DAFTAR HAGRA BAHAN DAN SATUAN UPAH

HARGA
NO URAIAN SATUAN SATUAN
(RUPIAH)
A UPAH:
1 Mandor hari 110,000.00
2 Kepala Tukang hari 110,000.00
3 Tukang hari 110,000.00
4 Pekerja hari 85,000.00

B BAHAN/MATERIAL
1 Air Kerja ls 4,500,000.00
2 Alkali Resisting kg 60,000.00
3 Cat Dasar exterior kg 34,000.00
Cat Dasar interior kg 23,913.04
4 Cat Kayu kg 60,000.00
5 Cat Meni kg 17,000.00
6 Nippon Cat Tembok exterior kg 34,400.00
Nippon Cat Tembok interior kg 25,000.00
7 Toto Kloset Jongkok bh 1,500,000.00
8 Amplas lbr 4,500.00
9 Anti Lumut kg 90,000.00
11 Atap Sakura Roof (2 Susun) m2 60,000.00
12 AW Pipa PVC Ø 1" m 22,400.00
13 AW Pipa PVC Ø 1/2" m 4,250.00
14 AW Pipa PVC Ø 2" m 12,500.00
15 AW Pipa PVC Ø 3" m 18,750.00
16 Batu Apung kg 15,000.00
17 hebel 10 cm bh 7,954.55
18 Batu Batako 10/20/40 bh 4,000.00
19 Batu Kali m3 150,000.00
20 Baut Engsel/Teralis dos 7,500.00
21 Baut Ø12-15 bh 1,680.00
22 Baut Ø16-20 bh 2,240.00
23 Belucci Kunci set 160,000.00
24 Besi Polos Ø 10 mm kg 5,115.16
25 Besi Polos Ø 12 mm kg 3,705.54
26 Besi Polos Ø 16 mm kg 3,635.18
27 Besi Polos Ø 8 mm kg 5,221.45
29 Besi Polos Ø 12 mm lnjr 120500 132,550.00
30 Besi Polos Ø 16 mm lnjr 0 0.00
28 Besi Polos Ø 10 mm lnjr 83400 91,740.00
31 Besi Polos Ø 8 mm lnjr 53300 58,630.00
Besi Polos Ø 6 mm lnjr 31500 34,650.00
32 Besi Strip kg 18,000.00
33 Diamond Kasar Keramik 20x20 bh 4,062.50
34 Falco Engsel Jendela 3" bh 38,000.00
35 Falco Engsel Pintu 5 " bh 33,600.00
36 Gypsum lbr 60,000.00
37 Hak Angin psg 11,200.00
38 Ikad Keramik 30x30 bh 8,333.33
39 Impra Dempul kg 20,000.00
40 Impresso Keramik 30x30 bh 8,333.33
41 Indocement Semen Warna 50 kg zak 65,000.00
42 Jendela Kaca/Jalusi Miring bh 250,000.00
43 Kaca Bening t = 5 mm m2 110,000.00
44 Kaca Hitam t = 5 mm m2 106,400.00
45 Kawat Bendrad kg 18,000.00
46 Kawat Beton kg 13,000.00
47 Kawat Duri m' 1,400.00
48 Kayau Meranti Papan 3/20 (Kls. 2) m3 1,100,000.00
49 Kayau Meranti Papan 3/20 (Kls. 2) btg 6,600.00
50 Kayu Meranti Balok 5/7 (Kls. 2) m3 123,200.00
51 Kayu Meranti Balok 5/7 (Kls. 2) btg 7,746.48
52 Kayu Bengkirai Balok (Kls. 1) m3 1,456,000.00
53 Kayu Bengkirai Papan (Kls. 1) m3 1,568,000.00
54 Kayu Bengkirai Balok 5/10 (Kls. 1) btg 29,500.00
55 Kayu Bengkirai Balok 5/7 (Kls. 1) btg 20,500.00
56 Kayu Bengkirai Balok 2/3 (Kls. 1) btg 3,500.00
57 Kayu Bengkirai Balok 8/12 (Kls. 1) btg 45,000.00
58 Kayu Bengkirai Papan 3/20 (Kls. 1) btg 60,500.00
59 Kayu Meranti 4/6 (Kls. I) btg 7,500.00
60 Kayu Ulin Balok (Kls. 1) btg 38,080.00
61 Kayu Meranti Balok (Kls. 1) m3 1,008,000.00
62 Kayu Meranti Papan (Kls. 1) m3 1,064,000.00
63 Kayu Ulin Balok (Kls. 1) m3 1,904,000.00
64 Kayu Ulin Papan (Kls. 1) m3 2,072,000.00
66 Kerikil Beton m3 150,000.00
67 Granit 60 x 60 bh 93,750.00
kramik 50 x 50 70,000.00
68 Kia Polos Keramik 20 x 20 bh 60,000.00
69 Kran Air bh 25,000.00
70 Kuas 4" bh 9,500.00
71 Kusen Bengkirai Standar m' 24,000.00
72 Lambersering meranti btg 15,000.00
73 Volk wastapel + cermin bh 500,000.00
74 List Profil m' 10,000.00
75 Lock Wiondow bh 15,000.00
76 Minyak Bekisting lt 10,000.00
77 Nicole Kunci set 78,400.00
78 Nok Surya Roof 100 mm bh 33,600.00
79 Nok Surya Roof 33 mm bh 16,800.00
80 Paku Biasa 2" - 5" kg 18,000.00
81 Paku Sekrup dos 10,000.00
82 Paku Ulin 1" - 5" kg 12,200.00
83 Paragon Plamir kg 8,540.00
84 Pasir Cor m3 200,000.00
85 Pasir Pasang m3 166,666.67
86 Pasir urug m3 83,333.33
87 Pemasangan Listrik ls 0.00
88 Perlatan Kecil ls 200,000.00
89 T-Dos (Kontak Hubung Bagi) b 4,500.00
90 Pintu WC bh 980,000.00
91 Playwood t = 6 mm lbr 65,000.00
92 Playwood t = 9 mm lbr 102,500.00
93 Playwood t =3 mm lbr 40,000.00
94 Pujatex Cat Minyak kg 36,600.00
95 Reservoir/Tangki Air 1200 L bh 952,000.00
96 Rol Cat bh 20,000.00
97 Seng Gelombang BJLS 32 lbr 32,480.00
98 Sirtu m3 100,000.00
99 Talang Air PVC btg 50,400.00
100 Tanah Urug m3 45,000.00
101 Terali Pengaman m2 100,000.00
102 Toto Kloset Jongkok bh 350,000.00
103 Tonasa Semen Portland 50 kg zak 48,000.00
104 Bak Cuci Stainless bh 500,000.00
105 Tulangan kg 14,308.25
106 Floor Drain Bh 40,000.00
107 Water Drain dan Asesories Bh 85,000.00
108 Pipa PVC Listrik m 7,000.00
109 Saklar Tunggal Bh 18,000.00
110 Kabel NYY 2.5 mm2 m 8,900.00
111 Kabel NYY 1.5 mm2 m 8,200.00
112 Lampu Pijar 20W bh 89,000.00
113 Fitting Lampu bh 15,000.00
114 Inbouw Doss bh 4,500.00
115 Perlengkapan (Isolasi, Paku, Klem, Samb) set 1,000.00
116 Stop Kontak bh 18,000.00
117 Lampu Neon Lengkap bh 35,000.00
118 Box MCB bh 35,000.00
119 Seng Plat 3 x 6 BJLS 28 lbr 28,500.00
120 MCB 6A bh 40,000.00
Tonasa Semen MU prekat kg 2,500.00
C HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI
1 Pembersihan Lapangan m2 0.00
2 Pemasangan Bouplank/Pengukuran m2 0.00
3 Pengadaan Air Kerja Ls 0.00
4 Pembuatan Gedung Semen dan Alat m2 0.00
5 Galian Tanah Biasa 1 Meter m 3
0.00
6 Galian Tanah Biasa 2 Meter m3 0.00
7 Galian Tanah Biasa 3 Meter m3 0.00
8 Galian Tanah Keras 1 Meter m 3
0.00
9 Galian Tanah Cadas 1 Meter m3 0.00
10 Galian Tanah Lumpur 1 Meter m3 0.00
11 Urugan Kembali Galian m3 0.00
12 Pemadatan Tanah m3 0.00
13 Urugan Pasir Bawah Pondasi m3 0.00
14 Pasangan Pondasi Batu Kosong m3 0.00
15 Pasangan Pondasi Batu Kali m3 0.00
16 Sloof 15/20 m3 0.00
17 Pekerjaan Pondasi Plat m3 0.00
18 Kolom 15/15 m3 0.00
19 Kolom 15/20 m3 0.00
20 Kolom 15/25 m3 0.00
21 Kolom 15/30 m3 0.00
22 Kolom 20 x 20 m3 0.00
23 Kolom 20 x 25 m3 0.00
24 Kolom 20 x 30 m 3
0.00
25 Kolom 20 x 35 m3 0.00
26 Kolom 20 x 40 m3 0.00
27 Kolom 25 x 25 m 3
0.00
28 Kolom 25 x 30 m3 0.00
29 Kolom 25 x 35 m3 0.00
30 Kolom 25 x 40 m3 0.00
31 Kolom 25 x 45 m3 0.00
32 Kolom 25 x 50 m3 0.00
33 Kolom 30 x 30 m3 0.00
34 Kolom 30 x 35 m3 0.00
35 Kolom 30 x 40 m3 0.00
36 Kolom 35 x 45 m3 0.00
37 Kolom 35 x 50 m3 0.00
38 Kolom 40 x 40 m3 0.00
39 Kolom 40 x 45 m3 0.00
40 Kolom 40 x 50 m3 0.00
41 Balok 15 x 20 m3 0.00
42 Balok 15 x 25 m3 0.00
43 Balok 15 x 30 m 3
0.00
44 Balok 20 x 20 m3 0.00
45 Balok 20 x 25 m3 0.00
46 Balok 20 x 30 m 3
0.00
47 Balok 20 x 35 m3 0.00
48 Balok 20 x 40 m3 0.00
49 Balok 25 x 25 m3 0.00
50 Balok 25 x 30 m3 0.00
51 Balok 25 x 35 m3 0.00
52 Balok 25 x 40 m3 0.00
53 Balok 25 x 45 m3 0.00
54 Balok 25 x 50 m3 0.00
55 Balok 30 x 30 m3 0.00
56 Balok 30 x 35 m3 0.00
57 Balok 30 x 40 m3 0.00
58 Balok 35 x 45 m3 0.00
59 Balok 35 x 50 m3 0.00
60 Balok 40 x 40 m3 0.00
61 Balok 40 x 45 m3 0.00
62 Balok 40 x 50 m 3
0.00
63 Plat Beton m3 0.00
64 Ring Balok m3 0.00
65 Tangga m 3
0.00
66 Pasangan Dinding Batubata (1:4) m3 0.00
67 Pasangan Dinding Batubata (1:2) m3 0.00
68 Kusen Pintu dan Jendela m3 0.00
69 Balok Dinding m3 0.00
70 Pekerjaan Kuda-Kuda m3 0.00
71 Pekerjaan Rangka Atap m3 0.00
72 Pekerjaan Listplank 3/25 m3 0.00
73 Gording 8/12 m3 0.00
74 Talang m' 0.00
75 Pemasangan Atap m2 0.00
76 Pemasangan Perabung m3 0.00
77 Rangka Plafon m2 0.00
78 Memasang Plafond Gypsum m2 0.00
79 Memasang Lis Plafond m' 0.00
80 Plasteran Dinding (1:2) m2 0.00
81 Plasteran Dinding (1:4) m 2
0.00
82 Acian m2 0.00
83 Pasangan Turap Porslent m2 0.00
84 Urugan Pasir 0.00
85 Pasangan Lantai Kramik 33 x 33 m2 0.00
86 Pasangan Lantai Kramik 20 x 20 m2 0.00
87 Pasangan Pintu Bh 0.00
88 Pasangan Jendela kaca m2 0.00
89 Pasangan Kaca Tebal 15 mm m2 0.00
90 Pasangan Engsel Pintu Bh 0.00
91 Pasangan Kunci Taman Antik Bh 0.00
92 Mendempul dan Mrnggosok Kayu m2 0.00
93 Mengecat Kayu Baru m2 0.00
94 Mengecat Tembok Baru m2 2,000.00
95 Pemasangan Listrik Baru Ls 0.00
96 Pemasangna Kloset Jongkok Bh 0.00
97 Pemasangan Kloset Duduk Bh 0.00
98 Pemasangan Floor Draine Bh 0.00
99 Pemasangan Bak Cuci Piring Bh 0.00
100 Pemasangan Wastafel Bh 0.00
101 Pem. Pipa Air Ø 3" Per M' M' 0.00
102 Pem. Pipa Air Ø 3/4" AW Per M' M' 0.00
103 Pem. Pipa Air Ø 1/2" AW Per M' M' 0.00
104 Pem. Kran Air Ø 3/4" atau 1/2" Bh 0.00
105 Rabat Beton (1:3:5) M3 0.00
106 Bak Kontrol Bh 0.00
107 Septictank Bh 0.00
108 Resapan Bh 0.00
UPAH
KEMBALI

KET

0.39 149,186
0.62 94,565
1.58 -
0.22 266,500

besi 6 27,500.00

166.67

50.000
1.440 135,000.00 4 0.36

40 x 40 1.000 93,750.00 0.6944444

0.160 0.96

pasir 170000.000
VOLUME PEKERJAAN

NO URAIAN PEKERJAAN luas VOLUME


I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. 1.1.1. Bongkaran dan pembersihan lapangan -
1.1.2. Pemasangan Bouplank/Pengukuran -
1.1.3. Pengadaan Air Kerja
1.1.4. Pembuatan Gudang Semen dan Alat -
1.1.5. Dereksi Keet

1.2. Pekerjaan Galian


1.2.1. Galian Tanah Biasa 1 Meter -
1.2.2. Galian Tanah Biasa 2 Meter
1.2.3. Galian Tanah Biasa 3 Meter
1.2.4. Galian Tanah Keras 1 Meter
1.2.5. Galian Tanah Cadas 1 Meter
1.2.6. Galian Tanah Lumpur 1 Meter -
1.2.7. Urugan Kembali Galian
1.2.8. Pemadatan Tanah
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi
1.3.2. Pasangan Pondasi Batu Belah
1.3.3. Pasangan Pondasi Batu Kali

II. PEKERJAAN BETON


2.1. Beton Bertulang
2.1.1. Sloof 15 x 20
2.1.2. Pondasi Foot Plat
2.1.2. Kolom 15 x 15
2.1.3. Kolom 15 x 20
2.1.4. Kolom 15 x 25
2.1.5. Kolom 15 x 30
2.1.6. Kolom 20 x 20
2.1.7. Kolom 20 x 25
2.1.4. Kolom 20 x 25
2.1.9. Kolom 20 x 35
2.1.10. Kolom 20 x 40
2.1.11. Kolom 25 x 25
2.1.12. Kolom 25 x 30
2.1.13. Kolom 25 x 35
2.1.14. Kolom 25 x 40
2.1.15. Kolom 25 x 45
2.1.16. Kolom 25 x 50
2.1.17. Kolom 30 x 30
2.1.18. Kolom 30 x 35
2.1.19. Kolom 30 x 40
2.1.20. Kolom 35 x 45
2.1.21. Kolom 35 x 50
2.1.22. Kolom 40 x 40
2.1.23. Kolom 40 x 45
2.1.24. Kolom 40 x 50
2.1.5. Balok 15 x 20
2.1.26. Balok 15 x 25
2.1.27. Balok 15 x 30
2.1.28. Balok iwf
2.1.29. Balok 20 x 25
2.1.30. Balok 20 x 30
2.1.31. Balok 20 x 35
2.1.32. Balok 20 x 40
2.1.33. Balok 25 x 25
2.1.34. Balok 25 x 30
2.1.35. Balok 25 x 35
2.1.36. Balok 25 x 40
2.1.37. Balok 25 x 45
2.1.38. Balok 25 x 50
2.1.39. Balok 30 x 30
2.1.6. Balok 30 x 35
2.1.40. Balok 30 x 40
2.1.41. Balok 35 x 45
2.1.42. Balok 35 x 50
2.1.43. Balok 40 x 40
2.1.44. Balok 40 x 45
2.1.45. Balok 40 x 50
2.1.7. Plat Beton
2.1.8. Ring Balok
2.1.9. Tangga

2.2. Beton Tak Bertulang


2.2.1. Beton Cor 1 : 2 : 3

III. PEKERJAAN DINDING


3.1. Dinding
3.1.1. Pasangan Dinding 1/2 Bata (1:4) -
3.1.2. Pasangan Dinding 1/2 Bata (1:2)

3.2. Kusen dan pintu wc


2.3.1. Kusen kayu -
2.3.2. Alumunium 2x4 cm untuk kaca mati -
2.3.3. Kusen alumunium 3 inchi untuk daun jendela/pintu -

IV. PEKERJAAN KAP DAN ATAP


4.1. Kap dan Rangka Atap
4.1.1. Balok Dinding 8/12
4.1.2. Pekerjaan Kuda-Kuda
4.1.3. Pekerjaan Rangka Atap
4.1.4. Pekerjaan Listplank 3/25
4.1.5. Pekerjaan Papan Reuter 3/25
4.1.6. Nog dan Gording 8/12
4.1.7. Pekerjaan Talang
4.2. Atap
4.2.1. Pemasangan Atap 29.00
4.2.2. Pemasangan kanopi -
4.2.3. pagar dan besi -
-
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon -
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum -
5.2.2. Memasang sayap Plafond -

VI. PEKERJAAN PLASTERAN DAN ACIAN


6.1. Plasteran
6.1.1. Plasteran Dinding (1:2)
6.1.2. Plasteran Dinding (1:4) -
6.1.3. Acian normal -
6.1.4. Acian instan AM 86 40 lg -
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent

VII. PEKERJAAN LANTAI


7.1. Urugan Bawah Lantai
7.1.1. Urugan Tanah -
7.1.2. Urugan Pasir -
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai vinly 45.00
7.2.2. Pasangan Lantai Kramik 40 x40 -

VIII. PEKERJAAN PINTU DAN JENDELA


8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu kayu - 0.00
8.1.2. Pasangan Jendela alumunium - 0.00
8.1.2. Pasangan Jendela mati alumunium -
8.2. Kaca 0.00
8.2.1. Pasangan Kaca Tebal 5 mm - 0.00
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu - 0.00
8.3.2. Pasangan Engsel,hak angin,slot jendela - 0.00
8.3.3. Pasangan Kunci Taman Antik - 0.00

IX. PEKERJAAN PENGECATAN


9.1. Mendempul dan Mrnggosok Kayu - 0.00
9.2. Mengecat Kayu Baru - 0.00
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
9.3. Mengecat Tembok Baru interior dan plafon - 0.00
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
9.4 Mengecat Tembok Baru ekterior - 0.00
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
X. PEKERJAAN PERLENGKAPAN DALAM
10.1. Listrik
10.1.1. Pasangan Lampu Pijar
10.1.2. Pemasangan Stop Kontak
10.1.3. Pemasangan Lampu TL
10.1.4. Pemasangan MCB
10.1.5. Pemasangan Kabel Jaringan
10.1.6. Pitting lampu
10.1.7. Pemasangan Sakelar
10.1.8. Pipa PVC (Pipa Listrik)
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok
10.2.2. Pemasangan Kloset Duduk
10.2.3. Pemasangan Floor Draine
10.2.4. Pemasangan Bak Cuci Piring
10.2.5. Pemasangan Wastafel
10.2.6. Pem. Pipa Air Ø 3" Per M'
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M'
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M'
10.2.10. Pem. Kran Air Ø 3/4" atau 1/2"
10.2.11. Pasang Toren air 500 L
XI. PEKERJAAN PERLENGKAPAN LUAR
11.1. Saluran Keliling
11.2. Rabat Beton (1:3:5)
11.3. Bak Kontrol
11.4. Resapan
11.5. Septictank
SAT

M2
M
Ls
M2
M2

M3
M3
M3
M3
M3
M3
M3
M3

M3
M3
M3

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

M3

M2
M3

M
M
M

M3
M3
M2
M2
M'
M3
M'

M2
M3
M2

M2
M'

M2
M2
M2
M2

M2

M3
M3

M2
M2

Bh
M2

M2

Bh
Bh
Bh

M2
m2

m2

M2

Bh
Bh
Bh
Bh
M'
Bh
Bh
M'

Unit
Unit
Bh
Bh
Bh
M'
M'
M'
Bh
Bh

M'
M2
M3
M3
M3
HARGA SATUAN PEKERJAAN

HARGA JUM. HARGA


No URAIAN PEKERJAAN
PER SATUAN PER SATUAN
I. PEKERJAAN PONDASI
1.1 PEKERJAAN PERSIAPAN
1.1.1 Tiap 1 M2 Pembersihan Lapangan butuh: Rp
Tenaga Kerja
0.7000 Org Pekerja @Rp 85,000 Rp
0.0900 Org Mandor @Rp 110,000 Rp
0.2000 buang material @Rp 100,000 Rp
Alat
Rp

1.1.2 Tiap 1 M' Pasangan Bouwlpank butuh: Rp


Bahan
0.8571 Lnjr 0.0120 M3 Kayu Meranti Balok 5/7 @Rp 7,746 Rp
0.2917 Lnjr 0.0070 M3 Kayu Meranti Papan 3/20 @Rp 6,600 Rp
0.0200 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
Rp
Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.1.3 Tiap Biaya Air Kerja butuh: Rp


1.0000 Ls Air Kerja @Rp 4,500,000 Rp

1.1.4 Tiap 1 M2 Gudang Semen dan Alat butuh: Rp


Bahan
1.7000 Lnjr 0.0238 M3 Perancah Meranti Balok 5/7 @Rp 7,746 Rp
8.7500 Lnjr 0.2100 M3 Kayu Meranti Papan 3/20 @Rp 6,600 Rp
0.3000 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
0.2100 Zak 10.5000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0300 M3 Pasir Beton @Rp 200,000 Rp
0.0500 M3 Koral Beton @Rp 150,000 Rp
1.5000 Lbr Seng GeloMbang BJLS 32 @Rp 32,480 Rp
Rp
Tenaga Kerja
1.0000 Org Pekerja @Rp 85,000 Rp
1.0000 Org Tukang Kayu @Rp 110,000 Rp
0.2000 Org Kepala Tukang @Rp 110,000 Rp
0.0500 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2 PEKERJAAN GALIAN


1.2.1 Tiap 1 M3 Galian Tanah Biasa Sedalam 1 Meter butuh: Rp
Tenaga Kerja
0.7500 Org Pekerja @Rp 85,000 Rp
0.0250 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
1.2.2 Tiap 1 M3 Galian Tanah Biasa Sedalam 2 Meter butuh: Rp
Tenaga Kerja
0.5260 Org Pekerja @Rp 85,000 Rp
0.0520 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2.3 Tiap 1 M3 Galian Tanah Biasa Sedalam 3 Meter butuh: Rp


Tenaga Kerja
0.7350 Org Pekerja @Rp 85,000 Rp
0.0735 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2.4 Tiap 1 M3 Galian Tanah Keras Sedalam 1 Meter butuh: Rp


Tenaga Kerja
0.6250 Org Pekerja @Rp 85,000 Rp
0.0620 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2.5 Tiap 1 M3 Galian Tanah Cadas Sedalam 1 Meter butuh: Rp


Tenaga Kerja
1.2500 Org Pekerja @Rp 85,000 Rp
0.1250 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2.6 Tiap 1 M3 Galian Tanah Lumpur Sedalam 1 Meter butuh: Rp


Tenaga Kerja
0.8230 Org Pekerja @Rp 85,000 Rp
0.0830 Org Mandor @Rp 110,000 Rp
Rp

Alat Rp

1.2.7 Tiap 1 M3 Urugan Kembali Galian Tanah butuh: Rp


Tenaga Kerja
0.1920 Org Pekerja @Rp 85,000 Rp
0.0190 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.2.8 Tiap 1 M3 Pemadatan Tanah butuh: Rp


Tenaga Kerja
0.5000 Org Pekerja @Rp 85,000 Rp
0.0500 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.3 PEKERJAAN PONDASI BATU KALI


1.3.1 Tiap 1 M3 Urugan Pasir Bawah Pondasi butuh: Rp
Bahan
1.2000 M3 Pasir urug @Rp 83,333 Rp
Rp
Tenaga Kerja
0.3000 Org Pekerja @Rp 85,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.3.2 Tiap 1 M3 Pasangan Pondasi Batu Kosong (Aanstampang) butuh: Rp


Bahan
1.2000 M3 Batu Kali @Rp 150,000 Rp
0.3000 M3 Pasir Urug @Rp 83,333 Rp
Rp
Tenaga Kerja
0.7800 Org Pekerja @Rp 85,000 Rp
0.3900 Org Tukang Batu @Rp 110,000 Rp
0.0390 Org Kepala Tukang @Rp 110,000 Rp
0.0390 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

1.3.3 Tiap 1 M3 Pasangan Pondasi Batu Kali (1:3) butuh: Rp


Bahan
1.2000 M3 Batu Kali @Rp 150,000 Rp
4.0400 Zak 202.0000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.4850 M3 Pasir Pasang @Rp 166,667 Rp
Rp
Tenaga Kerja
1.5000 Org Tukang @Rp 110,000 Rp
0.7500 Org Kepala Tukang @Rp 110,000 Rp
0.0750 Org Pekerja @Rp 85,000 Rp
0.0750 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

II PEKERJAAN BEKISTING DAN BETON BERTULANG


2.1 BEKISTING DAN BETON
2.1.1 Tiap 1 M2 Bekisting Sloof butuh: Rp
Bahan
1.2500 Btg Papan Meranti 3/20 Kelas II @Rp 6,600 Rp
3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II @Rp 7,746 Rp
0.3000 kg Paku @Rp 18,000 Rp
0.1000 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.3000 Org Pekerja @Rp 85,000 Rp
0.2600 Org Tukang Kayu @Rp 110,000 Rp
0.0260 Org Kepala Tukang @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp

2.1.2 Tiap 1 M3 Bekisting Kolom butuh: Rp


Bahan
0.3500 Lbr Playwood t = 6 mm @Rp 65,000 Rp
3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II @Rp 8,000 Rp
0.4000 kg Paku @Rp 18,000 Rp
0.2000 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0200 Org Kepala Tukang @Rp 110,000 Rp
0.0060 Org Mandor @Rp 110,000 Rp
Rp

2.1.3 Tiap 1 M3 Bekisting Balok butuh: Rp


Bahan
0.3500 Lbr Playwood 9mm @Rp 102,500 Rp
3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II @Rp 10,900 Rp
0.4000 kg Paku @Rp 18,000 Rp
0.2000 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.3200 Org Pekerja @Rp 85,000 Rp
0.3300 Org Tukang Kayu @Rp 110,000 Rp
0.0330 Org Kepala Tukang @Rp 110,000 Rp
0.0060 Org Mandor @Rp 110,000 Rp
Rp

2.1.4 Tiap 1 M2 Bekisting Plat Lantai butuh: Rp

0.3500 Lbr Playwood 9mm @Rp 102,500 Rp


1.5625 Btg 0.0150 M3 Kayu Meranti 4/6 Kelas II @Rp 7,500 Rp
6.0000 Btg Balok Meranti 5/7 Kelas II @Rp 10,900 Rp
0.4000 Kg Paku @Rp 18,000 Rp
0.2000 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.3200 Org Pekerja @Rp 85,000 Rp
0.3300 Org Tukang Kayu @Rp 110,000 Rp
0.0330 Org Kepala Tukang @Rp 110,000 Rp
0.0060 Org Mandor @Rp 110,000 Rp
Rp

2.1.5 Tiap 1 M2 Bekisting Tangga butuh: Rp


Bahan
0.3500 Btg 0.0400 M3 Playwood 9mm @Rp 102,500 Rp
0.6250 Btg 0.0150 M3 Kayu Meranti 3/20 (Kls II) @Rp 6,600 Rp
7.5000 Btg 0.1050 M3 Balok Meranti 5/7 Kelas II @Rp 10,900 Rp
0.4000 Kg Paku @Rp 18,000 Rp
0.1500 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.3200 Org Pekerja @Rp 85,000 Rp
2.3000 Org Tukang Kayu @Rp 110,000 Rp
0.0300 Org Kepala Tukang @Rp 110,000 Rp
0.0060 Org Mandor @Rp 110,000 Rp
Rp

2.1.6 Tiap 1 M2 Bekisting Pondasi Plat butuh: Rp


Bahan
0.3300 Btg Papan Meranti 3/20 Kelas II @Rp 6,600 Rp
0.6000 Btg Balok Meranti 5/7 Kelas II @Rp 10,900 Rp
0.4000 Kg Paku @Rp 18,000 Rp
0.2000 Lt Minyak Bekisting @Rp 10,000 Rp
Rp
Tenaga Kerja
0.3200 Org Pekerja @Rp 85,000 Rp
0.3200 Org Tukang Kayu @Rp 110,000 Rp
0.0300 Org Kepala Tukang @Rp 110,000 Rp
0.0060 Org Mandor @Rp 110,000 Rp
Rp

2.1.7 Tiap 1 M3 Beton 1Pc : 2 Ps : 3Kr butuh: Rp


Bahan
4.6400 Zak 232.0000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.5200 M3 Pasir Beton @Rp 200,000 Rp
0.7800 M3 Kerikil Beton @Rp 150,000 Rp
Rp
Tenaga Kerja
1.6500 Org Pekerja @Rp 85,000 Rp
0.2500 Org Tukang Batu @Rp 110,000 Rp
0.2500 Org Kepala Tukang @Rp 110,000 Rp
0.0800 Org Mandor @Rp 110,000 Rp
Rp

2.2 BETON BERTULANG


2.2.1 Tiap 1M3 Sloof 15/25 butuh: Rp
Bahan
13.3333 M2 Bekisting @Rp 97,613 Rp
8.8889 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
4.4444 Lnjr Besi Beton Polos Ø 8 @Rp 58,630
8.9600 Lnjr Besi Beton Polos Ø 6 @Rp 34,650 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.2 Tiap 1M3 Pondasi Plat butuh: Rp


Bahan
4.1000 M2 Bekisting @Rp 84,278 Rp
4.5556 Lnjr Besi Polos Ø 10 mm @Rp 91,740 Rp
6.8333 Besi Polos Ø 8 mm @Rp 58,630
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.3. Tiap 1 M3 Kolom Praktis (15/15) butuh: Rp


Bahan
13.3333 M2 Bekisting @Rp 100,096 Rp
14.8148 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
6.8000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.3. Tiap 1 M3 Kolom 15/20 butuh: Rp


Bahan
16.6667 M2 Bekisting @Rp 100,096 Rp
16.6667 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
9.8000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.4. Tiap 1 M3 Kolom 15/25 butuh: Rp


Bahan
14.6667 M2 Bekisting @Rp 100,096 Rp
8.8889 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
4.4444 Lnjr Besi Beton Polos Ø 8 @Rp 58,630
9.0000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.5. Tiap 1 M3 Kolom 15/30 butuh: Rp


Bahan
13.3333 M2 Bekisting @Rp 100,096 Rp
11.1111 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
10.4250 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.6. Tiap 1 M3 Kolom 20 x 20 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
8.3333 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
9.3333 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.7. Tiap 1 M3 Kolom 20/25 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
1.6667 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
10.5750 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.8. Tiap 1 M3 Kolom 20/30 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
6.1762 Lnjr Besi Beton Polos Ø 12 @Rp 91,740 Rp
11.8333 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.9. Tiap 1 M3 Kolom 20/35 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
1.1905 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
13.1083 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.10 Tiap 1 M3 Kolom 20/40 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
1.0417 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
14.4000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.11. Tiap 1 M3 Kolom 25/25 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
1.3333 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
12.0833 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.12. Tiap 1 M3 Kolom 25/30 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
1.1111 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
13.3833 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.13. Tiap 1 M3 Kolom 25/35 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
0.9524 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
14.7000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.14. Tiap 1 M3 Kolom 25/40 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
0.8333 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
16.0333 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.15. Tiap 1 M3 Kolom 25/45 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
0.7407 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
17.3833 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.16. Tiap 1 M3 Kolom 25/50 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 100,096 Rp
0.6667 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
18.7500 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.17. Tiap 1 M3 Kolom 30/30 butuh: Rp


Bahan
6.6667 M2 Bekisting @Rp 100,096 Rp
24.7047 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
15.1000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.18. Tiap 1 M3 Kolom 30/35 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 100,096 Rp
0.7937 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
16.4667 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.19. Tiap 1 M3 Kolom 30/40 butuh: Rp


Bahan
6.6667 M2 Bekisting @Rp 100,096 Rp
0.6944 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
17.8500 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.20. Tiap 1 M3 Kolom 35/45 butuh: Rp


Bahan
5.7143 M2 Bekisting @Rp 100,096 Rp
0.5291 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
20.5333 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
2.2.21. Tiap 1 M3 Kolom 35/50 butuh: Rp
Bahan
5.7143 M2 Bekisting @Rp 100,096 Rp
0.4762 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
21.9583 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.22. Tiap 1 M3 Kolom 40/40 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 100,096 Rp
0.5208 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
20.8000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.23. Tiap 1 M3 Kolom 40/45 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 100,096 Rp
0.4630 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
22.2417 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.24. Tiap 1 M3 Kolom 40/50 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 100,096 Rp
0.4167 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
23.7000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.6. Tiap 1 M3 Balok 15/20 butuh: Rp


Bahan
13.3333 M2 Bekisting @Rp 148,679 Rp
11.1111 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
9.2750 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.7. Tiap 1 M3 Balok 15/25 butuh: Rp


Bahan
14.6667 M2 Bekisting @Rp 148,679 Rp
8.8889 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
4.4444 Besi Beton Polos Ø 8 @Rp 58,630
9.0000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.8. Tiap 1 M3 Balok 15/30 butuh: Rp


Bahan
13.3333 M2 Bekisting @Rp 148,679 Rp
1.8519 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
12.0750 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.9. Tiap 1 M3 Balok 20 x 20 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 148,679 Rp
2.0833 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
10.8000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.10. Tiap 1 M3 Balok 20/25 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 148,679 Rp
1.6667 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
12.2250 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.11. Tiap 1 M3 Balok 20/30 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 148,679 Rp
1.3889 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
13.6667 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.12. Tiap 1 M3 Balok 20/35 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 148,679 Rp
1.1905 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
15.1250 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.13. Tiap 1 M3 Balok 20/40 butuh: Rp


Bahan
10.0000 M2 Bekisting @Rp 148,679 Rp
1.0417 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
16.6000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.14. Tiap 1 M3 Balok 25/25 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
1.3333 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
13.9167 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
2.2.15. Tiap 1 M3 Balok 25/30 butuh: Rp
Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
1.1111 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
15.4000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.16. Tiap 1 M3 Balok 25/35 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
24.7047 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
16.9000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.17. Tiap 1 M3 Balok 25/40 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
0.8333 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
18.4167 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.18. Tiap 1 M3 Balok 25/45 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
0.7407 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
19.9500 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.19. Tiap 1 M3 Balok 25/50 butuh: Rp


Bahan
8.0000 M2 Bekisting @Rp 148,679 Rp
0.6667 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
21.5000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.20. Tiap 1 M3 Balok 30/30 butuh: Rp


Bahan
6.6667 M2 Bekisting @Rp 148,679 Rp
0.9259 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
17.3000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.21. Tiap 1 M3 Balok 30/35 butuh: Rp


Bahan
6.6667 M2 Bekisting @Rp 148,679 Rp
5.5556 Lnjr Besi Beton Polos Ø 12 @Rp 91,740 Rp
18.8500 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.22. Tiap 1 M3 Balok 30/40 butuh: Rp


Bahan
6.6667 M2 Bekisting @Rp 148,679 Rp
0.6944 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
20.4167 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.23. Tiap 1 M3 Balok 35/45 butuh: Rp


Bahan
5.7143 M2 Bekisting @Rp 148,679 Rp
0.5291 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
23.4667 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.24. Tiap 1 M3 Balok 35/50 butuh: Rp


Bahan
5.7143 M2 Bekisting @Rp 148,679 Rp
0.4762 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
25.0750 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.25. Tiap 1 M3 Balok 40/40 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 148,679 Rp
24.7047 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
23.7333 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.26. Tiap 1 M3 Balok 40/45 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 148,679 Rp
0.4630 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
25.3583 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.27. Tiap 1 M3 Balok 40/50 butuh: Rp


Bahan
5.0000 M2 Bekisting @Rp 148,679 Rp
0.4167 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
27.0000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.28. Tiap 1 M3 Plat Beton butuh: Rp


Bahan
8.4333 M2 Bekisting @Rp 189,984 Rp
7.0278 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
7.0278 Lnjr Besi Beton Polos Ø 8 @Rp 58,630
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Rp

2.2.29. Tiap 1 M3 Ring Balok 15 x 15 butuh: Rp


Bahan
20.0000 M2 Bekisting @Rp 148,679 Rp
14.8148 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
11.2000 Lnjr Besi Beton Polos Ø 6 @Rp 58,630 Rp
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton 1:2:3 @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.30. Tiap 1 M3 Tangga Beton Bertulang butuh: Rp


Bahan
6.8183 M2 Bekisting @Rp 414,610 Rp
7.5759 Lnjr Besi Beton Polos Ø 10 @Rp 91,740 Rp
7.5759 Lnjr Besi Beton Polos Ø 8 @Rp 58,630
### Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.2.30. Tiap 1 M3 lisplang Beton Bertulang butuh: Rp


Bahan
6.8183 M2 Bekisting @Rp 414,610 Rp
7.5759 Lnjr Besi Beton Polos Ø 8 @Rp 58,630
526.6667 Kg Kawat Beton @Rp 13,000 Rp
1.0000 M3 Beton @Rp 647,770 Rp
Rp
Tenaga Kerja
4.8500 Org Pekerja @Rp 85,000 Rp
1.4000 Org Tukang Besi @Rp 110,000 Rp
0.3310 Org Kepala Tukang @Rp 110,000 Rp
0.1700 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.3. PEKERNJAAN DINDING


2.3.1. Tiap 1 M2 Pasangan Dinding bata ringan (1:4) Ukuran 5 x 11 x 22 cm butuh: Rp
Bahan
8.7500 Buah Bataringan 5/11/22 @Rp 7,955 Rp
2.5000 kg 11.5000 Kg Tonasa Semen MU prekat @Rp 2,500 Rp

Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0150 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

2.3.2. Tiap 1 M2 Pasangan Dinding Batu Bata (1:2) Ukuran 5 x 11 x 22 cm butuh: Rp


Bahan
70.0000 Buah Batu Bata @Rp 7,955 Rp
0.3790 Zak 18.9500 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0380 M3 Pasir Pasang @Rp 166,667 Rp
Rp
Tenaga Kerja
0.3200 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0150 Org Mandor @Rp 110,000 Rp
Rp
Alat

Tiap 1 M2 Pasangan roster


25.0000 bh roster terawang 12,000
1.3000 20.0000 semen 7,500

0.3000 Org Pekerja @Rp 85,000 Rp


0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0150 Org Mandor @Rp 110,000 Rp
Rp

Rp

2.4. PEKERJAAN KUSEN


2.4.1. Tiap 1 M3 Pasangan Kusen Pintu dan Jendela (Kayu Bengkirai) butuh: Rp
Bahan
28.6458 Lnjr 1.1000 M3 Kayu Bengkirai 8/12 @Rp 45,000 Rp
Rp
Tenaga Kerja
6.0000 Org Pekerja @Rp 85,000 Rp
20.0000 Org Tukang Kayu @Rp 110,000 Rp
2.0000 Org Kepala Tukang @Rp 110,000 Rp
0.3000 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

III PEKERJAAN KAP DAN ATAP


3.1. PEKERJAAN KAP DAN RANGKA ATAP
3.1.1. Tiap 1 M3 Pekerjaan Balok Dinding 8/12 butuh: Rp
Bahan
0.1250 Lnjr 0.0030 M3 Balok Bengkirai 8/12 @Rp 6,600 Rp
0.8000 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
Rp
Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.0330 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.1.2. Tiap 1 M3 Pekerjaan Kuda-Kuda Kayu (Bengkirai) butuh: Rp


Bahan
28.6458 Lnjr 1.1000 M3 Balok Bengkirai 6/12 @Rp 54,000 Rp
0.8000 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
15.0000 Kg Besi Strip @Rp 18,000 Rp
Rp
Tenaga Kerja
5.5000 Org Pekerja @Rp 85,000 Rp
8.3000 Org Tukang Kayu @Rp 110,000 Rp
2.2000 Org Kepala Tukang Kayu @Rp 110,000 Rp
1.5000 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.1.3. Tiap 1 M2 Pekerjaan rangka Atap (Kasau + Reng Bengkirai) butuh: Rp


Bahan
1.0000 Btg Balok Bengkirai 2/3 @Rp 3,500 Rp
1.0000 Btg Balok Bengkirai 5/7 @Rp 20,500 Rp
0.1500 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
Rp
Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.1.4. Tiap 1M' Papan Lisplank (3/20), Bengkirai butuh: Rp


Bahan
1.0000 Ljr 4.0000 m word plank 20 @Rp 58,000 Rp
4.0000 Kg Paku Biasa 2"-5" @Rp 800 Rp

Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0200 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.1.5. Tiap 1 M' Papan Reuter (3/25), Bengkirai

3.1.5. Pemasangan 1 M3 Gording, Nog 6/12 butuh: Rp


Bahan
0.0422 Lnjr 1.1000 M3 Kayu Bengkirai Balok 6/12 @Rp 45,000 Rp
0.8000 kg Paku @Rp 18,000 Rp
Rp
Tenaga Kerja
12.0000 Org Pekerja @Rp 85,000 Rp
4.0000 Org Tukang kayu @Rp 110,000 Rp
1.2000 Org Kepala Tukang @Rp 110,000 Rp
0.2000 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.1.6. Pemasangan 1 M' Talang Miring BJLS 28 butuh: Rp


Bahan
1.3000 l 4.0000 talang air @Rp 21,250 Rp
0.0300 Kg Paku 1/2'-1" @Rp 18,000 Rp
Rp
Tenaga Kerja
0.0400 Org Pekerja @Rp 85,000 Rp
0.4000 Org Tukang kayu @Rp 110,000 Rp
0.0250 Org Kepala Tukang @Rp 110,000 Rp
0.0013 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.2. PEKERJAAN PENUTUP ATAP


3.2.1. Tiap Pemasangan 1 M2 Atap butuh: Rp
Bahan
0.6000 Lbr Atap Sakura Roof 2 Susun @Rp 60,000 Rp
0.0500 Kg Paku @Rp 18,000 Rp
Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0010 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

3.2.2. Pemasangan 1 M' Perabung butuh: Rp


Bahan
3.0000 Lbr Perabung Dari Sakura Roof @Rp 16,800 Rp
0.1600 Zak Semen @Rp 48,000 Rp
0.5200 M3 Pasir Cor @Rp 200,000 Rp
Rp
Tenaga Kerja
0.0457 Org Pekerja @Rp 85,000 Rp
0.0500 Org Tukang Kayu @Rp 110,000 Rp
0.0050 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0010 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

IV. PEKERJAAN PLAFON


4.1. BALOK PLAFON
4.1.1. Tiap 1 M2 Rangka Plafon butuh: Rp
Bahan
0.8571 Btg 0.0120 M3 Balok Bengkirai 5/7 @Rp 20,500 Rp
0.1000 Kg Paku Biasa 2"-5" @Rp 18,000 Rp
Rp
Tenaga Kerja
0.1500 Org Pekerja @Rp 85,000 Rp
0.2500 Org Tukang Kayu @Rp 110,000 Rp
0.0250 Org Kepala Tukang @Rp 110,000 Rp
0.0075 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

4.2. Memasang Plafon


4.2.1. Tiap Memasang 1 M2 Plafond Gypsum butuh: Rp
Bahan
0.5000 Lbr Gypsum @Rp 60,000 Rp
0.1100 Kg Paku Biasa @Rp 18,000 Rp
0.1100 Kg Paku Sekrup @Rp 10,000 Rp
Rp
Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.0500 Org Tukang Kayu @Rp 110,000 Rp
0.0060 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

4.2.2. Tiap Memasang Lis Plafond butuh: Rp


Bahan
1.0500 M3 Kayu Profil @Rp 10,000 Rp
0.0040 Kg Paku @Rp 18,000 Rp
Rp
Tenaga Kerja
0.0210 Org Pekerja @Rp 85,000 Rp
0.0210 Org Tukang Kayu @Rp 110,000 Rp
0.0020 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0010 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

V. PEKERJAAN PLASTERAN
5.1. PLASTERAN
5.1.1. Tiap 1 M2 Plasteran Dinding (1:2) Tebal 15 cm butuh: Rp
Bahan
0.1704 Zak 8.5200 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0170 M3 Pasir Pasang @Rp 200,000 Rp
Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.1500 Org Tukang Batu @Rp 110,000 Rp
0.0150 Org Kepala Tukang @Rp 110,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

5.1.2. Tiap 1 M2 Plasteran Dinding (1:4) Tebal 15 cm butuh: Rp


Bahan
6.2400 kg 960.0000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0240 M3 Pasir Pasang @Rp 166,667 Rp
Rp
Tenaga Kerja
0.1600 Org Pekerja @Rp 85,000 Rp
0.0500 Org Tukang Batu @Rp 110,000 Rp
0.0150 Org Kepala Tukang @Rp 110,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

5.1.3. Tiap 1 M2 Acian Semen butuh: Rp


Bahan
3.2500 kg 1040.0000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0813 Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.0600 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp

Tiap 1 M2 Acian Semen MU 200 Rp


Bahan
4.2500 kg 5000.0000 Kg Tonasa Semen portland 50kg @Rp 100,000 Rp
0.0813 Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.0600 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp

5.2. Turap Porslin


5.2.1. Tiap 1 M2 Pasangan Dinding Porslin 20 x 20 cm, Warna butuh: Rp
Bahan
25.0000 Bh Porselin 15 x 15 cm, @Rp 60,000 Rp
0.1860 Zak 9.3000 Kg Semen @Rp 48,000 Rp
0.0180 M3 Pasir Pasang @Rp 166,667 Rp
0.0300 Zak 1.5000 Kg Semen Warna @Rp 65,000 Rp
Rp
Tenaga Kerja
0.6000 Org Pekerja @Rp 85,000 Rp
0.4550 Org Tukang Batu @Rp 110,000 Rp
0.0450 Org Kepala Tukang @Rp 110,000 Rp
0.0300 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

VI. PEKERJAAN LANTAI


6.1. Urugan Bawah Lantai
6.1.1. Tiap 1 M3 Urugan Pasir butuh: Rp
Bahan
1.2000 M3 Pasir Urug @Rp 83,333 Rp
Rp
Tenaga Kerja
0.3000 Org Pekerja @Rp 85,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

6.2. Pasangan Lantai


6.2.1. Tiap PASANG lantaiGRANIT 1 m Rp
Bahan
1.0800 Bh Granit 60 x 60 @Rp 93,750 Rp
9.6000 kg 960 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.4500 M3 Pasir Pasang @Rp 166,667 Rp
1.5000 Zak 50.0000 Kg Semen Warna @Rp 1,300 Rp
Rp
Tenaga Kerja
0.2400 Org Pekerja @Rp 85,000 Rp
0.1200 Org Tukang Batu @Rp 110,000 Rp
0.0120 Org Kepala Tukang @Rp 110,000 Rp
0.0120 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

6.2.2. Tiap 1 M2 Pasangan Lantai Kramik 20 x 20 butuh: Rp


Bahan
1.0500 Bh Diamond Kasar Keramik 20x20 @Rp 60,000 Rp
0.2500 sak Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0450 M3 Pasir Pasang @Rp 166,667 Rp
0.5000 Zak 1.5000 Kg IndoceMent Semen Warna 50 kg @Rp 18,000 Rp
Rp
Tenaga Kerja
0.3500 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Batu @Rp 110,000 Rp
0.0250 Org Kepala Tukang @Rp 110,000 Rp
0.0250 Org Mandor @Rp 110,000 Rp
Rp
Alat
Tiap 1 M2 Pasangan DINDING Kramik 50 x 50 butuh: Rp
Bahan
1.0500 Bh Diamond Kasar Keramik 50 x50 @Rp 70,000 Rp
0.2500 sak Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0450 M3 Pasir Pasang @Rp 166,667 Rp
1.3000 Zak 1.5000 Kg IndoceMent Semen Warna 50 kg @Rp 6,800 Rp
Rp
Tenaga Kerja
0.5000 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Batu @Rp 110,000 Rp
0.2000 Org Kepala Tukang @Rp 110,000 Rp
0.2000 Org Mandor @Rp 110,000 Rp
Rp

Tiap 1 M2 Pasangan dinding kramik Rp


Bahan
1.2000 Bh Diamond Kasar Keramik 20x20 @Rp 70,000 Rp
0.2500 sak Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0450 M3 Pasir Pasang @Rp 166,667 Rp
1.3000 Zak 1.5000 Kg IndoceMent Semen Warna 50 kg @Rp 6,800 Rp
Rp
Tenaga Kerja
0.3900 Org Pekerja @Rp 85,000 Rp
0.1875 Org Tukang Batu @Rp 110,000 Rp
0.0195 Org Kepala Tukang @Rp 110,000 Rp
0.0195 Org Mandor @Rp 110,000 Rp
Rp

Tiap 1 M2 Pasangan Lantai granit butuh: Rp


Bahan
1.2000 Bh Granit 60 x 60 @Rp 93,750 Rp
0.2500 sak Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0450 M3 Pasir Pasang @Rp 166,667 Rp
1.3000 Zak 1.5000 Kg IndoceMent Semen Warna 50 kg @Rp 6,800 Rp
Rp
Tenaga Kerja
0.2600 Org Pekerja @Rp 85,000 Rp
0.1300 Org Tukang Batu @Rp 110,000 Rp
0.0130 Org Kepala Tukang @Rp 110,000 Rp
0.0130 Org Mandor @Rp 110,000 Rp
Rp

VII. `
7.1. Pintu dan Jendela
7.1.1. Pasangan 1 Buah Pintu kayu Rp
Bahan
1.0000 Bh Pintu Panel Bengkirai @Rp 500,000 Rp
Rp
Tenaga Kerja
0.8000 Org Pekerja @Rp 85,000 Rp
0.8000 Org Tukang Kayu @Rp 110,000 Rp
0.0400 Org Kepala Tukang @Rp 110,000 Rp
0.0400 Org Mandor @Rp 110,000 Rp

a Pasangan 1 Buah Pintu alumunium


6.0000 1,100 5.8 Profil Aluminium daun pintu 31,667
2,000 m1
2.0 Skrup fixer + RIVET 2,000
0,060 1.0 Rp.
Sealant 35,000
Bh Rp.
1.0 120,000
tube
150,000
upah
150,000
150,000
Total =
1.00 Pasang pintu doble alumunium utama 2,2 x 0,8
pembuatan watang pintu
1.7 Kaca 5 mm 2 130,000
4.6 Profil kaca Aluminium 10,000
1.5 Engsel pintu 40,000
1.0 Pasang Kunci tanam antik 120,000
1.0 hendle pintu set 135,000
2.0 selot pintu set 85,000
1.0 Upah pemasangan set 100,000

1.00 Pasang pintu doble alumunium pasangan 2,2 x 0,8


pembuatan watang pintu
1.7 Kaca 5 mm 2 130,000
4.6 Profil kaca Aluminium 10,000
1.5 Engsel pintu 40,000
2.0 selot tanam atas bawah set 85,000
1.0 hendle pintu set 135,000
1.0 Upah pemasangan set 100,000

1.00 jendela swing alumunium 2,2 x 0,8


pembuatan watang pintu
1.7 Kaca 5 mm 2 130,000
4.6 Profil kaca Aluminium 10,000
1.5 Engsel pintu 40,000
1.0 Upah pemasangan set 60,000
1.0 hak angin set 25,000

1.0 JENDELA MATI


1.7 Kaca 5 mm 2 130,000
6.0 Profil m etalase 7,500
4.6 Profil kaca Aluminium 10,000
0.7 Sealant 35,000
6.0 Rp.
Skrup fixer + RIVET 2,000
1.0 Upah Rp.
pemasangan set 60,000

Pintu WC alumunium 1 set 2 x 0,8


pembuatan watang pintu
1.7 Kaca 5 mm 2 130,000
4.6 Profil kaca Aluminium 10,000
1.5 Engsel pintu 40,000
1.0 Pasang Kunci tanam antik 185,000
1.0 hendle pintu set -
2.0 selot pintu set -
1.0 Upah pemasangan set 100,000
1.0 stiker sanblast set 64,000
5.0 kusen alumunium 3in set 90,000
1.0 Selot jendela Swing Aluminium 18,000

Pasangan 1 Buah Pintu wc Rp


Bahan
1.0000 Bh Pintu Panel wc @Rp 1,000,000 Rp
Rp
Tenaga Kerja
0.7800 Org Pekerja @Rp 85,000 Rp
0.3900 Org Tukang Kayu @Rp 110,000 Rp
0.0390 Org Kepala Tukang @Rp 110,000 Rp
0.0780 Org Mandor @Rp 110,000 Rp

pintu alumunium
DAUN 5.4
KUSEN 5
skoneng 5
variasi 5
kaca 1.4
kunci 1
handle 1
lain lian
engsel
upah

Rp
Alat
Rp

7.1.2. Pasangan 1 M2 Jendela Kaca butuh: Rp


Bahan
1.4583 Bh 0.0350 M3 Papan Bengkirai 3/20 Kls II @Rp 60,500 Rp
Rp
Tenaga Kerja
0.8000 Org Pekerja @Rp 85,000 Rp
2.0000 Org Tukang Kayu @Rp 110,000 Rp
0.2000 Org Kepala Tukang @Rp 110,000 Rp
0.0400 Org Mandor @Rp 110,000 Rp
Rp

Alat
Rp

7.2. Kaca
7.2.1. Pasangan 1 M2 Kaca Tebal 5 MM butuh: Rp
Bahan
1.1000 M2 Kaca Bening t = 5 MM @Rp 110,000 Rp
Rp
Tenaga Kerja
0.0150 Org Pekerja @Rp 85,000 Rp
0.1500 Org Tukang Kayu @Rp 110,000 Rp
0.0150 Org Kepala Tukang @Rp 110,000 Rp
0.0002 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

7.3. Penggantung/Kunci
7.3.1. Tiap 1 Buah Pasangan Engsel Jendela kayu butuh: Rp
Bahan
1.0000 Bh Falco Engsel Jendela 3" @Rp 38,000 Rp
1.0000 hak angin Rp 18,000
1.0000 selot jendela Rp 15,000
Rp
Tenaga Kerja
0.0500 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0005 Org Mandor @Rp 110,000 Rp
Rp

Tiap 1 Buah Pasangan Engsel Jendelaalumunium butuh: Rp


Bahan
1.0000 Bh engsel cesment @Rp 38,000 Rp
1.0000 hak angin Rp 20,000
1.0000 selot jendela Rp 25,000
Rp
Tenaga Kerja
0.0500 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0005 Org Mandor @Rp 110,000 Rp
Rp

1.5 Engsel 60,000


1.0 kunci tanam 95,000
1.0 pegangan pintu bh 120,000
2.0 selot atas bawah set 15,000
2.0 Selot Pintu Swing Aluminium 60,000
Rp

7.3.2. Tiap 1 Buah Pasangan Kunci Tanam Antik butuh: Rp


Bahan
1.0000 Bh Belucci Kunci @Rp 160,000 Rp
Rp
Tenaga Kerja
0.0600 Org Pekerja @Rp 85,000 Rp
0.6000 Org Tukang Kayu @Rp 110,000 Rp
0.0600 Org Kepala Tukang @Rp 110,000 Rp
0.0030 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

VIII. PEKERJAAN PENGECATAN


8.1. Tiap 1 M2 Mendempul dan Menggosok Kayu butuh: Rp
Bahan
0.0800 Kg IMpra DeMpul @Rp 60 Rp
0.0200 Kg Pujatex Cat Minyak @Rp 36,600 Rp
0.1000 Kg Batu Apung @Rp 15,000 Rp
Rp
Tenaga Kerja
0.0400 Org Pekerja @Rp 85,000 Rp
0.0400 Org Tukang Cat @Rp 110,000 Rp
0.0040 Org Kepala Tukang @Rp 110,000 Rp
0.0025 Org Mandor @Rp 110,000 Rp
Rp

Alat
Rp

8.2. Tiap 1 M2 Mengecat Kayu Baru


(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) butuh: Rp
Bahan
0.2000 Kg Cat Meni @Rp 17,000 Rp
0.1500 Kg PlaMir @Rp 8,540 Rp
0.1700 Kg Cat Dasar @Rp 45,000 Rp
0.2600 Kg Cat Penutup 2 Kali @Rp 60,000 Rp
Rp
Tenaga Kerja
0.0700 Org Pekerja @Rp 85,000 Rp
0.0090 Org Tukang Cat @Rp 110,000 Rp
0.0060 Org Kepala Tukang @Rp 110,000 Rp
0.0025 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

8.3. Tiap 1 M2 Mengecat Tembok Baru EXTERIOR


(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) butuh: Rp
Bahan
0.1430 Kg Paragon PlaMir @Rp 8,540 Rp
0.1000 Kg Altex Cat Dasar @Rp 34,000 Rp
0.3000 Kg Cat Penutup 2x @Rp 34,400 Rp
Rp
Tenaga Kerja
0.0400 Org Pekerja @Rp 85,000 Rp
0.0400 Org Tukang Cat @Rp 110,000 Rp
0.0080 Org Kepala Tukang @Rp 110,000 Rp
0.0040 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

8.3. Tiap 1 M2 Mengecat Tembok Baru INTERIOR


(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) butuh: Rp
Bahan
0.1430 Kg Paragon PlaMir @Rp 8,540 Rp
0.1000 Kg Altex Cat Dasar @Rp 23,913 Rp
0.3000 Kg Cat Penutup 2x @Rp 25,000 Rp
Rp
Tenaga Kerja
0.0400 Org Pekerja @Rp 85,000 Rp
0.0400 Org Tukang Cat @Rp 110,000 Rp
0.0080 Org Kepala Tukang @Rp 110,000 Rp
0.0040 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

IX. PEKERJAAN INSTALASI DAN SANITASI


9.1. Tiap Pekerjaan Pemasangan Listrik butuh: Rp
Bahan
0.0000 Bh Philips Lampu TL Lengkap @Rp 35,000 Rp
0.0000 Bh Lampu Pijar 20 W @Rp 89,000 Rp
0.0000 Bh Pitting @Rp 15,000 Rp
0.0000 Bh Saklar @Rp 18,000 Rp
0.0000 Bh Stop Kontak @Rp 18,000 Rp
2.0000 Bh MCB 6 A @Rp 40,000 Rp
1.0000 Bh Kotak MCBN @Rp 35,000 Rp
0.0000 Bh T-Dos (Kontak Hubung Bagi) @Rp 4,500 Rp
0.0000 M' Kabel 3 x 2,5 MM2 @Rp 8,900 Rp
35.0000 M' Pipa PVC (Pipa Listrik) @Rp 7,000 Rp
1.0000 Ls KWH (Pasang Baru) @Rp 2,500,000 Rp
1.0000 Ls Alat Kecil @Rp 200,000 Rp
Rp
Tenaga Kerja
1.0000 Ls Biaya Pemasanagan @Rp - Rp
Rp

9.2. Pekerjaan Sanitasi


9.2.1. Tiap Pemasangna 1 Buah Kloset Jongkok butuh: Rp
Bahan
1.0000 Bh Toto Kloset Jongkok @Rp 350,000 Rp
6.0000 Kg 960.0000 Zak Semen Portland 50 kg @Rp 48,000 Rp
0.0100 M3 Pasir Pasang @Rp 166,667 Rp
Rp
Tenaga Kerja
1.0000 Org Pekerja @Rp 85,000 Rp
0.0000 Org Tukang Batu @Rp 110,000 Rp
0.0000 Org Kepala Tukang @Rp 110,000 Rp
0.1600 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.2. Tiap Pemasangan 1 Buah Kloset Duduk butuh: Rp


Bahan
6.0000 Kg 960.0000 Portland Cement Rp. @Rp 48,000 Rp
0.0100 M3 Pasir Pasangan Rp. @Rp 166,667 Rp
1.0000 Bh Closet Duduk CW705L/TV1 Rp. 1,500,000 Rp

Tenaga Kerja
1.0000 Org Pekerja @Rp 85,000 Rp
1.5000 Org Tukang Batu @Rp 110,000 Rp
0.1500 Org Kepala Tukang @Rp 110,000 Rp
0.1600 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.3. Tiap Pemasangan 1 Bh Floor Draine butuh: Rp


Bahan
1.0000 Bh Floor Drain @Rp 40,000 Rp
Rp
Tenaga Kerja
0.0100 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.4. Memasang 1 Buah Bak Cuci Piring Stainless butuh: Rp


Bahan
1.0000 Bh Bak Cuci Stainlees Steel @Rp 500,000 Rp
1.0000 Set Water Draiin + asesorises @Rp 85,000 Rp
Rp
Tenaga kerja
0.0300 Org Pekerja @Rp 85,000 Rp
0.3000 Org Tukang Batu @Rp 110,000 Rp
0.0300 Org Kepala Tukang @Rp 110,000 Rp
0.0020 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.5. Memasang 1 Wastafel butuh: Rp


Bahan
1.0000 Bh Wastafel @Rp 500,000 Rp
0.1200 Hk Perlengkapan @Rp 500,000 Rp
0.1200 Zak 6.0000 Kg Semen Abu-Abu @Rp 65,000 Rp
0.0100 M3 Pasir Pasang @Rp 166,667 Rp
Rp
Tenaga Kerja
0.5000 Org Pekerja @Rp 85,000 Rp
1.0000 Org Tukang Batu @Rp 110,000 Rp
0.1500 Org Kepala Tukang @Rp 110,000 Rp
0.1000 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.6. Memasang Pipa Air Ø 3" Per M' butuh: Rp


Bahan
1.2000 M Pipa PVC Ø 3" tipe D @Rp 18,750 Rp
0.3500 Hb Perlengkapan @Rp 18,750 Rp
Rp
Tenaga Kerja
0.0200 Org Pekerja @Rp 85,000 Rp
0.0700 Org Tukang Batu @Rp 110,000 Rp
0.0135 Org Kepala Tukang @Rp 110,000 Rp
0.0040 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.7. Memasang Pipa Air Ø 2" AW Per M' butuh: Rp


Bahan
1.2000 M Pipa PVC Ø 3/4" tipe AW @Rp 12,500 Rp
0.3500 Hb Perlengkapan @Rp 12,500 Rp
Rp
Tenaga Kerja
0.0200 Org Pekerja @Rp 85,000 Rp
0.0700 Org Tukang Batu @Rp 110,000 Rp
0.0135 Org Kepala Tukang @Rp 110,000 Rp
0.0040 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.8. Memasang Pipa Air Ø 1/2" AW Per M' butuh: Rp


Bahan
1.2000 M Pipa PVC Ø 1/2" tipe AW @Rp 4,250 Rp
0.3500 Hb Perlengkapan @Rp 4,250 Rp
Rp
Tenaga Kerja
0.0200 Org Pekerja @Rp 85,000 Rp
0.0700 Org Tukang Batu @Rp 110,000 Rp
0.0135 Org Kepala Tukang @Rp 110,000 Rp
0.0040 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

9.2.9. Memasangan 1 Kran Air Ø 3/4" atau 1/2" butuh: Rp


Bahan
1.0000 Bh Kran air Ø 3/4" atau 1/2" @Rp 25,000 Rp
0.0250 Rol Seal tape @Rp 33,750 Rp
Rp
Tenaga Kerja
0.0100 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

X. PEKERJAAN PERLENGKAPAN LUAR


10.1. Tiap 1 M3 Rabat Beton (1:3:5) butuh: Rp
Bahan
4.3600 Zak Tonasa Semen portland 50kg @Rp 48,000 Rp
0.5200 M3 Pasir cor @Rp 200,000 Rp
0.8700 M3 Kerikil Beton @Rp 150,000 Rp
Rp
Upah kerja
5.0000 Org Pekerja @Rp 85,000 Rp
0.8000 Org Tukang batu @Rp 110,000 Rp
0.0800 Org Kepala tukang @Rp 110,000 Rp
0.2000 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

10.2. Tiap 1Buah Bak Kontrol butuh: Rp


Bahan
126.0000 Bh Batu Bata @Rp 7,955 Rp
2.2800 Zak 114.0000 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.1840 M3 Pasir Pasang @Rp 166,667 Rp
0.0330 M3 Kerikil Beton @Rp 150,000 Rp
4.8500 Kg Besi Beton @Rp 5,221 Rp
0.1200 M3 Pasir Cor @Rp 200,000 Rp
Rp
Tenaga Kerja
2.2600 Org Pekerja @Rp 85,000 Rp
0.7200 Org Tukang Batu @Rp 110,000 Rp
0.0720 Org Kepala Tukang @Rp 110,000 Rp
0.1080 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp

10.3. Pembuatan 1 Buah Septictank 2 x 2 x 2 M butuh: Rp


8.0000 M3 Galian Tanah Biasa Sedalam 2 M @Rp 50,430 Rp
0.2000 M3 Urugan Pasir @Rp 126,600 Rp
16.0000 Bh Pas. Batako @Rp 4,000 Rp
1.5000 Btg 0.0300 M3 Ulin Kayu 5/10 @Rp 38,080 Rp
10.0000 M2 Plesteran 1 : 2 @Rp 47,829 Rp
1.0000 Btg 0.0160 M2 Meranti Papan 2/20 @Rp 6,600 Rp
0.3000 M3 Rabat Beton1 : 3 : 5 @Rp 987,580 Rp
Rp
Alat
Rp
10.4. Pembuatan 1 Unit Resapan 1.2 M Dalam 5 M butuh: Rp
8.8313 M3 Galian tanah @Rp 70,560 Rp
3.3912 M3 Pas. Batu kosong @Rp 322,780 Rp
2.2608 M 3
Pasangan batu bata @Rp 622,294 Rp
5.6520 M 2
Plesteran dan acian @Rp 77,009 Rp
0.2250 M 3
Plat beton bertulang tebal 10cm @Rp 79,592,860 Rp
Rp
Alat
Rp
JUM. HARGA KEMBALI
PER SATUAN

89,400

59,500
9,900
20,000
89,400
-

30,075

6,640
1,925
360
8,925

8,500
11,000
1,100
550
21,150

4,500,000
4,500,000

347,539

13,169
57,750
5,400
-
-
-
48,720
125,039

85,000
110,000
22,000
5,500
222,500

66,500

63,750
2,750
66,500
-
50,430

44,710
5,720
50,430

70,560

62,475
8,085
70,560

59,945

53,125
6,820
59,945

120,000

106,250
13,750
120,000

79,085

69,955
9,130
79,085

18,410

16,320
2,090
18,410

48,000

42,500
5,500
48,000
-

126,600

100,000
100,000

25,500
1,100
26,600

322,780

180,000
25,000
205,000

66,300
42,900
4,290
4,290
117,780

716,878

180,000
193,920
80,833
454,753

165,000
82,500
6,375
8,250
262,125

97,613

8,250
25,453
5,400
1,000
40,103

25,500
28,600
2,860
550
57,510

100,096

22,750
26,286
7,200
2,000
58,236

17,000
22,000
2,200
660
41,860

148,679

35,875
35,814
7,200
2,000
80,889

27,200
36,300
3,630
660
67,790

189,984

35,875
11,719
65,400
7,200
2,000
122,194

27,200
36,300
3,630
660
67,790

414,610

35,875
4,125
81,750
7,200
1,500
130,450

27,200
253,000
3,300
660
284,160

84,278

2,178
6,540
7,200
2,000
17,918

27,200
35,200
3,300
660
66,360

647,770

222,720
104,000
117,000
443,720

140,250
27,500
27,500
8,800
204,050

34,987,413

1,301,503
815,467
260,578
310,464
31,030,272
647,770
34,366,053

412,250
154,000
36,410
18,700
621,360

44,540,235

345,540
417,927
400,638
42,107,000
647,770
43,918,875

412,250
154,000
36,410
18,700
621,360

27,911,295

1,334,610
1,359,111
398,684
23,549,760
647,770
27,289,935

412,250
154,000
36,410
18,700
621,360

32,717,706

1,668,262
1,529,000
574,574
27,676,740
647,770
32,096,346

412,250
154,000
36,410
18,700
621,360

35,509,715

1,468,070
815,467
260,578
527,670
31,168,800
647,770
34,888,355
412,250
154,000
36,410
18,700
621,360

40,338,151

1,334,610
1,019,333
611,218
36,103,860
647,770
39,716,791

412,250
154,000
36,410
18,700
621,360

35,905,000

1,000,957
764,500
547,213
32,323,200
647,770
35,283,640

412,250
154,000
36,410
18,700
621,360

39,666,339

1,000,957
152,900
620,012
36,623,340
647,770
39,044,979

412,250
154,000
36,410
18,700
621,360
-

44,511,678

1,000,957
566,602
693,788
40,981,200
647,770
43,890,318

412,250
154,000
36,410
18,700
621,360

97,089,246

1,000,957
109,214
768,542
45,396,780
647,770
47,923,263

412,250
154,000
36,410
18,700
621,360

53,080,002

1,000,957
95,563
844,272
49,870,080
647,770
52,458,642

412,250
154,000
36,410
18,700
621,360

44,747,662
800,766
122,320
708,446
41,847,000
647,770
44,126,302

412,250
154,000
36,410
18,700
621,360

49,305,654

800,766
101,933
784,665
46,349,160
647,770
48,684,294

412,250
154,000
36,410
18,700
621,360

48,415,908

800,766
87,371
861,861
45,396,780
647,770
47,794,548

412,250
154,000
36,410
18,700
621,360

58,613,020

800,766
76,450
940,034
55,526,640
647,770
57,991,660

412,250
154,000
36,410
18,700
621,360

63,358,996

800,766
67,956
1,019,185
60,201,960
647,770
62,737,636

412,250
154,000
36,410
18,700
621,360

68,165,368

800,766
61,160
1,099,313
64,935,000
647,770
67,544,008

412,250
154,000
36,410
18,700
621,360

57,382,477

667,305
2,266,410
885,313
52,294,320
647,770
56,761,117

412,250
154,000
36,410
18,700
621,360

60,335,697

1,000,957
72,810
965,441
57,027,360
647,770
59,714,337

412,250
154,000
36,410
18,700
621,360

64,864,809

667,305
63,708
1,046,546
61,818,120
647,770
64,243,449

412,250
154,000
36,410
18,700
621,360

74,204,555

571,976
48,540
1,203,869
71,111,040
647,770
73,583,195

412,250
154,000
36,410
18,700
621,360

-
79,218,308

571,976
43,686
1,287,417
76,046,100
647,770
78,596,948

412,250
154,000
36,410
18,700
621,360

75,071,454

500,479
47,781
1,219,504
72,034,560
647,770
74,450,094

412,250
154,000
36,410
18,700
621,360

80,143,450

500,479
42,472
1,304,029
77,027,340
647,770
79,522,090

412,250
154,000
36,410
18,700
621,360

85,275,205

500,479
38,225
1,389,531
82,077,840
647,770
84,653,845

412,250
154,000
36,410
18,700
621,360

36,935,827

1,982,390
1,019,333
543,793
32,121,180
647,770
36,314,467

412,250
154,000
36,410
18,700
621,360

36,222,274

2,180,630
815,467
260,578
527,670
31,168,800
647,770
35,600,914

412,250
154,000
36,410
18,700
621,360

45,947,507

1,982,390
169,889
707,957
41,818,140
647,770
45,326,147
412,250
154,000
36,410
18,700
621,360

40,982,812

1,486,793
191,125
633,204
37,402,560
647,770
40,361,452

412,250
154,000
36,410
18,700
621,360

45,963,195

1,486,793
152,900
716,752
42,337,620
647,770
45,341,835

412,250
154,000
36,410
18,700
621,360

51,015,016

1,486,793
127,417
801,277
47,330,400
647,770
50,393,656

412,250
154,000
36,410
18,700
621,360

56,132,816

1,486,793
109,214
886,779
52,380,900
647,770
55,511,456

412,250
154,000
36,410
18,700
621,360

67,605,343

1,486,793
95,563
973,258
63,780,600
647,770
66,983,983

412,250
154,000
36,410
18,700
621,360

51,593,018

1,189,434
122,320
815,934
48,196,200
647,770
50,971,658

412,250
154,000
36,410
18,700
621,360

-
56,796,680

1,189,434
101,933
902,902
53,333,280
647,770
56,175,320

412,250
154,000
36,410
18,700
621,360

64,243,901

1,189,434
2,266,410
990,847
58,528,080
647,770
63,622,541

412,250
154,000
36,410
18,700
621,360

67,395,383

1,189,434
76,450
1,079,769
63,780,600
647,770
66,774,023

412,250
154,000
36,410
18,700
621,360

72,787,028

1,189,434
67,956
1,169,669
69,090,840
647,770
72,165,668

412,250
154,000
36,410
18,700
621,360

78,239,069

1,189,434
61,160
1,260,545
74,458,800
647,770
77,617,709

412,250
154,000
36,410
18,700
621,360

63,272,929

991,195
84,944
1,014,299
59,913,360
647,770
62,651,569

412,250
154,000
36,410
18,700
621,360

69,156,487

991,195
509,667
1,105,176
65,281,320
647,770
68,535,127

412,250
154,000
36,410
18,700
621,360

74,228,063

991,195
63,708
1,197,029
70,707,000
647,770
73,606,703

412,250
154,000
36,410
18,700
621,360

84,812,876

849,596
48,540
1,375,851
81,269,760
647,770
84,191,516

412,250
154,000
36,410
18,700
621,360

90,472,299

849,596
43,686
1,470,147
86,839,740
647,770
89,850,939

412,250
154,000
36,410
18,700
621,360
-

87,863,701

743,396
2,266,410
1,391,485
82,193,280
647,770
87,242,341

412,250
154,000
36,410
18,700
621,360

91,362,738

743,396
42,472
1,486,759
87,820,980
647,770
90,741,378

412,250
154,000
36,410
18,700
621,360

97,140,161

743,396
38,225
1,583,010
93,506,400
647,770
96,518,801

412,250
154,000
36,410
18,700
621,360

79,592,860 Pakai bondek :


bondek
1,602,196 wermesh
644,728 upah
412,039 backisting
75,664,767 coran
647,770 lainnya:
78,971,500
15.0000
412,250
154,000 semen
36,410 beton pasir beton
18,700 sprit
621,360 air
- pekerja
tukang
40,197,843 kepala tukang
mandor
2,973,586 pembesian besi wermesh
1,359,111 kawat beton
656,656 pekerja
33,939,360 tukang
647,770 kepala tukang
39,576,483 mandor
bakisting bondek
412,250 kayu kls 3
154,000 paku
36,410 minyak
18,700 balok kaso
621,360 triplek 9 mm
pekerja
- tukang
kepala tukang
93,546,763 mandor

2,826,938
695,013
444,175
88,311,508
647,770
92,925,403

412,250
154,000
36,410
18,700
621,360

11,386,909

2,826,938
444,175
6,846,667
647,770
10,765,549
412,250
154,000
36,410
18,700
621,360

106,602

69,602 8
6,250

75,852

17,000
11,000
1,100
1,650
30,750

622,294

556,818
18,192
6,333
581,344

27,200
11,000
1,100
1,650
40,950

349,000
300,000
9,750

25,500
11,000
1,100
1,650

4,252,063 An. SNI 6.11 1 m1 Kusen Pintu dan Jendela Aluminium

1.1
1,289,063 2
1,289,063 0.06
0.05
510,000 0.05
2,200,000 0.005
220,000 0.003
33,000
2,963,000

- An. SNI

1.1
2
0.06
29,005 0.043
0.043
825 0.004
14,400 0.002
15,225

8,500
3,630
1,100
550
13,780

3,618,775

1,546,875
14,400
270,000
1,831,275

467,500
913,000
242,000
165,000
1,787,500

47,850

3,500
20,500
2,700
26,700

8,500
11,000
1,100
550
21,150

94,450

58,000
3,200
61,200

8,500
22,000
2,200
550
33,250

1,630,301

1,901
14,400
16,301

1,020,000
440,000
132,000
22,000
1,614,000

78,458

27,625
540
28,165

3,400
44,000
2,750
143
50,293

66,110

36,000
900
36,900

17,000
11,000
1,100
110
29,210

172,123

50,400
7,680
104,000
162,080

3,883
5,500
550
110
10,043

1 m2 Rangka Plafond hollow 40 x 40 dan 20 x 40

63,196

17,571 0 Hollow 44 Cin;romate


1,800 0 Hollow 14 Cin;romate
19,371 0 Gypsum board  01/ 2 14/ 2  . Mm
0 Paku gypsum
12,750 4 Ramset  dina bolt
27,500 0 cotton plaste
2,750 0 compoun
825 0 0,0700 Org/Hari Pekerja

43,825 0 0,0035 Org/Hari Mandor

0 0,1000 Org/Hari Tukang

- 0 0,0100 Org/Hari Kepala Tukang

48,290
30,000
1,980
1,100
33,080

8,500
5,500
660
550
15,210

14,997

10,500
72
10,572

1,785
2,310
220
110
4,425

47,829

8,179
3,400
11,579

17,000
16,500
1,650
1,100
36,250

31,840

5,990
4,000
9,990

13,600
5,500
1,650
1,100
21,850

29,180

3,380
3,380

17,000
6,600
1,100
1,100
25,800

47,050

21,250
21,250

17,000
6,600
1,100
1,100
25,800

1,623,178

1,500,000
8,928
3,000
1,950
1,513,878

51,000
50,050
4,950
3,300
109,300

PEKERJAAN LANTAI
Tiap 1 M2 Pasangan vinil pakai perkat
126,600 Bahan
9.0000
100,000 0.4500
100,000

25,500
1,100 Tenaga Kerja
26,600 0.1500
0.1500
- 0.0150
0.0080

223,656

101,250
9,216
75,000
1,950
187,416

20,400
13,200
1,320
1,320
36,240

148,750

63,000
12,000
7,500
9,000
91,500

29,750
22,000
2,750
2,750
57,250

210,340

73,500
12,000
7,500
8,840
101,840

42,500
22,000
22,000
22,000
108,500

170,405
84,000
12,000
7,500
8,840
112,340

33,150
20,625
2,145
2,145
58,065

180,100

112,500 1 135000.0000
12,000 1` 112500.0000
7,500
8,840
140,840

22,100
14,300
1,430
1,430
39,260

664,800

500,000
500,000

68,000
88,000
4,400
4,400
164,800
CESMENT
183,667 1.2
4,000 2
35,000 1
90,000 0.085
0.085
0.009
0.005
312,667
1,166,227
312,667
222,560
46,000
60,000
120,000
135,000
170,000
100,000

312,667 1,046,227
222,560
46,000
60,000
170,000
135,000
100,000

312,667 726,227
222,560
46,000
60,000
60,000
25,000

410,060
222,560
45,000
46,000
24,500
12,000
60,000

1,440,227
312,667
222,560
46,000
60,000
185,000
-
-
100,000
64,000
450,000
18,000

1,122,070

1,000,000
1,000,000

66,300
42,900
4,290
8,580
122,070

165
155
60
40
180
120
80
20
30
150
1,000
1,000,000

164,800

402,629 jendela casment 1 m


1 bahan
88,229 Jendela casement silver + kaca
88,229 polos
Jendela casement coklat + kaca 60 x 120 + 5 mm
polos 60 x 120 + 5 mm
68,000 Jendela sliding silver + kaca polos 60 x 120 + 5 mm
220,000 Jendela sliding coklat + kaca polos 60 x 120 + 5 mm
22,000
4,400
314,400

140,442

121,000
121,000

1,275
16,500
1,650
17
19,442

80,405

38,000
-
15,000
53,000

4,250
22,000
1,100
55
27,405

110,405

38,000
20,000
25,000
83,000

4,250
22,000
1,100
55
27,405

90,000
95,000
120,000
30,000
120,000
-

238,030

160,000
160,000

5,100
66,000
6,600
330
78,030

10,752

5
732
1,500
2,237

3,400
4,400
440
275
8,515

35,806

3,400
1,281
7,650 0,2000 Kg Cat Meni Rp.
15,600 0,1500 Kg Plamir Rp.
27,931 0,1700 Kg Cat Dasar Rp.
0,2600 Kg Cat Penutup 2 Kali Rp.
5,950 0,0700 Org/Hari Pekerja Rp.
990 0,0025 Org/Hari Mandor Rp.
660 0,0090 Org/Hari Tukang Cat Rp.
275 0,0060 Org/Hari Kepala Tukang Cat Rp.
7,875

22,661

1,221
-
10,320
11,541
3,400
4,400
880
440
9,120

2,000

20,233

1,221
2,391
7,500
11,113

3,400
4,400
880
440
9,120

245,000

-
-
-
-
-
-
-
-
-
245,000
-
-
245,000

-
-

460,027

350,000
5,760
1,667
357,427

85,000
-
-
17,600
102,600

1,791,527

5,760
1,667
1,500,000
1,507,427

85,000
165,000
16,500
17,600
284,100

53,500

40,000
40,000

850
11,000
1,100
550
13,500

624,070

500,000
85,000
585,000

2,550
33,000
3,300
220
39,070

749,467

500,000
60,000
7,800
1,667
569,467

42,500
110,000
16,500
11,000
180,000

40,388

22,500
6,563
29,063

1,700
7,700
1,485
440
11,325

30,700

15,000
4,375
19,375

1,700
7,700
1,485
440
11,325

17,913

5,100
1,488
6,588

1,700
7,700
1,485
440
11,325

39,344

25,000
844
25,844

850
11,000
1,100
550
13,500

987,580

209,280
104,000
130,500
443,780

425,000
88,000
8,800
22,000
543,800

1,487,753

1,002,273
109,440
30,667
4,950
25,324
24,000
1,196,653

192,100
79,200
7,920
11,880
291,100

1,331,046
403,440
25,320
64,000
57,120
478,292
6,600
296,274
1,331,046

-
21,468,275
623,133
1,094,612
1,406,881
435,256
17,908,393
21,468,275

-
MeMbuat 1 M2 bekisting balok dan Kolom butuh :
Bahan :
0
0

0
2
Upah Kerja :
0
0

0
0

MeMbuat 1 M2 bekisting plat deck butuh :


BAHAN :
0
0
0

6
3
4X4 230,000
135,000 hebel 51,892
54,563 upah 100,000
150,000 lainnya 30,000
78,000
64,777
70,000
552,340 411,892
635,192

42.29 #REF!
79.57 #REF!
119.00 #REF!
24.51 #REF!
0.19 #REF!
0.03 #REF!
- #REF!
0.01 #REF!
5.80 #REF!
0.08 #REF!
0.04 #REF!
0.04 #REF!
- #REF!
- #REF!
1.03 #REF!
0.04 #REF!
0.10 #REF!
#REF!
#REF!
0.09 #REF!
0.17 #REF!
0.08 #REF!
0.01 #REF!
0.01 #REF!
#REF!
a Aluminium
1,100 Profil 26,667 29,333
Aluminium
m1
Rp.
2,000 Skrup fixer 2,000 4,000
Bh + RIVET
0,060 Sealant 35,000 2,100
tube Rp.
0,043 Pekerja
Rp. 120,000 6,000
Oh
0,043 Tukang
Rp. 150,000 7,500
Oh Besi
0,004 Kepala
Konstruksi 150,000 750
Oh Tukang
Rp.
0,002 Mandor Rp. 150,000 450
Oh
Rp. = 50,133
Biaya Over 10 5,013
Head
Total
Pelaksana = 55,147
1 m2 Pekerjaan (10%)
Bingkai
4,400
Alumunium Profil 13,333 14,667
Pintu/Jendela Slimar
m1
2,000 Skrup fixer
Jendela 2,000 4,000
Bh Alumi Rp.
0,060 Sealant
Rp. 35,000 2,100
tube
0,043 Pekerja
Rp. 85,000 3,655
Oh
0,043 Tukang
Rp. 130,000 5,590
Oh Besi
0,004 Kepala
Konstruksi 130,000 520
Oh Tukang
Rp.
0,002 Mandor Rp. 130,000 260
Oh
Rp. = 30,792
Biaya Over 10 3,079
Head
Total
Pelaksana = 33,871
(10%)
jumlah 89,018 #VALUE!
Rp. 20,000 8,200
Rp. 18,000 2,700
Rp. 60,000 21,600
Rp. 38,000 4,180
Rp. 2,000 8,000
Rp. 15,000 1,050
Rp. 60000 7,200
Rp. 85,000 8,500
Rp. 110,000 5,500
Rp. 110,000 5,500
Rp. 110,000 550
72,980
vinly merk aidi 350,000 ,/dus 16.0000

252,955

m Vinyl karet 16 dus @Rp 21,875.00 Rp 196,875.00


kg Lem Vinyl 3 fox 163 @Rp 135,000.00 Rp 24300
156,875.00 Rp
Rp
Rp 221,175.00

Org Pekerja @Rp 85,000.00 Rp 12,750.00


Org Tukang @Rp 110,000.00 Rp 16,500.00
Org Kepala Tukang @Rp 110,000.00 Rp 1,650.00
Org Mandor @Rp 110,000.00 Rp 880.00
415,000.00 31,780.00
harga pintu alumunium
pintu alumunium
sliding sam 1,800,000
pintu watan 1,400,000
pintu full ka -
pintu watan 1,600,000
pintu lipat 1,400,000

Profil 60,100 72,120


Aluminium
SkrupRp.
fixer + 2,000 4,000
RIVET
Sealant
Rp. 35,000 35,000
Rp.
Pekerja 120,000 10,200
Rp.
Tukang Besi 150,000 12,750
Konstruksi
Kepala
Rp. Tukang 150,000 1,350
Rp.
Mandor 150,000 750
Rp.
= 136,170
Biaya Over Head 10 13,617
Pelaksana (10%)
Total = 149,787
harga bahan ,@meter bahan
279,900 46,650 55,980

###
###
###
###
RENCANA ANGGARAN BIAYA (RAB)

HARGA SAT JUM


NO URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
Gambar 0.00
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Bongkaran dan pembersihan lapangan 162.0000 M2 89,400.00 14,482,800.00
1.1.2. Pemasangan Bouplank/Pengukuran 45.0000 M2 30,074.84 1,353,367.76
1.1.3. Pengadaan Air Kerja 0.0000 Ls 4,500,000.00 0.00
1.1.4. Pembuatan Gedung Semen dan Alat 0.0000 M2 347,539.01 0.00

1.2. Pekerjaan Galian


1.2.1. Galian Tanah Biasa 1 Meter 76.2800 M3 66,500.00 5,072,620.00
1.2.2. Galian Tanah Biasa 2 Meter 0.0000 M3 50,430.00 0.00
1.2.3. Galian Tanah Biasa 3 Meter 0.0000 M3 70,560.00 0.00
1.2.4. Galian Tanah Keras 1 Meter 0.0000 M 3
59,945.00 0.00
1.2.5. Galian Tanah Cadas 1 Meter 0.0000 M3 120,000.00 0.00
1.2.6. Galian Tanah Lumpur 1 Meter 0.0000 M3 79,085.00 0.00
1.2.7. Urugan Kembali Galian 12.9600 M3 18,410.00 238,593.60
1.2.8. Pemadatan Tanah 0.0000 M3 48,000.00 0.00

1.3. Pemasangan Pondasi Batu Kali


1.3.1. Urugan Pasir Bawah Pondasi 4.0500 M3 126,600.00 512,730.00
1.3.2. Pasangan Pondasi Batu Kosong bawah 0.0000 M3 322,780.00 0.00
1.3.3. Pasangan Pondasi Batu Kali 25.9200 M3 716,878.33 18,581,486.40

II. PEKERJAAN BETON


2.1. Beton Bertulang
2.1.1. Sloof 15/20 3.8250 M3 34,987,413.33 133,826,855.98
2.1.2. Pekerjaan Pondasi Plat 1.8720 M 3
44,540,234.80 83,379,319.55
2.1.2. Kolom 15/15 1.3500 M3 27,911,294.63 37,680,247.76
2.1.3. Kolom 15/20 2.5875 M3 32,717,705.90 84,657,064.03
2.1.4. Kolom 15/25 3.1941 M 3
35,509,714.92 113,421,580.43
2.1.5. Kolom 15/30 0.0000 M3 40,338,150.61 0.00
2.1.6. Kolom 20 x 20 0.0000 M3 35,905,000.48 0.00
2.1.7. Kolom 20 x 25 0.0000 M3 39,666,339.39 0.00
2.1.8. Kolom 20 x 30 0.0000 M3 44,511,677.88 0.00
2.1.9. Kolom 20 x 35 0.0000 M3 97,089,246.02 0.00
2.1.10. Kolom 20 x 40 0.0000 M3 53,080,001.64 0.00
2.1.11. Kolom 25 x 25 0.0000 M3 44,747,661.55 0.00
2.1.12. Kolom 25 x 30 0.0000 M3 49,305,653.88 0.00
2.1.13. Kolom 25 x 35 0.0000 M3 48,415,908.14 0.00
2.1.14. Kolom 25 x 40 0.0000 M3 58,613,020.05 0.00
2.1.15. Kolom 25 x 45 0.0000 M3 63,358,996.10 0.00
2.1.16. Kolom 25 x 50 0.0000 M 3
68,165,368.21 0.00
2.1.17. Kolom 30 x 30 0.0000 M3 57,382,477.37 0.00
2.1.18. Kolom 30 x 35 0.0000 M3 60,335,697.33 0.00
2.1.19. Kolom 30 x 40 0.0000 M 3
64,864,808.60 0.00
2.1.20. Kolom 35 x 45 0.0000 M3 74,204,554.53 0.00
2.1.21. Kolom 35 x 50 0.0000 M3 79,218,308.31 0.00
2.1.22. Kolom 40 x 40 0.0000 M 3
75,071,453.82 0.00
2.1.23. Kolom 40 x 45 0.0000 M3 80,143,449.71 0.00
2.1.24. Kolom 40 x 50 0.0000 M3 85,275,204.57 0.00
2.1.25. Balok 15 x 20 0.0000 M3 36,935,827.06 0.00
2.1.26. Balok 15 x 25 1.8675 M3 36,222,273.97 67,645,096.64
2.1.27. Balok 15 x 30 0.0000 M3 45,947,506.62 0.00
2.1.28. Balok iwf 0.0000 M 305,000.00 0.00
2.1.29. Balok 20 x 25 0.0000 M3 45,963,194.61 0.00
2.1.30. Balok 20 x 30 0.0000 M3 51,015,016.19 0.00
2.1.31. Balok 20 x 35 0.0000 M3 56,132,815.89 0.00
2.1.32. Balok 20 x 40 0.0000 M3 67,605,343.36 0.00
2.1.33. Balok 25 x 25 0.0000 M3 51,593,018.45 0.00
2.1.34. Balok 25 x 30 0.0000 M3 56,796,679.62 0.00
2.1.35. Balok 25 x 35 0.0000 M 3
64,243,900.90 0.00
2.1.36. Balok 25 x 40 0.0000 M3 67,395,383.45 0.00
2.1.37. Balok 25 x 45 0.0000 M3 72,787,028.34 0.00
2.1.38. Balok 25 x 50 0.0000 M 3
78,239,069.29 0.00
2.1.39. Balok 30 x 30 0.0000 M3 63,272,928.68 0.00
2.1.39. Balok 30 x 35 0.0000 M3 69,156,487.40 0.00
2.1.40. Balok 30 x 40 0.0000 M 3
74,228,062.74 0.00
2.1.41. Balok 35 x 45 0.0000 M3 84,812,876.27 0.00
2.1.42. Balok 35 x 50 0.0000 M3 90,472,298.88 0.00
2.1.43. Balok 40 x 40 0.0000 M3 87,863,701.37 0.00
2.1.44. Balok 40 x 45 0.0000 M3 91,362,737.73 0.00
2.1.45. Balok 40 x 50 0.0000 M3 97,140,161.43 0.00
2.1.9. Plat Beton BONDEK 36.8000 M2 635,191.57 23,375,049.62
2.1.10. Ring Balok 15 X 15 1.1813 M3 40,197,842.83 47,483,701.84
2.1.11. Tangga 0.7830 M3 93,546,762.77 73,247,115.25
2.1.11. leplang beton 0.5360 M3 11,386,909.17 6,103,383.32

2.2. Beton Tak Bertulang


2.2.1. Beton Cor 1 : 2 : 3 0.0000 M3 647,770.00 0.00

III. PEKERJAAN DINDING


3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 350.0000 M3 106,602.27 37,310,795.45
2.2.2. Pasangan Dinding Batubata (1:2) 0.0000 M 3
622,293.52 0.00

3.2. Kusen jendela dan pintu


1 m1 Kusen Pintu dan Jendela Aluminium - M 55,146.67 0.00
1 m2 Pekerjaan Bingkai Alumunium Pintu/Jendela 0 M 33,870.83 0.00
2.3.1. Kusen kayu 0.0000 M2 45,000.00 0.00
2.3.2. Alumunium 2x4 cm untuk kaca mati 0.0000 M2 40,000.00 0.00

IV. PEKERJAAN KAP DAN ATAP


4.1. Kap dan Rangka Atap
4.1.1.. Balok Dinding 8/12 0.0000 M3 29,005.00 0.00
4.1.2. Pekerjaan Kuda-Kuda 0.0000 M3 3,618,775.00 0.00
4.1.3. Pekerjaan Rangka Atap 0.0000 M 3
47,850.00 0.00
4.1.4. Pekerjaan Listplank 3/25 0.0000 M3 94,450.00 0.00
4.1.5. Gording 8/12 0.0000 M3 1,630,300.80 0.00
4.1.6. Talang 6.0000 M' 78,458.00 470,748.00

4.2. Atap dan variasi


4.2.1. atap utama 103 M2 250,000.00 25,750,000.00
4.2.2. Pemasangan kanopi 0 M3 300,000.00 0.00
pagar 0 m 380,000.00 0.00
variasi besi silang 0 m 380,000.00 0.00

V. PEKERJAAN PLAFOND
5.1. Balok Plafond
56,750
5.1.1. Rangka Plafon 153 M2 8,654,375.00

5.2. Memasang Plafond


5.2.1. Memasang Plafond Gypsum 125.0000 M2 47,228.50 5,903,562.50
5.2.2. Memasang sayap Plafon 27.5000 M2 47,228.50 1,298,783.75

VI. PEKERJAAN PLASTERAN


6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 572 M2 47,829.20 27,358,302.40
6.1.2. Plasteran Dinding (1:4) 564 M2 31,840.40 17,957,985.60
6.1.3. Acian 564 M2 29,180.00 16,457,520.00
6.1.4. Acian instan AM 86 - M2 47,050.00 0.00

6.2. Turap Porslen


6.2.1. Pasangan Turap Porslent 0.0000 M2 1,623,178.00 0.00

VII. PEKERJAAN LANTAI


7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 9.0000 126,600.00 1,139,400.00

7.2. Pasangan Lantai


7.2.1. Pasangan Lantai granit 107.1000 M2 180,100.00 19,288,710.00
Tiap 1 M2 Pasangan DINDING Kramik 50 x 50 butuh: 32.5000 M2 210,340.00 6,836,050.00
Tiap 1 M2 Pasangan Lantai Kramik 20 x 20 butuh: 5.5000 148,750.00 818,125.00
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu kayu 5.0 Bh 664,800.00 3,324,000.00
Pasang pintu doble alumunium utama 3.0 BH 1,166,226.67 3,498,680.00
Pasang pintu doble alumunium pasangan 3.0 bh 1,046,226.67 3,138,680.00
jendela swing alumunium 2.0 bh 726,226.67 1,452,453.33
JENDELA MATI 4.0 bh 410,060.00 1,640,240.00
Pintu WC 3.0 Bh 1,440,226.67 4,320,680.00
roster minimalis - 10,318 0.00
wood plank 7.0 65,000 455,000.00
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 5 mm 0.0000 M2 140,441.50 0.00

IX. PEKERJAAN PENGECATAN


9.1. Mendempul dan Mrnggosok Kayu - M2 10,751.80 0.00
9.2. Mengecat Kayu Baru - M2 35,806.00 0.00
9.3. Mengecat Tembok Baru interior dan plafon 483 M2 20,232.52 9,762,193.00
9.4 Mengecat Tembok Baru ekterior 152 M3 22,661.22 3,444,505.44

X. PEK. INSTALASI DAN SANITASI


10.1 Listrik jum harga

Pasang Kwh baru 1300 watt -


lampu pijar 17 0 35,000 595,000
Lampu LED trip 45 0 26,000 1,170,000
POWER SUPLAI 4 60,000 240,000
kabel jalur 2 utama 2 0 400,000 800,000
downliaght 0 0 35000 0
kabel jalur 1 2 0 200,000 400,000
stopkontak 18 0 18,000 324,000
saklar 11 0 18,500 203,500
anteneu tv 4 0 45,000 180,000
kabel anteneu 20 0 7,000 140,000
mangkok 29 0 3,500 101,500
upah 1 0 600,000 600,000
piting 17 0 15,000 255,000
paralon listrik dan lain lain 17 0 9000 153000

10.2. Sanitair dan Instalasi Air


10.2.1. Pemasangna Kloset Jongkok 2.0000 Bh 460,026.67 920,053.33
10.2.2. Pemasangan Kloset Duduk 1.0000 Bh 1,791,526.67 1,791,526.67
10.2.3. Pemasangan Floor Draine 3.0000 Bh 53,500.00 160,500.00
10.2.4. Pemasangan Bak Cuci Piring 1.0000 Bh 624,070.00 624,070.00
10.2.5. Pemasangan Wastafel 0.0000 Bh 749,466.67 0.00
10.2.6. Pem. Pipa Air Ø 3" Per M' 44.0000 M' 40,387.50 1,777,050.00
10.2.7. Pem. Pipa Air Ø 2" AW Per M' 44.0000 M' 30,700.00 1,350,800.00
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 20.0000 M' 17,912.50 358,250.00
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 7.0000 Bh 39,343.75 275,406.25
10.2.11. Pasang Toren air 500 L 1.0000 Bh 600,000.00 600,000.00

XI. PEK. PERLENGKAPAN LUAR


11.1 Rabat Beton (1:3:5) 2.0000 m 635,191.57 1,270,383.13
11.2 Bak Kontrol 0.0000 1,487,753.40 0.00
11.3 Septictank 1.0000 1,331,046.00 1,331,046.00
11.4 Resapan 0.0000 21,468,275.19 0.00

TOTAL ANGGARAN 926,962,887.02

luas rumah 145 6,807,738 987,122,060

362500000 0.00
-

17,089,704 15 300,000.00
1,596,974 100,000.00
-
-

5,985,692 22 0.20 4.4


- 45 0.40 18
- 25 0.60 15
- LAPANGAN 37.40
- PONDASI 81.00
-
281,540
-

605,021
-
21,926,154

TINGGI/PANJANG
157,915,690 13X23 85
98,387,597 60X60 13
44,462,692 10X15 10 0.027 -
99,895,336 10X20 15 0.0345 -
133,837,465 13 0.042 13.00
- 10X25 0 0.045 9.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
79,821,214 1 0.0225 -
- 13X23
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
27,582,559 32.00 4.80
56,030,768 10X15 0.0225
86,431,596 784,364,917
7,201,992

wc tangga LT 1 DAN 2 ATAP


211 4 115 20.00

JENDALA PINTU
- 75 40.00
-
-
- 0.00

-
-
-
-
-
-
555,483

49 54
-
-
- 49

UTAMA SAYAP
10,212,163 125 27.50

6,966,204 gypsum
1,532,565 18,710,931 skrup
dempul

340 232 LT 1+PLUR


21,190,423 335.00 225.00
19,419,874
- 40,610,637

1,344,492 76 28

LANTAI TANGGA
22,760,678 99.8 7.3 39.0000
8,066,539 WC 11 10.00
965,388 LANTAI WC 5.5
-
3,922,320 5
4,128,442 3 58.33
3,703,642 3
1,713,895 4
1,935,483 11
5,098,402 3
- 21,039,085
536,900

- 5
- dalam luar plafon
11,519,388 330 152.50
4,064,516 15,583,904 152.00

-
702,100
1,380,600 45.00
283,200
944,000
-
472,000
382,320
240,130
212,400
165,200
119,770
708,000
300,900
180,540 5,910,620.0000

1,085,663
2,114,001
189,390
736,403
-
2,096,919
1,593,944
422,735
324,979
708,000 9,272,034

1,499,052
-
1,570,634
-

987,122,060 209,503,655.73
6,807,738

15 375
465
336000000
5,250,000.00
4,500,000.00
1,500,000.00
11,250,000.00

0.48 38.88

TINGGI/PANJANG

5.00
5.00
5.85
5.00

32.00 51.00
49.00 3.50
5.80
5.50 1.2

340.00
56.67
hollo
18,000.00
7.50
4,500.00 33750 8000 15000 56750

60,000.00 2.88 20,833.33


9.00 250 2,250.00
15000
38,083.33

11.50
2.00
4.30 1.70
49.00
0.00
VOLUME KEBUTUAN MATERIAL KESELURUHAN

No Material Volume Sat


1 Kloset Duduk 0.00 bh
2 Atap Sakura Roof 0.00 m2
3 AW Pipa PVC Ø 1" 0.00 m
4 AW Pipa PVC Ø 1/2" 0.00 m
5 AW Pipa PVC Ø 3" 0.00 m
6 AW Pipa PVC Ø 3/4" 0.00 m
7 Bak Cuci Stainless 0.00 bh
8 Batu Bata 70.00 bh
9 Batu Batako 10/20/40 0.00 bh
10 Batu Kali 0.00 m3
13 Belucci Kunci 0.00 set
14 Besi Polos Ø 10 mm 7.03 lnjr
15 Besi Polos Ø 12 mm 0.00 lnjr
16 Besi Polos Ø 16 mm 0.00 lnjr
17 Besi Polos Ø 6 mm 0.00 lnjr
18 Besi Strip 0.00 kg
19 Box MCBN 1.00 bh
20 Cat Dasar 46.48 kg
21 Cat Kayu 0.00 kg
22 Cat Meni 0.00 kg
23 Diamond Kasar Keramik 20x20 #REF! bh
24 Falco Engsel Pintu 5 " 0.00 bh
25 Fitting Lampu 0.00 bh
26 Floor Drain 0.00 Bh
27 Gypsum #REF! lbr
28 Impra Dempul 0.00 kg
29 Indocement Semen Warna 50 kg #REF! zak
32 Kaca Bening t = 5 mm 0.00 m2
33 Kaca Hitam t = 5 mm 0.00 m2
34 Kawat Bendrat 0.00 kg
35 Kayau Meranti Papan 3/20 (Kls. 2) 0.00 btg
36 Kayu Meranti Balok 5/7 (Kls. 2) 0.00 btg
37 Kayu Bengkirai Balok 2/3 (Kls. 1) 0.00 btg
38 Kayu Bengkirai Balok 5/10 (Kls. 1) 0.00 btg
39 Kayu Bengkirai Balok 5/7 (Kls. 1) #REF! btg
40 Kayu Bengkirai Balok 8/12 (Kls. 1) 0.00 btg
41 Kayu Bengkirai Papan 3/20 (Kls. 1) #REF! btg
42 Kayu Ulin Balok 5/10 (Kls. 1) 0.00 btg
43 Kerikil Beton 0.78 m3
44 Kia Keramik 40x40 #REF! bh
45 Kia Polos Keramik 20x20 0.00 bh
46 Kran Air 0.00 bh
48 Lampu Neon Lengkap 0.00 bh
49 Lampu Pijar 20W 0.00 bh
50 Lexus Westafel 0.00 bh
51 List Profil #REF! m'
52 MCB 6A 2.00 bh
53 Minyak Bekisting 0.20 lt
54 Naturtone Cat Tembok 139.43 kg
55 Nok Surya Roof 100 mm 0.00 bh
56 Paku Biasa 2" - 5" kg
57 Paku Sekrup dos
58 Paku Ulin 1" - 5" kg
59 Paragon Plamir 66.46 kg
60 Pasir Cor 0.00 m3
61 Pasir Pasang #REF! m3
62 Pasir urug 0.30 m3
63 Perlengkapan Instalasi (Isolasi, Paku, dll) 1.00 set
64 Pintu Panel Bengkirai 80-100 x 200 0.00 bh
65 Pipa PVC Listrik 35.00 m
66 Playwood t = 6 mm 0.00 lbr
67 Playwood t = 9 mm 0.00 lbr
68 Playwood t =3 mm 0.00 lbr
69 Pujatex Cat Minyak 0.00 kg
70 Saklar 0.00 Bh
71 Seng Gelombang BJLS 32 0.00 lbr
72 Seng Plat 3 x 6 BJLS 28 0.00 lbr
73 Stop Kontak 0.00 bh
74 T-Dos (Kontak Hubung Bagi) 0.00 bh
75 Semen Portland 50 kg #REF! zak
76 Kloset Jongkok 0.00 bh
WAKTU PELAKSANAAN
BO-
NO JENIS PEKERJAAN BOT MINGGU KE
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

I PEK. PONDASI #REF! #REF! #REF! #REF! #REF! #REF!

II PEK. BETON #REF! #REF! #REF! #REF! #REF! #REF! #REF!

III PEK. DINDING #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

IV PEK. KAP DAN ATAP #REF! #REF! #REF! #REF! #REF! #REF! #REF!

V PEK. PLAFOND #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VI PEK. PLASTERAN DAN ACIAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VII PEK. LANTAI #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VIII PEK. PINTU DAN JENDELA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

IX PEK. PENGECATAN #REF! #REF! #REF! #REF! #REF!

X PEK. INSTALASI & SANITASI #REF! #REF! #REF! #REF!

XI PEK. PERLENGKAPAN LUAR #REF! #REF! #REF! #REF! #REF!

Total (%) #REF!

Rencana fisik per minggu #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Rencana fisik komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Gambar 4.7 Hasil Out Put Time Schedule dan Kurva "S" Dengan Menggunakan Microsoft Excel
KEMBALI
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON

1
No. Tipe konstruksi
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per
lbr tg panj (mm) (Kg/m') 1m' (kg)
A. Tulangan Pokok
1 Balok sloof s1 25 X 15 0.15 0.25 26.67 4 Ø 10.0 0,617 2,468.00
2 Ø 8.0 0,395 790.00
2 Balok sloof s2 30 X 20 0.30 0.20 16.67 7 Ø 12.0 0,888 6,216.00
2 Ø 8.0 0,395 790.00
3 Balok BL1 30 X 20 0.30 0.20 16.67 7 Ø 12.0 0,888 6,216.00
2 Ø 8.0 0,395 790.00
4 Balok RB1 15 X 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2,468.00
2 Ø 8.0 0,395 790.00
5 kolom KL1 15 x 20 0.15 0.20 33.33 6 Ø 12.0 0,888 5,328.00
6 kolom KL2 15 x 15 0.15 0.15 44.44 4 Ø 10.0 0,617 2,468.00
7 kolom KL3 20 x 20 0.20 0.20 25.00 8 Ø 12.0 0,888 7,104.00
8 balok K1 25 x 35 0.25 0.35 11.43 7 Ø 12.0 0,888 6,216.00
9 balok K2 15 x 30 0.15 0.30 22.22 7 Ø 12.0 0,888 6,216.00
8 Plat tebal 12 cm 1.00 0.12 8.43 10 Ø 10.0 0,617 6,170.00
84 Ø 10.0 0,617 52,033.67
10 Tangga Beton 1.00 0.12 6.82 13 Ø 12.0 0,888 11,840.00
91 Ø 10.0 0,617 56,091.93
lisplang beton 1.00 0.12 6.82 13 Ø 8.0 0,395 5,266.67
12 Poer tebal 25 cm 1.00 0.25 4.10 13 Ø 10.0 0,617 8,226.67
82 Ø 8.0 0,395 32,390.00

2 PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KO

Pnjng 1 Sengkang Kbthn. Tul/m3 Brt Tul Berat per


No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') per m3 (kg)
B. Beugel/sengkang dan tul. bagi
1 Balok sloof s1 25 X 15 0.13 0.23 0.80 134 Ø 6.0 0,222 23869.44
2 Balok sloof s2 30 X 20 0.28 0.18 1.00 85 Ø 6.0 0,222 18870.00
3 Balok BL1 30 X 20 0.28 0.18 1.00 85 Ø 6.0 0,222 18870.00
4 Balok RB1 15 X 25 0.13 0.23 0.80 135 Ø 6.0 0,222 23976.00
5 kolom KL1 15 x 20 0.13 0.18 0.70 168 Ø 6.0 0,222 26107.20
6 kolom KL2 15 x 15 0.13 0.13 0.60 224 Ø 6.0 0,222 29836.80
7 kolom KL3 20 x 20 0.18 0.18 0.80 126 Ø 6.0 0,222 22377.60
8 balok K1 25 x 35 0.23 0.33 1.20 58 Ø 8.0 0,395 27492.00
9 balok K2 15 x 30 0.13 0.28 0.90 113 Ø 8.0 0,395 40171.50
NGAN PER M3 BETON TOTAL KEBUTUHAN BESI (LONJOR)

Output Output

3
Input Manual
Kbthn Jumlah lonjor Luasan Jumlah Begel/ m3 JUMLAH TULANGAN (LONJ
per m3 (kg) Per M3 bkstng (m2) beton volume beton P12

### 8.89 13.33 134.33 134.40


### 4.44 13.33 2.77
### 9.72 13.33 84.33 85.00
### 2.78 6.67 1.70 16.51
### 9.72 13.33 84.33 85.00
### 2.78 6.67 1.47 14.30
### 8.89 14.67 134.33 135.00
### 4.44 13.33 7.55 67.12
### 16.67 16.67 167.67 168.00 0.73 12.20
### 14.81 20.00 223.22 224.00 1.31 19.43
### 16.67 15.00 126.00 126.00 1.52 25.33
### 6.67 9.71 57.14 58.00 0.84 5.60
### 12.96 13.33 112.11 113.00 0.84 10.89
52,033.67 7.03 8.43
52,033.67 7.03 2.71
80,728.74 7.58 6.82
56,091.93 7.58 0.46
35,909.74 7.58 6.82
33,729.33 4.56 4.10
32,390.00 6.83 0.76

JUMLAH 171.38
PEMBULATAN 172

BETON PADA TIAP ELEMEN KONSTRUKSI

Pnjng Jumlah Lonjor Kawat 10% x berat besi


Per M3 (m) Per M3 Beton (kg)

107.52 8.96 2386.94


85.00 7.08 1887.00
85.00 7.08 1887.00
108.00 9.00 2397.60
117.60 9.80 2610.72
134.40 11.20 2983.68
100.80 8.40 2237.76
69.60 5.80 2749.20
101.70 8.48 4017.15
BUTUHAN BESI (LONJOR)

JUMLAH TULANGAN (LONJOR) Kawat Beton


D10 P8 (Kg)

24.62 37.13 6612.1

16.74 3204.1

18.50 2775.0

96.98 18103.3
86.08 9.8
176.30 11.2
153.22 8.4
58.46 5.8
85.43 8.5

38.15

6.91

8.68

78.36 728.85 30738.3


79 729
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI

Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn Pnjng Luasan
No. Tipe konstruksi Jumlah Begel
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg) Per M3 bkstng (m2)
A. Tulangan Pokok
1 Balok sloof 15 x 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2468 65,813.33 8.89 13.3333 133.33 134
0.15 0.25 26.67 2 Ø 8.0 0,395 790 21,066.67 4.44
2 Kolom 15 x 15 0.15 0.15 44.44 4 Ø 10.0 0,617 2468 ### 14.81 13.3333 222.22 136
3 Kolom 15 x 20 0.15 0.20 33.33 4 Ø 10.0 0,617 2468 82,266.67 11.11 13.3333 166.67 137
4 Kolom 15 x 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2468 65,813.33 8.89 13.3333 133.33 138
0.15 0.25 26.67 2 Ø 10.0 0,617 1234 32,906.67 4.44
5 Kolom 15 x 30 0.15 0.30 22.22 6 Ø 10.0 0,617 3702 82,266.67 11.11 13.3333 111.11 139
6 Kolom 20 x 20 0.20 0.20 25.00 4 Ø 10.0 0,617 2468 61,700.00 8.33 10.0000 125.00 140
7 Kolom 20 x 25 0.20 0.25 20.00 1 Ø 6.0 0,222 222 4,440.00 1.67 10.0000 100.00 141
8 Kolom 20 x 30 0.20 0.30 16.67 6 Ø 12.0 0,888 5328 88,800.00 6.18 10.0000 83.33 142
9 Kolom 20 x 35 0.20 0.35 14.29 1 Ø 6.0 0,222 222 3,171.43 1.19 10.0000 71.43 143
10 Kolom 20 x 40 0.20 0.40 12.50 1 Ø 6.0 0,222 222 2,775.00 1.04 10.0000 62.50 144
11 Kolom 25 x 25 0.25 0.25 16.00 1 Ø 6.0 0,222 222 3,552.00 1.33 8.0000 80.00 145
12 Kolom 25 x 30 0.25 0.30 13.33 1 Ø 12.0 0,888 888 11,840.00 1.11 8.0000 66.67 146
13 Kolom 25 x 35 0.25 0.35 11.43 1 Ø 6.0 0,222 222 2,537.14 0.95 8.0000 57.14 147
14 Kolom 25 x 40 0.25 0.40 10.00 1 Ø 6.0 0,222 222 2,220.00 0.83 8.0000 50.00 148
15 Kolom 25 x 45 0.25 0.45 8.89 1 Ø 6.0 0,222 222 1,973.33 0.74 8.0000 44.44 149
16 Kolom 25 x 50 0.25 0.50 8.00 1 Ø 6.0 0,222 222 1,776.00 0.67 8.0000 40.00 150
17 Kolom 30 x 30 0.30 0.30 11.11 1 Ø 6.0 0,222 222 2,466.67 24.70 6.6667 55.56 151
18 Kolom 30 x 35 0.30 0.35 9.52 1 Ø 6.0 0,222 222 2,114.29 0.79 6.6667 47.62 152
19 Kolom 30 x 40 0.30 0.40 8.33 1 Ø 6.0 0,222 222 1,850.00 0.69 6.6667 41.67 153
20 Kolom 35 x 45 0.35 0.45 6.35 1 Ø 6.0 0,222 222 1,409.52 0.53 5.7143 31.75 154
21 Kolom 35 x 50 0.35 0.50 5.71 1 Ø 6.0 0,222 222 1,268.57 0.48 5.7143 28.57 155
22 Kolom 40 x 40 0.40 0.40 6.25 1 Ø 6.0 0,222 222 1,387.50 0.52 5.0000 31.25 156
23 Kolom 40 x 45 0.40 0.45 5.56 1 Ø 6.0 0,222 222 1,233.33 0.46 5.0000 27.78 157
24 Kolom 40 x 50 0.40 0.50 5.00 1 Ø 6.0 0,222 222 1,110.00 0.42 5.0000 25.00 158
25 Balok 15 x 20 0.15 0.20 33.33 4 Ø 10.0 0,617 2468 82,266.67 11.11 13.3333 166.67 159
26 Balok 15 x 25 0.15 0.25 26.67 1 Ø 10.0 0,617 617 16,453.33 8.89 13.3333 133.33 160
27 Balok 15 x 30 0.15 0.30 22.22 1 Ø 10.0 0,617 617 13,711.11 1.85 13.3333 111.11 161
28 Balok 20 x 20 0.20 0.20 25.00 1 Ø 6.0 0,222 222 5,550.00 2.08 10.0000 125.00 162
29 Balok 20 x 25 0.20 0.25 20.00 1 Ø 6.0 0,222 222 4,440.00 1.67 10.0000 100.00 163
30 Balok 20 x 30 0.20 0.30 16.67 1 Ø 6.0 0,222 222 3,700.00 1.39 10.0000 83.33 164
31 Balok 20 x 35 0.20 0.35 14.29 1 Ø 6.0 0,222 222 3,171.43 1.19 10.0000 71.43 165
32 Balok 20 x 40 0.20 0.40 12.50 1 Ø 6.0 0,222 222 2,775.00 1.04 10.0000 62.50 166
33 Balok 25 x 25 0.25 0.25 16.00 1 Ø 6.0 0,222 222 3,552.00 1.33 8.0000 80.00 167
34 Balok 25 x 30 0.25 0.30 13.33 1 Ø 6.0 0,222 222 2,960.00 1.11 8.0000 66.67 168
35 Balok 25 x 35 0.25 0.35 11.43 1 Ø 6.0 0,222 222 2,537.14 24.70 8.0000 57.14 169
36 Balok 25 x 40 0.25 0.40 10.00 1 Ø 6.0 0,222 222 2,220.00 0.83 8.0000 50.00 170
37 Balok 25 x 45 0.25 0.45 8.89 1 Ø 6.0 0,222 222 1,973.33 0.74 8.0000 44.44 171
38 Balok 25 x 50 0.25 0.50 8.00 1 Ø 6.0 0,222 222 1,776.00 0.67 8.0000 40.00 172
39 Balok 30 x 30 0.30 0.30 11.11 1 Ø 6.0 0,222 222 2,466.67 0.93 6.6667 55.56 173
40 Balok 30 x 35 0.30 0.35 9.52 7 Ø 12.0 0,888 6216 59,200.00 5.56 6.6667 47.62 174
41 Balok 30 x 40 0.30 0.40 8.33 1 Ø 6.0 0,222 222 1,850.00 0.69 6.6667 41.67 175
42 Balok 35 x 45 0.35 0.45 6.35 1 Ø 6.0 0,222 222 1,409.52 0.53 5.7143 31.75 176
43 Balok 35 x 50 0.35 0.50 5.71 1 Ø 6.0 0,222 222 1,268.57 0.48 5.7143 28.57 177
44 Balok 40 x 40 0.40 0.40 6.25 1 Ø 6.0 0,222 222 1,387.50 24.70 5.0000 31.25 178
45 Balok 40 x 45 0.40 0.45 5.56 1 Ø 6.0 0,222 222 1,233.33 0.46 5.0000 27.78 179
46 Balok 40 x 50 0.40 0.50 5.00 1 Ø 6.0 0,222 222 1,110.00 0.42 5.0000 25.00 180
47 Balok ring 15x15 0.15 0.15 44.44 4 Ø 8.0 0,395 1580 70,222.22 14.81 13.3333 222.22 181
48 Pondasi Plat 0.25 0.09 2.94 47 Ø 12.0 0,888 41736 ### 11.52 0.5294
49 Plat tebal 12 cm 1.00 1.00 1.10 10 Ø 10.0 0,617 6170 150.00 0.02 2.2000
50 Tangga Beton 0.12 0.18 25.46 19 Ø 10.0 0,617 11723 ### 40.30 9.1638
51 Balok gantung 15c 0.15 0.25 26.67 1 Ø 10.0 0,617 617 16,453.33 2.22 17.3333 133.33 134
52 Balok gantung 15c 0.15 0.30 22.22 1 Ø 10.0 0,617 617 13,711.11 1.85 16.6667 111.11 112
53 Plat deck 50 cm 0.50 0.10 20.00 1 Ø 8.0 0,395 209.350 4,187.00 13.88 14.0000
54 Plat deck 110 cm 1.10 0.10 9.09 1 Ø 10.0 0,617 697.210 6,338.27 0.86 10.9091
55 Talang cor 0.50 0.10 20.00 1 Ø 8.0 0,395 209.350 4,187.00 0.88 14.0000 100.00 100
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI

Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Pnjng Jumlah Lonjo Kebutuhan Kawat
No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') 1m' (kg) Per M3 Per M3 Beton
B. Beugel/sengkang dan tul. ba
1 Balok sloof 15 x 25 0.13 0.23 0.80 134 Ø 8.0 0,395 42344.00 107.20 8.93 4234.4000 Kg
2 Kolom 15x15 0.13 0.13 0.60 136 Ø 6.0 0,222 18115.20 81.60 6.80 1811.5200 Kg
3 Kolom 15x20 0.13 0.18 0.70 137 Ø 6.0 0,222 21289.80 95.90 7.99 2128.9800 Kg
4 Kolom 15x25 0.13 0.23 0.80 138 Ø 6.0 0,222 24508.80 110.40 9.20 2450.8800 Kg
5 Kolom 15x30 0.13 0.28 0.90 139 Ø 6.0 0,222 27772.20 125.10 10.43 2777.2200 Kg
6 Kolom 20 x 20 0.18 0.18 0.80 140 Ø 6.0 0,222 24864.00 112.00 9.33 2486.4000 Kg
7 Kolom 20 x 25 0.18 0.23 0.90 141 Ø 6.0 0,222 28171.80 126.90 10.58 2817.1800 Kg
8 Kolom 20 x 30 0.18 0.28 1.00 142 Ø 6.0 0,222 31524.00 142.00 11.83 3152.4000 Kg
9 Kolom 20 x 35 0.18 0.33 1.10 143 Ø 6.0 0,222 34920.60 157.30 13.11 3492.0600 Kg
10 Kolom 20 x 40 0.18 0.38 1.20 144 Ø 6.0 0,222 38361.60 172.80 14.40 3836.1600 Kg
11 Kolom 25 x 25 0.23 0.23 1.00 145 Ø 6.0 0,222 32190.00 145.00 12.08 3219.0000 Kg
12 Kolom 25 x 30 0.23 0.28 1.10 146 Ø 6.0 0,222 35653.20 160.60 13.38 3565.3200 Kg
13 Kolom 25 x 35 0.23 0.33 1.20 147 Ø 6.0 0,222 39160.80 176.40 14.70 3916.0800 Kg
14 Kolom 25 x 40 0.23 0.38 1.30 148 Ø 6.0 0,222 42712.80 192.40 16.03 4271.2800 Kg
15 Kolom 25 x 45 0.23 0.43 1.40 149 Ø 6.0 0,222 46309.20 208.60 17.38 4630.9200 Kg
16 Kolom 25 x 50 0.23 0.48 1.50 150 Ø 6.0 0,222 49950.00 225.00 18.75 4995.0000 Kg
17 Kolom 30 x 30 0.28 0.28 1.20 151 Ø 6.0 0,222 40226.40 181.20 15.10 4022.6400 Kg
18 Kolom 30 x 35 0.28 0.33 1.30 152 Ø 6.0 0,222 43867.20 197.60 16.47 4386.7200 Kg
19 Kolom 30 x 40 0.28 0.38 1.40 153 Ø 6.0 0,222 47552.40 214.20 17.85 4755.2400 Kg
20 Kolom 35 x 45 0.33 0.43 1.60 154 Ø 6.0 0,222 54700.80 246.40 20.53 5470.0800 Kg
21 Kolom 35 x 50 0.33 0.48 1.70 155 Ø 6.0 0,222 58497.00 263.50 21.96 5849.7000 Kg
22 Kolom 40 x 40 0.38 0.38 1.60 156 Ø 6.0 0,222 55411.20 249.60 20.80 5541.1200 Kg
23 Kolom 40 x 45 0.38 0.43 1.70 157 Ø 6.0 0,222 59251.80 266.90 22.24 5925.1800 Kg
24 Kolom 40 x 50 0.38 0.48 1.80 158 Ø 6.0 0,222 63136.80 284.40 23.70 6313.6800 Kg
25 Balok 15 x 20 0.13 0.18 0.70 159 Ø 6.0 0,222 24708.60 111.30 9.28 2470.8600 Kg
26 Balok 15 x 25 0.13 0.23 0.80 160 Ø 6.0 0,222 28416.00 128.00 10.67 2841.6000 Kg
27 Balok 15 x 30 0.13 0.28 0.90 161 Ø 6.0 0,222 32167.80 144.90 12.08 3216.7800 Kg
28 Balok 20 x 20 0.18 0.18 0.80 162 Ø 6.0 0,222 28771.20 129.60 10.80 2877.1200 Kg
29 Balok 20 x 25 0.18 0.23 0.90 163 Ø 6.0 0,222 32567.40 146.70 12.23 3256.7400 Kg
30 Balok 20 x 30 0.18 0.28 1.00 164 Ø 6.0 0,222 36408.00 164.00 13.67 3640.8000 Kg
31 Balok 20 x 35 0.18 0.33 1.10 165 Ø 6.0 0,222 40293.00 181.50 15.13 4029.3000 Kg
32 Balok 20 x 40 0.18 0.38 1.20 166 Ø 6.0 0,222 44222.40 199.20 16.60 4422.2400 Kg
33 Balok 25 x 25 0.23 0.23 1.00 167 Ø 6.0 0,222 37074.00 167.00 13.92 3707.4000 Kg
34 Balok 25 x 30 0.23 0.28 1.10 168 Ø 6.0 0,222 41025.60 184.80 15.40 4102.5600 Kg
35 Balok 25 x 35 0.23 0.33 1.20 169 Ø 6.0 0,222 45021.60 202.80 16.90 4502.1600 Kg
36 Balok 25 x 40 0.23 0.38 1.30 170 Ø 6.0 0,222 49062.00 221.00 18.42 4906.2000 Kg
37 Balok 25 x 45 0.23 0.43 1.40 171 Ø 6.0 0,222 53146.80 239.40 19.95 5314.6800 Kg
38 Balok 25 x 50 0.23 0.48 1.50 172 Ø 6.0 0,222 57276.00 258.00 21.50 5727.6000 Kg
39 Balok 30 x 30 0.28 0.28 1.20 173 Ø 6.0 0,222 46087.20 207.60 17.30 4608.7200 Kg
40 Balok 30 x 35 0.28 0.33 1.30 174 Ø 6.0 0,222 50216.40 226.20 18.85 5021.6400 Kg
41 Balok 30 x 40 0.28 0.38 1.40 175 Ø 6.0 0,222 54390.00 245.00 20.42 5439.0000 Kg
42 Balok 35 x 45 0.33 0.43 1.60 176 Ø 6.0 0,222 62515.20 281.60 23.47 6251.5200 Kg
43 Balok 35 x 50 0.33 0.48 1.70 177 Ø 6.0 0,222 66799.80 300.90 25.08 6679.9800 Kg
44 Balok 40 x 40 0.38 0.38 1.60 178 Ø 6.0 0,222 63225.60 284.80 23.73 6322.5600 Kg
45 Balok 40 x 45 0.38 0.43 1.70 179 Ø 6.0 0,222 67554.60 304.30 25.36 6755.4600 Kg
46 Balok 40 x 50 0.38 0.48 1.80 180 Ø 6.0 0,222 71928.00 324.00 27.00 7192.8000 Kg
47 Balok ring 15x15 0.13 0.13 0.60 181 Ø 6.0 0,222 24109.20 108.60 9.05 2410.9200 Kg
48 Pondasi Plat 0.0000 Kg
HASIL PERHITUNGAN LAMANYA WAKTU PELAKSANAAN PEKERJAAN

Koef Tenaga Kerja Kemampuan Pekerja Vol Pek Jmlh Hari Untuk Rencana Jumlah Org Yang
Per Satuan Pekerjaan Menyelesaikan Pkrjn Menyelesaikan Kes Vol Pek Hari Kerja Dibutuhkan
No Uraian Pekerjaan (a) Dalam 1 Hari (b) (c) (1 Org) (d) (e) (f) (g)
1/a c/b d/e
PEKERJAAN PERSIAPAN
1 M2 Pembersihan Lapangan P 0.7000 1.43 0.00 0.00 4.0 0.00 0
M 0.0900 11.11 0.00 0.00 4.0 0.00 5

1 M' Pasangan Bouwlpank P 0.1000 10.00 0.00 0.00 2.0 0.00 0


T 0.1000 10.00 0.00 0.00 2.0 0.00 0
KT 0.0100 100.00 0.00 0.00 2.0 0.00 1
M 0.0050 200.00 0.00 0.00 2.0 0.00 1

1 M2 Gudang Semen dan Alat P 1.0000 1.00 0.00 0.00 7.0 0.00 0
T 1.0000 1.00 0.00 0.00 7.0 0.00 0
KT 0.2000 5.00 0.00 0.00 7.0 0.00 1
M 0.0500 20.00 0.00 0.00 7.0 0.00 1
PEKERJAAN GALIAN
1 M3 Galian Tanah Biasa Sedalam 1 Meter P 0.7500 1.33 0.00 0.00 7.0 0.00 9
M 0.0250 40.00 0.00 0.00 7.0 0.00 0

1 M3 Urugan Kembali Galian Tanah P 0.1920 5.21 0.00 0.00 2.0 0.00 0
M 0.0190 52.63 0.00 0.00 2.0 0.00 1
PEKERJAAN PONDASI BATU KALI
1 M3 Urugan Pasir Bawah Pondasi P 0.3000 3.33 0.00 0.00 1.0 0.00 0
M 0.0100 100.00 0.00 0.00 1.0 0.00 1

1 M3 Pasangan Pondasi Batu Kosong P 0.7800 1.28 #REF! #REF! 3.0 #REF! 7
T 0.3900 2.56 #REF! #REF! 3.0 #REF! 4
KT 0.0390 25.64 #REF! #REF! 3.0 #REF! 1
M 0.0390 25.64 #REF! #REF! 3.0 #REF! 1

1 M3 Pasangan Pondasi Batu Kali (1:3) P 0.0750 13.33 0.00 0.00 10.0 0.00 9
T 1.5000 0.67 0.00 0.00 10.0 0.00 4
KT 0.7500 1.33 0.00 0.00 10.0 0.00 1
M 0.0750 13.33 0.00 0.00 10.0 0.00 1

PEKERJAAN BETON
1M3 Pondasi Plat P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
KT 0.3310 3.02 0.00 0.00 5.0 0.00 1
M 0.1700 5.88 0.00 0.00 5.0 0.00 1

1M3 Sloof 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 5


T 1.4000 0.71 0.00 0.00 3.0 0.00 2
KT 0.3310 3.02 0.00 0.00 3.0 0.00 1
M 0.1700 5.88 0.00 0.00 3.0 0.00 1

1 M3 Kolom Praktis (15/15) P 4.8500 0.21 0.00 0.00 7.0 0.00 4


T 1.4000 0.71 0.00 0.00 7.0 0.00 1
KT 0.3310 3.02 0.00 0.00 7.0 0.00 1
M 0.1700 5.88 0.00 0.00 7.0 0.00 1

1 M3 Kolom 15/20 P 4.8500 0.21 0.00 0.00 5.0 0.00 4


T 1.4000 0.71 0.00 0.00 5.0 0.00 1
KT 0.3310 3.02 0.00 0.00 5.0 0.00 1
M 0.1700 5.88 0.00 0.00 5.0 0.00 1

1 M3 Kolom 20/30 P 4.8500 0.21 0.00 0.00 8.0 0.00 0


T 1.4000 0.71 0.00 0.00 8.0 0.00 0
KT 0.3310 3.02 0.00 0.00 8.0 0.00 1
M 0.1700 5.88 0.00 0.00 8.0 0.00 1
1 M3 Balok 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 0
T 1.4000 0.71 0.00 0.00 3.0 0.00 2
KT 0.3310 3.02 0.00 0.00 3.0 0.00 1
M 0.1700 5.88 0.00 0.00 3.0 0.00 1

1 M3 Balok 30/35 P 4.8500 0.21 0.00 0.00 8.0 0.00 4


T 1.4000 0.71 0.00 0.00 8.0 0.00 1
KT 0.3310 3.02 0.00 0.00 8.0 0.00 1
M 0.1700 5.88 0.00 0.00 8.0 0.00 1

1 M3 Plat Beton P 4.8500 0.21 0.00 0.00 10.0 0.00 4


T 1.4000 0.71 0.00 0.00 10.0 0.00 2
KT 0.3310 3.02 0.00 0.00 10.0 0.00 1
M 0.1700 5.88 0.00 0.00 10.0 0.00 1

1 M3 Ring Balok P 4.8500 0.21 0.00 0.00 4.0 0.00 0


T 1.4000 0.71 0.00 0.00 4.0 0.00 2
KT 0.3310 3.02 0.00 0.00 4.0 0.00 1
M 0.1700 5.88 0.00 0.00 4.0 0.00 1

1 M3 Tangga Beton Bertulang 200 kg P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 0
KT 0.3310 3.02 0.00 0.00 4.0 0.00 1
M 0.1700 5.88 0.00 0.00 4.0 0.00 1

1 M2 Pasangan Dinding Batu Bata (1:4) P 0.2000 5.00 0.00 0.00 34.0 0.00 0
T 0.1000 10.00 0.00 0.00 34.0 0.00 2
KT 0.0100 100.00 0.00 0.00 34.0 0.00 1
M 0.0150 66.67 0.00 0.00 34.0 0.00 1

1 M2 Pasangan Dinding Batu Bata (1:2) P 0.3200 3.13 0.00 0.00 5.0 0.00 4
T 0.1000 10.00 0.00 0.00 5.0 0.00 0
KT 0.0100 100.00 0.00 0.00 5.0 0.00 1
M 0.0150 66.67 0.00 0.00 5.0 0.00 1

1 M3 Pasangan Kusen Pintu dan Jendela P 6.0000 0.17 0.00 0.00 7.0 0.00 2
T 20.0000 0.05 0.00 0.00 7.0 0.00 4
KT 2.0000 0.50 0.00 0.00 7.0 0.00 1
M 0.3000 3.33 0.00 0.00 7.0 0.00 1
PEKERJAAN KAP DAN ATAP
1 M3 Pekerjaan Balok Dinding P 0.1000 10.00 0.00 0.00 2.0 0.00 1
T 0.0330 30.30 0.00 0.00 2.0 0.00 1
KT 0.0100 100.00 0.00 0.00 2.0 0.00 1
M 0.0050 200.00 0.00 0.00 2.0 0.00 1
1 M3 Pekerjaan Kuda-Kuda Kayu P 5.5000 0.18 0.00 0.00 4.0 0.00 2
T 8.3000 0.12 0.00 0.00 4.0 0.00 3
KT 2.2000 0.45 0.00 0.00 4.0 0.00 1
M 1.5000 0.67 0.00 0.00 4.0 0.00 1

1 M2 Pekerjaan rangka Atap P 0.1000 10.00 0.00 0.00 7.0 0.00 2


T 0.1000 10.00 0.00 0.00 7.0 0.00 2
KT 0.0100 100.00 0.00 0.00 7.0 0.00 1
M 0.0050 200.00 0.00 0.00 7.0 0.00 1

1M' Papan Lisplank P 0.1000 10.00 0.00 0.00 3.0 0.00 0


T 0.2000 5.00 0.00 0.00 3.0 0.00 4
KT 0.0200 50.00 0.00 0.00 3.0 0.00 1
M 0.0050 200.00 0.00 0.00 3.0 0.00 1

Pemasangan 1 M3 Gording, Nog P 12.0000 0.08 0.00 0.00 14.0 0.00 5


T 4.0000 0.25 0.00 0.00 14.0 0.00 2
KT 1.2000 0.83 0.00 0.00 14.0 0.00 0
M 0.2000 5.00 0.00 0.00 14.0 0.00 1

Pemasangan 1 M' Talang Miring BJLS 28 P 0.0400 25.00 0.00 0.00 2.0 0.00 1
T 0.4000 2.50 0.00 0.00 2.0 0.00 4
KT 0.0250 40.00 0.00 0.00 2.0 0.00 1
M 0.0013 769.23 0.00 0.00 2.0 0.00 1

Pemasangan 1 M2 Atap Sakura Roof P 0.2000 5.00 0.00 0.00 4.0 0.00 2
T 0.1000 10.00 0.00 0.00 4.0 0.00 4
KT 0.0100 100.00 0.00 0.00 4.0 0.00 1
M 0.0010 1,000.00 0.00 0.00 4.0 0.00 1

Pemasangan 1 M2 Perabung P 0.0457 21.89 0.00 0.00 1.0 0.00 0


T 0.0500 20.00 0.00 0.00 1.0 0.00 0
KT 0.0050 200.00 0.00 0.00 1.0 0.00 1
M 0.0010 1,000.00 0.00 0.00 1.0 0.00 1
PEKERJAAN PLAFON
1 M2 Rangka Plafon P 0.1500 6.67 #REF! #REF! 12.0 #REF! #REF!
T 0.2500 4.00 #REF! #REF! 12.0 #REF! #REF!
KT 0.0250 40.00 #REF! #REF! 12.0 #REF! 1
M 0.0075 133.33 #REF! #REF! 12.0 #REF! 1

1 M2 Plafond Gypsum P 0.1000 10.00 #REF! #REF! 17.0 #REF! #REF!


T 0.0500 20.00 #REF! #REF! 17.0 #REF! 6
KT 0.0060 166.67 #REF! #REF! 17.0 #REF! #REF!
M 0.0050 200.00 #REF! #REF! 17.0 #REF! 1

Memasang Lis Plafond P 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
T 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
KT 0.0020 500.00 #REF! #REF! 2.0 #REF! 1
M 0.0010 1,000.00 #REF! #REF! 2.0 #REF! 1
PEKERJAAN PLASTERAN
1 M2 Plasteran Dinding (1:2) P 0.2000 5.00 0.00 0.00 9.0 0.00 3
T 0.1500 6.67 0.00 0.00 9.0 0.00 3
KT 0.0150 66.67 0.00 0.00 9.0 0.00 1
M 0.0100 100.00 0.00 0.00 9.0 0.00 1

1 M2 Plasteran Dinding (1:4) P 0.1600 6.25 0.00 0.00 40.0 0.00 0


T 0.0500 20.00 0.00 0.00 40.0 0.00 3
KT 0.0150 66.67 0.00 0.00 40.0 0.00 1
M 0.0100 100.00 0.00 0.00 40.0 0.00 1

1 M2 Acian Semen T 0.0600 16.67 0.00 0.00 12.0 0.00 5


KT 0.0100 100.00 0.00 0.00 12.0 0.00 3
M 0.0100 100.00 0.00 0.00 12.0 0.00 1

1 M2 Pasangan Dinding Porslin P 0.6000 1.67 0.0000 0.00 6.0 0.00 5


T 0.4550 2.20 0.0000 0.00 6.0 0.00 4
KT 0.0450 22.22 0.0000 0.00 6.0 0.00 1
M 0.0300 33.33 0.0000 0.00 6.0 0.00 1
PEKERJAAN LANTAI
1 M3 Urugan Pasir P 0.3000 3.33 0.00 0.00 1.0 0.00 4
M 0.0100 100.00 0.00 0.00 1.0 0.00 1

1 M2 Pasangan Lantai Kramik 33 x 33 P 0.2400 4.17 #REF! #REF! 29.0 #REF! 4


T 0.1200 8.33 #REF! #REF! 29.0 #REF! 3
KT 0.0120 83.33 #REF! #REF! 29.0 #REF! 1
M 0.0120 83.33 #REF! #REF! 29.0 #REF! 1
1 M2 Pasangan Lantai Kramik 20 x 20 P 0.3500 2.86 #REF! #REF! 4.0 #REF! 4
T 0.2000 5.00 #REF! #REF! 4.0 #REF! 3
KT 0.0250 40.00 #REF! #REF! 4.0 #REF! 1
M 0.0250 40.00 #REF! #REF! 4.0 #REF! 1

PEKERJAAN PINTU DAN JENDELA


1 M2 Pintu dan Jendela kaca P 0.8000 1.25 0.00 0.00 44.0 0.00 2
T 0.8000 1.25 0.00 0.00 44.0 0.00 5
KT 0.0400 25.00 0.00 0.00 44.0 0.00 1
M 0.0400 25.00 0.00 0.00 44.0 0.00 1

1 M2 Kaca Tebal 5 MM P 0.0150 66.67 0.00 0.00 1.0 0.00 1


T 0.1500 6.67 0.00 0.00 1.0 0.00 0
KT 0.0150 66.67 0.00 0.00 1.0 0.00 1
M 0.0002 6,666.67 0.00 0.00 1.0 0.00 1

1 Buah Pasangan Engsel Pintu P 0.0500 20.00 0.00 0.00 5.0 0.00 1
T 0.6000 1.67 0.00 0.00 5.0 0.00 5
KT 0.0600 16.67 0.00 0.00 5.0 0.00 1
M 0.0030 333.33 0.00 0.00 5.0 0.00 1

1 Buah Pasangan Kunci Tanam Antik P 0.0600 16.67 0.00 0.00 2.0 0.00 1
T 0.6000 1.67 0.00 0.00 2.0 0.00 4
KT 0.0600 16.67 0.00 0.00 2.0 0.00 1
M 0.0030 333.33 0.00 0.00 2.0 0.00 1
PEKERJAAN PENGECATAN
1 M2 Mendempul dan Menggosok Kayu P 0.0400 25.00 0.00 0.00 1.0 0.00 0
T 0.0400 25.00 0.00 0.00 1.0 0.00 0
KT 0.0040 250.00 0.00 0.00 1.0 0.00 1
M 0.0025 400.00 0.00 0.00 1.0 0.00 1

1 M2 Mengecat Kayu Baru P 0.0700 14.29 0.00 0.00 8.0 0.00 0


T 0.0090 111.11 0.00 0.00 8.0 0.00 1
KT 0.0060 166.67 0.00 0.00 8.0 0.00 1
M 0.0025 400.00 0.00 0.00 8.0 0.00 1

1 M2 Mengecat Tembok Baru P 0.0400 25.00 0.00 0.00 6.0 0.00 3


T 0.0400 25.00 0.00 0.00 6.0 0.00 0
KT 0.0080 125.00 0.00 0.00 6.0 0.00 1
M 0.0040 250.00 0.00 0.00 6.0 0.00 1

PEKERJAAN PERLENGKAPAN DALAM


Pekerjaan Pemasangan Listrik 12.0

Pemasangna 1 Buah Kloset Jongkok P 1.0000 1.00 0.00 0.00 1.0 0.00 0
T 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! #DIV/0!
KT 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! #DIV/0!
M 0.1600 6.25 0.00 0.00 1.0 0.00 1

Pemasangan 1 Buah KloSet Duduk P 1.0000 1.00 0.00 0.00 2.0 0.00 0
T 1.5000 0.67 0.00 0.00 2.0 0.00 2
KT 0.1500 6.67 0.00 0.00 2.0 0.00 1
M 0.1600 6.25 0.00 0.00 2.0 0.00 1

Floor Draine P 0.0100 100.00 0.00 0.00 0.5 0.00 1


T 0.1000 10.00 0.00 0.00 0.5 0.00 0
KT 0.0100 100.00 0.00 0.00 0.5 0.00 1
M 0.0050 200.00 0.00 0.00 0.5 0.00 1

1 Buah Bak Cuci Piring Stainless P 0.0300 33.33 0.00 0.00 0.5 0.00 1
T 0.3000 3.33 0.00 0.00 0.5 0.00 1
KT 0.0300 33.33 0.00 0.00 0.5 0.00 1
M 0.0020 500.00 0.00 0.00 0.5 0.00 1

Memasang 1 Wastafel P 0.5000 2.00 0.00 0.00 1.0 0.00 3


T 1.0000 1.00 0.00 0.00 1.0 0.00 0
KT 0.1500 6.67 0.00 0.00 1.0 0.00 1
M 0.1000 10.00 0.00 0.00 1.0 0.00 1

Memasang Pipa Air Ø 3" Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 3
T 0.0700 14.29 0.00 0.00 1.0 0.00 5
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1

Memasang Pipa Air Ø 3/4" AW Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 2
T 0.0700 14.29 0.00 0.00 1.0 0.00 0
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1
Memasang Pipa Air Ø 1/2" AW Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 2
T 0.0700 14.29 0.00 0.00 1.0 0.00 0
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1

Memasangan 1 Kran Air Ø 3/4" atau 1/2" P 0.0100 100.00 0.00 0.00 1.0 0.00 1
T 0.1000 10.00 0.00 0.00 1.0 0.00 1
KT 0.0100 100.00 0.00 0.00 1.0 0.00 1
M 0.0050 200.00 0.00 0.00 1.0 0.00 1
PEKERJAAN PERLENGKAPAN LUAR
1 M3 Rabat Beton (1:3:5) P 5.0000 0.20 0.00 0.00 22.0 0.00 5
T 0.8000 1.25 0.00 0.00 22.0 0.00 1
KT 0.0800 12.50 0.00 0.00 22.0 0.00 1
M 0.2000 5.00 0.00 0.00 22.0 0.00 1

Analisis 1Buah Bak Kontrol P 2.2600 0.44 0.00 0.00 1.0 0.00 3
T 0.7200 1.39 0.00 0.00 1.0 0.00 0
KT 0.0720 13.89 0.00 0.00 1.0 0.00 1
M 0.1080 9.26 0.00 0.00 1.0 0.00 1

1 Buah Septictank 2 x 2 x 2 M P 6.3460 0.16 0.00 0.00 4.0 0.00 0


T 1.0500 0.95 0.00 0.00 4.0 0.00 1
KT 0.1050 9.52 0.00 0.00 4.0 0.00 1
M 0.2870 3.48 0.00 0.00 4.0 0.00 1

1 Unit Resapan P 6.8850 0.15 0.00 0.00 2.0 0.00 0


TB 0.7000 1.43 0.00 0.00 2.0 0.00 1
TBs 1.4000 0.71 0.00 0.00 2.0 0.00 0
KT 0.0740 13.51 0.00 0.00 2.0 0.00 1
KTbs 0.3310 3.02 0.00 0.00 2.0 0.00 1
M 0.3175 3.15 0.00 0.00 2.0 0.00 1
Jum
URAIAN PEKERJAAN
Hari 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

PEKERJAAN PERSIAPAN

Pembersihan Lapangan

Pasangan Bouwlpank

Gudang Semen dan Alat

PEKERJAAN GALIAN

Galian Tanah

Urugan Kembali Galian Tanah

PEK. PONDASI BATU KALI

Urugan Pasir Bawah Pondasi

Pasangan Pondasi Batu Kosong

Pasangan Pondasi Batu Kali (1:3)

PEK. BETON

Pondasi Plat

Kolom

Balok

Plat Beton

Ring Balok

Tangga Beton Bertulang

Plafond Gypsum

Memasang Lis Plafond

Pasangan Dinding Porslin


Acian

PEKERJAAN LANTAI

Urugan Pasir

Pasangan Lantai Kramik

PEK. PINTU DAN JENDELA

Pintu dan Jendela kaca

Kaca Tebal 5 MM

Pasangan Engsel Pintu

Pasangan Kunci Tanam Antik

PEKERJAAN PENGECATAN

Mendempul dan Menggosok Kayu

Mengecat Kayu Baru

Mengecat Tembok Baru

PEK. PERLWNGKAPAN DALAM

Pekerjaan Pasangan Listrik

Pekerjaan Sanitasi

PEK. PERLENGKAPAN LUAR

Rabat Beton (1:2:3)

Bak Kontrol

Septictank

Resapan
46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
WAKTU PELAKSANAAN (HARI)

77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119
120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169
170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190
Tabel 4.1 Daftar Harga Bahan dan Satuan Upah
HARGA UPAH/SATUAN
NO URAIAN SATUAN KET
(RUPIAH)
A UPAH:
1 Mandor hari 65,000.00
2 Kepala Tukang hari 55,000.00
3 Tukang hari 45,000.00
4 Pekerja hari 35,000.00
B BAHAN/MATERIAL
1 Air Kerja ls 4,500,000.00
2 Alkali Resisting kg 60,000.00
3 Cat Dasar kg 18,300.00
4 Cat Kayu kg 18,300.00
5 Cat Meni kg 18,300.00
6 Naturtone Cat Tembok kg 14,640.00
7 American Standart Kloset Duduk bh 1,904,000.00
8 Amplas lbr 3,000.00
11 Atap Sakura Roof (2 Susun) m2 51,968.00
12 AW Pipa PVC Ø 1" m 22,400.00
13 AW Pipa PVC Ø 1/2" m 11,200.00
14 AW Pipa PVC Ø 3/4" m 15,680.00
15 AW Pipa PVC Ø 3" m 63,500.00
17 Batu Bata bh 225.00
18 Batu Batako 10/20/40 bh 4,000.00
19 Batu Kali m3 150,000.00
20 Baut Engsel/Teralis dos 7,500.00
21 Baut Ø12-15 bh 1,680.00
22 Baut Ø16-20 bh 2,240.00
23 Belucci Kunci set 112,000.00
24 Besi Polos Ø 10 mm kg 4,384.42
25 Besi Polos Ø 12 mm kg 3,705.54
26 Besi Polos Ø 16 mm kg 3,635.18
27 Besi Polos Ø 8 mm kg 5,221.45
28 Besi Polos Ø 10 mm lnjr 37,872.62
29 Besi Polos Ø 12 mm lnjr 54,507.11
30 Besi Polos Ø 16 mm lnjr 123,377.57
31 Besi Polos Ø 8 mm lnjr 30,875.08
32 Besi Strip kg 5,384.42
33 Diamond Kasar Keramik 20x20 bh 2,440.00
34 Falco Engsel Jendela 3" bh 20,160.00
35 Falco Engsel Pintu 5 " bh 33,600.00
36 Gypsum lbr 61,600.00
37 Hak Angin psg 11,200.00
38 Ikad Keramik 30x30 bh 6,100.00
39 Impra Dempul kg 20,000.00
40 Impresso Keramik 30x30 bh 4,990.91
41 Indocement Semen Warna 50 kg zak 91,500.00
42 Jendela Kaca/Jalusi Miring bh 250,000.00
43 Kaca Bening t = 5 mm m2 95,200.00
44 Kaca Hitam t = 5 mm m2 106,400.00
45 Kawat Bendrad kg 10,750.00
46 Kawat Beton kg 11,200.00
47 Kawat Duri m' 1,400.00
48 Kayau Meranti Papan 3/20 (Kls. 2) m3 784,000.00
49 Kayau Meranti Papan 3/20 (Kls. 2) btg 18,700.00
50 Kayu Meranti Balok 5/7 (Kls. 2) m3 784,000.00
51 Kayu Meranti Balok 5/7 (Kls. 2) btg 10,900.00
52 Kayu Bengkirai Balok (Kls. 1) m3 1,456,000.00
53 Kayu Bengkirai Papan (Kls. 1) m3 1,568,000.00
54 Kayu Bengkirai Balok 5/10 (Kls. 1) btg 29,500.00
55 Kayu Bengkirai Balok 5/7 (Kls. 1) btg 20,500.00
Sambungan Tabel 4.1
56 Kayu Bengkirai Balok 2/3 (Kls. 1) btg 3,500.00
57 Kayu Bengkirai Balok 8/12 (Kls. 1) btg 54,000.00
58 Kayu Bengkirai Papan 3/20 (Kls. 1) btg 60,500.00
59 Kayu Meranti 4/6 (Kls. I) btg 7,500.00
60 Kayu Ulin Balok (Kls. 1) btg 38,080.00
61 Kayu Meranti Balok (Kls. 1) m3 1,008,000.00
62 Kayu Meranti Papan (Kls. 1) m3 1,064,000.00
63 Kayu Ulin Balok (Kls. 1) m3 1,904,000.00
64 Kayu Ulin Papan (Kls. 1) m3 2,072,000.00
66 Kerikil Beton m3 140,000.00
67 Kia Keramik 40x40 bh 11,183.33
68 Kia Polos Keramik 20x20 bh 2,196.00
69 Kran Air bh 40,000.00
70 Kuas 4" bh 7,840.00
71 Kusen Bengkirai Standar m' 24,000.00
72 Lambersering meranti btg 15,000.00
73 Lexus Westafel bh 952,000.00
74 List Profil m' 10,000.00
76 Minyak Bekisting lt 10,000.00
77 Nicole Kunci set 78,400.00
78 Nok Surya Roof 100 mm bh 33,600.00
79 Nok Surya Roof 33 mm bh 16,800.00
80 Paku Biasa 2" - 5" kg 9,800.00
81 Paku Sekrup dos 10,000.00
82 Paku Ulin 1" - 5" kg 12,200.00
83 Paragon Plamir kg 8,540.00
84 Pasir Cor m3 130,000.00
85 Pasir Pasang m3 100,000.00
86 Pasir urug m3 80,000.00
87 Pemasangan Listrik ls 1,500,000.00
88 Perlatan Kecil ls 100,000.00
89 T-Dos (Kontak Hubung Bagi) b 4,500.00
90 Pintu Panel Bengkirai 80-100 x 200 bh 390,000.00
91 Playwood t = 6 mm lbr 56,000.00
92 Playwood t = 9 mm lbr 100,800.00
93 Playwood t =3 mm lbr 39,600.00
94 Pujatex Cat Minyak kg 36,600.00
95 Reservoir/Tangki Air 1200 L bh 952,000.00
96 Rol Cat bh 10,000.00
99 Talang Air PVC btg 50,400.00
100 Tanah Urug m3 45,000.00
102 Toto Kloset Jongkok bh 100,800.00
103 Tonasa Semen Portland 50 kg zak 51,240.00
104 Bak Cuci Stainless bh 257,600.00
105 Tulangan kg 14,308.25
106 Floor Drain Bh 20,000.00
107 Water Drain dan Asesories Bh 85,000.00
108 Pipa PVC Listrik m 7,000.00
109 Saklar Tunggal Bh 15,000.00
110 Kabel NYY 2.5 mm2 m 7,000.00
111 Kabel NYY 1.5 mm2 m 6,500.00
112 Lampu Pijar 20W bh 20,000.00
113 Fitting Lampu bh 10,000.00
114 Inbouw Doss bh 4,500.00
115 Perlengkapan (Isolasi, Paku, Klem, Samb) set 1,000.00
116 Stop Kontak bh 15,000.00
117 Lampu Neon Lengkap bh 35,000.00
118 Box MCB bh 10,000.00
119 Seng Plat 3 x 6 BJLS 28 lbr 28,500.00
120 MCB 6A bh 20,000.00
C HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI
1 Pembersihan Lapangan m2 0.00
2 Pemasangan Bouplank/Pengukuran m 2
0.00
3 Pengadaan Air Kerja Ls 0.00
4 Pembuatan Gedung Semen dan Alat m2 0.00
5 Galian Tanah Biasa 1 Meter m 3
0.00
6 Galian Tanah Biasa 2 Meter m3 0.00
7 Galian Tanah Biasa 3 Meter m3 0.00
8 Galian Tanah Keras 1 Meter m 3
0.00
9 Galian Tanah Cadas 1 Meter m3 0.00
10 Galian Tanah Lumpur 1 Meter m3 0.00
11 Urugan Kembali Galian m 3
0.00
12 Pemadatan Tanah m3 0.00
13 Urugan Pasir Bawah Pondasi m 3
0.00
14 Pasangan Pondasi Batu Kosong m 3
0.00
15 Pasangan Pondasi Batu Kali m3 0.00
16 Sloof 15/20 m 3
0.00
17 Pekerjaan Pondasi Plat m3 0.00
18 Kolom 15/15 m3 0.00
19 Kolom 15/20 m3 0.00
20 Kolom 15/25 m3 0.00
21 Kolom 15/30 m3 0.00
22 Kolom 20 x 20 m3 0.00
23 Kolom 20 x 25 m3 0.00
24 Kolom 20 x 30 m3 0.00
25 Kolom 20 x 35 m3 0.00
26 Kolom 20 x 40 m3 0.00
27 Kolom 25 x 25 m3 0.00
28 Kolom 25 x 30 m3 0.00
29 Kolom 25 x 35 m3 0.00
30 Kolom 25 x 40 m3 0.00
31 Kolom 25 x 45 m3 0.00
32 Kolom 25 x 50 m3 0.00
33 Kolom 30 x 30 m3 0.00
34 Kolom 30 x 35 m3 0.00
35 Kolom 30 x 40 m3 0.00
36 Kolom 35 x 45 m3 0.00
37 Kolom 35 x 50 m3 0.00
38 Kolom 40 x 40 m3 0.00
39 Kolom 40 x 45 m3 0.00
40 Kolom 40 x 50 m3 0.00
41 Balok 15 x 20 m3 0.00
42 Balok 15 x 25 m3 0.00
43 Balok 15 x 30 m3 0.00
44 Balok 20 x 20 m3 0.00
45 Balok 20 x 25 m3 0.00
46 Balok 20 x 30 m3 0.00
47 Balok 20 x 35 m3 0.00
48 Balok 20 x 40 m3 0.00
49 Balok 25 x 25 m3 0.00
50 Balok 25 x 30 m3 0.00
51 Balok 25 x 35 m3 0.00
52 Balok 25 x 40 m3 0.00
53 Balok 25 x 45 m3 0.00
54 Balok 25 x 50 m3 0.00
55 Balok 30 x 30 m3 0.00
56 Balok 30 x 35 m3 0.00
57 Balok 30 x 40 m3 0.00
58 Balok 35 x 45 m3 0.00
59 Balok 35 x 50 m3 0.00
60 Balok 40 x 40 m3 0.00
61 Balok 40 x 45 m3 0.00
62 Balok 40 x 50 m3 0.00
63 Plat Beton m3 0.00
64 Ring Balok m3 0.00
65 Tangga m3 0.00
66 Pasangan Dinding Batubata (1:4) m3 0.00
67 Pasangan Dinding Batubata (1:2) m3 0.00
68 Kusen Pintu dan Jendela m3 0.00
69 Balok Dinding m3 0.00
70 Pekerjaan Kuda-Kuda m3 0.00
71 Pekerjaan Rangka Atap m3 0.00
72 Pekerjaan Listplank 3/25 m3 0.00
73 Gording 8/12 m3 0.00
74 Talang m' 0.00
75 Pemasangan Atap m2 0.00
76 Pemasangan Perabung m3 0.00
77 Rangka Plafon m2 0.00
78 Memasang Plafond Gypsum m2 0.00
79 Memasang Lis Plafond m' 0.00
80 Plasteran Dinding (1:2) m2 0.00
81 Plasteran Dinding (1:4) m2 0.00
82 Acian m2 0.00
83 Pasangan Turap Porslent m2 0.00
84 Urugan Pasir 0.00
85 Pasangan Lantai Kramik 33 x 33 m2 0.00
86 Pasangan Lantai Kramik 20 x 20 m2 0.00
87 Pasangan Pintu Bh 0.00
88 Pasangan Jendela kaca m2 0.00
89 Pasangan Kaca Tebal 15 mm m2 0.00
90 Pasangan Engsel Pintu Bh 0.00
91 Pasangan Kunci Taman Antik Bh 0.00
92 Mendempul dan Mrnggosok Kayu m2 0.00
93 Mengecat Kayu Baru m2 0.00
94 Mengecat Tembok Baru m2 0.00
95 Pemasangan Listrik Baru Ls 0.00
96 Pemasangna Kloset Jongkok Bh 0.00
97 Pemasangan Kloset Duduk Bh 0.00
98 Pemasangan Floor Draine Bh 0.00
99 Pemasangan Bak Cuci Piring Bh 0.00
100 Pemasangan Wastafel Bh 0.00
101 Pem. Pipa Air Ø 3" Per M' M' 0.00
102 Pem. Pipa Air Ø 3/4" AW Per M' M' 0.00
103 Pem. Pipa Air Ø 1/2" AW Per M' M' 0.00
104 Pem. Kran Air Ø 3/4" atau 1/2" Bh 0.00
105 Rabat Beton (1:3:5) M3 0.00
106 Bak Kontrol Bh 0.00
107 Septictank Bh 0.00
108 Resapan Bh 0.00
Tabel 4.2 Hasil Daftar Volume/Bobot Pekerjaan
NO URAIAN PEKERJAAN VOLUME SAT
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 340.0000 M2
1.1.2. Pemasangan Bouplank/Pengukuran 56.0000 M
1.1.3. Pengadaan Air Kerja 1.0000 Ls
1.1.4. Pembuatan Gudang Semen dan Alat 20.0000 M2
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 1 Meter 148.2500 M3
1.2.2. Galian Tanah Biasa 2 Meter 0.0000 M3
1.2.7. Urugan Kembali Galian 0.0000 M3
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 12.1513 M3
1.3.2. Pasangan Pondasi Batu Kosong 24.6692 M3
1.3.3. Pasangan Pondasi Batu Kali 56.1260 M3
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15 x 20 2.5744 M3
2.1.2. Pondasi Plat 3.7960 M3
2.1.2. Kolom 15 x 15 4.9800 M3
2.1.3. Kolom 15 x 20 3.4300 M3
2.1.8. Kolom 20 x 30 5.4600 M3
2.1.25. Balok 15 x 20 2.3400 M3
2.1.39. Balok 30 x 35 6.6045 M3
2.1.46. Plat Beton 7.3600 M3
2.1.47. Ring Balok 3.7400 M3
2.1.48. Tangga 1.8534 M3
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 0.8920 M3
III. PEKERJAAN DINDING
3.1. Dinding
3.1.1. Pasangan Dinding 1/2 Bata (1:4) 413.5688 M2
3.1.2. Pasangan Dinding 1/2 Bata (1:2) 51.1000 M2
3.2. Kusen
3.2.1. Kusen Pintu dan Jendela 1.2541 M3
3.2.2. Bout-bout/Angker 60.2770 Kg
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1. Balok Dinding 8/12 0.2939 M3
4.1.2. Pekerjaan Kuda-Kuda 1.3629 M3
4.1.3. Pekerjaan Rangka Atap 138.0646 M2
4.1.4. Pekerjaan Listplank 3/25 53.9000 M2
4.1.5. Pekerjaan Papan Reuter 3/25 34.1700 M'
4.1.6. Nog dan Gording 8/12 5.6300 M3
4.1.7. Pekerjaan Talang 17.0000 M'
4.2. Atap
4.2.1. Pemasangan Atap 158.0646 M2
4.2.2. Pemasangan Perabung 0.0000 M3
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon #REF! M2
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 165.6500 M2
5.2.2. Memasang Lis Plafond 179.9500 M'
VI. PEKERJAAN PLASTERAN DAN ACIAN
Sambungan Tabel 4.2
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 134.5000 M2
6.1.2. Plasteran Dinding (1:4) 780.2350 M2
6.1.3. Acian 914.7350 M2
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 47.2160 M2
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Tanah 0.0000 M3
7.1.2. Urugan Pasir 11.2648 M3
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 33 x 33 182.3750 M2
7.2.2. Pasangan Lantai Kramik 20 x 20 24.6325 M2
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 17.0000 Bh
8.1.2. Pasangan Jendela 28.9350 M2
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 71.5420 M2
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu dan Jendela 68.0000 Bh
8.3.3. Pasangan Kunci Taman Antik 12.0000 Bh
IX. PEKERJAAN PENGECATAN
9.1. Mendempul dan Mrnggosok Kayu 0.0000 M2
9.2. Mengecat Kayu Baru
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 610.5400 M2
9.3. Mengecat Tembok Baru
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 493.7300 M2
X. PEKERJAAN PERLENGKAPAN DALAM
10.1. Listrik
10.1.1. Pasangan Lampu Pijar 38.0000 Bh
10.1.2. Pemasangan Stop Kontak 12.0000 Bh
10.1.3. Pemasangan Lampu TL 5.0000 Bh
10.1.4. Pemasangan MCB 1.0000 Bh
10.1.5. Pemasangan Kabel Jaringan 348.0000 M'
10.1.6. Pitting lampu 26.0000 Bh
10.1.7. Pemasangan Sakelar 26.0000 Bh
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 2.0000 Unit
10.2.2. Pemasangan Kloset Duduk 2.0000 Unit
10.2.3. Pemasangan Floor Draine 4.0000 Bh
10.2.4. Pemasangan Bak Cuci Piring 1.0000 Bh
10.2.5. Pemasangan Wastafel 2.0000 Bh
10.2.6. Pem. Pipa Air Ø 3" Per M' 30.0000 M'
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 42.0000 M'
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 46.5300 M'
10.2.10. Pem. Kran Air Ø 3/4" atau 1/2" 8.0000 Bh
XI. PEKERJAAN PERLENGKAPAN LUAR
11.1. Saluran Keliling 57.0000 M'
11.2. Rabat Beton (1:3:5) 21.2100 M2
11.3. Bak Kontrol 1.0000 Bh
11.4. Resapan 1.0000 Bh
11.5. Septictank 1.0000 Bh
10.5. Pek. Pilar 37.0000 M'
Tabel 4.3 Hasil Ringkasan Keseluruhan Daftar Harga Satuan Pekerjaan
No URAIAN PEKERJAAN Harga Bahan Harga Upah Tenaga Kerja JUM. HARGA PER SAT
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 0.00 20,000.00 20,000.00
1.1.2. Pemasangan Bouplank/Pengukuran 8,924.84 21,150.00 30,074.84
1.1.3. Pengadaan Air Kerja 4,500,000.00 0.00 4,500,000.00
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 0.00 66,500.00 66,500.00
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 100,000.00 26,600.00 126,600.00
1.3.2. Pasangan Pondasi Batu Kosong 205,000.00 117,780.00 322,780.00
1.3.3. Pasangan Pondasi Batu Kali 454,753.33 262,125.00 716,878.33
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15/20 34,366,053.33 621,360.00 34,987,413.33
2.1.2. Pekerjaan Pondasi Plat 43,918,874.80 621,360.00 44,540,234.80
2.1.2. Kolom 15/15 27,289,934.63 621,360.00 27,911,294.63
2.1.3. Kolom 15/20 32,096,345.90 621,360.00 32,717,705.90
2.1.8. Kolom 20 x 30 43,890,317.88 621,360.00 44,511,677.88
2.1.25. Balok 15 x 20 36,314,467.06 621,360.00 36,935,827.06
2.1.39. Balok 30 x 35 68,535,127.40 621,360.00 69,156,487.40
2.1.9. Plat Beton 78,971,499.90 621,360.00 79,592,859.90
2.1.10. Ring Balok 39,576,482.83 621,360.00 40,197,842.83
2.1.11. Tangga 92,925,402.77 621,360.00 93,546,762.77
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 443,720.00 204,050.00 647,770.00
III. PEKERJAAN DINDING
3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 75,852.27 30,750.00 106,602.27
2.2.2. Pasangan Dinding Batubata (1:2) 581,343.52 40,950.00 622,293.52
3.2. Kusen
2.3.1. Kusen Pintu dan Jendela 1,289,062.50 2,963,000.00 4,252,062.50
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1.. Balok Dinding 15,225.00 13,780.00 29,005.00
4.1.2. Pekerjaan Kuda-Kuda 1,831,275.00 1,787,500.00 3,618,775.00
4.1.3. Pekerjaan Rangka Atap 26,700.00 21,150.00 47,850.00
4.1.4. Pekerjaan Listplank 3/25 #REF! 33,250.00 #REF!
4.1.5. Gording 8/12 16,300.80 1,614,000.00 1,630,300.80
4.1.6. Talang 28,165.00 50,293.00 78,458.00
4.2. Atap
4.2.1. Pemasangan Atap 36,900.00 29,210.00 66,110.00
4.2.2. Pemasangan Perabung 162,080.00 10,043.45 172,123.45
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon 19,371.43 43,825.00 63,196.43
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 33,080.00 15,210.00 48,290.00
5.2.2. Memasang Lis Plafond 10,572.00 4,425.00 14,997.00
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 11,579.20 36,250.00 47,829.20
6.1.2. Plasteran Dinding (1:4) 9,990.40 21,850.00 31,840.40
6.1.3. Acian 3,380.00 25,800.00 29,180.00
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 1,513,878.00 109,300.00 1,623,178.00
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 100,000.00 26,600.00 126,600.00
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 40 x 40 187,416.00 36,240.00 223,656.00
7.2.2. Pasangan Lantai Kramik 20 x 20 91,500.00 57,250.00 148,750.00
Sambungan Tabel 4.3
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 500,000.00 164,800.00 664,800.00
8.1.2. Pasangan Jendela kaca 88,229.17 314,400.00 402,629.17
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 121,000.00 19,441.50 140,441.50
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu 53,000.00 27,405.00 80,405.00
8.3.3. Pasangan Kunci Taman Antik 160,000.00 78,030.00 238,030.00
IX. PEKERJAAN PENGECATAN
9.2. Mengecat Kayu Baru 27,931.00 7,875.00 35,806.00
9.3. Mengecat Tembok Baru 11,541.22 9,120.00 20,661.22
X. PEK. INSTALASI DAN SANITASI
10.1 Listrik
10.1.1 Pemasangan Listrik Baru 245,000.00 0.00 245,000.00
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 357,426.67 102,600.00 460,026.67
10.2.2. Pemasangan Kloset Duduk 1,500,000.00 284,100.00 1,784,100.00
10.2.3. Pemasangan Floor Draine 40,000.00 13,500.00 53,500.00
10.2.4. Pemasangan Bak Cuci Piring 585,000.00 39,070.00 624,070.00
10.2.5. Pemasangan Wastafel 569,466.67 180,000.00 749,466.67
10.2.6. Pem. Pipa Air Ø 3" Per M' 29,062.50 11,325.00 40,387.50
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 19,375.00 11,325.00 30,700.00
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 6,587.50 11,325.00 17,912.50
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 25,843.75 13,500.00 39,343.75
XI. PEK. PERLENGKAPAN LUAR
11.1 Rabat Beton (1:3:5) 443,780.00 543,800.00 987,580.00
11.2 Bak Kontrol 1,196,653.40 291,100.00 1,487,753.40
11.3 Septictank 1,331,046.00 0.00 1,331,046.00
11.4 Resapan 21,468,275.19 0.00 21,468,275.19
Tabel 4.4 Hasil Daftar Rencana Anggaran Biaya (RAB)
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 0.0000 M2 89,400.00 0.00
1.1.2. Pemasangan Bouplank/Pengukuran 0.0000 M2 30,074.84 0.00
1.1.3. Pengadaan Air Kerja 0.0000 Ls 4,500,000.00 0.00
0.00
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 1 Meter 0.0000 M3 66,500.00 0.00
0.00
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 0.0000 M3 126,600.00 0.00
1.3.2. Pasangan Pondasi Batu Kosong #REF! M3 322,780.00 #REF!
1.3.3. Pasangan Pondasi Batu Kali 0.0000 M3 716,878.33 0.00
#REF!
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15/20 0.0000 M3 34,987,413.33 0.00
2.1.2. Pekerjaan Pondasi Plat 0.0000 M3 44,540,234.80 0.00
2.1.2. Kolom 15/15 0.0000 M3 27,911,294.63 0.00
2.1.3. Kolom 15/20 0.0000 M3 32,717,705.90 0.00
2.1.8. Kolom 20 x 30 0.0000 M3 44,511,677.88 0.00
2.1.25. Balok 15 x 20 0.0000 M3 36,935,827.06 0.00
2.1.39. Balok 30 x 35 0.0000 M3 69,156,487.40 0.00
2.1.9. Plat Beton 0.0000 M3 79,592,859.90 0.00
2.1.10. Ring Balok 0.0000 M3 40,197,842.83 0.00
2.1.11. Tangga 0.0000 M3 93,546,762.77 93,546,762.77
93,546,762.77
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 0.0000 M3 647,770.00 0.00
0.00
III. PEKERJAAN DINDING
3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 0.0000 M3 106,602.27 0.00
2.2.2. Pasangan Dinding Batubata (1:2) 0.0000 M3 622,293.52 0.00
0.00
3.2. Kusen
2.3.1. Kusen Pintu dan Jendela 0.0000 M3 4,252,062.50 0.00
0.00
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1.. Balok Dinding 8/12 0.0000 M3 29,005.00 0.00
4.1.2. Pekerjaan Kuda-Kuda 0.0000 M3 3,618,775.00 0.00
4.1.3. Pekerjaan Rangka Atap 0.0000 M3 47,850.00 0.00
4.1.4. Pekerjaan Listplank 3/25 0.0000 M3 94,450.00 0.00
4.1.5. Gording 8/12 0.0000 M3 1,630,300.80 0.00
4.1.6. Talang 0.0000 M' 78,458.00 0.00
0.00
4.2. Atap
4.2.1. Pemasangan Atap 0.0000 M2 66,110.00 0.00
4.2.2. Pemasangan Perabung 0.0000 M3 172,123.45 0.00
0.00
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon #REF! M2 63,196.43 #REF!
#REF!
Sambungan Tabel 3.4
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum #REF! M2 48,290.00 #REF!
5.2.2. Memasang Lis Plafond #REF! 14,997.00 #REF!
#REF!
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 0.0000 M2 47,829.20 0.00
6.1.2. Plasteran Dinding (1:4) 0.0000 M2 31,840.40 0.00
6.1.3. Acian 0.0000 M2 29,180.00 0.00
0.00
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 0.0000 M2 1,623,178.00 0.00
0.00
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 0.0000 126,600.00 0.00
0.00
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 40 x 40 #REF! M2 223,656.00 #REF!
7.2.2. Pasangan Lantai Kramik 20 x 20 #REF! M2 148,750.00 #REF!
#REF!
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 0.0000 Bh 664,800.00 0.00
8.1.2. Pasangan Jendela kaca 0.0000 M2 402,629.17 0.00
0.00
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 0.0000 M2 140,441.50 0.00
0.00
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu 0.0000 Bh 80,405.00 0.00
8.3.3. Pasangan Kunci Taman Antik 0.0000 Bh 238,030.00 0.00
0.00
IX. PEKERJAAN PENGECATAN
9.2. Mengecat Kayu Baru 0.0000 M2 35,806.00 0.00
9.3. Mengecat Tembok Baru 464.7500 M2 22,661.22 10,531,802.00
10,531,802.00
X. PEK. INSTALASI DAN SANITASI
10.1 Listrik
10.1.1 Pemasangan Listrik Baru 1.0000 Ls 245,000.00 245,000.00
245,000.00
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 0.0000 Bh 460,026.67 0.00
10.2.2. Pemasangan Kloset Duduk 0.0000 Bh 1,791,526.67 0.00
10.2.3. Pemasangan Floor Draine 0.0000 Bh 53,500.00 0.00
10.2.4. Pemasangan Bak Cuci Piring 0.0000 Bh 624,070.00 0.00
10.2.5. Pemasangan Wastafel 0.0000 Bh 749,466.67 0.00
10.2.6. Pem. Pipa Air Ø 3" Per M' 0.0000 M' 40,387.50 0.00
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 0.0000 M' 30,700.00 0.00
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 0.0000 M' 17,912.50 0.00
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 0.0000 Bh 39,343.75 0.00
0.00
XI. PEK. PERLENGKAPAN LUAR
11.1 Rabat Beton (1:3:5) 0.0000 987,580.00 0.00
11.2 Bak Kontrol 0.0000 1,487,753.40 0.00
11.3 Septictank 0.0000 1,331,046.00 0.00
11.4 Resapan 1.0000 21,468,275.19 21,468,275.19
21,468,275.19
Tabel 4.6 Hasil Perhitungan Lamanya Waktu Pelaksanaan Pekerjaan
Uraian Pekerjaan TK (a) (b) 1/a (c) (d) c/b (e) (f) d/e (g)
PEKERJAAN PERSIAPAN
1 M2 Pembersihan Lapangan P 0.7000 1.43 0.00 0.00 4.0 0.00 0
M 0.0900 11.11 0.00 0.00 4.0 0.00 5
1 M' Pasangan Bouwlpank P 0.1000 10.00 0.00 0.00 2.0 0.00 0
T 0.1000 10.00 0.00 0.00 2.0 0.00 0
1 M2 Gudang Semen dan Alat P 1.0000 1.00 0.00 0.00 7.0 0.00 0
T 1.0000 1.00 0.00 0.00 7.0 0.00 0
PEKERJAAN GALIAN
1 M3 Galian Tanah Biasa Sedalam 1 Meter P 0.7500 1.33 0.00 0.00 7.0 0.00 9
M 0.0250 40.00 0.00 0.00 7.0 0.00 0
1 M3 Urugan Kembali Galian Tanah P 0.1920 5.21 0.00 0.00 2.0 0.00 0
M 0.0190 52.63 0.00 0.00 2.0 0.00 1
PEKERJAAN PONDASI BATU KALI
1 M3 Urugan Pasir Bawah Pondasi P 0.3000 3.33 0.00 0.00 1.0 0.00 0
M 0.0100 100.00 0.00 0.00 1.0 0.00 1
1 M3 Pasangan Pondasi Batu Kosong P 0.7800 1.28 #REF! #REF! 3.0 #REF! 7
T 0.3900 2.56 #REF! #REF! 3.0 #REF! 4
1 M3 Pasangan Pondasi Batu Kali (1:3) P 0.0750 13.33 0.00 0.00 10.0 0.00 9
T 1.5000 0.67 0.00 0.00 10.0 0.00 4
PEKERJAAN BETON
1M3 Pondasi Plat P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
1M3 Sloof 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 5
T 1.4000 0.71 0.00 0.00 3.0 0.00 2
1 M3 Kolom Praktis (15/15) P 4.8500 0.21 0.00 0.00 7.0 0.00 4
T 1.4000 0.71 0.00 0.00 7.0 0.00 1
1 M3 Kolom 15/20 P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
1 M3 Kolom 20/30 P 4.8500 0.21 0.00 0.00 8.0 0.00 0
T 1.4000 0.71 0.00 0.00 8.0 0.00 0
1 M3 Balok 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 0
T 1.4000 0.71 0.00 0.00 3.0 0.00 2
1 M3 Balok 30/35 P 4.8500 0.21 0.00 0.00 8.0 0.00 4
T 1.4000 0.71 0.00 0.00 8.0 0.00 1
1 M3 Plat Beton P 4.8500 0.21 0.00 0.00 10.0 0.00 4
T 1.4000 0.71 0.00 0.00 10.0 0.00 2
1 M3 Ring Balok P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 2
1 M3 Tangga Beton Bertulang 200 kg P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 0
1 M2 Pasangan Dinding Batu Bata (1:4) P 0.2000 5.00 0.00 0.00 34.0 0.00 0
T 0.1000 10.00 0.00 0.00 34.0 0.00 2
1 M2 Pasangan Dinding Batu Bata (1:2) P 0.3200 3.13 0.00 0.00 5.0 0.00 4
T 0.1000 10.00 0.00 0.00 5.0 0.00 0
1 M3 Pasangan Kusen Pintu dan Jendela P 6.0000 0.17 0.00 0.00 7.0 0.00 2
T 20.0000 0.05 0.00 0.00 7.0 0.00 4
PEKERJAAN KAP DAN ATAP
1 M3 Pekerjaan Balok Dinding P 0.1000 10.00 0.00 0.00 2.0 0.00 1
T 0.0330 30.30 0.00 0.00 2.0 0.00 1
1 M3 Pekerjaan Kuda-Kuda Kayu P 5.5000 0.18 0.00 0.00 4.0 0.00 2
T 8.3000 0.12 0.00 0.00 4.0 0.00 3
1 M2 Pekerjaan rangka Atap P 0.1000 10.00 0.00 0.00 7.0 0.00 2
T 0.1000 10.00 0.00 0.00 7.0 0.00 2
1M' Papan Lisplank P 0.1000 10.00 0.00 0.00 3.0 0.00 0
T 0.2000 5.00 0.00 0.00 3.0 0.00 4
Pemasangan 1 M3 Gording, Nog P 12.0000 0.08 0.00 0.00 14.0 0.00 5
T 4.0000 0.25 0.00 0.00 14.0 0.00 2
Pemasangan 1 M' Talang Miring BJLS 28 P 0.0400 25.00 0.00 0.00 2.0 0.00 1
T 0.4000 2.50 0.00 0.00 2.0 0.00 4
Pemasangan 1 M2 Atap Sakura Roof P 0.2000 5.00 0.00 0.00 4.0 0.00 2
T 0.1000 10.00 0.00 0.00 4.0 0.00 4
Pemasangan 1 M2 Perabung P 0.0457 21.89 0.00 0.00 1.0 0.00 0
T 0.0500 20.00 0.00 0.00 1.0 0.00 0
Sambungan Tabel 4.6
PEKERJAAN PLAFON
1 M2 Rangka Plafon P 0.1500 6.67 #REF! #REF! 12.0 #REF! #REF!
T 0.2500 4.00 #REF! #REF! 12.0 #REF! #REF!
1 M2 Plafond Gypsum P 0.1000 10.00 #REF! #REF! 17.0 #REF! #REF!
T 0.0500 20.00 #REF! #REF! 17.0 #REF! 6
Memasang Lis Plafond P 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
T 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
PEKERJAAN PLASTERAN
1 M2 Plasteran Dinding (1:2) P 0.2000 5.00 0.00 0.00 9.0 0.00 3
T 0.1500 6.67 0.00 0.00 9.0 0.00 3
1 M2 Plasteran Dinding (1:4) P 0.1600 6.25 0.00 0.00 40.0 0.00 0
T 0.0500 20.00 0.00 0.00 40.0 0.00 3
1 M2 Acian Semen T 0.0600 16.67 0.00 0.00 12.0 0.00 5
M 0.0100 100.00 0.00 0.00 12.0 0.00 1
1 M2 Pasangan Dinding Porslin P 0.6000 1.67 0.0000 0.00 6.0 0.00 5
T 0.4550 2.20 0.0000 0.00 6.0 0.00 4
PEKERJAAN LANTAI
1 M3 Urugan Pasir P 0.3000 3.33 0.00 0.00 1.0 0.00 4
M 0.0100 100.00 0.00 0.00 1.0 0.00 1
1 M2 Pasangan Lantai Kramik 40 x 40 P 0.2400 4.17 #REF! #REF! 29.0 #REF! 4
T 0.1200 8.33 #REF! #REF! 29.0 #REF! 3
1 M2 Pasangan Lantai Kramik 20 x 20 P 0.3500 2.86 #REF! #REF! 4.0 #REF! 4
T 0.2000 5.00 #REF! #REF! 4.0 #REF! 3
PEKERJAAN PINTU DAN JENDELA
1 M2 Pintu dan Jendela kaca P 0.8000 1.25 0.00 0.00 44.0 0.00 2
T 0.8000 1.25 0.00 0.00 44.0 0.00 5
1 M2 Kaca Tebal 5 MM P 0.0150 66.67 0.00 0.00 1.0 0.00 1
T 0.1500 6.67 0.00 0.00 1.0 0.00 0
1 Buah Pasangan Engsel Pintu P 0.0500 20.00 0.00 0.00 5.0 0.00 1
T 0.6000 1.67 0.00 0.00 5.0 0.00 5
1 Buah Pasangan Kunci Tanam Antik P 0.0600 16.67 0.00 0.00 2.0 0.00 1
T 0.6000 1.67 0.00 0.00 2.0 0.00 4
PEKERJAAN PENGECATAN
1 M2 Mendempul dan Menggosok Kayu P 0.0400 25.00 0.00 0.00 1.0 0.00 0
T 0.0400 25.00 0.00 0.00 1.0 0.00 0
1 M2 Mengecat Kayu Baru P 0.0700 14.29 0.00 0.00 8.0 0.00 0
T 0.0090 111.11 0.00 0.00 8.0 0.00 1
1 M2 Mengecat Tembok Baru P 0.0400 25.00 0.00 0.00 6.0 0.00 3
T 0.0400 25.00 0.00 0.00 6.0 0.00 0
PEKERJAAN PERLENGKAPAN DALAM
Pemasangna 1 Buah Kloset Jongkok P 1.0000 1.00 0.00 0.00 1.0 0.00 0
T 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! ###
Pemasangan 1 Buah KloSet Duduk P 1.0000 1.00 0.00 0.00 2.0 0.00 0
T 1.5000 0.67 0.00 0.00 2.0 0.00 2
Floor Draine P 0.0100 100.00 0.00 0.00 0.5 0.00 1
T 0.1000 10.00 0.00 0.00 0.5 0.00 0
1 Buah Bak Cuci Piring Stainless P 0.0300 33.33 0.00 0.00 0.5 0.00 1
T 0.3000 3.33 0.00 0.00 0.5 0.00 1
Memasang 1 Wastafel P 0.5000 2.00 0.00 0.00 1.0 0.00 3
T 1.0000 1.00 0.00 0.00 1.0 0.00 0
Memasang Pipa Air Ø 3" Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 3
T 0.0700 14.29 0.00 0.00 1.0 0.00 5
T 0.1000 10.00 0.00 0.00 1.0 0.00 1
PEKERJAAN PERLENGKAPAN LUAR
1 M3 Rabat Beton (1:3:5) P 5.0000 0.20 0.00 0.00 22.0 0.00 5
T 0.8000 1.25 0.00 0.00 22.0 0.00 1
Analisis 1Buah Bak Kontrol P 2.2600 0.44 0.00 0.00 1.0 0.00 3
T 0.7200 1.39 0.00 0.00 1.0 0.00 0
1 Buah Septictank 2 x 2 x 2 M P 6.3460 0.16 0.00 0.00 4.0 0.00 0
T 1.0500 0.95 0.00 0.00 4.0 0.00 1
1 Unit Resapan P 6.8850 0.15 0.00 0.00 2.0 0.00 0
T 2.1000 0.48 0.00 0.00 2.0 0.00 1

Koef Tenaga Kerja Kemampuan Pekerja


Vol Pek mlh Hari Untuk Rencana Jml Org Yang
Per Satuan Pekerjaan Menyelesaikan PkrjnMnylskn Kes Vol Pek Hari Kerja Dibutuhkan
(a) Dalam 1 Hari (b) ( c ) (1 Org) (d) (e) (f) (g)
1/a c/b d/e
Tabel 4.7 Hasil Pembuatan Tabel Time Schedule, dan Perhitungan Bobot Serta Pembangiannya
WAKTU PELAKSANAAN
BO-
NO JENIS PEKERJAAN BOT MINGGU KE
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

I PEK. PONDASI #REF! #REF! #REF! #REF! #REF! #REF!

II PEK. BETON #REF! #REF! #REF! #REF! #REF! #REF! #REF!

III PEK. DINDING #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

IV PEK. KAP DAN ATAP #REF! #REF! #REF! #REF! #REF! #REF! #REF!

V PEK. PLAFOND #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VI PEK. PLASTERAN DAN ACIAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VII PEK. LANTAI #REF! #REF! #REF! #REF! #REF! #REF! #REF!

VIII PEK. PINTU DAN JENDELA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

IX PEK. PENGECATAN #REF! #REF! #REF! #REF! #REF!

X PEK. INSTALASI & SANITASI #REF! #REF! #REF! #REF!

XI PEK. PERLENGKAPAN LUAR #REF! #REF! #REF! #REF! #REF!

Total (%) #REF!

Rencana fisik per minggu #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Rencana fisik komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KEMBALI

9
VOLUME KEBUTUAN MATERIAL KESELURUHAN

No Material Volume
1 Kloset Duduk 2.00 bh
2 Atap Sakura Roof (2 Susun) 94.84 m2
3 AW Pipa PVC Ø 1" 0.00 m
4 AW Pipa PVC Ø 1/2" 55.84 m
5 AW Pipa PVC Ø 3" 36.00 m
6 AW Pipa PVC Ø 3/4" 50.40 m
7 Bak Cuci Stainless 1.00 bh
8 Batu Bata 32,792.82 bh
9 Batu Batako 10/20/40 0.00 bh
10 Batu Kali 61.74 m3
11 Belucci Kunci 12.00 set
12 Besi Polos Ø 10 mm 304.26 lnjr
13 Besi Polos Ø 12 mm 82.19 lnjr
14 Besi Polos Ø 16 mm 0.00 lnjr
15 Besi Polos Ø 6 mm 234.24 lnjr
16 Besi Strip 20.44 kg
17 Box MCBN 1.00 bh
18 Cat Dasar 150.27 kg
19 Cat Kayu 158.74 kg
20 Cat Meni 122.11 kg
21 Diamond Kasar Keramik 20x20 615.81 bh
22 Falco Engsel Pintu 5 " 68.00 bh
23 Fitting Lampu 26.00 bh
24 Floor Drain 4.00 Bh
25 Gypsum 69.02 lbr
26 Impra Dempul 7.28 kg
27 Indocement Semen Warna 50 kg 15.26 zak
28 Kaca Bening t = 5 mm 78.70 m2
29 Kaca Hitam t = 5 mm 0.00 m2
30 Kawat Bendrat 78.66 kg
31 Kayau Meranti Papan 3/20 (Kls. 2) 196.71 btg
32 Kayu Meranti Balok 5/7 (Kls. 2) 258.55 btg
33 Kayu Bengkirai Balok 2/3 (Kls. 1) 138.06 btg
34 Kayu Bengkirai Balok 5/10 (Kls. 1) 0.00 btg
35 Kayu Bengkirai Balok 5/7 (Kls. 1) 315.50 btg
36 Kayu Bengkirai Balok 8/12 (Kls. 1) 75.24 btg
37 Kayu Bengkirai Papan 3/20 (Kls. 1) 147.52 btg
38 Kayu Ulin Balok 5/10 (Kls. 1) 1.50 btg
39 Kerikil Beton 38.19 m3
40 Kia Keramik 40x40 1,094.25 bh
41 Kia Polos Keramik 20x20 1,180.40 bh
42 Kran Air 8.00 bh
43 Lampu Neon Lengkap 5.00 bh
44 Lampu Pijar 20W 38.00 bh
45 Lexus Westafel 2.00 bh
46 List Profil 188.95 m'
47 MCB 6A 2.00 bh
48 Minyak Bekisting 8.28 lt
49 Naturtone Cat Tembok 120.84 kg
50 Nok Surya Roof 100 mm 102.51 bh
51 Paragon Plamir 138.06 kg
52 Pasir Cor 46.86 m3
53 Pasir Pasang 75.44 m3
54 Pasir urug 37.00 m3
55 Perlengkapan Instalasi (Isolasi, Paku, dll) 1.00 set
56 Pintu Panel Bengkirai 80-100 x 200 17.00 bh
57 Pipa PVC Listrik 69.60 m
58 Playwood t = 6 mm 0.00 lbr
59 Pujatex Cat Minyak 1.82 kg
60 Saklar 26.00 Bh
61 Seng Gelombang BJLS 32 30.00 lbr
62 Seng Plat 3 x 6 BJLS 28 8.50 lbr
63 Stop Kontak 11.00 bh
64 T-Dos (Kontak Hubung Bagi) 26.00 bh
65 Semen Portland 50 kg 817.21 zak
66 Kloset Jongkok 2.00 bh
TERIMA KA
A KASIH

You might also like