No Name of Problem Quantity Actual state Repair Price
Replacing with a new screw convenyor of Wam (Italia-
Cement crew Repaired, welded, low capacity, Often China). Repair the 2 screw converyors at the factory 1 02 77,000,000.00 conveyor cement in stuck of Vincent (Long Thanh-Dong Nai), using one, one for spare
Replacing all with new gates
Make new & gavanized 06 sets 18,000,000.00 Discharge gates of Cylinders: equipped a new accumulator & Adjust the 2 06 Rustry, too thin, weak cylinder 3,000,000.00 Agg Bkr air volume Replacing with new 6 cylinders 9,000,000.00 Replacing with air hoses, head wrench 2,000,000.00 New hopper of Make one new aggregate hopper, 2 gates 78,000,000.00 aggregate and Have 3 hoppers, 6 gates, gear motor: 7.5 3 01 Prolonged agg KW Prolonging the scale aggregate convenyor 34,000,000.00 scale convenyor Replacing with gear motor 11 KW (90%) 26,000,000.00 Reinforce the frame , weld/adjust the water bin 4 Water scale bin 01 Shaking, not accurate Welding/ Adjust frame + Low shaking 6,000,000.00 Opening the cone to make the new check gate + 5 Prepare silos 02 No checking gate, cement in stuct 10,000,000.00 decompress cone
Replacing with the program of Vincent: Easy 17,000,000.00
operating & Stabilizied The existing program is often adjusted - New operating 6 01 Used long time, Not suitable with a new Replacing with 3 new indicators DN10W of Dacell program 16,000,000.00 aggregate hopper -Korea Cables for connection & operation 3,000,000.00 Re-use: PLC S7-200-Control desk -04 load cell 7 Tile of mixer Replacing 2/3 existing tiles + Bolts + Nut = 56 pcs 38,000,000.00 The preparing time are: 1day to take off the 2 existing screw conveyors and fit up the new one + 6days for the 8 Labor cost 18,000,000.00 full prepair works Total (excluded the VAT) 355,000,000.00
DINAS PENDIDIKAN DAN KEBUDAYAAN KOTA TANGERANG UPT KECAMATAN PERIUK PENILAIAN AKHIR SEMESTER SEMESTER GANJIL TAHUN PELAJARAN 2019 – 2020 BAHASA INGGRIS