Professional Documents
Culture Documents
Request
Form Number: 160.88-CL1 (1021)
New Release
Issue Date: 2021-10-29
c. Check cooling system for leaks Note: Do NOT cut to length or connect
without Johnson Controls supervision.
Note: Any component notes can be 2. Control Center:
recorded in the components notes space
a. Jumper wire is NOT installed between
provided on the following page(s).
terminal 24 and 25 located on the
control center terminal strip (TB-6).
B. Vibration isolators b. External control wiring is completed
from the control center to chilled
1. Isolators meet the requirements as outlined water flow switches or interlocks
in the isolator table in 160.88-N1, Isolator in accordance with the YORK Wiring
selection and mounting. Diagram Form 160-88-PW2.
2. Isolators are adjusted so that the unit c. Power is available and wiring is
is level and that all isolators are equally completed to the chilled water pump,
deflected. and rotation has been checked.
Note: Do NOT check the compressor
C. Water piping motor rotation.
1. Chilled water piping is installed between
cooler, pumps, and cooling coils. G. Testing, evacuation, and charging
2. Make-up and fill lines are installed to the
1. Dry nitrogen is available for testing.
chilled water system.
3. All water piping is checked for strain. Piping 2. A high vacuum pump is available for
must not spring when connections are evacuation and dehydration of system.
broken at unit.
3. Refrigerant, as supplied by Johnson
4. Water piping is leak tested and flushed, and Controls, is available for charging.
water strainers are cleaned after flushing.
4. Unit has been or is ready to be been
5. Piping systems are filled with water and pressure tested, evacuated, dehydrated,
trapped and all air is vented. and charged as outlined in 160.88-OM1.
6. Chilled water flow is available to meet the
unit design requirements.
H. Conditions
1. Cooling load is available for testing and
D. Refrigerant relief piping (when required) operating the unit.
1. Refrigerant relief piping with flexible 2. Personnel are available for final wiring
connection is installed from unit to connections.
atmosphere in accordance with local codes.
3. Personnel are available for start-up and
testing.
E. Unit clearances
1. Ensure that the clearances around the
unit meet the requirements of 160.88-N1,
Installation section.
Name: _______________________________________
Name: _______________________________________
Name: _______________________________________
With reference to the terms of the above contract, we are requesting the presence of your JCI Authorized Representative
at the job site on _______/_______/_______ (Month / Day / Year) to start the system and instruct operating personnel.
TERMS: We understand that the services of the Johnson Controls Authorized Representative will be furnished in
accordance with the contract for a period of time of not more than ________ consecutive normal working hours, and we
agree that a charge of __________ per diem plus travel expenses will be made to Johnson Controls if services are required
for longer than _________ consecutive normal hours or if repeated calls are required, through no fault of Johnson Controls.
Title: ___________________________________________________________
© 2021 Johnson Controls. 5000 Renaissance Drive, New Freedom, York, PA 17349, USA. Subject to change without notice. All rights
reserved.