You are on page 1of 84

INSPECTION AND TEST PLAN (TOWERS & FASTENERS)

Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

PROJECT DESCRIPTION
ENERGY CONNECT-SOUTH AUSTRALIA-NEW SOUTH
WALES TRANSMISSION INTERCONNECTOR
CLIENT NAME
EPC SECURE ENERGY JV
END CLIENT NAME
TRANSGRID
SUPPLIER
SKIPPER LIMITED, KOLKATA (INDIA)
LEGEND
S: Supplier - Skipper Limited, Kolkata, India
SEJV: EPC Secure Energy JV
E: Employer (Transgrid)
P: Perform
SRV: Surveillance
R: Review
H: Hold
W: Witness

Page 1 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

A. Raw Material Inspection


Components/ Testing Agency
Quantum of Check / Reference document Format of
Sr. No. Operation & Type of Check Acceptance Norms Remarks
Sampling with basis for Testing Record S SEJV E
Description of Test
1.0 RAW MATERIALS
1.1 Structural Steel All Material EN 10025-2 S275J0 Fully Killed Steel P R -- Raw material to be
(Angle Sections, EN 10025-2 S355J0 suitable for HDG procured from
Plates and sheets) BSEN 10204 type 3.1 “Skipper” approved
Mill certificates sources & angles to be
re-rolled from “Skipper”
approved sources as
per the enclosed
Annexure-1 &
Annexure-2
1.1.1 Mechanical Properties
(a) Test For As per Appendix B of AS EN 10025-2 S275J0 As per Table-1 Attached P W -- MIR at re-roller’s
Ultimate NZs 3679.1. the EN 10025-2 S355J0 Page No. 6 of 84 Format works.
Tensile sampling Plan must be SL-QC-MTR
Strength as per Table B2
(Production & Testing)
(b) Test For Yield As per Appendix B of AS EN 10025-2 S275J0 As per Table-1 Attached P W -- MIR at re-roller’s works.
Stress NZs 3679.1. the EN 10025-2 S355J0 Page No. 6 of 84 Format .
sampling Plan must be SL-QC-MTR
as per Table B2
(Production & Testing)

Page 2 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

A. Raw Material Inspection

Components/ Testing Agency


Quantum of Check / Reference document Format of
Sr. No. Operation & Type of Check Acceptance Norms Remarks
Sampling with basis for Testing Record
Description of Test S SEJV E

(c) Percentage As per Appendix B of AS EN 10025-2 S275J0 As per Table-1 Attached P W -- MIR at re-roller’s
Elongation NZs 3679.1. the EN 10025-2 S355J0 Page No. 6 of 84 Format works.
Test sampling Plan must be SL-QC-MTR
as per Table B2
(Production & Testing)
(d) Impact As per Appendix B of AS EN 10025-2 S275J0 As per Table-1 Attached P W -- MIR at re-roller’s
NZs 3679.1. the EN 10025-2 S355J0 Page No. 6 of 84 Format works.
sampling Plan must be SL-QC-MTR
as per Table B2
(Production & Testing)
1.1.2 Chemical Chemical As per Appendix B of AS EN 10025-2 S275J0 As per Table-1 P SRV/R -- MIR at re-roller’s
Composition Analysis NZs 3679.1. the EN 10025-2 S355J0 Page No. 6 of 84 works.
sampling Plan must be
as per Table B2
(Production & Testing)
1.1.3 Visual Visual As per Appendix B of AS Material to be free Attached P SRV -- MIR at re-roller’s
Inspection NZs 3679.1. the from surface defects Format works.
sampling Plan must be like laminations, SL-QC-DVIIR
as per Table B2 rough/jagged and
(Production & Testing) imperfect edges, cracks,
rounded apex, deep roll
marks, pipy and any
harmful defects

Page 3 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

A. Raw Material Inspection

Components/ Testing Agency


Quantum of Check / Reference document Format of
Sr. No. Operation & Type of Check Acceptance Norms Remarks
Sampling with basis for Testing Record
Description of Test S SEJV E

1.1.4 Dimensional Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
Inspection NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)
1.1.5 Tolerances For Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
Leg Length Of NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
Angles Equal / Un sampling Plan must be SL-QC-DVIIR
Equal as per Table B2
(Production & Testing)
1.1.6 Out of Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
Squareness NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)
1.1.7 Camber Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)
1.1.8 Root Radius Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)

Page 4 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

A. Raw Material Inspection


Components/ Testing Agency
Quantum of Check / Reference document Format of
Sr. No. Operation & Type of Check Acceptance Norms Remarks
Sampling with basis for Testing Record
Description of Test S SEJV E
1.1.8 Weight Tolerance Unit Weight As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
For Angle Sections Test NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)
1.1.9 Thickness Measurement As per Appendix B of AS As per As per Attached P SRV -- MIR at re-roller’s
Tolerance NZs 3679.1. the EN 10056-2 EN 10056-2 Format works.
For Plates sampling Plan must be SL-QC-DVIIR
as per Table B2
(Production & Testing)
1.2 Zinc Chemical As per Appendix B of AS EN 1179/ASTM B6 EN 1179/ASTM B6 SKIPPER/ P SRV -- Zinc to be procured
Ingot Analysis NZs 3679.1. the (Grade 99.95%) (Grade 99.95%) ZINC Mfr TC from “Skipper”
sampling Plan must be approved sources
as per Table B2 (Hindustan Zinc
(Production & Testing) Limited)

1.2.1 Zinc Bath Chemical The molten metal in The molten metal in Chemical P SRV -- Review Chemical
(Molten Zinc) Analysis galvanising bath galvanising bath (Spectro) (Spectro) Report
sample shall not contain less Report
than 98.5% by mass of
zinc

Page 5 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Table-1
CHEMICAL & MECHANICAL COMPOSITION (PRODUCT ANALYSIS)

CHEMICAL COMPOSITION MECHANICAL

Ultimate
SPECIFICATION & Yield Strength (N/mm²)
% Micro Tensile Percent
GRADE C% Mn% S% P% Si% Al% CE% (min)
alloying Strength Elongation Impact
(max) (max) (max) (max) (max) (min) (max)
elements (N/mm²) (min)
(min)
≤ 16 >16 ≤40 > 40

EN 10025-2 S275 J0 0.21 1.60 0.040 0.040 ---- ---- 0.015 0.420 275 265 255 410 23% 27 J at 0° C

V+Ti+Nb % is
EN 10025-2 S355J0 0.23 1.70 0.040 0.040 0.600 not more than 0.015 0.470 355 345 335 470 22% 27 J at 0° C
0.25%

Page 6 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Components/ Reference Testing Agency
Sr. Quantum of Check / Format of
Operation & Type of Check document for Acceptance Norms Remarks
No. Sampling with basis Record S SEJV E
Description of Test Testing
P SRV -- Approval
2.0 PROTOTYPE Measurement 100% Drawing released Refer to the TLDM-MNB section 12.10, Key Internal of Dossier
ASSEMBLY for Proto Checks to be derived from this standard Inspection
assembly Report
3.0 INPROCESS Visual & Visually 100 % & AS/NZS 5131/ AS/NZS 5131/ approved Drwg., Shop Attached P SRV --
INSPECTION Measurement Measurement as per approved Drwg., Sketches Format
st
Fabrication of Tower sample as 1 Piece Shop Sketches SL-QC-IFI
Parts and every 50th Piece
(a) Straightening Visual 100% AS/NZS 5131/ Refer to section 12.9 of TLDM-MNB Attached P SRV -- Review
approved Drwg., Format skipper
Shop Sketches SL-QC-IFI records
st
(b) Shearing and Cutting Dimensional 1 Piece and every AS/NZS 5131/ Refer to section 12.9 .3 of TLDM-MNB Attached P W -- Review
50th Piece approved Drwg., Format skipper
Shop Sketches SL-QC-IFI records
st
(c) Stamping Visual 1 Piece and every AS/NZS 5131/ Attached P W -- Review
50th Piece approved Drwg., Letter size height 12 minimum mm and Format skipper
Shop Sketches should be legible. The item Mark No will be SL-QC-IFI records
written down on some small pieces where
hard punch will be not possible.
(Maximum 12 digits in item number
embossing including Prefix and Mark
number).
st
(d) Punching / Drilling Dimensional 1 Piece and AS/NZS 5131/ Refer to TLDM-MNB section Attached P W -- Review
every 50th Piece approved Drwg., 12.9.4. Format skipper
Shop Sketches SL-QC-IFI records

Page 7 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Components/ Reference Testing Agency
Sr. Quantum of Check / Format of
Operation & Type of Check document for Acceptance Norms Remarks
No. Sampling with basis Record S SEJV E
Description of Test Testing
st
(e) Edge Security Dimensional 1 Piece and every AS/NZS 5131/ Attached P R -- Review
50th Piece approved Drwg., Format skipper
Shop Sketches SL-QC-IFI records
(i) For 13.5 mm dia Hole Sheared 20mm Min.
Rolled 16mm Min.
(ii) For 17.5 mm dia Hole Sheared 24mm Min.
Rolled 20mm Min.
(iii) For 21.5 mm dia Hole Sheared 28mm Min.
Rolled 25mm Min.

(iv) For 25 mm & 25.5 As per approved


mm dia Hole Drawing
st
(f) Drilling & Punching I Piece and every 50th AS/NZS 5131/ Tolerance cumulative and between Attached P W -- Review
Hole To Hole Distance Piece approved Drwg., consecutive hole shall be within ± 2 mm Format skipper
Shop Sketches and ± 1mm respectively SL-QC-IFI records

st
(g) Notching I Piece and every AS/NZS 5131/ + 5mm on specified length of cut Attached P W -- Review
Flange Cut 50th Piece approved Drwg., operationally shearing up to 12 mm thick Format skipper
Corner Cut Shop Sketches by gas cutting for material above 12 mm SL-QC-IFI records
Bevel Cut thick

st
(h) Heel Cutting Dimensional I Piece and every AS/NZS 5131/ For members > 12mm thick Attached P W -- Review
50th Piece approved Drwg., gas cutting to be adopted followed by Format skipper
Shop Sketches grinding/Machine cutting. Tolerance on SL-QC-IFI records
heel cutting length +10mm

Page 8 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Components/ Testing Agency
Sr. Operation & Type of Quantum of Check / Format of
Reference document for Testing Acceptance Norms Remarks
No. Description of Check Sampling with basis Record
Test S SEJV E

(i) Bending 100% Pieces AS/NZS 5131/ approved Drwg, (1) HT Sections / Plates Attached P SRV -- Review
Shop Sketches All Sections & all plates to be hot Format skipper
bent. SL-QC-IFI records
(2) MS Section
(i) Cold – Section up to 75x75x 6-
Angle up to 8°
(ii) Cold – Section up to 100x100x
8-Angle up to 5°
(iii)Hot – Section above 75x75x 6-
Angle above 8°
(iv)Hot – Section above 100x100x
8-Angle above 5°
(3) M.S Plates
(i)Cold up to 12mm thick up to 8°
(ii)Hot – others

(j) Welding Magnetic 10 % Welds are to be Welding to be carried out as per Welding should be free from Skipper P R -- Review
particle tested out of the total ASME Sec. IX and MPI to be welding defects. Inspection skipper
(MPI) lot manufactured. tested as per ASME Sec. V, Report records
MPI Procedure Document
Number : SL-QC-MPI
(k) Final Inspection Visual 100 % Visual Scanning All parameters from 3.0 (a) to 3.0 Acceptance criteria 3.0 (a) to 3.0 (j) Attached P SRV -- Review
of Fabricated 10 % Visual Inspection (j) above are checked and record will be considered. Format skipper
Parts maintained before releasing the .As per AS 5131 Section 13.6 CC2 SL-QC-IFI records
Materials for galvanising.

Page 9 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Quantum of Reference Testing Agency
Sr. Components/ Operation & Format of
Type of Check Check / Sampling document for Acceptance Norms Remarks
No. Description of Test Record S SEJV E
with basis Testing
4.0 GLAVANISING Chemical One sample daily Skipper norms As per 4.1 (a), (b), (c) and (d) Attached P SRV -- Review skipper
(Surface Preparation basis of Format records
Procedure) galvanising SL-QC-GSSR
chemical
4.1 Processing Review skipper
(a) It is acid base degreasing Chemical One sample Skipper norms Strength of sol between 5 to Attached P SRV -- records
solution at room temperature Daily 7 point as per manufacture Format
which dose not require water recommendation SL-QC-GSSR
rinsing
(b) Pickling P SRV -- Review skipper
Pickling is done in Hydrochloric Chemical One sample Skipper norms Acid concentration 50 to 210 Attached records
acid at room temperature. Daily Gm/ltr. Iron contents 0 to Format
160 gram/litre. Max SL-QC-GSSR
(c) Rinsing P SRV -- Review skipper
After pickling the material is Chemical One sample Skipper norms pH Value 5 to 6 Attached records
washed in water tank with Daily . Format
continuous water SL-QC-GSSR
arrangement
(d) Fluxing Chemical One sample Skipper norms The Specification of solution Attached P SRV -- Review skipper
After water rinsing the material daily are kept as mentioned below Format records
is fluxed by dipping in Zinc : SL-QC-GSSR
0
Chloride and Amonium 1. Temp- Room to 80 C
Chloride solution./ any suitable 2. Density – 18 to 30 Be.
patent fluxing reagent. 3. Ph Value – 2-5
4. Iron Content – 0 to 10
Gms/Litre Max
(e) Pre-heating P SRV -- Review skipper
records
Material is dried in Hot Measurement One check Skipper norms The Temperature should not
0
Chamber before dipping to per day exceed 170 C
Zinc bath

Page 10 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Quantum of Reference Testing Agency
Components/ Operation & Type of Format of
Sr. No. Check / Sampling document for Acceptance Norms Remarks
Description of Test Check Record S SEJV E
with basis Testing
4.2 Dipping P SRV -- Review skipper
After drying is over the material records
is dipped in molten zinc.
Following parameters are
controlled

(a) Zinc bath temperature Hourly check Skipper Norms 445° - 465° C. SKIPPER P SRV -- Review skipper
Recording manually in the RECORD records
SKIPPER format by the help of
calibrated temperature
controller.

(b) Immersion & Articles to be immersed till


Withdrawal time. Skipper Norms reaction takes place which
Degree of immersion and is indicated by stoppage of
withdrawal time is decided bubbling,withdrawal to be
based on thickness and length of controlled so that Zinc
material. drains freely

(c) Quenching in Running Water: Skipper Norms


After dipping the material is
quenched in running water

(d) Dichromating : One Sample Skipper Norms De-oxidant solution 1% to SKIPPER P SRV -- Review skipper
After quenching, material is Daily 0.2 % is used. Temperature RECORD records
dipped in sodium dichromatic of solution should be less
solution to avoid the white rust. than 65°C

Page 11 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. In Process Inspection
Quantum of Reference Testing Agency
Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing
4.3 Galvanising Checking

(a) Visual Checking Visual 100% AS/NZS 4680 Surface to be free from defects like SKIPPER P W --
Free from defects bare / black spots, (except when small RECORD
and suitable for patching) heavy ash &
flux inclusions, lumps, pimples, runs
etc

(b) Thickness of Measurement 3 samples / shift AS/NZS 4680 Minimum thickness of Zinc coating Attached P W -- Review
Zinc coating should be 85microns for 5 mm and Format skipper
above thick and 65 microns for SL-QC-HDGTR records
below 5 mm thick

(c) Weight of Zinc Measurement 3 samples / shift AS/NZS 4680 Minimum weight should be at least Attached P W -- Review
coating 600 gm/m² for 5 mm and above Format skipper
thick and average weight should be SL-QC-HDGTR records
460 gm/m² for below 5 mm thick

(d) Adhesion Tests of Zinc Pivoted 3 samples / shift AS/NZS 4680 No removal or lifting of coating in Attached P W -- Review
coating Hammer Test areas between hammer impressions Format skipper
SL-QC-HDGTR records

Page 12 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

C. Final Inspection & Testing


Components/ Testing Agency
Sr. Operation & Quantum of Check / Reference document
Type of Check Acceptance Norms Format of Record Remarks
No. Description of Sampling with basis for Testing S SEJV E
Test
1.0 FINAL INSPECTION & TESTING
(a) MECHANICAL (i) UTS Test As per Appendix B of EN 10025-2 S275J0 Testing will be done P W -- Client Clearance
PROPERTIES AS NZs 3679.1. the EN 10025-2 S355J0 at ISO 17025 certified Report
(ii) Yield Stress Test sampling Plan must Lab and test report
be as per Table B2 will be given in
(iii) Percentage (Production & Attached Format
Elongation Test Testing) SL-QC-CMTR

(iv) Impact

(b) GALVANISING (i) Visual One sample for Every AS/NZS 4680 AS/NZS 4680 Testing will be done P W -- Client Clearance
TESTS (ii) Thickness of 50 MT/ section or at ISO 17025 certified Report
Zinc Coating part thereof Lab and test report
(iii) Weight of Zinc will be given in
Coating Attached Format
(iv) Adhesion Test SL-QC-GTR
of Zinc Coating
(c) VISUAL & For Fabrication (as As per Appendix B of Raw Material Steel EN 10056-2 Dimension report P W -- Client Clearance
DIMENSIONAL per approved AS NZs 3679.1. the Dimension: should be submitted Report
INSPECTION dwg.) & sampling Plan must EN 10056-2
Galvanising be as per Table B2
(Production & Fabrication Dimension: AS/NZS 5131/
Testing) AS/NZS 5131/ approved approved Drwg.,
Drwg., Shop Sketches Shop Sketches

Galvanising AS/NZS 4680

Page 13 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Source of Approval for Raw-Material (Billets & Blooms)


Annexure-1
SL NO. PARTY NAME ADDRESS APPROVED BY

1 STEEL AUTHORITY OF INDIA LIMITED DURGAPUR -713203, (W.B) POWER GRID

2 IISCO STEEL PLANT BURNPUR-713325,(W.B) POWER GRID

3 ELECTROSTEEL STEEL LIMITED VILL-SIYALJORI,P.O-JOGIDIH, BOKARO-828303, JHARKHAND POWER GRID


PHASE-V, ADITYAPUR INDUSTRIAL AREA,GAMHARIA, DIST-
4 USHA MARTIN LIMITED POWER GRID
SARAIKELA,KHARSAWARA, JHARKHAND-832108
5 RSSHTRIYA ISPAT NIGAM LIMITED VISAKHAPATNAM POWER GRID
KAINGANAGAR INDUSTRIAL COMPLEX, P.O-JAKHAPURA,DIST- JAJPUR,
6 VISA STEEL LIMITED POWER GRID
ODISHA-755026
7 JSPL 16 KHARSIA ROAD, RAIGARH-496001 (C.G) POWER GRID
VILL-CHANDRIHARIHARPUR,P.O-KUARMUNDA, DIST-SUNDARGARH,
8 ADHUNIK ISPAT LIMITED POWER GRID
ROURKELA, ORISSA
SILTARA INDUSTRIAL GROWTH CENTRE RAIPUR (CHHATTISGARH)-
9 JASAWAL NECO INDUSTRIES LIMITED POWER GRID
493111
KALIDANGA NAGAR INDUSTRIAL COMPLEX, DUBURI, DIST. JAIPUR, ODISHA-
10 NEELANCHAN ISPAT NIGAM LIMITED POWER GRID
755026

Page 14 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

List of Approved Re-rollers


Annexure-2
SL NO. NAME OF THE SUPPLIERS ADDRESS APPROVED BY

1 M/S SKIPPER LIMITED UNIT-ULUBERIA NH-6, VILL- MADHABPUR, P.O- MAHISHREKHA, HOWRAH-711303 (W.B) POWER GRID

2 M/S SANVIJAY ROLLING & ENGINEERING LTD 41/43 M.I.D.C. HINGNA ROAD, NAGPUR-440016, MAHARASTRA POWER GRID

3 M/S SANVIJAY ROLLING & ENGINEERING LTD F11/12,M.I.D.C. HINGNA ROAD, NAGPUR-440016,MAHARASTRA POWER GRID

4 M/S SANVIJAY ROLLING & ENGINEERING LTD B-202 M.I.D.C. BUTIBON NAGPUR-441108, MAHARASTRA POWER GRID

5 M/S SANVIJAY ROLLING & ENGINEERING LTD B-203 M.I.D.C BUTIBONI , NAGPUR- 440016 ,MAHARASTRA POWER GRID

6 M/S SHREE PARASNATH RE-ROLLING MILL LTD 3511-P, DR. B.C ROY AVNUE, DURGAPUR-713201 (W.B) POWER GRID

7 M/S KHYATI ISPAT PVT.LTD VILL-JARWAH, P.O- HIRAPUR, DIST- RAIPUR, CHHATTISGARH, PIN- 492099 POWER GRID

8 M/S SWASTIKA STEELS & ALLIED PRODUCTS 811 NATUN PARA ROAD , LILUAH, HOWRAH-711204 (W.B) POWER GRID

9 M/S HOOGHLY ALLOY & STEEL (P) LIMITED NH-2 , DELHI ROAD , DAKSHIN HOOGHLY - 712203 (W.B) POWER GRID
521/, URLA INDUSTRIAL COMPLEX , URLA , RAIPUR, CHHATTISGARH, PIN-
10 M/S SHRI BAJRANG ALLOYS LTD POWER GRID
493221
P.B. NO.-16, KHRSIA ROAD , RAIGARH, CHHATTISGARH, PIN-496001
11 M/S JSPL CHHENDIPADA ROAD, SH-63, AT\PO : JINDAL NAGAR, PIN-759111. DIST POWER GRID
: ANGUL (ODISHA)

Page 15 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Fasteners
Quantum of Testing Agency
Components/ Operation Reference document Format of
Sr. No. Type of Check Check / Sampling Acceptance Norms Remarks
& Description of Test for Testing Record S SEJV E
with basis
A Raw Materials
1.1 Steel for Hex Bolts, Hex Nuts, Step Bolts , Flat washers, Pack washers & Spring washers
Round wire for Hex Bolts & BSEN 10204
1 Sample per Heat %C=0.55 max. Reviewed on
Hex Step Bolts AS 1559 : 2018
1.1.1
(Grade T)
Chemical or 1 Sample per 10
or
%P=0.035 max. type 3.1 Mill P SRV --
MT. %S=0.035 max. certificates
surveillance basis
SAE 1018

%C=0.58 max. BSEN 10204


Round wire for Hex Nuts 1 Sample per Heat Reviewed on
AS 1559 : 2018 %P=0.060 max.
1.1.2 (Class 5 Z) Chemical or 1 Sample per 10
or %S=0.150 max.
type 3.1 Mill P SRV --
MT. certificates
surveillance basis
SAE 1018

AS 1442:2001 Grade %C=0.65-0.75 or 0.75-0.88


Round wire for Spring 1 Sample per Heat 1070 or 1080 %Si=0.10-0.35 BSEN 10204
Reviewed on
1.1.4 washers Chemical or 1 Sample per 10 Equivalent to %Mn=0.60-0.90 type 3.1 Mill P SRV --
MT. IS 7904, Grade HC72B %P=0.040 max certificates
surveillance basis
or HC82BX %S=0.040 max

AS 3678-250 or
AS 3679.1 %C=0.22 max. or 0.25 max
1 Sample per Heat Equivalent to %Si=0.55 max or 0.50 max BSEN 10204
Round wire/Plate for Flat Reviewed on
1.1.5
/Pack washers
Chemical or 1 Sample per 10 EN 10025-2 S275J0 or %Mn=1.70 max or 1.60 max type 3.1 Mill P SRV --
MT. EN 10025-2 S355J0 or %P=0.040 max or 0.040 max certificates
surveillance basis
SAE 1010 or %S=0.030 max or 0.040 max
SAE 1018 or

Page 16 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing
1.2 Zinc

1 Sample /lot of
EN 1179/ Test Reviewed on
1.2.1 Chemical Composition Chemical 25MT or part 99.95% Zinc P SRV --
ASTM B6 certificate surveillance basis
thereof

The molten
metal in the
The molten metal in the Test
Galvanising
As per Plant Galvanising bath shall not certificate/S Reviewed on
1.1.2 Chemical Composition Chemical bath shall not P SRV --
Specification contain less than 98.5% by pectro surveillance basis
contain less Report
mass of Zinc
than 98.5% by
mass of Zinc
B In-Process Inspection
2.1 Dimensions for Hex Bolts & Step Bolts (Grade T as per AS 1559: 2018, Clause 1.5.1, Figure No. 1.1)
M12=1.75 mm
AS 1559 :
M16=2.00 mm Reviewed on
2.1.1 Pitch (p) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=2.50 mm surveillance basis
(Table 2.1)
M24=3.00 mm

M12=2.63 to 3.50 mm
AS 1559 :
M16=3.00 to 4.00 mm Reviewed on
2.1.2 Thread run out Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=3.75 to 5.00 mm surveillance basis
(Table 2.1)
M24=4.50 to 6.00 mm

Page 17 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing
M12=11.30 to 12.70 mm
AS 1559 :
M16=15.30 to 16.70 mm Reviewed on
2.1.3 Diameter of Shank (ds) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=19.16 to 20.84 mm surveillance basis
(Table 2.1)
M24=23.16 to 24.84 mm

M12=17.57 to 18.00 mm
AS 1559 :
M16=23.16 to 24.00 mm Reviewed on
2.1.4 Width Across Flat (s) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=29.16 to 30.00 mm surveillance basis
(Table 2.1)
M24=35.00 to 36.00 mm

M12=19.85 to 20.70 mm
AS 1559 :
Width across corner M16=26.17 to 27.70 mm Reviewed on
2.1.5 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
(e ) M20=32.95 to 34.60 mm surveillance basis
(Table 2.1)
M24=39.55 to 41.60 mm

M12=16.50 mm min.
AS 1559 :
M16=22.00 mm min. Reviewed on
2.1.6 Washer Face dia (dw ) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=27.70 mm min. surveillance basis
(Table 2.1)
M24=33.20 mm min.

M12=0.15 to 0.60 mm
AS 1559 :
Depth of Washer Face M16=0.20 to 0.80 mm Reviewed on
2.1.7 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
(c) M20=0.20 to 0.80 mm surveillance basis
(Table 2.1)
M24=0.20 to 0.80 mm

Page 18 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing
M12=14.70 mm min.
AS 1559 :
M16=18.70 mm min. Reviewed on
2.1.8 Transition dia (da ) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=24.40 mm min. surveillance basis
(Table 2.1)
M24=28.40 mm min.

M12=0.60 mm max.
AS 1559 :
M16=0.60 mm max. Reviewed on
2.1.9 Radius under head ( r ) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=0.80 mm max. surveillance basis
(Table 2.1)
M24=0.80 mm max.

M12=3.00 mm max.
AS 1559 :
M16=3.00 mm max. Reviewed on
2.1.10 Fillet length (lf ) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=4.00 mm max. surveillance basis
(Table 2.1)
M24=4.00 mm max.

M12=7.05 to 7.95 mm
AS 1559 :
M16=9.25 to 10.75 mm Reviewed on
2.1.11 Height of Head (k) Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
M20=11.60 to 13.40 mm surveillance basis
(Table 2.1)
M24=14.10 to 15.90 mm

M12=0.84 mm max.
AS 1559 :
Symmetry of head to M16=0.84 mm max. Reviewed on
2.1.12 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV --
body M20=0.84 mm max. surveillance basis
(Table 2.1)
M24=1.00 mm max.

Page 19 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
M12=1.40 mm max.
AS 1559 : Reviewed on
M16=1.40 mm max.
2.1.13 Concentricity tolerance Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV -- surveillance
M20=1.68 mm max.
(Table 2.1) basis
M24=1.68 mm max.

M12=0.54 mm max.
AS 1559 : Reviewed on
Squareness of bearing M16=0.68 mm max.
2.1.14 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV -- surveillance
face to shank M20=0.84 mm max.
(Table 2.1) basis
M24=1.00 mm max.

M12=21.00 mm +1P
AS 1559 : Reviewed on
Thread Length (b) for M16=25.00 mm +1P
2.1.15 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV -- surveillance
Single Nuts M20=28.00 mm +1P
(Table 2.2) basis
M24=31.00 mm +1P

M12=30.60 mm +1P
AS 1559 : Reviewed on
Thread Length (b) for M16=38.80 mm +1P
2.1.16 Measurement 1 Sample per hour 2018 SL/F/IPIR/01 P SRV -- surveillance
double Nuts M20=46.00 mm +1P
(Table 2.2) basis
M24=54.20 mm +1P
M16, lg= 130 mm max.
AS 1559 : M20, lg= 130 mm max. (180 to 190 Reviewed on
Thread Length (b) for
2.1.17 Measurement 1 Sample per hour 2018 mm) & 150 mm max.(210 to 290 mm) SL/F/IPIR/01 P SRV -- surveillance
Step Bolts
(Table 2.5) M24, lg= 150 mm max basis
(b=l- lg )

Page 20 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
AS 1559 : Up to 50 mm ±1.25 mm
Reviewed on
2018 55 to 80 mm ±1.50 mm
2.1.18 Total length (L) Measurement 1 Sample per hour SL/F/IPIR/01 P SRV -- surveillance
(Table 2.3& 85 to 120 mm ±1.75 mm
2.4) 125 to 160 mm ±2.00 mm basis

AS 1559 : M12 ls = lg -2p


Reviewed on
2018 M16 ls = lg -2p
2.1.19 Shank length (ls) Measurement 1 Sample per hour SL/F/IPIR/01 P SRV -- surveillance
(Table 2.3& M20 ls = lg -2p
2.4) M24 ls = lg -2p basis

AS 1559 : M12 Lg = l- b
Reviewed on
2018 M16 Lg = l- b
2.1.20 Grip length (lg) Measurement 1 Sample per hour SL/F/IPIR/01 P SRV -- surveillance
(Table 2.3& M20 Lg = l- b
2.4) M24 Lg = l- b basis

AS 1559 : SL T ( SL= Skipper Limited &


Reviewed on
2018 T= Grade)
2.1.21 Embossing Visual 1 Sample per hour SL/F/IPIR/01 P SRV -- surveillance
(Clause Or T with other manufacturers
1.5.1) logo basis

Page 21 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

2.2 Dimensions for Hex Nuts (Class 5 Z as per AS 1559: 2018 , Clause 1.5.2, Figure No.1.2)

M12=1.75 mm
AS 1559 : Reviewed on
M16=2.00 mm SL/F/IPIR/
2.2.1 Pitch (p) Measurement 1 Sample per hour 2018 P SRV -- surveillance
M20=2.50 mm 02
(Table 3.1) basis
M24=3.00 mm

M12=12.00 to 13.00 mm
AS 1559 : Reviewed on
M16=16.00 to 17.30 mm SL/F/IPIR/
2.2.2 Counter dia (da ) Measurement 1 Sample per hour 2018 P SRV -- surveillance
M20=20.00 to 21.60 mm 02
(Table 3.1) basis
M24=24.00 to 25.90 mm.

M12=16.60 mm min.
AS 1559 : Reviewed on
M16=22.49 mm min. SL/F/IPIR/
2.2.3 Washer Face dia (dw ) Measurement 1 Sample per hour 2018 P SRV -- surveillance
M20=27.70 mm min. 02
(Table 3.1) basis
M24=33.25 mm min.

M12=20.03 mm min
AS 1559 : Reviewed on
M16=26.75 mm min SL/F/IPIR/
2.2.4 Width across corner (e ) Measurement 1 Sample per hour 2018 P SRV -- surveillance
M20=32.95 mm min 02
(Table 3.1) basis
M24=39.55 mm min

Page 22 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
M12=10.37 to 10.80 mm
AS 1559 : Reviewed on
M16=14.10 to 14.80 mm
2.2.5 Thickness of Nuts (m) Measurement 1 Sample per hour 2018 SL/F/IPIR/02 P SRV -- surveillance
M20=16.90 to 18.00 mm
(Table 3.1) basis
M24=20.20 to 21.50 mm

M12=8.30 mm min.
AS 1559 : Reviewed on
M16=11.28 mm min.
2.2.6 Wrench height (mw ) Measurement 1 Sample per hour 2018 SL/F/IPIR/02 P SRV -- surveillance
M20=13.52 mm min.
(Table 3.1) basis
M24=16.16 mm min.

M12=17.73 to 18.00 mm
AS 1559 : Reviewed on
M16=23.67 to 24.00 mm
2.2.7 Width across flat (s) Measurement 1 Sample per hour 2018 SL/F/IPIR/02 P SRV -- surveillance
M20=29.16 to 30.00 mm
(Table 3.1) basis
M24=35.00 to 36.00 mm

AS 1559 : SL 5Z ( SL= Skipper Limited &


Reviewed on
2018 5Z= Grade)
2.2.8 Embossing/Engraving Visual 1 Sample per hour SL/F/IPIR/02 P SRV -- surveillance
(Clause Or 5Z with other manufacturers
1.5.2) logo basis

Page 23 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

2.3 Dimensions for Flat/Pack Washers

M12=14.00 to 14.43 mm
AS 1559 :
M16=18.00 to 18.43 mm Reviewed on
2.3.1 Inside diameter (d₁) Measurement 1 Sample per hour 2018 SL/F/IPIR/06 P SRV --
M20=22.00 to 22.52 mm surveillance basis
(Table 4.1)
M24=26.00 to 26.52 mm

M12=22.70 to 24.00 mm
AS 1559 :
M16=28.70 to 30.00 mm Reviewed on
2.3.2 Outside diameter (d₂) Measurement 1 Sample per hour 2018 SL/F/IPIR/06 P SRV --
M20=35.40 to 37.00 mm surveillance basis
(Table 4.1)
M24=42.40 to 44.00 mm

M12=4.73 to 5.27 mm
AS 1559 :
M16=4.73 to 5.27 mm Reviewed on
2.3.2 Thickness (h) Measurement 1 Sample per hour 2018 SL/F/IPIR/06 P SRV --
M20=4.73 to 5.27 mm surveillance basis
(Table 4.1)
M24=4.73 to 5.27 mm

1.00 to 2.5 ±0.30 mm


2.50 to 4.00 ±0.60 mm
Thickness for Pack As per Plant Reviewed on
2.3.3 Measurement 1 Sample per hour 4.00 to 6.00 ±1.00 mm SL/F/IPIR/06 P SRV --
Washer Standard surveillance basis
6.00 to 10.00 ±1.20 mm
10.00 to 18.00 ±1.50 mm

Page 24 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

2.4 Dimensions for Helical Spring washers

M12=12.70 to 13.20 mm
AS 1559 :
M16=16.70 to 17.50 mm Reviewed on
2.4.1 Inside diameter (D₁) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=20.70 to 21.70 mm surveillance basis
(Table 5.1)
M24=25.00 to 26.00 mm

M12=21.60 mm max.
AS 1559 :
M16=27.90 mm max. Reviewed on
2.4.2 Outside diameter (D₂) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=34.10 mm max. surveillance basis
(Table 5.1)
M24=40.50 mm max.

M12=3.80 to 4.20 mm
AS 1559 :
M16=4.80 to 5.20 mm Reviewed on
2.4.3 Section width (b) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=5.80 to 6.20 mm surveillance basis
(Table 5.1)
M24=6.75 to 7.25 mm

M12=2.35 to 2.65 mm
AS 1559 :
M16=3.30 to 3.70 mm Reviewed on
2.4.4 Section thickness (S) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=3.80 to 4.20 mm surveillance basis
(Table 5.1)
M24=4.80 to 5.20 mm

Page 25 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
M12=1.00 mm max.
AS 1559 :
M16=1.15 mm max. Reviewed on
2.4.5 Section radius (R) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=1.30 mm max. surveillance basis
(Table 5.1)
M24=1.65 mm max.

M12=4.25 to 5.75 mm
AS 1559 :
M16=5.95 to 8.05 mm Reviewed on
2.4.6 Free height(h) Measurement 1 Sample per hour 2018 SL/F/IPIR/07 P SRV --
M20=6.80 to 9.20 mm surveillance basis
(Table 5.1)
M24=8.50 to 11.50 mm

2.5 Heat Treatment Process for Spring Washers (Hardness as per AS 1559 : 2018, Clause 5.2.3)

Temperature/ As per Plant Reviewed on


2.5.1 Hardening
soaking time
1 Time/Lot
Specification
840 to 860 °C SL/QC/HT/01 P SRV --
surveillance basis

Temperature/ As per Plant Reviewed on


2.5.2 Tempering
soaking time
1 Time/Lot
Specification
380 to 400 °C SL/QC/HT/01 P SRV --
surveillance basis

AS 1559 : M12, M16, M20 & M24 Reviewed on


2.5.3 Hardness Mechanical 2 Samples /2 Hours 2018, Clause 450 to 540 HV SL/QC/HT/01 P SRV --
5.4.1 (45 to 52 HRC) surveillance basis

Page 26 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

2.6 Hot Dip Galvanising process for Hex Bolts, Step Bolts ,Hex Nuts, Flat washers, Pack Washers & Spring Washers

One Sample per As per Plant Reviewed on


2.6.1 Degreasing Chemical Sp. Gr.1.05 to 1.25 pH<5 QA/Galv/02 P SRV --
Day Specification surveillance basis

One Sample per As per Plant Sp. Gr.1.07 to 1.26 Reviewed on


2.6.2 Pickling Chemical QA/Galv/02 P SRV --
Day Specification Fe Content 120 gm/lit max surveillance basis

One Sample per As per Plant Reviewed on


2.6.3 Rinsing Chemical pH 5 to 7 QA/Galv/02 P SRV --
Day Specification surveillance basis

One Sample per As per Plant Sp. Gr.1.16 to 1.32 Reviewed on


2.6.4 Pre Fluxing Chemical QA/Galv/02 P SRV --
Day Specification pH 4 to 5 surveillance basis

2.6.6 Dipping : After drying is over the material is dipped in molten Zinc following parameters are controlled
a) Zinc bath
455 °C to 480 °C SL/QF/HDG/ Reviewed on
2.6.7 temperature : With Measurement Hourly check AS 1214 P SRV --
01 surveillance basis
digital display
2.6.8 b) immersion and withdrawal time degree of immersion and withdrawal time is decided based on thickness and length of material

As per Plant Reviewed on


2.6.9 Centrifuging Visual Continuous 2 to 3 seconds … P SRV --
Specification surveillance basis

Page 27 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
Quenching in running
water : After dipping
Once in two As per Plant Temperature should be less Reviewed on
2.6.10 the material is Measurement SL/QF/HDG/02 P SRV --
hours Specification than 65°C surveillance basis
quenched in running
water

Dichromate: After
quenching material is
Once in each As per Plant Temperature should be less Reviewed on
2.6.11 dipped in sodium Measurement SL/QF/HDG/02 P SRV --
shift Specification than 65°C surveillance basis
dichromatic solution to
avoid the white rust

2.7 Hot Dip Galvanising test for Hex Bolts, Step Bolts ,Hex Nuts, Flat washers, Pack Washers & Spring Washers
AS 1214 and
Free from uncoated areas,
refer
blisters, flux deposits, black Reviewed on
2.7.1 Visual Checking Visual 100 % TLDM- SL/QF/HDG/01 P SRV --
spot, dross inclusions and surveillance basis
MNB
other defect.
Section 4.5
AS 1214
Local coating thickness
3 Samples/2 (TLDM- Reviewed on
2.7.2 Zinc coating thickness Measurement minimum 42 µm SL/QF/HDG/01 P SRV --
Hours MNB surveillance basis
Section 4.5)

Adhesion test of zinc 3 samples/2 No coating should be paring Reviewed on


2.7.3 Knife Test AS 1214 SL/QF/HDG/01 P SRV --
coating Hours / whittling surveillance basis

Page 28 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Type of Format of
Sr. No. Check / Sampling document for Acceptance Norms Remarks
& Description of Test Check Record S SEJV E
with basis Testing

2.8 Mechanical properties test for Hex Bolts & Step Bolts (Grade T)
480 MPa min.
AS 1559 :
M12=40.50 kN min. Reviewed on
Tensile strength under 2018
2.8.1 Mechanical 1 Sample per hour M16=75.40 kN min. SL/QF/M&P/01 P SRV -- surveillance
wedge loading (Table 2.7 &
M20=118.00 kN min. basis
2.8)
M24=169.00 kN min.
320 MPa min.
AS 1559 :
M12=27.00 kN Reviewed on
2018
2.8.2 Stress under proof load Mechanical 1 Sample per hour M16=50.20 kN SL/QF/M&P/01 P SRV -- surveillance
(Table 2.7 &
M20=78.40 kN basis
2.8)
M24=113.00 kN
320 MPa min.
AS 1559 :
M12=72.40 kN min. Reviewed on
Shear stress (Double 2018
2.8.3 Mechanical 1 Sample per hour M16=129.00 kN min. SL/QF/M&P/01 P SRV -- surveillance
Shear) (Table 2.7 &
M20=201.00 kN min. basis
2.8)
M24=290.00 kN min.

AS 1559 : Reviewed on
Charpy V-Notch Impact Average of 3 tests min. 27 J at 0° C
2.8.4 Mechanical 1 Sample per hour 2018 Individual test min. 20 J at 0° C
SL/QF/M&P/01 P SRV -- surveillance
Strength
(Table 2.7) basis

Page 29 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

2.9 Mechanical properties test for Hex Nuts (Class 5 Z)


Testing will be done
M12=51.40 kN at ISO 17025 certified
AS 1559 :
M16=95.80 kN Lab and test report Reviewed on
2.9.1 Proof load Mechanical 1 Sample per hour 2018 P SRV --
M20=154.40 kN will be given in surveillance basis
(Table 3.3) Attached Format
M24=222.40 kN
SL/QF/M&P/01
Testing will be done
M12=130 to 302 HV at ISO 17025 certified
AS 1559 :
M16=130 to 302 HV Lab and test report Reviewed on
2.9.2 Hardness Mechanical 1 Sample per hour 2018 P SRV --
M20=146 to 302 HV will be given in surveillance basis
(Table 3.3) Attached Format
M24=146 to 302 HV
SL/QF/M&P/01

2.10 Mechanical properties test for Helical Spring washer


AS 1559 :
No sign of fracture at Reviewed on
2.10.1 Twist test Mechanical 1 Sample per hour 2018, Clause SL/QF/M&P/01 P SRV --
5.4.2 90° surveillance basis

AS 1559 :
Closure test for Free height not less Reviewed on
2.10.2 Mechanical 1 Sample per hour 2018, Clause SL/QF/M&P/01 P SRV --
permanent set 5.4.3 than 60% after 1 hour surveillance basis

AS 1559 :
No sign of cracks or Reviewed on
2.10.3 Embrittlement test Mechanical 1 Sample per hour 2018, Clause SL/QF/M&P/01 P SRV --
5.4.4 fracture after 24 hours surveillance basis

Page 30 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing
C Final Inspection
3.1 Dimensions for Hex Bolts & Step Bolts (Grade T as per AS 1559: 2018, Clause 1.5.1, Figure No. 1.1)
M12=17.57 to 18.00 mm
AS 1559 : Client Clearance
M16=23.16 to 24.00 mm
3.1.1 Width Across Flat (s) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=29.16 to 30.00 mm
(Table 2.1)
M24=35.00 to 36.00 mm
M12=19.85 to 20.70 mm
AS 1559 : Client Clearance
Width across corner M16=26.17 to 27.70 mm
3.1.2 Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
(e ) M20=32.95 to 34.60 mm
(Table 2.1)
M24=39.55 to 41.60 mm
M12=7.05 to 7.95 mm
AS 1559 : Client Clearance
M16=9.25 to 10.75 mm
3.1.3 Height of Head (k) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=11.60 to 13.40 mm
(Table 2.1)
M24=14.10 to 15.90 mm
M12=11.30 to 12.70 mm
AS 1559 : Client Clearance
M16=15.30 to 16.70 mm
3.1.4 Diameter of Shank (ds) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=19.16 to 20.84 mm
(Table 2.1)
M24=23.16 to 24.84 mm

AS 1559 : Up to 50 mm ±1.25 mm
Client Clearance
2018 55 to 80 mm ±1.50 mm
3.1.5 Total length (L) Measurement 5 Sample/ Dia SL/FIR/D/01 P SRV -- Report
(Table 2.3& 85 to 120 mm ±1.75 mm
2.4) 125 to 160 mm ±2.00 mm

Page 31 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Testing Agency


Components/ Reference
Sr. Type of Check / Format of
Operation & document Acceptance Norms Remarks
No. Check Sampling with Record S SEJV E
Description of Test for Testing
basis
M12=21.00 mm +1P
AS 1559 : Client Clearance
Thread Length (b) for M16=25.00 mm +1P
3.1.6 Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
Single Nuts M20=28.00 mm +1P
(Table 2.2)
M24=31.00 mm +1P
M12=30.60 mm +1P
AS 1559 : Client Clearance
Thread Length (b) for M16=38.80 mm +1P
3.1.7 Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
double Nuts M20=46.00 mm +1P
(Table 2.2)
M24=54.20 mm +1P
AS 1559 : M12 ls = lg -2p
Client Clearance
2018 M16 ls = lg -2p
3.1.8 Shank length (ls) Measurement 5 Sample/ Dia SL/FIR/D/01 P SRV -- Report
(Table 2.3& M20 ls = lg -2p
2.4) M24 ls = lg -2p
AS 1559 : M12 Lg = l- b
Client Clearance
2018 M16 Lg = l- b
3.1.9 Grip length (lg) Measurement 5 Sample/ Dia SL/FIR/D/01 P SRV -- Report
(Table 2.3& M20 Lg = l- b
2.4) M24 Lg = l- b
M12=1.75 mm
AS 1559 : Client Clearance
M16=2.00 mm
3.1.10 Thread dimension (d) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=2.50 mm
(Table 2.1)
M24=3.00 mm
M12=0.60 mm max.
AS 1559 : Client Clearance
M16=0.60 mm max.
3.1.11 Radius under head ( r ) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=0.80 mm max.
(Table 2.1)
M24=0.80 mm max.

Page 32 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.2 Dimensions for Hex Nuts (Class 5 Z as per AS 1559: 2018 , Clause 1.5.2, Figure No.1.2)

M12=17.73 to 18.00 mm
AS 1559 : Client Clearance
M16=23.67 to 24.00 mm
3.2.1 Width across flat (s) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=29.16 to 30.00 mm
(Table 3.1)
M24=35.00 to 36.00 mm

M12=20.03 mm min
AS 1559 : Client Clearance
M16=26.75 mm min
3.2.2 Width across corner (e ) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=32.95 mm min
(Table 3.1)
M24=39.55 mm min

M12=10.37 to 10.80 mm
AS 1559 : Client Clearance
M16=14.10 to 14.80 mm
3.2.3 Thickness of Nuts (m) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=16.90 to 18.00 mm
(Table 3.1)
M24=20.20 to 21.50 mm

M12=1.75 mm
AS 1559 : Client Clearance
M16=2.00 mm
3.2.4 Thread dimension (d) Measurement 5 Sample/ Dia 2018 SL/FIR/D/01 P SRV -- Report
M20=2.50 mm
(Table 3.1)
M24=3.00 mm

Page 33 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.3 Dimensions for Flat/Pack Washers

M12=14.00 to 14.43 mm
AS 1559 : Client Clearance
M16=18.00 to 18.43 mm
3.3.1 Inside diameter (d₁) Measurement 5 Sample/ Dia 2018 SL/FIR/FW/01 P SRV -- Report
M20=22.00 to 22.52 mm
(Table 4.1)
M24=26.00 to 26.52 mm

M12=22.70 to 24.00 mm
AS 1559 : Client Clearance
M16=28.70 to 30.00 mm
3.3.2 Outside diameter (d₂) Measurement 5 Sample/ Dia 2018 SL/FIR/FW/01 P SRV -- Report
M20=35.40 to 37.00 mm
(Table 4.1)
M24=42.40 to 44.00 mm

M12=4.73 to 5.27 mm
AS 1559 : Client Clearance
M16=4.73 to 5.27 mm
3.3.3 Thickness (h) Measurement 5 Sample/ Dia 2018 SL/FIR/FW/01 P SRV -- Report
M20=4.73 to 5.27 mm
(Table 4.1)
M24=4.73 to 5.27 mm
1.00 to 2.5 ±0.30 mm
2.50 to 4.00 ±0.60 mm Client Clearance
Thickness for Pack As per Plant
3.3.4 Measurement 5 Sample/ Dia 4.00 to 6.00 ±1.00 mm SL/FIR/FW/01 P SRV -- Report
Washer Standard
6.00 to 10.00 ±1.20 mm
10.00 to 18.00 ±1.50 mm

Page 34 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.4 Dimensions for Helical Spring washers

M12=12.70 to 13.20 mm
AS 1559 : Client Clearance
M16=16.70 to 17.50 mm SL/FIR/SW
3.4.1 Inside diameter (D₁) Measurement 5 Sample/ Dia 2018 P SRV -- Report
M20=20.70 to 21.70 mm /01
(Table 5.1)
M24=25.00 to 26.00 mm

M12=21.60 mm max.
AS 1559 : Client Clearance
M16=27.90 mm max. SL/FIR/SW
3.4.2 Outside diameter (D₂) Measurement 5 Sample/ Dia 2018 P SRV -- Report
M20=34.10 mm max. /01
(Table 5.1)
M24=40.50 mm max.

M12=3.80 to 4.20 mm
AS 1559 : Client Clearance
M16=4.80 to 5.20 mm SL/FIR/SW
3.4.3 Section width (b) Measurement 5 Sample/ Dia 2018 P SRV -- Report
M20=5.80 to 6.20 mm /01
(Table 5.1)
M24=6.75 to 7.25 mm

M12=2.35 to 2.65 mm
AS 1559 : Client Clearance
M16=3.30 to 3.70 mm SL/FIR/SW
3.4.4 Section thickness (S) Measurement 5 Sample/ Dia 2018 P SRV -- Report
M20=3.80 to 4.20 mm /01
(Table 5.1)
M24=4.80 to 5.20 mm

M12=4.25 to 5.75 mm
AS 1559 : Client Clearance
M16=5.95 to 8.05 mm SL/FIR/SW
3.4.5 Free height(h) Measurement 5 Sample/ Dia 2018 P SRV -- Report
M20=6.80 to 9.20 mm /01
(Table 5.1)
M24=8.50 to 11.50 mm

Page 35 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.5 Mechanical properties test for Hex Bolts & Step Bolts (Grade T)
480 MPa min.
AS 1559 :
M12=40.50 kN min. Client Clearance
Tensile strength under 2018
3.5.1 Mechanical 5 Sample/ Dia M16=75.40 kN min. P SRV -- Report
wedge loading (Table 2.7 &
M20=118.00 kN min.
2.8)
M24=169.00 kN min.
320 MPa min. Testing will be
AS 1559 :
M12=27.00 kN done at ISO Client Clearance
2018
3.5.2 Stress under proof load Mechanical 5 Sample/ Dia M16=50.20 kN 17025 certified P SRV -- Report
(Table 2.7 & Lab and test
M20=78.40 kN
2.8) report will be
M24=113.00 kN
given in
320 MPa min. Attached
AS 1559 :
M12=72.40 kN min. Format Client Clearance
Shear stress (Double 2018
3.5.3 Mechanical 5 Sample/ Dia M16=129.00 kN min. SL/FIR/P/01 P SRV -- Report
Shear) (Table 2.7 &
M20=201.00 kN min.
2.8)
M24=290.00 kN min.
AS 1559 : Client Clearance
Charpy V-Notch Impact Average of 3 tests min. 27 J at 0° C
3.5.4 Mechanical 3 Sample/ Dia 2018 P SRV -- Report
Strength Individual test min. 20 J at 0° C
(Table 2.7)
Surface integrity Client Clearance
Bolts shall be cleanly finished,
3.5.5 (Surface discontinuity Visual 5 Sample/ Dia AS 4291.1 SL/FIR/P/01 P SRV -- Report
sound and free from surface defects
Inspection )

Page 36 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.6 Mechanical properties test for Hex Nuts (Class 5 Z)


M12=51.40 kN
AS 1559 : Client Clearance
M16=95.80 kN SL/FIR/P/
3.6.1 Proof load Mechanical 5 Sample/ Dia 2018 P SRV -- Report
M20=154.40 kN 01
(Table 3.3)
M24=222.40 kN
M12=130 to 302 HV
AS 1559 : Client Clearance
M16=130 to 302 HV SL/FIR/P/
3.6.2 Hardness Mechanical 5 Sample/ Dia 2018 P SRV -- Report
M20=146 to 302 HV 01
(Table 3.3)
M24=146 to 302 HV

Surface integrity Client Clearance


Nuts shall be cleanly finished, sound SL/FIR/P/
3.6.3 (Surface discontinuity Visual 5 Sample/ Dia AS 4291.2 P SRV -- Report
and free from surface defects 01
Inspection )

3.7 Mechanical properties test for Helical Spring washer


AS 1559 : Client Clearance
SL/FIR/SW
3.7.1 Twist test Mechanical 5 Sample/ Dia 2018, Clause No sign of fracture at 90° P SRV -- Report
/01
5.4.2
AS 1559 : Client Clearance
Closure test for Free height not less than 60% after SL/FIR/SW
3.7.2 Mechanical 5 Sample/ Dia 2018, Clause P SRV -- Report
permanent set 1 hour /01
5.4.3
AS 1559 : Client Clearance
No sign of cracks or fracture after SL/FIR/SW
3.7.1 Embrittlement test Mechanical 5 Sample/ Dia 2018, Clause P SRV -- Report
24 hours /01
5.4.4

Page 37 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation Format of
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Remarks
& Description of Test Record S SEJV E
with basis Testing

3.8 Chemical properties test for Hex Bolts & Step Bolts (Grade T)
AS 1559 : Client Clearance
0.55 max. SL/FIR/C/
3.8.1 % Corbon Chemical 1 Sample/ Dia 2018 P SRV R/H Report
01
(Table 2.6)
AS 1559 : Client Clearance
0.035 max. SL/FIR/C/
3.8.2 % Phosphorous Chemical 1 Sample/ Dia 2018 P SRV -- Report
01
(Table 2.6)
AS 1559 : Client Clearance
0.035 max. SL/FIR/C/
3.8.3 % Sulphur Chemical 1 Sample/ Dia 2018 P SRV -- Report
01
(Table 2.6)

3.9 Chemical properties test for Hex Nuts (Class 5 Z)

AS 1559 : Client Clearance


0.58 max. SL/FIR/C/
3.9.1 % Corbon Chemical 1 Sample/ Dia 2018 P SRV -- Report
01
(Table 3.2)

AS 1559 : Client Clearance


0.060 max. SL/FIR/C/
3.9.2 % Phosphorous Chemical 1 Sample/ Dia 2018 P SRV -- Report
01
(Table 3.2)
AS 1559 : Client Clearance
0.150 max. SL/FIR/C/
3.9.3 % Sulphur Chemical 1 Sample/ Dia 2018 P SRV -- Report
01
(Table 3.2)

Page 38 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Quantum of Reference Testing Agency


Components/ Operation
Sr. No. Type of Check Check / Sampling document for Acceptance Norms Format of Record Remarks
& Description of Test S SEJV E
with basis Testing

3.10 Hot Dip Galvanising test for Hex Bolts, Step Bolts ,Hex Nuts, Flat washers, Pack Washers & Spring Washers
Free from uncoated areas,
blisters, flux deposits, Client Clearance
3.10.1 Visual Checking Visual 100 % AS 1214 black spot, dross P SRV -- Report
inclusions and other
defect.
Testing will be
AS 1214 done at ISO 17025
Local coating thickness certified Lab and Client Clearance
(TLDM-
3.10.2 Zinc coating thickness Measurement 5 Sample/ Dia minimum 42 µm test report will be P SRV -- Report
MNB
Section 4.5) given in Attached
Format
SL/FIR/G/01
Final Endorsed
Client Clearance
Adhesion test of zinc No coating should be
3.10.3 Knife Test 5 Sample/ Dia AS 1214 P SRV -- Report
coating paring / whittling

Page 39 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

List of Approved Sources of Raw-Material for Bolts, Nuts & Washers

S.
Supplier’s Name Address
No
1 M/s Jindal Steel Power Limited Balkundra,Patratu District: Ramgarh, Jharkhand-829142 India
4th Floor, Tolstoy House,15-17, Tolstoy marg, Cannaught place, New Delhi-110001,
2 M/s Bhushan Power Steel Limited
Works- Rengali Dist- Sambalpur (Orissa)
3 M/s Jayaswal Neco Industries Limited Siltara industrial Growth Centre Raipur ,Chhattisgarh- 493111
4 M/s JSW Steel Limited JSW center, Bandra Kurla Complex , Bandra (East) Mumbai -400051
5 M/s Usha Martin Mangal kailash 2A, Shakespeare Sarani, Kolkata-700071
6 M/s Rashtriya Ispat Nigam Limited Vishakhapattanam
7 M/s ESL Steel Limited Village-Siyaljori,PO.-Jogidih, Bokaro-828303, Jharkhand
8 M/s Steel Authority of India Limited Iisco Steel Plant, Burnpur-713325
9 M/s Tata Spong Iron Limited P.O. Gamharia, Dist.-Saraikela Kharaswan, Jamshedpur, Jharkhand-832108

10 M/s Tata Steel long Products Limited Phase-V,Adityapur Industrial Area, Gamharia, Dist, Saraikela-Kharsawan, Jharkhand-832108, India.

11 M/s Tata Steel Limited Regd. Office: Bombay House, 24 Homi Modi Street,Mumbai-400001

12 M/s Bansal Wire Industries Limited Unit-3,B-5 & B-6, Site-II,Loni Road Industrial area, Mohan Nagar, Ghaziabad, Utter-Predash-201007

Page 40 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

FORMAT FOR TOWER PARTS

Page 41 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 42 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 43 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 44 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 45 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 46 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 47 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

FORMAT FOR FASTENERS

Page 48 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 49 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 50 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 51 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 52 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 53 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 54 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 55 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 56 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 57 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 58 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 59 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 60 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 61 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 62 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 63 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

SOP FOR QUALITY CHECKING & TESTING TOWER PARTS

I) FUNCTION: In-process and final inspection of fabricated tower parts


II) OBJECTIVE: Quality control of fabricated and galvanized materials as per the specified standards and customer requirements
III) PURPOSE (Business Profitability) : Reducing of rejections of fabricated materials (Proto & Mass) to zero level by meeting the standards as well as
customers through efficient and effective quality control of hot dip galvanized tower parts thus maximizing the business profitability

IV) CONTORL AND CHECK POINT OF INCOMING RAW MATERIAL


a) Receiving the Invoice & TC from outside or in-house
b) Inspection of visual and dimensional of raw material as per invoice

(i) Acceptance criteria for dimensions of leg length as per customer specification
Up to & Including 45 mm
Above 45 mm & including 100 mm
Above 100 mm
Note:-Difference between two leg lengths shall be within 75% of the total, tolerance
(Plus and minus) specified on the leg length.) (Only for Angle)
(ii) Acceptance criteria for dimensions of leg length as per customer specification
Less than 8 mm
From 8 mm up to and including 12
mm
Above 12 mm

Page 64 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

(iii) Acceptance criteria for surface as per customer specification


The material should be free from any harmful surface defects like,
patches, chips inclusion, scratches, rough surface, improper shape,
lamination, jagged edge, flaws, invisible or improper embossing
etc.
(iv) Acceptance criteria for weight per meter as per customer specification
Tolerance on weight per
Thickness of Leg Length
meter
Up to and including 3 mm
Above 3 mm
(v) Acceptance criteria for straightness as per customer specification
(iv) OUT OF SQUARE :-
The legs of angles shall be perpendicular to each other within a tolerance of ± 1 degree.
(vii) CAMBER :-
The permissible limits for camber shall be as follows:
LEG LENGTH (mm) CAMBER Max (mm)
Less than 100 mm Should be reasonably straight
Including and over 100 mm 0.2 % of length

Page 65 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

a) Chemical properties: Chemical analysis must meet the requirement of specified standard and customer otherwise material is rejected and
returned to the supplier with rejection note.
b) Mechanical Properties : Mechanical properties must be meet the requirement of specified standard and customer otherwise material is
rejected and returned to the supplier with rejection note.
Acceptance criteria for Chemical & Mechanical properties as per customer specification
CHEMICAL COMPOSITION MECHANICAL PROPERTIES
SPECIFICATION Yield
UTS
& GRADE Stress 2 E% Bend Impact
C% Mn% S% P% Si% CE 2 N/mm
N/mm (Min) Test Test
(Min)
(Min)

c) Sectional Weight: Sectional weight must comply the requirement as -3% & +5% of unit weight. If deviation is occurring, adjustment need
to be done in mill setting or furnace temperature.
d) Visual, chemical and mechanical testing is to be carried out on stacked material on sampling basis. If deviation occurs in angles in either
chemical or mechanical, the materials will be rejected.
e) If tests on raw material found Ok, the material will be cleared for fabrication

Page 66 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 67 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

V) PROCESS FLOW FABRICATION


c) Receiving the Job Card from Planning department
d) Receiving the steel as per Job card
e) Inspection of cutting of tower parts
f) Inspection of stamping of tower parts
g) Inspection of punching/drilling of tower parts
h) Inspection of notching of tower parts
i) Inspection of heel grinding of tower parts
j) Inspection of bending of tower parts
k) Inspection of hole after bend of tower parts
l) Inspection of welding of tower parts
m) Inspection of RFG materials
n) Sending RFG cleared materials for hot dip

VI) PROCESS FLOW GALVANISING


a) Receiving RFG cleared materials from fabrication
b) Load chaining of materials for galvanising process
c) Inspection of materials during degreasing process
d) Inspection of materials during pickling process
e) Inspection materials during rinsing water process

Page 68 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

f) Inspection of materials during fluxing


g) Inspection of materials during process
h) Inspection of materials during hot dipping in Zinc process
i) Inspection of materials during quenching in water process
j) Inspection of materials during di-chromating process
k) Inspection of finished materials

Acceptance criteria for Galvanising testing as per customer specification


Elcometer Test Coating
Thickness
( Microns ) Stripping Test (Wt.
Preece Test
Adherence ( Hammer ) Test difference) Wt. of Zn
4 dips of one minute
Coating gms/m²
A B C

l) Transfer to finished yard


m) Offer for client’s inspection
n) Dispatch of customer cleared materials

Page 69 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 70 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 71 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

CONTROL AND CHECK POINTS:

a) Fabrication of tower parts in the shop floor: If operations of cutting, stamping, drilling, notching, heel grinding, bending and welding are having
defects within the observable limits as per the specified standards then rework and rectification of tower parts will be done otherwise, the
materials will be rejected with the help of rejection note.

b) Hot Dip Galvanization of tower parts : Visual inspection of HDG materials are carried out. The visual defects are categorized as black spots,
general roughness, pimples, lumps, runs, flux inclusions, dross inclusions, dull grey coating, white rust, blisters etc.

c) If the galvanized materials defects are within the observable limits as per the specified standards, then rework and rectification of tower parts
will be done otherwise, the materials will be rejected with the help of rejection note.
d) Tests of coating thickness, uniformity of Zinc coating and adhesion are carried out and checked for conformance as per requirements of
standards. If the test results are not meeting the requirements the materials will be rejected with the rejection note.

BUSINESS CONTINUITY PLAN

e) Deviations in proto assembled tower parts need to be rectified immediately and accordingly drawings to be modified and issued to shop floor
for mass production. Preventing delays in rectification and modification of drawings of tower parts help in continuing the business without
interruptions.
f) Arrangement of planning materials as per projects enhances the continuity of works without delays. Elimination of stacking of different project
materials at one place will reduce the timing of feeding of materials for cutting operation
g) 100% checking of cleats, plates, bend items, cross arms must be done to ensure quality of the fabricated materials. This helps in continuity of
business without any non-conformities and customer complaints
h) Reduction of excess filing of lumps on galvanized materials will reduce major defects like zinc feel off. This can be achieved by using proper filing
tools, monitoring and procedure thus helping the business to be continued without any problem.
i) Inspection of HDG cleared materials before loading into the container will double ensure the quality of the products to be dispatched to
customer sites thus continuing the business smoothly.

Page 72 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

SOP FOR QUALITY CHECKING & TESTING OF FASTENERS

FUNCTION: Final Inspection of Hex Bolts, Step Bolt, Hex Nuts, spring washer & Flat /Pack washer.

OBJECTIVE: Quality control of Hex Bolts, Step Bolt, Hex Nuts, Spring washer & Flat /Pack washer as per the specified standards and customer
requirements.

PURPOSE (BUSINESS PROFITABILTY): Minimization of rejections by meeting the standards as well as customers through efficient and effective
inspection of fasteners thus maximizing the business profitability

1-Dimensional checking procedures for Hex Bolts and Step Bolts as per AS 1559-2018

Testing Procedure

a) Check the bolt length with help of Vanier caliper under the head portion of selected sample as per ITP.
b) Check the Bolt diameter with help of Micro meter of selected sample as per ITP.
c) Check the Across Flats with help of Vanier caliper of selected sample as per ITP.
d) Check the Across Corner with help of Vanier caliper of selected sample as per ITP.
e) Check the Height of head with help of Vanier caliper of selected sample as per ITP.
f) Check the thread pitch with help of thread pitch gauge of selected sample as per ITP.
g) Check the thread length with help of Vanier caliper of selected sample as per ITP.
h) Check the grip rang (ls & lg) with help of Vanier caliper of selected sample as per ITP.

Page 73 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

2-Dimensional checking procedures for Hex Nut as per AS 1559-2018

a) Check the Across Flats with help of Vanier caliper of selected sample as per ITP.
b) Check the Across Corner with help of Vanier caliper of selected sample as per ITP.
c) Check the Height of Nut with help of Vanier caliper of selected sample as per ITP.
d) Check the thread pitch with help of thread pitch gauge of selected sample as per ITP.

3-Dimensional checking procedures for Helical spring washer as per AS 1559-2018

a) Check the Inside Diameter with help of Vanier caliper of selected sample as per ITP.
b) Check the Outside diameter with help of Vanier caliper of selected sample as per ITP.
c) Check the Thickness with help of Vanier caliper of selected sample as per ITP.
d) Check the Width with help of Vanier caliper of selected sample as per ITP.
e) Check the Height with help of Vanier caliper of selected sample as per ITP.

4-Dimensional checking procedures for Flat washer /Pack washer as per AS 1559-2018

a) Check the Inside Diameter with help of Vanier caliper of selected sample as per ITP.
b) Check the Outside diameter with help of Vanier caliper of selected sample as per ITP.
c) Check the Thickness with help of Vanier caliper of selected sample as per ITP.

Page 74 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

5-Mechanical testing procedures for Hex Bolts & Hex Step Bolts as per AS 1559-2018

A. Tensile load test: (Performed with universal testing machine)

Test Procedure –
1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The bolt or screw to be tested shall be mounted into adaptors and wedge washer with UTM machine. The length of thread engagement shall at
least 1d.
3) The load shall be measured continuously until fracture occurs.
4) After getting the result in order materials will be acceptable for further clearance.

B. Proof load test : (Performed with universal testing machine)

Test Procedure –
1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The Fasteners shall be suitably prepared at each end the centre- drilled.
3) For length measurements, the fasteners shall be placed in a bench – mounted measuring instrument fitted with spherical anvils or any other
suitable method.
4) The total length of the fasteners shall be measured before loading.
5) The bolt or screw to be tested shall be mounted into adaptors and Flats washers with UTM machine. The length of thread engagement shall at
least 1d.
6) The specified proof load shall be applied axially to the fastener.
7) After unloading, the total length of fastener shall be measured.
8) After getting the result in order materials will be acceptable for further clearance.
.

Page 75 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

C. Shear load test : (Performed with universal testing machine)

Test Procedure –
1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The shear strength of the bolt shall be determined on a full-size bolt or, if the bolt is too short to be accommodated in the test fixture, two full
size bolts with the heads removed are to be used.
3) Shearing of the bolt or bolts at two points is achieved by applying either a tensile or compressive load to the test fixture.
4) After getting the result in order materials will be acceptable for further clearance.
6-Mechanical testing procedures for Hex Nut

A. Proof Load: (Performed with universal testing machine)

Test Procedure –
1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The nut shall be assembled on the test mandrel and flat washer according to axial tensile load or axial compressive test mode with UTM machine.
3) Specified proof load shall be applied and shall be maintained for 15 s and then released.
4) The nut shall be removed using the fingers from the test mandrel. It may be necessary to use a manual wrench to start the nut in motion.
5) After getting the result in order materials will be acceptable for further clearance.

Page 76 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

B. Hardness test: (Performed with Vickers Hardness testing machine)

Test Procedure –
1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The test shall be carried out on a surface which is smooth and even, free from oxide scale, foreign matter and, in particular, completely free from
lubricants.
3) The test piece shall be placed on a rigid support.
4) Bring the indenter into contact with the test surface and apply the test force in a direction perpendicular to the surface, without shock or
variation, until the applied force attains the specified value.
5) Measure the length of the diagonals. The arithmetical mean of the two reading shall be taken of the calculation of the Vickers hardness.
6) After getting the result in order materials will be acceptable for further clearance.

7 -Chemical testing procedures for Hex Bolt, Step Bolt & Hex Nut

Test Procedure –

1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The test shall be carried out on a surface which is Polish smooth and even, free from oxide scale, foreign matter and, in particular, completely free
from lubricants.
3) The test piece shall be placed on a Spark point of Spectro machine.
4) After getting the result in order materials will be acceptable for further clearance.

Page 77 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

8 -H.D.G testing procedures for Hex Bolt, Step Bolt, Hex Nut, Flat washer, Pack washer & Helical Spring washer

Test Procedure –

1) Select the sample from the offer lot as per sampling plan as given in ITP.
2) The coating thickness shall be measurement on a flat surface.(i.e Head portion and thickness portion).
3) To determine the adherence of the zinc coating to the surface of the surface of the base metal, use the point of a stout knife. Cut or prise, with
the application on considerable pressure, in a manner tending to remove a portion of the coating.
4) Testing shall not be done at edges or corners to determine adherence of coating.
5) Likewise, the removal of small particles of the coating by paring or whittling shall not constitute failure and therefore not be ground for
rejection.

Page 78 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 79 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 80 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 81 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 82 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Page 83 of 84
INSPECTION AND TEST PLAN (TOWERS & FASTENERS)
Manufacturer : Project Energy Connect-South Australia-New south Wales ITP No: SL/SEJV/ITP/TOWER & FASTENERS-01
SKIPPER LIMITED Transmission Interconnector 6
Rev:
Document Manufacturing Quality plan for Tower Structure Date: 17.05.2022
(Inspection by Customer)

Storage procedure to be followed at customer sites


Stacking galvanized articles closely together for extended periods of time, thereby limiting access to freely circulating air, can lead to the formation of a white powdery product commonly called wet
storage stain.
Fabricated assemblies that fully expose the galvanized surfaces to freely circulating air typically do not need a post-treatment to prevent the formation of wet storage stain. Although most after-
fabrication hot-dip galvanized products are shipped without any post-treatment, the need for a post-treatment largely depends on the fabrications configuration and anticipated storage and shipping
conditions.

The extent of damage by wet storage stain depends on the duration of exposure to the wet-storage-stain-inducing environment and retained moisture. The attack is accelerated when the retained
moisture contains chlorides from seawater, sulfur compounds from industrial environments, or flux residues from galvanising operations.
To minimize the possibility of wet storage stain, consider these guidelines:
A) Whenever possible, avoid nested stacking
B) Provide adequate ventilation between stacked pieces
C) Incline parts to allow for maximum drainage
D) Use spacers and tarp material during shipping if there is the likelihood of condensation or moisture
E) Stagger or cross stack galvanized pieces
F) Elevate and separate articles stacked outdoors with strip spacers (poplar, ash, spruce)
G) Avoid stacking on wet soil or decaying vegetation
H) Thoroughly dry small items that are quenched before packing in storage containers
I) Include a dehumidifying agent in sealed containers

Whenever possible, store material under cover in dry, well-ventilated conditions, away from doorways opens to the environment
a) Ensure the final product is free of flux residues
b) Treat with a passivating agent
c) Remove road salts from galvanized articles

If wet storage stain does form, the objects should be arranged so that their surfaces dry rapidly. Once dry, most stains can be easily removed by brushing with a stiff bristle (not wire) brush .If the
affected area will not be fully exposed in service or if it will be subject to an extremely humid environment, even superficial white films should be removed with a soft-bristle brush.
This allows for the successful formation of galvanized coatings protective zinc carbonate patina.

In cases where heavy white deposit (above) or red stain has formed because of prolonged exposure to or storage under poor conditions, it must be removed and the damaged area repaired as detailed
in ASTM A780. In advanced stages of wet storage stain, the typical white or gray product may blacken. When this occurs, some of the protective coating has been consumed, affecting service-life.
Coating thickness tests can be performed on affected areas to ensure that sufficient zinc coating remains after the removal of the wet storage stain. Where the surface staining is light and smooth -as
judged by lightly rubbing fingertips across the surface -the stain will disappear gradually and blend with the surrounding surface during normal weathering .

Page 84 of 84