Professional Documents
Culture Documents
HARGA
NO URAIAN SATUAN SATUAN
(RUPIAH)
A UPAH:
1 Mandor hari 110,000.00
2 Kepala Tukang hari 110,000.00
3 Tukang hari 110,000.00
4 Pekerja hari 85,000.00
B BAHAN/MATERIAL
1 Air Kerja ls 4,500,000.00
2 Alkali Resisting kg 60,000.00
3 Cat Dasar exterior kg 34,000.00
Cat Dasar interior kg 23,913.04
4 Cat Kayu kg 60,000.00
5 Cat Meni kg 17,000.00
6 Nippon Cat Tembok exterior kg 34,400.00
Nippon Cat Tembok interior kg 25,000.00
7 Toto Kloset Jongkok bh 1,500,000.00
8 Amplas lbr 4,500.00
9 Anti Lumut kg 90,000.00
11 Atap Sakura Roof (2 Susun) m2 60,000.00
12 AW Pipa PVC Ø 1" m 22,400.00
13 AW Pipa PVC Ø 1/2" m 4,250.00
14 AW Pipa PVC Ø 2" m 12,500.00
15 AW Pipa PVC Ø 3" m 18,750.00
16 Batu Apung kg 15,000.00
17 hebel 10 cm bh 7,954.55
18 Batu Batako 10/20/40 bh 4,000.00
19 Batu Kali m3 150,000.00
20 Baut Engsel/Teralis dos 7,500.00
21 Baut Ø12-15 bh 1,680.00
22 Baut Ø16-20 bh 2,240.00
23 Belucci Kunci set 160,000.00
24 Besi Polos Ø 10 mm kg 5,115.16
25 Besi Polos Ø 12 mm kg 3,705.54
26 Besi Polos Ø 16 mm kg 3,635.18
27 Besi Polos Ø 8 mm kg 5,221.45
29 Besi Polos Ø 12 mm lnjr 120500 132,550.00
30 Besi Polos Ø 16 mm lnjr 0 0.00
28 Besi Polos Ø 10 mm lnjr 83400 91,740.00
31 Besi Polos Ø 8 mm lnjr 53300 58,630.00
Besi Polos Ø 6 mm lnjr 31500 34,650.00
32 Besi Strip kg 18,000.00
33 Diamond Kasar Keramik 20x20 bh 4,062.50
34 Falco Engsel Jendela 3" bh 38,000.00
35 Falco Engsel Pintu 5 " bh 33,600.00
36 Gypsum lbr 60,000.00
37 Hak Angin psg 11,200.00
38 Ikad Keramik 30x30 bh 8,333.33
39 Impra Dempul kg 20,000.00
40 Impresso Keramik 30x30 bh 8,333.33
41 Indocement Semen Warna 50 kg zak 65,000.00
42 Jendela Kaca/Jalusi Miring bh 250,000.00
43 Kaca Bening t = 5 mm m2 110,000.00
44 Kaca Hitam t = 5 mm m2 106,400.00
45 Kawat Bendrad kg 18,000.00
46 Kawat Beton kg 13,000.00
47 Kawat Duri m' 1,400.00
48 Kayau Meranti Papan 3/20 (Kls. 2) m3 1,100,000.00
49 Kayau Meranti Papan 3/20 (Kls. 2) btg 6,600.00
50 Kayu Meranti Balok 5/7 (Kls. 2) m3 123,200.00
51 Kayu Meranti Balok 5/7 (Kls. 2) btg 7,746.48
52 Kayu Bengkirai Balok (Kls. 1) m3 1,456,000.00
53 Kayu Bengkirai Papan (Kls. 1) m3 1,568,000.00
54 Kayu Bengkirai Balok 5/10 (Kls. 1) btg 29,500.00
55 Kayu Bengkirai Balok 5/7 (Kls. 1) btg 20,500.00
56 Kayu Bengkirai Balok 2/3 (Kls. 1) btg 3,500.00
57 Kayu Bengkirai Balok 8/12 (Kls. 1) btg 45,000.00
58 Kayu Bengkirai Papan 3/20 (Kls. 1) btg 60,500.00
59 Kayu Meranti 4/6 (Kls. I) btg 7,500.00
60 Kayu Ulin Balok (Kls. 1) btg 38,080.00
61 Kayu Meranti Balok (Kls. 1) m3 1,008,000.00
62 Kayu Meranti Papan (Kls. 1) m3 1,064,000.00
63 Kayu Ulin Balok (Kls. 1) m3 1,904,000.00
64 Kayu Ulin Papan (Kls. 1) m3 2,072,000.00
66 Kerikil Beton m3 150,000.00
67 Granit 60 x 60 bh 93,750.00
kramik 50 x 50 70,000.00
68 Kia Polos Keramik 20 x 20 bh 60,000.00
69 Kran Air bh 25,000.00
70 Kuas 4" bh 9,500.00
71 Kusen Bengkirai Standar m' 24,000.00
72 Lambersering meranti btg 15,000.00
73 Volk wastapel + cermin bh 500,000.00
74 List Profil m' 10,000.00
75 Lock Wiondow bh 15,000.00
76 Minyak Bekisting lt 10,000.00
77 Nicole Kunci set 78,400.00
78 Nok Surya Roof 100 mm bh 33,600.00
79 Nok Surya Roof 33 mm bh 16,800.00
80 Paku Biasa 2" - 5" kg 18,000.00
81 Paku Sekrup dos 10,000.00
82 Paku Ulin 1" - 5" kg 12,200.00
83 Paragon Plamir kg 8,540.00
84 Pasir Cor m3 200,000.00
85 Pasir Pasang m3 166,666.67
86 Pasir urug m3 83,333.33
87 Pemasangan Listrik ls 0.00
88 Perlatan Kecil ls 200,000.00
89 T-Dos (Kontak Hubung Bagi) b 4,500.00
90 Pintu WC bh 980,000.00
91 Playwood t = 6 mm lbr 65,000.00
92 Playwood t = 9 mm lbr 102,500.00
93 Playwood t =3 mm lbr 40,000.00
94 Pujatex Cat Minyak kg 36,600.00
95 Reservoir/Tangki Air 1200 L bh 952,000.00
96 Rol Cat bh 20,000.00
97 Seng Gelombang BJLS 32 lbr 32,480.00
98 Sirtu m3 100,000.00
99 Talang Air PVC btg 50,400.00
100 Tanah Urug m3 45,000.00
101 Terali Pengaman m2 100,000.00
102 Toto Kloset Jongkok bh 350,000.00
103 Tonasa Semen Portland 50 kg zak 48,000.00
104 Bak Cuci Stainless bh 500,000.00
105 Tulangan kg 14,308.25
106 Floor Drain Bh 40,000.00
107 Water Drain dan Asesories Bh 85,000.00
108 Pipa PVC Listrik m 7,000.00
109 Saklar Tunggal Bh 18,000.00
110 Kabel NYY 2.5 mm2 m 8,900.00
111 Kabel NYY 1.5 mm2 m 8,200.00
112 Lampu Pijar 20W bh 89,000.00
113 Fitting Lampu bh 15,000.00
114 Inbouw Doss bh 4,500.00
115 Perlengkapan (Isolasi, Paku, Klem, Samb) set 1,000.00
116 Stop Kontak bh 18,000.00
117 Lampu Neon Lengkap bh 35,000.00
118 Box MCB bh 35,000.00
119 Seng Plat 3 x 6 BJLS 28 lbr 28,500.00
120 MCB 6A bh 40,000.00
Tonasa Semen MU prekat kg 2,500.00
C HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI
1 Pembersihan Lapangan m2 0.00
2 Pemasangan Bouplank/Pengukuran m2 0.00
3 Pengadaan Air Kerja Ls 0.00
4 Pembuatan Gedung Semen dan Alat m2 0.00
5 Galian Tanah Biasa 1 Meter m 3
0.00
6 Galian Tanah Biasa 2 Meter m3 0.00
7 Galian Tanah Biasa 3 Meter m3 0.00
8 Galian Tanah Keras 1 Meter m 3
0.00
9 Galian Tanah Cadas 1 Meter m3 0.00
10 Galian Tanah Lumpur 1 Meter m3 0.00
11 Urugan Kembali Galian m3 0.00
12 Pemadatan Tanah m3 0.00
13 Urugan Pasir Bawah Pondasi m3 0.00
14 Pasangan Pondasi Batu Kosong m3 0.00
15 Pasangan Pondasi Batu Kali m3 0.00
16 Sloof 15/20 m3 0.00
17 Pekerjaan Pondasi Plat m3 0.00
18 Kolom 15/15 m3 0.00
19 Kolom 15/20 m3 0.00
20 Kolom 15/25 m3 0.00
21 Kolom 15/30 m3 0.00
22 Kolom 20 x 20 m3 0.00
23 Kolom 20 x 25 m3 0.00
24 Kolom 20 x 30 m 3
0.00
25 Kolom 20 x 35 m3 0.00
26 Kolom 20 x 40 m3 0.00
27 Kolom 25 x 25 m 3
0.00
28 Kolom 25 x 30 m3 0.00
29 Kolom 25 x 35 m3 0.00
30 Kolom 25 x 40 m3 0.00
31 Kolom 25 x 45 m3 0.00
32 Kolom 25 x 50 m3 0.00
33 Kolom 30 x 30 m3 0.00
34 Kolom 30 x 35 m3 0.00
35 Kolom 30 x 40 m3 0.00
36 Kolom 35 x 45 m3 0.00
37 Kolom 35 x 50 m3 0.00
38 Kolom 40 x 40 m3 0.00
39 Kolom 40 x 45 m3 0.00
40 Kolom 40 x 50 m3 0.00
41 Balok 15 x 20 m3 0.00
42 Balok 15 x 25 m3 0.00
43 Balok 15 x 30 m 3
0.00
44 Balok 20 x 20 m3 0.00
45 Balok 20 x 25 m3 0.00
46 Balok 20 x 30 m 3
0.00
47 Balok 20 x 35 m3 0.00
48 Balok 20 x 40 m3 0.00
49 Balok 25 x 25 m3 0.00
50 Balok 25 x 30 m3 0.00
51 Balok 25 x 35 m3 0.00
52 Balok 25 x 40 m3 0.00
53 Balok 25 x 45 m3 0.00
54 Balok 25 x 50 m3 0.00
55 Balok 30 x 30 m3 0.00
56 Balok 30 x 35 m3 0.00
57 Balok 30 x 40 m3 0.00
58 Balok 35 x 45 m3 0.00
59 Balok 35 x 50 m3 0.00
60 Balok 40 x 40 m3 0.00
61 Balok 40 x 45 m3 0.00
62 Balok 40 x 50 m 3
0.00
63 Plat Beton m3 0.00
64 Ring Balok m3 0.00
65 Tangga m 3
0.00
66 Pasangan Dinding Batubata (1:4) m3 0.00
67 Pasangan Dinding Batubata (1:2) m3 0.00
68 Kusen Pintu dan Jendela m3 0.00
69 Balok Dinding m3 0.00
70 Pekerjaan Kuda-Kuda m3 0.00
71 Pekerjaan Rangka Atap m3 0.00
72 Pekerjaan Listplank 3/25 m3 0.00
73 Gording 8/12 m3 0.00
74 Talang m' 0.00
75 Pemasangan Atap m2 0.00
76 Pemasangan Perabung m3 0.00
77 Rangka Plafon m2 0.00
78 Memasang Plafond Gypsum m2 0.00
79 Memasang Lis Plafond m' 0.00
80 Plasteran Dinding (1:2) m2 0.00
81 Plasteran Dinding (1:4) m 2
0.00
82 Acian m2 0.00
83 Pasangan Turap Porslent m2 0.00
84 Urugan Pasir 0.00
85 Pasangan Lantai Kramik 33 x 33 m2 0.00
86 Pasangan Lantai Kramik 20 x 20 m2 0.00
87 Pasangan Pintu Bh 0.00
88 Pasangan Jendela kaca m2 0.00
89 Pasangan Kaca Tebal 15 mm m2 0.00
90 Pasangan Engsel Pintu Bh 0.00
91 Pasangan Kunci Taman Antik Bh 0.00
92 Mendempul dan Mrnggosok Kayu m2 0.00
93 Mengecat Kayu Baru m2 0.00
94 Mengecat Tembok Baru m2 2,000.00
95 Pemasangan Listrik Baru Ls 0.00
96 Pemasangna Kloset Jongkok Bh 0.00
97 Pemasangan Kloset Duduk Bh 0.00
98 Pemasangan Floor Draine Bh 0.00
99 Pemasangan Bak Cuci Piring Bh 0.00
100 Pemasangan Wastafel Bh 0.00
101 Pem. Pipa Air Ø 3" Per M' M' 0.00
102 Pem. Pipa Air Ø 3/4" AW Per M' M' 0.00
103 Pem. Pipa Air Ø 1/2" AW Per M' M' 0.00
104 Pem. Kran Air Ø 3/4" atau 1/2" Bh 0.00
105 Rabat Beton (1:3:5) M3 0.00
106 Bak Kontrol Bh 0.00
107 Septictank Bh 0.00
108 Resapan Bh 0.00
UPAH
KEMBALI
KET
0.39 149,186
0.62 94,565
1.58 -
0.22 266,500
besi 6 27,500.00
166.67
50.000
1.440 135,000.00 4 0.36
0.160 0.96
pasir 170000.000
VOLUME PEKERJAAN
M2
M
Ls
M2
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M3
M
M
M
M3
M3
M2
M2
M'
M3
M'
M2
M3
M2
M2
M'
M2
M2
M2
M2
M2
M3
M3
M2
M2
Bh
M2
M2
Bh
Bh
Bh
M2
m2
m2
M2
Bh
Bh
Bh
Bh
M'
Bh
Bh
M'
Unit
Unit
Bh
Bh
Bh
M'
M'
M'
Bh
Bh
M'
M2
M3
M3
M3
HARGA SATUAN PEKERJAAN
Alat Rp
Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.1000 Org Tukang Batu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0150 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
Rp
Tenaga Kerja
0.1000 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0200 Org Kepala Tukang Kayu @Rp 110,000 Rp
0.0050 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
V. PEKERJAAN PLASTERAN
5.1. PLASTERAN
5.1.1. Tiap 1 M2 Plasteran Dinding (1:2) Tebal 15 cm butuh: Rp
Bahan
0.1704 Zak 8.5200 Kg Tonasa Semen portland 50kg @Rp 48,000 Rp
0.0170 M3 Pasir Pasang @Rp 200,000 Rp
Rp
Tenaga Kerja
0.2000 Org Pekerja @Rp 85,000 Rp
0.1500 Org Tukang Batu @Rp 110,000 Rp
0.0150 Org Kepala Tukang @Rp 110,000 Rp
0.0100 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
VII. `
7.1. Pintu dan Jendela
7.1.1. Pasangan 1 Buah Pintu kayu Rp
Bahan
1.0000 Bh Pintu Panel Bengkirai @Rp 500,000 Rp
Rp
Tenaga Kerja
0.8000 Org Pekerja @Rp 85,000 Rp
0.8000 Org Tukang Kayu @Rp 110,000 Rp
0.0400 Org Kepala Tukang @Rp 110,000 Rp
0.0400 Org Mandor @Rp 110,000 Rp
pintu alumunium
DAUN 5.4
KUSEN 5
skoneng 5
variasi 5
kaca 1.4
kunci 1
handle 1
lain lian
engsel
upah
Rp
Alat
Rp
Alat
Rp
7.2. Kaca
7.2.1. Pasangan 1 M2 Kaca Tebal 5 MM butuh: Rp
Bahan
1.1000 M2 Kaca Bening t = 5 MM @Rp 110,000 Rp
Rp
Tenaga Kerja
0.0150 Org Pekerja @Rp 85,000 Rp
0.1500 Org Tukang Kayu @Rp 110,000 Rp
0.0150 Org Kepala Tukang @Rp 110,000 Rp
0.0002 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
7.3. Penggantung/Kunci
7.3.1. Tiap 1 Buah Pasangan Engsel Jendela kayu butuh: Rp
Bahan
1.0000 Bh Falco Engsel Jendela 3" @Rp 38,000 Rp
1.0000 hak angin Rp 18,000
1.0000 selot jendela Rp 15,000
Rp
Tenaga Kerja
0.0500 Org Pekerja @Rp 85,000 Rp
0.2000 Org Tukang Kayu @Rp 110,000 Rp
0.0100 Org Kepala Tukang @Rp 110,000 Rp
0.0005 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
Tenaga Kerja
1.0000 Org Pekerja @Rp 85,000 Rp
1.5000 Org Tukang Batu @Rp 110,000 Rp
0.1500 Org Kepala Tukang @Rp 110,000 Rp
0.1600 Org Mandor @Rp 110,000 Rp
Rp
Alat
Rp
89,400
59,500
9,900
20,000
89,400
-
30,075
6,640
1,925
360
8,925
8,500
11,000
1,100
550
21,150
4,500,000
4,500,000
347,539
13,169
57,750
5,400
-
-
-
48,720
125,039
85,000
110,000
22,000
5,500
222,500
66,500
63,750
2,750
66,500
-
50,430
44,710
5,720
50,430
70,560
62,475
8,085
70,560
59,945
53,125
6,820
59,945
120,000
106,250
13,750
120,000
79,085
69,955
9,130
79,085
18,410
16,320
2,090
18,410
48,000
42,500
5,500
48,000
-
126,600
100,000
100,000
25,500
1,100
26,600
322,780
180,000
25,000
205,000
66,300
42,900
4,290
4,290
117,780
716,878
180,000
193,920
80,833
454,753
165,000
82,500
6,375
8,250
262,125
97,613
8,250
25,453
5,400
1,000
40,103
25,500
28,600
2,860
550
57,510
100,096
22,750
26,286
7,200
2,000
58,236
17,000
22,000
2,200
660
41,860
148,679
35,875
35,814
7,200
2,000
80,889
27,200
36,300
3,630
660
67,790
189,984
35,875
11,719
65,400
7,200
2,000
122,194
27,200
36,300
3,630
660
67,790
414,610
35,875
4,125
81,750
7,200
1,500
130,450
27,200
253,000
3,300
660
284,160
84,278
2,178
6,540
7,200
2,000
17,918
27,200
35,200
3,300
660
66,360
647,770
222,720
104,000
117,000
443,720
140,250
27,500
27,500
8,800
204,050
34,987,413
1,301,503
815,467
260,578
310,464
31,030,272
647,770
34,366,053
412,250
154,000
36,410
18,700
621,360
44,540,235
345,540
417,927
400,638
42,107,000
647,770
43,918,875
412,250
154,000
36,410
18,700
621,360
27,911,295
1,334,610
1,359,111
398,684
23,549,760
647,770
27,289,935
412,250
154,000
36,410
18,700
621,360
32,717,706
1,668,262
1,529,000
574,574
27,676,740
647,770
32,096,346
412,250
154,000
36,410
18,700
621,360
35,509,715
1,468,070
815,467
260,578
527,670
31,168,800
647,770
34,888,355
412,250
154,000
36,410
18,700
621,360
40,338,151
1,334,610
1,019,333
611,218
36,103,860
647,770
39,716,791
412,250
154,000
36,410
18,700
621,360
35,905,000
1,000,957
764,500
547,213
32,323,200
647,770
35,283,640
412,250
154,000
36,410
18,700
621,360
39,666,339
1,000,957
152,900
620,012
36,623,340
647,770
39,044,979
412,250
154,000
36,410
18,700
621,360
-
44,511,678
1,000,957
566,602
693,788
40,981,200
647,770
43,890,318
412,250
154,000
36,410
18,700
621,360
97,089,246
1,000,957
109,214
768,542
45,396,780
647,770
47,923,263
412,250
154,000
36,410
18,700
621,360
53,080,002
1,000,957
95,563
844,272
49,870,080
647,770
52,458,642
412,250
154,000
36,410
18,700
621,360
44,747,662
800,766
122,320
708,446
41,847,000
647,770
44,126,302
412,250
154,000
36,410
18,700
621,360
49,305,654
800,766
101,933
784,665
46,349,160
647,770
48,684,294
412,250
154,000
36,410
18,700
621,360
48,415,908
800,766
87,371
861,861
45,396,780
647,770
47,794,548
412,250
154,000
36,410
18,700
621,360
58,613,020
800,766
76,450
940,034
55,526,640
647,770
57,991,660
412,250
154,000
36,410
18,700
621,360
63,358,996
800,766
67,956
1,019,185
60,201,960
647,770
62,737,636
412,250
154,000
36,410
18,700
621,360
68,165,368
800,766
61,160
1,099,313
64,935,000
647,770
67,544,008
412,250
154,000
36,410
18,700
621,360
57,382,477
667,305
2,266,410
885,313
52,294,320
647,770
56,761,117
412,250
154,000
36,410
18,700
621,360
60,335,697
1,000,957
72,810
965,441
57,027,360
647,770
59,714,337
412,250
154,000
36,410
18,700
621,360
64,864,809
667,305
63,708
1,046,546
61,818,120
647,770
64,243,449
412,250
154,000
36,410
18,700
621,360
74,204,555
571,976
48,540
1,203,869
71,111,040
647,770
73,583,195
412,250
154,000
36,410
18,700
621,360
-
79,218,308
571,976
43,686
1,287,417
76,046,100
647,770
78,596,948
412,250
154,000
36,410
18,700
621,360
75,071,454
500,479
47,781
1,219,504
72,034,560
647,770
74,450,094
412,250
154,000
36,410
18,700
621,360
80,143,450
500,479
42,472
1,304,029
77,027,340
647,770
79,522,090
412,250
154,000
36,410
18,700
621,360
85,275,205
500,479
38,225
1,389,531
82,077,840
647,770
84,653,845
412,250
154,000
36,410
18,700
621,360
36,935,827
1,982,390
1,019,333
543,793
32,121,180
647,770
36,314,467
412,250
154,000
36,410
18,700
621,360
36,222,274
2,180,630
815,467
260,578
527,670
31,168,800
647,770
35,600,914
412,250
154,000
36,410
18,700
621,360
45,947,507
1,982,390
169,889
707,957
41,818,140
647,770
45,326,147
412,250
154,000
36,410
18,700
621,360
40,982,812
1,486,793
191,125
633,204
37,402,560
647,770
40,361,452
412,250
154,000
36,410
18,700
621,360
45,963,195
1,486,793
152,900
716,752
42,337,620
647,770
45,341,835
412,250
154,000
36,410
18,700
621,360
51,015,016
1,486,793
127,417
801,277
47,330,400
647,770
50,393,656
412,250
154,000
36,410
18,700
621,360
56,132,816
1,486,793
109,214
886,779
52,380,900
647,770
55,511,456
412,250
154,000
36,410
18,700
621,360
67,605,343
1,486,793
95,563
973,258
63,780,600
647,770
66,983,983
412,250
154,000
36,410
18,700
621,360
51,593,018
1,189,434
122,320
815,934
48,196,200
647,770
50,971,658
412,250
154,000
36,410
18,700
621,360
-
56,796,680
1,189,434
101,933
902,902
53,333,280
647,770
56,175,320
412,250
154,000
36,410
18,700
621,360
64,243,901
1,189,434
2,266,410
990,847
58,528,080
647,770
63,622,541
412,250
154,000
36,410
18,700
621,360
67,395,383
1,189,434
76,450
1,079,769
63,780,600
647,770
66,774,023
412,250
154,000
36,410
18,700
621,360
72,787,028
1,189,434
67,956
1,169,669
69,090,840
647,770
72,165,668
412,250
154,000
36,410
18,700
621,360
78,239,069
1,189,434
61,160
1,260,545
74,458,800
647,770
77,617,709
412,250
154,000
36,410
18,700
621,360
63,272,929
991,195
84,944
1,014,299
59,913,360
647,770
62,651,569
412,250
154,000
36,410
18,700
621,360
69,156,487
991,195
509,667
1,105,176
65,281,320
647,770
68,535,127
412,250
154,000
36,410
18,700
621,360
74,228,063
991,195
63,708
1,197,029
70,707,000
647,770
73,606,703
412,250
154,000
36,410
18,700
621,360
84,812,876
849,596
48,540
1,375,851
81,269,760
647,770
84,191,516
412,250
154,000
36,410
18,700
621,360
90,472,299
849,596
43,686
1,470,147
86,839,740
647,770
89,850,939
412,250
154,000
36,410
18,700
621,360
-
87,863,701
743,396
2,266,410
1,391,485
82,193,280
647,770
87,242,341
412,250
154,000
36,410
18,700
621,360
91,362,738
743,396
42,472
1,486,759
87,820,980
647,770
90,741,378
412,250
154,000
36,410
18,700
621,360
97,140,161
743,396
38,225
1,583,010
93,506,400
647,770
96,518,801
412,250
154,000
36,410
18,700
621,360
2,826,938
695,013
444,175
88,311,508
647,770
92,925,403
412,250
154,000
36,410
18,700
621,360
11,386,909
2,826,938
444,175
6,846,667
647,770
10,765,549
412,250
154,000
36,410
18,700
621,360
106,602
69,602 8
6,250
75,852
17,000
11,000
1,100
1,650
30,750
622,294
556,818
18,192
6,333
581,344
27,200
11,000
1,100
1,650
40,950
349,000
300,000
9,750
25,500
11,000
1,100
1,650
1.1
1,289,063 2
1,289,063 0.06
0.05
510,000 0.05
2,200,000 0.005
220,000 0.003
33,000
2,963,000
- An. SNI
1.1
2
0.06
29,005 0.043
0.043
825 0.004
14,400 0.002
15,225
8,500
3,630
1,100
550
13,780
3,618,775
1,546,875
14,400
270,000
1,831,275
467,500
913,000
242,000
165,000
1,787,500
47,850
3,500
20,500
2,700
26,700
8,500
11,000
1,100
550
21,150
94,450
58,000
3,200
61,200
8,500
22,000
2,200
550
33,250
1,630,301
1,901
14,400
16,301
1,020,000
440,000
132,000
22,000
1,614,000
78,458
27,625
540
28,165
3,400
44,000
2,750
143
50,293
66,110
36,000
900
36,900
17,000
11,000
1,100
110
29,210
172,123
50,400
7,680
104,000
162,080
3,883
5,500
550
110
10,043
63,196
48,290
30,000
1,980
1,100
33,080
8,500
5,500
660
550
15,210
14,997
10,500
72
10,572
1,785
2,310
220
110
4,425
47,829
8,179
3,400
11,579
17,000
16,500
1,650
1,100
36,250
31,840
5,990
4,000
9,990
13,600
5,500
1,650
1,100
21,850
29,180
3,380
3,380
17,000
6,600
1,100
1,100
25,800
47,050
21,250
21,250
17,000
6,600
1,100
1,100
25,800
1,623,178
1,500,000
8,928
3,000
1,950
1,513,878
51,000
50,050
4,950
3,300
109,300
PEKERJAAN LANTAI
Tiap 1 M2 Pasangan vinil pakai perkat
126,600 Bahan
9.0000
100,000 0.4500
100,000
25,500
1,100 Tenaga Kerja
26,600 0.1500
0.1500
- 0.0150
0.0080
223,656
101,250
9,216
75,000
1,950
187,416
20,400
13,200
1,320
1,320
36,240
148,750
63,000
12,000
7,500
9,000
91,500
29,750
22,000
2,750
2,750
57,250
210,340
73,500
12,000
7,500
8,840
101,840
42,500
22,000
22,000
22,000
108,500
170,405
84,000
12,000
7,500
8,840
112,340
33,150
20,625
2,145
2,145
58,065
180,100
112,500 1 135000.0000
12,000 1` 112500.0000
7,500
8,840
140,840
22,100
14,300
1,430
1,430
39,260
664,800
500,000
500,000
68,000
88,000
4,400
4,400
164,800
CESMENT
183,667 1.2
4,000 2
35,000 1
90,000 0.085
0.085
0.009
0.005
312,667
1,166,227
312,667
222,560
46,000
60,000
120,000
135,000
170,000
100,000
312,667 1,046,227
222,560
46,000
60,000
170,000
135,000
100,000
312,667 726,227
222,560
46,000
60,000
60,000
25,000
410,060
222,560
45,000
46,000
24,500
12,000
60,000
1,440,227
312,667
222,560
46,000
60,000
185,000
-
-
100,000
64,000
450,000
18,000
1,122,070
1,000,000
1,000,000
66,300
42,900
4,290
8,580
122,070
165
155
60
40
180
120
80
20
30
150
1,000
1,000,000
164,800
140,442
121,000
121,000
1,275
16,500
1,650
17
19,442
80,405
38,000
-
15,000
53,000
4,250
22,000
1,100
55
27,405
110,405
38,000
20,000
25,000
83,000
4,250
22,000
1,100
55
27,405
90,000
95,000
120,000
30,000
120,000
-
238,030
160,000
160,000
5,100
66,000
6,600
330
78,030
10,752
5
732
1,500
2,237
3,400
4,400
440
275
8,515
35,806
3,400
1,281
7,650 0,2000 Kg Cat Meni Rp.
15,600 0,1500 Kg Plamir Rp.
27,931 0,1700 Kg Cat Dasar Rp.
0,2600 Kg Cat Penutup 2 Kali Rp.
5,950 0,0700 Org/Hari Pekerja Rp.
990 0,0025 Org/Hari Mandor Rp.
660 0,0090 Org/Hari Tukang Cat Rp.
275 0,0060 Org/Hari Kepala Tukang Cat Rp.
7,875
22,661
1,221
-
10,320
11,541
3,400
4,400
880
440
9,120
2,000
20,233
1,221
2,391
7,500
11,113
3,400
4,400
880
440
9,120
245,000
-
-
-
-
-
-
-
-
-
245,000
-
-
245,000
-
-
460,027
350,000
5,760
1,667
357,427
85,000
-
-
17,600
102,600
1,791,527
5,760
1,667
1,500,000
1,507,427
85,000
165,000
16,500
17,600
284,100
53,500
40,000
40,000
850
11,000
1,100
550
13,500
624,070
500,000
85,000
585,000
2,550
33,000
3,300
220
39,070
749,467
500,000
60,000
7,800
1,667
569,467
42,500
110,000
16,500
11,000
180,000
40,388
22,500
6,563
29,063
1,700
7,700
1,485
440
11,325
30,700
15,000
4,375
19,375
1,700
7,700
1,485
440
11,325
17,913
5,100
1,488
6,588
1,700
7,700
1,485
440
11,325
39,344
25,000
844
25,844
850
11,000
1,100
550
13,500
987,580
209,280
104,000
130,500
443,780
425,000
88,000
8,800
22,000
543,800
1,487,753
1,002,273
109,440
30,667
4,950
25,324
24,000
1,196,653
192,100
79,200
7,920
11,880
291,100
1,331,046
403,440
25,320
64,000
57,120
478,292
6,600
296,274
1,331,046
-
21,468,275
623,133
1,094,612
1,406,881
435,256
17,908,393
21,468,275
-
MeMbuat 1 M2 bekisting balok dan Kolom butuh :
Bahan :
0
0
0
2
Upah Kerja :
0
0
0
0
6
3
4X4 230,000
135,000 hebel 51,892
54,563 upah 100,000
150,000 lainnya 30,000
78,000
64,777
70,000
552,340 411,892
635,192
42.29 #REF!
79.57 #REF!
119.00 #REF!
24.51 #REF!
0.19 #REF!
0.03 #REF!
- #REF!
0.01 #REF!
5.80 #REF!
0.08 #REF!
0.04 #REF!
0.04 #REF!
- #REF!
- #REF!
1.03 #REF!
0.04 #REF!
0.10 #REF!
#REF!
#REF!
0.09 #REF!
0.17 #REF!
0.08 #REF!
0.01 #REF!
0.01 #REF!
#REF!
a Aluminium
1,100 Profil 26,667 29,333
Aluminium
m1
Rp.
2,000 Skrup fixer 2,000 4,000
Bh + RIVET
0,060 Sealant 35,000 2,100
tube Rp.
0,043 Pekerja
Rp. 120,000 6,000
Oh
0,043 Tukang
Rp. 150,000 7,500
Oh Besi
0,004 Kepala
Konstruksi 150,000 750
Oh Tukang
Rp.
0,002 Mandor Rp. 150,000 450
Oh
Rp. = 50,133
Biaya Over 10 5,013
Head
Total
Pelaksana = 55,147
1 m2 Pekerjaan (10%)
Bingkai
4,400
Alumunium Profil 13,333 14,667
Pintu/Jendela Slimar
m1
2,000 Skrup fixer
Jendela 2,000 4,000
Bh Alumi Rp.
0,060 Sealant
Rp. 35,000 2,100
tube
0,043 Pekerja
Rp. 85,000 3,655
Oh
0,043 Tukang
Rp. 130,000 5,590
Oh Besi
0,004 Kepala
Konstruksi 130,000 520
Oh Tukang
Rp.
0,002 Mandor Rp. 130,000 260
Oh
Rp. = 30,792
Biaya Over 10 3,079
Head
Total
Pelaksana = 33,871
(10%)
jumlah 89,018 #VALUE!
Rp. 20,000 8,200
Rp. 18,000 2,700
Rp. 60,000 21,600
Rp. 38,000 4,180
Rp. 2,000 8,000
Rp. 15,000 1,050
Rp. 60000 7,200
Rp. 85,000 8,500
Rp. 110,000 5,500
Rp. 110,000 5,500
Rp. 110,000 550
72,980
vinly merk aidi 350,000 ,/dus 16.0000
252,955
###
###
###
###
RENCANA ANGGARAN BIAYA (RAB)
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
56,750
5.1.1. Rangka Plafon 153 M2 8,654,375.00
362500000 0.00
-
17,089,704 15 300,000.00
1,596,974 100,000.00
-
-
605,021
-
21,926,154
TINGGI/PANJANG
157,915,690 13X23 85
98,387,597 60X60 13
44,462,692 10X15 10 0.027 -
99,895,336 10X20 15 0.0345 -
133,837,465 13 0.042 13.00
- 10X25 0 0.045 9.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
79,821,214 1 0.0225 -
- 13X23
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
27,582,559 32.00 4.80
56,030,768 10X15 0.0225
86,431,596 784,364,917
7,201,992
JENDALA PINTU
- 75 40.00
-
-
- 0.00
-
-
-
-
-
-
555,483
49 54
-
-
- 49
UTAMA SAYAP
10,212,163 125 27.50
6,966,204 gypsum
1,532,565 18,710,931 skrup
dempul
1,344,492 76 28
LANTAI TANGGA
22,760,678 99.8 7.3 39.0000
8,066,539 WC 11 10.00
965,388 LANTAI WC 5.5
-
3,922,320 5
4,128,442 3 58.33
3,703,642 3
1,713,895 4
1,935,483 11
5,098,402 3
- 21,039,085
536,900
- 5
- dalam luar plafon
11,519,388 330 152.50
4,064,516 15,583,904 152.00
-
702,100
1,380,600 45.00
283,200
944,000
-
472,000
382,320
240,130
212,400
165,200
119,770
708,000
300,900
180,540 5,910,620.0000
1,085,663
2,114,001
189,390
736,403
-
2,096,919
1,593,944
422,735
324,979
708,000 9,272,034
1,499,052
-
1,570,634
-
987,122,060 209,503,655.73
6,807,738
15 375
465
336000000
5,250,000.00
4,500,000.00
1,500,000.00
11,250,000.00
0.48 38.88
TINGGI/PANJANG
5.00
5.00
5.85
5.00
32.00 51.00
49.00 3.50
5.80
5.50 1.2
340.00
56.67
hollo
18,000.00
7.50
4,500.00 33750 8000 15000 56750
11.50
2.00
4.30 1.70
49.00
0.00
VOLUME KEBUTUAN MATERIAL KESELURUHAN
III PEK. DINDING #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV PEK. KAP DAN ATAP #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VI PEK. PLASTERAN DAN ACIAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VII PEK. LANTAI #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VIII PEK. PINTU DAN JENDELA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana fisik per minggu #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana fisik komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Gambar 4.7 Hasil Out Put Time Schedule dan Kurva "S" Dengan Menggunakan Microsoft Excel
KEMBALI
PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON
1
No. Tipe konstruksi
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per
lbr tg panj (mm) (Kg/m') 1m' (kg)
A. Tulangan Pokok
1 Balok sloof s1 25 X 15 0.15 0.25 26.67 4 Ø 10.0 0,617 2,468.00
2 Ø 8.0 0,395 790.00
2 Balok sloof s2 30 X 20 0.30 0.20 16.67 7 Ø 12.0 0,888 6,216.00
2 Ø 8.0 0,395 790.00
3 Balok BL1 30 X 20 0.30 0.20 16.67 7 Ø 12.0 0,888 6,216.00
2 Ø 8.0 0,395 790.00
4 Balok RB1 15 X 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2,468.00
2 Ø 8.0 0,395 790.00
5 kolom KL1 15 x 20 0.15 0.20 33.33 6 Ø 12.0 0,888 5,328.00
6 kolom KL2 15 x 15 0.15 0.15 44.44 4 Ø 10.0 0,617 2,468.00
7 kolom KL3 20 x 20 0.20 0.20 25.00 8 Ø 12.0 0,888 7,104.00
8 balok K1 25 x 35 0.25 0.35 11.43 7 Ø 12.0 0,888 6,216.00
9 balok K2 15 x 30 0.15 0.30 22.22 7 Ø 12.0 0,888 6,216.00
8 Plat tebal 12 cm 1.00 0.12 8.43 10 Ø 10.0 0,617 6,170.00
84 Ø 10.0 0,617 52,033.67
10 Tangga Beton 1.00 0.12 6.82 13 Ø 12.0 0,888 11,840.00
91 Ø 10.0 0,617 56,091.93
lisplang beton 1.00 0.12 6.82 13 Ø 8.0 0,395 5,266.67
12 Poer tebal 25 cm 1.00 0.25 4.10 13 Ø 10.0 0,617 8,226.67
82 Ø 8.0 0,395 32,390.00
Output Output
3
Input Manual
Kbthn Jumlah lonjor Luasan Jumlah Begel/ m3 JUMLAH TULANGAN (LONJ
per m3 (kg) Per M3 bkstng (m2) beton volume beton P12
JUMLAH 171.38
PEMBULATAN 172
16.74 3204.1
18.50 2775.0
96.98 18103.3
86.08 9.8
176.30 11.2
153.22 8.4
58.46 5.8
85.43 8.5
38.15
6.91
8.68
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn Pnjng Luasan
No. Tipe konstruksi Jumlah Begel
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg) Per M3 bkstng (m2)
A. Tulangan Pokok
1 Balok sloof 15 x 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2468 65,813.33 8.89 13.3333 133.33 134
0.15 0.25 26.67 2 Ø 8.0 0,395 790 21,066.67 4.44
2 Kolom 15 x 15 0.15 0.15 44.44 4 Ø 10.0 0,617 2468 ### 14.81 13.3333 222.22 136
3 Kolom 15 x 20 0.15 0.20 33.33 4 Ø 10.0 0,617 2468 82,266.67 11.11 13.3333 166.67 137
4 Kolom 15 x 25 0.15 0.25 26.67 4 Ø 10.0 0,617 2468 65,813.33 8.89 13.3333 133.33 138
0.15 0.25 26.67 2 Ø 10.0 0,617 1234 32,906.67 4.44
5 Kolom 15 x 30 0.15 0.30 22.22 6 Ø 10.0 0,617 3702 82,266.67 11.11 13.3333 111.11 139
6 Kolom 20 x 20 0.20 0.20 25.00 4 Ø 10.0 0,617 2468 61,700.00 8.33 10.0000 125.00 140
7 Kolom 20 x 25 0.20 0.25 20.00 1 Ø 6.0 0,222 222 4,440.00 1.67 10.0000 100.00 141
8 Kolom 20 x 30 0.20 0.30 16.67 6 Ø 12.0 0,888 5328 88,800.00 6.18 10.0000 83.33 142
9 Kolom 20 x 35 0.20 0.35 14.29 1 Ø 6.0 0,222 222 3,171.43 1.19 10.0000 71.43 143
10 Kolom 20 x 40 0.20 0.40 12.50 1 Ø 6.0 0,222 222 2,775.00 1.04 10.0000 62.50 144
11 Kolom 25 x 25 0.25 0.25 16.00 1 Ø 6.0 0,222 222 3,552.00 1.33 8.0000 80.00 145
12 Kolom 25 x 30 0.25 0.30 13.33 1 Ø 12.0 0,888 888 11,840.00 1.11 8.0000 66.67 146
13 Kolom 25 x 35 0.25 0.35 11.43 1 Ø 6.0 0,222 222 2,537.14 0.95 8.0000 57.14 147
14 Kolom 25 x 40 0.25 0.40 10.00 1 Ø 6.0 0,222 222 2,220.00 0.83 8.0000 50.00 148
15 Kolom 25 x 45 0.25 0.45 8.89 1 Ø 6.0 0,222 222 1,973.33 0.74 8.0000 44.44 149
16 Kolom 25 x 50 0.25 0.50 8.00 1 Ø 6.0 0,222 222 1,776.00 0.67 8.0000 40.00 150
17 Kolom 30 x 30 0.30 0.30 11.11 1 Ø 6.0 0,222 222 2,466.67 24.70 6.6667 55.56 151
18 Kolom 30 x 35 0.30 0.35 9.52 1 Ø 6.0 0,222 222 2,114.29 0.79 6.6667 47.62 152
19 Kolom 30 x 40 0.30 0.40 8.33 1 Ø 6.0 0,222 222 1,850.00 0.69 6.6667 41.67 153
20 Kolom 35 x 45 0.35 0.45 6.35 1 Ø 6.0 0,222 222 1,409.52 0.53 5.7143 31.75 154
21 Kolom 35 x 50 0.35 0.50 5.71 1 Ø 6.0 0,222 222 1,268.57 0.48 5.7143 28.57 155
22 Kolom 40 x 40 0.40 0.40 6.25 1 Ø 6.0 0,222 222 1,387.50 0.52 5.0000 31.25 156
23 Kolom 40 x 45 0.40 0.45 5.56 1 Ø 6.0 0,222 222 1,233.33 0.46 5.0000 27.78 157
24 Kolom 40 x 50 0.40 0.50 5.00 1 Ø 6.0 0,222 222 1,110.00 0.42 5.0000 25.00 158
25 Balok 15 x 20 0.15 0.20 33.33 4 Ø 10.0 0,617 2468 82,266.67 11.11 13.3333 166.67 159
26 Balok 15 x 25 0.15 0.25 26.67 1 Ø 10.0 0,617 617 16,453.33 8.89 13.3333 133.33 160
27 Balok 15 x 30 0.15 0.30 22.22 1 Ø 10.0 0,617 617 13,711.11 1.85 13.3333 111.11 161
28 Balok 20 x 20 0.20 0.20 25.00 1 Ø 6.0 0,222 222 5,550.00 2.08 10.0000 125.00 162
29 Balok 20 x 25 0.20 0.25 20.00 1 Ø 6.0 0,222 222 4,440.00 1.67 10.0000 100.00 163
30 Balok 20 x 30 0.20 0.30 16.67 1 Ø 6.0 0,222 222 3,700.00 1.39 10.0000 83.33 164
31 Balok 20 x 35 0.20 0.35 14.29 1 Ø 6.0 0,222 222 3,171.43 1.19 10.0000 71.43 165
32 Balok 20 x 40 0.20 0.40 12.50 1 Ø 6.0 0,222 222 2,775.00 1.04 10.0000 62.50 166
33 Balok 25 x 25 0.25 0.25 16.00 1 Ø 6.0 0,222 222 3,552.00 1.33 8.0000 80.00 167
34 Balok 25 x 30 0.25 0.30 13.33 1 Ø 6.0 0,222 222 2,960.00 1.11 8.0000 66.67 168
35 Balok 25 x 35 0.25 0.35 11.43 1 Ø 6.0 0,222 222 2,537.14 24.70 8.0000 57.14 169
36 Balok 25 x 40 0.25 0.40 10.00 1 Ø 6.0 0,222 222 2,220.00 0.83 8.0000 50.00 170
37 Balok 25 x 45 0.25 0.45 8.89 1 Ø 6.0 0,222 222 1,973.33 0.74 8.0000 44.44 171
38 Balok 25 x 50 0.25 0.50 8.00 1 Ø 6.0 0,222 222 1,776.00 0.67 8.0000 40.00 172
39 Balok 30 x 30 0.30 0.30 11.11 1 Ø 6.0 0,222 222 2,466.67 0.93 6.6667 55.56 173
40 Balok 30 x 35 0.30 0.35 9.52 7 Ø 12.0 0,888 6216 59,200.00 5.56 6.6667 47.62 174
41 Balok 30 x 40 0.30 0.40 8.33 1 Ø 6.0 0,222 222 1,850.00 0.69 6.6667 41.67 175
42 Balok 35 x 45 0.35 0.45 6.35 1 Ø 6.0 0,222 222 1,409.52 0.53 5.7143 31.75 176
43 Balok 35 x 50 0.35 0.50 5.71 1 Ø 6.0 0,222 222 1,268.57 0.48 5.7143 28.57 177
44 Balok 40 x 40 0.40 0.40 6.25 1 Ø 6.0 0,222 222 1,387.50 24.70 5.0000 31.25 178
45 Balok 40 x 45 0.40 0.45 5.56 1 Ø 6.0 0,222 222 1,233.33 0.46 5.0000 27.78 179
46 Balok 40 x 50 0.40 0.50 5.00 1 Ø 6.0 0,222 222 1,110.00 0.42 5.0000 25.00 180
47 Balok ring 15x15 0.15 0.15 44.44 4 Ø 8.0 0,395 1580 70,222.22 14.81 13.3333 222.22 181
48 Pondasi Plat 0.25 0.09 2.94 47 Ø 12.0 0,888 41736 ### 11.52 0.5294
49 Plat tebal 12 cm 1.00 1.00 1.10 10 Ø 10.0 0,617 6170 150.00 0.02 2.2000
50 Tangga Beton 0.12 0.18 25.46 19 Ø 10.0 0,617 11723 ### 40.30 9.1638
51 Balok gantung 15c 0.15 0.25 26.67 1 Ø 10.0 0,617 617 16,453.33 2.22 17.3333 133.33 134
52 Balok gantung 15c 0.15 0.30 22.22 1 Ø 10.0 0,617 617 13,711.11 1.85 16.6667 111.11 112
53 Plat deck 50 cm 0.50 0.10 20.00 1 Ø 8.0 0,395 209.350 4,187.00 13.88 14.0000
54 Plat deck 110 cm 1.10 0.10 9.09 1 Ø 10.0 0,617 697.210 6,338.27 0.86 10.9091
55 Talang cor 0.50 0.10 20.00 1 Ø 8.0 0,395 209.350 4,187.00 0.88 14.0000 100.00 100
PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI
Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Pnjng Jumlah Lonjo Kebutuhan Kawat
No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') 1m' (kg) Per M3 Per M3 Beton
B. Beugel/sengkang dan tul. ba
1 Balok sloof 15 x 25 0.13 0.23 0.80 134 Ø 8.0 0,395 42344.00 107.20 8.93 4234.4000 Kg
2 Kolom 15x15 0.13 0.13 0.60 136 Ø 6.0 0,222 18115.20 81.60 6.80 1811.5200 Kg
3 Kolom 15x20 0.13 0.18 0.70 137 Ø 6.0 0,222 21289.80 95.90 7.99 2128.9800 Kg
4 Kolom 15x25 0.13 0.23 0.80 138 Ø 6.0 0,222 24508.80 110.40 9.20 2450.8800 Kg
5 Kolom 15x30 0.13 0.28 0.90 139 Ø 6.0 0,222 27772.20 125.10 10.43 2777.2200 Kg
6 Kolom 20 x 20 0.18 0.18 0.80 140 Ø 6.0 0,222 24864.00 112.00 9.33 2486.4000 Kg
7 Kolom 20 x 25 0.18 0.23 0.90 141 Ø 6.0 0,222 28171.80 126.90 10.58 2817.1800 Kg
8 Kolom 20 x 30 0.18 0.28 1.00 142 Ø 6.0 0,222 31524.00 142.00 11.83 3152.4000 Kg
9 Kolom 20 x 35 0.18 0.33 1.10 143 Ø 6.0 0,222 34920.60 157.30 13.11 3492.0600 Kg
10 Kolom 20 x 40 0.18 0.38 1.20 144 Ø 6.0 0,222 38361.60 172.80 14.40 3836.1600 Kg
11 Kolom 25 x 25 0.23 0.23 1.00 145 Ø 6.0 0,222 32190.00 145.00 12.08 3219.0000 Kg
12 Kolom 25 x 30 0.23 0.28 1.10 146 Ø 6.0 0,222 35653.20 160.60 13.38 3565.3200 Kg
13 Kolom 25 x 35 0.23 0.33 1.20 147 Ø 6.0 0,222 39160.80 176.40 14.70 3916.0800 Kg
14 Kolom 25 x 40 0.23 0.38 1.30 148 Ø 6.0 0,222 42712.80 192.40 16.03 4271.2800 Kg
15 Kolom 25 x 45 0.23 0.43 1.40 149 Ø 6.0 0,222 46309.20 208.60 17.38 4630.9200 Kg
16 Kolom 25 x 50 0.23 0.48 1.50 150 Ø 6.0 0,222 49950.00 225.00 18.75 4995.0000 Kg
17 Kolom 30 x 30 0.28 0.28 1.20 151 Ø 6.0 0,222 40226.40 181.20 15.10 4022.6400 Kg
18 Kolom 30 x 35 0.28 0.33 1.30 152 Ø 6.0 0,222 43867.20 197.60 16.47 4386.7200 Kg
19 Kolom 30 x 40 0.28 0.38 1.40 153 Ø 6.0 0,222 47552.40 214.20 17.85 4755.2400 Kg
20 Kolom 35 x 45 0.33 0.43 1.60 154 Ø 6.0 0,222 54700.80 246.40 20.53 5470.0800 Kg
21 Kolom 35 x 50 0.33 0.48 1.70 155 Ø 6.0 0,222 58497.00 263.50 21.96 5849.7000 Kg
22 Kolom 40 x 40 0.38 0.38 1.60 156 Ø 6.0 0,222 55411.20 249.60 20.80 5541.1200 Kg
23 Kolom 40 x 45 0.38 0.43 1.70 157 Ø 6.0 0,222 59251.80 266.90 22.24 5925.1800 Kg
24 Kolom 40 x 50 0.38 0.48 1.80 158 Ø 6.0 0,222 63136.80 284.40 23.70 6313.6800 Kg
25 Balok 15 x 20 0.13 0.18 0.70 159 Ø 6.0 0,222 24708.60 111.30 9.28 2470.8600 Kg
26 Balok 15 x 25 0.13 0.23 0.80 160 Ø 6.0 0,222 28416.00 128.00 10.67 2841.6000 Kg
27 Balok 15 x 30 0.13 0.28 0.90 161 Ø 6.0 0,222 32167.80 144.90 12.08 3216.7800 Kg
28 Balok 20 x 20 0.18 0.18 0.80 162 Ø 6.0 0,222 28771.20 129.60 10.80 2877.1200 Kg
29 Balok 20 x 25 0.18 0.23 0.90 163 Ø 6.0 0,222 32567.40 146.70 12.23 3256.7400 Kg
30 Balok 20 x 30 0.18 0.28 1.00 164 Ø 6.0 0,222 36408.00 164.00 13.67 3640.8000 Kg
31 Balok 20 x 35 0.18 0.33 1.10 165 Ø 6.0 0,222 40293.00 181.50 15.13 4029.3000 Kg
32 Balok 20 x 40 0.18 0.38 1.20 166 Ø 6.0 0,222 44222.40 199.20 16.60 4422.2400 Kg
33 Balok 25 x 25 0.23 0.23 1.00 167 Ø 6.0 0,222 37074.00 167.00 13.92 3707.4000 Kg
34 Balok 25 x 30 0.23 0.28 1.10 168 Ø 6.0 0,222 41025.60 184.80 15.40 4102.5600 Kg
35 Balok 25 x 35 0.23 0.33 1.20 169 Ø 6.0 0,222 45021.60 202.80 16.90 4502.1600 Kg
36 Balok 25 x 40 0.23 0.38 1.30 170 Ø 6.0 0,222 49062.00 221.00 18.42 4906.2000 Kg
37 Balok 25 x 45 0.23 0.43 1.40 171 Ø 6.0 0,222 53146.80 239.40 19.95 5314.6800 Kg
38 Balok 25 x 50 0.23 0.48 1.50 172 Ø 6.0 0,222 57276.00 258.00 21.50 5727.6000 Kg
39 Balok 30 x 30 0.28 0.28 1.20 173 Ø 6.0 0,222 46087.20 207.60 17.30 4608.7200 Kg
40 Balok 30 x 35 0.28 0.33 1.30 174 Ø 6.0 0,222 50216.40 226.20 18.85 5021.6400 Kg
41 Balok 30 x 40 0.28 0.38 1.40 175 Ø 6.0 0,222 54390.00 245.00 20.42 5439.0000 Kg
42 Balok 35 x 45 0.33 0.43 1.60 176 Ø 6.0 0,222 62515.20 281.60 23.47 6251.5200 Kg
43 Balok 35 x 50 0.33 0.48 1.70 177 Ø 6.0 0,222 66799.80 300.90 25.08 6679.9800 Kg
44 Balok 40 x 40 0.38 0.38 1.60 178 Ø 6.0 0,222 63225.60 284.80 23.73 6322.5600 Kg
45 Balok 40 x 45 0.38 0.43 1.70 179 Ø 6.0 0,222 67554.60 304.30 25.36 6755.4600 Kg
46 Balok 40 x 50 0.38 0.48 1.80 180 Ø 6.0 0,222 71928.00 324.00 27.00 7192.8000 Kg
47 Balok ring 15x15 0.13 0.13 0.60 181 Ø 6.0 0,222 24109.20 108.60 9.05 2410.9200 Kg
48 Pondasi Plat 0.0000 Kg
HASIL PERHITUNGAN LAMANYA WAKTU PELAKSANAAN PEKERJAAN
Koef Tenaga Kerja Kemampuan Pekerja Vol Pek Jmlh Hari Untuk Rencana Jumlah Org Yang
Per Satuan Pekerjaan Menyelesaikan Pkrjn Menyelesaikan Kes Vol Pek Hari Kerja Dibutuhkan
No Uraian Pekerjaan (a) Dalam 1 Hari (b) (c) (1 Org) (d) (e) (f) (g)
1/a c/b d/e
PEKERJAAN PERSIAPAN
1 M2 Pembersihan Lapangan P 0.7000 1.43 0.00 0.00 4.0 0.00 0
M 0.0900 11.11 0.00 0.00 4.0 0.00 5
1 M2 Gudang Semen dan Alat P 1.0000 1.00 0.00 0.00 7.0 0.00 0
T 1.0000 1.00 0.00 0.00 7.0 0.00 0
KT 0.2000 5.00 0.00 0.00 7.0 0.00 1
M 0.0500 20.00 0.00 0.00 7.0 0.00 1
PEKERJAAN GALIAN
1 M3 Galian Tanah Biasa Sedalam 1 Meter P 0.7500 1.33 0.00 0.00 7.0 0.00 9
M 0.0250 40.00 0.00 0.00 7.0 0.00 0
1 M3 Urugan Kembali Galian Tanah P 0.1920 5.21 0.00 0.00 2.0 0.00 0
M 0.0190 52.63 0.00 0.00 2.0 0.00 1
PEKERJAAN PONDASI BATU KALI
1 M3 Urugan Pasir Bawah Pondasi P 0.3000 3.33 0.00 0.00 1.0 0.00 0
M 0.0100 100.00 0.00 0.00 1.0 0.00 1
1 M3 Pasangan Pondasi Batu Kosong P 0.7800 1.28 #REF! #REF! 3.0 #REF! 7
T 0.3900 2.56 #REF! #REF! 3.0 #REF! 4
KT 0.0390 25.64 #REF! #REF! 3.0 #REF! 1
M 0.0390 25.64 #REF! #REF! 3.0 #REF! 1
1 M3 Pasangan Pondasi Batu Kali (1:3) P 0.0750 13.33 0.00 0.00 10.0 0.00 9
T 1.5000 0.67 0.00 0.00 10.0 0.00 4
KT 0.7500 1.33 0.00 0.00 10.0 0.00 1
M 0.0750 13.33 0.00 0.00 10.0 0.00 1
PEKERJAAN BETON
1M3 Pondasi Plat P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
KT 0.3310 3.02 0.00 0.00 5.0 0.00 1
M 0.1700 5.88 0.00 0.00 5.0 0.00 1
1 M3 Tangga Beton Bertulang 200 kg P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 0
KT 0.3310 3.02 0.00 0.00 4.0 0.00 1
M 0.1700 5.88 0.00 0.00 4.0 0.00 1
1 M2 Pasangan Dinding Batu Bata (1:4) P 0.2000 5.00 0.00 0.00 34.0 0.00 0
T 0.1000 10.00 0.00 0.00 34.0 0.00 2
KT 0.0100 100.00 0.00 0.00 34.0 0.00 1
M 0.0150 66.67 0.00 0.00 34.0 0.00 1
1 M2 Pasangan Dinding Batu Bata (1:2) P 0.3200 3.13 0.00 0.00 5.0 0.00 4
T 0.1000 10.00 0.00 0.00 5.0 0.00 0
KT 0.0100 100.00 0.00 0.00 5.0 0.00 1
M 0.0150 66.67 0.00 0.00 5.0 0.00 1
1 M3 Pasangan Kusen Pintu dan Jendela P 6.0000 0.17 0.00 0.00 7.0 0.00 2
T 20.0000 0.05 0.00 0.00 7.0 0.00 4
KT 2.0000 0.50 0.00 0.00 7.0 0.00 1
M 0.3000 3.33 0.00 0.00 7.0 0.00 1
PEKERJAAN KAP DAN ATAP
1 M3 Pekerjaan Balok Dinding P 0.1000 10.00 0.00 0.00 2.0 0.00 1
T 0.0330 30.30 0.00 0.00 2.0 0.00 1
KT 0.0100 100.00 0.00 0.00 2.0 0.00 1
M 0.0050 200.00 0.00 0.00 2.0 0.00 1
1 M3 Pekerjaan Kuda-Kuda Kayu P 5.5000 0.18 0.00 0.00 4.0 0.00 2
T 8.3000 0.12 0.00 0.00 4.0 0.00 3
KT 2.2000 0.45 0.00 0.00 4.0 0.00 1
M 1.5000 0.67 0.00 0.00 4.0 0.00 1
Pemasangan 1 M' Talang Miring BJLS 28 P 0.0400 25.00 0.00 0.00 2.0 0.00 1
T 0.4000 2.50 0.00 0.00 2.0 0.00 4
KT 0.0250 40.00 0.00 0.00 2.0 0.00 1
M 0.0013 769.23 0.00 0.00 2.0 0.00 1
Pemasangan 1 M2 Atap Sakura Roof P 0.2000 5.00 0.00 0.00 4.0 0.00 2
T 0.1000 10.00 0.00 0.00 4.0 0.00 4
KT 0.0100 100.00 0.00 0.00 4.0 0.00 1
M 0.0010 1,000.00 0.00 0.00 4.0 0.00 1
Memasang Lis Plafond P 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
T 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
KT 0.0020 500.00 #REF! #REF! 2.0 #REF! 1
M 0.0010 1,000.00 #REF! #REF! 2.0 #REF! 1
PEKERJAAN PLASTERAN
1 M2 Plasteran Dinding (1:2) P 0.2000 5.00 0.00 0.00 9.0 0.00 3
T 0.1500 6.67 0.00 0.00 9.0 0.00 3
KT 0.0150 66.67 0.00 0.00 9.0 0.00 1
M 0.0100 100.00 0.00 0.00 9.0 0.00 1
1 Buah Pasangan Engsel Pintu P 0.0500 20.00 0.00 0.00 5.0 0.00 1
T 0.6000 1.67 0.00 0.00 5.0 0.00 5
KT 0.0600 16.67 0.00 0.00 5.0 0.00 1
M 0.0030 333.33 0.00 0.00 5.0 0.00 1
1 Buah Pasangan Kunci Tanam Antik P 0.0600 16.67 0.00 0.00 2.0 0.00 1
T 0.6000 1.67 0.00 0.00 2.0 0.00 4
KT 0.0600 16.67 0.00 0.00 2.0 0.00 1
M 0.0030 333.33 0.00 0.00 2.0 0.00 1
PEKERJAAN PENGECATAN
1 M2 Mendempul dan Menggosok Kayu P 0.0400 25.00 0.00 0.00 1.0 0.00 0
T 0.0400 25.00 0.00 0.00 1.0 0.00 0
KT 0.0040 250.00 0.00 0.00 1.0 0.00 1
M 0.0025 400.00 0.00 0.00 1.0 0.00 1
Pemasangna 1 Buah Kloset Jongkok P 1.0000 1.00 0.00 0.00 1.0 0.00 0
T 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! #DIV/0!
KT 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! #DIV/0!
M 0.1600 6.25 0.00 0.00 1.0 0.00 1
Pemasangan 1 Buah KloSet Duduk P 1.0000 1.00 0.00 0.00 2.0 0.00 0
T 1.5000 0.67 0.00 0.00 2.0 0.00 2
KT 0.1500 6.67 0.00 0.00 2.0 0.00 1
M 0.1600 6.25 0.00 0.00 2.0 0.00 1
1 Buah Bak Cuci Piring Stainless P 0.0300 33.33 0.00 0.00 0.5 0.00 1
T 0.3000 3.33 0.00 0.00 0.5 0.00 1
KT 0.0300 33.33 0.00 0.00 0.5 0.00 1
M 0.0020 500.00 0.00 0.00 0.5 0.00 1
Memasang Pipa Air Ø 3" Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 3
T 0.0700 14.29 0.00 0.00 1.0 0.00 5
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1
Memasang Pipa Air Ø 3/4" AW Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 2
T 0.0700 14.29 0.00 0.00 1.0 0.00 0
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1
Memasang Pipa Air Ø 1/2" AW Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 2
T 0.0700 14.29 0.00 0.00 1.0 0.00 0
KT 0.0135 74.07 0.00 0.00 1.0 0.00 1
M 0.0040 250.00 0.00 0.00 1.0 0.00 1
Memasangan 1 Kran Air Ø 3/4" atau 1/2" P 0.0100 100.00 0.00 0.00 1.0 0.00 1
T 0.1000 10.00 0.00 0.00 1.0 0.00 1
KT 0.0100 100.00 0.00 0.00 1.0 0.00 1
M 0.0050 200.00 0.00 0.00 1.0 0.00 1
PEKERJAAN PERLENGKAPAN LUAR
1 M3 Rabat Beton (1:3:5) P 5.0000 0.20 0.00 0.00 22.0 0.00 5
T 0.8000 1.25 0.00 0.00 22.0 0.00 1
KT 0.0800 12.50 0.00 0.00 22.0 0.00 1
M 0.2000 5.00 0.00 0.00 22.0 0.00 1
Analisis 1Buah Bak Kontrol P 2.2600 0.44 0.00 0.00 1.0 0.00 3
T 0.7200 1.39 0.00 0.00 1.0 0.00 0
KT 0.0720 13.89 0.00 0.00 1.0 0.00 1
M 0.1080 9.26 0.00 0.00 1.0 0.00 1
PEKERJAAN PERSIAPAN
Pembersihan Lapangan
Pasangan Bouwlpank
PEKERJAAN GALIAN
Galian Tanah
PEK. BETON
Pondasi Plat
Kolom
Balok
Plat Beton
Ring Balok
Plafond Gypsum
PEKERJAAN LANTAI
Urugan Pasir
Kaca Tebal 5 MM
PEKERJAAN PENGECATAN
Pekerjaan Sanitasi
Bak Kontrol
Septictank
Resapan
46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
WAKTU PELAKSANAAN (HARI)
77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119
120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169
170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190
Tabel 4.1 Daftar Harga Bahan dan Satuan Upah
HARGA UPAH/SATUAN
NO URAIAN SATUAN KET
(RUPIAH)
A UPAH:
1 Mandor hari 65,000.00
2 Kepala Tukang hari 55,000.00
3 Tukang hari 45,000.00
4 Pekerja hari 35,000.00
B BAHAN/MATERIAL
1 Air Kerja ls 4,500,000.00
2 Alkali Resisting kg 60,000.00
3 Cat Dasar kg 18,300.00
4 Cat Kayu kg 18,300.00
5 Cat Meni kg 18,300.00
6 Naturtone Cat Tembok kg 14,640.00
7 American Standart Kloset Duduk bh 1,904,000.00
8 Amplas lbr 3,000.00
11 Atap Sakura Roof (2 Susun) m2 51,968.00
12 AW Pipa PVC Ø 1" m 22,400.00
13 AW Pipa PVC Ø 1/2" m 11,200.00
14 AW Pipa PVC Ø 3/4" m 15,680.00
15 AW Pipa PVC Ø 3" m 63,500.00
17 Batu Bata bh 225.00
18 Batu Batako 10/20/40 bh 4,000.00
19 Batu Kali m3 150,000.00
20 Baut Engsel/Teralis dos 7,500.00
21 Baut Ø12-15 bh 1,680.00
22 Baut Ø16-20 bh 2,240.00
23 Belucci Kunci set 112,000.00
24 Besi Polos Ø 10 mm kg 4,384.42
25 Besi Polos Ø 12 mm kg 3,705.54
26 Besi Polos Ø 16 mm kg 3,635.18
27 Besi Polos Ø 8 mm kg 5,221.45
28 Besi Polos Ø 10 mm lnjr 37,872.62
29 Besi Polos Ø 12 mm lnjr 54,507.11
30 Besi Polos Ø 16 mm lnjr 123,377.57
31 Besi Polos Ø 8 mm lnjr 30,875.08
32 Besi Strip kg 5,384.42
33 Diamond Kasar Keramik 20x20 bh 2,440.00
34 Falco Engsel Jendela 3" bh 20,160.00
35 Falco Engsel Pintu 5 " bh 33,600.00
36 Gypsum lbr 61,600.00
37 Hak Angin psg 11,200.00
38 Ikad Keramik 30x30 bh 6,100.00
39 Impra Dempul kg 20,000.00
40 Impresso Keramik 30x30 bh 4,990.91
41 Indocement Semen Warna 50 kg zak 91,500.00
42 Jendela Kaca/Jalusi Miring bh 250,000.00
43 Kaca Bening t = 5 mm m2 95,200.00
44 Kaca Hitam t = 5 mm m2 106,400.00
45 Kawat Bendrad kg 10,750.00
46 Kawat Beton kg 11,200.00
47 Kawat Duri m' 1,400.00
48 Kayau Meranti Papan 3/20 (Kls. 2) m3 784,000.00
49 Kayau Meranti Papan 3/20 (Kls. 2) btg 18,700.00
50 Kayu Meranti Balok 5/7 (Kls. 2) m3 784,000.00
51 Kayu Meranti Balok 5/7 (Kls. 2) btg 10,900.00
52 Kayu Bengkirai Balok (Kls. 1) m3 1,456,000.00
53 Kayu Bengkirai Papan (Kls. 1) m3 1,568,000.00
54 Kayu Bengkirai Balok 5/10 (Kls. 1) btg 29,500.00
55 Kayu Bengkirai Balok 5/7 (Kls. 1) btg 20,500.00
Sambungan Tabel 4.1
56 Kayu Bengkirai Balok 2/3 (Kls. 1) btg 3,500.00
57 Kayu Bengkirai Balok 8/12 (Kls. 1) btg 54,000.00
58 Kayu Bengkirai Papan 3/20 (Kls. 1) btg 60,500.00
59 Kayu Meranti 4/6 (Kls. I) btg 7,500.00
60 Kayu Ulin Balok (Kls. 1) btg 38,080.00
61 Kayu Meranti Balok (Kls. 1) m3 1,008,000.00
62 Kayu Meranti Papan (Kls. 1) m3 1,064,000.00
63 Kayu Ulin Balok (Kls. 1) m3 1,904,000.00
64 Kayu Ulin Papan (Kls. 1) m3 2,072,000.00
66 Kerikil Beton m3 140,000.00
67 Kia Keramik 40x40 bh 11,183.33
68 Kia Polos Keramik 20x20 bh 2,196.00
69 Kran Air bh 40,000.00
70 Kuas 4" bh 7,840.00
71 Kusen Bengkirai Standar m' 24,000.00
72 Lambersering meranti btg 15,000.00
73 Lexus Westafel bh 952,000.00
74 List Profil m' 10,000.00
76 Minyak Bekisting lt 10,000.00
77 Nicole Kunci set 78,400.00
78 Nok Surya Roof 100 mm bh 33,600.00
79 Nok Surya Roof 33 mm bh 16,800.00
80 Paku Biasa 2" - 5" kg 9,800.00
81 Paku Sekrup dos 10,000.00
82 Paku Ulin 1" - 5" kg 12,200.00
83 Paragon Plamir kg 8,540.00
84 Pasir Cor m3 130,000.00
85 Pasir Pasang m3 100,000.00
86 Pasir urug m3 80,000.00
87 Pemasangan Listrik ls 1,500,000.00
88 Perlatan Kecil ls 100,000.00
89 T-Dos (Kontak Hubung Bagi) b 4,500.00
90 Pintu Panel Bengkirai 80-100 x 200 bh 390,000.00
91 Playwood t = 6 mm lbr 56,000.00
92 Playwood t = 9 mm lbr 100,800.00
93 Playwood t =3 mm lbr 39,600.00
94 Pujatex Cat Minyak kg 36,600.00
95 Reservoir/Tangki Air 1200 L bh 952,000.00
96 Rol Cat bh 10,000.00
99 Talang Air PVC btg 50,400.00
100 Tanah Urug m3 45,000.00
102 Toto Kloset Jongkok bh 100,800.00
103 Tonasa Semen Portland 50 kg zak 51,240.00
104 Bak Cuci Stainless bh 257,600.00
105 Tulangan kg 14,308.25
106 Floor Drain Bh 20,000.00
107 Water Drain dan Asesories Bh 85,000.00
108 Pipa PVC Listrik m 7,000.00
109 Saklar Tunggal Bh 15,000.00
110 Kabel NYY 2.5 mm2 m 7,000.00
111 Kabel NYY 1.5 mm2 m 6,500.00
112 Lampu Pijar 20W bh 20,000.00
113 Fitting Lampu bh 10,000.00
114 Inbouw Doss bh 4,500.00
115 Perlengkapan (Isolasi, Paku, Klem, Samb) set 1,000.00
116 Stop Kontak bh 15,000.00
117 Lampu Neon Lengkap bh 35,000.00
118 Box MCB bh 10,000.00
119 Seng Plat 3 x 6 BJLS 28 lbr 28,500.00
120 MCB 6A bh 20,000.00
C HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI
1 Pembersihan Lapangan m2 0.00
2 Pemasangan Bouplank/Pengukuran m 2
0.00
3 Pengadaan Air Kerja Ls 0.00
4 Pembuatan Gedung Semen dan Alat m2 0.00
5 Galian Tanah Biasa 1 Meter m 3
0.00
6 Galian Tanah Biasa 2 Meter m3 0.00
7 Galian Tanah Biasa 3 Meter m3 0.00
8 Galian Tanah Keras 1 Meter m 3
0.00
9 Galian Tanah Cadas 1 Meter m3 0.00
10 Galian Tanah Lumpur 1 Meter m3 0.00
11 Urugan Kembali Galian m 3
0.00
12 Pemadatan Tanah m3 0.00
13 Urugan Pasir Bawah Pondasi m 3
0.00
14 Pasangan Pondasi Batu Kosong m 3
0.00
15 Pasangan Pondasi Batu Kali m3 0.00
16 Sloof 15/20 m 3
0.00
17 Pekerjaan Pondasi Plat m3 0.00
18 Kolom 15/15 m3 0.00
19 Kolom 15/20 m3 0.00
20 Kolom 15/25 m3 0.00
21 Kolom 15/30 m3 0.00
22 Kolom 20 x 20 m3 0.00
23 Kolom 20 x 25 m3 0.00
24 Kolom 20 x 30 m3 0.00
25 Kolom 20 x 35 m3 0.00
26 Kolom 20 x 40 m3 0.00
27 Kolom 25 x 25 m3 0.00
28 Kolom 25 x 30 m3 0.00
29 Kolom 25 x 35 m3 0.00
30 Kolom 25 x 40 m3 0.00
31 Kolom 25 x 45 m3 0.00
32 Kolom 25 x 50 m3 0.00
33 Kolom 30 x 30 m3 0.00
34 Kolom 30 x 35 m3 0.00
35 Kolom 30 x 40 m3 0.00
36 Kolom 35 x 45 m3 0.00
37 Kolom 35 x 50 m3 0.00
38 Kolom 40 x 40 m3 0.00
39 Kolom 40 x 45 m3 0.00
40 Kolom 40 x 50 m3 0.00
41 Balok 15 x 20 m3 0.00
42 Balok 15 x 25 m3 0.00
43 Balok 15 x 30 m3 0.00
44 Balok 20 x 20 m3 0.00
45 Balok 20 x 25 m3 0.00
46 Balok 20 x 30 m3 0.00
47 Balok 20 x 35 m3 0.00
48 Balok 20 x 40 m3 0.00
49 Balok 25 x 25 m3 0.00
50 Balok 25 x 30 m3 0.00
51 Balok 25 x 35 m3 0.00
52 Balok 25 x 40 m3 0.00
53 Balok 25 x 45 m3 0.00
54 Balok 25 x 50 m3 0.00
55 Balok 30 x 30 m3 0.00
56 Balok 30 x 35 m3 0.00
57 Balok 30 x 40 m3 0.00
58 Balok 35 x 45 m3 0.00
59 Balok 35 x 50 m3 0.00
60 Balok 40 x 40 m3 0.00
61 Balok 40 x 45 m3 0.00
62 Balok 40 x 50 m3 0.00
63 Plat Beton m3 0.00
64 Ring Balok m3 0.00
65 Tangga m3 0.00
66 Pasangan Dinding Batubata (1:4) m3 0.00
67 Pasangan Dinding Batubata (1:2) m3 0.00
68 Kusen Pintu dan Jendela m3 0.00
69 Balok Dinding m3 0.00
70 Pekerjaan Kuda-Kuda m3 0.00
71 Pekerjaan Rangka Atap m3 0.00
72 Pekerjaan Listplank 3/25 m3 0.00
73 Gording 8/12 m3 0.00
74 Talang m' 0.00
75 Pemasangan Atap m2 0.00
76 Pemasangan Perabung m3 0.00
77 Rangka Plafon m2 0.00
78 Memasang Plafond Gypsum m2 0.00
79 Memasang Lis Plafond m' 0.00
80 Plasteran Dinding (1:2) m2 0.00
81 Plasteran Dinding (1:4) m2 0.00
82 Acian m2 0.00
83 Pasangan Turap Porslent m2 0.00
84 Urugan Pasir 0.00
85 Pasangan Lantai Kramik 33 x 33 m2 0.00
86 Pasangan Lantai Kramik 20 x 20 m2 0.00
87 Pasangan Pintu Bh 0.00
88 Pasangan Jendela kaca m2 0.00
89 Pasangan Kaca Tebal 15 mm m2 0.00
90 Pasangan Engsel Pintu Bh 0.00
91 Pasangan Kunci Taman Antik Bh 0.00
92 Mendempul dan Mrnggosok Kayu m2 0.00
93 Mengecat Kayu Baru m2 0.00
94 Mengecat Tembok Baru m2 0.00
95 Pemasangan Listrik Baru Ls 0.00
96 Pemasangna Kloset Jongkok Bh 0.00
97 Pemasangan Kloset Duduk Bh 0.00
98 Pemasangan Floor Draine Bh 0.00
99 Pemasangan Bak Cuci Piring Bh 0.00
100 Pemasangan Wastafel Bh 0.00
101 Pem. Pipa Air Ø 3" Per M' M' 0.00
102 Pem. Pipa Air Ø 3/4" AW Per M' M' 0.00
103 Pem. Pipa Air Ø 1/2" AW Per M' M' 0.00
104 Pem. Kran Air Ø 3/4" atau 1/2" Bh 0.00
105 Rabat Beton (1:3:5) M3 0.00
106 Bak Kontrol Bh 0.00
107 Septictank Bh 0.00
108 Resapan Bh 0.00
Tabel 4.2 Hasil Daftar Volume/Bobot Pekerjaan
NO URAIAN PEKERJAAN VOLUME SAT
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 340.0000 M2
1.1.2. Pemasangan Bouplank/Pengukuran 56.0000 M
1.1.3. Pengadaan Air Kerja 1.0000 Ls
1.1.4. Pembuatan Gudang Semen dan Alat 20.0000 M2
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 1 Meter 148.2500 M3
1.2.2. Galian Tanah Biasa 2 Meter 0.0000 M3
1.2.7. Urugan Kembali Galian 0.0000 M3
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 12.1513 M3
1.3.2. Pasangan Pondasi Batu Kosong 24.6692 M3
1.3.3. Pasangan Pondasi Batu Kali 56.1260 M3
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15 x 20 2.5744 M3
2.1.2. Pondasi Plat 3.7960 M3
2.1.2. Kolom 15 x 15 4.9800 M3
2.1.3. Kolom 15 x 20 3.4300 M3
2.1.8. Kolom 20 x 30 5.4600 M3
2.1.25. Balok 15 x 20 2.3400 M3
2.1.39. Balok 30 x 35 6.6045 M3
2.1.46. Plat Beton 7.3600 M3
2.1.47. Ring Balok 3.7400 M3
2.1.48. Tangga 1.8534 M3
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 0.8920 M3
III. PEKERJAAN DINDING
3.1. Dinding
3.1.1. Pasangan Dinding 1/2 Bata (1:4) 413.5688 M2
3.1.2. Pasangan Dinding 1/2 Bata (1:2) 51.1000 M2
3.2. Kusen
3.2.1. Kusen Pintu dan Jendela 1.2541 M3
3.2.2. Bout-bout/Angker 60.2770 Kg
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1. Balok Dinding 8/12 0.2939 M3
4.1.2. Pekerjaan Kuda-Kuda 1.3629 M3
4.1.3. Pekerjaan Rangka Atap 138.0646 M2
4.1.4. Pekerjaan Listplank 3/25 53.9000 M2
4.1.5. Pekerjaan Papan Reuter 3/25 34.1700 M'
4.1.6. Nog dan Gording 8/12 5.6300 M3
4.1.7. Pekerjaan Talang 17.0000 M'
4.2. Atap
4.2.1. Pemasangan Atap 158.0646 M2
4.2.2. Pemasangan Perabung 0.0000 M3
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon #REF! M2
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 165.6500 M2
5.2.2. Memasang Lis Plafond 179.9500 M'
VI. PEKERJAAN PLASTERAN DAN ACIAN
Sambungan Tabel 4.2
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 134.5000 M2
6.1.2. Plasteran Dinding (1:4) 780.2350 M2
6.1.3. Acian 914.7350 M2
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 47.2160 M2
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Tanah 0.0000 M3
7.1.2. Urugan Pasir 11.2648 M3
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 33 x 33 182.3750 M2
7.2.2. Pasangan Lantai Kramik 20 x 20 24.6325 M2
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 17.0000 Bh
8.1.2. Pasangan Jendela 28.9350 M2
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 71.5420 M2
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu dan Jendela 68.0000 Bh
8.3.3. Pasangan Kunci Taman Antik 12.0000 Bh
IX. PEKERJAAN PENGECATAN
9.1. Mendempul dan Mrnggosok Kayu 0.0000 M2
9.2. Mengecat Kayu Baru
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 610.5400 M2
9.3. Mengecat Tembok Baru
(1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 493.7300 M2
X. PEKERJAAN PERLENGKAPAN DALAM
10.1. Listrik
10.1.1. Pasangan Lampu Pijar 38.0000 Bh
10.1.2. Pemasangan Stop Kontak 12.0000 Bh
10.1.3. Pemasangan Lampu TL 5.0000 Bh
10.1.4. Pemasangan MCB 1.0000 Bh
10.1.5. Pemasangan Kabel Jaringan 348.0000 M'
10.1.6. Pitting lampu 26.0000 Bh
10.1.7. Pemasangan Sakelar 26.0000 Bh
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 2.0000 Unit
10.2.2. Pemasangan Kloset Duduk 2.0000 Unit
10.2.3. Pemasangan Floor Draine 4.0000 Bh
10.2.4. Pemasangan Bak Cuci Piring 1.0000 Bh
10.2.5. Pemasangan Wastafel 2.0000 Bh
10.2.6. Pem. Pipa Air Ø 3" Per M' 30.0000 M'
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 42.0000 M'
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 46.5300 M'
10.2.10. Pem. Kran Air Ø 3/4" atau 1/2" 8.0000 Bh
XI. PEKERJAAN PERLENGKAPAN LUAR
11.1. Saluran Keliling 57.0000 M'
11.2. Rabat Beton (1:3:5) 21.2100 M2
11.3. Bak Kontrol 1.0000 Bh
11.4. Resapan 1.0000 Bh
11.5. Septictank 1.0000 Bh
10.5. Pek. Pilar 37.0000 M'
Tabel 4.3 Hasil Ringkasan Keseluruhan Daftar Harga Satuan Pekerjaan
No URAIAN PEKERJAAN Harga Bahan Harga Upah Tenaga Kerja JUM. HARGA PER SAT
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 0.00 20,000.00 20,000.00
1.1.2. Pemasangan Bouplank/Pengukuran 8,924.84 21,150.00 30,074.84
1.1.3. Pengadaan Air Kerja 4,500,000.00 0.00 4,500,000.00
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 0.00 66,500.00 66,500.00
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 100,000.00 26,600.00 126,600.00
1.3.2. Pasangan Pondasi Batu Kosong 205,000.00 117,780.00 322,780.00
1.3.3. Pasangan Pondasi Batu Kali 454,753.33 262,125.00 716,878.33
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15/20 34,366,053.33 621,360.00 34,987,413.33
2.1.2. Pekerjaan Pondasi Plat 43,918,874.80 621,360.00 44,540,234.80
2.1.2. Kolom 15/15 27,289,934.63 621,360.00 27,911,294.63
2.1.3. Kolom 15/20 32,096,345.90 621,360.00 32,717,705.90
2.1.8. Kolom 20 x 30 43,890,317.88 621,360.00 44,511,677.88
2.1.25. Balok 15 x 20 36,314,467.06 621,360.00 36,935,827.06
2.1.39. Balok 30 x 35 68,535,127.40 621,360.00 69,156,487.40
2.1.9. Plat Beton 78,971,499.90 621,360.00 79,592,859.90
2.1.10. Ring Balok 39,576,482.83 621,360.00 40,197,842.83
2.1.11. Tangga 92,925,402.77 621,360.00 93,546,762.77
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 443,720.00 204,050.00 647,770.00
III. PEKERJAAN DINDING
3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 75,852.27 30,750.00 106,602.27
2.2.2. Pasangan Dinding Batubata (1:2) 581,343.52 40,950.00 622,293.52
3.2. Kusen
2.3.1. Kusen Pintu dan Jendela 1,289,062.50 2,963,000.00 4,252,062.50
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1.. Balok Dinding 15,225.00 13,780.00 29,005.00
4.1.2. Pekerjaan Kuda-Kuda 1,831,275.00 1,787,500.00 3,618,775.00
4.1.3. Pekerjaan Rangka Atap 26,700.00 21,150.00 47,850.00
4.1.4. Pekerjaan Listplank 3/25 #REF! 33,250.00 #REF!
4.1.5. Gording 8/12 16,300.80 1,614,000.00 1,630,300.80
4.1.6. Talang 28,165.00 50,293.00 78,458.00
4.2. Atap
4.2.1. Pemasangan Atap 36,900.00 29,210.00 66,110.00
4.2.2. Pemasangan Perabung 162,080.00 10,043.45 172,123.45
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon 19,371.43 43,825.00 63,196.43
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 33,080.00 15,210.00 48,290.00
5.2.2. Memasang Lis Plafond 10,572.00 4,425.00 14,997.00
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 11,579.20 36,250.00 47,829.20
6.1.2. Plasteran Dinding (1:4) 9,990.40 21,850.00 31,840.40
6.1.3. Acian 3,380.00 25,800.00 29,180.00
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 1,513,878.00 109,300.00 1,623,178.00
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 100,000.00 26,600.00 126,600.00
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 40 x 40 187,416.00 36,240.00 223,656.00
7.2.2. Pasangan Lantai Kramik 20 x 20 91,500.00 57,250.00 148,750.00
Sambungan Tabel 4.3
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 500,000.00 164,800.00 664,800.00
8.1.2. Pasangan Jendela kaca 88,229.17 314,400.00 402,629.17
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 121,000.00 19,441.50 140,441.50
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu 53,000.00 27,405.00 80,405.00
8.3.3. Pasangan Kunci Taman Antik 160,000.00 78,030.00 238,030.00
IX. PEKERJAAN PENGECATAN
9.2. Mengecat Kayu Baru 27,931.00 7,875.00 35,806.00
9.3. Mengecat Tembok Baru 11,541.22 9,120.00 20,661.22
X. PEK. INSTALASI DAN SANITASI
10.1 Listrik
10.1.1 Pemasangan Listrik Baru 245,000.00 0.00 245,000.00
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 357,426.67 102,600.00 460,026.67
10.2.2. Pemasangan Kloset Duduk 1,500,000.00 284,100.00 1,784,100.00
10.2.3. Pemasangan Floor Draine 40,000.00 13,500.00 53,500.00
10.2.4. Pemasangan Bak Cuci Piring 585,000.00 39,070.00 624,070.00
10.2.5. Pemasangan Wastafel 569,466.67 180,000.00 749,466.67
10.2.6. Pem. Pipa Air Ø 3" Per M' 29,062.50 11,325.00 40,387.50
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 19,375.00 11,325.00 30,700.00
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 6,587.50 11,325.00 17,912.50
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 25,843.75 13,500.00 39,343.75
XI. PEK. PERLENGKAPAN LUAR
11.1 Rabat Beton (1:3:5) 443,780.00 543,800.00 987,580.00
11.2 Bak Kontrol 1,196,653.40 291,100.00 1,487,753.40
11.3 Septictank 1,331,046.00 0.00 1,331,046.00
11.4 Resapan 21,468,275.19 0.00 21,468,275.19
Tabel 4.4 Hasil Daftar Rencana Anggaran Biaya (RAB)
HARGA SATUAN JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
I. PEKERJAAN PONDASI
1.1. Pekerjaan Persiapan
1.1.1. Pembersihan Lapangan 0.0000 M2 89,400.00 0.00
1.1.2. Pemasangan Bouplank/Pengukuran 0.0000 M2 30,074.84 0.00
1.1.3. Pengadaan Air Kerja 0.0000 Ls 4,500,000.00 0.00
0.00
1.2. Pekerjaan Galian
1.2.1. Galian Tanah Biasa 1 Meter 0.0000 M3 66,500.00 0.00
0.00
1.3. Pemasangan Pondasi Batu Kali
1.3.1. Urugan Pasir Bawah Pondasi 0.0000 M3 126,600.00 0.00
1.3.2. Pasangan Pondasi Batu Kosong #REF! M3 322,780.00 #REF!
1.3.3. Pasangan Pondasi Batu Kali 0.0000 M3 716,878.33 0.00
#REF!
II. PEKERJAAN BETON
2.1. Beton Bertulang
2.1.1. Sloof 15/20 0.0000 M3 34,987,413.33 0.00
2.1.2. Pekerjaan Pondasi Plat 0.0000 M3 44,540,234.80 0.00
2.1.2. Kolom 15/15 0.0000 M3 27,911,294.63 0.00
2.1.3. Kolom 15/20 0.0000 M3 32,717,705.90 0.00
2.1.8. Kolom 20 x 30 0.0000 M3 44,511,677.88 0.00
2.1.25. Balok 15 x 20 0.0000 M3 36,935,827.06 0.00
2.1.39. Balok 30 x 35 0.0000 M3 69,156,487.40 0.00
2.1.9. Plat Beton 0.0000 M3 79,592,859.90 0.00
2.1.10. Ring Balok 0.0000 M3 40,197,842.83 0.00
2.1.11. Tangga 0.0000 M3 93,546,762.77 93,546,762.77
93,546,762.77
2.2. Beton Tak Bertulang
2.2.1. Beton Cor 1 : 2 : 3 0.0000 M3 647,770.00 0.00
0.00
III. PEKERJAAN DINDING
3.1. Dinding
2.2.1. Pasangan Dinding Batubata (1:4) 0.0000 M3 106,602.27 0.00
2.2.2. Pasangan Dinding Batubata (1:2) 0.0000 M3 622,293.52 0.00
0.00
3.2. Kusen
2.3.1. Kusen Pintu dan Jendela 0.0000 M3 4,252,062.50 0.00
0.00
IV. PEKERJAAN KAP DAN ATAP
4.1. Kap dan Rangka Atap
4.1.1.. Balok Dinding 8/12 0.0000 M3 29,005.00 0.00
4.1.2. Pekerjaan Kuda-Kuda 0.0000 M3 3,618,775.00 0.00
4.1.3. Pekerjaan Rangka Atap 0.0000 M3 47,850.00 0.00
4.1.4. Pekerjaan Listplank 3/25 0.0000 M3 94,450.00 0.00
4.1.5. Gording 8/12 0.0000 M3 1,630,300.80 0.00
4.1.6. Talang 0.0000 M' 78,458.00 0.00
0.00
4.2. Atap
4.2.1. Pemasangan Atap 0.0000 M2 66,110.00 0.00
4.2.2. Pemasangan Perabung 0.0000 M3 172,123.45 0.00
0.00
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon #REF! M2 63,196.43 #REF!
#REF!
Sambungan Tabel 3.4
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum #REF! M2 48,290.00 #REF!
5.2.2. Memasang Lis Plafond #REF! 14,997.00 #REF!
#REF!
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 0.0000 M2 47,829.20 0.00
6.1.2. Plasteran Dinding (1:4) 0.0000 M2 31,840.40 0.00
6.1.3. Acian 0.0000 M2 29,180.00 0.00
0.00
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 0.0000 M2 1,623,178.00 0.00
0.00
VII. PEKERJAAN LANTAI
7.1. Urugan Bawah Lantai
7.1.1. Urugan Pasir 0.0000 126,600.00 0.00
0.00
7.2. Pasangan Lantai
7.2.1. Pasangan Lantai Kramik 40 x 40 #REF! M2 223,656.00 #REF!
7.2.2. Pasangan Lantai Kramik 20 x 20 #REF! M2 148,750.00 #REF!
#REF!
VIII. PEKERJAAN PINTU DAN JENDELA
8.1. Pintu dan Jendela
8.1.1. Pasangan Pintu 0.0000 Bh 664,800.00 0.00
8.1.2. Pasangan Jendela kaca 0.0000 M2 402,629.17 0.00
0.00
8.2. Kaca
8.2.1. Pasangan Kaca Tebal 15 mm 0.0000 M2 140,441.50 0.00
0.00
8.3. Penggantung/Kunci
8.3.1. Pasangan Engsel Pintu 0.0000 Bh 80,405.00 0.00
8.3.3. Pasangan Kunci Taman Antik 0.0000 Bh 238,030.00 0.00
0.00
IX. PEKERJAAN PENGECATAN
9.2. Mengecat Kayu Baru 0.0000 M2 35,806.00 0.00
9.3. Mengecat Tembok Baru 464.7500 M2 22,661.22 10,531,802.00
10,531,802.00
X. PEK. INSTALASI DAN SANITASI
10.1 Listrik
10.1.1 Pemasangan Listrik Baru 1.0000 Ls 245,000.00 245,000.00
245,000.00
10.2. Sanitair dan Instalasi Air
10.2.1. Pemasangna Kloset Jongkok 0.0000 Bh 460,026.67 0.00
10.2.2. Pemasangan Kloset Duduk 0.0000 Bh 1,791,526.67 0.00
10.2.3. Pemasangan Floor Draine 0.0000 Bh 53,500.00 0.00
10.2.4. Pemasangan Bak Cuci Piring 0.0000 Bh 624,070.00 0.00
10.2.5. Pemasangan Wastafel 0.0000 Bh 749,466.67 0.00
10.2.6. Pem. Pipa Air Ø 3" Per M' 0.0000 M' 40,387.50 0.00
10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 0.0000 M' 30,700.00 0.00
10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 0.0000 M' 17,912.50 0.00
10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" 0.0000 Bh 39,343.75 0.00
0.00
XI. PEK. PERLENGKAPAN LUAR
11.1 Rabat Beton (1:3:5) 0.0000 987,580.00 0.00
11.2 Bak Kontrol 0.0000 1,487,753.40 0.00
11.3 Septictank 0.0000 1,331,046.00 0.00
11.4 Resapan 1.0000 21,468,275.19 21,468,275.19
21,468,275.19
Tabel 4.6 Hasil Perhitungan Lamanya Waktu Pelaksanaan Pekerjaan
Uraian Pekerjaan TK (a) (b) 1/a (c) (d) c/b (e) (f) d/e (g)
PEKERJAAN PERSIAPAN
1 M2 Pembersihan Lapangan P 0.7000 1.43 0.00 0.00 4.0 0.00 0
M 0.0900 11.11 0.00 0.00 4.0 0.00 5
1 M' Pasangan Bouwlpank P 0.1000 10.00 0.00 0.00 2.0 0.00 0
T 0.1000 10.00 0.00 0.00 2.0 0.00 0
1 M2 Gudang Semen dan Alat P 1.0000 1.00 0.00 0.00 7.0 0.00 0
T 1.0000 1.00 0.00 0.00 7.0 0.00 0
PEKERJAAN GALIAN
1 M3 Galian Tanah Biasa Sedalam 1 Meter P 0.7500 1.33 0.00 0.00 7.0 0.00 9
M 0.0250 40.00 0.00 0.00 7.0 0.00 0
1 M3 Urugan Kembali Galian Tanah P 0.1920 5.21 0.00 0.00 2.0 0.00 0
M 0.0190 52.63 0.00 0.00 2.0 0.00 1
PEKERJAAN PONDASI BATU KALI
1 M3 Urugan Pasir Bawah Pondasi P 0.3000 3.33 0.00 0.00 1.0 0.00 0
M 0.0100 100.00 0.00 0.00 1.0 0.00 1
1 M3 Pasangan Pondasi Batu Kosong P 0.7800 1.28 #REF! #REF! 3.0 #REF! 7
T 0.3900 2.56 #REF! #REF! 3.0 #REF! 4
1 M3 Pasangan Pondasi Batu Kali (1:3) P 0.0750 13.33 0.00 0.00 10.0 0.00 9
T 1.5000 0.67 0.00 0.00 10.0 0.00 4
PEKERJAAN BETON
1M3 Pondasi Plat P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
1M3 Sloof 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 5
T 1.4000 0.71 0.00 0.00 3.0 0.00 2
1 M3 Kolom Praktis (15/15) P 4.8500 0.21 0.00 0.00 7.0 0.00 4
T 1.4000 0.71 0.00 0.00 7.0 0.00 1
1 M3 Kolom 15/20 P 4.8500 0.21 0.00 0.00 5.0 0.00 4
T 1.4000 0.71 0.00 0.00 5.0 0.00 1
1 M3 Kolom 20/30 P 4.8500 0.21 0.00 0.00 8.0 0.00 0
T 1.4000 0.71 0.00 0.00 8.0 0.00 0
1 M3 Balok 15/20 P 4.8500 0.21 0.00 0.00 3.0 0.00 0
T 1.4000 0.71 0.00 0.00 3.0 0.00 2
1 M3 Balok 30/35 P 4.8500 0.21 0.00 0.00 8.0 0.00 4
T 1.4000 0.71 0.00 0.00 8.0 0.00 1
1 M3 Plat Beton P 4.8500 0.21 0.00 0.00 10.0 0.00 4
T 1.4000 0.71 0.00 0.00 10.0 0.00 2
1 M3 Ring Balok P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 2
1 M3 Tangga Beton Bertulang 200 kg P 4.8500 0.21 0.00 0.00 4.0 0.00 0
T 1.4000 0.71 0.00 0.00 4.0 0.00 0
1 M2 Pasangan Dinding Batu Bata (1:4) P 0.2000 5.00 0.00 0.00 34.0 0.00 0
T 0.1000 10.00 0.00 0.00 34.0 0.00 2
1 M2 Pasangan Dinding Batu Bata (1:2) P 0.3200 3.13 0.00 0.00 5.0 0.00 4
T 0.1000 10.00 0.00 0.00 5.0 0.00 0
1 M3 Pasangan Kusen Pintu dan Jendela P 6.0000 0.17 0.00 0.00 7.0 0.00 2
T 20.0000 0.05 0.00 0.00 7.0 0.00 4
PEKERJAAN KAP DAN ATAP
1 M3 Pekerjaan Balok Dinding P 0.1000 10.00 0.00 0.00 2.0 0.00 1
T 0.0330 30.30 0.00 0.00 2.0 0.00 1
1 M3 Pekerjaan Kuda-Kuda Kayu P 5.5000 0.18 0.00 0.00 4.0 0.00 2
T 8.3000 0.12 0.00 0.00 4.0 0.00 3
1 M2 Pekerjaan rangka Atap P 0.1000 10.00 0.00 0.00 7.0 0.00 2
T 0.1000 10.00 0.00 0.00 7.0 0.00 2
1M' Papan Lisplank P 0.1000 10.00 0.00 0.00 3.0 0.00 0
T 0.2000 5.00 0.00 0.00 3.0 0.00 4
Pemasangan 1 M3 Gording, Nog P 12.0000 0.08 0.00 0.00 14.0 0.00 5
T 4.0000 0.25 0.00 0.00 14.0 0.00 2
Pemasangan 1 M' Talang Miring BJLS 28 P 0.0400 25.00 0.00 0.00 2.0 0.00 1
T 0.4000 2.50 0.00 0.00 2.0 0.00 4
Pemasangan 1 M2 Atap Sakura Roof P 0.2000 5.00 0.00 0.00 4.0 0.00 2
T 0.1000 10.00 0.00 0.00 4.0 0.00 4
Pemasangan 1 M2 Perabung P 0.0457 21.89 0.00 0.00 1.0 0.00 0
T 0.0500 20.00 0.00 0.00 1.0 0.00 0
Sambungan Tabel 4.6
PEKERJAAN PLAFON
1 M2 Rangka Plafon P 0.1500 6.67 #REF! #REF! 12.0 #REF! #REF!
T 0.2500 4.00 #REF! #REF! 12.0 #REF! #REF!
1 M2 Plafond Gypsum P 0.1000 10.00 #REF! #REF! 17.0 #REF! #REF!
T 0.0500 20.00 #REF! #REF! 17.0 #REF! 6
Memasang Lis Plafond P 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
T 0.0210 47.62 #REF! #REF! 2.0 #REF! #REF!
PEKERJAAN PLASTERAN
1 M2 Plasteran Dinding (1:2) P 0.2000 5.00 0.00 0.00 9.0 0.00 3
T 0.1500 6.67 0.00 0.00 9.0 0.00 3
1 M2 Plasteran Dinding (1:4) P 0.1600 6.25 0.00 0.00 40.0 0.00 0
T 0.0500 20.00 0.00 0.00 40.0 0.00 3
1 M2 Acian Semen T 0.0600 16.67 0.00 0.00 12.0 0.00 5
M 0.0100 100.00 0.00 0.00 12.0 0.00 1
1 M2 Pasangan Dinding Porslin P 0.6000 1.67 0.0000 0.00 6.0 0.00 5
T 0.4550 2.20 0.0000 0.00 6.0 0.00 4
PEKERJAAN LANTAI
1 M3 Urugan Pasir P 0.3000 3.33 0.00 0.00 1.0 0.00 4
M 0.0100 100.00 0.00 0.00 1.0 0.00 1
1 M2 Pasangan Lantai Kramik 40 x 40 P 0.2400 4.17 #REF! #REF! 29.0 #REF! 4
T 0.1200 8.33 #REF! #REF! 29.0 #REF! 3
1 M2 Pasangan Lantai Kramik 20 x 20 P 0.3500 2.86 #REF! #REF! 4.0 #REF! 4
T 0.2000 5.00 #REF! #REF! 4.0 #REF! 3
PEKERJAAN PINTU DAN JENDELA
1 M2 Pintu dan Jendela kaca P 0.8000 1.25 0.00 0.00 44.0 0.00 2
T 0.8000 1.25 0.00 0.00 44.0 0.00 5
1 M2 Kaca Tebal 5 MM P 0.0150 66.67 0.00 0.00 1.0 0.00 1
T 0.1500 6.67 0.00 0.00 1.0 0.00 0
1 Buah Pasangan Engsel Pintu P 0.0500 20.00 0.00 0.00 5.0 0.00 1
T 0.6000 1.67 0.00 0.00 5.0 0.00 5
1 Buah Pasangan Kunci Tanam Antik P 0.0600 16.67 0.00 0.00 2.0 0.00 1
T 0.6000 1.67 0.00 0.00 2.0 0.00 4
PEKERJAAN PENGECATAN
1 M2 Mendempul dan Menggosok Kayu P 0.0400 25.00 0.00 0.00 1.0 0.00 0
T 0.0400 25.00 0.00 0.00 1.0 0.00 0
1 M2 Mengecat Kayu Baru P 0.0700 14.29 0.00 0.00 8.0 0.00 0
T 0.0090 111.11 0.00 0.00 8.0 0.00 1
1 M2 Mengecat Tembok Baru P 0.0400 25.00 0.00 0.00 6.0 0.00 3
T 0.0400 25.00 0.00 0.00 6.0 0.00 0
PEKERJAAN PERLENGKAPAN DALAM
Pemasangna 1 Buah Kloset Jongkok P 1.0000 1.00 0.00 0.00 1.0 0.00 0
T 0.0000 #DIV/0! 0.00 #DIV/0! 1.0 #DIV/0! ###
Pemasangan 1 Buah KloSet Duduk P 1.0000 1.00 0.00 0.00 2.0 0.00 0
T 1.5000 0.67 0.00 0.00 2.0 0.00 2
Floor Draine P 0.0100 100.00 0.00 0.00 0.5 0.00 1
T 0.1000 10.00 0.00 0.00 0.5 0.00 0
1 Buah Bak Cuci Piring Stainless P 0.0300 33.33 0.00 0.00 0.5 0.00 1
T 0.3000 3.33 0.00 0.00 0.5 0.00 1
Memasang 1 Wastafel P 0.5000 2.00 0.00 0.00 1.0 0.00 3
T 1.0000 1.00 0.00 0.00 1.0 0.00 0
Memasang Pipa Air Ø 3" Per M' P 0.0200 50.00 0.00 0.00 1.0 0.00 3
T 0.0700 14.29 0.00 0.00 1.0 0.00 5
T 0.1000 10.00 0.00 0.00 1.0 0.00 1
PEKERJAAN PERLENGKAPAN LUAR
1 M3 Rabat Beton (1:3:5) P 5.0000 0.20 0.00 0.00 22.0 0.00 5
T 0.8000 1.25 0.00 0.00 22.0 0.00 1
Analisis 1Buah Bak Kontrol P 2.2600 0.44 0.00 0.00 1.0 0.00 3
T 0.7200 1.39 0.00 0.00 1.0 0.00 0
1 Buah Septictank 2 x 2 x 2 M P 6.3460 0.16 0.00 0.00 4.0 0.00 0
T 1.0500 0.95 0.00 0.00 4.0 0.00 1
1 Unit Resapan P 6.8850 0.15 0.00 0.00 2.0 0.00 0
T 2.1000 0.48 0.00 0.00 2.0 0.00 1
III PEK. DINDING #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
IV PEK. KAP DAN ATAP #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VI PEK. PLASTERAN DAN ACIAN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VII PEK. LANTAI #REF! #REF! #REF! #REF! #REF! #REF! #REF!
VIII PEK. PINTU DAN JENDELA #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana fisik per minggu #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rencana fisik komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KEMBALI
9
VOLUME KEBUTUAN MATERIAL KESELURUHAN
No Material Volume
1 Kloset Duduk 2.00 bh
2 Atap Sakura Roof (2 Susun) 94.84 m2
3 AW Pipa PVC Ø 1" 0.00 m
4 AW Pipa PVC Ø 1/2" 55.84 m
5 AW Pipa PVC Ø 3" 36.00 m
6 AW Pipa PVC Ø 3/4" 50.40 m
7 Bak Cuci Stainless 1.00 bh
8 Batu Bata 32,792.82 bh
9 Batu Batako 10/20/40 0.00 bh
10 Batu Kali 61.74 m3
11 Belucci Kunci 12.00 set
12 Besi Polos Ø 10 mm 304.26 lnjr
13 Besi Polos Ø 12 mm 82.19 lnjr
14 Besi Polos Ø 16 mm 0.00 lnjr
15 Besi Polos Ø 6 mm 234.24 lnjr
16 Besi Strip 20.44 kg
17 Box MCBN 1.00 bh
18 Cat Dasar 150.27 kg
19 Cat Kayu 158.74 kg
20 Cat Meni 122.11 kg
21 Diamond Kasar Keramik 20x20 615.81 bh
22 Falco Engsel Pintu 5 " 68.00 bh
23 Fitting Lampu 26.00 bh
24 Floor Drain 4.00 Bh
25 Gypsum 69.02 lbr
26 Impra Dempul 7.28 kg
27 Indocement Semen Warna 50 kg 15.26 zak
28 Kaca Bening t = 5 mm 78.70 m2
29 Kaca Hitam t = 5 mm 0.00 m2
30 Kawat Bendrat 78.66 kg
31 Kayau Meranti Papan 3/20 (Kls. 2) 196.71 btg
32 Kayu Meranti Balok 5/7 (Kls. 2) 258.55 btg
33 Kayu Bengkirai Balok 2/3 (Kls. 1) 138.06 btg
34 Kayu Bengkirai Balok 5/10 (Kls. 1) 0.00 btg
35 Kayu Bengkirai Balok 5/7 (Kls. 1) 315.50 btg
36 Kayu Bengkirai Balok 8/12 (Kls. 1) 75.24 btg
37 Kayu Bengkirai Papan 3/20 (Kls. 1) 147.52 btg
38 Kayu Ulin Balok 5/10 (Kls. 1) 1.50 btg
39 Kerikil Beton 38.19 m3
40 Kia Keramik 40x40 1,094.25 bh
41 Kia Polos Keramik 20x20 1,180.40 bh
42 Kran Air 8.00 bh
43 Lampu Neon Lengkap 5.00 bh
44 Lampu Pijar 20W 38.00 bh
45 Lexus Westafel 2.00 bh
46 List Profil 188.95 m'
47 MCB 6A 2.00 bh
48 Minyak Bekisting 8.28 lt
49 Naturtone Cat Tembok 120.84 kg
50 Nok Surya Roof 100 mm 102.51 bh
51 Paragon Plamir 138.06 kg
52 Pasir Cor 46.86 m3
53 Pasir Pasang 75.44 m3
54 Pasir urug 37.00 m3
55 Perlengkapan Instalasi (Isolasi, Paku, dll) 1.00 set
56 Pintu Panel Bengkirai 80-100 x 200 17.00 bh
57 Pipa PVC Listrik 69.60 m
58 Playwood t = 6 mm 0.00 lbr
59 Pujatex Cat Minyak 1.82 kg
60 Saklar 26.00 Bh
61 Seng Gelombang BJLS 32 30.00 lbr
62 Seng Plat 3 x 6 BJLS 28 8.50 lbr
63 Stop Kontak 11.00 bh
64 T-Dos (Kontak Hubung Bagi) 26.00 bh
65 Semen Portland 50 kg 817.21 zak
66 Kloset Jongkok 2.00 bh
TERIMA KA
A KASIH