Professional Documents
Culture Documents
RPO: 6510906231 BI: W/O: 14 C171 Title: Install Generator For Back-Up Power Supply For Building 3
Work Permit required: Yes No Project Quality Plan: Hold Point ✔ Witness Point
Proponent representative has verified that the Work is ready for CONTRACTOR has verified that the Work to be inspected is
inspection and conforms to the project requirements. complete and in compliance with the following specifications:
Name: � Time:
REMARKS:
Distribution: