Phone: (632) 634.4242 loc. 828 & 829 F-CMGSI-QC-10-028/1
Fax. No.: (632) 634.4338
The following items are to be corrected to comply with the contract documents: [Attach keyplan, testing & commisioning certificates/reports,
etc]
APPROVED BY:
CMG REPRESENTATIVE CLIENT / OWNER REPRESENTATIVE
DATE DATE
PROJECT FORM NO.
F-YLFCCS-QC-10-
028/2
The following items are to be corrected to comply with the contract documents: [Attach COMPLETION
keyplan, testing & commisioning certificates/reports, etc]
DATE SPEC No. /
ITEM NO. PARTICULAR STATUS Date Required Date Completed Certified by:
INSPECTED DWG NO.
REWORKS
APPROVED BY:
YLFCCS REPRESENTATIVE CLIENT / OWNER REPRESENTATIVE
DATE DATE
Subject: Activity Close-Out: Punch Out Inspections
This guide form shall indicate during the final stages of a contract all work or corrective action remaining
before acceptance of the project. This is prepared by the subcontractor's Project Engineer and directed
to MDC Project Manager.
The basic premise of the “completion inspections” required under the contract is that the subcontractor
certifies the work as completed in accordance with the contract before the finished project is presented to
the Owner for acceptance. There should be no surprises for the Contractor during the pre-final
inspection,and no surprises to the client during the final walk through.
Punch-Out Inspections may occur near the completion of all work or any portion thereof established by a
completion time. The Project Engineer shall conduct an inspection of the work and develop a "punch list"
of items that do not conform to the approved drawings and specifications. He shall include in the punch
list any remaining items on the Deviations Log which were not corrected prior to the Punch-Out
Inspection. The punch list shall include the estimated date by which the deficiencies will be corrected. A
copy of the punch list shall be provided to the Owner.
The Project Engineer shall make follow-on inspections to ascertain that all deficiencies have been
corrected. Once this is accomplished, the Contractor shall notify the Owner that the facility is ready for
the Owner's "Pre-Final Inspection."
There may be multiple punch lists, each getting progressively shorter. If so, retain original item numbers
from punch list for remaining items on later lists for identification. Date all lists.