You are on page 1of 1

This drawing has been prepared for the use of AECOM’s client.

It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM’s express written consent. Do not scale this document. All measurements must be obtained from the stated dimensions.
PROJECT

PROJECT CIRRUS
EIRGRID 220 kV GIS BUILDING
B
Approved : BW

20m

17m 18500
17m
Checked : PB

15m CLIENT
FFL 78.15m AOD FFL 78.15m AOD
FFL 78.15m AOD
HUNTSTOWN POWER
FFL 78.15m AOD FFL 78.15m AOD
COMPANY LTD.

2997
Designer : OB

10m

17000
FFL 78.15m AOD

2000
Project Management Initials :

2000
CONSULTANT
5m
4.25m FFL 82.45m AOD
AECOM
FFL SLOPES 77.38m-77.2m AOD
Adelphi Plaza
Georges Street Upper

4252
Dun Laoghaire
FPL
County Dublin
1m FGL
78.00m
78.15m
AOD FFL 78.15m AOD FOOTPATH
Ireland
AOD
FFL 78.00m AOD T +353 (0)1 2383100
FFL 77.20m AOD
www.aecom.com

18500 LEGEND

NOTES

GROUND FLOOR LAYOUT EIRGRID 220 kV GIS - SECTION B-B 1. DRAWINGS ARE INDICATIVE ONLY AND SHOULD
NOT BE USED AS DETAILED FOR DESIGN;
2. THE EIRGRID SUBSTATION IS BASED ON THE
LATEST EIRGRID STANDARD (AS OF 01/09/2020)
AND IS SUBJECT TO CHANGE BY EIRGRID;
3. THE EQUIPMENT LAYOUTS ARE INDICATIVE AND
DIMENSIONS MAY CHANGE ONCE THE EXACT
Filename: \\IEDBL2FP001.EU.AECOMNET.COM\DATA\DCS\PROJECTS\BP\60641561_PROJECT_CIRRUS\900_CAD_GIS\910_CAD\PLANNING FOLDER\R3\60641561-DWG-706-P2.DWG

SPECIFICATIONS ARE DETERMINED;


4. REQUIREMENT FOR LOUVERED VENTS IN
SWITCHROOM TBC BASED ON SWITCHGEAR
MANUFACTURER REQUIREMENTS.
5. EIRGRID GIS BUILDING SIZE IS BASED ON
ERIGRID STANDARD DRAWING NUMBER
XDN-LAY-ELV-STND-F-004 (220kV 12 Bay GIS)
6. ALL CLEARANCE DIMENSIONS ARE MINIMUM
REQUIRED, AND FINAL DIMENSIONS WILL BE
SUBJECT TO FINALISED EQUIPMENT VENDOR
PLANS;
7. GAS INSULATED BUSDUCTS DETAILS TO BE
CONFIRMED WITH CHOSEN MANUFACTURER.

B
61000

3736 ISSUE/REVISION

LADDER

P4 03/09/2021 FOR PLANNING


FFL 82.45m AOD P3 30/07/2021 REVISED COMMENTS
FFL 82.45m AOD
P2 28/06/2021 REVISED COMMENTS
P1 11/05/2021 CLIENT COMMENTS
P0 16/04/2021 FIRST ISSUE FOR PLANNING
I/R DATE DESCRIPTION
Last saved by: OISIN.BURKE(2021-09-03) Last Plotted: 2021-09-03

FFL 82.45m AOD

STATUS

FOR PLANNING
B
PROJECT NUMBER SCALE

60641561 1:150 @ A1
SHEET TITLE

MOORETOWN 220 kV SUBSTATION


EIRGRID 220 kV GIS BUILDING
SECTIONS & LAYOUT
1 st FLOOR LAYOUT
SHEET NUMBER REV

60641561-DWG-706 P4