DESCRIPTION *(ISSUER shall keep the Description to the point. If Filling by hand, use clear open letter handwriting)
1. DESCRIPTION OF DEFICIENCIES
REFERENCES
TITLE Name Signature Date
AGREED COMPLETION DATE
Supervision Consultant (initiator)
(ACD) Qiddiya Quality Representative (For DNCR)
Qiddiya Project Representative (For DNCR)
Contractor to Acknowledge the QNCR and response with the Acknoledgment withing 48 Hours
Contractor Quality Manager
Contractor Project Manager
*FAILURE TO RESOLVE DEFICIENCIES ABOVE AFTER (EACD) WILL RESULT IN ESCALATION TO NEXT LEVEL AS PER QDC QUALITY PROCEDURE
RECEIVER SHALL LIST THE PROPOSED CORRECTIONS TO BE CARRIED OUT
CORRECTION(S)
2. PROPOSED
RECEIVER SHALL LIST THE ROOT CAUSE THAT LEAD TO THE OCCURANCE OF DEFICIENCY
3. ROOT CAUSE
RECEIVER SHALL LIST THE CORRECTIVE /PREVENTIVE ACTIONS TO AVOID DEFICIENCY FROM RE-OCCURING
4. CORRECTIVE/PREVENTIVE
MEASURES
NCR ORIGINATOR SHALL REVIEW THE IMPLEMENTED CORRECTION, CORRECTIVE/ PREVENTIVE ACTIONS(S)
Implemented correction and corrective/ preventive action(s) were found to be satisfactory & this NCR is considered closed.
Implemented correction and corrective/ preventive action(s) were found to be not satisfactory. Works have to be redone as per the approved proposal. This NCR is
considered opened.
Justification Accepted to Extend Extended
5. REVIEW AND CLOSURE
REMARKS
NAME DESIGNATION
ORIGINATOR RECIPIENT
DISTRIBUTION
OTHER (Specify:_________________________) OTHER (Specify:_________________________)