You are on page 1of 4

PEMASANGAN DI bp.

Tangguh
ANALISA HARGA
Pabrikasi Pengecatan / galvanis pengiriman
Material (Kg) (Kg) (Kg)
Plate ss400 Kg 10,000 8,000 4,000
Plate sm490yb Kg 8,000 10,000
Chexerrplate Kg 12,000 8,000 10,000
Conforated Plate 14,500 8,000 10,000
WF Kg 10,500 8,000 10,000
HB Kg
Siku Kg 12,000 8,000 10,000
Unp Kg 10,000 8,000 10,000
baut Pcs 18,000 6,000
Dyna Bolt kg 28,000 10,000
nut / washer Pcs
angkur Pcs 125,000 10,000 5,000 10,000
Sagrod Kg 8,000 10,000
Welded Beam Kg
Turn Bucle Pcs 100,000 10,000
grating m2 750,000 65,000 10,000
Handrail m' - 400,000 2,000,000
Roofing m2
Cladding m2
Painting m2 175,000

Elbow 90 65,000 8,000 10,000


Elbow 45 37,500 8,000 10,000
pemasangan Total (Kg)
(Kg)
15,000 37,000
15,000 33,000
15,000 45,000
15,000 47,500
15,000 43,500
-
15,000 45,000
15,000 43,000
15,000 39,000
15,000 53,000
-
15,000 165,000
15,000 33,000
-
15,000 125,000
150,000 975,000
50,000 2,400,000
-
-
175,000

12,000 95,000
12,000 67,500
REQUIRED WEIGHT (MC0)
PART NO. DESCRIPTION SPECIFICATION MATERIAL
QTY UNIT Kg/UNIT Kg TOTAL

1 Platform A 36 C 200 x 80 x 7.5 x 12 x 6,000.00 15 kg 24.67 2,220.0


2 Support A 36 L 70 x 70 x 7 x 6,000.00 1 kg 7.38 44.3
3 Anggle Post A 36 L 65 x 65 x6 x 6,000.00 74 kg 5.91 437.22
4 Base Plate A 36 PL 8 x 500 x 1,000.00 1 kg 31.40 31.40
5 Steffener & Clip A 36 PL 6 x 1219 x 2,438.00 5 kg 139.98 699.89
6 Pipe Handrail STKM 1 1/4" SCH 40 x 6,000.00 20 kg 3.47 416.40
A 36 19 x 1,260.00 1 kg 2.23 2.81

Total : 3,852
PPN 10% :
PRICE
REMARKS
Unit Total

You might also like