water system USA (flow 2000 LPH)
a. ForCold water = 4set_ @SR32,000/- = SR 128,000/-
b. ForHotwater = set @SR32,000/- = SR 128,000/-
2. Supply and installation, testing and commissioning of fully automatic regeneration water,
Softner model EWS $130 manufactured by ECO water system USA (flow 2000 LPH)
a. ForCold water —- 1set_ @SR29,000/- = SR 29,000/
b. ForHotwater —-1set_ @SR29,000/- = SR 29,000/
All pipes and fittings used are UPVC class V.
PRICE: Our price for above scope of work will be SR 314,000/-.
15% VAT: SR 47,100/-
Net Amount: SR 361,100/-
{Saudi Riyal Three Hundred Sixty One Thousand One Hundred only.)
PAYMENT TERMS: 60% Advance and 40% upon completion.
DELIVERY PERIOD: Within 10 weeks from receiving your P.O. along with Advance,
WARRANTY: 1 year from the handing over for any manufacturing defects.
a Bess Cover -Tala Aoaeen Crossing P.O. Box 121683 - eh 21322, Tl O12 53GB. GR: ACBDTNETS CAND: 7984
Sa Ai, 5Reda Al Sheikh Est. For Contracting
Nghia Lady al
For General Contracts -Electromechanical Works 2 i : 4
Ay Ap Slay Aaa Lal
We hope our offer remain inline with your requirement and awaits your valued instruction.
Thanking you, we remaifi:—.
Best eas, 77
‘Siu As, Ta Buses Carta town Cran P.O, on 283 - sea 2127, a O12 68804 CR eSOTSDTS CIN: THB