UOM (Units of Total Weight (In kg) Total Weight (kg) CWC support crane,

Sr.No Item Description


Measurement) Block 1 Block 2 Block 3 Block 4 ( 4 Unit) Consumable,All erection Tools
BOILER STRUCTURE,PLATFORMS,SUPPORTING
Subcontactor Price
STRUCTURE,ETC PRE FABRICATED/SKD (Dimensions as per
1 Foundation bolt for biolers columns (Bolt joint)
kg 700.00 - - - 700.00 8.00 5,600.00
2 Insert plate for boiler slab
3 Columns for boiler (Bolt joint) kg 15,000.00 - - - 15,000.00 8.00 120,000.00
4 Beams & Bracings for boiler (Bolt joint) kg 39,000.00 - - - 39,000.00 8.00 312,000.00
5 Temporary support arrangement for drum kg 1,000.00 - - - 1,000.00 8.00 8,000.00
6 Handrails,Staircase and ladders kg 1,650.00 - - - 1,650.00 8.00 13,200.00
7 Grills and gratings kg 7,000.00 - - - 7,000.00 8.00 56,000.00
8 Floor Railing kg 3,000.00 - - - 3,000.00 8.00 24,000.00
9 Economizer Casing kg 2,300.00 - - - 2,300.00 8.00 18,400.00
10 Buckstay kg 1,000.00 - - - 1,000.00 8.00 8,000.00
11 Boiler Canopy weight (Bolt joint) kg 13,500.00 - - - 13,500.00 8.00 108,000.00
12 Refractory Supporting Structure kg 3,750.00 - - - 3,750.00 8.00 30,000.00
FUEL SILO-PRE FABRICATED/SKD (Dimensions as per Cargo/Freight)
13 Fuel ailo and Chute from silo outlet to furnace kg 1,000.00 - - - 1,000.00 8.00 8,000.00
AIR PRE HEATER - PRE FABRICATED / CKD
14 Air Heater Assembly 5,750.00 - - - 5,750.00 8.00 46,000.00
FLUE GAS CLEANING SYSTEM - PRE FABRICATED
15 ESP kg - - - - - - -
DUCTING & HOPPERS - PRE FABRICATED / SKD (Dimensions as
per Cargo/Freight)
Flue Gas Ducting
16 Boiler Bank Outlet to Economizer Inlet Ducting
17 Economizer Outler to Air Pre Heater Inlet Ducting
18 Air Pre Heater Outlet to ESP Inlet Ducting
19 ESP Outlet to ID Fan Inlet Ducting kg 7,000.00 - - - 7,000.00 8.00 56,000.00
20 ID Fan Outlet to Chimney Inlet Ducting
21 Expanslon Joints & Dampers
22 Support to all ducts
Air Ducting
23 FD Fan Outlet to APH Inlet Ducting
24 Aerofoil duct for FD fan
25 APH Outlet to Grate Inlet Ducting
kg 5,800.00 - - - 5,800.00 8.00 46,400.00
26 SA Fan outlet to APH Inlet Ducting
27 APH Outlet Ducting to Secondary Air Nozzle
28 Expanslon Joints & Dampers
Hoppers
29 Boiler Bank Hoppers
30 Economizer Hoppers
kg 11,000.00 - - - 11,000.00 8.00 88,000.00
31 APH Hoppers
32 Grate Hopper
CASING - PRE FABRICATED / SKD (ASSEMBLY & ERECTION AT
SITE)
33 Surge Hopper,Chute,Grate Arrangement
34 Fumace sealing arrangement
35 Roof wall casing
kg 3,000.00 - - - 3,000.00 8.00 24,000.00
36 Evaporator casing
37 Access door assembly
38 Peep hole assembly with sliding gate
PRESSURE PARTS,TANKS - PRE FABRICATED / CKD (Dimensions
as per Cargo / Freight)
39 Economiser Assembly kg 2,200.00 - - - 2,200.00 10.00 22,000.00
40 Water Wall Panels kg 10,500.00 - - - 10,500.00 10.00 105,000.00
41 Steam drum Assembly kg 6,500.00 - - - 6,500.00 10.00 65,000.00
42 Water drum Assembly kg 3,000.00 - - - 3,000.00 10.00 30,000.00
43 Boiler bank tubes kg 7,650.00 - - - 7,650.00 10.00 76,500.00
44 Super heater Assembly kg 5,000.00 - - - 5,000.00 10.00 50,000.00
45 Downcomers and Risers kg 1,000.00 - - - 1,000.00 10.00 10,000.00
46 Integral piping and Non integral piping
47 Support for integral and non integral PPG
48 Drains to the common point
kg 6,200.00 - - - 6,200.00 10.00 62,000.00
49 Vents
50 Pressure parts supports
51 Anchor arrangement for roof tubes
52 Deaerator storage tank assembly
kg - - - - - - -
53 Deaerator platform,Ladder with cage
54 Common Blow Down Tank kg 2,000.00 - - - 2,000.00 10.00 20,000.00
55 Chimney - 30 Meters Height kg 14,000.00 - - - 14,000.00 8.00 112,000.00
PIPING - LOOSE SUPPLY
Extemal IBR & NIBR Piping # Approximate Total Piping length
56 kg - - - - - - -
will be 600 meters of various sizes starting from 25 NB to 250 NB )
BOUGHTOUT ITEMS - LOOSE SUPPLY
57 Set of valves,Instrumentation and other items. kg - - - - - - -
58 Dosing system kg - - - - - - -
59 Sample coolers kg - - - - - - -
60 Soot Blowers kg - - - - - - -
61 Silencers kg - - - - - - -
62 Fuel Feeders - Ram feeder kg - - - - - - -
BALANCE OF PLANT ITEMS - LOOSE SUPPLY
63 Fuel Handing system kg - - - - - - -
Ash Handling system - Bottom Ash Handing + Dense Phase Ash
64 kg - - - - - - -
handling system + MS Fly ash silo (100m3)
65 Water Treatment Plant (Include piping) kg - - - - - - -
66 Main Cooling Tower + Pumps + piping kg - - - - - - -
67 Air Compressor + Air Dryer + Air Reciver (Include piping) kg - - - - - - -

SCOPE OF WORKS : PRE - ASSEMBY WELDING INSTALLATION AND PRIMER COATING,PIPING WILL BE TESTING BY SUBCONTACTOR 1,524,100.00