BJ Besi 7850 Kg/M3

Dia. Pipa Berat Air


Tebal Luas
Luas Luar Volume Berat / M" dalam
Pipa Dalam
Dalam Luar Pipa/ M
dia. 400.00 412.70 12.70 0.134 0.126 0.00810 63.60 125.60
dia. 350.00 362.70 12.70 0.103 0.096 0.00711 55.78 96.16
dia. 300.00 312.70 12.70 0.077 0.071 0.00611 47.95 70.65
dia. 250.00 260.00 10.00 0.053 0.049 0.00400 31.43 49.06
dia. 200.00 210.00 10.00 0.035 0.031 0.00322 25.27 31.40
dia. 150.00 159.70 9.70 0.020 0.018 0.00236 18.51 17.66
dia. 100.00 109.70 9.70 0.009 0.008 0.00160 12.53 7.85
dia. 75.00 83.10 8.10 0.005 0.004 0.00101 7.89 4.42
dia. 50.00 57.30 7.30 0.003 0.002 0.00061 4.83 1.96
dia. 40.00 46.50 6.50 0.002 0.001 0.00044 3.46 1.26
Lampiran - 10 : Pengadaan/ Pemasangan Sambungan Rumah Dan Accessories Sambungan Rumah
Pekerjaaan :
#REF!

Lokasi : #REF!
Tahun Anggaran : #REF!

Harga Satuan
No Uraian Kegiatan Volume Satuan Analisa (Rp)

1 Water Meter dia. 1/2 " 1.00 Bh Ditaksir 379,500.00


2 Clam Saddle GIP. Dia. 100/75 mm x 3/4" 1.00 Bh Ditaksir 114,000.00
3 Tee GIP dia. 1/2 " 1.00 Bh Ditaksir 18,000.00
4 Hand Kran dia. 1/2 " 1.00 Bh Ditaksir 20,000.00
5 Stop Kran dia. 1/2 " 1.00 Bh Ditaksir 66,000.00
6 Reducer GIP ( V- ring ) 3/4" x 1/2 " 1.00 Bh Ditaksir 15,000.00
7 Double Nepple GIP 1/2 " 1.00 Bh Ditaksir 14,400.00
8 Elbow GIP 3/4 " x 90° 2.00 Bh Ditaksir 13,300.00
9 Elbow PVC 3/4 " x 90° 1.00 Bh Ditaksir 10,000.00
10 V Shock PVC dia. 3/4 ( Drat Dalam ) 2.00 Bh Ditaksir 10,000.00
11 Dop GIP dia. 1/2 " 1.00 Bh Ditaksir 5,600.00
12 Sealtape 2.00 rol Ditaksir 6,000.00
13 Lem Pipa 1.00 Tube Ditaksir 14,400.00
14 Box Meter 1.00 Bh Ditaksir 90,000.00
15 Pipa PVC dia. 3/4 " 6.00 M' Ditaksir 5,760.00
16 Pipa GIP dia. 3/4 " 0.75 M' Ditaksir 58,600.00
17 Pipa GIP dia. 1/2 " 0.75 M' Ditaksir 31,600.00
18 Pemasangan Sambungan Rumah lengkap dengan 1.00 Ls Ditaksir 150,000.00
trus block

Jumlah Untuk 1 Unit Sambungan Rumah


Rumah

Jumlah Harga (Rp)

379,500.00
114,000.00
18,000.00
20,000.00
66,000.00
15,000.00
14,400.00
26,600.00
10,000.00
20,000.00
5,600.00
12,000.00
14,400.00
90,000.00
34,560.00
43,950.00
23,700.00
150,000.00

1,057,710.00
REKAP HARGA PERKIRAAN SENDIRI (HPS)

#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!

NO URAIAN PEKERJAAN

II

III

IV

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)

(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)

(D) JUMLAH TOTAL DIBULATKAN

Terbilang : #NAME?
RAAN SENDIRI (HPS)

JUMLAH HARGA
( Rp )

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
REKAPITULASI
PEKERJAAN : ………………….
TAHUN ANGGARAN Err:509
LOKASI : KECAMATAN ……………..
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH

SUB JUMLAH
NO. URAIAN PEKERJAAN
HARGA (Rp.)

A. REHABILITASI MASJID BAITURRAHMAN BLANG KUTA (OTSUS) 475,000,000.000


B. PENGAWASAN 15,000,000.000

TOTAL
DIBULATKAN
Terbilang : Lima Ratus Lima Belas Juta Rupiah

Menyetujui / Mengetahu
KEPALA DINAS PEKERJAAN

BAHRON BAKTI, ST
Pembina / Nip. 19691115 19980
REKAPITULASI

JUMLAH
HARGA (Rp.)

475,000,000.00
15,000,000.00

490,000,000.00
490,000,000.00
ma Belas Juta Rupiah

Menyetujui / Mengetahui
KEPALA DINAS PEKERJAAN UMUM

BAHRON BAKTI, ST
Pembina / Nip. 19691115 199803 1 002
REKAPITULASI
PEKERJAAN : ………………….
LOKASI : KECAMATAN ……………..
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH
TAHUN ANGGARAN : 2018

SUB JUMLAH JUMLAH


NO. URAIAN PEKERJAAN
HARGA (Rp.) HARGA (Rp.)

A. PEKERJAAN FISIK
I PEKERJAAN PERSIAPAN
II PEKERJAAN PEMBANGUNAN IPALD/MCK
451,250,000

B. BIAYA PENUNJANG 23,750,000 23,750,000

TOTAL A + B 475,000,000
DIBULATKAN 475,000,000
Terbilang : #NAME?

Diperiksa Oleh : Dibuat Oleh :


Tenaga Fasilitator Lapangan KELOMPOK SWADAYA MASYARAKAT

……………………..... ……………………………..
Ketua

Mengetahui, Menyetujui / Mengetahui


PENGGUNA ANGGARAN PPTK BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM KAB. PIDIE JAYA

BAHRON BAKTI, ST, MT SALAHUDDIN, ST


Nip. 19691115 199803 1 002 Nip. 19721231 200604 1 014
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN FISIK

PEKERJAAN : ………………….
TAHUN ANGGARAN : 2018
LOKASI : KECAMATAN ……………..
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH

HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN
(Rp.)
1 2 3 4 5

I PEKERJAAN PERSIAPAN
I PEKERJAAN PERSIAPAN
1 Barak Kerja / Gudang 1.00 Ls Taksir
2 Papan Nama Proyek 1.00 Ls Taksir
3 Pemasangan Bowplank 1.00 Ls Taksir
TOTAL I
HARGA
NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN
(Rp.)
1 2 3 4 5
AN BIAYA (RAB) PEKERJAAN FISIK

JUMLAH
HARGA
(Rp.)
6

-
-
-
-
JUMLAH
HARGA
(Rp.)
6
REKAPITULASI KEBUTUHAN UPAH DAN BAHAN
PEMBANGUNAN MASJID JAMIK JANGKA BUYA

PEKERJAAN : PEMBANGUNAN MASJID JAMIK JANGKA BUYA


TAHUN ANGGARAN : 2016
LOKASI : KECAMATAN JANGKA BUYA
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH

KODE
Volume
U R A I A N
BIAYA
Total

I UPAH KERJA
1 Mandor Err:509
2 kepala tukang Err:509
3 Pekerja Err:509
4 Tukang Err:509
5 ADM Panitia 1.00
6 Barak Kerja / Gudang 1.00
7 Papan Nama Proyek 1.00
8 Err:509 Err:509
9 Pemasangan Bowplank 1.00

II BAHAN / MATERIAL
1 Semen PC 40 kg Err:509
2 Pasir Pasang Err:509
3 Kerikil Beton Err:509
4 Batu Bata Err:509
5 Paku 5 cm - 10 cm Err:509
6 Pasir Beton Err:509
7 Besi Beton Polos Err:509
8 kawat beton Err:509
9 Minyak Bekisting Err:509
10 Kayu kelas III Err:509
11 Balok kayu kelas II Err:509
12 Dolken Err:509
13 Plywood tebal 9 mm Err:509
14 Air Err:509
15 - -
16 - -
17 - -
18 - -
19 - -
20 Err:509 Err:509
21 Err:509 Err:509
Terbilang : Enam Ratus Juta Rupiah

Mengetahui:
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
KABUPATEN PIDIE JAYA

BAHRON BAKTI, ST
Nip. 19691115 199803 1 002
UPAH DAN BAHAN
K JANGKA BUYA

Harga Satuan Jumlah Total


Satuan
(Rp) (Rp)

Hok 112,000.00 Err:509


Hok 130,000.00 Err:509
Hok 80,000.00 Err:509
Hok 98,000.00 Err:509
ls 10,000,000.00 10,000,000.00
Ls - -
Ls - -
Err:509 Err:509 Err:509
Ls - -

Sub Total I Err:509

ZAK 62,000.00 Err:509


M3 200,000.00 Err:509
M3 200,000.00 Err:509
Buah 800.00 Err:509
Kg 18,000.00 Err:509
M3 200,000.00 Err:509
Kg 12,000.00 Err:509
kg 14,000.00 Err:509
Kg 13,000.00 Err:509
M3 4,600,000.00 Err:509
M3 5,800,000.00 Err:509
btg 12,000.00 Err:509
Lembar 145,000.00 Err:509
liter 100.00 Err:509
- - -
- - -
- - -
- - -
- - -
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Sub Total II Err:509
TOTAL Err:509
DIBULATKAN Err:509

Meureudu 2016
DIAJUKAN OLEH :
KELOMPOK SWADAYA MASYARAKAT

-
Ketua
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

Harga Satuan Dasar


No Uraian Satuan (Rp)
I UPAH
1 Pekerja Galian Tanah OH 70,000.00
2 Pekerja OH 80,000.00
3 Tukang OH 98,000.00
4 Kepala Tukang OH 130,000.00
5 Mandor OH 112,000.00
6 Supir OH 125,000.00
7 Operator OH 96,000.00

II Material / Bahan
2 Air Liter 100.00
5 Asphalt kG 13,800.00
8 Batu Bata Bh 800.00
9 Batu Kali/ Batu Belah (Sungai / Gunung ) M3 200,000.00
11 Besi Beton Polos Kg 12,000.00
12 Besi Beton Ulir Kg 16,000.00
13 Beton Rooster/ Kerawang Bh 15,000.00
14 Bubungan Seng M'
15 Cat Kayu Dasar Kg 48,000.00
16 Cat Kayu Mengkilat/Penutup Kg 61,500.00
17 Cat Menie Besi Kg 48,000.00
18 Cat Tembok Kg 30,000.00
19 Dempul Kayu Kg 30,200.00
20 Engsel Jendela Pasang 18,450.00
21 Engsel Pintu Pasang 30,750.00
22 Filler Kg 1,800.00
23 Floor Drain Bh 25,000.00
28 Kawat Beton Kg 14,000.00
29 Kawat Bronjong Pabrikan Uk. ( 2 x 1 x 0,5 ) dia. 3 mm Unit 34,500.00
30 Kawat Duri Kg 24,600.00
31 Kawat Las Kg 45,000.00
32 Kayu Bakau / Dolken 10 Cm Btg 12,000.00
33 Kayu Kelas I M3 6,500,000.00
34 Kayu Kelas II M3 5,800,000.00
35 Kayu Kelas III M3 4,600,000.00
36 Kayu Kelas IV M3 3,900,000.00
38 Keramik 20 x 40 Cm M2 89,000.00
38 Keramik uk. 30 x 30 cm M2 70,000.00
39 Keramik uk. 40 x 40 cm M2 75,000.00
40 Kertas Amplas Lbr 9,000.00
41 Kloset Jongkok Keramik Terpasang Bh 600,000.00
42 Kuas Bh 30,000.00
48 Minyak Pelumas Liter 44,000.00
49 Multiplek 4 mm Lbr 78,000.00
50 Multiplek 6 mm Lbr 110,000.00
51 Multiplek 9 mm Lbr 145,000.00
54 Paku Kayu Kg 18,000.00
55 Paku Seng Kg 18,000.00
56 Pasir Batu (Sirtu) material jalan M3
Harga Satuan Dasar
No Uraian Satuan (Rp)
57 Pasir Beton / Kerikil M3 200,000.00
58 Pasir Beton / Kerikil Kg 142.86
59 Pasir Pasang M3 200,000.00
60 Pasir Urug M3 93,000.00
61 Plamir Tembok Kg 30,200.00
62 Residu Ltr 13,000.00
65 Semen Portland 40 kg Zak 62,000.00
66 Semen Portland Kg 1,550.00
68 Semen Putih Kg 3,689.18
69 Seng Gelombang BJLS 30 Cat Pabrik 8 kaki (90x240 cm) Lbr 116,824.00
70 Seng Plat BJLS 30 (90x240 cm) Lbr 104,527.00
71 Sirtu M3 130,000.00
72 Solar Industri Liter 10,500.00
73 Stop Kontak + Instalasi Titik 170,000.00
74 Tanah Timbun M3 80,000.00
75 Titik Lampu + Instalasi Titik 170,000.00
78 Bak Air Viber Buah 250,000.00
RENCANA PENGUNAAN DANA (RPD) TAHA
PEMBANGUNAN MASJID JAMIK JANGKA BUYA

PEKERJAAN : PEMBANGUNAN MASJID JAMIK JANGKA BUYA


TAHUN ANGGARAN : 2016
LOKASI : KECAMATAN JANGKA BUYA
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH

Volume
KODE
U R A I A N
BIAYA Real s/d Tahap
Kebutuhan
lalu

I UPAH KERJA
1 Mandor Err:509 Err:509
2 kepala tukang Err:509 Err:509
3 Pekerja Err:509 90.00
4 Tukang Err:509 45.00
5 ADM Panitia 1.00 0.30
6 Barak Kerja / Gudang 1.00 1.00
7 Papan Nama Proyek 1.00 1.00
8 Err:509 Err:509 Err:509
9 Pemasangan Bowplank 1.00 1.00

II BAHAN / MATERIAL
1 Semen PC 40 kg Err:509 Err:509
2 Pasir Pasang Err:509 Err:509
3 Kerikil Beton Err:509 Err:509
4 Batu Bata Err:509 Err:509
5 Paku 5 cm - 10 cm Err:509 20.00
6 Pasir Beton Err:509 Err:509
7 Besi Beton Polos Err:509 Err:509
8 kawat beton Err:509 Err:509
9 Minyak Bekisting Err:509 Err:509
10 Kayu kelas III Err:509 Err:509
11 Balok kayu kelas II Err:509 Err:509
12 Dolken Err:509 Err:509
13 Plywood tebal 9 mm Err:509 Err:509
14 Air Err:509 1,480.00
15 - - 0.25
16 - - 0.00
17 - - 0.00
18 - - 10.00
19 - - -
20 Err:509 Err:509 -
21 Err:509 Err:509 -
Terbilang : Seratus Delapan Puluh Juta Rupiah

Disetujui Oleh: Diperiksa oleh:


KOORDINATOR WILAYAH TENAGA PENDAMPING LAPANGAN
BIDANG CIPTA KARYA BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM PIJAY KABUPATEN PIDIE JAYA

RACHMAWATI, ST TARMIZI, A.Md / MAKINUDDIN ASMAR, ST


Nip. 19821007 200804 2 001 Nip. 19831231 201003 1 001

Mengetahui:
PEJABAT PELAKSANA TEKNIS KEGIATAN
BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM PIJAY

SALAHUDDIN, ST
Nip. 19721231 200604 1 014
N DANA (RPD) TAHAP II
JID JAMIK JANGKA BUYA

Volume Harga Satuan


Jumlah Total
Satuan
Pengajuan (Rp)
Jumlah komulatif (Rp)
Sekarang

Err:509 Err:509 Hok 112,000 Err:509


Err:509 Err:509 Hok 130,000 Err:509
26.00 116.00 Hok 80,000 2,080,000
Err:509 Err:509 Hok 98,000 Err:509
0.25 0.55 ls 10,000,000 2,500,000
- 1.00 Ls - -
- 1.00 Ls - -
Err:509 Err:509 Err:509 Err:509 Err:509
- 1.00 Ls - -
-
Sub Total I Err:509
-
Err:509 Err:509 ZAK 62,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 Buah 800 Err:509
Err:509 Err:509 Kg 18,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 Kg 12,000 Err:509
Err:509 Err:509 kg 14,000 Err:509
Err:509 Err:509 Kg 13,000 Err:509
Err:509 Err:509 M3 4,600,000 Err:509
Err:509 Err:509 M3 5,800,000 Err:509
Err:509 Err:509 btg 12,000 Err:509
Err:509 Err:509 Lembar 145,000 Err:509
90.00 1,570.00 liter 100 9,000
0.37 0.62 0 - -
- - 0 - -
- - 0 - -
(10.00) - 0 - -
4.00 4.00 0 - -
- - Err:509 Err:509 Err:509
13.00 13.00 Err:509 Err:509 Err:509
-
Sub Total II Err:509
TOTAL Err:509
DIBULATKAN Err:509

iperiksa oleh: Meureudu 2016


NDAMPING LAPANGAN Diajukan Oleh
NG CIPTA KARYA Kelompok Swadaya Masyarakat
ATEN PIDIE JAYA

/ MAKINUDDIN ASMAR, ST 0
31231 201003 1 001 Ketua

KSANA TEKNIS KEGIATAN


NG CIPTA KARYA
KERJAAN UMUM PIJAY

AHUDDIN, ST
21231 200604 1 014
Err:509
Err:509
600,000,000 Err:509
240,000,000 40%
180,000,000 30%
180,000,000 30%

600,000,000

Err:509

5,200,000.00

109
RENCANA PENGUNAAN DANA (RPD) TAHAP
PEMBANGUNAN MASJID JAMIK JANGKA BUYA

PEKERJAAN : PEMBANGUNAN MASJID JAMIK JANGKA BUYA


TAHUN ANGGARAN : 2016
LOKASI : KECAMATAN JANGKA BUYA
KABUPATEN : PIDIE JAYA
PROPINSI : ACEH

Volume
KODE
U R A I A N
BIAYA Real s/d Tahap
Kebutuhan
lalu

I UPAH KERJA
1 Mandor Err:509 Err:509
2 kepala tukang Err:509 Err:509
3 Pekerja Err:509 90.00
4 Tukang Err:509 45.00
5 ADM Panitia 1.00 0.30
6 Barak Kerja / Gudang 1.00 1.00
7 Papan Nama Proyek 1.00 1.00
8 Err:509 Err:509 Err:509
9 Pemasangan Bowplank 1.00 1.00

II BAHAN / MATERIAL
1 Semen PC 40 kg Err:509 Err:509
2 Pasir Pasang Err:509 Err:509
3 Kerikil Beton Err:509 Err:509
4 Batu Bata Err:509 Err:509
5 Paku 5 cm - 10 cm Err:509 20.00
6 Pasir Beton Err:509 Err:509
7 Besi Beton Polos Err:509 Err:509
8 kawat beton Err:509 Err:509
9 Minyak Bekisting Err:509 Err:509
10 Kayu kelas III Err:509 Err:509
11 Balok kayu kelas II Err:509 Err:509
12 Dolken Err:509 Err:509
13 Plywood tebal 9 mm Err:509 Err:509
14 Air Err:509 1,480.00
15 - - 0.25
16 - - 0.00
17 - - 0.00
18 - - 10.00
19 - - -
20 Err:509 Err:509 -
21 Err:509 Err:509 -
Terbilang : Seratus Delapan Puluh Juta Rupiah

Disetujui Oleh: Diperiksa oleh:


KOORDINATOR WILAYAH TENAGA PENDAMPING LAPANGAN
BIDANG CIPTA KARYA BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM PIJAY KABUPATEN PIDIE JAYA

RACHMAWATI, ST TARMIZI, A.Md / MAKINUDDIN ASMAR, ST


Nip. 19821007 200804 2 001 Nip. 19831231 201003 1 001

Mengetahui:
PEJABAT PELAKSANA TEKNIS KEGIATAN
BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM PIJAY

SALAHUDDIN, ST
Nip. 19721231 200604 1 014
N DANA (RPD) TAHAP III
JID JAMIK JANGKA BUYA

Volume Harga Satuan


Jumlah Total
Satuan
Pengajuan (Rp)
Jumlah komulatif (Rp)
Sekarang

Err:509 Err:509 Hok 112,000 Err:509


Err:509 Err:509 Hok 130,000 Err:509
26.00 116.00 Hok 80,000 2,080,000
Err:509 Err:509 Hok 98,000 Err:509
0.25 0.55 ls 10,000,000 2,500,000
- 1.00 Ls - -
- 1.00 Ls - -
Err:509 Err:509 Err:509 Err:509 Err:509
- 1.00 Ls - -
-
Sub Total I Err:509
-
Err:509 Err:509 ZAK 62,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 Buah 800 Err:509
Err:509 Err:509 Kg 18,000 Err:509
Err:509 Err:509 M3 200,000 Err:509
Err:509 Err:509 Kg 12,000 Err:509
Err:509 Err:509 kg 14,000 Err:509
Err:509 Err:509 Kg 13,000 Err:509
Err:509 Err:509 M3 4,600,000 Err:509
Err:509 Err:509 M3 5,800,000 Err:509
Err:509 Err:509 btg 12,000 Err:509
Err:509 Err:509 Lembar 145,000 Err:509
90.00 1,570.00 liter 100 9,000
0.37 0.62 0 - -
- - 0 - -
- - 0 - -
(10.00) - 0 - -
4.00 4.00 0 - -
- - Err:509 Err:509 Err:509
13.00 13.00 Err:509 Err:509 Err:509
-
Sub Total II Err:509
TOTAL Err:509
DIBULATKAN Err:509

iperiksa oleh: Meureudu 2016


NDAMPING LAPANGAN Diajukan Oleh
NG CIPTA KARYA Kelompok Swadaya Masyarakat
ATEN PIDIE JAYA

/ MAKINUDDIN ASMAR, ST 0
31231 201003 1 001 Ketua

KSANA TEKNIS KEGIATAN


NG CIPTA KARYA
KERJAAN UMUM PIJAY

AHUDDIN, ST
21231 200604 1 014
Err:509
Err:509
600,000,000 Err:509
240,000,000 40%
180,000,000 30%
180,000,000 30%

600,000,000

Err:509

5,200,000.00

109
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.7500 70,000.00
2 Mandor OH 0.0250 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.2

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.9000 70,000.00
2 Mandor OH 0.0450 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 3 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.3

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 1.0500 70,000.00
2 Mandor OH 0.0670 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.2500 70,000.00
2 Mandor OH 0.0833 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memadatkan tanah (per 20 cm)


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 70,000.00
2 Mandor OH 0.0500 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah Didatangkan


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11a

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 70,000.00
2 Mandor OH 0.0100 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Tanah Timbun M3 1.2000 80,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Tanah Bekas Galian Termasuk Perataan dan Pemadatan (stamper)
Satuan / Unit : M3
Analisa : AHSP PU - T.14 b

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 70,000.00
2 Mandor OH 0.0500 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.0500 300,000.00
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan


Satuan / Unit : M3
Analisa : AHSP PU - T.14 E

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 70,000.00
2 Mandor OH 0.0500 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Tanah Timbun M3 1.2000 80,000.00
Jumlah Bahan
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.0500 300,000.00
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 70,000.00
2 Mandor OH 0.0100 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Pasir Urug M3 1.2000 93,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.5000 80,000.00
2 Tukang OH 0.7500 98,000.00
3 Kepala Tukang OH 0.0750 130,000.00
4 Mandor OH 0.0750 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 200,000.00
2 Semen Portland Kg 163.0000 1,550.00
3 Pasir Pasang M3 0.5200 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.7800 80,000.00
2 Tukang OH 0.3900 98,000.00
3 Kepala Tukang OH 0.0390 130,000.00
4 Mandor OH 0.0390 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 200,000.00
2 Pasir Urug M3 0.4320 93,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 2
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3000 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0150 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Bata Merah (20 x 5 x 10 Cm) Bh 80.0000 800.00
2 Semen Portland Kg 18.9500 1,550.00
3 Pasir Pasang M3 0.0380 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.3000 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0150 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Bata Merah (20 x 5 x 10 Cm) Bh 80.0000 800.00
2 Semen Portland Kg 11.5000 1,550.00
3 Pasir Pasang M3 0.0430 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Terawang ( Roster ) Campuran 1 : 4


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.3000 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0150 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Terawang (Roster ) Bh 30.0000 15,000.00
2 Semen Portland Kg 11.0000 1,550.00
3 Pasir Pasang M3 0.0350 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 : 2 Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.3000 80,000.00
2 Tukang OH 0.1500 98,000.00
3 Kepala Tukang OH 0.0150 130,000.00
4 Mandor OH 0.0150 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 10.2240 1,550.00
2 Pasir Pasang M3 0.0200 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 : 4 Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.3000 80,000.00
2 Tukang OH 0.1500 98,000.00
3 Kepala Tukang OH 0.0150 130,000.00
4 Mandor OH 0.0150 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 6.2400 1,550.00
2 Pasir Pasang M3 0.0240 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K 100), Slump (3-6) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.4

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.2000 80,000.00
2 Tukang OH 0.2000 98,000.00
3 Kepala Tukang OH 0.0200 130,000.00
4 Mandor OH 0.0600 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 230.0000 1,550.00
2 Pasir Beton Kg 893.0000 142.86
3 Kerikil Kg 1,027.0000 142.86
4 Air Liter 200.0000 100.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.6500 80,000.00
2 Tukang OH 0.2750 98,000.00
3 Kepala Tukang OH 0.0280 130,000.00
4 Mandor OH 0.0830 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 326.0000 1,550.00
2 Pasir Beton Kg 760.0000 142.86
3 Kerikil Kg 1,029.0000 142.86
4 Air Liter 215.0000 100.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.6500 80,000.00
2 Tukang OH 0.2750 98,000.00
3 Kepala Tukang OH 0.0280 130,000.00
4 Mandor OH 0.0830 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 371.0000 1,550.00
2 Pasir Beton Kg 698.0000 142.86
3 Kerikil Kg 1,047.0000 142.86
4 Air Liter 215.0000 100.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.6500 80,000.00
2 Tukang OH 0.2750 98,000.00
3 Kepala Tukang OH 0.0280 130,000.00
4 Mandor OH 0.0830 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland Kg 384.0000 1,550.00
2 Pasir Beton Kg 692.0000 142.86
3 Kerikil Kg 1,039.0000 142.86
4 Air Liter 215.0000 100.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos Atau Besi Ulir
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0700 80,000.00
2 Tukang OH 0.0700 98,000.00
3 Kepala Tukang OH 0.0070 130,000.00
4 Mandor OH 0.0400 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Besi Beton Polos Kg 10.5000 12,000.00
2 Kawat Beton Kg 0.1500 14,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Per Kg Pembesian = D / 10
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 Kg Jaring Kawat Baja / Wire Mesh


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.19

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0250 80,000.00
2 Tukang OH 0.0250 98,000.00
3 Kepala Tukang OH 0.0020 130,000.00
4 Mandor OH 0.0010 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Jaring Kawat Baja Di Las Kg 1.0200 12,000.00
2 Kawat Beton Kg 0.0500 14,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.5200 80,000.00
2 Tukang OH 0.2600 98,000.00
3 Kepala Tukang OH 0.0260 130,000.00
4 Mandor OH 0.0260 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.3000 18,000.00
3 Minyak Bekisting Liter 0.1000 13,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Sloof
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.5200 80,000.00
2 Tukang OH 0.2600 98,000.00
3 Kepala Tukang OH 0.0260 130,000.00
4 Mandor OH 0.0260 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0450 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.3000 18,000.00
3 Minyak Bekisting Liter 0.1000 13,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Bekisting Untuk Kolom
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.6600 80,000.00
2 Tukang OH 0.3300 98,000.00
3 Kepala Tukang OH 0.0330 130,000.00
4 Mandor OH 0.0330 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 18,000.00
3 Minyak Bekisting Liter 0.2000 13,000.00
4 Balok Kayu Kelas II M3 0.0150 5,800,000.00
5 Plywood tebal 9 mm Lbr 0.3500 145,000.00
6 kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 12,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Balok
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.6600 80,000.00
2 Tukang OH 0.3300 98,000.00
3 Kepala Tukang OH 0.0330 130,000.00
4 Mandor OH 0.0330 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 18,000.00
3 Minyak Bekisting Liter 0.2000 13,000.00
4 Balok Kayu Kelas II M3 0.0180 5,800,000.00
5 Plywood tebal 9 mm Lbr 0.3500 145,000.00
6 kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 12,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.6600 80,000.00
2 Tukang OH 0.3300 98,000.00
3 Kepala Tukang OH 0.0330 130,000.00
4 Mandor OH 0.0330 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 18,000.00
3 Minyak Bekisting Liter 0.2000 13,000.00
4 Balok Kayu Kelas II M3 0.0150 5,800,000.00
5 Plywood tebal 9 mm Lbr 0.3500 145,000.00
6 kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 12,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Dinding


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.6600 80,000.00
2 Tukang OH 0.3300 98,000.00
3 Kepala Tukang OH 0.0330 130,000.00
4 Mandor OH 0.0330 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas III M3 0.0300 4,600,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 18,000.00
3 Minyak Bekisting Liter 0.2000 13,000.00
4 Balok Kayu Kelas II M3 0.0200 5,800,000.00
5 Plywood tebal 9 mm Lbr 0.3500 145,000.00
6 kayu dolken dia. 8-10 cm, L = 4 M Batang 3.0000 12,000.00
7 Penjaga jarak / Spacer Bh 4.0000 1,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Bekisting Dipakai 3 x = D/3
F Overhead & Profit 10% X E
G Harga Satuan Pekerjaan ( E + F )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengelasan dengan Listrik


Satuan / Unit : M'
Analisa : AHSP PU A.4.2.1.5

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.4000 80,000.00
2 Tukang OH 0.2000 98,000.00
3 Kepala Tukang OH 0.0200 130,000.00
4 Mandor OH 0.0200 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kawat Las Listrik Kg 4.0000 45,000.00
2 Solar Liter 3.0000 10,500.00
3 Minyak Pelumas Liter 0.4000 44,000.00
Jumlah Bahan
C. PERALATAN
1 Sewa Mesin Las Jam 1.7000 -
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : 1 M' Pengelasan Pipa HDPE


Satuan / Unit : M'
Analisa : Anl. HDPE. A

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.4000 80,000.00
2 Tukang OH 0.2000 98,000.00
3 Kepala Tukang OH 0.0200 130,000.00
4 Mandor OH 0.0200 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Solar Liter 3.0000 10,500.00
2 Minyak Pelumas Liter 0.4000 44,000.00
Jumlah Bahan
C. PERALATAN
1 Sewa Mesin Penyambung HDPE Jam 1.7000 -
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 50 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.1

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0810 80,000.00
2 Tukang Pipa OH 0.0410 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0080 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 75 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.2

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0940 80,000.00
2 Tukang Pipa OH 0.0470 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0090 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 100 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.3
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.1050 80,000.00
2 Tukang Pipa OH 0.0530 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0110 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 150 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.4

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1180 80,000.00
2 Tukang Pipa OH 0.0590 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0120 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 200 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.5

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1890 80,000.00
2 Tukang Pipa OH 0.0950 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0190 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 250 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.6
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.2560 80,000.00
2 Tukang Pipa OH 0.1280 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0260 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 300 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.7

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.2940 80,000.00
2 Tukang Pipa OH 0.1470 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0290 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 350 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.7a

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.4190 80,000.00
2 Tukang Pipa OH 0.2095 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0415 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa PVC dia. 400 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.8

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.5440 80,000.00
2 Tukang OH 0.2720 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0540 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 M' pipa Steel dia. 50 mm


Satuan / Unit : M'
Analisa : AHSP PU A.8.4.1.64

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.4990 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH - 130,000.00
4 Mandor OH 0.0500 112,000.00
Jumlah Tenaga Kerja
B. BAHAN

Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.6700 80,000.00
2 Tukang OH 2.0000 98,000.00
3 Kepala Tukang OH 0.2000 130,000.00
4 Mandor OH 0.3350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 5,800,000.00
2 Paku Kayu Kg 0.1500 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.14
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 6.7000 80,000.00
2 Tukang OH 20.1000 98,000.00
3 Kepala Tukang OH 2.0100 130,000.00
4 Mandor OH 0.3350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Balok Kayu Kelas I M3 1.2000 5,800,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 12,000.00
3 Paku Kayu Kg 5.6000 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Gordeng, Kayu Kelas II


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.15

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 2.4000 80,000.00
2 Tukang OH 7.2000 98,000.00
3 Kepala Tukang OH 0.7200 130,000.00
4 Mandor OH 0.1200 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Balok Kayu Kelas II M3 1.1000 5,800,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 12,000.00
3 Paku Kayu Kg 3.0000 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rangka Langit-Langit (60 x 60) Cm, Kelas II


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.20

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.2000 80,000.00
2 Tukang OH 0.3000 98,000.00
3 Kepala Tukang OH 0.0300 130,000.00
4 Mandor OH 0.0100 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kaso Kelas II (5x7) Cm M3 0.0163 5,800,000.00
2 Paku Kayu Kg 0.2500 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1000 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0050 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Tripleks Tebal 4 mm Lbr 0.3750 78,000.00
2 Paku Kayu Kg 0.0300 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Lantai Keramik Artistik Uk.10 x 10 cm atau 5 x 20 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.33

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.7000 80,000.00
2 Tukang OH 0.3500 98,000.00
3 Kepala Tukang OH 0.0350 130,000.00
4 Mandor OH 0.0350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Keramik Artistik M2 1.0000 -
2 Semen Portland Kg 8.1900 1,550.00
3 Pasir Pasang M3 0.0450 200,000.00
4 Semen Warna Kg 3.2000 3,689.18
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Lantai Keramik Uk. 40 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.34a

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.7000 80,000.00
2 Tukang OH 0.3500 98,000.00
3 Kepala Tukang OH 0.0350 130,000.00
4 Mandor OH 0.0350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Keramik Uk. 40 x 40 cm M2 1.0000 75,000.00
2 Semen Portland Kg 8.1900 1,550.00
3 Pasir Pasang M3 0.0450 200,000.00
4 Semen Warna Kg 1.6200 3,689.18
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Dinding Keramik Uk. 20 x 40 cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54.a

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.9000 80,000.00
2 Tukang OH 0.4500 98,000.00
3 Kepala Tukang OH 0.0450 130,000.00
4 Mandor OH 0.0350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Keramik Dinding Uk. 20 x 40 cm m2 1.0000 89,000.00
2 Semen Portland Kg 9.3000 1,550.00
3 Pasir Pasang M3 0.0180 200,000.00
4 Semen Warna Kg 1.9400 3,689.18
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10.0% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Dinding Keramik Uk. 25 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54b

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.9000 80,000.00
2 Tukang OH 0.4500 98,000.00
3 Kepala Tukang OH 0.0450 130,000.00
4 Mandor OH 0.0350 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Keramik 20 x 40 Cm Bh 12.5000 89,000.00
2 Semen Portland Kg 9.3000 1,550.00
3 Pasir Pasang M3 0.0180 200,000.00
4 Semen Warna Kg 1.9400 3,689.18
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10.0% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Atap seng Gelombang


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.38

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1200 80,000.00
2 Tukang OH 0.0600 98,000.00
3 Kepala Tukang OH 0.0060 130,000.00
4 Mandor OH 0.0060 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Seng BJLS 0,30 Lbr 0.7000 116,824.00
2 Paku seng Kg 0.0200 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Atap Nok Seng


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.39

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1500 80,000.00
2 Tukang OH 0.0700 98,000.00
3 Kepala Tukang OH 0.0080 130,000.00
4 Mandor OH 0.0600 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Seng Plat BJLS 0,30 Lbr 0.3000 104,527.00
2 Paku seng Kg 0.0400 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Listplank Uk. 3 x 20 Cm Kayu Kelas II


Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.1000 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0500 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kayu Kelas II M3 0.0088 5,800,000.00
2 Paku Kg 0.0600 18,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kloset Jongkok Porselen


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.2

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 1.0000 80,000.00
2 Tukang OH 1.5000 98,000.00
3 Kepala Tukang OH 1.5000 130,000.00
4 Mandor OH 0.1600 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kloset Jongkok Porselen Bh 1.0000 600,000.00
2 Semen Portland Kg 6.0000 1,550.00
3 Pasir Pasang M3 0.0100 200,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Floor Drain


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.14

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0100 80,000.00
2 Tukang OH 0.1000 98,000.00
3 Kepala Tukang OH 0.0100 130,000.00
4 Mandor OH 0.0050 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Floor Drain Bh 1.0000 25,000.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0050 80,000.00
2 Tukang OH 0.5000 98,000.00
3 Kepala Tukang OH 0.0500 130,000.00
4 Mandor OH 0.0030 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Kunci Pintu Silinder Bh 1.0000 -
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

No Uraian Satuan Koefisien Harga Satuan


A. TENAGA
1 Pekerja OH 0.0150 80,000.00
2 Tukang OH 0.1500 98,000.00
3 Kepala Tukang OH 0.0150 130,000.00
4 Mandor OH 0.0008 112,000.00
Jumlah Tenaga Kerja
B. BAHAN
1 Engsel Pintu Bh 1.0000 30,750.00
Jumlah Bahan
C. PERALATAN

Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

52,500.00
2,800.00
55,300.00

-
55,300.00
5,530.00
60,830.00

Jumlah Harga

63,000.00
5,040.00
68,040.00

-
68,040.00

68,040.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

73,500.00
7,504.00
81,004.00
-

-
81,004.00

81,004.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

17,500.00
9,333.33
26,833.33

-
26,833.33
2,683.33
29,516.67

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

35,000.00
5,600.00
40,600.00

-
40,600.00
4,060.00
44,660.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

21,000.00
1,120.00
22,120.00

96,000.00
96,000.00

-
118,120.00
11,812.00
129,932.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

35,000.00
5,600.00
40,600.00

15,000.00
15,000.00
55,600.00
5,560.00
61,160.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

35,000.00
5,600.00
40,600.00

96,000.00
96,000.00

15,000.00
15,000.00
151,600.00
15,160.00
166,760.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

21,000.00
1,120.00
22,120.00
111,600.00
111,600.00

-
133,720.00
13,372.00
147,092.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

120,000.00
73,500.00
9,750.00
8,400.00
211,650.00

240,000.00
252,650.00
104,000.00
596,650.00

-
808,300.00
80,830.00
889,130.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

62,400.00
38,220.00
5,070.00
4,368.00
110,058.00

240,000.00
40,176.00
280,176.00

-
390,234.00
39,023.40
429,257.40

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

24,000.00
9,800.00
1,300.00
1,680.00
36,780.00

64,000.00
29,372.50
7,600.00
100,972.50

-
137,752.50
13,775.25
151,527.75
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

24,000.00
9,800.00
1,300.00
1,680.00
36,780.00

64,000.00
17,825.00
8,600.00
90,425.00

-
127,205.00
12,720.50
139,925.50

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

24,000.00
9,800.00
1,300.00
1,680.00
36,780.00

450,000.00
17,050.00
7,000.00
474,050.00

-
510,830.00
51,083.00
561,913.00

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

24,000.00
14,700.00
1,950.00
1,680.00
42,330.00

15,847.20
4,000.00
19,847.20

-
62,177.20
6,217.72
68,394.92
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

24,000.00
14,700.00
1,950.00
1,680.00
42,330.00

9,672.00
4,800.00
14,472.00

-
56,802.00
5,680.20
62,482.20

ALISA HARGA SATUAN PEKERJAAN

n Mutu F'c = 7,4 Mpa (K 100), Slump (3-6) cm, W/c = 0,87

Jumlah Harga

96,000.00
19,600.00
2,600.00
6,720.00
124,920.00

356,500.00
127,571.43
146,714.29
20,000.00
650,785.71

-
775,705.71
77,570.57
853,276.29

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

132,000.00
26,950.00
3,640.00
9,296.00
171,886.00

505,300.00
108,571.43
147,000.00
21,500.00
782,371.43

-
954,257.43
95,425.74
1,049,683.17
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

132,000.00
26,950.00
3,640.00
9,296.00
171,886.00

575,050.00
99,714.29
149,571.43
21,500.00
845,835.71

-
1,017,721.71
101,772.17
1,119,493.89

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

132,000.00
26,950.00
3,640.00
9,296.00
171,886.00

595,200.00
98,857.14
148,428.57
21,500.00
863,985.71

-
1,035,871.71
103,587.17
1,139,458.89

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

5,600.00
6,860.00
910.00
4,480.00
17,850.00

126,000.00
2,100.00
128,100.00

-
145,950.00
14,595.00
1,459.50
16,054.50
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

2,000.00
2,450.00
260.00
112.00
4,822.00

12,240.00
700.00
12,940.00

-
17,762.00
1,776.20
19,538.20

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

41,600.00
25,480.00
3,380.00
2,912.00
73,372.00

184,000.00
5,400.00
1,300.00
190,700.00

-
264,072.00
88,024.00
8,802.40
96,826.40

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

41,600.00
25,480.00
3,380.00
2,912.00
73,372.00

207,000.00
5,400.00
1,300.00
213,700.00

-
287,072.00
95,690.67
9,569.07
105,259.73
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

52,800.00
32,340.00
4,290.00
3,696.00
93,126.00

184,000.00
7,200.00
2,600.00
87,000.00
50,750.00
24,000.00
355,550.00

-
448,676.00
149,558.67
14,955.87
164,514.53

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

52,800.00
32,340.00
4,290.00
3,696.00
93,126.00

184,000.00
7,200.00
2,600.00
104,400.00
50,750.00
24,000.00
372,950.00

-
466,076.00
155,358.67
15,535.87
170,894.53

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

52,800.00
32,340.00
4,290.00
3,696.00
93,126.00

184,000.00
7,200.00
2,600.00
87,000.00
50,750.00
72,000.00
403,550.00

-
496,676.00
165,558.67
16,555.87
182,114.53
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

52,800.00
32,340.00
4,290.00
3,696.00
93,126.00

138,000.00
7,200.00
2,600.00
116,000.00
50,750.00
36,000.00
4,000.00
354,550.00

-
354,550.00
118,183.33
11,818.33
130,001.67

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

32,000.00
19,600.00
2,600.00
2,240.00
56,440.00

180,000.00
31,500.00
17,600.00
229,100.00

-
-
285,540.00
28,554.00
314,094.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

32,000.00
19,600.00
2,600.00
2,240.00
56,440.00

31,500.00
17,600.00
49,100.00

-
-
105,540.00
10,554.00
116,094.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

6,480.00
4,018.00
-
896.00
11,394.00

-
11,394.00
1,139.40
12,533.40

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

7,520.00
4,606.00
-
1,008.00
13,134.00

-
13,134.00
1,313.40
14,447.40

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

8,400.00
5,194.00
-
1,232.00
14,826.00

-
14,826.00
1,482.60
16,308.60
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

9,440.00
5,782.00
-
1,344.00
16,566.00

-
16,566.00
1,656.60
18,222.60

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

15,120.00
9,310.00
-
2,128.00
26,558.00

-
26,558.00
2,655.80
29,213.80

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

20,480.00
12,544.00
-
2,912.00
35,936.00

-
35,936.00
3,593.60
39,529.60
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

23,520.00
14,406.00
-
3,248.00
41,174.00

-
41,174.00
4,117.40
45,291.40

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

33,520.00
20,531.00
-
4,648.00
58,699.00

-
58,699.00
5,869.90
64,568.90

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga
43,520.00
26,656.00
-
6,048.00
76,224.00

-
76,224.00
7,622.40
83,846.40
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

39,920.00
9,800.00
-
5,600.00
55,320.00

-
55,320.00
5,532.00
60,852.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

53,600.00
196,000.00
26,000.00
37,520.00
313,120.00

348,000.00
2,700.00
350,700.00

-
663,820.00
66,382.00
730,202.00

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

536,000.00
1,969,800.00
261,300.00
37,520.00
2,804,620.00

6,960,000.00
180,000.00
100,800.00
7,240,800.00

-
10,045,420.00
1,004,542.00
11,049,962.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

192,000.00
705,600.00
93,600.00
13,440.00
1,004,640.00

6,380,000.00
180,000.00
54,000.00
6,614,000.00

-
7,618,640.00
761,864.00
8,380,504.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

16,000.00
29,400.00
3,900.00
1,120.00
50,420.00

94,540.00
4,500.00
99,040.00

-
149,460.00
14,946.00
164,406.00

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

8,000.00
9,800.00
1,300.00
560.00
19,660.00

29,250.00
540.00
29,790.00

-
49,450.00
4,945.00
54,395.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

56,000.00
34,300.00
4,550.00
3,920.00
98,770.00

-
12,694.50
9,000.00
11,805.38
33,499.88

-
132,269.88
13,226.99
145,496.86

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

56,000.00
34,300.00
4,550.00
3,920.00
98,770.00

75,000.00
12,694.50
9,000.00
5,976.47
102,670.97

-
201,440.97
20,144.10
221,585.07

NALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

72,000.00
44,100.00
5,850.00
3,920.00
125,870.00

89,000.00
14,415.00
3,600.00
7,157.01
114,172.01

-
240,042.01
24,004.20
264,046.21
NALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

72,000.00
44,100.00
5,850.00
3,920.00
125,870.00

1,112,500.00
14,415.00
3,600.00
7,157.01
1,137,672.01

-
1,263,542.01
126,354.20
1,389,896.21

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

9,600.00
5,880.00
780.00
672.00
16,932.00

81,776.80
360.00
82,136.80

-
99,068.80
9,906.88
108,975.68

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

12,000.00
6,860.00
1,040.00
6,720.00
26,620.00

31,358.10
720.00
32,078.10

-
58,698.10
5,869.81
64,567.91
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

8,000.00
9,800.00
1,300.00
5,600.00
24,700.00

51,040.00
1,080.00
52,120.00

-
76,820.00
7,682.00
84,502.00

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

80,000.00
147,000.00
195,000.00
17,920.00
439,920.00

600,000.00

2,000.00
602,000.00

-
1,041,920.00
104,192.00
1,146,112.00

ALISA HARGA SATUAN PEKERJAAN


Jumlah Harga

800.00
9,800.00
1,300.00
560.00
12,460.00

25,000.00
25,000.00

-
37,460.00
3,746.00
41,206.00
ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

400.00
49,000.00
6,500.00
336.00
56,236.00

-
-

-
56,236.00
5,623.60
61,859.60

ALISA HARGA SATUAN PEKERJAAN

Jumlah Harga

1,200.00
14,700.00
1,950.00
84.00
17,934.00

30,750.00
30,750.00

-
48,684.00
4,868.40
53,552.40
BACK UP VOLUME

ATAS BAWAH
NO PEKERJAAN
(a) (b)
1 2 3 4
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Administrasi dan Dokumentasi
B PEKERJAAN GALIAN TANAH DAN BATU
1 Galian Pondasi Tapak
Type P1
Type P2
Type P3
2 Urugan Tanah Kembali Galian Tapak
3 Galian Pondasi Menerus
4 Urugan Tanah Kembali Galian Pondasi
5 Urugan Pasir Pondasi Menerus
6 Lantai Kerja
Type P1
Type P2
Type P3
7 Batu Kosong (Anstaamping)
9 Pasangan Batu Gunung 0.3 0.6
10 Galian Tanah (Bak Kulah)
12 Urugan Pasir Pondasi (Bak Kulah)
13 Batu Kosong (Anstaamping) Bak Kulah
C PEKERJAAN TIMBUNAN DAN LANTAI
1 Timbunan Tanah

2 Lapisan Pasir

3 Beton Cor

4 Lantai Granite 60x60 cm

- pengurangan km/wc
- pengurangan km/wc
5 Lantai Keramik 30x30 cm
- km/wc pria
- km/wc wanita
D PEKERJAAN BETON
1 Pondasi Tapak
a. Beton Cor K-250
Type P1
Type P2
Type P3
b. Besi Polos
Type P1
Type P2
Type P3
c. Bekisting + Pembongkaran + Penyiraman
Type P1
Type P2
Type P3
2 Kolom Pedestal
4 a. Beton Cor K-250
5 b. Besi Polos
6 c. Bekisting + Pembongkaran + Penyiraman
7 Bekisting Pedestal
8 Pengecoran Sloof K-250
9 Pembesian Sloof ø 12
10 Pembesian Sloof ø 8
11 Bekisting Sloof
12 Pengecoran Kolom 30x30 K-250
13 Pembesian Kolom 30x30 ø 12
14 Pembesian Kolom 30x30 ø 8
15 Bekisting Kolom 30x30
16 Pengecoran Kolom 13x13 K-250
17 Pembesian Kolom 13x13 ø 12
18 Pembesian Kolom 13x13 ø 8
19 Bekisting Kolom 13x13
20 Pengecoran Ring Balok 25/35 K-250
21 Pembesian Ring Balok ø 12
22 Pembesian Ring Balok ø 8
23 Bekisting Ring Balok 25/35
24 Pengecoran Ring Balok 20/30 K-250
25 Pembesian Ring Balok ø 12
26 Pembesian Ring Balok ø 8
27 Bekisting Ring Balok 20/30
28 Pengecoran Ring Balok 15/20 K-250
29 Pembesian Ring Balok ø 12
30 Pembesian Ring Balok ø 8
31 Bekisting Ring Balok 15/20
32 Pengecoran Plat Lantai K-250
33 Pembesian Plat Lantai ø 12
34 Bekisting Plat Lantai
E PEKERJAAN DINDING DAN PLASTERAN
1 Dinding 1/2 Bata 1 : 4
2 Plasteran 1 : 4
3 Dinding 1/2 Bata Trasram 1 : 2
4 Plasteran 1 : 2
F PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu Alumunium Terpasang
2 Kusen Ventilasi
G PEKERJAAN PENGECETAN
1 Cat Dinding Luar dan Dalam
2 Cat Langit-Langit Plat Lantai
H PEKERJAAN LAIN-LAIN
1 Batu Krawang Merah
2 Batu Roster
3 Besi Hollow Kanopi
4 Kaca Tempered T = 5 mm
5 GRC Terpasang
VOLUME

PANJANG TINGGI LEBAR


JUMLAH VOLUME KET
(P) (T) (L)
5 6 7 8 9 10

1.00 Ls
1.00 Ls

18.74 m³
1 1.1 1 12 13.20 m³
0.6 1.1 1.2 1 0.79 m³
1.2 1.1 1.2 3 4.75 m³
17.56 m³
87 0.5 0.7 30.45 m³
7.6125 m³
87 0.05 0.9 3.915 m³
0.85 m³
1 0.05 1 12 0.60 m³
0.6 0.05 1.2 1 0.04 m³
1.2 0.05 1.2 3 0.22 m³
87 0.1 0.7 6.09 m³
87 0.8 31.32 m³
10 0.2 0.8 1.6 m³
10 0.05 0.8 0.4 m³
10 0.15 0.8 1.2 m³

123.28 m³
14.8 1.15 6.5 110.63 m³
5.5 1.15 2 12.65 m³
7.50 m³
14.8 0.07 6.5 6.73 m³
5.5 0.07 2 0.77 m³
5.36 m³
14.8 0.05 6.5 4.81 m³
5.5 0.05 2 0.55 m³
92.58 m2
14.8 6.5 96.20 m2
5.5 2 11.00 m2
1.5 4.5 -6.75 m2
1.75 4.5 -7.88 m2
14.63 m2
1.5 4.5 6.75 m2
1.75 4.5 7.88 m2
4.50 m³
638.88 Kg
1 1.1 1 12 13.20 m³
0.6 1.1 1.2 1 0.79 m³
1.2 1.1 1.2 3 4.75 m³

1 1.1 1 12 13.20 m³
0.6 1.1 1.2 1 0.79 m³
1.2 1.1 1.2 3 4.75 m³

1 1.1 1 12 13.20 m³
0.6 1.1 1.2 1 0.79 m³
1.2 1.1 1.2 3 4.75 m³
18.00 m²
2.03 m³
159.81 Kg
107.01 Kg
27.00 m²
9.93 m³
159.81 Kg
537.90 Kg
79.45 m²
6.48 m³
511.38 Kg
341.39 Kg
86.40 m²
1.15 m³
241.49 Kg
139.73 Kg
35.36 m²
6.26 m³
67.93 Kg
339.03 Kg
67.93 m²
0.90 m³
79.90 Kg
59.58 Kg
12.00 m²
0.81 m³
95.88 Kg
74.85 Kg
14.85 m²
11.76 m³
3131.21 Kg
117.63 m²

71.75 2.5 229.85 m²


459.69 m²
71.75 1.5 158.10 m²
316.19 m²

6.000 Bh
1.6 0.13 0.06 0.012 m³

775.88 m²
8.63 13.63 117.63 m²

4.16 m²
14.45 m²
20.3 20.3 m
3.4 1.9 6.46 m²
4.80 m²
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pembersihan Lapangan
2 Pemasangan Bowplank
3 Pengadaan dan Pemasangan Papan Nama Proyek
4 Administrasi dan Dokumentasi

B PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah

Pondasi Menerus 5.10 0.90 0.90

2 Urugan Pasir

Pondasi Menerus 5.10 0.90 - 0.05

3 Pasangan Aastamping

Pondasi Menerus 5.10 0.90 0.10

4 Pas. Pondasi Batu Gunung/Batu Kali 1Pc: 4Ps


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

Pondasi Menerus 5.10 0.30 0.65 0.75

5 Urugan Tanah Kembali


Pondasi Menerus 3.10

C PEKERJAAN TIMBUNAN DAN LANTAI

1 Timbunan Tanah

KM 1.80 1.50 0.10

SELASAR 6.60 1.00 -

2 Urugan Pasir

KM 1.80 1.50 0.07

SELASAR 6.60 1.00 0.07

3 Beton Cor K-100

KM 1.80 1.50 0.05


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

SELASAR 6.60 1.00 0.10


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

4 Pemasangan Keramik Selasar uk. 40x40 cm Polished

SELASAR 6.60 1.00

5 Pemasangan Keramik KM/WC uk. 20x20 cm Unpolished

KM/WC 1.80 1.50

C PEKERJAAN BETON BERTULANG

1 Sloof Type SL1 uk. (18 x 25 cm)


a. Beton Cor K-175
- Panjang Melintang dan Memanjang 5.10 0.18 0.25

b. Besi Polos
Tulangan Pokok
- Panjang Melintang dan Memanjang

Sengkang
- Panjang Melintang dan Memanjang 5.10

c. Bekisting + Pembongkaran + Penyiraman


- Panjang Melintang dan Memanjang 5.10 0.50
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

2 Kolom Type KP uk. (13x13 cm)


a. Beton Cor K-175
0.13 0.13 3.50

b. Besi Polos
Tulangan Pokok
Sengkang

c. Bekisting + Pembongkaran + Penyiraman


0.52 3.50

3 Balok Type RB uk. (15 x 20 cm)


a. Beton Cor K-175
Elv. +3.5
5.10 0.15 0.20

b. Besi Polos
Tulangan Pokok
Elv. +3.5
- Panjang Melintang dan Memanjang 5.10
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

Sengkang
Elv. +3.5
5.10

c. Bekisting + Pembongkaran + Penyiraman


Elv. +3.5
5.10 0.55
4 Balok Type BLt uk. (13 x 15 cm)
a. Beton Cor K-175
Elv. +2.2
3.30 0.13 0.15

b. Besi Polos
Tulangan Pokok
Elv. +2.2
0 3.30

Sengkang
Elv. +2.2
3.30

c. Bekisting + Pembongkaran + Penyiraman


Elv. +2.2
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

3.30 0.43

D PEKERJAAN PASANGAN DINDING

1 Pasangan Dinding Bata 1 : 2


5.10 1.80

Pengurangan Kusen 0.70 1.80


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

2 Pasangan Dinding Bata 1 : 4

5.10 1.70
Pengurangan Kusen
0.68 0.50
3 Plesteran Dinding Bata 1 : 2

4 Plesteran Dinding Bata 1 : 4

E PEKERJAAN PINTU, JENDELA DAN VENTILASI

1 Pintu Type P1
-Kusen 6/13 5.00 0.06 0.13

2 Pintu Type P2
-Kusen 6/13 5.00 0.06 0.13
-Daun Pintu Tebal 4 cm 2.10 0.80

3 Jendela Type J1
-Kusen 6/13 1.44 1.52

4 Jendela Type J2
-Kusen 6/13 0.98 1.52
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

Ventilasi Type V1
-Kusen Ventilasi 6/13 0.60 0.42
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI
M M M M
1 2 3 4 5 6

F PEKERJAAN ATAP

1 Pemasangan Plafond UPVC


-Ruangan
2 Pemasangan Rangka Atap
-Kuda-Kuda 5/7 Type 1 30.75 0.05 0.07
-Kuda-Kuda 5/7 Type 2 7.69 0.05 0.07
-Gording 5/10 106.78 0.05 0.05
-Penutup Atap Onduline
-Rabung 39.61
-listplank 41.20

G PEKERJAAN PENGECATAN

1 Pelapisan Cat Alkali Sealer

2 Pengecatan Dinding

H PEKERJAAN ELEKTRIKAL
-MCB
-Box Zakering

Pekerjaan Panel/Lampu/Titik Nyala/Stop Kontak


-Lampu LED 16 Watt (Termasuk Fitting)
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00

4.13

4.13

0.23

0.23

0.46

0.46

1.82
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

1.82

3.10
3.10

0.27

0.27
-
-

0.65

0.19

0.46

0.75

0.09
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

0.66
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

6.60

6.60

2.70

2.70

0.23
0.23

36.03

12.0 0.888 5.1 5.10 6.00 30.60 27.17

8.0 0.395 0.13 0.20 0.13 0.20 0.66 34.00 22.44 8.86

2.55
2.55
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

0.18
3.00 0.18

32.58
10.0 0.617 3.50 3.50 4.00 14.00 3.00 25.91
7.0 0.302 0.08 0.08 0.08 0.08 0.32 23.00 7.36 3.00 6.67

5
3.00 5.46

0.15

0.15

17.72

10.0 0.617 5.10 5.10 4.00 20.40 12.59


DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

7.0 0.302 0.10 0.15 0.10 0.15 0.50 34.00 17.00 5.13

2.81

2.81

0.06

0.06

10.53

10.0 0.617 3.30 3.30 4.00 13.20 8.14

7.0 0.302 0.08 0.10 0.08 0.10 0.36 22.00 7.92 2.39

1.42
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

1.42

10.44
1.00 9.18

(1.00) (1.26)
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

8.33

8.67

(1.00) (0.34)
10.44 2.00 20.88

8.33 2.00 16.66

2.00 0.08

2.00 0.08
1.68 2.00 3.36

1.00 2.19

1.00 1.49
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

1.00 0.25
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
LUAS BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME
M2 KG/M M M M M M M M M UNIT M
7 8 9 10 11 12 13 14 15 16 17 18 19 20

1.80 1.80

3.00 0.32
4.00 0.11
0.27
68.60 68.60
39.61
41.20

37.54
37.54 37.54
37.54
37.54 37.54

1.00 1.00
1.00 1.00

6.00 6.00
SATUAN

21

Ls
Ls
Ls
Ls

M3

M3

M3

M3
SATUAN

21

M3

M3

M3

M3
SATUAN

21
SATUAN

21

M2

M2

M3

Kg

M2
SATUAN

21

M3

Kg

M2

M3

Kg
SATUAN

21

M2

M3

Kg

M2
SATUAN

21

M2
SATUAN

21

M2

M2

M2

M3

M3
M2

M2

M2
SATUAN

21

M2
SATUAN

21

m2

M3
M3
M3
M2
M1
M1

M2

M2

unit
unit

unit
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

NAMA PEKERJAAN : PENYUSUNAN DED BALAI BUDIDAYA AIR PAYAU (BBAP) DAN BALAI BUDIDAYA AIR
LAUT (BBAL)
ITEM PEKERJAAN : BANGUNAN RUMAH DINAS
LOKASI : KAB. ACEH BESAR
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN

1 2
A PEKERJAAN PERSIAPAN Rp.
B PEKERJAAN TANAH DAN PONDASI Rp.
C PEKERJAAN TIMBUNAN DAN LANTAI Rp.
D PEKERJAAN BETON BERTULANG Rp.
E PEKERJAAN PASANGAN DINDING Rp.
F PEKERJAAN PINTU, JENDELA DAN VENTILASI Rp.
G PEKERJAAN ATAP Rp.
H PEKERJAAN PENGECATAN Rp.
I PEKERJAAN ELEKTRIKAL Rp.
J PEKERJAAN PLUMBING Rp.
K PEKERJAAN LAIN-LAIN Rp.
JUMLAH 1 UNIT RUMAH Rp.
PPN 10% Rp.
Total Keseluruhan Rp.
Dibulatkan Rp.
TOTAL 2 UNIT RUMAH Rp.
TERBILANG : Err:50

Diperiksa Oleh : Dibuat Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) PT.JAYA TATA BERSAMA

DINAS KELAUTAN DAN PERIKANAN ACEH

RAZALI, S.Pi M.Si MUHAMMAD IHSAN, ST


NIP. 196908192001121003 DIREKTUR

Disetujui Oleh : Mengetahui / Menyutujui Oleh :


KUASA PENGGUNA ANGGARAN PROGRAM KEPALA DINAS KELAUTAN DAN
PENGEMBANGAN BUDIDAYA PERIKANAN PERIKANAN ACEH
Ir. ADRIANSYAH, MM CUT YUSMINAR, A.Pi.,M.Si
NIP. 196303151990021002 NIP. 196210101986032004
REKAPITULASI
ENCANA ANGGARAN BIAYA (RAB)

UNAN DED BALAI BUDIDAYA AIR PAYAU (BBAP) DAN BALAI BUDIDAYA AIR
AL)

JUMLAH
TOTAL
HARGA (Rp)
3
2,500,000.00
2,191,743.00
2,294,342.00
Err:509
5,216,568.00
17,259,520.00
25,142,172.00
1,701,538.00
5,050,000.00
4,800,595.00
12,731,200.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Dibuat Oleh :
PT.JAYA TATA BERSAMA

MUHAMMAD IHSAN, ST
DIREKTUR

Mengetahui / Menyutujui Oleh :


KEPALA DINAS KELAUTAN DAN
PERIKANAN ACEH
CUT YUSMINAR, A.Pi.,M.Si
NIP. 196210101986032004
RENCANA ANGGARAN BIAYA (RAB)

NAMA PEKERJAAN : PENYUSUNAN DED BALAI BUDIDAYA AIR PAYAU (BBAP) DAN BALAI BUDIDAYA AIR LAUT (BBAL)

ITEM PEKERJAAN : BANGUNAN RUMAH DINAS


LOKASI : KAB. ACEH BESAR
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
A PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank 1.00 Ls
2 Pengadaan dan Pemasangan Papan Nama Proyek 1.00 Ls
3 Administrasi dan Dokumentasi 1.00 Ls

B PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah 4.13 M3
2 Urugan Pasir 0.23 M3
3 Pasangan Aastamping 0.46 M3
4 Pas. Pondasi Batu Gunung/Batu Kali 1Pc: 4Ps 1.82 M3
5 Urugan Tanah Kembali 3.10 M3

C PEKERJAAN TIMBUNAN DAN LANTAI


1 Timbunan Tanah 0.27 M3
2 Urugan Pasir 0.65 M3
3 Beton Cor K-100 0.75 M3
4 Pemasangan Keramik Selasar uk. 40x40 cm Polished 6.60 M2

D PEKERJAAN BETON BERTULANG


1 Sloof Type SL1 uk. (18 x 25 cm)
a. Beton Cor K-175 0.23 M3
b. Besi Polos 36.03 Kg
c. Bekisting + Pembongkaran + Penyiraman 2.55 M2
2 Kolom Type KP uk. (13x13 cm)
a. Beton Cor K-175 0.18 M3
b. Besi Polos 32.58 Kg
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
c. Bekisting + Pembongkaran + Penyiraman 5.46 M2
3 Err:509
a. Beton Cor K-175 Err:509 M3
b. Besi Polos Err:509 Kg
c. Bekisting + Pembongkaran + Penyiraman Err:509 M2
4 Err:509
a. Beton Cor K-175 Err:509 M3
b. Besi Polos Err:509 Kg
c. Bekisting + Pembongkaran + Penyiraman Err:509 M2
5 Balok Type RB uk. (15 x 20 cm)
a. Beton Cor K-175 0.15 M3
b. Besi Polos 17.72 Kg
c. Bekisting + Pembongkaran + Penyiraman 2.81 M2
6 Err:509
a. Beton Cor K-175 Err:509 M3
b. Besi Polos Err:509 Kg
c. Bekisting + Pembongkaran + Penyiraman Err:509 M2

E PEKERJAAN PASANGAN DINDING


1 Pasangan Dinding Bata 1 : 2 10.44 M2
2 Pasangan Dinding Bata 1 : 4 8.33 M2
3 Plesteran Dinding Bata 1 : 2 20.88 M2
4 Plesteran Dinding Bata 1 : 4 16.66 M2
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

F PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kusen + Pintu UPVC
-Kusen UPVC Pintu Type P1 1.00 Unit
-Kusen UPVC Pintu Type P2 3.00 Unit
-Kusen PVC Pintu Type P3 (Pintu KM) 1.00 Unit

2 Kusen + Jendela UPVC


-Kusen Jendela UPVC type J1 2.19 M2
-Kusen Jendela UPVC type J2 1.49 M2

3 Kusen Jendela + Ventilasi UPVC


-Kusen Jendela Ventilasi UPVC type V1 0.25 M2

G PEKERJAAN ATAP
1 Pemasangan Plafond PVC T = 9 mm 1.80 M2
2 Pemasangan Rangka Atap
-Kuda-Kuda 5/7 Type 1 0.32 M3
-Kuda-Kuda 5/7 Type 2 0.11 M3
-Gording 5/10 0.27 M3
-Penutup Atap Onduline 68.60 M2
-Rabung 39.61 M1
-listplank 41.20 M1

H PEKERJAAN PENGECATAN
1 Pelapisan Cat Alkali Sealer 37.54 M2
2 Pengecatan Dinding 37.54 M2

I PEKERJAAN ELEKTRIKAL
-MCB 1.00 unit
-Box Zakering 1.00 unit

Pekerjaan Panel/Lampu/Titik Nyala/Stop Kontak


-Lampu LED 16 Watt (Termasuk Fitting) 6.00 unit
-Saklar Tunggal (Termasuk Mangkok + Penutup + switch) 6.00
-Saklar Ganda (Termasuk Mangkok + Penutup + switch) 1.00 unit
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
-Stop Kontak (Termasuk Mangkok + Penutup + switch) 12.00 unit

Pekerjaan Titik Instalasi Listrik


-Instalasi Titik Penerangan (Termasuk Pembobokan dan Perapian) 6.00 titik
- Instalasi Titik Stop Kontak (Termasuk Pembobokan dan Perapian) 13.00 titik

Pekerjaan Kabel
a. Kabel NYM 2 x 2.5 mm2 untuk penerangan 50.00 M1

J PEKERJAAN PLUMBING
1 Pipa PVC Ø 3''+ Aksesories 10.00 M1
2 Pipa PVC Ø 3/4''+ Aksesories 10.00 M1
3 Instalasi Air Bersih (termasuk galian, pembobokan, penyambungan koneksi) 1.00 Titik
4 Instalasi Air Kotor (termasuk galian, pembobokan, penyambungan koneksi) 1.00 Titik
5 Floor Drain 1.00 Unit
6 Kran Air 1.00 Unit

K PEKERJAAN LAIN-LAIN
1 Pemasangan Dinding Partisi Gypsum + Rangka Hollow 2 Sisi 13.20 M2
2 Pemasangan Batu Alam Batu Susun Sirih Fasade Kamar Depan 4.00 M2
3 Relief Kolom 1.00 Unit
4 Relief Fasade Kamar Depan 3.65 M2
ANGGARAN BIAYA (RAB)

N BALAI BUDIDAYA AIR LAUT (BBAL)

HARGA JUMLAH
ANALISA SATUAN HARGA
(Rp) (Rp)
5 6 7

Taksir 1,000,000.00 1,000,000.00


Taksir 500,000.00 500,000.00
Taksir 1,000,000.00 1,000,000.00
SUB JUMLAH 2,500,000.00

AHSP PU A.2.3.1.1 60,830.00 251,289.00


AHSP PU A.2.3.1.11 147,092.00 33,758.00
AHSP PU A.3.2.1.9 429,257.40 197,029.00
AHSP PU A.3.2.1.2 889,130.00 1,618,217.00
AHSP PU A.2.3.1.9 29,516.67 91,450.00

SUB JUMLAH 2,191,743.00

AHSP PU A.2.3.1.11a 129,932.00 35,082.00


AHSP PU A.2.3.1.11 147,092.00 95,757.00
AHSP PU A.4.1.1.4 853,276.29 639,957.00
AHSP PU A.4.4.3.35.c 230,840.28 1,523,546.00
SUB JUMLAH 2,294,342.00

AHSP PU A.4.1.1.5 1,049,683.17 241,427.00


AHSP PU A.4.1.1.17 19,538.20 703,961.00
AHSP PU A.4.1.1.21 105,259.73 268,412.00

AHSP PU A.4.1.1.5 1,049,683.17 188,943.00


AHSP PU A.4.1.1.17 19,538.20 636,555.00
HARGA JUMLAH
ANALISA SATUAN HARGA
(Rp) (Rp)
5 6 7
AHSP PU A.4.1.1.22 164,514.53 898,249.00

AHSP PU A.4.1.1.5 1,049,683.17 Err:509


AHSP PU A.4.1.1.17 19,538.20 Err:509
AHSP PU A.4.1.1.22 164,514.53 Err:509

AHSP PU A.4.1.1.5 1,049,683.17 Err:509


AHSP PU A.4.1.1.17 19,538.20 Err:509
AHSP PU A.4.1.1.22 164,514.53 Err:509

AHSP PU A.4.1.1.5 1,049,683.17 157,452.00


AHSP PU A.4.1.1.17 19,538.20 346,217.00
AHSP PU A.4.1.1.23 170,894.53 480,214.00

AHSP PU A.4.1.1.5 1,049,683.17 Err:509


AHSP PU A.4.1.1.17 19,538.20 Err:509
AHSP PU A.4.1.1.24 182,114.53 Err:509
SUB JUMLAH Err:509

AHSP PU A.4.4.1.7 151,527.75 1,581,950.00


AHSP PU A.4.4.1.9 139,925.50 1,165,579.00
AHSP PU A.4.4.2.2 68,394.92 1,428,086.00
AHSP PU A.4.4.2.4 62,482.20 1,040,953.00
SUB JUMLAH 5,216,568.00
HARGA JUMLAH
ANALISA SATUAN HARGA
(Rp) (Rp)
5 6 7

Taksir 2,850,000.00 2,850,000.00


Taksir 2,600,000.00 7,800,000.00
Taksir 1,500,000.00 1,500,000.00

Taksir 1,300,000.00 2,845,440.00


Taksir 1,300,000.00 1,936,480.00

Taksir 1,300,000.00 327,600.00


SUB JUMLAH 17,259,520.00

Taksir 235,000.00 423,000.00

AHSP PU A.4.6.1.13 7,013,358.00 2,264,438.00


AHSP PU A.4.6.1.13 7,013,358.00 755,058.00
AHSP PU A.4.6.1.15 7,617,200.00 2,033,412.00
Taksir 160,000.00 10,976,000.00
AHSP PU A.4.5.2.25.a 131,501.70 5,208,782.00
AHSP PU A.4.6.1.21 84,502.00 3,481,482.00
SUB JUMLAH 25,142,172.00

AHSP PU A.4.7.1.10 22,663.00 850,769.00


AHSP PU A.4.7.1.10 22,663.00 850,769.00
SUB JUMLAH 1,701,538.00

Taksir 65,000.00 65,000.00


Taksir 60,000.00 60,000.00

Taksir 145,000.00 870,000.00

Taksir 35,000.00 35,000.00


HARGA JUMLAH
ANALISA SATUAN HARGA
(Rp) (Rp)
5 6 7
Taksir 35,000.00 420,000.00

Taksir 150,000.00 900,000.00


Taksir 150,000.00 1,950,000.00

Taksir 15,000.00 750,000.00


SUB JUMLAH 5,050,000.00

AHSP PU A.5.1.1.23 389,604.60 3,896,046.00


AHSP PU A.5.1.1.20 70,453.35 704,534.00
Taksir 65,000.00 65,000.00
Taksir 65,000.00 65,000.00
AHSP PU A.4.5.1.14 41,206.00 41,206.00
AHSP PU A.5.1.1.14 28,809.00 28,809.00
SUB JUMLAH 4,800,595.00

Taksir 450,000.00 5,940,000.00


Taksir 650,000.00 2,600,000.00
Taksir 2,000,000.00 2,000,000.00
Taksir 600,000.00 2,191,200.00
SUB JUMLAH 12,731,200.00
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

NAMA PEKERJAAN : PENYUSUNAN DED BALAI BUDIDAYA AIR PAYAU (BBAP) DAN BALAI BUDIDAYA AIR
LAUT (BBAL)
ITEM PEKERJAAN : BANGUNAN RUMAH DINAS
LOKASI : KAB. ACEH BESAR
TAHUN ANGGARAN : 2018

NO URAIAN PEKERJAAN

1 2
A PEKERJAAN PERSIAPAN Rp.
B PEKERJAAN TANAH DAN PONDASI Rp.
C PEKERJAAN TIMBUNAN DAN LANTAI Rp.
D PEKERJAAN BETON BERTULANG Rp.
E PEKERJAAN PASANGAN DINDING Rp.
F PEKERJAAN PINTU, JENDELA DAN VENTILASI Rp.
G PEKERJAAN ATAP Rp.
H PEKERJAAN PENGECATAN Rp.
I PEKERJAAN ELEKTRIKAL Rp.
J PEKERJAAN PLUMBING Rp.
K PEKERJAAN LAIN-LAIN Rp.
JUMLAH 1 UNIT RUMAH Rp.
PPN 10% Rp.
Total Keseluruhan Rp.
Dibulatkan Rp.
TOTAL 2 UNIT RUMAH Rp.
TERBILANG : Err:50
REKAPITULASI
ENCANA ANGGARAN BIAYA (RAB)

UNAN DED BALAI BUDIDAYA AIR PAYAU (BBAP) DAN BALAI BUDIDAYA AIR
AL)

JUMLAH
TOTAL
HARGA (Rp)
3
2,500,000.00
2,191,743.00
2,294,342.00
Err:509
5,216,568.00
17,259,520.00
25,142,172.00
1,701,538.00
5,050,000.00
4,800,595.00
12,731,200.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.888 8.88
96000 106560

DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pembersihan Lapangan
2 Pemasangan Bowplank
3 Pengadaan dan Pemasangan Papan Nama Proyek
4 Administrasi dan Dokumentasi

B PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah

7.75 2.35 2.75


1.25 2.35 1.70
9.00 2.00 0.20

2 Urugan Pasir

7.75 2.35 - 0.20


1.25 2.35 0.20
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

9.00 2.00 0.10

3 Urugan Tanah Kembali


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

C PEKERJAAN BETON BERTULANG


10 Lantai Kerja
a. Beton Cor K-100

7.75 2.35 0.10


1.25 2.35 0.10
9.00 2.00 0.10

10 Plat Lantai Dasar


a. Beton Cor K-225

7.75 2.35 0.20


1.25 2.35 0.20

b. Besi Polos

- Sumbu x 7.75 2.35


- Sumbu y 7.75 2.35

- Sumbu x 1.25 2.35


- Sumbu y 1.25 2.35

c. Bekisting + Pembongkaran + Siram


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

8.15 2.75
1.65 2.75

3 Sloof Type SL1 uk. (20 x 20 cm)


a. Beton Cor K-225
- Panjang Melintang 29.60 0.20 0.20
7.70 0.20 0.20

b. Besi Polos
Tulangan Pokok
- Panjang Melintang
- Panjang Melintang

Sengkang
- Panjang Melintang 29.60
- Panjang Melintang 7.70

c. Bekisting + Pembongkaran + Penyiraman


- Panjang Melintang 29.60 0.40
- Panjang Melintang 7.70 0.40

#REF! Kolom Type K1 uk. (25x25 cm)


DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

a. Beton Cor K-225


0.25 0.25 2.05
0.25 0.25 1.00

b. Besi Polos
Tulangan Pokok
Tulangan Pokok

Sengkang
Sengkang

c. Bekisting + Pembongkaran + Penyiraman


1.00 2.05
1.00 1.00
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

#REF! Balok Type RB1 uk. (20 x 20 cm)


a. Beton Cor K-225

34.45 0.20 0.20

b. Besi Polos
Tulangan Pokok

34.45

Sengkang

34.45

c. Bekisting + Pembongkaran + Penyiraman

34.45 0.60

#REF! Balok Penahan Plat Saring uk. (15 x 20 cm)


a. Beton Cor K-175

9.30 0.15 0.20

b. Besi Polos
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

Tulangan Pokok

9.30

Sengkang

9.30

c. Bekisting + Pembongkaran + Penyiraman

9.30 0.55

10 Dinding Beton Bertulang


a. Beton Cor K-250

23.60 2.05 0.20


3.85 1.00 0.20

b. Besi Polos
Tulangan Pokok

- Sumbu x 23.60 2.05


- Sumbu y 23.60 2.05
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

- Sumbu x 3.85 1.00


- Sumbu y 3.85 1.00

c. Bekisting + Pembongkaran + Siram

24.00 2.45

10 Plat Penutup
a. Beton Cor K-250

9.00 2.35 0.20

b. Besi Polos
Tulangan Pokok

- Sumbu x 9.00 2.35


- Sumbu y 9.00 2.35

c. Bekisting + Pembongkaran + Siram

9.40 2.75

10 Plat Penyaring
a. Beton Cor K-250
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

1.55 1.90 0.05


void 0.40 0.40 0.05

b. Besi Polos
Tulangan Pokok

- Sumbu x 1.55 1.90


- Sumbu y 1.55 1.90

- Sumbu x 0.40 0.40


- Sumbu y 0.40 0.40

c. Bekisting + Pembongkaran + Siram

1.65 2.00
D PEKERJAAN LAIN-LAIN

1 Pemasangan Manhole Lengkap Terpasang 6.00


2 Pemasangan Pipa PVC Ø 2'' 5.10
3 Pemasangan Pipa PVC Ø 4'' 33.60
4 Pemasangan Pipa PVC Ø 6'' 2.50
5 Pemasangan Buis Beton Ø 40 cm 2.00
6 Pemasangan Material Filter
DIMENSI
No URAIAN PEKERJAAN PANJANG LEBAR 1 LEBAR 2 TINGGI LUAS
M M M M M2
1 2 3 4 5 6 7

7 Pemasangan Tee PVC 4" 31.00


8 Pemasangan Bend/Elbow PVC 4" 5.00
9 Pemasangan Bend/Elbow PVC 6" 1.00

K PEKERJAAN LAIN - LAIN

1 Pembersihan Akhir 1.00


0.617 10 6.17

6787

DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA


BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.00 1.00 Ls
1.00 1.00 Ls
1.00 1.00 Ls
1.00 1.00 Ls

58.68 M3

50.08
4.99
3.60

6.03 M3

3.64
0.59
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.80

19.56 M3
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

3.92 M3

1.82
0.29
1.80

4.23 M3

1.00 3.64
1.00 0.59

538.84 Kg

12.00 0.888 7.75 0.10 0.10 7.95 16.00 127.20 2.00 225.91
12.00 0.888 2.35 0.10 0.10 2.55 52.00 132.60 2.00 235.50

12.00 0.888 1.25 0.10 0.10 1.45 16.00 23.20 2.00 41.20
12.00 0.888 2.35 0.10 0.10 2.55 8.00 20.40 2.00 36.23

26.95 M2
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.00 22.41
1.00 4.54

1.49 M3
1.18
0.31

390.01 Kg

12.00 0.888 29.60 29.60 10.00 296.00 262.85


12.00 0.888 7.70 7.70 10.00 77.00 68.38

8.00 0.395 0.15 0.15 0.15 0.15 0.60 197.00 118.20 46.69
8.00 0.395 0.15 0.15 0.15 0.15 0.60 51.00 30.60 12.09

14.92 M2
11.84
3.08
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.67 M3
12.00 1.54
2.00 0.13

340.96 Kg
12.00 0.888 2.05 2.05 12.00 24.60 12.00 262.14
12.00 0.888 1.00 1.00 12.00 12.00 2.00 21.31

8.00 0.395 0.20 0.20 0.20 0.20 0.80 14.00 11.20 12.00 53.09
8.00 0.395 0.20 0.20 0.20 0.20 0.80 7.00 5.60 2.00 4.42

26.60 M2
12.00 24.60
2.00 2.00
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

1.38 M3

1.38

391.02 Kg

12.00 0.888 34.45 34.45 11.00 378.95 336.51

8.00 0.395 0.15 0.15 0.15 0.15 0.60 230.00 138.00 54.51

20.67 M2

20.67

0.28 M3

0.28

29.83 Kg
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

10.00 0.617 9.30 9.30 4.00 37.20 22.95

6.00 0.222 0.10 0.15 0.10 0.15 0.50 62.00 31.00 6.88

5.12 M2

5.12

10.45 M3

1.00 9.68
1.00 0.77

920.56 Kg

10.00 0.617 23.60 0.10 0.10 23.80 14.00 333.20 2.00 411.17
10.00 0.617 2.05 0.10 0.10 2.25 157.00 353.25 2.00 435.91
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

10.00 0.617 3.85 0.10 0.10 4.05 7.00 28.35 2.00 34.98
10.00 0.617 1.00 0.10 0.10 1.20 26.00 31.20 2.00 38.50

58.80 M2

1.00 58.80

4.23 M3

1.00 4.23

277.83 Kg

10.00 0.617 9.00 0.10 0.10 9.20 12.00 110.40 2.00 136.23
10.00 0.617 2.35 0.10 0.10 2.55 45.00 114.75 2.00 141.60

25.85 M2

1.00 25.85

0.27 M3
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

2.00 0.29
(2.00) (0.02)

49.01 Kg

8.00 0.395 1.55 0.10 0.10 1.75 19.00 33.25 2.00 26.27
8.00 0.395 1.90 0.10 0.10 2.10 16.00 33.60 2.00 26.54

8.00 0.395 0.40 0.10 0.10 0.60 4.00 2.40 (2.00) (1.90)
8.00 0.395 0.40 0.10 0.10 0.60 4.00 2.40 (2.00) (1.90)

6.60 M2

2.00 6.60

6.00 bh
5.10 m'
33.60 m'
2.50 m'
2.00 bh
- M2
DIA KOEF DIMENSI TULANGAN OVER PJG JMLH PJG QUANTITA
BESI BESI a b c d e f STICK POT POT TOTAL S VOLUME SATUAN
KG/M M M M M M M M M UNIT M
8 9 10 11 12 13 14 15 16 17 18 19 20 21

31.00 bh
5.00 bh
1.00 bh

1.00 Ls
DAFTAR ANALISA HARGA SATUAN

AHSP PU-A. 2.2.1.4


Pengukuran dan Pemasangan 1m' Bouwplank

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.100 80,000.00
Tukang kayu OH 0.100 95,000.00
Kepala Tukang OH 0.010 125,000.00
Mandor OH 0.005 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Balok 5/7 m3 0.120 4,000,000.00
Paku 2"-3" Kg 0.020 16,500.00
Kayu Papan 3/20 m3 0.007 4,000,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 2.2.1.9


Pembersihan 1 M2 Lapangan dan Perataan

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.100 80,000.00
Mandor OH 0.005 100,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 2.2.1.13


Pembongkaran 1 M3 Beton Bertulang

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 13.334 80,000.00
Mandor OH 0.666 100,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.11
Pengurugan 1 M3 dengan Pasir Urug

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Mandor OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pasir Urug M3 1.200 110,675.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.11a
Pengurugan 1 M3 Dengan Tanah Urug

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Mandor OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Tanah Urug M3 1.200 92,229.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 3.2.1.2
Pemasangan 1M3 Pondasi Batu Belah Campuran 1SP : 4PP

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.500 90,000.00
Tukang batu OH 0.750 101,000.00
Kepala Tukang OH 0.075 134,000.00
Mandor OH 0.075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 250,902.00
Semen Portland Kg 163.000 1,629.38
Pasir Pasang m3 0.520 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 3.2.1.3


Pemasangan 1M3 Pondasi Batu Belah Campuran 1SP : 5PP

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.500 80,000.00
Tukang batu OH 0.750 95,000.00
Kepala Tukang OH 0.075 125,000.00
Mandor OH 0.075 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 171,000.00
Semen Portland Kg 136.000 1,375.00
Pasir Pasang m3 0.544 170,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 3.2.1.9
Pemasangan 1m3 batu kosong (Aanstamping)

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.780 90,000.00
Tukang batu OH 0.390 101,000.00
Kepala Tukang OH 0.039 134,000.00
Mandor OH 0.039 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 250,902.00
Pasir Urug m3 0.432 110,675.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.1
Menggali 1 M3 Tanah Biasa Sedalam 1 Meter

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.750 90,000.00
Mandor OH 0.025 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A.2.3.1.2
Menggali 1 M3 Tanah Biasa Sedalam 2 Meter

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.900 80,000.00
Mandor OH 0.045 100,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
AHSP PU-A. 2.3.1.4
Penggalian 1 m3 Tanah Keras sedalam 1 m

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.000 80,000.00
Mandor OH 0.032 100,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.3.1.9
Pengurugan kembali 1 M3 Galian Tanah
Pengurugan kembali 1 m3 galian

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.2500 90,000.00
Mandor OH 0.0833 115,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
AHSP PU-A. 2.3.1.10
Pemadatan Tanah 1 M3 Tanah (Per 20 Cm)

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.500 80,000.00
Mandor OH 0.050 100,000.00
Jumlah Tenaga Kerja
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3
AHSP PU-A. 4.1.1.1
Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w/c = 0.87

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 247.000 1,629.38
Pasir Beton kg 869.000 121.43
Kerikil (Maks 30 mm) kg 999.000 125.93
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.2


Membuat 1 m3 Beton Mutu f'c = 9.8 Mpa (K 125),Slump (12 ± 2) Cm, w/c = 0.78

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 276.000 1,629.38
Pasir Beton kg 828.000 121.43
Kerikil (Maks 30 mm) kg 1,012.000 125.93
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.4


Membuat 1 M3 Beton Mutu f'c = 7.4 Mpa (K 100),Slump (3-6) Cm, w/c = 0.87

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.200 80,000.00
Tukang batu OH 0.200 95,000.00
Kepala Tukang OH 0.020 125,000.00
Mandor OH 0.060 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 230.000 1,629.38
Pasir Beton kg 893.000 121.43
Kerikil (Maks 30 mm) kg 1,027.000 125.93
Air Liter 200.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.3


Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 299.000 1,629.38
Pasir Beton kg 799.000 121.43
Kerikil (Maks 30 mm) kg 1,017.000 125.93
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.5
Membuat 1 M3 Beton Mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 90,000.00
Tukang batu OH 0.275 101,000.00
Kepala Tukang OH 0.028 134,000.00
Mandor OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 326.000 1,629.38
Pasir Beton kg 760.000 116.49
Kerikil (Maks 30 mm) kg 1,029.000 120.80
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.6
Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 90,000.00
Tukang batu OH 0.275 101,000.00
Kepala Tukang OH 0.028 134,000.00
Mandor OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 352 1,629.38
Pasir Beton kg 731 116.49
Kerikil (Maks 30 mm) kg 1,031 120.80
Air Liter 215 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.7. 11
Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0.58

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 90,000.00
Tukang batu OH 0.275 101,000.00
Kepala Tukang OH 0.028 134,000.00
Mandor OH 0.083 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 371.000 1,629.38
Pasir Beton kg 698.000 116.49
Kerikil (Maks 30 mm) kg 1,047.000 120.80
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.1.1.8
Membuat 1 M3 Beton Mutu f'c = 21.7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0.56

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 384.000 1,629.38
Pasir Beton kg 692.000 121.43
Kerikil (Maks 30 mm) kg 1,039.000 125.93
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.9


Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 406 1,629.38
Pasir Beton kg 684 121.43
Kerikil (Maks 30 mm) kg 1,026 125.93
Air Liter 215 50.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.10


Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0.52

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 1.650 80,000.00
Tukang batu OH 0.275 95,000.00
Kepala Tukang OH 0.028 125,000.00
Mandor OH 0.083 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 413.000 1,629.38
Pasir Beton kg 681.000 121.43
Kerikil (Maks 30 mm) kg 1,021.000 125.93
Air Liter 215.000 50.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.1.1.17
Pembesian 10 kg dengan besi polos
Untuk Pembesian 10 Kg dengan Besi Polos

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.070 90,000.00
Tukang besi OH 0.070 101,000.00
Kepala Tukang OH 0.007 134,000.00
Mandor OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Polos kg 10.500 14,757.00
Kawat Beton kg 0.150 24,595.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Untuk 1 Kg Besi Polos (F/10)

AHSP PU-A. 4.1.1.17a


Pembesian 10 kg dengan Besi Ulir
Untuk Pembesian 10 Kg dengan Besi Ulir

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.070 80,000.00
Tukang besi OH 0.070 95,000.00
Kepala Tukang OH 0.007 125,000.00
Mandor OH 0.004 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Ulir kg 10.500 14,000.00
Kawat Beton kg 0.150 24,595.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Untuk 1 Kg Besi Ulir (F/10)
A. 4.1.1.20
Pemasangan 1m2 bekesting untuk pondasi

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.520 90,000.00
Tukang kayu OH 0.260 101,000.00
Kepala Tukang OH 0.026 134,000.00
Mandor OH 0.026 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 4,549,985.00
Paku 5 - 10 cm kg 0.300 14,757.00
Minyak Bekesting liter 0.100 5,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (F) 2x Pemakaian
A. 4.1.1.21
Pemasangan 1m2 bekesting untuk sloof

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.520 90,000.00
Tukang kayu OH 0.260 101,000.00
Kepala Tukang OH 0.026 134,000.00
Mandor OH 0.026 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III M3 0.045 4,549,985.00
Paku 5 - 10 cm Kg 0.300 14,757.00
Minyak Bekesting liter 0.100 5,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (F) 3x Pemakaian

A. 4.1.1.22
Pemasangan 1m2 bekesting untuk kolom

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)
A TENAGA
Pekerja OH 0.660 90,000.00
Tukang kayu OH 0.330 101,000.00
Kepala Tukang OH 0.033 134,000.00
Mandor OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 4,549,985.00
Paku 5 - 10 cm kg 0.400 14,757.00
Minyak Bekesting liter 0.200 5,000.00
Balok Kayu Klas II m3 0.015 4,918,903.00
Plywood tebal 9 mm Lbr 0.350 153,716.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 Batang 2.000 17,300.00
m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (F) 4x Pemakaian
A. 4.1.1.23
Pemasangan 1m2 bekesting untuk balok

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.660 90,000.00
Tukang kayu OH 0.330 101,000.00
Kepala Tukang OH 0.033 134,000.00
Mandor OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 4,549,985.00
Paku 5 - 10 cm kg 0.400 14,757.00
Minyak Bekesting liter 0.200 5,000.00
Balok Kayu Klas II m3 0.018 4,918,903.00
Plywood tebal 9 mm Lbr 0.350 153,716.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 Batang 2.000 17,300.00
m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (F) 3x Pemakaian
A. 4.1.1.24
Pemasangan 1m2 bekesting untuk lantai
Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)
A TENAGA
Pekerja OH 0.660 90,000.00
Tukang kayu OH 0.330 101,000.00
Kepala Tukang OH 0.033 134,000.00
Mandor OH 0.033 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 4,549,985.00
Paku 5 - 10 cm kg 0.400 14,757.00
Minyak Bekesting liter 0.200 5,000.00
Balok Kayu Klas II m3 0.015 4,918,903.00
Plywood tebal 9 mm Lbr 0.350 153,716.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 Batang 6.000 17,300.00
m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (F) 2x Pemakaian

AHSP PU-A. 4.1.1.25


Pemasangan 1m2 bekesting untuk dinding

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.660 80,000.00
Tukang kayu OH 0.330 95,000.00
Kepala Tukang OH 0.033 125,000.00
Mandor OH 0.033 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 4,549,985.00
Paku 5 - 10 cm kg 0.400 14,757.00
Minyak Bekesting liter 0.200 5,000.00
Balok Kayu Klas II m3 0.020 4,918,903.00
Plywood tebal 9 mm Lbr 0.350 153,716.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 Batang 3.000 17,300.00
m
Penjaga Jarak bekesting/ spacer Buah 4.000 5,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.1.1.26


Pemasangan 1m2 bekesting untuk tangga

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.660 80,000.00
Tukang kayu OH 0.330 95,000.00
Kepala Tukang OH 0.033 125,000.00
Mandor OH 0.033 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 4,549,985.00
Paku 5 - 10 cm kg 0.400 14,757.00
Minyak Bekesting liter 0.150 5,000.00
Balok Kayu Klas II m3 0.015 4,918,903.00
Plywood tebal 9 mm Lbr 0.350 153,716.00
Dolken kayu ᴓ 8 - 10 cm - panjang 4 Batang 2.000 17,300.00
m
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
REKAPITULASI PEKERJAAN BETON BERTULANG
SUPL. 1
1 M3 Pondasi 60/60 Cm, Pembesian 7,09 Kg, Cetakan 2,00 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 7.090 19,075.00
3 Bekesting Untuk Pondasi M2 2.000 293,106.55
JUMLAH

SUPL. 2
1 M3 Pondasi 190/190 Cm, Pembesian 20,543 Kg, Cetakan 1,5 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 20.543 19,075.00
3 Bekesting Untuk Pondasi M2 1.500 293,106.55
JUMLAH

SUPL. 3
1 M3 Sloof 15/20 Cm, Pembesian 175,697 Kg, Cetakan 4,44 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 175.697 19,075.00
3 Bekesting Untuk Sloof M2 4.440 318,131.47
JUMLAH

SUPL. 4
1 M3 Sloof 15/20 Cm, Pembesian 178,210 Kg, Cetakan 4,44 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 178.210 19,075.00
3 Bekesting Untuk Sloof M2 4.440 318,131.47
JUMLAH
SUPL. 5
1 M3 Sloof 15/20 Cm, Pembesian 142,04 Kg, Cetakan 4,44 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 142.040 19,075.00
3 Bekesting Untuk Sloof M2 4.440 318,131.47
JUMLAH

SUPL. 6
1 M3 Sloof 25/40 Cm, Pembesian 127,858 Kg, Cetakan 2,667 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 127.858 19,075.00
3 Bekesting Untuk Sloof M2 2.667 318,131.47
JUMLAH

SUPL. 7
1 M3 Kolom 20/20 Cm, Pembesian 201,152 Kg, Cetakan 6,667 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 201.152 19,075.00
3 Bekesting Untuk Kolom M2 6.667 497,236.68
JUMLAH

SUPL. 8
1 M3 Kolom 20/20 Cm, Pembesian 178,660 Kg, Cetakan 6,667 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 178.660 19,075.00
3 Bekesting Untuk Kolom M2 6.667 497,236.68
JUMLAH

SUPL. 9
1 M3 Kolom 25/25 Cm, Pembesian 145,947 Kg, Cetakan 5,333 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 145.947 19,075.00
3 Bekesting Untuk Kolom M2 5.333 497,236.68
JUMLAH

SUPL. 10
1 M3 Kolom 30/30 Cm, Pembesian 178,514 Kg, Cetakan 4,444 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 178.514 19,075.00
3 Bekesting Untuk Kolom M2 4.444 497,236.68
JUMLAH

SUPL. 11
1 M3 Kolom 35/35 Cm, Pembesian 104,775 Kg, Cetakan 3,810 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 104.775 19,075.00
3 Bekesting Untuk Kolom M2 3.810 497,236.68
JUMLAH

SUPL. 12
1 M3 Kolom Praktis 15/15 Cm, Pembesian 196,067 Kg, Cetakan 8,889 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.225 M3 1.000 1,113,871.00


2 Pekerjaan Besi Polos Kg 196.067 19,075.00
3 Bekesting Untuk Kolom M2 8.889 497,236.68
JUMLAH

SUPL. 13
1 M3 Balok Latai 13/13 Cm, Pembesian 267,692 Kg, Cetakan 7,692 M2
Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.225 M3 1.000 1,113,871.00


2 Pekerjaan Besi Polos Kg 267.692 19,075.00
3 Bekesting Untuk Balok Latai M2 7.692 513,469.06
JUMLAH

SUPL. 14
1 M3 Balok Latai 13/15 Cm, Pembesian 199,341 Kg, Cetakan 7,350 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.225 M3 1.000 1,113,871.00


2 Pekerjaan Besi Polos Kg 199.341 19,075.00
3 Bekesting Untuk Balok Latai M2 7.350 513,469.06
JUMLAH

SUPL. 15
1 M3 Balok 15/20 Cm, Pembesian 115,862 Kg, Cetakan 4,444 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.225 M3 1.000 1,113,871.00


2 Pekerjaan Besi Polos Kg 115.862 19,075.00
3 Bekesting Untuk Balok M2 4.444 513,469.06
JUMLAH

SUPL. 16
1 M3 Balok 13/20 Cm, Pembesian 173,094 Kg, Cetakan 6,795 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.225 M3 1.000 1,113,871.00


2 Pekerjaan Besi Polos Kg 173.094 19,075.00
3 Bekesting Untuk Balok M2 6.795 513,469.06
JUMLAH

SUPL. 17
1 M3 Balok Latai 20/25 Cm, Pembesian 169,375 Kg, Cetakan 3,333 M2
Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 169.375 19,075.00
3 Bekesting Untuk Balok M2 3.333 513,469.06
JUMLAH

SUPL. 18
1 M3 Ring Balok 18/25 Cm, Pembesian 184,580 Kg, Cetakan 3,704 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 184.580 19,075.00
3 Bekesting Untuk Balok M2 3.704 513,469.06
JUMLAH

SUPL. 19
1 M3 Plat Penutup Plat, Pembesian 141,187 Kg, Cetakan 4,000 M2

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

1 Beton Cor K.250 M3 1.000 1,123,350.53


2 Pekerjaan Besi Polos Kg 141.187 19,075.00
3 Bekesting Untuk Kolom M2 4.000 497,236.68
JUMLAH
A. 4.4.1.7
Pemasangan 1 M2 Dinding Bata Merah Tebal 1/2 Batu Campuran 1SP : 2PP

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Tukang batu OH 0.100 101,000.00
Kepala Tukang OH 0.010 134,000.00
Mandor OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 738.00
Semen Portland kg 18.950 1,629.38
Pasir Pasang m3 0.038 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.9
Pemasangan 1 M2 Dinding Bata Merah Tebal 1/2 Batu campuran 1SP : 4PP

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Tukang batu OH 0.100 101,000.00
Kepala Tukang OH 0.010 134,000.00
Mandor OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 738.00
Semen Portland kg 11.500 1,629.38
Pasir Pasang m3 0.043 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.2.2
Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Tukang batu OH 0.150 101,000.00
Kepala Tukang OH 0.015 134,000.00
Mandor OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 10.224 1,629.38
Pasir Pasang m3 0.020 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.2.4
Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.300 90,000.00
Tukang batu OH 0.150 101,000.00
Kepala Tukang OH 0.015 134,000.00
Mandor OH 0.015 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 6.240 1,629.38
Pasir Pasang m3 0.024 169,359.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.2.27
Pemasangan 1 M2 Acian

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.200 90,000.00
Tukang batu OH 0.100 101,000.00
Kepala Tukang OH 0.010 134,000.00
Mandor OH 0.010 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 3.250 1,629.38
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.4
Pemasangan 1 M2 Lantai Keramik Ukuran 40 x 40 Cm

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.250 90,000.00
Tukang batu OH 0.125 101,000.00
Kepala Tukang OH 0.013 134,000.00
Mandor OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik 40 x 40 Cm Bh 6.630 12,500.00
Semen Portland kg 9.800 1,629.38
Semen Warna Kg 1.300 3,689.18
Pasir Pasang M3 0.045 169,359.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

AHSP PU-A. 4.4.3.5


Pemasangan 1 M2 Lantai Keramik Ukuran 30 x 30 Cm

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.260 80,000.00
Tukang batu OH 0.130 95,000.00
Kepala Tukang OH 0.013 125,000.00
Mandor OH 0.013 100,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik 30 x 30 Cm Bh 11.870 0.00
Semen Portland kg 10.000 1,629.38
Semen Warna Kg 1.500 1,500.00
Pasir Pasang M3 0.045 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.3.5a
Pemasangan 1 M2 Lantai Keramik Ukuran 25 x 25 Cm (Anti Slip)

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.260 90,000.00
Tukang batu OH 0.130 101,000.00
Kepala Tukang OH 0.013 134,000.00
Mandor OH 0.013 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik 25 x 25 Cm (Anti Slip) Bh 11.870 3,750.00
Semen Portland kg 10.000 1,629.38
Semen Warna Kg 1.500 3,689.18
Pasir Pasang M3 0.045 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.10. a
Pemasangan 1m2 lantai ubin granit ukuran 60cm x60cm Polished

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.240 90,000.00
Tukang batu OH 0.120 101,000.00
Kepala Tukang OH 0.012 134,000.00
Mandor OH 0.012 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Granit 60 x 60 cm Polihed Bh 4.000 46,250.00
Semen Portland kg 9.600 1,629.38
Semen Warna Kg 1.500 3,689.18
Pasir Pasang M3 0.045 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.10. b
Pemasangan 1m2 lantai ubin granit ukuran 60cm x60cm Unpolished

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.240 90,000.00
Tukang batu OH 0.120 101,000.00
Kepala Tukang OH 0.012 134,000.00
Mandor OH 0.012 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Granit 60 x 60 Cm Unpolished Bh 4.000 48,750.00
Semen Portland kg 9.600 1,629.38
Semen Warna Kg 1.500 3,689.18
Pasir Pasang M3 0.045 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.3.54.a
Pemasangan 1 M2 Dinding Keramik Ukuran 20 x 40 Cm

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.900 90,000.00
Tukang batu OH 0.450 101,000.00
Kepala Tukang OH 0.045 134,000.00
Mandor OH 0.045 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Keramik 20 x 40 Cm Bh 12.500 20,000.00
Semen Portland kg 9.300 1,629.38
Semen Warna Kg 0.018 3,689.18
Pasir Pasang M3 1.940 169,359.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.7.1.4
Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.070 90,000.00
Tukang Cat OH 0.009 101,000.00
Kepala Tukang OH 0.006 134,000.00
Mandor OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Cat Menie kg 0.200 67,020.00
Plamur kg 0.150 22,000.00
Cat Dasar kg 0.170 23,365.00
Cat Penutup kg 0.260 50,000.00
Kuas Bh 0.010 15,000.00
Pengencer kg 0.030 15,000.00
Amplas Lbr 0.200 8,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.7.1.10
Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.020 90,000.00
Tukang Cat OH 0.063 101,000.00
Kepala Tukang OH 0.0063 134,000.00
Mandor OH 0.003 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Plamur kg 0.100 22,000.00
Cat Dasar kg 0.100 23,365.00
Cat Penutup kg 0.260 50,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.6.1.21
Pemasangan 1 m' listplank Kayu

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.100 90,000.00
Tukang Cat OH 0.200 101,000.00
Kepala Tukang OH 0.020 134,000.00
Mandor OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Papan Kayu m3 0.0108 4,549,985.00
Paku kg 0.100 14,757.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.5.2.39a
Pemasangan 1 m2 atap seng gelombang

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.120 90,000.00
Tukang Cat OH 0.060 101,000.00
Kepala Tukang OH 0.006 134,000.00
Mandor OH 0.006 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Atap Spandek Lbr 0.700 135,000.00
Perlengkapan Kg 0.020 22,135.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.19
Pemasangan 1 m2 Rangka Langit-langit, kayu kelas II atau III

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.150 90,000.00
Tukang Cat OH 0.300 101,000.00
Kepala Tukang OH 0.030 134,000.00
Mandor OH 0.075 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III bh 0.015 4,549,985.00
Paku Kayu kg 0.200 14,757.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 5.1.1.1a
Pemasangan 1 buah closet Jongkok

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 3.300 90,000.00
Tukang Cat OH 1.100 101,000.00
Kepala Tukang OH 0.010 134,000.00
Mandor OH 0.160 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Closet Jongkok Unit 1.0000 600,000.00
Perlengkapan Ls 0.100 36,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 5.1.1.14
Pemasangan 1 buah floor drain

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.010 90,000.00
Tukang Cat OH 0.100 101,000.00
Kepala Tukang OH 0.010 134,000.00
Mandor OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Floor Drain Unit 1.000 45,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 5.1.1.19
Pemasangan 1 buah Kran Air

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.010 90,000.00
Tukang Cat OH 0.400 101,000.00
Kepala Tukang OH 0.040 134,000.00
Mandor OH 0.005 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Kran Air Unit 1.000 65,000.00
Sealtape Buah 0.025 4,000.00
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 5.1.1.26
Pemasangan 1 m' pipa PVC diameter 3/4"

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.036 90,000.00
Tukang Cat OH 0.060 101,000.00
Kepala Tukang OH 0.006 134,000.00
Mandor OH 0.002 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 3/4" M 1.200 5,123.83
Perlengkapan % 35.000 5,123.83
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 5.1.1.31
Pemasangan 1 m' pipa PVC diameter 3"

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.081 90,000.00
Tukang Cat OH 0.135 101,000.00
Kepala Tukang OH 0.0135 134,000.00
Mandor OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 3" M 1.200 24,594.50
Perlengkapan % 35.000 24,594.50
Jumlah Harga Bahan
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 5.1.1.32
Pemasangan 1 m' pipa PVC diameter 4"

Harga Satuan
No. Uraian Satuan Koeefisien (Rp.)

A TENAGA
Pekerja OH 0.081 90,000.00
Tukang Cat OH 0.135 101,000.00
Kepala Tukang OH 0.0135 134,000.00
Mandor OH 0.004 115,000.00
Jumlah Tenaga Kerja
B BAHAN
Pipa PVC 4" M 1.200 30,743.17
Perlengkapan % 35.000 30,743.17
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
DAFTAR ANALISA HARGA SATUAN

Jumlah Harga
(Rp.)

8,000.00
9,500.00
1,250.00
500.00
19,250.00

480,000.00
330.00
28,000.00
508,330.00

527,580.00
52,758.00
580,338.00

Jumlah Harga
(Rp.)

8,000.00
500.00
8,500.00

0.00
8,500.00
850.00
9,350.00

Jumlah Harga
(Rp.)

1,066,720.00
66,600.00
1,133,320.00

0.00

1,133,320.00
113,332.00
1,246,652.00

Jumlah Harga
(Rp.)

27,000.00
1,150.00
28,150.00

132,810.00
132,810.00
160,960.00
16,096.00
177,056.00

Jumlah Harga
(Rp.)

27,000.00
1,150.00
28,150.00

110,674.80
110,674.80

138,824.80
13,882.48
152,707.28
Jumlah Harga
(Rp.)

135,000.00
75,750.00
10,050.00
8,625.00
229,425.00

301,082.40
265,588.94
88,066.68
654,738.02

884,163.02
88,416.30
972,579.00

Jumlah Harga
(Rp.)

120,000.00
71,250.00
9,375.00
7,500.00
208,125.00

205,200.00
187,000.00
92,480.00
484,680.00
692,805.00
69,280.50
762,085.50

Jumlah Harga
(Rp.)

70,200.00
39,390.00
5,226.00
4,485.00
119,301.00

301,082.40
47,811.60
348,894.00

468,195.00
46,819.50
515,015.00
Jumlah Harga
(Rp.)

67,500.00
2,875.00
70,375.00

70,375.00
7,037.50
77,413.00

Jumlah Harga
(Rp.)

72,000.00
4,500.00
76,500.00

76,500.00
7,650.00
84,150.00
Jumlah Harga
(Rp.)

80,000.00
3,200.00
83,200.00

83,200.00
8,320.00
91,520.00

Jumlah Harga
(Rp.)

22,500.00
9,579.50
32,079.50

32,079.50
3,207.95
35,287.00
Jumlah Harga
(Rp.)

40,000.00
5,000.00
45,000.00

45,000.00
4,500.00
49,500.00

Jumlah Harga
(Rp.)

132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

402,456.86
105,522.67
125,804.07
10,750.00
644,533.60
814,458.60
81,445.86
895,904.46

Jumlah Harga
(Rp.)

132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

449,708.88
100,544.04
127,441.16
10,750.00
688,444.08

858,369.08
85,836.91
944,205.99

Jumlah Harga
(Rp.)

96,000.00
19,000.00
2,500.00
6,000.00
123,500.00

374,757.40
108,436.99
129,330.11
10,000.00
622,524.50

746,024.50
74,602.45
820,626.95

Jumlah Harga
(Rp.)

132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

487,184.62
97,022.57
128,070.81
10,750.00
723,028.00

892,953.00
89,295.30
982,248.30
Jumlah Harga
(Rp.)

148,500.00
27,775.00
3,752.00
9,545.00
189,572.00

531,177.88
88,532.40
124,303.20
10,750.00
754,763.48

944,335.48
94,433.55
1,038,769.00

Jumlah Harga
(Rp.)

148,500.00
27,775.00
3,752.00
9,545.00
189,572.00

573,541.76
85,154.19
124,544.80
10,750.00
793,990.75

983,562.75
98,356.28
1,081,919.03

Jumlah Harga
(Rp.)

148,500.00
27,775.00
3,752.00
9,545.00
189,572.00

604,499.98
81,310.02
126,477.60
10,750.00
823,037.60

1,012,609.60
101,260.96
1,113,871.00

Jumlah Harga
(Rp.)
132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

625,681.92
84,029.56
130,841.27
10,750.00
851,302.75

1,021,227.75
102,122.78
1,123,350.53

Jumlah Harga
(Rp.)

132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

661,528.28
83,058.12
129,204.18
10,750.00
884,540.58
1,054,465.58
105,446.56
1,159,912.14

Jumlah Harga
(Rp.)

132,000.00
26,125.00
3,500.00
8,300.00
169,925.00

672,933.94
82,693.83
128,574.53
10,750.00
894,952.30

1,064,877.30
106,487.73
1,171,365.03
Jumlah Harga
(Rp.)

6,300.00
7,070.00
938.00
460.00
14,768.00

154,948.50
3,689.25
158,637.75

173,405.75
17,340.58
190,746.33
19,075.00

Jumlah Harga
(Rp.)

5,600.00
6,650.00
875.00
400.00
13,525.00

147,000.00
3,689.25
150,689.25

164,214.25
16,421.43
180,635.68
18,063.57

Jumlah Harga
(Rp.)

46,800.00
26,260.00
3,484.00
2,990.00
79,534.00

181,999.40
4,427.10
500.00
186,926.50

266,460.50
26,646.05
293,106.55
146,553.00
Jumlah Harga
(Rp.)

46,800.00
26,260.00
3,484.00
2,990.00
79,534.00

204,749.33
4,427.10
500.00
209,676.43

289,210.43
28,921.04
318,131.47
106,044.00

Jumlah Harga
(Rp.)

59,400.00
33,330.00
4,422.00
3,795.00
100,947.00

181,999.40
5,902.80
1,000.00
73,783.55
53,800.60
34,600.000

351,086.35

452,033.35
45,203.33
497,236.68
124,309.00
Jumlah Harga
(Rp.)

59,400.00
33,330.00
4,422.00
3,795.00
100,947.00

181,999.40
5,902.80
1,000.00
88,540.25
53,800.60

34,600.000

365,843.05

466,790.05
46,679.01
513,469.06
171,156.00
Jumlah Harga
(Rp.)

59,400.00
33,330.00
4,422.00
3,795.00
100,947.00

181,999.40
5,902.80
1,000.00
73,783.55
53,800.60

103,800.000

420,286.35

521,233.35
52,123.33
573,356.68
286,678.00

Jumlah Harga
(Rp.)

52,800.00
31,350.00
4,125.00
3,300.00
91,575.00

136,499.55
5,902.80
1,000.00
98,378.06
53,800.60
51,900.000
20,000.000
367,481.01

459,056.01
45,905.60
504,961.61

Jumlah Harga
(Rp.)

52,800.00
31,350.00
4,125.00
3,300.00
91,575.00

136,499.55
5,902.80
750.00
73,783.55
53,800.60
34,600.000
305,336.50

396,911.50
39,691.15
436,602.65
Jumlah Harga
(Rp.)

1,123,350.53
135,241.75
586,213.10
1,844,805.38

Jumlah Harga
(Rp.)

1,123,350.53
391,857.73
439,659.83
1,954,868.09

Jumlah Harga
(Rp.)

1,123,350.53
3,351,420.28
1,412,503.72
5,887,274.53

Jumlah Harga
(Rp.)

1,123,350.53
3,399,355.75
1,412,503.72
5,935,210.00
Jumlah Harga
(Rp.)

1,123,350.53
2,709,413.00
1,412,503.72
5,245,267.25

Jumlah Harga
(Rp.)

1,123,350.53
2,438,891.35
848,456.62
4,410,698.50

Jumlah Harga
(Rp.)

1,123,350.53
3,836,974.40
3,315,076.94
8,275,401.87

Jumlah Harga
(Rp.)

1,123,350.53
3,407,939.50
3,315,076.94
7,846,366.97
Jumlah Harga
(Rp.)

1,123,350.53
2,783,939.03
2,651,763.21
6,559,052.77

Jumlah Harga
(Rp.)

1,123,350.53
3,405,154.55
2,209,719.80
6,738,224.88

Jumlah Harga
(Rp.)

1,123,350.53
1,998,583.13
1,894,471.75
5,016,405.41

Jumlah Harga
(Rp.)

1,113,871.00
3,739,978.03
4,419,936.84
9,273,785.87
Jumlah Harga
(Rp.)

1,113,871.00
5,106,224.90
3,949,604.01
10,169,699.91

Jumlah Harga
(Rp.)

1,113,871.00
3,802,429.58
3,773,997.59
8,690,298.17

Jumlah Harga
(Rp.)

1,113,871.00
2,210,067.65
2,281,856.50
5,605,795.15

Jumlah Harga
(Rp.)

1,113,871.00
3,301,768.05
3,489,022.26
7,904,661.31
Jumlah Harga
(Rp.)

1,123,350.53
3,230,828.13
1,711,392.38
6,065,571.04

Jumlah Harga
(Rp.)

1,123,350.53
3,520,863.50
1,901,889.40
6,546,103.43

Jumlah Harga
(Rp.)

1,123,350.53
2,693,142.03
1,988,946.72
5,805,439.28
Jumlah Harga
(Rp.)

27,000.00
10,100.00
1,340.00
1,725.00
40,165.00

51,660.00
30,876.75
6,435.64
88,972.39

129,137.39
12,913.74
142,051.00

Jumlah Harga
(Rp.)

27,000.00
10,100.00
1,340.00
1,725.00
40,165.00

51,660.00
18,737.87
7,282.44
77,680.31
117,845.31
11,784.53
129,630.00
Jumlah Harga
(Rp.)

27,000.00
15,150.00
2,010.00
1,725.00
45,885.00

16,658.78
3,387.18
20,045.96

65,930.96
6,593.10
72,524.06

Jumlah Harga
(Rp.)

27,000.00
15,150.00
2,010.00
1,725.00
45,885.00

10,167.33
4,064.62
14,231.95
60,116.95
6,011.69
66,129.00
Jumlah Harga
(Rp.)

18,000.00
10,100.00
1,340.00
1,150.00
30,590.00

5,295.49
5,295.49

35,885.49
3,588.55
39,474.00

Jumlah Harga
(Rp.)

22,500.00
12,625.00
1,742.00
1,495.00
38,362.00

82,875.00
15,967.92
4,795.93
7,621.16
111,260.01
149,622.01
14,962.20
164,584.21

Jumlah Harga
(Rp.)

20,800.00
12,350.00
1,625.00
1,300.00
36,075.00

0.00
16,293.80
2,250.00
7,621.16
26,164.96

62,239.96
6,224.00
68,463.96
Jumlah Harga
(Rp.)

23,400.00
13,130.00
1,742.00
1,495.00
39,767.00

44,512.50
16,293.80
5,533.77
7,621.16
73,961.23

113,728.23
11,372.82
125,101.05

Jumlah Harga
(Rp.)

21,600.00
12,120.00
1,608.00
1,380.00
36,708.00

185,000.00
15,642.05
5,533.77
7,621.16
213,796.97

250,504.97
25,050.50
275,555.47
Jumlah Harga
(Rp.)

21,600.00
12,120.00
1,608.00
1,380.00
36,708.00

195,000.00
15,642.05
5,533.77
7,621.16
223,796.97

260,504.97
26,050.50
286,555.47

Jumlah Harga
(Rp.)

81,000.00
45,450.00
6,030.00
5,175.00
137,655.00

250,000.00
15,153.23
66.41
328,556.46
593,776.10

731,431.10
73,143.11
804,574.21
Jumlah Harga
(Rp.)

6,300.00
909.00
804.00
345.00
8,358.00

13,404.00
3,300.00
3,972.05
13,000.00
150.00
450.00
1,600.00
35,876.05

44,234.05
4,423.41
48,657.46
Jumlah Harga
(Rp.)

1,800.00
6,363.00
844.20
345.00
9,352.20

2,200.00
2,336.50
13,000.00
17,536.50

26,888.70
2,688.87
29,578.00

Jumlah Harga
(Rp.)

9,000.00
20,200.00
2,680.00
575.00
32,455.00

49,139.84
1,475.70
50,615.54
83,070.54
8,307.05
91,377.59
Jumlah Harga
(Rp.)

10,800.00
6,060.00
804.00
690.00
18,354.00

94,500.00
442.70
94,942.70

113,296.70
11,329.67
124,626.00

Jumlah Harga
(Rp.)

13,500.00
30,300.00
4,020.00
8,625.00
56,445.00

70,069.77
2,951.40
73,021.17
129,466.17
12,946.62
142,413.00
Jumlah Harga
(Rp.)

297,000.00
111,100.00
1,340.00
18,400.00
427,840.00

600,000.00
3,600.00
603,600.00

1,031,440.00
103,144.00
1,134,584.00

Jumlah Harga
(Rp.)

900.00
10,100.00
1,340.00
575.00
12,915.00

45,000.00
45,000.00
57,915.00
5,791.50
63,706.50
Jumlah Harga
(Rp.)

900.00
40,400.00
5,360.00
575.00
47,235.00

65,000.00
100.00
65,100.00

112,335.00
11,233.50
123,569.00

Jumlah Harga
(Rp.)

3,240.00
6,060.00
804.00
230.00
10,334.00

6,148.60
1,793.34
7,941.94
18,275.94
1,827.59
20,104.00
Jumlah Harga
(Rp.)

7,290.00
13,635.00
1,809.00
460.00
23,194.00

29,513.40
8,608.08
38,121.48

61,315.48
6,131.55
67,447.00

Jumlah Harga
(Rp.)

7,290.00
13,635.00
1,809.00
460.00
23,194.00

36,891.80
10,760.11
47,651.91
70,845.91
7,084.59
77,930.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO BAHAN / MATERIAL SATUAN

A. UPAH KERJA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH

B. BAHAN

1 Air Liter
2 Amplas Lbr
3 Atap Spandek Lbr
4 Batu Bata Buah
5 Batu Kali/Batu Belah M3
6 Besi Beton Polos Kg
7 Besi Beton Ulir Kg
8 Besi Strip Kg
9 Cat Kayu Dasar Kg
10 Cat Kayu Penutup Kg
11 Cat Menie Kg
12 Cat Tembok Dasar Kg
13 Cat Tembok Penutup Kg
14 Closet Jongkok Unit
15 Dempul Kayu Kg
16 Dolken Kayu ø 8-10/4 m Batang
17 Floor Drain Bh
18 Granit 60x60 cm Polished Bh
19 Granit 60x60 cm Unpolished Bh
20 Kawat Beton Kg
21 Kayu Kelas I (Seumantok) M3
22 Kayu Kelas II M3
23 Kayu Kelas III M3
24 Kayu/Papan Bekisting (Klas IV) M3
25 Keramik 40 x 40 Cm Buah
26 Keramik 40 x 40 Cm Kulit Jeruk Buah
27 Keramik 25 x 25 Cm Kulit Jeruk Buah
28 Keramik 20 x 40 Cm Buah
29 Kertas Amplas Lbr
30 Kran Air Buah
31 Kuas Cat Buah
32 Minyak Bekisting / Residu Liter
33 Multiplek 9 mm Lembar
34 Multiplek 4 mm Lembar
35 Paku Kayu Kg
NO BAHAN / MATERIAL SATUAN
36 Paku Seng Kg
37 Paku Skrup Kg
38 Pasir Beton/ Kerikil M3
39 Pasir Beton Kg
40 Plafond PVC M2
NO BAHAN / MATERIAL SATUAN
41 Pipa PVC 3/4" M
42 Pipa PVC 3" M
43 Pipa PVC 4" M
44 Kerikil M3
45 Kerikil Kg
46 Pasir Pasang M3
47 Pasir Urug M3
48 Papan Listplank (Kayu Klas II) M3
49 Plamur Tembok Kg
50 Sealtape Buah
51 Semen Portland 40 kg Zak
52 Semen @ 1 Kg Kg
53 Semen Putih (Warna) Kg
54 Tiner Ltr
55 Tanah Timbun M3

Banda Aceh, Desember 2017


Konsultan,
CV. Peut Sagoe Design

Mustaqim. H, ST
Direktur
DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA

90,000.00
101,000.00
134,000.00
115,000.00

50.00
8,000.00
135,000.00
738.00
250,902.00
14,757.00
17,216.00
5,000.00
63,946.00
67,635.00
67,020.00
23,365.00
50,000.00
600,000.00
22,135.00
17,300.00
45,000.00
46,250.00
48,750.00
24,595.00
6,148,629.00
4,918,903.00
4,549,985.00
2,951,342.00
12,500.00
13,333.33
3,750.00
20,000.00
7,200.00
65,000.00
15,000.00
5,000.00
153,716.00
83,621.00
14,757.00
HARGA
22,135.00
10,000.00
163,086.00
116.49
250,000.00
HARGA
5,123.83
24,594.50
30,743.17
163,086.00
120.80
169,359.00
110,675.00
4,549,985.00
22,000.00
4,000.00
65,175.00
1,629.38
3,689.18
15,000.00
92,229.00

Banda Aceh, Desember 2017

CV. Peut Sagoe Design

Mustaqim. H, ST
ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

I PEKERJAAN PERSIAPAN

Anl. I.1 1 M² Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
A.2.2.1.2
A. BAHAN : Kayu perancah (dolken) 1.2500
Semen 2.5000
Seng Gelombang BJLS 30 1.6000
Pasir Beton/ Kerikil 0.0050
Pasir Beton/ Kerikil 0.0090
Kayu Klas IV (Sengon/ dll) 0.0720
Paku Kayu 0.0600

B. UPAH : MANDOR 0.0200


KEPALA TUKANG KAYU / CAT 0.0200
TUKANG KAYU / CAT 0.4000
LADEN TUKANG KAYU / CAT 0.2000

Anl. I.2 1 M¹ Pengukuran dan pemasangan Bouwplank


A.2.2.1.4
A. BAHAN : Kayu Klas III (Borneo/ dll) 0.0120
Paku Kayu 0.0200
Kayu Klas IV (Sengon/ dll) 0.0070

B. UPAH : MANDOR 0.0050


KEPALA TUKANG KAYU / CAT 0.0100
TUKANG KAYU / CAT 0.1000
LADEN TUKANG KAYU / CAT 0.1000

Anl. I.3 1 M² Pembuatan kantor sementara lantai plesteran


A.2.2.1.5
A. BAHAN : Kayu perancah (dolken) 1.2500
Kayu Klas IV (Sengon/ dll) 0.1800
Paku Kayu 0.0800
Besi strip 1.1000
Semen 35.0000
Pasir Beton/ Kerikil 0.1000
Kerikil 0.1500
Batu Bata/ Tela 30.0000

275 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Seng Plat BJLS 30 0.7200
Naco (Kerangka+Daun) 0.2000
Kaca Bening uk. 2 mm 0.0800
Kunci Pintu 0.1500
Multipleks 4 mm 0.0600

B. UPAH : MANDOR 0.0500


KEPALA TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 2.0000
LADEN TUKANG KAYU / CAT 1.0000

Anl. I.3 1 M² Pembuatan bedeng pekerja


A.2.2.1.8
A. BAHAN : Kayu perancah (dolken) 1.2500
Kayu Klas IV (Sengon/ dll) 0.1860
Paku Kayu 0.3000
Semen 18.0000
Pasir Beton/ Kerikil 0.0300
Kerikil 0.0500
Seng Gelombang BJLS 30 1.2800
Multipleks 4 mm 1.3500

B. UPAH : MANDOR 0.0500


KEPALA TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 2.0000
LADEN TUKANG KAYU / CAT 1.0000

Anl. I.4 1 M² Pembersihan lapangan dan perataan


A.2.2.1.9
UPAH : MANDOR 0.0500
PEKERJA GALIAN TANAH 0.1000

Anl. I.5 1 M³ Pembongkaran beton bertulang


A.2.2.1.13
UPAH : LADEN TUKANG BATU / BESI 13.3340

276 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.6660

Anl. I.6 1 M³ Pembongkaran dinding tembok bata


A.2.2.1.14
UPAH : LADEN TUKANG BATU / BESI 6.6670
MANDOR 0.3330

II PEKERJAAN TANAH

Anl. II.1 1 M³ Galian tanah (tanah biasa) sedalam 1 m


A.2.3.1.1
UPAH : MANDOR 0.0250
PEKERJA GALIAN TANAH 0.7500

Anl. II.2 1 M³ Galian tanah (tanah biasa) sedalam 2 m


A.2.3.1.2
UPAH : MANDOR 0.0450
PEKERJA GALIAN TANAH 0.9000

Anl. II.3 1 M³ Urugan tanah kembali


A.2.3.1.9
UPAH : MANDOR 0.0500
PEKERJA GALIAN TANAH 0.5000

Anl. II.4 1 M³ Memadatkan tanah (per 20 cm)


A.2.3.1.10
UPAH : MANDOR 0.0500
PEKERJA GALIAN TANAH 0.5000

277 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. II.5 1 M³ Pengurugan dengan pasir urug


A.2.3.1.11.A
BAHAN : Pasir Urug 1.2000
UPAH : MANDOR 0.0100
PEKERJA GALIAN TANAH 0.3000

Anl. II.6 1 M³ Pengurugan dengan Tanah Timbun


A.2.3.1.11.B
BAHAN : Tanah Timbun 1.2000
UPAH : MANDOR 0.0100
PEKERJA GALIAN TANAH 0.3000

Anl. II.7 1 M³ Pengurugan sirtu padat


A.2.3.1.14
BAHAN : Pasir Batu (Sirtu) - Material Jalan 1.2000
UPAH : MANDOR 0.0250
PEKERJA GALIAN TANAH 0.2500

III PEKERJAAN PONDASI

Anl. III.1 1 M³ Pasangan batu belah / kali campuran 1 Pc : 3 Pp


A.3.2.1.1
A. BAHAN : Batu Kali/ Batu Belah (Sungai/ Gunung) 1.2000
Semen 200.0000
Pasir Pasang 0.4850

B. UPAH : KEPALA TUKANG BATU / BESI 0.0750


MANDOR 0.0750
LADEN TUKANG BATU / BESI 1.5000
TUKANG BATU / BESI 0.7500

Anl. III.2 1 M³ Pasangan batu belah / kali campuran 1 Pc : 4 Pp

278 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
A.3.2.1.2
A. BAHAN : Batu Kali/ Batu Belah (Sungai/ Gunung) 1.2000
Semen 163.0000
Pasir Pasang 0.5200

B. UPAH : KEPALA TUKANG BATU / BESI 0.0750


MANDOR 0.0750
LADEN TUKANG BATU / BESI 1.5000
TUKANG BATU / BESI 0.7500

Anl. III.3 1 M³ Pasangan batu kosong (aanstamping)


A.3.2.1.9
A. BAHAN : Batu Kali/ Batu Belah (Sungai/ Gunung) 1.2000
Pasir Urug 0.4320
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0390
MANDOR 0.0390
LADEN TUKANG BATU / BESI 0.7800
TUKANG BATU / BESI 0.3900

Anl. III.4 1 M³ Pemasangan pondasi siklop, 60% beton campuran 1PP : 2PB : 3Kr dan 40% batu belah
A.3.2.1.10
A. BAHAN : Batu Kali/ Batu Belah (Sungai/ Gunung) 0.4800
Semen 194.0000
Pasir Beton/ Kerikil 0.3120
Pasir Beton/ Kerikil 0.4680
Kawat beton 1.8000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0850
MANDOR 0.1700
LADEN TUKANG BATU / BESI 3.4000
TUKANG BATU / BESI 0.8500

Anl. III.5 1 M³ Pemasangan pondasi sumuran, diameter 100 cm

279 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
A.3.2.1.11
A. BAHAN : Batu Kali/ Batu Belah (Sungai/ Gunung) 0.4500
Semen 194.0000
Pasir Beton/ Kerikil 0.3120
Pasir Beton/ Kerikil 0.4680
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0800
MANDOR 0.1190
LADEN TUKANG BATU / BESI 2.4000
TUKANG BATU / BESI 0.8000

IV PEKERJAAN BETON

Anl. IV.1 1 M³ Membuat beton mutu f'c = 7,4 Mpa (K-100)


A.4.1.1.1
A. BAHAN : Semen 247.0000
Pasir Beton/ Kerikil 0.6207
Pasir Beton/ Kerikil 0.7400
Air 215.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0280
MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.2 1 M³ Lantai kerja beton mutu fc' = 7,4 Mpa (K - 100)
A.4.1.1.4
A. BAHAN : Semen 230.0000
Pasir Beton/ Kerikil 0.6379
Pasir Beton/ Kerikil 0.7607
Air 200.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0200
MANDOR 0.0600
LADEN TUKANG BATU / BESI 1.2000
TUKANG BATU / BESI 0.2000

280 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IV.3 1 M³ Membuat beton mutu f'c = 14,5 Mpa (K-175)


A.4.1.1.5
A. BAHAN : Semen 326.0000
Pasir Beton/ Kerikil 0.5429
Pasir Beton/ Kerikil 0.7622
Air 215.0000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0280


MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.4 1 M³ Membuat beton mutu f'c = 16,9 Mpa (K-200)


A.4.1.1.6
A. BAHAN : Semen 352.0000
Pasir Beton/ Kerikil 0.5221
Pasir Beton/ Kerikil 0.7637
Air 215.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0280
MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.5 1 M³ Membuat beton mutu f'c = 19,3 Mpa (K-225)


A.4.1.1.7
A. BAHAN : Semen 371.0000
Pasir Beton/ Kerikil 0.4986
Pasir Beton/ Kerikil 0.7756
Air 215.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0280
MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500

281 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG BATU / BESI 0.2750

Anl. IV.6 1 M³ Beton mutu fc¹ = 21,7 Mpa K - 250


A.4.1.1.8
A. BAHAN : Semen 384.0000
Pasir Beton/ Kerikil 0.4943
Pasir Beton/ Kerikil 0.7696
Air 215.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0280
MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.7 1 M³ Beton mutu fc¹ = 24,0 Mpa K - 275


A.4.1.1.9
A. BAHAN : Semen 406.0000
Pasir Beton/ Kerikil 0.4886
Pasir Beton/ Kerikil 0.7600
Air 215.0000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0280


MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.8 1 M³ Beton mutu fc¹ = 26,4 Mpa K - 300


A.4.1.1.10
A. BAHAN : Semen 413.0000
Pasir Beton/ Kerikil 0.4864
Pasir Beton/ Kerikil 0.7563
Air 215.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0280

282 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0830
LADEN TUKANG BATU / BESI 1.6500
TUKANG BATU / BESI 0.2750

Anl. IV.9 10 Kg Pembesian dengan besi polos


A.4.1.1.17.A
A. BAHAN : Besi Beton Polos 10.5000
Kawat beton 0.1500
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0070
MANDOR 0.0040
LADEN TUKANG BATU / BESI 0.0700
TUKANG BATU / BESI 0.0700

Anl. IV.10 10 Kg Pembesian dengan besi Ulir


A.4.1.1.17.B
A. BAHAN : Besi Beton Ulir 10.5000
Kawat beton 0.1500
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0070
MANDOR 0.0040
LADEN TUKANG BATU / BESI 0.0700
TUKANG BATU / BESI 0.0700

Anl. IV.11 10 Kg Pemasangan jaring kawat baja (wiremesh) 4 mm


A.4.1.1.19.A
A. BAHAN : Jaring kawat baja / wire mesh 4 mm 10.2000
Kawat beton 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250


MANDOR 0.0010
LADEN TUKANG BATU / BESI 0.0250

283 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG BATU / BESI 0.0250

Anl. IV.11 10 Kg Pemasangan jaring kawat baja (wiremesh) M5


A.4.1.1.19.B
A. BAHAN : Wiremesh SNI M5 uk. 2,1 x 5,4 m 10.2000
Kawat beton 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250


MANDOR 0.0010
LADEN TUKANG BATU / BESI 0.0250
TUKANG BATU / BESI 0.0250

Anl. IV.11 10 Kg Pemasangan jaring kawat baja (wiremesh) M6


A.4.1.1.19.C
A. BAHAN : Wiremesh SNI M6 uk. 2,1 x 5,4 m 10.2000
Kawat beton 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250


MANDOR 0.0010
LADEN TUKANG BATU / BESI 0.0250
TUKANG BATU / BESI 0.0250

Anl. IV.11 10 Kg Pemasangan jaring kawat baja (wiremesh) M7


A.4.1.1.19.D
A. BAHAN : Wiremesh SNI M7 uk. 2,1 x 5,4 m 10.2000
Kawat beton 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250


MANDOR 0.0010
LADEN TUKANG BATU / BESI 0.0250
TUKANG BATU / BESI 0.0250

284 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IV.11 10 Kg Pemasangan jaring kawat baja (wiremesh) M8


A.4.1.1.19.E
A. BAHAN : Wiremesh SNI M8 uk. 2,1 x 5,4 m 10.2000
Kawat beton 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250


MANDOR 0.0010
LADEN TUKANG BATU / BESI 0.0250
TUKANG BATU / BESI 0.0250

Anl. IV.12 1 M² Pasangan bekisting untuk pondasi


A.4.1.1.20
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.3000
Minyak bekisting 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0260


MANDOR 0.0260
LADEN TUKANG KAYU / CAT 0.5200
TUKANG KAYU / CAT 0.2600

Anl. IV.13 1 M² Pasangan bekisting untuk pondasi 3x pakai


A.4.1.1.20.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.3000
Minyak bekisting 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0260


MANDOR 0.0260
LADEN TUKANG KAYU / CAT 0.5200
TUKANG KAYU / CAT 0.2600

285 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IV.14 1 M² Pasangan bekisting untuk sloof


A.4.1.1.21.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0450
Paku Kayu 0.3000
Minyak bekisting 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0260


MANDOR 0.0260
LADEN TUKANG KAYU / CAT 0.5200
TUKANG KAYU / CAT 0.2600

Anl. IV.15 1 M² Pasangan bekisting untuk sloof 2x pakai


A.4.1.1.21.B
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0450
Paku Kayu 0.3000
Minyak bekisting 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0260


MANDOR 0.0260
LADEN TUKANG KAYU / CAT 0.5200
TUKANG KAYU / CAT 0.2600

Anl. IV.16 1 M² Pasangan bekisting untuk sloof 3x pakai


A.4.1.1.21.C
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0450
Paku Kayu 0.3000
Minyak bekisting 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0260


MANDOR 0.0260
LADEN TUKANG KAYU / CAT 0.5200
TUKANG KAYU / CAT 0.2600

286 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IV.17 1 M² Pasangan bekisting untuk dinding 2x pakai


A.4.1.1.25.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0300
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0200
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 3.0000
Spacer / Formite 4.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.18 1 M² Pasangan bekisting untuk dinding 3x pakai


A.4.1.1.25.B
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0300
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0200
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 3.0000
Spacer / Formite 4.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.19 1 M² Pasangan bekisting kolom untuk 2x pakai


A.4.1.1.22.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000

287 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0150
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 2.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.20 1 M² Pasangan bekisting kolom untuk 3x pakai


A.4.1.1.22.B
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0150
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 2.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.21 1 M² Pasangan Bekisting Balok untuk 2x pakai


A.4.1.1.23.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0180
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 2.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

288 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IV.22 1 M² Pasangan bekisting balok untuk 3x pakai


A.4.1.1.23.B
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas II (Kamper/ Kruing/ dll) 0.0180
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 2.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.23 1 M² Pasangan Bekisting Plat Lantai untuk 2x pakai


A.4.1.1.24.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas IV (Sengon/ dll) 0.0150
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 6.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.24 1 M² Pasangan bekisting plat lantai untuk 3x pakai


A.4.1.1.24.B
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0400
Paku Kayu 0.4000
Minyak bekisting 0.2000
Kayu Klas IV (Sengon/ dll) 0.0150

289 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 6.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.24 1 M² Pasangan bekisting plat lantai floordeck untuk 1x pakai


A.4.1.1.24.C
A. BAHAN : Floordeck 1 mm, lebar efektif 880 mm 1.1364
Paku Sekrup 0.4000
Minyak bekisting 0.2000
Kayu perancah (dolken) 6.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

Anl. IV.25 1 M² Pemasangan bekisting untuk tangga untuk 2x pakai


A.4.1.1.26.A
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0300
Paku Kayu 0.4000
Minyak bekisting 0.1500
Kayu Klas IV (Sengon/ dll) 0.0150
Multipleks 9 mm 0.3500
Kayu perancah (dolken) 2.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0330


MANDOR 0.0330
LADEN TUKANG KAYU / CAT 0.6600
TUKANG KAYU / CAT 0.3300

290 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Anl. IV.25 1 M² Upah Titik Join Sling
A.4.1.2.24
A. BAHAN : 0.0300

B. UPAH : LADEN TUKANG KAYU / CAT 0.2200


TUKANG KAYU / CAT 0.2200
TUKANG BATU / BESI 0.2200
MANDOR 0.0110

VI PEKERJAAN BESI DAN ALUMINIUM

Anl. VI.1 1 Kg Pekerjaan pemasangan besi profil


A.4.2.1.1.A
A. BAHAN : Besi profil 1.1500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0060


MANDOR 0.0030
LADEN TUKANG BATU / BESI 0.0600
TUKANG BATU / BESI 0.0600

Anl. VI.1 1 Kg Pekerjaan pemasangan baja profil


A.4.2.1.1.B
A. BAHAN : Baja Profil 1.1500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0060


MANDOR 0.0030
LADEN TUKANG BATU / BESI 0.0600
TUKANG BATU / BESI 0.0600

Anl. VI.1 1 Kg Pekerjaan pemasangan kabel baja / sling


A.4.2.1.1.C
A. BAHAN : Kabel Baja/ Sling 1.1500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0060

291 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0030
LADEN TUKANG BATU / BESI 0.0600
TUKANG BATU / BESI 0.0600

Anl. VI.2 1 Kg Pekerjaan pemasangan rangka kuda-kuda baja IWF


A.4.2.1.2
A. BAHAN : Baja Profil 1.1500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0060


MANDOR 0.0030
LADEN TUKANG BATU / BESI 0.0600
TUKANG BATU / BESI 0.0600

Anl. VI.3 100 Kg Pekerjaan perakitan


A.4.2.1.3
A. BAHAN : Solar (Industri) 1.0000
Pelumas/ Oli 0.1000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0010


MANDOR 0.0050
LADEN TUKANG BATU / BESI 0.1000
TUKANG BATU / BESI 0.1000

ALAT : Err:509 0.0800

Anl. VI.4 1 M² Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A.4.2.1.4
A. BAHAN : Baja Profil Siku L.30.30.3 15.0000
Plat Baja 32.8000
Kawat las listrik 0.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.1050


MANDOR 0.0520
LADEN TUKANG BATU / BESI 1.0500

292 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG BATU / BESI 1.0500

ALAT : Err:509 0.0800

Anl. VI.5 10 Cm Pekerjaan mengelas dengan las listrik


A.4.2.1.5
A. BAHAN : Kawat las listrik 0.4000
Solar (Industri) 0.3000
Pelumas/ Oli 0.0400

B. UPAH : KEPALA TUKANG BATU / BESI 0.0020


MANDOR 0.0020
LADEN TUKANG BATU / BESI 0.0400
TUKANG BATU / BESI 0.0020

ALAT : Err:509 0.1700

Anl. VI.6 1 M' Pemasangan kusen pintu alluminium


A.4.2.1.11
A. BAHAN : Kusen Pintu Aluminium 1.1000
Paku Sekrup 2.0000
Sealant 0.0600

B. UPAH : KEPALA TUKANG BATU / BESI 0.0043


MANDOR 0.0021
LADEN TUKANG BATU / BESI 0.0430
TUKANG BATU / BESI 0.0430

Anl. VI.6 1 M² Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A.4.2.1.20
A. BAHAN : Besi Hollow 40 x 40 3.5000
Assesoris 100.0000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0250

293 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0130
LADEN TUKANG BATU / BESI 0.2500
TUKANG BATU / BESI 0.2500

Anl. VI.6 1 M² Pemasangan rangka besi hollow, modul 60 x 60 cm, plafond


A.4.2.1.21
A. BAHAN : Besi Hollow 40 x 40 4.0000
Assesoris 100.0000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0180
LADEN TUKANG BATU / BESI 0.3500
TUKANG BATU / BESI 0.3500

VII PEKERJAAN PASANGAN DINDING

Anl. VII.1 1 M² Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 PC : 2 PP
A.4.4.1.1
A. BAHAN : Batu Bata/ Tela 140.0000
Semen 43.5000
Pasir Pasang 0.0800
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0200
MANDOR 0.0300
LADEN TUKANG BATU / BESI 0.6000
TUKANG BATU / BESI 0.2000

Anl. VII.2 1 M² Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 PC : 4 PP
A.4.4.1.3
A. BAHAN : Batu Bata/ Tela 140.0000
Semen 26.5500
Pasir Pasang 0.0930

B. UPAH : KEPALA TUKANG BATU / BESI 0.0200

294 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0300
LADEN TUKANG BATU / BESI 0.6000
TUKANG BATU / BESI 0.2000

Anl. VII.3 1 M² Pemasangan dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 2 PP
A.4.4.1.7
A. BAHAN : Batu Bata/ Tela 70.0000
Semen 18.9500
Pasir Pasang 0.0380

B. UPAH : KEPALA TUKANG BATU / BESI 0.0100


MANDOR 0.0150
LADEN TUKANG BATU / BESI 0.3000
TUKANG BATU / BESI 0.1000

Anl. VII.4 1 M² Pemasangan dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 4 PP
A.4.4.1.9
A. BAHAN : Batu Bata/ Tela 70.0000
Semen 11.5000
Pasir Pasang 0.0430

B. UPAH : KEPALA TUKANG BATU / BESI 0.0100


MANDOR 0.0150
LADEN TUKANG BATU / BESI 0.3000
TUKANG BATU / BESI 0.1000

Anl. VII.5 1 M² Dinding terawang / roster (12 x 11 x 24 cm) campuran spesi 1 Pc : 4 Pp


A.4.4.1.23
A. BAHAN : Err:509 30.0000
Semen 11.0000
Pasir Pasang 0.0350

B. UPAH : KEPALA TUKANG BATU / BESI 0.0100


MANDOR 0.0150

295 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
LADEN TUKANG BATU / BESI 0.3000
TUKANG BATU / BESI 0.1000

VIII PEKERJAAN PLESTERAN

Anl. VIII.1 1 M² Pemasangan plasteran 1 PC : 2 PP tebal 15 mm


A.4.2.2.2
A. BAHAN : Semen 10.2240
Pasir Pasang 0.0200

B. UPAH : KEPALA TUKANG BATU / BESI 0.0150


MANDOR 0.0150
LADEN TUKANG BATU / BESI 0.3000
TUKANG BATU / BESI 0.1500

Anl. VIII.2 1 M² Pemasangan plasteran 1 PC : 4 PP tebal 15 mm


A.4.2.2.4
A. BAHAN : Semen 6.2400
Pasir Pasang 0.0240

B. UPAH : KEPALA TUKANG BATU / BESI 0.0150


MANDOR 0.0150
LADEN TUKANG BATU / BESI 0.3000
TUKANG BATU / BESI 0.1500

Anl. VIII.3 1 M² Pemasangan acian


A.4.2.2.27
A. BAHAN : Semen 3.2500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0100


MANDOR 0.0100
LADEN TUKANG BATU / BESI 0.2000
TUKANG BATU / BESI 0.1000

296 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

IX PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Anl. IX.1 1 M² Memasang Lantai Travertine ukuran (60 x 60 cm)


A.4.4.3.13.A
A. BAHAN : Granite ukr. 60 x 60 cm 1.1000
Semen 9.6000
Pasir Pasang 0.0450
Semen Warna 1.5000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0120
MANDOR 0.0120
LADEN TUKANG BATU / BESI 0.2400
TUKANG BATU / BESI 0.1200

Anl. IX.2 1 M² Memasang Lantai Travertine ukuran (60 x 120 cm)


A.4.4.3.13.B
A. BAHAN : Travertine ukr. 60 x 120 1.1000
Semen 9.6000
Pasir Pasang 0.0450
Semen Warna 1.5000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0120


MANDOR 0.0120
LADEN TUKANG BATU / BESI 0.2400
TUKANG BATU / BESI 0.1200

Anl. IX.2 1 M² Pemasangan paving block


A.4.4.3.32.A
A. BAHAN : Paving Block 1.0500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0300


MANDOR 0.0300
LADEN TUKANG BATU / BESI 0.6000
TUKANG BATU / BESI 0.3000

297 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. IX.3 1 M² Memasang lantai keramik ukuran (40 x 40 cm)


A.4.4.3.34
A. BAHAN : Keramik uk. 40 x 40 cm 1.0500
Semen 8.1900
Pasir Pasang 0.0450
Semen Warna 1.6200

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.4 1 M² Memasang lantai keramik ukuran (30 x 30 cm) setara Platinum
A.4.4.3.35.A
A. BAHAN : Keramik uk. 30 x 30 cm setara Platinum 1.0000
Semen 10.0000
Pasir Pasang 0.0450
Semen Warna 1.5000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.4 1 M² Memasang lantai keramik ukuran (30 x 30 cm) setara IKAD
A.4.4.3.35.B
A. BAHAN : Keramik uk. 30 x 30 cm setara IKAD 1.0000
Semen 10.0000
Pasir Pasang 0.0450
Semen Warna 1.5000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350

298 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.5 1 M² Memasang lantai keramik ukuran (20 x 20 cm)


A.4.4.3.36.A
A. BAHAN : Keramik Sisi Kulit Jeruk 20 x 20 cm 1.0000
Semen 10.4000
Pasir Pasang 0.0450
Semen Warna 1.6200

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.5 1 M² Memasang lantai keramik ukuran (25 x 25 cm)


A.4.4.3.36.B
A. BAHAN : Keramik uk. 25 x 25 cm setara KAISAR 1.0000
Semen 10.4000
Pasir Pasang 0.0450
Semen Warna 1.6200

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.5 1 M² Pemasangan lantai parquet kayu


A.4.4.3.46.A
A. BAHAN : Parquet Jati uk. 1,5 x 15 x 30-120 1.0500
Lem kayu 0.6000

B. UPAH : KEPALA TUKANG BATU / BESI 0.0350


MANDOR 0.0350

299 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
LADEN TUKANG BATU / BESI 0.7000
TUKANG BATU / BESI 0.3500

Anl. IX.6 1 M² Memasang lantai Teakwood


A.4.4.3.46.B
A. BAHAN : Multipleks 9 mm 0.4000
Lem kayu 0.6000

B. UPAH : LADEN TUKANG KAYU / CAT 0.7000


TUKANG KAYU / CAT 0.3500
KEPALA TUKANG KAYU / CAT 0.0350
MANDOR 0.0350

Anl. IX.7 1 M² Memasang keramik Dinding ukuran (20 x 25 cm)


A.4.4.3.54.A
A. BAHAN : Keramik uk. 20 x 25 cm 1.0000
Semen 9.3000
Pasir Pasang 0.0180
Semen Warna 1.9400

B. UPAH : KEPALA TUKANG BATU / BESI 0.0450


MANDOR 0.0450
LADEN TUKANG BATU / BESI 0.9000
TUKANG BATU / BESI 0.4500

Anl. IX.8 1 M² Memasang keramik Dinding ukuran (30 x 30 cm)


A.4.4.3.54.B
A. BAHAN : Keramik uk. 30 x 30 cm setara IKAD 1.0000
Semen 9.3000
Pasir Pasang 0.0180
Semen Warna 1.9400

B. UPAH : KEPALA TUKANG BATU / BESI 0.0450


MANDOR 0.0450
LADEN TUKANG BATU / BESI 0.9000

300 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG BATU / BESI 0.4500

Anl. IX.7 1 M² Memasang keramik Dinding ukuran (25 x 40 cm)


A.4.4.3.54.C
A. BAHAN : Keramik uk. 25 x 40 cm setara KAISAR 1.0500
Semen 9.3000
Pasir Pasang 0.0180
Semen Warna 1.9400

B. UPAH : KEPALA TUKANG BATU / BESI 0.0450


MANDOR 0.0450
LADEN TUKANG BATU / BESI 0.9000
TUKANG BATU / BESI 0.4500

Anl. IX.8 1 M² Memasang keramik Dinding ukuran (30 x 60 cm)


A.4.4.3.54.D
A. BAHAN : Keramik uk. 30 x 60 cm setara ROMAN 1.0000
Semen 9.3000
Pasir Pasang 0.0180
Semen Warna 1.9400

B. UPAH : KEPALA TUKANG BATU / BESI 0.0450


MANDOR 0.0450
LADEN TUKANG BATU / BESI 0.9000
TUKANG BATU / BESI 0.4500

Anl. IX.7 1 M² Pemasangan HPL uk. 122cm x 244cm


A.4.4.3.60.B
A. BAHAN : HPL Taco New Natural Maple 0.3695
Lem Kuning 0.2500

B. UPAH : KEPALA TUKANG BATU / BESI 0.0170


MANDOR 0.0020
LADEN TUKANG BATU / BESI 0.3500

301 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG BATU / BESI 0.1750

X PEKERJAAN LANGIT-LANGIT (PLAFOND)

Anl. X.1 1 M² Pemasangan langit-langit tripleks ukuran (120x240) cm, tebal 3 mm


A.4.5.1.5.A
A. BAHAN : Multipleks 3 mm 0.3750
Paku triplek 0.0300
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.1000

Anl. X.2 1 M² Pemasangan langit-langit tripleks ukuran (120x240) cm, tebal 4 mm


A.4.5.1.5.B
A. BAHAN : Multipleks 4 mm 0.3750
Paku triplek 0.0300
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.1000

Anl. X.3 1 M² Pemasangan langit-langit tripleks ukuran (120x240) cm, tebal 6 mm


A.4.5.1.5.C
A. BAHAN : Multipleks 6 mm 0.3750
Paku triplek 0.0300
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.1000

302 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. X.3 1 M² Pemasangan langit-langit tripleks ukuran (120x240) cm, tebal 9 mm


A.4.5.1.5.D
A. BAHAN : Multipleks 9 mm 0.3750
Paku triplek 0.0300
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.1000

Anl. X.4 1 M² Pemasangan langit-langit gypsum board ukuran (120x240) cm, tebal 9 mm
A.4.5.1.7.A
A. BAHAN : Gip Sum (120x240)cm 0.3640
Paku Sekrup 0.1100
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.0100

Anl. X.4 1 M² Pemasangan langit-langit calsiboard ukuran (125 x 285) cm, tebal 12 mm
A.4.5.1.7.B
A. BAHAN : Err:509 0.3640
Paku Sekrup 0.1100
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.0100

303 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Anl. X.5 1 M² Pemasangan langit-langit akustik ukuran (30x60) cm
A.4.5.1.8.A
A. BAHAN : Err:509 5.8000
Paku triplek 0.0500
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0120
MANDOR 0.0060
LADEN TUKANG KAYU / CAT 0.1200
TUKANG KAYU / CAT 0.1200

Anl. X.6 1 M² Langit-langit Shunda Plafon


A.4.5.1.8.B
A. BAHAN : Plafon PVC 6 mm uk. 20 x 400 cm setara SHUNDA 1.3050
Paku triplek 0.0500
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.0100

Anl. X.7 1 M¹ Pemasangan list langit-langit kayu profil


A.4.5.1.9.A
A. BAHAN : List profil 1.0500
Paku Kayu 0.0100
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0030
LADEN TUKANG KAYU / CAT 0.0500
TUKANG KAYU / CAT 0.0500

Anl. X.8 1 M¹ List Shunda Plafon


A.4.5.1.9.B
A. BAHAN : List Shunda Plafon 1.0500
Perlengkapan 0.1000

304 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0030
LADEN TUKANG KAYU / CAT 0.0500
TUKANG KAYU / CAT 0.0500

Anl. X.9 1 M¹ List Profil Gypsum


A.4.5.1.9.C
A. BAHAN : List Gypsum 1.0500
Perlengkapan 0.1000
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0050
MANDOR 0.0030
LADEN TUKANG KAYU / CAT 0.0500
TUKANG KAYU / CAT 0.0500

XI PEKERJAAN PENUTUP ATAP

Anl. XI.1 1 M² Pemasangan genteng metal setara Emerald


A.4.5.2.32.A
A. BAHAN : Genteng Beton 1.0500
Paku Seng 0.0200
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0010
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.1000

Anl. XI.1 1 M² Pemasangan atap spandek


A.4.5.2.32.C
A. BAHAN : Spandek 0,35 BMT 1.0000
Paku Seng 0.0200
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100

305 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0010
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.1000

Anl. XI.1 1 M² Pemasangan atap Klip-Lok


A.4.5.2.32.B
A. BAHAN : Atap Klip-Lok 1.0000
Paku Seng 0.0200
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0010
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.1000

Anl. VIII.1 1 M² Pasang Atap Onduline 3 mm


A.4.5.2.32.C
BAHAN : Onduline 3 mm uk. 200 x 95 mm 0.5789
Paku Onduline 20.0000
`
UPAH : KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0010
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.1000

Anl. XI.2 1 M¹ Pemasangan nok genteng metal


A.4.5.2.36.A
A. BAHAN : Nok/ Rabung Seng 0,35 Tidak Dicat 0.6111
Paku Seng 0.0500
`
B. UPAH : KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0130
LADEN TUKANG KAYU / CAT 0.2500
TUKANG KAYU / CAT 0.1500

306 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XI.3 1 M¹ Pemasangan nok genteng metal cat pabrik


A.4.5.2.36.B
A. BAHAN : Nok/ Rabung Seng 0,35 Cat Pabrik 0.6111
Paku Seng 0.0600

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0150


MANDOR 0.0130
LADEN TUKANG KAYU / CAT 0.2500
TUKANG KAYU / CAT 0.1500

Anl. XI.4 1 M² Pemasangan atap seng gelombang


A.4.5.2.38
A. BAHAN : Seng Gelombang BJLS 30 0.7000
Paku Seng 0.0200

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0060


MANDOR 0.0060
LADEN TUKANG KAYU / CAT 0.1200
TUKANG KAYU / CAT 0.0600

Anl. XI.5 1 M² Pemasangan nok atap seng


A.4.5.2.39
A. BAHAN : Seng Plat BJLS 30 1.1340
Paku Seng 0.0400

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0070


MANDOR 0.0060
LADEN TUKANG KAYU / CAT 0.1500
TUKANG KAYU / CAT 0.0700

307 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

XII PEKERJAAN KAYU

Anl. XII.1 1 M³ Pembuatan dan pemasangan kusen pintu dan kusen jendela kayu kelas I
A.4.6.1.1
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 1.1000
Paku Kayu 1.2500
Lem kayu 1.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 2.1000


MANDOR 0.3500
LADEN TUKANG KAYU / CAT 7.0000
TUKANG KAYU / CAT 21.0000

Anl. XII.2 1 M³ Pembuatan dan pemasangan kusen pintu dan kusen jendela kayu kelas II
A.4.6.1.2.A
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 1.2000
Paku Kayu 1.2500
Lem kayu 1.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 1.8000


MANDOR 0.3000
LADEN TUKANG KAYU / CAT 6.0000
TUKANG KAYU / CAT 18.0000

Anl. XII.3 1 M³ Pembuatan dan pemasangan kusen pintu dan kusen jendela kayu kelas III
A.4.6.1.2.B
A. BAHAN : Kayu Klas III (Borneo/ dll) 1.2000
Paku Kayu 1.2500
Lem kayu 1.0000

B. UPAH : KEPALA TUKANG KAYU / CAT 1.8000


MANDOR 0.3000
LADEN TUKANG KAYU / CAT 6.0000
TUKANG KAYU / CAT 18.0000

308 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XII.4 1 M² Pembuatan dan pemasangan daun pintu panel, kayu kelas I
A.4.6.1.5.A
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 0.0400
Lem kayu 0.5000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.3000


MANDOR 0.0500
LADEN TUKANG KAYU / CAT 1.0000
TUKANG KAYU / CAT 3.0000

Anl. XII.5 1 M² Pembuatan dan pemasangan daun pintu panel, kayu kelas II
A.4.6.1.5.B
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0400
Lem kayu 0.5000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.3000


MANDOR 0.0500
LADEN TUKANG KAYU / CAT 1.0000
TUKANG KAYU / CAT 3.0000

Anl. XII.6 1 M² Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas II
A.4.6.1.6
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0240
Lem kayu 0.3000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.2400


MANDOR 0.0400
LADEN TUKANG KAYU / CAT 0.8000
TUKANG KAYU / CAT 2.4000

Anl. XII.7 1 M² Pemasangan jalusi kusen, kayu kelas II


A.4.6.1.10
A. BAHAN : Kayu Klas IV (Sengon/ dll) 0.0600

309 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Paku Kayu 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.2000


MANDOR 0.3350
LADEN TUKANG KAYU / CAT 0.6700
TUKANG KAYU / CAT 2.0000

Anl. XII.7 1 M³ Pemasangan konstruksi kuda-kuda konvensional kayu kelas II


A.4.6.1.13.A
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 1.1000
Besi strip 15.0000
Paku Kayu 5.6000

B. UPAH : LADEN TUKANG KAYU / CAT 4.0000


TUKANG KAYU / CAT 12.0000
KEPALA TUKANG KAYU / CAT 1.2000
MANDOR 0.2000

Anl. XII.7 1 M³ Pemasangan konstruksi rangka konvensional kayu kelas I


A.4.6.1.13.B
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 1.1000
Besi strip 15.0000
Paku Kayu 5.6000

B. UPAH : LADEN TUKANG KAYU / CAT 4.0000


TUKANG KAYU / CAT 12.0000
KEPALA TUKANG KAYU / CAT 1.2000
MANDOR 0.2000

Anl. XII.7 1 M³ Pemasangan konstruksi rangka konvensional kayu kelas II


A.4.6.1.13.C
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 1.1000
Besi strip 15.0000
Paku Kayu 5.6000

310 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

B. UPAH : LADEN TUKANG KAYU / CAT 4.0000


TUKANG KAYU / CAT 12.0000
KEPALA TUKANG KAYU / CAT 1.2000
MANDOR 0.2000

Anl. XII.7 1 M³ Pemasangan konstruksi gording kayu kelas II


A.4.6.1.15
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 1.1000
Besi strip 15.0000
Paku Kayu 3.0000

B. UPAH : LADEN TUKANG KAYU / CAT 6.7000


TUKANG KAYU / CAT 20.1000
KEPALA TUKANG KAYU / CAT 2.0100
MANDOR 0.3350

Anl. XII.8 1 M² Pemasangan rangka langit-langit (50x100) cm, kayu kelas III
A.4.6.1.19
A. BAHAN : Kayu Klas III (Borneo/ dll) 0.0154
Paku Kayu 0.2000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0300


MANDOR 0.0750
LADEN TUKANG KAYU / CAT 0.1500
TUKANG KAYU / CAT 0.3000

Anl. XII.9 1 M² Pemasangan rangka langit-langit (60x60) cm, kayu kelas II


A.4.6.1.20.A
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0163
Paku Kayu 0.2500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0300


MANDOR 0.0100

311 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.3000

Anl. XII.10 1 M² Pemasangan rangka langit-langit (60x60) cm, kayu kelas III
A.4.6.1.20.B
A. BAHAN : Kayu Klas III (Borneo/ dll) 0.0163
Paku Kayu 0.2500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0300


MANDOR 0.0100
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.3000

Anl. XII.11 1 M¹ Pemasangan lisplank ukuran (3x20) cm, kayu kelas I


A.4.6.1.21.A
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 0.0108
Paku Kayu 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0200


MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.2000

Anl. XII.12 1 M¹ Pemasangan lisplank ukuran (3x20) cm, kayu kelas II


A.4.6.1.21.B
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0108
Paku Kayu 0.1000

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0200


MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.2000

312 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XII.13 1 M¹ Pemasangan lisplank ukuran (3x30) cm, kayu kelas I


A.4.6.1.22.A
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 0.0110
Paku Kayu 0.0500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0200


MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.2000

Anl. XII.14 1 M¹ Pemasangan lisplank ukuran (3x30) cm, kayu kelas II


A.4.6.1.22.B
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0110
Paku Kayu 0.0500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0200


MANDOR 0.0050
LADEN TUKANG KAYU / CAT 0.1000
TUKANG KAYU / CAT 0.2000

Anl. XII.15 1 M² Pemasangan rangka dinding pemisah (60x120) cm kayu kelas III
A.4.6.1.23
A. BAHAN : Kayu Klas III (Borneo/ dll) 0.0280
Paku Kayu 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0450


MANDOR 0.0080
LADEN TUKANG KAYU / CAT 0.1500
TUKANG KAYU / CAT 0.4500

Anl. XII.16 1 M² Pemasangan dinding pemisah Plywood rangkap

313 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
A.4.6.1.25.B
A. BAHAN : Paku Kayu 0.1500
Multipleks 9 mm 0.8600
Lem kayu 0.5600

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0600


MANDOR 0.0100
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.6000

Anl. XII.16 1 M² Pemasangan dinding pemisah Gypsum rangkap


A.4.6.1.25.C
A. BAHAN : Paku Kayu 0.1500
Gip Sum (120x240)cm 0.8600
Lem kayu 0.5600

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0600


MANDOR 0.0100
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.6000

SNI.3434.2008-6.1 1 M² Pemasangan Kayu Kusen Kelas 1


A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 1.1000
Lem kayu 0.5600
paku 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.0600


MANDOR 0.0100
LADEN TUKANG KAYU / CAT 0.2000
TUKANG KAYU / CAT 0.6000
Anl. XII.16 1 M² Pemasangan dinding lambrisering dari papan kayu kelas I
A.4.6.1.26.A
A. BAHAN : Kayu Klas I (Seumantok/ Ulin/ dll) 0.0070
Paku Kayu 0.1000
Paku Sekrup 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.1800


MANDOR 0.0300
LADEN TUKANG KAYU / CAT 0.6000

314 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
TUKANG KAYU / CAT 1.8000

Anl. XII.16 1 M² Pemasangan dinding lambrisering dari papan kayu kelas II


A.4.6.1.26.B
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0070
Paku Kayu 0.1000
Paku Sekrup 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.1800


MANDOR 0.0300
LADEN TUKANG KAYU / CAT 0.6000
TUKANG KAYU / CAT 1.8000

Anl. XII.16 1 M² Pemasangan lantai dari papan kayu kelas II


A.4.6.1.26.C
A. BAHAN : Kayu Klas II (Kamper/ Kruing/ dll) 0.0070
Paku Kayu 0.1000
Paku Sekrup 0.1500

B. UPAH : KEPALA TUKANG KAYU / CAT 0.1800


MANDOR 0.0300
LADEN TUKANG KAYU / CAT 0.6000
TUKANG KAYU / CAT 1.8000

XIII PEKERJAAN KUNCI DAN KACA

Anl. XIII.1 1 Bh Pemasangan kunci tanam biasa


A.4.6.2.2
A. BAHAN : Kunci Pintu 1.0000
`

315 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
B. UPAH : LADEN TUKANG KAYU / CAT 0.0100
TUKANG KAYU / CAT 0.5000
KEPALA TUKANG KAYU / CAT 0.0500
MANDOR 0.0050

Anl. XIII.2 1 Bh Pasang kunci kamar mandi


A.4.6.2.3
A. BAHAN : Kunci Pintu Kamar Mandi 1.0000
`
B. UPAH : LADEN TUKANG KAYU / CAT 0.0050
TUKANG KAYU / CAT 0.5000
KEPALA TUKANG KAYU / CAT 0.0500
MANDOR 0.0030

Anl. XIII.3 1 Bh Pemasangan engsel pintu


A.4.6.2.5
A. BAHAN : Engsel Pintu 0.5000
`
B. UPAH : LADEN TUKANG KAYU / CAT 0.0150
TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0008

Anl. XIII.4 1 Bh Pemasang engsel jendela kupu-kupu


A.4.6.2.6
A. BAHAN : Engsel Jendela 0.5000
`
B. UPAH : LADEN TUKANG KAYU / CAT 0.0100
TUKANG KAYU / CAT 0.1000
KEPALA TUKANG KAYU / CAT 0.0100
MANDOR 0.0005

316 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XIII.5 1 Bh Pemasang spring knip


A.4.6.2.6
A. BAHAN : Spring Knip 379 Solid 1.0000
`
B. UPAH : LADEN TUKANG KAYU / CAT 0.0150
TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0080

Anl. XIII.6 1 Bh Pemasangan kait angin


A.4.6.2.9
A. BAHAN : Hak Angin 1.0000
`
B. UPAH : LADEN TUKANG KAYU / CAT 0.0150
TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0080

Anl. XIII.7 1 Bh Pemasangan kunci slot


A.4.6.2.11
A. BAHAN : Kunci Slot Besi 1.0000

B. UPAH : LADEN TUKANG KAYU / CAT 0.0200


TUKANG KAYU / CAT 0.2000
KEPALA TUKANG KAYU / CAT 0.0200
MANDOR 0.0010

Anl. XIII.8 1 M² Pemasangan kaca bening tebal 5 mm


A.4.6.2.17.A
A. BAHAN : Kaca Bening uk. 5 mm 1.1000
Sealant 0.0500

317 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
B. UPAH : LADEN TUKANG KAYU / CAT 0.0150
TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0008

Anl. XIII.8 1 M² Pemasangan kaca rayband tebal 5 mm


A.4.6.2.17.B
A. BAHAN : Kaca Raybend uk. 5 mm 1.1000
Sealant 0.0500

B. UPAH : LADEN TUKANG KAYU / CAT 0.0150


TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0008

Anl. XIII.9 1 M² Pemasangan kaca tempered tebal 12 mm


A.4.6.2.19
A. BAHAN : Kaca clear tempered 12 mm 1.1000
Sealant 0.0700

B. UPAH : LADEN TUKANG KAYU / CAT 0.0150


TUKANG KAYU / CAT 0.1500
KEPALA TUKANG KAYU / CAT 0.0150
MANDOR 0.0008

XIV PEKERJAAN PENGECATAN

Anl. XIV.1 1 M² Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.4
A. BAHAN : Cat Menie 0.2000
Plamir Kayu 0.1500
Cat Kayu Dasar 0.1700
Cat Kayu Mengkilat 0.2600
Kuas 4" setara ETERNA 0.0100

318 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Minyak Cat 0.0300
Kertas Amplas 0.2000

B. UPAH : LADEN TUKANG KAYU / CAT 0.0700


TUKANG KAYU / CAT 0.0090
KEPALA TUKANG KAYU / CAT 0.0060
MANDOR 0.0030

Anl. XIV.2 1 M² Pelaburan bidang kayu dengan cat residu dan ter
A.4.7.1.8
A. BAHAN : Residu 0.3500

B. UPAH : LADEN TUKANG KAYU / CAT 0.1000


MANDOR 0.0060

Anl. XIV.3 1 M² Pengecetan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.10
A. BAHAN : Plamur Tembok 0.1000
Cat Dasar Tembok 0.1000
Cat Tembok setara Jotun 0.2600

B. UPAH : LADEN TUKANG KAYU / CAT 0.0200


TUKANG KAYU / CAT 0.0630
KEPALA TUKANG KAYU / CAT 0.0063
MANDOR 0.0030

Anl. XIV.4 1 M² Pengecetan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.11
A. BAHAN : Cat Dasar Tembok 0.1200
Cat Tembok setara Jotun 0.1800

B. UPAH : LADEN TUKANG KAYU / CAT 0.0280


TUKANG KAYU / CAT 0.0420
KEPALA TUKANG KAYU / CAT 0.0042

319 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
MANDOR 0.0030

Anl. XIV.5 1 M² Waterproofing SIKATOP 107 SEAL (2 lapis)


A.4.7.1.21
A. BAHAN : Sika TOP 2.0000

B. UPAH : LADEN TUKANG KAYU / CAT 0.0280


TUKANG KAYU / CAT 0.0420
KEPALA TUKANG KAYU / CAT 0.0042
MANDOR 0.0030

Anl. XIV.6 1 M² SIKA WATERPROOFING MORTAL (2 lapis)


A.4.7.1.22
A. BAHAN : Sika Waterproofing 4.0000

B. UPAH : LADEN TUKANG KAYU / CAT 0.0280


TUKANG KAYU / CAT 0.0420
KEPALA TUKANG KAYU / CAT 0.0042
MANDOR 0.0030

Anl. XIV.7 1 M² Pengecatan permukaan baja dengan menie besi


A.4.7.1.16
A. BAHAN : Cat Menie 0.1000
Kuas 4" setara ETERNA 0.0100

B. UPAH : LADEN TUKANG KAYU / CAT 0.0200


TUKANG KAYU / CAT 0.2000
KEPALA TUKANG KAYU / CAT 0.0200
MANDOR 0.0025

320 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Anl. XIV.8 1 M² Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
A.4.7.1.19
A. BAHAN : Cat Menie 0.1000
Kuas 4" setara ETERNA 0.0100
Minyak Cat 0.0100

B. UPAH : LADEN TUKANG KAYU / CAT 0.0600


TUKANG KAYU / CAT 0.0600
KEPALA TUKANG KAYU / CAT 0.0120
MANDOR 0.0030

XV PEKERJAAN SANITASI

Anl. XIII.2 1 Bh Pemasangan closet duduk/ monoblock setara TOTO


A.5.1.1.1
A. BAHAN : Kloset Duduk Keramik setara TOTO 1.0000
Perlengkapan 6.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0010
MANDOR 0.1600
LADEN TUKANG BATU / BESI 3.3000
TUKANG BATU / BESI 1.1000

Anl. XIII.1 1 Bh Pemasangan closet jongkok keramik setara TOTO


A.5.1.1.2
A. BAHAN : Kloset Jongkok Keramik setara TOTO 1.0000
Semen 6.0000
Pasir Pasang 0.0100
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1500
MANDOR 0.1600
LADEN TUKANG BATU / BESI 1.0000
TUKANG BATU / BESI 1.5000

321 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Anl. XIII.3 1 Bh Pemasangan urinoir
A.5.1.1.4
A. BAHAN : Urinoir Keramik 1.0000
Perlengkapan 30.0000
Semen 6.0000
Pasir Pasang 0.0100
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1000
MANDOR 0.0500
LADEN TUKANG BATU / BESI 1.0000
TUKANG BATU / BESI 1.0000

Anl. XIII.4 1 Bh Pemasangan wastafel setara TOTO


A.5.1.1.5
A. BAHAN : Spacer / Formite 1.0000
Kloset Jongkok Keramik setara TOTO 12.0000
Semen 6.0000
Pasir Pasang 0.0100
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1500
MANDOR 0.0600
LADEN TUKANG BATU / BESI 1.2000
TUKANG BATU / BESI 1.4500

Anl. XIII.4 1 Bh Pemasangan wastafel setara TOTO + Cermin


A.5.1.1.5.B
A. BAHAN : Westafel setara TOTO 1.0000
Cermin Setara Toto 1.0000
Perlengkapan 12.0000
Semen 6.0000
Pasir Pasang 0.0100
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1500
MANDOR 0.0600
LADEN TUKANG BATU / BESI 1.2000
TUKANG BATU / BESI 1.4500

322 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XIII.4 1 Bh Pemasangan bak fibreglass


A.5.1.1.7
A. BAHAN : Bak Mandi Fibre 1.0000
Perlengkapan 12.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0500
MANDOR 0.9000
LADEN TUKANG BATU / BESI 3.0000
TUKANG BATU / BESI 4.5000

Anl. XIII.4 1 Bh Pemasangan bak mandi batu bata vol 0,30 m3


A.5.1.1.8
A. BAHAN : Batu Bata/ Tela 150.0000
Semen 120.0000
Pasir Pasang 0.3000
Keramik uk. 30 x 30 cm setara Platinum 4.3560
Semen Warna 6.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.3000
MANDOR 0.0300
LADEN TUKANG BATU / BESI 6.0000
TUKANG BATU / BESI 3.0000

Anl. XIII.10 1 BH Pemasangan floor drain


A.5.1.1.14
A. BAHAN : Floor drain 1.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0100
MANDOR 0.0050
LADEN TUKANG BATU / BESI 0.0100
TUKANG BATU / BESI 0.1000

323 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XIII.5 1 Bh Pasang bak kontrol pasangan batu bata ukuran 30 x 30 cm tinggi 50 cm
A.5.1.1.16
A. BAHAN : Batu Bata/ Tela 70.0000
Semen 77.0000
Pasir Pasang 0.1300
Pasir Beton/ Kerikil 0.0200
Besi Beton Polos 2.6000
Pasir Beton/ Kerikil 0.0900
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0110
MANDOR 0.0160
LADEN TUKANG BATU / BESI 3.2000
TUKANG BATU / BESI 1.1500

Anl. XIII.9 1 BH Pemasangan kran diameter 1/2" atau 3/4"


A.5.1.1.19
A. BAHAN : Kran air 3/4 atau 1/2 setara San Ei 1.0000
Seal tape 0.0250
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0400
MANDOR 0.0050
LADEN TUKANG BATU / BESI 0.0100
TUKANG BATU / BESI 0.4000

Anl. XIII.6 1 M¹ Pemasangan pipa PVC diameter 1/2" Kualitas AWE (United)
A.5.1.1.25
A. BAHAN : Pipa PVC Ø ½" Kualitas AWE (United) 0.2400
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0060
MANDOR 0.0020
LADEN TUKANG BATU / BESI 0.0360
TUKANG BATU / BESI 0.0600

324 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3

Anl. XIII.6 1 M¹ Pasang PVC Diameter 3/4"


A.5.1.1.26
A. BAHAN : Pipa PVC Ø ¾" 0.2400
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0060
MANDOR 0.0018
LADEN TUKANG BATU / BESI 0.0360
TUKANG BATU / BESI 0.0600

Anl. XIII.6 1 M¹ Pasang PVC Diameter 1"


A.5.1.1.27
A. BAHAN : Pipa PVC Ø 1" 0.2400
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0060
MANDOR 0.0020
LADEN TUKANG BATU / BESI 0.0360
TUKANG BATU / BESI 0.0600

Anl. XIII.7 1 M¹ Pasang pipa PVC tipe AW diameter 2 "


A.5.1.1.29
A. BAHAN : Pipa PVC Ø 2" 0.2400
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.0090
MANDOR 0.0027
LADEN TUKANG BATU / BESI 0.0540
TUKANG BATU / BESI 0.0900

Anl. XIII.8 1 M¹ Pasang pipa PVC tipe AW diameter 3 "


A.5.1.1.31
A. BAHAN : Pipa PVC Ø 3" 0.2400

325 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1350
MANDOR 0.0041
LADEN TUKANG BATU / BESI 0.0810
TUKANG BATU / BESI 0.1350

Anl. XIII.8 1 M¹ Pasang pipa PVC diameter 4


A.5.1.1.32
A. BAHAN : Pipa PVC Ø 4" 0.2400
Perlengkapan 35.0000
`
B. UPAH : KEPALA TUKANG BATU / BESI 0.1350
MANDOR 0.0041
LADEN TUKANG BATU / BESI 0.0810
TUKANG BATU / BESI 0.1350

XVI TAKSIR

1 M² Panel ACP Lengkap Terpasang


T.01
A. BAHAN : Panel ACP Merk Seven Tipe PVDF, t = 4 mm 1.0000
Ongkos Kirim Barang dari Surabaya 4.0000
Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, 1.0000
dinding partisi

B. UPAH : Biaya Pemasangan

1 M² Curtain Wall Lengkap Terpasang


T.02
A. BAHAN : Kaca Panasap 8 mm 1.1000
Ongkos Kirim Barang dari Surabaya 4.0000
Kusen Pintu Aluminium 4.0000

326 dari 391


ANALISA HARGA SATUAN

No URAIAN PEKERJAAN KOEFISIEN

1 2 3
B. UPAH : Biaya Pemasangan 1.0000

*) Overhead = 0%

327 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 477,678.00
btg Rp 40,000.00 Rp 50,000.00
kg Rp 1,400.00 Rp 3,500.00
m² Rp 49,200.00 Rp 78,720.00
m³ Rp 153,000.00 Rp 765.00
m³ Rp 153,000.00 Rp 1,377.00
m³ Rp 3,918,000.00 Rp 282,096.00
kg Rp 17,000.00 Rp 1,020.00
JUMLAH A Rp 417,478.00
OH Rp 100,000.00 Rp 2,000.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 40,000.00
OH Rp 80,000.00 Rp 16,000.00
JUMLAH B Rp 60,200.00
Jumlah (A+B) Rp 477,678.00
Overhead Rp -
Total Rp 477,678.00

Rp 124,838.00
m³ Rp 6,456,000.00 Rp 77,472.00
kg Rp 17,000.00 Rp 340.00
m³ Rp 3,918,000.00 Rp 27,426.00
JUMLAH A Rp 105,238.00
OH Rp 100,000.00 Rp 500.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 10,000.00
OH Rp 80,000.00 Rp 8,000.00
JUMLAH B Rp 19,600.00
Jumlah (A+B) Rp 124,838.00
Overhead Rp -
Total Rp 124,838.00

Rp 1,425,666.00
btg Rp 40,000.00 Rp 50,000.00
m³ Rp 3,918,000.00 Rp 705,240.00
kg Rp 17,000.00 Rp 1,360.00
kg Rp 20,000.00 Rp 22,000.00
kg Rp 1,400.00 Rp 49,000.00
m³ Rp 153,000.00 Rp 15,300.00
m³ Rp 530,000.00 Rp 79,500.00
Bh Rp 700.00 Rp 21,000.00

328 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
m² Rp 30,000.00 Rp 21,600.00
m² Rp 610,080.00 Rp 122,016.00
m² Rp 61,500.00 Rp 4,920.00
buah Rp 147,000.00 Rp 22,050.00
lembar Rp 78,000.00 Rp 4,680.00
JUMLAH A Rp 1,118,666.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 110,000.00 Rp 22,000.00
OH Rp 100,000.00 Rp 200,000.00
OH Rp 80,000.00 Rp 80,000.00
JUMLAH B Rp 307,000.00
Jumlah (A+B) Rp 1,425,666.00
Overhead Rp -
Total Rp 1,425,666.00

Rp 1,210,114.00
btg Rp 40,000.00 Rp 50,000.00
m³ Rp 3,918,000.00 Rp 728,748.00
kg Rp 17,000.00 Rp 5,100.00
kg Rp 1,400.00 Rp 25,200.00
m³ Rp 153,000.00 Rp 4,590.00
m³ Rp 530,000.00 Rp 26,500.00
m² Rp 49,200.00 Rp 62,976.00
lembar Rp 78,000.00 Rp 105,300.00
JUMLAH A Rp 903,114.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 110,000.00 Rp 22,000.00
OH Rp 100,000.00 Rp 200,000.00
OH Rp 80,000.00 Rp 80,000.00
JUMLAH B Rp 307,000.00
Jumlah (A+B) Rp 1,210,114.00
Overhead Rp -
Total Rp 1,210,114.00

Rp 13,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 8,000.00
Jumlah Rp 13,000.00
Overhead Rp -
Total Rp 13,000.00

Rp 1,133,320.00
OH Rp 80,000.00 Rp 1,066,720.00

329 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 66,600.00
Jumlah Rp 1,133,320.00
Overhead Rp -
Total Rp 1,133,320.00

Rp 566,660.00
OH Rp 80,000.00 Rp 533,360.00
OH Rp 100,000.00 Rp 33,300.00
Jumlah Rp 566,660.00
Overhead Rp -
Total Rp 566,660.00

Rp 62,500.00
OH Rp 100,000.00 Rp 2,500.00
OH Rp 80,000.00 Rp 60,000.00
Jumlah Rp 62,500.00
Overhead Rp -
Total Rp 62,500.00

Rp 76,500.00
OH Rp 100,000.00 Rp 4,500.00
OH Rp 80,000.00 Rp 72,000.00
Jumlah Rp 76,500.00
Overhead Rp -
Total Rp 76,500.00

Rp 45,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 40,000.00
Jumlah Rp 45,000.00
Overhead Rp -
Total Rp 45,000.00

Rp 45,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 40,000.00
A.4.1.1.4 Rp 45,000.00
Overhead Rp -
Total Rp 45,000.00

330 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 145,000.00
m³ Rp 100,000.00 Rp 120,000.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 24,000.00
Jumlah Rp 145,000.00
Overhead Rp -
Total Rp 145,000.00

Rp 97,600.00
m³ Rp 60,500.00 Rp 72,600.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 24,000.00
Jumlah Rp 97,600.00
Overhead Rp -
Total Rp 97,600.00

Rp 317,700.00
m³ Rp 246,000.00 Rp 295,200.00
OH Rp 100,000.00 Rp 2,500.00
OH Rp 80,000.00 Rp 20,000.00
Jumlah Rp 317,700.00
Overhead Rp -
Total Rp 317,700.00

Rp 743,500.00
m³ Rp 150,000.00 Rp 180,000.00
kg Rp 1,400.00 Rp 280,000.00
m³ Rp 150,000.00 Rp 72,750.00
JUMLAH A Rp 532,750.00
OH Rp 110,000.00 Rp 8,250.00
OH Rp 100,000.00 Rp 7,500.00
OH Rp 80,000.00 Rp 120,000.00
OH Rp 100,000.00 Rp 75,000.00
JUMLAH B Rp 210,750.00
Jumlah (A+B) Rp 743,500.00
Overhead Rp -
Total Rp 743,500.00

331 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Rp 696,950.00
m³ Rp 150,000.00 Rp 180,000.00
kg Rp 1,400.00 Rp 228,200.00
m³ Rp 150,000.00 Rp 78,000.00
JUMLAH A Rp 486,200.00
OH Rp 110,000.00 Rp 8,250.00
OH Rp 100,000.00 Rp 7,500.00
OH Rp 80,000.00 Rp 120,000.00
OH Rp 100,000.00 Rp 75,000.00
JUMLAH B Rp 210,750.00
Jumlah (A+B) Rp 696,950.00
Overhead Rp -
Total Rp 696,950.00

Rp 332,790.00
m³ Rp 150,000.00 Rp 180,000.00
m³ Rp 100,000.00 Rp 43,200.00
JUMLAH A Rp 223,200.00
OH Rp 110,000.00 Rp 4,290.00
OH Rp 100,000.00 Rp 3,900.00
OH Rp 80,000.00 Rp 62,400.00
OH Rp 100,000.00 Rp 39,000.00
JUMLAH B Rp 109,590.00
Jumlah (A+B) Rp 332,790.00
Overhead Rp -
Total Rp 332,790.00

p, 60% beton campuran 1PP : 2PB : 3Kr dan 40% batu belah
Rp 880,490.00
m³ Rp 150,000.00 Rp 72,000.00
kg Rp 1,400.00 Rp 271,600.00
m³ Rp 153,000.00 Rp 47,736.00
m³ Rp 153,000.00 Rp 71,604.00
kg Rp 19,000.00 Rp 34,200.00
JUMLAH A Rp 497,140.00
OH Rp 110,000.00 Rp 9,350.00
OH Rp 100,000.00 Rp 17,000.00
OH Rp 80,000.00 Rp 272,000.00
OH Rp 100,000.00 Rp 85,000.00
JUMLAH B Rp 383,350.00
Jumlah (A+B) Rp 880,490.00
Overhead Rp -
Total Rp 880,490.00

332 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Rp 751,140.00
m³ Rp 150,000.00 Rp 67,500.00
kg Rp 1,400.00 Rp 271,600.00
m³ Rp 153,000.00 Rp 47,736.00
m³ Rp 153,000.00 Rp 71,604.00
JUMLAH A Rp 458,440.00
OH Rp 110,000.00 Rp 8,800.00
OH Rp 100,000.00 Rp 11,900.00
OH Rp 80,000.00 Rp 192,000.00
OH Rp 100,000.00 Rp 80,000.00
JUMLAH B Rp 292,700.00
Jumlah (A+B) Rp 751,140.00
Overhead Rp -
Total Rp 751,140.00

Rp 724,869.00
kg Rp 1,400.00 Rp 345,800.00
m³ Rp 153,000.00 Rp 94,969.29
m³ Rp 153,000.00 Rp 113,220.00
ltr Rp 100.00 Rp -
JUMLAH A Rp 553,989.29
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 724,869.29
Overhead Rp -
Total Rp 724,869.29

Rp 660,185.00
kg Rp 1,400.00 Rp 322,000.00
m³ Rp 153,000.00 Rp 97,592.14
m³ Rp 153,000.00 Rp 116,393.33
ltr Rp 100.00 Rp -
JUMLAH A Rp 535,985.48
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 6,000.00
OH Rp 80,000.00 Rp 96,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 124,200.00

333 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 660,185.48
Overhead Rp -
Total Rp 660,185.48

Rp 826,957.00
kg Rp 1,400.00 Rp 456,400.00
m³ Rp 153,000.00 Rp 83,057.14
m³ Rp 153,000.00 Rp 116,620.00
ltr Rp 100.00 Rp -
JUMLAH A Rp 656,077.14
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 826,957.14
Overhead Rp -
Total Rp 826,957.14

Rp 860,415.00
kg Rp 1,400.00 Rp 492,800.00
m³ Rp 153,000.00 Rp 79,887.86
m³ Rp 153,000.00 Rp 116,846.67
ltr Rp 100.00 Rp -
JUMLAH A Rp 689,534.52
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 860,414.52
Overhead Rp -
Total Rp 860,414.52

Rp 885,221.00
kg Rp 1,400.00 Rp 519,400.00
m³ Rp 153,000.00 Rp 76,281.43
m³ Rp 153,000.00 Rp 118,660.00
ltr Rp 100.00 Rp -
JUMLAH A Rp 714,341.43
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00

334 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 885,221.43
Overhead Rp -
Total Rp 885,221.43

Rp 901,859.00
kg Rp 1,400.00 Rp 537,600.00
m³ Rp 153,000.00 Rp 75,625.71
m³ Rp 153,000.00 Rp 117,753.33
ltr Rp 100.00 Rp -
JUMLAH A Rp 730,979.05
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 901,859.05
Overhead Rp -
Total Rp 901,859.05

Rp 930,311.00
kg Rp 1,400.00 Rp 568,400.00
m³ Rp 153,000.00 Rp 74,751.43
m³ Rp 153,000.00 Rp 116,280.00
ltr Rp 100.00 Rp -
JUMLAH A Rp 759,431.43
OH Rp 110,000.00 Rp 3,080.00
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 930,311.43
Overhead Rp -
Total Rp 930,311.43

Rp 939,217.00
kg Rp 1,400.00 Rp 578,200.00
m³ Rp 153,000.00 Rp 74,423.57
m³ Rp 153,000.00 Rp 115,713.33
ltr Rp 100.00 Rp -
JUMLAH A Rp 768,336.90
OH Rp 110,000.00 Rp 3,080.00

335 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 8,300.00
OH Rp 80,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 27,500.00
JUMLAH B Rp 170,880.00
Jumlah (A+B) Rp 939,216.90
Overhead Rp -
Total Rp 939,216.90

Rp 16,677.00
kg Rp 14,300.00 Rp 150,150.00
kg Rp 19,000.00 Rp 2,850.00
JUMLAH A Rp 153,000.00
OH Rp 110,000.00 Rp 770.00
OH Rp 100,000.00 Rp 400.00
OH Rp 80,000.00 Rp 5,600.00
OH Rp 100,000.00 Rp 7,000.00
JUMLAH B Rp 13,770.00
Jumlah (A+B) Rp 166,770.00
Untuk 1 Kg besi Rp 16,677.00
Overhead Rp -
Total Rp 16,677.00

Rp 21,297.00
kg Rp 18,700.00 Rp 196,350.00
kg Rp 19,000.00 Rp 2,850.00
JUMLAH A Rp 199,200.00
OH Rp 110,000.00 Rp 770.00
OH Rp 100,000.00 Rp 400.00
OH Rp 80,000.00 Rp 5,600.00
OH Rp 100,000.00 Rp 7,000.00
JUMLAH B Rp 13,770.00
Jumlah (A+B) Rp 212,970.00
Untuk 1 Kg besi Rp 21,297.00
Overhead Rp -
Total Rp 21,297.00

Rp 21,019.00
kg Rp 19,793.01 Rp 201,888.75
kg Rp 19,000.00 Rp 950.00
JUMLAH A Rp 202,838.75
OH Rp 110,000.00 Rp 2,750.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 2,000.00

336 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 2,500.00
JUMLAH B Rp 7,350.00
Jumlah (A+B) Rp 210,188.75
Untuk 1 Kg Rp 21,018.87
Overhead Rp -
Total Rp 21,018.87

Rp 16,988.00
kg Rp 15,840.93 Rp 161,577.46
kg Rp 19,000.00 Rp 950.00
JUMLAH A Rp 162,527.46
OH Rp 110,000.00 Rp 2,750.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 2,000.00
OH Rp 100,000.00 Rp 2,500.00
JUMLAH B Rp 7,350.00
Jumlah (A+B) Rp 169,877.46
Untuk 1 Kg Rp 16,987.75
Overhead Rp -
Total Rp 16,987.75

Rp 17,263.00
kg Rp 16,110.47 Rp 164,326.81
kg Rp 19,000.00 Rp 950.00
JUMLAH A Rp 165,276.81
OH Rp 110,000.00 Rp 2,750.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 2,000.00
OH Rp 100,000.00 Rp 2,500.00
JUMLAH B Rp 7,350.00
Jumlah (A+B) Rp 172,626.81
Untuk 1 Kg Rp 17,262.68
Overhead Rp -
Total Rp 17,262.68

Rp 18,319.00
kg Rp 17,145.73 Rp 174,886.48
kg Rp 19,000.00 Rp 950.00
JUMLAH A Rp 175,836.48
OH Rp 110,000.00 Rp 2,750.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 2,000.00
OH Rp 100,000.00 Rp 2,500.00

337 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
JUMLAH B Rp 7,350.00
Jumlah (A+B) Rp 183,186.48
Untuk 1 Kg Rp 18,318.65
Overhead Rp -
Total Rp 18,318.65

Rp 16,988.00
kg Rp 15,840.75 Rp 161,575.66
kg Rp 19,000.00 Rp 950.00
JUMLAH A Rp 162,525.66
OH Rp 110,000.00 Rp 2,750.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 2,000.00
OH Rp 100,000.00 Rp 2,500.00
JUMLAH B Rp 7,350.00
Jumlah (A+B) Rp 169,875.66
Untuk 1 Kg Rp 16,987.57
Overhead Rp -
Total Rp 16,987.57

Rp 235,600.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 5,100.00
ltr Rp 7,200.00 Rp 720.00
JUMLAH A Rp 162,540.00
OH Rp 110,000.00 Rp 2,860.00
OH Rp 100,000.00 Rp 2,600.00
OH Rp 80,000.00 Rp 41,600.00
OH Rp 100,000.00 Rp 26,000.00
JUMLAH B Rp 73,060.00
Jumlah (A+B) Rp 235,600.00
Overhead Rp -
Total Rp 235,600.00

Rp 78,533.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 5,100.00
ltr Rp 7,200.00 Rp 720.00
JUMLAH A Rp 54,180.00
OH Rp 110,000.00 Rp 2,860.00
OH Rp 100,000.00 Rp 2,600.00
OH Rp 80,000.00 Rp 41,600.00
OH Rp 100,000.00 Rp 26,000.00

338 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
JUMLAH B Rp 24,353.33
Jumlah (A+B) Rp 78,533.33
Overhead Rp -
Total Rp 78,533.33

Rp 255,190.00
m³ Rp 3,918,000.00 Rp 176,310.00
kg Rp 17,000.00 Rp 5,100.00
ltr Rp 7,200.00 Rp 720.00
JUMLAH A Rp 182,130.00
OH Rp 110,000.00 Rp 2,860.00
OH Rp 100,000.00 Rp 2,600.00
OH Rp 80,000.00 Rp 41,600.00
OH Rp 100,000.00 Rp 26,000.00
JUMLAH B Rp 73,060.00
Jumlah (A+B) Rp 255,190.00
Overhead Rp -
Total Rp 255,190.00

Rp 164,125.00
m³ Rp 3,918,000.00 Rp 176,310.00
kg Rp 17,000.00 Rp 5,100.00
ltr Rp 7,200.00 Rp 720.00
JUMLAH A Rp 91,065.00
OH Rp 110,000.00 Rp 2,860.00
OH Rp 100,000.00 Rp 2,600.00
OH Rp 80,000.00 Rp 41,600.00
OH Rp 100,000.00 Rp 26,000.00
JUMLAH B Rp 73,060.00
Jumlah (A+B) Rp 164,125.00
Overhead Rp -
Total Rp 164,125.00

Rp 133,770.00
m³ Rp 3,918,000.00 Rp 176,310.00
kg Rp 17,000.00 Rp 5,100.00
ltr Rp 7,200.00 Rp 720.00
JUMLAH A Rp 60,710.00
OH Rp 110,000.00 Rp 2,860.00
OH Rp 100,000.00 Rp 2,600.00
OH Rp 80,000.00 Rp 41,600.00
OH Rp 100,000.00 Rp 26,000.00
JUMLAH B Rp 73,060.00

339 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 133,770.00
Overhead Rp -
Total Rp 133,770.00

Rp 312,550.00
m³ Rp 3,918,000.00 Rp 117,540.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 116,800.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 120,000.00
Buah Rp 29,760.00 Rp 119,040.00
JUMLAH A Rp 266,185.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 46,365.00
Jumlah (A+B) Rp 312,550.00
Overhead Rp -
Total Rp 312,550.00

Rp 208,367.00
m³ Rp 3,918,000.00 Rp 117,540.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 116,800.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 120,000.00
Buah Rp 29,760.00 Rp 119,040.00
JUMLAH A Rp 177,456.67
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 30,910.00
Jumlah (A+B) Rp 208,366.67
Overhead Rp -
Total Rp 208,366.67

Rp 284,385.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00

340 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 87,600.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 80,000.00
JUMLAH A Rp 191,655.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 284,385.00
Overhead Rp -
Total Rp 284,385.00

Rp 220,500.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 87,600.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 80,000.00
JUMLAH A Rp 127,770.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 220,500.00
Overhead Rp -
Total Rp 220,500.00

Rp 246,780.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 105,120.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 80,000.00
JUMLAH A Rp 200,415.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 46,365.00

341 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 246,780.00
Overhead Rp -
Total Rp 246,780.00

Rp 164,520.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 5,840,000.00 Rp 105,120.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 80,000.00
JUMLAH A Rp 133,610.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 30,910.00
Jumlah (A+B) Rp 164,520.00
Overhead Rp -
Total Rp 164,520.00

Rp 349,970.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 3,918,000.00 Rp 58,770.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 240,000.00
JUMLAH A Rp 257,240.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 349,970.00
Overhead Rp -
Total Rp 349,970.00

Rp 264,223.00
m³ Rp 3,918,000.00 Rp 156,720.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
m³ Rp 3,918,000.00 Rp 58,770.00

342 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 240,000.00
JUMLAH A Rp 171,493.33
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 264,223.33
Overhead Rp -
Total Rp 264,223.33

Rp 573,243.00
m Rp 204,400.00 Rp 232,272.73
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,440.00
btg Rp 40,000.00 Rp 240,000.00
JUMLAH A Rp 480,512.73
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 573,242.73
Overhead Rp -
Total Rp 573,242.73

Rp 250,200.00
m³ Rp 3,918,000.00 Rp 117,540.00
kg Rp 17,000.00 Rp 6,800.00
ltr Rp 7,200.00 Rp 1,080.00
m³ Rp 3,918,000.00 Rp 58,770.00
lembar Rp 145,000.00 Rp 50,750.00
btg Rp 40,000.00 Rp 80,000.00
JUMLAH A Rp 157,470.00
OH Rp 110,000.00 Rp 3,630.00
OH Rp 100,000.00 Rp 3,300.00
OH Rp 80,000.00 Rp 52,800.00
OH Rp 100,000.00 Rp 33,000.00
JUMLAH B Rp 92,730.00
Jumlah (A+B) Rp 250,200.00
Overhead Rp -
Total Rp 250,200.00

343 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 62,700.00
Rp -
JUMLAH A Rp -
OH Rp 80,000.00 Rp 17,600.00
OH Rp 100,000.00 Rp 22,000.00
OH Rp 100,000.00 Rp 22,000.00
OH Rp 100,000.00 Rp 1,100.00
JUMLAH B Rp 62,700.00
Jumlah (A+B) Rp 62,700.00
Overhead Rp -
Total Rp 62,700.00

Rp 34,760.00
kg Rp 20,000.00 Rp 23,000.00
JUMLAH A Rp 23,000.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,800.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 11,760.00
Jumlah (A+B) Rp 34,760.00
Overhead Rp -
Total Rp 34,760.00

Rp 44,650.00
kg Rp 28,600.00 Rp 32,890.00
JUMLAH A Rp 32,890.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,800.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 11,760.00
Jumlah (A+B) Rp 44,650.00
Overhead Rp -
Total Rp 44,650.00

Rp 61,440.00
kg Rp 43,200.00 Rp 49,680.00
JUMLAH A Rp 49,680.00
OH Rp 110,000.00 Rp 660.00

344 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,800.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 11,760.00
Jumlah (A+B) Rp 61,440.00
Overhead Rp -
Total Rp 61,440.00

Rp 44,650.00
kg Rp 28,600.00 Rp 32,890.00
JUMLAH A Rp 32,890.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,800.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 11,760.00
Jumlah (A+B) Rp 44,650.00
Overhead Rp -
Total Rp 44,650.00

Err:509
liter Rp 10,500.00 Rp 10,500.00
ltr Rp 45,500.00 Rp 4,550.00
JUMLAH A Rp 15,050.00
OH Rp 110,000.00 Rp 110.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 18,610.00
Err:509 Err:509 Err:509
JUMLAH B Err:509
Jumlah (A+B+C) Err:509
Overhead Err:509
Total Err:509

Err:509
kg Rp 28,600.00 Rp 429,000.00
kg Rp 28,600.00 Rp 938,080.00
kg Rp 45,000.00 Rp 2,250.00
JUMLAH A Rp 1,369,330.00
OH Rp 110,000.00 Rp 11,550.00
OH Rp 100,000.00 Rp 5,200.00
OH Rp 80,000.00 Rp 84,000.00

345 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 105,000.00
JUMLAH B Rp 205,750.00
Err:509 Err:509 Err:509
JUMLAH B Err:509
Jumlah (A+B+C) Err:509
Overhead Err:509
Total Err:509

Err:509
kg Rp 45,000.00 Rp 18,000.00
liter Rp 10,500.00 Rp 3,150.00
ltr Rp 45,500.00 Rp 1,820.00
JUMLAH A Rp 22,970.00
OH Rp 110,000.00 Rp 220.00
OH Rp 100,000.00 Rp 200.00
OH Rp 80,000.00 Rp 3,200.00
OH Rp 100,000.00 Rp 200.00
JUMLAH B Rp 3,820.00
Err:509 Err:509 Err:509
JUMLAH C Err:509
Jumlah (A+B+C) Err:509
Overhead Err:509
Total Err:509

Rp 113,673.00
m¹ Rp 60,000.00 Rp 66,000.00
kg Rp 17,000.00 Rp 34,000.00
kg Rp 87,500.00 Rp 5,250.00
JUMLAH A Rp 105,250.00
OH Rp 110,000.00 Rp 473.00
OH Rp 100,000.00 Rp 210.00
OH Rp 80,000.00 Rp 3,440.00
OH Rp 100,000.00 Rp 4,300.00
JUMLAH B Rp 8,423.00
Jumlah (A+B) Rp 113,673.00
Overhead Rp -
Total Rp 113,673.00

ollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi


Rp 140,050.00
m Rp 13,000.00 Rp 45,500.00
% Rp 45,500.00 Rp 45,500.00
JUMLAH A Rp 91,000.00
OH Rp 110,000.00 Rp 2,750.00

346 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 1,300.00
OH Rp 80,000.00 Rp 20,000.00
OH Rp 100,000.00 Rp 25,000.00
JUMLAH B Rp 49,050.00
Jumlah (A+B) Rp 140,050.00
Overhead Rp -
Total Rp 140,050.00

Rp 172,650.00
m Rp 13,000.00 Rp 52,000.00
% Rp 52,000.00 Rp 52,000.00
JUMLAH A Rp 104,000.00
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 1,800.00
OH Rp 80,000.00 Rp 28,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 68,650.00
Jumlah (A+B) Rp 172,650.00
Overhead Rp -
Total Rp 172,650.00

merah (5x11x22) cm tebal 1 batu campuran 1 PC : 2 PP


Rp 244,100.00
Bh Rp 700.00 Rp 98,000.00
kg Rp 1,400.00 Rp 60,900.00
m³ Rp 150,000.00 Rp 12,000.00
JUMLAH A Rp 170,900.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 73,200.00
Jumlah (A+B) Rp 244,100.00
Overhead Rp -
Total Rp 244,100.00

merah (5x11x22) cm tebal 1 batu campuran 1 PC : 4 PP


Rp 222,320.00
Bh Rp 700.00 Rp 98,000.00
kg Rp 1,400.00 Rp 37,170.00
m³ Rp 150,000.00 Rp 13,950.00
JUMLAH A Rp 149,120.00
OH Rp 110,000.00 Rp 2,200.00

347 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 73,200.00
Jumlah (A+B) Rp 222,320.00
Overhead Rp -
Total Rp 222,320.00

merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 2 PP


Rp 117,830.00
Bh Rp 700.00 Rp 49,000.00
kg Rp 1,400.00 Rp 26,530.00
m³ Rp 150,000.00 Rp 5,700.00
JUMLAH A Rp 81,230.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 1,500.00
OH Rp 80,000.00 Rp 24,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 36,600.00
Jumlah (A+B) Rp 117,830.00
Overhead Rp -
Total Rp 117,830.00

merah (5x11x22) cm tebal 1/2 batu campuran 1 PC : 4 PP


Rp 108,150.00
Bh Rp 700.00 Rp 49,000.00
kg Rp 1,400.00 Rp 16,100.00
m³ Rp 150,000.00 Rp 6,450.00
JUMLAH A Rp 71,550.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 1,500.00
OH Rp 80,000.00 Rp 24,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 36,600.00
Jumlah (A+B) Rp 108,150.00
Overhead Rp -
Total Rp 108,150.00

Err:509
Err:509 Err:509 Err:509
kg Rp 1,400.00 Rp 15,400.00
m³ Rp 150,000.00 Rp 5,250.00
JUMLAH A Err:509
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 1,500.00

348 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 24,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 36,600.00
Jumlah (A+B) Err:509
Overhead Err:509
Total Err:509

Rp 59,464.00
kg Rp 1,400.00 Rp 14,313.60
m³ Rp 150,000.00 Rp 3,000.00
JUMLAH A Rp 17,313.60
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 1,500.00
OH Rp 80,000.00 Rp 24,000.00
OH Rp 100,000.00 Rp 15,000.00
JUMLAH B Rp 42,150.00
Jumlah (A+B) Rp 59,463.60
Overhead Rp -
Total Rp 59,463.60

Rp 54,486.00
kg Rp 1,400.00 Rp 8,736.00
m³ Rp 150,000.00 Rp 3,600.00
JUMLAH A Rp 12,336.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 1,500.00
OH Rp 80,000.00 Rp 24,000.00
OH Rp 100,000.00 Rp 15,000.00
JUMLAH B Rp 42,150.00
Jumlah (A+B) Rp 54,486.00
Overhead Rp -
Total Rp 54,486.00

Rp 32,650.00
kg Rp 1,400.00 Rp 4,550.00
JUMLAH A Rp 4,550.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 28,100.00

349 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 32,650.00
Overhead Rp -
Total Rp 32,650.00

P DINDING

Rp 234,320.00
m² Rp 160,000.00 Rp 176,000.00
kg Rp 1,400.00 Rp 13,440.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,410.00
JUMLAH A Rp 200,600.00
OH Rp 110,000.00 Rp 1,320.00
OH Rp 100,000.00 Rp 1,200.00
OH Rp 80,000.00 Rp 19,200.00
OH Rp 100,000.00 Rp 12,000.00
JUMLAH B Rp 33,720.00
Jumlah (A+B) Rp 234,320.00
Overhead Rp -
Total Rp 234,320.00

Rp 1,083,168.00
m² Rp 931,680.00 Rp 1,024,848.00
kg Rp 1,400.00 Rp 13,440.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,410.00
JUMLAH A Rp 1,049,448.00
OH Rp 110,000.00 Rp 1,320.00
OH Rp 100,000.00 Rp 1,200.00
OH Rp 80,000.00 Rp 19,200.00
OH Rp 100,000.00 Rp 12,000.00
JUMLAH B Rp 33,720.00
Jumlah (A+B) Rp 1,083,168.00
Overhead Rp -
Total Rp 1,083,168.00

Rp 218,700.00
m² Rp 128,000.00 Rp 134,400.00
JUMLAH A Rp 134,400.00
OH Rp 110,000.00 Rp 3,300.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00
OH Rp 100,000.00 Rp 30,000.00

350 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
JUMLAH B Rp 84,300.00
Jumlah (A+B) Rp 218,700.00
Overhead Rp -
Total Rp 218,700.00

Rp 205,119.00
m² Rp 79,800.00 Rp 83,790.00
kg Rp 1,400.00 Rp 11,466.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,762.80
JUMLAH A Rp 106,768.80
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 205,118.80
Overhead Rp -
Total Rp 205,118.80

Rp 196,510.00
m² Rp 73,000.00 Rp 73,000.00
kg Rp 1,400.00 Rp 14,000.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,410.00
JUMLAH A Rp 98,160.00
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 196,510.00
Overhead Rp -
Total Rp 196,510.00

Rp 196,510.00
m² Rp 73,000.00 Rp 73,000.00
kg Rp 1,400.00 Rp 14,000.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,410.00
JUMLAH A Rp 98,160.00
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00

351 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 196,510.00
Overhead Rp -
Total Rp 196,510.00

Rp 232,663.00
m² Rp 108,240.00 Rp 108,240.00
kg Rp 1,400.00 Rp 14,560.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,762.80
JUMLAH A Rp 134,312.80
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 232,662.80
Overhead Rp -
Total Rp 232,662.80

Rp 236,423.00
kotak Rp 112,000.00 Rp 112,000.00
kg Rp 1,400.00 Rp 14,560.00
m³ Rp 150,000.00 Rp 6,750.00
kg Rp 2,940.00 Rp 4,762.80
JUMLAH A Rp 138,072.80
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 236,422.80
Overhead Rp -
Total Rp 236,422.80

Rp 625,150.00
m² Rp 480,000.00 Rp 504,000.00
kg Rp 38,000.00 Rp 22,800.00
JUMLAH A Rp 526,800.00
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00

352 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 625,150.00
Overhead Rp -
Total Rp 625,150.00

Rp 179,150.00
lembar Rp 145,000.00 Rp 58,000.00
kg Rp 38,000.00 Rp 22,800.00
JUMLAH A Rp 80,800.00
OH Rp 80,000.00 Rp 56,000.00
OH Rp 100,000.00 Rp 35,000.00
OH Rp 110,000.00 Rp 3,850.00
OH Rp 100,000.00 Rp 3,500.00
JUMLAH B Rp 98,350.00
Jumlah (A+B) Rp 179,150.00
Overhead Rp -
Total Rp 179,150.00

Rp 291,874.00
kotak Rp 144,000.00 Rp 144,000.00
kg Rp 1,400.00 Rp 13,020.00
m³ Rp 150,000.00 Rp 2,700.00
kg Rp 2,940.00 Rp 5,703.60
JUMLAH A Rp 165,423.60
OH Rp 110,000.00 Rp 4,950.00
OH Rp 100,000.00 Rp 4,500.00
OH Rp 80,000.00 Rp 72,000.00
OH Rp 100,000.00 Rp 45,000.00
JUMLAH B Rp 126,450.00
Jumlah (A+B) Rp 291,873.60
Overhead Rp -
Total Rp 291,873.60

Rp 220,874.00
m² Rp 73,000.00 Rp 73,000.00
kg Rp 1,400.00 Rp 13,020.00
m³ Rp 150,000.00 Rp 2,700.00
kg Rp 2,940.00 Rp 5,703.60
JUMLAH A Rp 94,423.60
OH Rp 110,000.00 Rp 4,950.00
OH Rp 100,000.00 Rp 4,500.00
OH Rp 80,000.00 Rp 72,000.00

353 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 45,000.00
JUMLAH B Rp 126,450.00
Jumlah (A+B) Rp 220,873.60
Overhead Rp -
Total Rp 220,873.60

Rp 278,914.00
kotak Rp 124,800.00 Rp 131,040.00
kg Rp 1,400.00 Rp 13,020.00
m³ Rp 150,000.00 Rp 2,700.00
kg Rp 2,940.00 Rp 5,703.60
JUMLAH A Rp 152,463.60
OH Rp 110,000.00 Rp 4,950.00
OH Rp 100,000.00 Rp 4,500.00
OH Rp 80,000.00 Rp 72,000.00
OH Rp 100,000.00 Rp 45,000.00
JUMLAH B Rp 126,450.00
Jumlah (A+B) Rp 278,913.60
Overhead Rp -
Total Rp 278,913.60

Rp 353,474.00
m² Rp 205,600.00 Rp 205,600.00
kg Rp 1,400.00 Rp 13,020.00
m³ Rp 150,000.00 Rp 2,700.00
kg Rp 2,940.00 Rp 5,703.60
JUMLAH A Rp 227,023.60
OH Rp 110,000.00 Rp 4,950.00
OH Rp 100,000.00 Rp 4,500.00
OH Rp 80,000.00 Rp 72,000.00
OH Rp 100,000.00 Rp 45,000.00
JUMLAH B Rp 126,450.00
Jumlah (A+B) Rp 353,473.60
Overhead Rp -
Total Rp 353,473.60

Rp 146,822.00
lbr Rp 228,000.00 Rp 84,251.55
kg Rp 60,000.00 Rp 15,000.00
JUMLAH A Rp 99,251.55
OH Rp 110,000.00 Rp 1,870.00
OH Rp 100,000.00 Rp 200.00
OH Rp 80,000.00 Rp 28,000.00

354 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 17,500.00
JUMLAH B Rp 47,570.00
Jumlah (A+B) Rp 146,821.55
Overhead Rp -
Total Rp 146,821.55

Rp 50,050.00
lembar Rp 80,000.00 Rp 30,000.00
kg Rp 15,000.00 Rp 450.00
JUMLAH A Rp 30,450.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 19,600.00
Jumlah (A+B) Rp 50,050.00
Overhead Rp -
Total Rp 50,050.00

Rp 49,300.00
lembar Rp 78,000.00 Rp 29,250.00
kg Rp 15,000.00 Rp 450.00
JUMLAH A Rp 29,700.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 19,600.00
Jumlah (A+B) Rp 49,300.00
Overhead Rp -
Total Rp 49,300.00

Rp 61,300.00
lembar Rp 110,000.00 Rp 41,250.00
kg Rp 15,000.00 Rp 450.00
JUMLAH A Rp 41,700.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 19,600.00

355 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 61,300.00
Overhead Rp -
Total Rp 61,300.00

Rp 74,425.00
lembar Rp 145,000.00 Rp 54,375.00
kg Rp 15,000.00 Rp 450.00
JUMLAH A Rp 54,825.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 19,600.00
Jumlah (A+B) Rp 74,425.00
Overhead Rp -
Total Rp 74,425.00

Rp 54,453.00
lembar Rp 116,850.00 Rp 42,533.40
kg Rp 17,000.00 Rp 1,870.00
JUMLAH A Rp 44,403.40
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 1,000.00
JUMLAH B Rp 10,050.00
Jumlah (A+B) Rp 54,453.40
Overhead Rp -
Total Rp 54,453.40

Err:509
Err:509 Err:509 Err:509
kg Rp 17,000.00 Rp 1,870.00
JUMLAH A Err:509
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 1,000.00
JUMLAH B Rp 10,050.00
Jumlah (A+B) Err:509
Overhead Err:509
Total Err:509

356 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Err:509
Err:509 Err:509 Err:509
kg Rp 15,000.00 Rp 750.00
JUMLAH A Err:509
OH Rp 110,000.00 Rp 1,320.00
OH Rp 100,000.00 Rp 600.00
OH Rp 80,000.00 Rp 9,600.00
OH Rp 100,000.00 Rp 12,000.00
JUMLAH B Rp 23,520.00
Jumlah (A+B) Err:509
Overhead Err:509
Total Err:509

Rp 219,600.00
lembar Rp 160,000.00 Rp 208,800.00
kg Rp 15,000.00 Rp 750.00
JUMLAH A Rp 209,550.00
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 1,000.00
JUMLAH B Rp 10,050.00
Jumlah (A+B) Rp 219,600.00
Overhead Rp -
Total Rp 219,600.00

Rp 48,818.00
m¹ Rp 36,950.00 Rp 38,797.50
kg Rp 17,000.00 Rp 170.00
JUMLAH A Rp 38,967.50
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,000.00
OH Rp 100,000.00 Rp 5,000.00
JUMLAH B Rp 9,850.00
Jumlah (A+B) Rp 48,817.50
Overhead Rp -
Total Rp 48,817.50

Rp 99,550.00
m¹ Rp 78,000.00 Rp 81,900.00
Ls Rp 78,000.00 Rp 7,800.00

357 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
JUMLAH A Rp 89,700.00
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,000.00
OH Rp 100,000.00 Rp 5,000.00
JUMLAH B Rp 9,850.00
Jumlah (A+B) Rp 99,550.00
Overhead Rp -
Total Rp 99,550.00

Rp 28,250.00
m¹ Rp 16,000.00 Rp 16,800.00
Ls Rp 16,000.00 Rp 1,600.00
JUMLAH A Rp 18,400.00
OH Rp 110,000.00 Rp 550.00
OH Rp 100,000.00 Rp 300.00
OH Rp 80,000.00 Rp 4,000.00
OH Rp 100,000.00 Rp 5,000.00
JUMLAH B Rp 9,850.00
Jumlah (A+B) Rp 28,250.00
Overhead Rp -
Total Rp 28,250.00

Rp 43,058.00
14,760.0000 Rp 14,760.00 Rp 15,498.00
kg Rp 18,000.00 Rp 360.00
JUMLAH A Rp 15,858.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 27,200.00
Jumlah (A+B) Rp 43,058.00
Overhead Rp -
Total Rp 43,058.00

Rp 363,560.00
m² Rp 336,000.00 Rp 336,000.00
kg Rp 18,000.00 Rp 360.00
JUMLAH A Rp 336,360.00
OH Rp 110,000.00 Rp 1,100.00

358 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 27,200.00
Jumlah (A+B) Rp 363,560.00
Overhead Rp -
Total Rp 363,560.00

Rp 363,560.00
m² Rp 336,000.00 Rp 336,000.00
kg Rp 18,000.00 Rp 360.00
JUMLAH A Rp 336,360.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 27,200.00
Jumlah (A+B) Rp 363,560.00
Overhead Rp -
Total Rp 363,560.00

Rp 187,126.32
lembar Rp 210,600.00 Rp 121,926.32
buah Rp 1,900.00 Rp 38,000.00
JUMLAH A Rp 159,926.32
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 100.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 27,200.00
Jumlah (A+B) Rp 187,126.32
Overhead Rp -
Total Rp 187,126.32

Rp 77,335.00
lembar Rp 62,976.00 Rp 38,485.33
kg Rp 18,000.00 Rp 900.00
JUMLAH A Rp 39,385.33
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 1,300.00
OH Rp 80,000.00 Rp 20,000.00
OH Rp 100,000.00 Rp 15,000.00
JUMLAH B Rp 37,950.00

359 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Jumlah (A+B) Rp 77,335.33
Overhead Rp -
Total Rp 77,335.33

Rp 83,529.00
lembar Rp 72,816.00 Rp 44,498.67
kg Rp 18,000.00 Rp 1,080.00
JUMLAH A Rp 45,578.67
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 1,300.00
OH Rp 80,000.00 Rp 20,000.00
OH Rp 100,000.00 Rp 15,000.00
JUMLAH B Rp 37,950.00
Jumlah (A+B) Rp 83,528.67
Overhead Rp -
Total Rp 83,528.67

Rp 51,660.00
m² Rp 49,200.00 Rp 34,440.00
kg Rp 18,000.00 Rp 360.00
JUMLAH A Rp 34,800.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 600.00
OH Rp 80,000.00 Rp 9,600.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 16,860.00
Jumlah (A+B) Rp 51,660.00
Overhead Rp -
Total Rp 51,660.00

Rp 55,110.00
m² Rp 30,000.00 Rp 34,020.00
kg Rp 18,000.00 Rp 720.00
JUMLAH A Rp 34,740.00
OH Rp 110,000.00 Rp 770.00
OH Rp 100,000.00 Rp 600.00
OH Rp 80,000.00 Rp 12,000.00
OH Rp 100,000.00 Rp 7,000.00
JUMLAH B Rp 20,370.00
Jumlah (A+B) Rp 55,110.00
Overhead Rp -
Total Rp 55,110.00

360 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 10,553,250.00
m³ Rp 6,880,000.00 Rp 7,568,000.00
kg Rp 17,000.00 Rp 21,250.00
kg Rp 38,000.00 Rp 38,000.00
JUMLAH A Rp 7,627,250.00
OH Rp 110,000.00 Rp 231,000.00
OH Rp 100,000.00 Rp 35,000.00
OH Rp 80,000.00 Rp 560,000.00
OH Rp 100,000.00 Rp 2,100,000.00
JUMLAH B Rp 2,926,000.00
Jumlah (A+B) Rp 10,553,250.00
Overhead Rp -
Total Rp 10,553,250.00

Rp 9,575,250.00
m³ Rp 5,840,000.00 Rp 7,008,000.00
kg Rp 17,000.00 Rp 21,250.00
kg Rp 38,000.00 Rp 38,000.00
JUMLAH A Rp 7,067,250.00
OH Rp 110,000.00 Rp 198,000.00
OH Rp 100,000.00 Rp 30,000.00
OH Rp 80,000.00 Rp 480,000.00
OH Rp 100,000.00 Rp 1,800,000.00
JUMLAH B Rp 2,508,000.00
Jumlah (A+B) Rp 9,575,250.00
Overhead Rp -
Total Rp 9,575,250.00

Rp 10,314,450.00
m³ Rp 6,456,000.00 Rp 7,747,200.00
kg Rp 17,000.00 Rp 21,250.00
kg Rp 38,000.00 Rp 38,000.00
JUMLAH A Rp 7,806,450.00
OH Rp 110,000.00 Rp 198,000.00
OH Rp 100,000.00 Rp 30,000.00
OH Rp 80,000.00 Rp 480,000.00
OH Rp 100,000.00 Rp 1,800,000.00
JUMLAH B Rp 2,508,000.00
Jumlah (A+B) Rp 10,314,450.00
Overhead Rp -
Total Rp 10,314,450.00

361 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 712,200.00
m³ Rp 6,880,000.00 Rp 275,200.00
kg Rp 38,000.00 Rp 19,000.00
JUMLAH A Rp 294,200.00
OH Rp 110,000.00 Rp 33,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 80,000.00
OH Rp 100,000.00 Rp 300,000.00
JUMLAH B Rp 418,000.00
Jumlah (A+B) Rp 712,200.00
Overhead Rp -
Total Rp 712,200.00

Rp 670,600.00
m³ Rp 5,840,000.00 Rp 233,600.00
kg Rp 38,000.00 Rp 19,000.00
JUMLAH A Rp 252,600.00
OH Rp 110,000.00 Rp 33,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 80,000.00
OH Rp 100,000.00 Rp 300,000.00
JUMLAH B Rp 418,000.00
Jumlah (A+B) Rp 670,600.00
Overhead Rp -
Total Rp 670,600.00

Rp 485,960.00
m³ Rp 5,840,000.00 Rp 140,160.00
kg Rp 38,000.00 Rp 11,400.00
JUMLAH A Rp 151,560.00
OH Rp 110,000.00 Rp 26,400.00
OH Rp 100,000.00 Rp 4,000.00
OH Rp 80,000.00 Rp 64,000.00
OH Rp 100,000.00 Rp 240,000.00
JUMLAH B Rp 334,400.00
Jumlah (A+B) Rp 485,960.00
Overhead Rp -
Total Rp 485,960.00

Rp 546,730.00
m³ Rp 3,918,000.00 Rp 235,080.00

362 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
kg Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 237,630.00
OH Rp 110,000.00 Rp 22,000.00
OH Rp 100,000.00 Rp 33,500.00
OH Rp 80,000.00 Rp 53,600.00
OH Rp 100,000.00 Rp 200,000.00
JUMLAH B Rp 309,100.00
Jumlah (A+B) Rp 546,730.00
Overhead Rp -
Total Rp 546,730.00

Rp 8,491,200.00
m³ Rp 5,840,000.00 Rp 6,424,000.00
kg Rp 20,000.00 Rp 300,000.00
kg Rp 17,000.00 Rp 95,200.00
JUMLAH A Rp 6,819,200.00
OH Rp 80,000.00 Rp 320,000.00
OH Rp 100,000.00 Rp 1,200,000.00
OH Rp 110,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 1,672,000.00
Jumlah (A+B) Rp 8,491,200.00
Overhead Rp -
Total Rp 8,491,200.00

Rp 9,635,200.00
m³ Rp 6,880,000.00 Rp 7,568,000.00
kg Rp 20,000.00 Rp 300,000.00
kg Rp 17,000.00 Rp 95,200.00
JUMLAH A Rp 7,963,200.00
OH Rp 80,000.00 Rp 320,000.00
OH Rp 100,000.00 Rp 1,200,000.00
OH Rp 110,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 1,672,000.00
Jumlah (A+B) Rp 9,635,200.00
Overhead Rp -
Total Rp 9,635,200.00

Rp 8,491,200.00
m³ Rp 5,840,000.00 Rp 6,424,000.00
kg Rp 20,000.00 Rp 300,000.00
kg Rp 17,000.00 Rp 95,200.00

363 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
JUMLAH A Rp 6,819,200.00
OH Rp 80,000.00 Rp 320,000.00
OH Rp 100,000.00 Rp 1,200,000.00
OH Rp 110,000.00 Rp 132,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 1,672,000.00
Jumlah (A+B) Rp 8,491,200.00
Overhead Rp -
Total Rp 8,491,200.00

Rp 9,575,600.00
m³ Rp 5,840,000.00 Rp 6,424,000.00
kg Rp 20,000.00 Rp 300,000.00
kg Rp 17,000.00 Rp 51,000.00
JUMLAH A Rp 6,775,000.00
OH Rp 80,000.00 Rp 536,000.00
OH Rp 100,000.00 Rp 2,010,000.00
OH Rp 110,000.00 Rp 221,100.00
OH Rp 100,000.00 Rp 33,500.00
JUMLAH B Rp 2,800,600.00
Jumlah (A+B) Rp 9,575,600.00
Overhead Rp -
Total Rp 9,575,600.00

Rp 155,622.00
m³ Rp 6,456,000.00 Rp 99,422.40
kg Rp 17,000.00 Rp 3,400.00
JUMLAH A Rp 102,822.40
OH Rp 110,000.00 Rp 3,300.00
OH Rp 100,000.00 Rp 7,500.00
OH Rp 80,000.00 Rp 12,000.00
OH Rp 100,000.00 Rp 30,000.00
JUMLAH B Rp 52,800.00
Jumlah (A+B) Rp 155,622.40
Overhead Rp -
Total Rp 155,622.40

Rp 149,742.00
m³ Rp 5,840,000.00 Rp 95,192.00
kg Rp 17,000.00 Rp 4,250.00
JUMLAH A Rp 99,442.00
OH Rp 110,000.00 Rp 3,300.00
OH Rp 100,000.00 Rp 1,000.00

364 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 30,000.00
JUMLAH B Rp 50,300.00
Jumlah (A+B) Rp 149,742.00
Overhead Rp -
Total Rp 149,742.00

Rp 159,783.00
m³ Rp 6,456,000.00 Rp 105,232.80
kg Rp 17,000.00 Rp 4,250.00
JUMLAH A Rp 109,482.80
OH Rp 110,000.00 Rp 3,300.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 30,000.00
JUMLAH B Rp 50,300.00
Jumlah (A+B) Rp 159,782.80
Overhead Rp -
Total Rp 159,782.80

Rp 106,704.00
m³ Rp 6,880,000.00 Rp 74,304.00
kg Rp 17,000.00 Rp 1,700.00
JUMLAH A Rp 76,004.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 30,700.00
Jumlah (A+B) Rp 106,704.00
Overhead Rp -
Total Rp 106,704.00

Rp 95,472.00
m³ Rp 5,840,000.00 Rp 63,072.00
kg Rp 17,000.00 Rp 1,700.00
JUMLAH A Rp 64,772.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 30,700.00
Jumlah (A+B) Rp 95,472.00

365 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Overhead Rp -
Total Rp 95,472.00

Rp 107,230.00
m³ Rp 6,880,000.00 Rp 75,680.00
kg Rp 17,000.00 Rp 850.00
JUMLAH A Rp 76,530.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 30,700.00
Jumlah (A+B) Rp 107,230.00
Overhead Rp -
Total Rp 107,230.00

Rp 95,790.00
m³ Rp 5,840,000.00 Rp 64,240.00
kg Rp 17,000.00 Rp 850.00
JUMLAH A Rp 65,090.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 20,000.00
JUMLAH B Rp 30,700.00
Jumlah (A+B) Rp 95,790.00
Overhead Rp -
Total Rp 95,790.00

Rp 246,068.00
m³ Rp 6,456,000.00 Rp 180,768.00
kg Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 183,318.00
OH Rp 110,000.00 Rp 4,950.00
OH Rp 100,000.00 Rp 800.00
OH Rp 80,000.00 Rp 12,000.00
OH Rp 100,000.00 Rp 45,000.00
JUMLAH B Rp 62,750.00
Jumlah (A+B) Rp 246,068.00
Overhead Rp -
Total Rp 246,068.00

366 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Rp 232,130.00
kg Rp 17,000.00 Rp 2,550.00
lembar Rp 145,000.00 Rp 124,700.00
kg Rp 38,000.00 Rp 21,280.00
JUMLAH A Rp 148,530.00
OH Rp 110,000.00 Rp 6,600.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 60,000.00
JUMLAH B Rp 83,600.00
Jumlah (A+B) Rp 232,130.00
Overhead Rp -
Total Rp 232,130.00

Rp 207,921.00
kg Rp 17,000.00 Rp 2,550.00
lembar Rp 116,850.00 Rp 100,491.00
kg Rp 38,000.00 Rp 21,280.00
JUMLAH A Rp 124,321.00
OH Rp 110,000.00 Rp 6,600.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 60,000.00
JUMLAH B Rp 83,600.00
Jumlah (A+B) Rp 207,921.00
Overhead Rp -
Total Rp 207,921.00

kg Rp 38,000.00 Rp 21,280.00
Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 23,830.00
OH Rp 110,000.00 Rp 6,600.00
OH Rp 100,000.00 Rp 1,000.00
OH Rp 80,000.00 Rp 16,000.00
OH Rp 100,000.00 Rp 60,000.00

Rp 303,210.00
m³ Rp 6,880,000.00 Rp 48,160.00
kg Rp 17,000.00 Rp 1,700.00
kg Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 52,410.00
OH Rp 110,000.00 Rp 19,800.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00

367 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 180,000.00
JUMLAH B Rp 250,800.00
Jumlah (A+B) Rp 303,210.00
Overhead Rp -
Total Rp 303,210.00

Rp 295,930.00
m³ Rp 5,840,000.00 Rp 40,880.00
kg Rp 17,000.00 Rp 1,700.00
kg Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 45,130.00
OH Rp 110,000.00 Rp 19,800.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00
OH Rp 100,000.00 Rp 180,000.00
JUMLAH B Rp 250,800.00
Jumlah (A+B) Rp 295,930.00
Overhead Rp -
Total Rp 295,930.00

Rp 295,930.00
m³ Rp 5,840,000.00 Rp 40,880.00
kg Rp 17,000.00 Rp 1,700.00
kg Rp 17,000.00 Rp 2,550.00
JUMLAH A Rp 45,130.00
OH Rp 110,000.00 Rp 19,800.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 48,000.00
OH Rp 100,000.00 Rp 180,000.00
JUMLAH B Rp 250,800.00
Jumlah (A+B) Rp 295,930.00
Overhead Rp -
Total Rp 295,930.00

JUMLAH B Rp 83,600.00
Jumlah (A+B) Rp 107,430.00
Overhead Rp -
Total Rp 107,430.00

Rp 203,800.00
buah Rp 147,000.00 Rp 147,000.00
JUMLAH A Rp 147,000.00

368 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 800.00
OH Rp 100,000.00 Rp 50,000.00
OH Rp 110,000.00 Rp 5,500.00
OH Rp 100,000.00 Rp 500.00
JUMLAH B Rp 56,800.00
Jumlah (A+B) Rp 203,800.00
Overhead Rp -
Total Rp 203,800.00

Rp 231,200.00
buah Rp 175,000.00 Rp 175,000.00
JUMLAH A Rp 175,000.00
OH Rp 80,000.00 Rp 400.00
OH Rp 100,000.00 Rp 50,000.00
OH Rp 110,000.00 Rp 5,500.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 56,200.00
Jumlah (A+B) Rp 231,200.00
Overhead Rp -
Total Rp 231,200.00

Rp 33,305.00
pasang Rp 30,750.00 Rp 15,375.00
JUMLAH A Rp 15,375.00
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 80.00
JUMLAH B Rp 17,930.00
Jumlah (A+B) Rp 33,305.00
Overhead Rp -
Total Rp 33,305.00

Rp 21,175.00
pasang Rp 18,450.00 Rp 9,225.00
JUMLAH A Rp 9,225.00
OH Rp 80,000.00 Rp 800.00
OH Rp 100,000.00 Rp 10,000.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 50.00
JUMLAH B Rp 11,950.00
Jumlah (A+B) Rp 21,175.00
Overhead Rp -

369 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Total Rp 21,175.00

Rp 46,010.00
Buah Rp 27,360.00 Rp 27,360.00
JUMLAH A Rp 27,360.00
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 800.00
JUMLAH B Rp 18,650.00
Jumlah (A+B) Rp 46,010.00
Overhead Rp -
Total Rp 46,010.00

Rp 28,200.00
buah Rp 12,000.00 Rp 12,000.00
JUMLAH A Rp 12,000.00
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 800.00
JUMLAH B Rp 16,200.00
Jumlah (A+B) Rp 28,200.00
Overhead Rp -
Total Rp 28,200.00

Rp 51,600.00
buah Rp 30,000.00 Rp 30,000.00
JUMLAH A Rp 30,000.00
OH Rp 80,000.00 Rp 1,600.00
OH Rp 100,000.00 Rp 20,000.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 100.00
JUMLAH B Rp 21,600.00
Jumlah (A+B) Rp 51,600.00
Overhead Rp -
Total Rp 51,600.00

Rp 227,403.00
m² Rp 186,452.89 Rp 205,098.18
kg Rp 87,500.00 Rp 4,375.00
JUMLAH A Rp 209,473.18

370 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 80.00
JUMLAH B Rp 17,930.00
Jumlah (A+B) Rp 227,403.18
Overhead Rp -
Total Rp 227,403.18

Rp 271,990.00
m² Rp 226,986.13 Rp 249,684.74
kg Rp 87,500.00 Rp 4,375.00
JUMLAH A Rp 254,059.74
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 80.00
JUMLAH B Rp 17,930.00
Jumlah (A+B) Rp 271,989.74
Overhead Rp -
Total Rp 271,989.74

Rp 1,286,855.00
m² Rp 1,148,000.00 Rp 1,262,800.00
kg Rp 87,500.00 Rp 6,125.00
JUMLAH A Rp 1,268,925.00
OH Rp 80,000.00 Rp 1,200.00
OH Rp 100,000.00 Rp 15,000.00
OH Rp 110,000.00 Rp 1,650.00
OH Rp 100,000.00 Rp 80.00
JUMLAH B Rp 17,930.00
Jumlah (A+B) Rp 1,286,855.00
Overhead Rp -
Total Rp 1,286,855.00

aru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)


Rp 51,613.00
kg Rp 61,500.00 Rp 12,300.00
kg Rp 30,200.00 Rp 4,530.00
kg Rp 48,000.00 Rp 8,160.00
kg Rp 61,500.00 Rp 15,990.00
bh Rp 32,000.00 Rp 320.00

371 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
liter Rp 29,500.00 Rp 885.00
lembar Rp 9,840.00 Rp 1,968.00
JUMLAH A Rp 44,153.00
OH Rp 80,000.00 Rp 5,600.00
OH Rp 100,000.00 Rp 900.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 7,460.00
Jumlah (A+B) Rp 51,613.00
Overhead Rp -
Total Rp 51,613.00

Rp 13,150.00
kg Rp 13,000.00 Rp 4,550.00
JUMLAH A Rp 4,550.00
OH Rp 80,000.00 Rp 8,000.00
OH Rp 100,000.00 Rp 600.00
JUMLAH B Rp 8,600.00
Jumlah (A+B) Rp 13,150.00
Overhead Rp -
Total Rp 13,150.00

1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)


Rp 21,153.00
kg Rp 30,200.00 Rp 3,020.00
kg Rp 30,000.00 Rp 3,000.00
kg Rp 24,000.00 Rp 6,240.00
JUMLAH A Rp 12,260.00
OH Rp 80,000.00 Rp 1,600.00
OH Rp 100,000.00 Rp 6,300.00
OH Rp 110,000.00 Rp 693.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 8,893.00
Jumlah (A+B) Rp 21,153.00
Overhead Rp -
Total Rp 21,153.00

Rp 15,122.00
kg Rp 30,000.00 Rp 3,600.00
kg Rp 24,000.00 Rp 4,320.00
JUMLAH A Rp 7,920.00
OH Rp 80,000.00 Rp 2,240.00
OH Rp 100,000.00 Rp 4,200.00
OH Rp 110,000.00 Rp 462.00

372 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 7,202.00
Jumlah (A+B) Rp 15,122.00
Overhead Rp -
Total Rp 15,122.00

Rp 60,962.00
kg Rp 26,880.00 Rp 53,760.00
JUMLAH A Rp 53,760.00
OH Rp 80,000.00 Rp 2,240.00
OH Rp 100,000.00 Rp 4,200.00
OH Rp 110,000.00 Rp 462.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 7,202.00
Jumlah (A+B) Rp 60,962.00
Overhead Rp -
Total Rp 60,962.00

Rp 94,242.00
m² Rp 21,760.00 Rp 87,040.00
JUMLAH A Rp 87,040.00
OH Rp 80,000.00 Rp 2,240.00
OH Rp 100,000.00 Rp 4,200.00
OH Rp 110,000.00 Rp 462.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 7,202.00
Jumlah (A+B) Rp 94,242.00
Overhead Rp -
Total Rp 94,242.00

Rp 30,520.00
kg Rp 61,500.00 Rp 6,150.00
bh Rp 32,000.00 Rp 320.00
JUMLAH A Rp 6,470.00
OH Rp 80,000.00 Rp 1,600.00
OH Rp 100,000.00 Rp 20,000.00
OH Rp 110,000.00 Rp 2,200.00
OH Rp 100,000.00 Rp 250.00
JUMLAH B Rp 24,050.00
Jumlah (A+B) Rp 30,520.00
Overhead Rp -
Total Rp 30,520.00

373 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
a galvanis secara manual sistem 1 lapis cat mutakhir
Rp 18,890.00
kg Rp 61,500.00 Rp 6,150.00
bh Rp 32,000.00 Rp 320.00
liter Rp 29,500.00
JUMLAH A Rp 6,470.00
OH Rp 80,000.00 Rp 4,800.00
OH Rp 100,000.00 Rp 6,000.00
OH Rp 110,000.00 Rp 1,320.00
OH Rp 100,000.00 Rp 300.00
JUMLAH B Rp 12,420.00
Jumlah (A+B) Rp 18,890.00
Overhead Rp -
Total Rp 18,890.00

Rp 1,497,810.00
bh Rp 1,045,000.00 Rp 1,045,000.00
% Rp 1,045,000.00 Rp 62,700.00
JUMLAH A Rp 1,107,700.00
OH Rp 110,000.00 Rp 110.00
OH Rp 100,000.00 Rp 16,000.00
OH Rp 80,000.00 Rp 264,000.00
OH Rp 100,000.00 Rp 110,000.00
JUMLAH B Rp 390,110.00
Jumlah (A+B) Rp 1,497,810.00
Overhead Rp -
Total Rp 1,497,810.00

Rp 742,400.00
bh Rp 470,000.00 Rp 470,000.00
kg Rp 1,400.00 Rp 8,400.00
m³ Rp 150,000.00 Rp 1,500.00
JUMLAH A Rp 479,900.00
OH Rp 110,000.00 Rp 16,500.00
OH Rp 100,000.00 Rp 16,000.00
OH Rp 80,000.00 Rp 80,000.00
OH Rp 100,000.00 Rp 150,000.00
JUMLAH B Rp 262,500.00
Jumlah (A+B) Rp 742,400.00
Overhead Rp -
Total Rp 742,400.00

374 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 2,675,900.00
buah Rp 1,900,000.00 Rp 1,900,000.00
% Rp 1,900,000.00 Rp 570,000.00
kg Rp 1,400.00 Rp 8,400.00
m³ Rp 150,000.00 Rp 1,500.00
JUMLAH A Rp 2,479,900.00
OH Rp 110,000.00 Rp 11,000.00
OH Rp 100,000.00 Rp 5,000.00
OH Rp 80,000.00 Rp 80,000.00
OH Rp 100,000.00 Rp 100,000.00
JUMLAH B Rp 196,000.00
Jumlah (A+B) Rp 2,675,900.00
Overhead Rp -
Total Rp 2,675,900.00

Rp 306,731.00
Buah Rp 29,760.00 Rp 29,760.00
bh Rp 29,760.00 Rp 3,571.20
kg Rp 1,400.00 Rp 8,400.00
m³ Rp 150,000.00 Rp 1,500.00
JUMLAH A Rp 43,231.20
OH Rp 110,000.00 Rp 16,500.00
OH Rp 100,000.00 Rp 6,000.00
OH Rp 80,000.00 Rp 96,000.00
OH Rp 100,000.00 Rp 145,000.00
JUMLAH B Rp 263,500.00
Jumlah (A+B) Rp 306,731.20
Overhead Rp -
Total Rp 306,731.20

Rp 2,601,400.00
Buah Rp 1,900,000.00 Rp 1,900,000.00
buah Rp 200,000.00 Rp 200,000.00
% Rp 1,900,000.00 Rp 228,000.00
kg Rp 1,400.00 Rp 8,400.00
m³ Rp 150,000.00 Rp 1,500.00
JUMLAH A Rp 2,337,900.00
OH Rp 110,000.00 Rp 16,500.00
OH Rp 100,000.00 Rp 6,000.00
OH Rp 80,000.00 Rp 96,000.00
OH Rp 100,000.00 Rp 145,000.00
JUMLAH B Rp 263,500.00
Jumlah (A+B) Rp 2,601,400.00

375 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Overhead Rp -
Total Rp 2,601,400.00

Rp 1,569,500.00
buah Rp 700,000.00 Rp 700,000.00
% Rp 700,000.00 Rp 84,000.00
JUMLAH A Rp 784,000.00
OH Rp 110,000.00 Rp 5,500.00
OH Rp 100,000.00 Rp 90,000.00
OH Rp 80,000.00 Rp 240,000.00
OH Rp 100,000.00 Rp 450,000.00
JUMLAH B Rp 785,500.00
Jumlah (A+B) Rp 1,569,500.00
Overhead Rp -
Total Rp 1,569,500.00

Rp 1,289,208.00
Bh Rp 700.00 Rp 105,000.00
kg Rp 700.00 Rp 840.00
m³ Rp 150,000.00 Rp 45,000.00
m² Rp 73,000.00 Rp 317,988.00
kg Rp 73,000.00 Rp 4,380.00
JUMLAH A Rp 473,208.00
OH Rp 110,000.00 Rp 33,000.00
OH Rp 100,000.00 Rp 3,000.00
OH Rp 80,000.00 Rp 480,000.00
OH Rp 100,000.00 Rp 300,000.00
JUMLAH B Rp 816,000.00
Jumlah (A+B) Rp 1,289,208.00
Overhead Rp -
Total Rp 1,289,208.00

Rp 41,400.00
bh Rp 29,000.00 Rp 29,000.00
JUMLAH A Rp 29,000.00
OH Rp 110,000.00 Rp 1,100.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 800.00
OH Rp 100,000.00 Rp 10,000.00
JUMLAH B Rp 12,400.00
Jumlah (A+B) Rp 41,400.00
Overhead Rp -
Total Rp 41,400.00

376 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 604,120.00
Bh Rp 700.00 Rp 49,000.00
kg Rp 1,400.00 Rp 107,800.00
m³ Rp 150,000.00 Rp 19,500.00
m³ Rp 153,000.00 Rp 3,060.00
kg Rp 14,300.00 Rp 37,180.00
m³ Rp 153,000.00 Rp 13,770.00
JUMLAH A Rp 230,310.00
OH Rp 110,000.00 Rp 1,210.00
OH Rp 100,000.00 Rp 1,600.00
OH Rp 80,000.00 Rp 256,000.00
OH Rp 100,000.00 Rp 115,000.00
JUMLAH B Rp 373,810.00
Jumlah (A+B) Rp 604,120.00
Overhead Rp -
Total Rp 604,120.00

Rp 105,888.00
bh Rp 60,000.00 Rp 60,000.00
bh Rp 7,500.00 Rp 187.50
JUMLAH A Rp 60,187.50
OH Rp 110,000.00 Rp 4,400.00
OH Rp 100,000.00 Rp 500.00
OH Rp 80,000.00 Rp 800.00
OH Rp 100,000.00 Rp 40,000.00
JUMLAH B Rp 45,700.00
Jumlah (A+B) Rp 105,887.50
Overhead Rp -
Total Rp 105,887.50

Rp 22,538.00
batang Rp 39,500.00 Rp 9,480.00
% Rp 9,480.00 Rp 3,318.00
JUMLAH A Rp 12,798.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 200.00
OH Rp 80,000.00 Rp 2,880.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 9,740.00
Jumlah (A+B) Rp 22,538.00
Overhead Rp -
Total Rp 22,538.00

377 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5

Rp 24,462.00
batang Rp 45,500.00 Rp 10,920.00
% Rp 10,920.00 Rp 3,822.00
JUMLAH A Rp 14,742.00
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 180.00
OH Rp 80,000.00 Rp 2,880.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 9,720.00
Jumlah (A+B) Rp 24,462.00
Overhead Rp -
Total Rp 24,462.00

Rp 26,394.00
batang Rp 51,400.00 Rp 12,336.00
% Rp 12,336.00 Rp 4,317.60
JUMLAH A Rp 16,653.60
OH Rp 110,000.00 Rp 660.00
OH Rp 100,000.00 Rp 200.00
OH Rp 80,000.00 Rp 2,880.00
OH Rp 100,000.00 Rp 6,000.00
JUMLAH B Rp 9,740.00
Jumlah (A+B) Rp 26,393.60
Overhead Rp -
Total Rp 26,393.60

Rp 61,446.00
batang Rp 144,648.00 Rp 34,715.52
% Rp 34,715.52 Rp 12,150.43
JUMLAH A Rp 46,865.95
OH Rp 110,000.00 Rp 990.00
OH Rp 100,000.00 Rp 270.00
OH Rp 80,000.00 Rp 4,320.00
OH Rp 100,000.00 Rp 9,000.00
JUMLAH B Rp 14,580.00
Jumlah (A+B) Rp 61,445.95
Overhead Rp -
Total Rp 61,445.95

Rp 118,929.00
batang Rp 258,300.00 Rp 61,992.00

378 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
% Rp 61,992.00 Rp 21,697.20
JUMLAH A Rp 83,689.20
OH Rp 110,000.00 Rp 14,850.00
OH Rp 100,000.00 Rp 410.00
OH Rp 80,000.00 Rp 6,480.00
OH Rp 100,000.00 Rp 13,500.00
JUMLAH B Rp 35,240.00
Jumlah (A+B) Rp 118,929.20
Overhead Rp -
Total Rp 118,929.20

Rp 166,752.00
batang Rp 405,900.00 Rp 97,416.00
% Rp 97,416.00 Rp 34,095.60
JUMLAH A Rp 131,511.60
OH Rp 110,000.00 Rp 14,850.00
OH Rp 100,000.00 Rp 410.00
OH Rp 80,000.00 Rp 6,480.00
OH Rp 100,000.00 Rp 13,500.00
JUMLAH B Rp 35,240.00
Jumlah (A+B) Rp 166,751.60
Overhead Rp -
Total Rp 166,751.60

Rp 916,050.00
m² Rp 600,000.00 Rp 600,000.00
Kg Rp 44,000.00 Rp 176,000.00
m² Rp 140,050.00 Rp 140,050.00

JUMLAH A Rp 916,050.00
Ls Rp 45,000.00 Rp -
JUMLAH B Rp -
Jumlah (A+B) Rp 916,050.00
Overhead Rp -
Total Rp 916,050.00

Rp 904,000.00
m² Rp 380,000.00 Rp 418,000.00
Kg Rp 44,000.00 Rp 176,000.00
m' Rp 60,000.00 Rp 240,000.00
JUMLAH A Rp 834,000.00

379 dari 391


ANALISA HARGA SATUAN
HARGA SATUAN JUMLAH HARGA
KOEFISIEN
(Rp.) (Rp.)
3 4 5
Ls Rp 70,000.00 Rp 70,000.00
JUMLAH B Rp 70,000.00
Jumlah (A+B) Rp 904,000.00
Overhead Rp -
Total Rp 904,000.00

#REF!

#REF!
#REF!

#REF!
#REF!

380 dari 391


DAFTAR HARGA UPAH DAN BAHAN BANGUNAN

A. UPAH PEKERJA
HARGA SATUAN
No. SATUAN KETERANGAN
Rp.
1 MANDOR 100,000.00 OH
2 KEPALA TUKANG KAYU / CAT 110,000.00 OH
3 TUKANG KAYU / CAT 100,000.00 OH
4 LADEN TUKANG KAYU / CAT 80,000.00 OH
5 KEPALA TUKANG BATU / BESI 110,000.00 OH
6 TUKANG BATU / BESI 100,000.00 OH
7 LADEN TUKANG BATU / BESI 80,000.00 OH
8 PEKERJA GALIAN TANAH 80,000.00 OH
9 OPERATOR 175,000.00 OH
10 SUPIR 125,000.00 OH
11 PENJAGA MALAM / SATPAM 80,000.00 OH
12 PENYELAM 200,000.00 OH

B. HARGA BAHAN
HARGA SATUAN
No. SATUAN KETERANGAN
Rp.
1 Air 100.00 ltr
2 Atap Seng Metal 67,650.00 m²
3 Atap Klip-Lok 336,000.00 m²
4 Baja Profil 28,600.00 kg
5 Baja Profil Siku L.30.30.3 28,600.00 kg
6 Bak kontrol induk pas. 1/2 batu ukuran 50 x 50 cm 950,000.00 unit
7 Bak Cuci Piring Logam 900,000.00 buah
8 Bak Cuci Tangan/ Wastafel Keramik 1,550,000.00 buah
9 Bak Mandi Fibre 700,000.00 buah
10 Bataco 8,000.00 buah
11 Batu (>1000) Kg - Material Water Break 350,000.00 m³
12 Batu (250-1000) Kg - Material Water Break 300,000.00 m³
13 Batu (<250) Kg - Material Water Break 250,000.00 m³
14 Batu Bata/ Tela 700.00 Bh
15 Batu Kali/ Batu Belah (Sungai/ Gunung) 150,000.00 m³
16 Batu Pakhlag (Batu 5-7 cm) 199,200.00 m³
17 Batu Pecah 2-3 cm 378,500.00 m³
18 Baut Kap Ø 1/2- 8 5,500.00 buah
19 Baut reng 5,500.00 buah
20 Baut truss 5,500.00 buah
21 Bensin (Industri) 10,500.00 liter
22 Besi Beton Polos 14,300.00 kg
23 Besi Beton Ulir 18,700.00 kg
24 Besi Bout (Kuda-kuda) 5/8 - 10" 4,920.00 buah
25 Besi Hollow 40 x 40 13,000.00 m
26 Besi profil 20,000.00 kg
27 Besi strip 20,000.00 kg
28 Zakering (Kast Lokal 1 Zakering) 181,700.00 buah
29 Bubungan Genteng 55,350.00 m'
30 Bubungan Seng 79,950.00 m'

Upah Bahan PIJAY 2018 383 dari 391


31 Cat Dasar Tembok 30,000.00 kg
32 Cat Dasar Tembok setara Dulux 55,800.00 kg
33 Cat Kayu Dasar 48,000.00 kg
34 Cat Kayu Mengkilat 61,500.00 kg
35 Cat marka Jalan (Non Thermoplast) 36,900.00 kg
36 Cat Menie 61,500.00 kg
37 Cat Meni Besi 48,000.00 Kg
38 Cat Tembok setara Jotun 24,000.00 kg
39 Cermin Setara Toto 200,000.00 buah
40 Chipping 8,000.00 m²
41 Dempul Kayu 30,200.00 kg
42 Engsel Jendela 18,450.00 pasang
43 Engsel Pintu 30,750.00 pasang
44 Espagnolet 147,500.00 buah
45 Filler 1,845.00 Kg
46 Fitting lampu 15,000.00 bh
47 Floor drain 29,000.00 bh
48 Floordeck 1 mm, lebar efektif 880 mm 204,400.00 m
49 Geosand Bag (2,4m x 1,45 m) 638,450.00 bag
50 Geotube (P + 20m, T + 1,5m, L + 1,8m) 91,530,000.00 tube
51 Genteng Beton 14,760.00 keping
52 Genteng Keramik 18,450.00 keping
53 Granite ukr. 60 x 60 cm 160,000.00 m²
54 Travertine ukr. 60 x 120 931,680.00 m²
55 Gip Sum (120x240)cm 116,850.00 lembar
56 Grendel Jendela/ Pintu 12,300.00 buah
57 Gravel 156,000.00 m³
58 Hak Angin 12,000.00 buah
59 HPL Taco New Natural Maple 228,000.00 lbr
60 Ijuk 24,000.00 Kg
61 Instalasi 219,000.00 ttk
62 Instalasi PDAM 1,850,000.00 unit
63 Jaring kawat baja / wire mesh 4 mm 19,793.01 kg
64 Jendela kawat harmonika lapis plastik PVC 35,000.00 m²
65 Kabel Baja/ Sling 43,200.00 kg
66 Kabel NYM 3 x 2,5 mm² 18,450.00 m¹
67 Kaca Bening uk. 2 mm 61,500.00 m²
68 Kaca Bening uk. 3 mm 135,110.79 m²
69 Kaca Bening uk. 5 mm 186,452.89 m²
70 Kaca Raybend uk. 3 mm 186,452.89 m²
71 Kaca Raybend uk. 5 mm 226,986.13 m²
72 Kaca Cermin 2 mm 149,162.31 m²
73 Kaca Cermin 3 mm 149,162.31 m²
74 Kaca Cermin 5 mm 149,162.31 m²
75 Kaca clear tempered 12 mm 1,148,000.00 m²
76 kaca es 3 mm 133,000.00 m²
77 Kaca Panasap 8 mm 380,000.00 m²
78 Kaca warna 5 mm 147,000.00 m²
79 Kanstin 27,200.00 Bh
80 Karpus Asbes Gelombang Besar 116,850.00 m¹
81 Karpus Asbes Gelombang Kecil 98,400.00 m¹

Upah Bahan PIJAY 2018 384 dari 391


82 Karpus Genteng Beton 73,800.00 m¹
83 Karpus Genteng Keramik 118,080.00 m¹
84 Kawat beton 19,000.00 kg
85 Kawat Bronjong Ø 3 mm 34,500.00 kg
86 Kawat Bronjong Ø 4 mm 34,500.00 kg
87 Kawat Bronjong Ø 5 mm 34,500.00 kg
88 Kawat Duri 24,600.00 Kg
89 Kawat Harmonika 24,600.00 m²
90 Kawat Nyamuk/ Kasa Logam 25,500.00 m²
91 Kawat Nyamuk/ Kasa Plastik 27,000.00 m²
92 Kawat las listrik 45,000.00 kg
93 Kayu Bakar 780,000.00 m³
94 Kayu Bakau 10 cm 64,000.00 batang
95 Kayu Cerucuk 10 cm 60,000.00 batang
96 Kayu Klas I (Seumantok/ Ulin/ dll) 6,880,000.00 m³
97 Kayu Klas II (Kamper/ Kruing/ dll) 5,840,000.00 m³
98 Kayu Klas III (Borneo/ dll) 6,456,000.00 m³
99 Kayu Klas IV (Sengon/ dll) 3,918,000.00 m³
100 Kayu perancah (dolken) 40,000.00 btg
101 Keramik uk. 16 x 60 cm setara STAR WHITE 155,054.08 buah
102 Keramik Sisi Kulit Jeruk 20 x 20 cm 108,240.00 m²
103 Keramik uk. 20 x 25 cm 144,000.00 kotak
104 Keramik uk. 25 x 25 cm setara KAISAR 112,000.00 kotak
105 Keramik uk. 25 x 40 cm setara KAISAR 124,800.00 kotak
106 Keramik uk. 30 x 30 cm setara Platinum 73,000.00 m²
107 Keramik uk. 30 x 30 cm setara IKAD 73,000.00 m²
108 Keramik uk. 30 x 60 cm setara ROMAN 205,600.00 m²
109 Keramik uk. 30 x 60 cm setara STAR WHITE 246,108.16 buah
110 Keramik uk. 40 x 40 cm 79,800.00 m²
111 Keramik uk. 40 x 40 cm setara PLATINUM 27,937.60 buah
112 Keramik uk. 60 x 120 cm setara STAR WHITE 746,905.60 buah
113 Kerikil 530,000.00 m³
114 Kerosen/ Minyak Tanah (Industri) 10,000.00 liter
115 Kerosen/ Minyak Tanah (Subsidi) 10,000.00 liter
116 Kertas Amplas 9,840.00 lembar
117 Kloset Duduk Keramik 1,045,000.00 buah
118 Kloset Duduk Keramik setara TOTO 1,045,000.00 bh
119 Kloset Jongkok Keramik 450,000.00 buah
120 Kloset Jongkok Keramik setara TOTO 470,000.00 bh
121 Kran air 3/4 atau 1/2 setara San Ei 60,000.00 bh
122 Kuas 4" setara ETERNA 32,000.00 bh
123 Kunci gembok 54,000.00 bh
124 Kunci Pintu 147,000.00 buah
125 Kunci Pintu Kamar Mandi 175,000.00 buah
126 Kunci Slot Besi 30,000.00 buah
127 Kusen Jendela Aluminium 60,000.00 m¹
128 Kusen Pintu Aluminium 60,000.00 m¹
129 Lampu Pijar 40 Watt 25,000.00 buah
130 Lampu RM 2x20 watt setara PHILIPS 520,000.00 bh
131 Lampu TL 20 watt 56,000.00 buah
132 Lampu TL 40 watt 85,000.00 buah

Upah Bahan PIJAY 2018 385 dari 391


133 Lampu TL 23 watt setara PHILIPS 171,200.00 bh
134 Lampu TL 40 watt setara PHILIPS 208,000.00 bh
135 Lem Aibon 29,520.00 buah
136 Lem kayu 38,000.00 kg
137 Lem Kuning 60,000.00 kg
138 Lempengan Rumput 51,840.00 m²
139 List Eternit Kayu 36,950.00 m¹
140 List profil 36,950.00 m¹
141 List Gypsum 16,000.00 m¹
142 List Shunda Plafon 78,000.00 m¹
143 Marmer 1,180,800.00 m²
144 MCB 1 phase stuz 2 s/d 10 Amp 75,889.33 bh
145 Minyak bekisting 7,200.00 ltr
146 Minyak Cat 29,500.00 liter
147 Multipleks 3 mm 80,000.00 lembar
148 Multipleks 4 mm 78,000.00 lembar
149 Multipleks 6 mm 110,000.00 lembar
150 Multipleks 9 mm 145,000.00 lembar
151 Naco (Kerangka+Daun) 610,080.00 m²
152 Nok/ Rabung Seng 0,35 Cat Pabrik 72,816.00 lembar
153 Nok/ Rabung Seng 0,35 Tidak Dicat 62,976.00 lembar
154 Oksigen 430,500.00 m³
155 Onduline 3 mm uk. 200 x 95 mm 210,600.00 lembar
156 Ongkos Kirim Barang dari Surabaya 44,000.00 Kg
157 Paku Asbes 45,500.00 Kg
158 Paku Beton 65,000.00 kg
159 Paku Beton 8 Inchi 18,000.00 kotak
160 Paku Kait 1,200.00 buah
161 Paku Kayu 17,000.00 kg
162 Paku Onduline 1,900.00 buah
163 Paku Reng 15,000.00 kg
164 Paku Seng 18,000.00 kg
165 Paku Sekrup 17,000.00 kg
166 Paku Sumbat 1,200.00 buah
167 Paku triplek 15,000.00 kg
168 Paku Ulir Primadek 3,690.00 buah
169 Panel ACP Merk Seven Tipe PVDF, t = 4 mm 600,000.00 m²
170 Parquet Jati uk. 1,5 x 15 x 30-120 480,000.00 m²
171 Pasir Batu (Sirtu) - Material Jalan 246,000.00 m³
172 Pasir Beton/ Kerikil 153,000.00 m³
173 Pasir Pasang 150,000.00 m³
174 Pasir Urug 100,000.00 m³
175 Paving Block 128,000.00 m²
176 Paving Block Tipe Conblock 4 128,000.00 m²
177 Pelumas/ Oli 45,500.00 ltr
178 Pengadaan sumur bor 45,000,000.00 unit
179 Pipa Leiding Ø 1" Galvanis Tebal 3,2mm 244,200.00 batang
180 Pipa Leiding Ø ½" Galvanis Tebal 3,2mm 148,000.00 batang
181 Pipa Leiding Ø 1½" Galvanis Tebal 3,2mm 351,000.00 batang
182 Pipa Leiding Ø 2" Galvanis Tebal 3,2mm 414,500.00 batang
183 Pipa Leiding Ø 3" Galvanis Tebal 3,2mm 418,200.00 batang

Upah Bahan PIJAY 2018 386 dari 391


184 Pipa Leiding Ø 4" Galvanis Tebal 3,2mm 826,560.00 batang
185 Pipa Leiding Ø 6" Galvanis Tebal 3,2mm 1,845,000.00 batang
186 Pipa PVC Ø 1" 51,400.00 batang
187 Pipa PVC Ø ½" Kualitas AWE (United) 39,500.00 batang
188 Pipa PVC Ø 1½" 103,320.00 batang
189 Pipa PVC Ø 2" 144,648.00 batang
190 Pipa PVC Ø 3" 258,300.00 batang
191 Pipa PVC Ø ¾" 45,500.00 batang
192 Pipa PVC Ø 4" 405,900.00 batang
193 Plamir Kayu 30,200.00 kg
194 Plamur Tembok 30,200.00 kg
195 Plat Baja 28,600.00 kg
196 Plafon PVC 6 mm uk. 20 x 400 cm setara SHUNDA 160,000.00 lembar
197 Plint Keramik 15 x 30 29,766.00 buah
198 Plint Ubin Abu-abu 15 x 20 10,420.00 buah
199 Plint Ubin Berwarna 15 x 20 10,420.00 buah
200 Plint Ubin Teraso 10 x 30 8,856.00 buah
201 Ramset 5,600.00 m¹
202 Rangka / bingkai plat strip + kawat kasa 16,600.00 m²
203 Rangka Furing 185,000.00 m²
204 Relief timbul 5 cm 250,000.00 m¹
205 Reng U 0.5 10,000.00 m¹
206 Residu 13,000.00 kg
207 Reservoir Air 0,5 m³ Fibre 2,214,000.00 buah
208 Reservoir Air 1 m³ Fibre 3,600,000.00 buah
209 Reservoir Air 0,5 m³ Stailess Steel 4,075,000.00 buah
210 Reservoir Air 1 m³ Stailess Steel 6,250,000.00 buah
211 Seal tape 7,500.00 bh
212 Semen 1,400.00 kg
213 Semen @ 40 kg 56,000.00 Zak
214 Semen @ 50 kg 70,000.00 Zak
215 Semen Putih @ 50 kg 147,000.00 Zak
216 Semen Warna 2,940.00 kg
217 Seng BJLS 0,2 29,000.00 m²
218 Seng BJLS 0,2 Cat Pabrik 36,000.00 m²
219 Seng Gelombang BJLS 30 49,200.00 m²
220 Seng Gelombang BJLS 30 Cat Pabrik 79,000.00 m²
221 Seng Plat BJLS 20 27,000.00 m²
222 Seng Plat BJLS 30 30,000.00 m²
223 Septictank dan bidang resapan 8,500,000.00 unit
224 Sealant 87,500.00 kg
225 Sika TOP 26,880.00 kg
226 Sika Waterproofing 21,760.00 m²
227 Solar (Industri) 10,500.00 liter
228 Spandek 0,35 BMT 336,000.00 m²
229 Spacer / Formite 29,760.00 Buah
230 Spring Knip 379 Solid 27,360.00 Buah
231 Stop Kontak + Instalasi 73,000.00 titik
232 Tanah Timbun 60,500.00 m³
233 Tanah Timbun Pilihan - Material jalan 97,000.00 m³
234 Tiang / pipa galvanis Ø 2 " 300,000.00 m¹

Upah Bahan PIJAY 2018 387 dari 391


235 Teralis Besi 615,000.00 m²
236 Titik Lampu + Instalasi 219,000.00 titik
237 Urinoir Keramik 1,900,000.00 buah
238 Urinoir setara TOTO 3,192,000.00 Buah
239 Westafel setara TOTO 1,900,000.00 Buah
240 Vinyl 246,000.00 m²
241 Wiremesh SNI M5 uk. 2,1 x 5,4 m 15,840.93 kg
242 Wiremesh SNI M6 uk. 2,1 x 5,4 m 16,110.47 kg
243 Wiremesh SNI M7 uk. 2,1 x 5,4 m 17,145.73 kg
244 Wiremesh SNI M8 uk. 2,1 x 5,4 m 15,840.75 kg

Upah Bahan PIJAY 2018 388 dari 391


Pidie

No Uraian Satuan Harga Harga

1 Mandor OH 96,000.00
###
2 Kepala Tukang Kayu / Cat OH 104,000.00
###
3 Tukang Kayu / Cat OH 96,000.00
###
4 Laden Tukang Kayu / Cat OH 70,000.00
###
5 Kepala Tukang Batu / Besi OH 104,000.00
###
6 Tukang Batu/ Besi OH 96,000.00
###
7 Laden Tukang Batu/ Besi OH 70,000.00
###
8 Pekerja Galian Tanah OH 70,000.00
###
9 Penjaga Malam OH 64,000.00
###
10 Penyelam OH 150,000.00
###
11 Supir OH 125,000.00
###
12 Operator OH 175,000.00
###
13 Pembantu Operator OH 93,000.00
###
14 Pembantu Juru Ukur OH 90,000.00
###
15 Juru Ukur OH 120,000.00
###

II Material / Bahan
1 Air M3 100,000.00
###
2 Air Liter 100.00
###
3 Agregat Kasar M3 193,472.00
###
4 Agregat Halus M3 204,356.00
###
5 Asphalt Kg 13,860.00
###
6 Baja Profil Kg 28,600.00
###
7 Bak Cuci Piring Logam Bh 378,000.00
###
8 Batu Bata Bh 600.00
###
9 Batu Kali/ Batu Belah (Sungai / Gunung ) M3 142,500.00
###
10 Bensin (Industri) Liter 7,200.00
###
11 Besi Beton Polos Kg 13,000.00
###
12 Besi Beton Ulir Kg 17,000.00
###
13 Beton Rooster/ Kerawang Bh 25,000.00
###
14 Bubungan Seng M' 13,500.00
###
15 Cat Kayu Dasar Kg 16,000.00
###
16 Cat Kayu Mengkilat/Penutup Kg 45,000.00
###
17 Cat Menie Besi Kg 45,000.00
###
18 Cat Tembok Kg 20,000.00
###
19 Dempul Kayu Kg 25,000.00
###
20 Engsel Jendela Pasang 15,000.00
###
21 Engsel Pintu Pasang 18,000.00
###
22 Filler Kg 1,815.00
###
23 Floor Drain Bh 20,000.00
###
24 Gomuk Kg 30,000.00
###
25 Grendel Jendela / Pintu Bh 12,000.00
###
26 Hak Angin Bh 10,000.00
###
27 Kaca Bening Uk. 5 mm M2 120,000.00
###
28 Kawat Beton Kg 18,700.00
###
29 Kawat Bronjong Pabrikan Uk. ( 2 x 1 x 0,5 ) dia. 3 mm kG 17,380.00
###
30 Kawat Duri Kg 16,740.00
###
31 Kawat Las Kg 17,600.00
###
32 Kayu Bakau / Dolken 10 Cm Btg 60,000.00
###
33 Kayu Kelas I M3 6,482,550.00
###
34 Kayu Kelas II M3 5,255,650.00
###
35 Kayu Kelas III M3 4,554,850.00
###
36 Kayu Kelas IV M3 3,817,000.00
###
37 Keramik uk. 30 x 30 cm M2 60,000.00
###
38 Keramik uk. 40 x 40 cm M2 70,000.00
###
39 Kertas amplas Lbr 2,160.00
###
40 Kloset Jongkok Keramik terpasang Bh 250,000.00
###
41 Kuas cat Bh 20,000.00
###
42 Kunci Pintu Tanam Bh 97,400.00
###
43 Lem kayu Kg 16,200.00
###
44 Lempengan Rumput M2 35,000.00
###
45 Minyak Cat Liter 16,200.00
###
46 Minyak Hidrolik Liter 44,110.00
###
47 Minyak Pelumas Liter 44,110.00
###
48 Multiplek 4 mm Lbr 58,000.00
###
49 Multiplek 6 mm Lbr 72,000.00
###
50 Multiplek 9 mm Lbr 112,500.00
###
51 Nok / Rabung Seng 0,35 Cat Pabrik Lbr 89,640.00
###
52 Nok / Rabung Seng 0,35 tidak di cat Lbr 60,480.00
###
53 Paku Kayu Kg 14,000.00
###
54 Paku Seng Kg 32,400.00
###
55 Pasir Batu (Sirtu) material jalan M3 216,000.00
###
56 Pasir Beton / Kerikil M3 104,300.00
###
57 Pasir Pasang M3 117,900.00
###
58 Pasir Urug M3 89,900.00
###
59 Plamur Tembok Kg 21,600.00
###
60 Residu Ltr 9,000.00
###
61 Reservoir Fiber Glass 1 M3 Unit 1,925,000.00
###
62 Reservoir Stainless Steel 1 M3 Unit 2,800,000.00
###
63 Semen 40 kg Zak 53,000.00
###
64 Semen Putih 50 Kg Zak 66,000.00
###
65 Seng Gelombang BJLS 30 Cat Pabrik M2 70,000.00
###
66 Seng Plat BJLS 30 M2 65,000.00
###
67 Solar Industri Liter 8,386.37
###
68 Stop Kontak + Instalasi Titik 150,000.00
###
69 Tanah Timbun M3 53,568.00
###
70 Titik Lampu + Instalasi Titik 150,000.00
###
71 Kerosene (Minyak Tanah) Industri Liter 13,500.00
###
72 Tarian Jendela bh 10,000.00
73 Bak air Viber 70 X 70 X 66 CM bh 265,000.00
74 Instalasi Air Kotor Unit 1,000,000.00
75 Septictank dan resapan dari Cincin sumur Unit 1,000,000.00
76 Lampu HE 18 W bh 25,000.00
77 Sakelar 1 gang Setara Braco bh 15,000.00
78 Sakelar 2 gang Setara Braco bh 20,000.00
79 Stop Kontak setara Braco bh 15,000.00
80 Pintu kayu 80 x 200 cm bh 620,000.00
81 Pintu kayu 70 x 200 cm bh 600,000.00
82 Pintu Viber bh 250,000.00
83 Daun Jendela 60 x 120 bh 300,000.00
84 Kontruksi Kuda -Kuda Ringan Galvanized m2 175,000.00
85 Pekerjaan Atap Galvanized t=0.25 mm m2 65,000.00