SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :

MARK WALL DESCRIPTION MARK WALL DESCRIPTION


LEGEND:
150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
FL - 1 EWF - 1 PAINTED FINISH
(PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
R REVISION OF DRAWING DETAILS (1/23/2018) (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
(FROM 150 mm THK. CHB RAILING TO REINFORCED FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
DESIGN.
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) NOTE: R
100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
BREAKER) ABOVE WINDOW (W-1) AT REAR. AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
- REVISION OF TOILET'S WALL & FLOOR FINISHES ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
USED AS ALTERNATE ROOFING MATERIALS).
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
FINISH - TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 400 1200 1100 2200 400 1000

R
EWF-1 W-1a EWF-1 EWF-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1
W-4 W-1 W-1 W-1 W-1 W-1 W-1 W-1
W-1
IWF-2 LINE OF MEDIA AGUA ABOVE W-4 W-3 IWF-2
W-3 W-4
C
(low partition) - 1800 mm HIGH

1200
1200

IWF-1 IWF-1 IWF-1 IWF-1


SHO.
PWD PWD
DRY WALL

IWF-1
IWF-2
3150

3150
IWF-2

HANDWASHING
BD-1 BD-1 D-3
D-3 HE BD-1
SHE LOCKERS
&
IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

FL-3 D-2 DRESSING RM.


D-2
D-2a
CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING SCIENCE LABORATORY ROOM FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1

CONCRETE PLATFORM
EWF-1 FL-1 EWF-1
D-2
EWF-1
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM
3850

3850
3500
HANDWASHING

IWF-1
EWF-1 IWF-1 ELEV. 319.00 mm IWF-1 IWF-1 IWF-1
R

STO. IWF-1 STO.


IWF-1
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
UP D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a UP
EWF-1
2500

2500
W-2 1675
UP EWF-1 C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1 EWF-1
EWF-1a 1500 2250 R FL-2 FL-2 FL-2 1500
ELEV. 300.00 mm

125
300
1200
1600

1600
1200

SLOPE 1:12 SLOPE 1:12


RAMP UP 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH)
UP UP RAMP UP EWF-1
FL-4 REINFORCED CONCRETE BENCH WITH PLAIN
AT 600 mm HIGH WITH PLAIN CEMENT PLASTER PAINTED FL-4
LINE OF CANOPY ABOVE ELEV. 0.00 mm CEMENT PLASTER PAINTED FINISH
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)

9000 (1 @ 900 mm, 1@ 700 mm


HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
1500 3600 9550 3600 1500
- TYPICAL TO OTHER SIDE SIDE ( SEE DETAIL)

1 GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM - OPTION - 4)


SCALE 1: 100 M.
A-2b

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN WITH SCIENCE LABORATORY
CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ROOM
BUREAU OF DESIGN THREE (3) STOREY, FIFTEEN (15)
SCHEDULE OF FLOOR FINISHES FRANCIS G. SERRANO
ARCHITECT III
APPROVED WITH SIGNATURE BOD
A - 2b
BUILDINGS DIVISION SCHEDULE OF WALL FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 89
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH