HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp. )
UPAH
1 Pekerja OH 110,000.00
2 Tukang OH 130,000.00
3 Kepala Tukang OH 150,000.00
4 Mandor OH 125,000.00
BAHAN
1 Alumunium Frame/Bingkai Jendela+Siku+Profil Kaca m' 26,700.00
2 Alumunium Profil Daun Pintu Warna Coklat m' 27,600.00
3 Alumunium Profil 4" Warna Coklat m' 36,250.00
4 Air Kerja m3 1,000.00
5 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Lbr 65,000.00
6 Amplas Bh 2,500.00
7 Batu Bata Bh 800.00
8 Batu Kali/Belah m3 245,000.00
9 Batu Pecah 20-30 mm m3 355,000.00
10 Baut Rangka Baja Ringan (Screw Driver) Bh 500.00
11 Besi Beton Kg 9,550.00
12 Besi Holow 2x4 Galvanis Btg 32,000.00
13 Besi Holow 2x4 Galvanis/m m 8,000.00
14 Besi Holow 4x4 Galvanis Btg 64,000.00
15 Besi Holow 4x4 Galvanis/m m 16,000.00
16 Beton 1pc : 2psr : 3krl m3 1,288,691.25
17 Beton K.225 m3 1,288,691.25
18 Bubungan/Nok Genteng Metal (Setara Multi Roof) Bh 64,800.00
19 Cat Dasar tembok/Alkali Ex. Catylac Kg 25,500.00
20 Cat Dasar tembok/Alkali Ex. Catylac Kg 21,875.00
21 Cat Tembok Interior (Ex. Catylac) Kg 30,000.00
22 Dolken Kayu Ø 8-10/400 cm Btg 21,500.00
23 Dolken/Bambu Ø 8-10 cm P = 4m Btg 21,500.00
24 Dynabolt Bh 1,800.00
25 Down Light 6" Bh 75,000.00
26 Engsel Pintu Aluminium Bh 22,000.00
27 Engsel Jendela Aluminium Bh 17,400.00
28 Door Closer Bh 227,500.00
29 Floor Drain Stainlees Steel Bh 85,000.00
30 GRC 4 mm m2 79,000.00
31 Gypsum 9 mm Lbr 65,000.00
32 Ekspanoulet/ Grendle Pintu Tanam Bh 59,500.00
33 Grendle JendelaAluminium/Rambuncis Bh 19,000.00
34 Handle Pintu Aluminium Bh 95,000.00
35 Kabel NYM 2x2,25 M' 8,250.00
36 Kabel NYM 1x2,26 M' 8,000.00
37 Kaca Rayben 5 mm m2 96,000.00
38 Kawat Beton Kg 23,100.00
39 Kayu 5/7 m3 7,500,000.00
40 Kayu Kls. II m3 7,500,000.00
41 Kayu Kls. III m3 3,500,000.00
42 Kerikil m3 355,000.00
43 Kunci Tanam 2 Slaag Bh 145,000.00
44 Kunci Cylinder Bh 125,000.00
45 Kloset Duduk Bh 950,000.00
46 Koral Beton m3 355,000.00
47 Kuas 3" Bh 12,500.00
48 Lampu SL 23 Watt Bh 86,000.00
49 Lampu SL 14 Watt Bh 56,000.00
50 List Karet Kaca M' 6,500.00
51 List Profil Gypsum m 32,500.00
52 Mata Kran Ø ½" Bh 33,000.00
53 Minyak Bekisting Ltr 11,000.00
54 Paku Kg 22,350.00
55 Paku Sekrup Kg 60,000.00
56 Panel Box MCB Unit 175,000.00
57 Pasir Beton m3 125,000.00
58 Pasir Pasang m3 125,000.00
59 Pasir Urug m3 75,000.00
60 Pembesian Kg 14,495.00
61 Penggantung Kawat Aluminium. + Ramzet Bh 9,500.00
62 Pipa PVC Ø1/2" AW m 4,200.00
63 Pipa PVC Ø3/4" AW m 4,730.00
64 Pipa PVC Ø1" m 6,500.00
65 Pipa PVC Ø1 1/5" m 10,500.00
66 Pipa PVC Ø2" m 15,750.00
67 Pipa PVC Ø3" m 26,250.00
68 Pipa PVC Ø4" m 58,750.00
69 Multypleks 9 mm Lbr 135,500.00
70 Profil C-75, 08 Baja Ringan m' 14,166.67
71 Profil C-75, 06 Baja Ringan m' 13,333.33
72 Profil Reng Baja Ringan Uk.40/45 m' 8,833.33
73 Profil Talang Jurai (Rangka Baja Ringan) m' 8,833.33
74 Rol Cat Bh 17,000.00
75 Rumput Gajah Mini m2 70,000.00
76 Saklar Tunggal Ex. Panasonic Bh 45,000.00
77 Saklar Ganda Bh 49,000.00
78 Sealant Putih Tube 35,000.00
79 Sekrup Fixer Bh 22,000.00
80 Semen Portland Kg 1,200.00
81 Semen Warna Kg 2,630.00
82 Stifenner Bh 1,200.00
83 Stop Kontak Ex. Panasonic Bh 45,000.00
84 Stop Kran Ø ½" Bh 36,750.00
85 Stop Kran Ø 1" Bh 78,750.00
86 T. Dos PVC Bh 1,200.00
87 Tanah Urug m3 60,000.00
88 Tegel Keramik 20 x 20 cm (anti slip) Bh 2,478.00
89 Tegel Keramik 25 x 40 cm Bh 5,500.00
90 Tegel Keramik 30 x 30 cm Bh 6,500.00
91 Tegel Keramik 30 x 30 cm (anti slip) Bh 6,830.00
92 Tegel Keramik 40 x 40 cm Bh 15,000.00
93 Tegel Keramik 50 x 50 cm Bh 20,500.00
94 Thinner Ltr 15,000.00
95 Wastafel Keramik Gantung Bh 650,000.00
ANALISA HARGA SATUAN PEKERJAAN
UTAMA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
1 m³ Urugan Tanah
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Tanah Urug m³ 1.200 60,000.00 72,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 106,250.00
Over Head, Keuntungan, DLL 10,625.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 116,875.00
1 m³ Urugan Pasir
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Pasir Urug m³ 1.200 75,000.00 90,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 124,250.00
Over Head, Keuntungan, DLL 12,425.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 136,675.00
1 m2 Pasangan Batu Bata 1pc : 5psr
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 800.00 56,000.00
Bahan Semen Portland (PC) Kg 9.680 1,200.00 11,616.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.300 110,000.00 33,000.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 122,616.00
Over Head, Keuntungan, DLL 12,261.60
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 134,878.00
1 m² Acian
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Semen Portland (PC) Kg 1.250 1,200.00 1,500.00
Pekerja OH 110,000.00 -
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 17,250.00
Over Head, Keuntungan, DLL 1,725.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 18,975.00
1 m² Plafond Gypsum 9 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Gypsum 9 mm Lbr 0.364 65,000.00 23,660.00
Bahan
Paku Skrup Kg 0.110 60,000.00 6,600.00
Pekerja OH 0.100 110,000.00 11,000.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 49,135.00
Over Head, Keuntungan, DLL 4,913.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 54,049.00
1 m² Cat Tembok Exterior 3x, 1 Lap. Cat Dasar & 2 Lap. Cat Penutup Setara Catylac
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 44,500.00 6,675.00
Bahan Cat Dasar Ex. Dulux Kg 0.250 25,500.00 6,375.00
Cat Penutup Ex. Dulux Kg 0.260 67,200.00 17,472.00
Pekerja OH 0.020 110,000.00 2,200.00
Tukang OH 0.003 130,000.00 325.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.006 125,000.00 750.00
Sub Jumlah 42,797.00
Over Head, Keuntungan, DLL 4,279.70
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 47,077.00
1 m² Cat Tembok Interior 3x, 1 Lap. Cat Dasar & 2 Lap. Cat Penutup Setara Catylac
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 44,500.00 6,675.00
Bahan Cat Dasar Ex. Catylac Kg 0.250 21,875.00 5,468.75
Cat Penutup Ex. Catylac Kg 0.260 30,000.00 7,800.00
Pekerja OH 0.020 110,000.00 2,200.00
Tukang OH 0.003 130,000.00 325.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.006 125,000.00 750.00
Sub Jumlah 32,218.75
Over Head, Keuntungan, DLL 3,221.88
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 35,441.00
1 Bh Pas. Wastafel
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Wastafel Bh 1.000 650,000.00 650,000.00
Perlengkapan % 12.000 650,000.00 78,000.00
Bahan
Semen Portland (PC) Kg 6.000 1,200.00 7,200.00
Pasir Pasang m³ 0.010 125,000.00 1,250.00
Pekerja OH 1.200 110,000.00 132,000.00
Tukang OH 1.450 130,000.00 188,500.00
Tenaga Kerja
Kepala Tukang OH 1.450 150,000.00 217,500.00
Mandor OH 0.100 125,000.00 12,500.00
Sub Jumlah 1,286,950.00
Over Head, Keuntungan, DLL 128,695.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 1,415,645.00
1 Bh Floor Drain
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Floor Drain Bh 1.000 85,000.00 85,000.00
Bahan
Perlengkapan % 35.000 85,000.00 29,750.00
Pekerja OH 0.100 110,000.00 11,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 127,000.00
Over Head, Keuntungan, DLL 12,700.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 139,700.00
1 Bh Saklar Tunggal
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Saklar Tunggal Bh 1.000 45,000.00 45,000.00
Pekerja OH 0.023 110,000.00 2,530.00
Tukang OH 0.047 130,000.00 6,110.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 55,015.00
Over Head, Keuntungan, DLL 5,501.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 60,517.00
1 Bh Saklar Ganda
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Saklar Tunggal Bh 1.000 49,000.00 49,000.00
Pekerja OH 0.023 110,000.00 2,530.00
Tukang OH 0.047 130,000.00 6,110.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 59,015.00
Over Head, Keuntungan, DLL 5,901.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 64,917.00
HARGA SATUAN
(Rp.)
94,188.00
115,088.00
67,375.00
31,396.00
116,875.00
136,675.00
776,887.10
520,988.00
921,498.00
75,714.00
73,824.00
18,975.00
53,955.00
177,122.00
949,520.00
445,963.00
139,425.00
124,179.00
479,703.00
111,841.00
258,244.00
247,876.00
225,943.00
66,006.00
146,754.00
113,630.00
191,123.00
158,757.00
542,333.00
164,142.00
85,468.00
169,440.00
100,615.00
84,619.00
306,363.00
34,372.00
216,706.00
169,675.00
185,994.00
184,905.00
266,338.00
220,138.00
585,613.00
510,538.00
510,538.00
45,100.00
240,719.00
200,357.00
52,910.00
47,135.00
54,049.00
59,950.00
104,885.00
35,441.00
60,173.00
52,800.00
72,600.00
1,411,245.00
665,170.00
1,415,645.00
68,049.00
130,419.00
62,480.00
139,700.00
21,335.00
22,238.00
25,256.00
48,114.00
96,701.00
152,114.00
432,284.00
464,530.00
DAFTAR HARGA SATUAN JADI
KEGIATAN : PEMBANGUNAN GEDUNG BALAI KESEHATAN MATA MASYARAKAT
PEKERJAAN : DETAIL ENGINEERING DRAWING (DED)
LOKASI : KOTA MANADO
TAHUN ANGGARAN : 2015 (APBD MURNI)
HARGA SATUAN
(Rp.)
61,875.00
74,250.00
41,250.00
103,950.00
123,750.00
534,260.10
293,453.00
718,603.00
59,968.00
57,806.00
33,880.00
19,360.00
131,835.00
881,348.00
594,790.00
4,916,689.00
5,284,267.00
5,394,267.00
5,951,899.00
6,503,648.00
126,836.00
129,679.00
227,007.00
220,292.00
259,078.00
252,478.00
237,628.00
247,082.00
111,046.00
93,638.00
647,268.00
363,468.00
317,878.00
177,364.00
206,773.00
749,953.00
206,773.00
77,017.00
278,278.00
151,074.00
120,483.00
209,407.00
20,790.00
172,260.00
133,623.00
HARGA SATUAN
(Rp.)
130,295.00
129,690.00
239,250.00
193,050.00
385,963.00
351,313.00
333,988.00
190,053.00
160,234.00
42,295.00
42,295.00
49,748.00
51,810.00
84,673.00
41,635.00
44,388.00
39,105.00
59,565.00
1,383,525.00
554,400.00
523,600.00
82,500.00
45,375.00
52,800.00
112,200.00
31,708.00
40,233.00
57,283.00
100,843.00
176,495.00
295,845.00
354,899.00
1,252,824.00
402,325.00
33,743.00
1,429,623.00
6,681,523.00
Dibuat oleh :
RDY TULUNGEN, ST
Cost Estimator
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
TERBILANG : Dua Milyar Dua Ratus Dua Juta Tiga Ratus Sembilan Ribu Rupiah
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
TOTAL 1,845,247,420.47
DIBULATKAN 1,845,247,000.00
Terbilang : (Tujuh Belas Milyar Empat ratus Lima Puluh Delapan Juta Sembilan Ratus Enam
Puluh Dua Ribu Rupiah )
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
SATU MILYAR EMPAT RATUS EMPAT PULUH DUA JUTA EMPAT RATUS LIMA PULUH DELAPAN RIBU
TERBILANG: :
RUPIAH
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 52,964,128.00
II. PEKERJAAN TANAH 26,831,681.95
III. PEKERJAAN PONDASI 107,683,477.60
IV. PEKERJAAN BETON Elv.+30 - 440 cm 717,561,422.65
V PEKERJAAN DINDING 167,427,419.27
VI PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22
VII PEKERJAAN SANITAIR 33,679,822.00
VIII PEKERJAAN LISTRIK 3,164,724.00
IX PEKERJAAN ATAP DEPAN 10,286,033.44
X PEKERJAAN LAIN-LAIN 1,801,587.66
XI PEKERJAAN AKHIR 3,000,000.00
JUMLAH 1,311,448,807.79
TOTAL 1,442,593,688.57
DIBULATKAN 1,442,593,000.00
Terbilang : SATU MILYAR EMPAT RATUS EMPAT PULUH DUA JUTA EMPAT RATUS LIMA PULUH
DELAPAN RIBU RUPIAH
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG Kls III
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
JUMLAH 2,738,941,337.89
PPN 10 % 273,894,133.79
JUMLAH TOTAL 3,012,835,471.68
DIBULATKAN 3,012,835,000.00
TERBILANG : Dua Milyar Sembilan Ratus Enam Puluh Tiga Juta Tiga Ratus Enam Puluh Tujuh Ribu Rupiah
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
A. LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 73,542,531.20
II. PEKERJAAN TANAH 26,831,681.95
III. PEKERJAAN PONDASI 107,683,477.60
IV. PEKERJAAN BETON Elv.-10 - 400 cm 717,561,422.65
V PEKERJAAN DINDING 167,427,419.27
VI PEKERJAAN PLAFOND 74,891,500.58
VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 133,008,104.43
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22
IX PEKERJAAN PENGECATAN DAN FINISHING 51,783,036.80
X PEKERJAAN SANITAIR 33,679,822.00
XI PEKERJAAN LISTRIK 37,422,736.00
XII PEKERJAAN ATAP DEPAN 10,286,033.44
XIII PEKERJAAN LAIN-LAIN LT. 1 25,154,874.38
JUMLAH 2,738,941,337.89
TOTAL 3,012,835,471.68
DIBULATKAN 3,012,835,000.00
Terbilang : (Dua Milyar Sembilan Ratus Enam Puluh Tiga Juta Tiga Ratus Enam Puluh Tujuh Ribu
Rupiah)
REKAPITULASI BILL OF QUANTITY
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN -
II. PEKERJAAN TANAH -
III. PEKERJAAN PONDASI -
IV. PEKERJAAN BETON Elv.+30 - 440 cm -
V PEKERJAAN DINDING -
VI PEKERJAAN PENUTUP LANTAI DAN DINDING -
VII PEKERJAAN SANITAIR -
VIII PEKERJAAN LISTRIK -
IX PEKERJAAN ATAP DEPAN -
X PEKERJAAN LAIN-LAIN -
XI PEKERJAAN AKHIR -
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang :
Dibuat Oleh
CV/PT. ....................................
_________________________
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN
KEGIATAN : PEMBANGUNAN GEDUNG Kls III TAHAP I
SKPD : RUMAH SAKIT JIWA PROF. Dr. V. L. RATUMBUYSANG
LOKASI : MANADO
TAHUN ANGGARAN : 2015
HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp. )
UPAH
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
BAHAN
1 Alumunium Frame/Bingkai Jendela+Siku+Profil Kaca m'
2 Alumunium Profil Daun Pintu Warna Coklat m'
3 Alumunium Profil 4" Warna Coklat m'
4 Air Kerja m3
5 Atap Genteng Metal (Setara Multi Roof) m2
6 Amplas Bh
7 Baja H Beam Kg
8 Bak Cuci Piring Stainless Steel (1 Lubang) Bh
9 Batu Alam/Bunga m2
10 Batu Bata Bh
11 Batu Kali/Belah m3
12 Batu Pecah 20-30 mm m3
13 Baut Rangka Baja Ringan (Screw Driver) Bh
18 Besi Beton Kg
19 Besi Holow 2x4 m
20 Besi Holow 4x4 m
21 Besi Holow 8x8 m
22 Besi Holow 2x4 Galvanis Btg
23 Besi Holow 2x4 Galvanis/m m
24 Besi Holow 4x4 Galvanis Btg
25 Besi Holow 4x4 Galvanis/m m
25 Besi Siku 50.50.5 Kg
28 Bubungan/Nok Genteng Metal (Setara Multi Roof) Bh
29 Canal C Uk.1.25x0.50 m
30 Canstain 15x30x50 Bh
31 Cat Menie Kg
32 Cat Minyak Kg
33 Cat Dasar tembok Kg
34 Cat Tembok (Metrolite/Catylac/Setara) Kg
35 Cladding (Alumunium Composite Panel) m2
36 Dolken Kayu Ø 8-10/400 cm Btg
36 Dolken/Bambu Ø 8-10 cm P = 4m Btg
37 Dynabolt Bh
38 Down Light 6" Bh
39 Electric Air Conditioning; City Multi R410a Inverter Unit
40 Engsel Pintu Aluminium Bh
41 Engsel Jendela Aluminium Bh
42 Floor Drain Stainlees Steel Bh
43 Flashing Genteng Metal (setara Multi roof) M'
44 GRC 4 mm m2
45 Gypsum 9 mm Lbr
46 Grendle Pintu Tanam Bh
46 Grendle JendelaAluminium/Rambuncis Bh
47 Hollow Breeck kw 1 Bh
48 Handle Solid Type HP 61.04 Silver(Stainleesteell) Bh
49 Kabel NYM 2x2,25 M'
50 Kabel NYM 1x2,26 M'
51 Kaca Bening 12 mm m2
52 Kaca Bening 15 mm m2
53 Kaca Bening 5 mm m2
54 Kaca Rayben 5 mm m2
55 Kaca Sandblast 8 mm m2
56 Kaca Tempered 12 mm m2
56 Kaca Tempered 8 mm m2
57 Kalsiboard 6 mm Lbr
58 Kawat Beton Kg
59 Kawat Las Kg
60 Kayu 5/7 m3
61 Kayu Kls. II m3
62 Kayu Kls. III m3
63 Kerikil m3
64 Kunci Tanam 2 Slaag Bh
65 Kunci Cylinder Bh
66 Kusen PVC Best Quality Unit
67 Kloset Duduk Bh
67 Kloset Jongkok Unit
68 Koral Beton m3
69 Kuas 3" Bh
70 Lampu SL 23 Watt Bh
71 Lampu SL 18 Watt Bh
72 Lem Kg
73 List Karet Kaca M'
74 List Profil Gypsum m
75 List Profil Kalsiboard m
76 Mata Kran Ø ½" Bh
77 Meni besi Kg
77 Metal Furing Ujg
78 Minyak Bekisting Ltr
79 Nok Samping Genteng Metal (Setara multi roof) Bh
80 Paku Kg
81 Paku Sekrup Kg
82 Panel Box MCB Unit
83 Pasir Beton m3
84 Pasir Pasang m3
85 Pasir Urug m3
86 Paving Stone Bh
87 Pembesian Kg
88 Pengelasan cm
88 Penggantung Kawat Aluminium. + Ramzet Bh
89 Pintu Km PVC Lengkap + Kunci Unit
90 Pipa Black Steel Ø 2 ½ " Medium A m
91 Pipa Black Steel Ø 3 " Medium A m
92 Pipa PVC Ø5/8" Btg
93 Pipa Galvanised Ø ½" Bh
94 Pipa Galvanised Ø ¾" Bh
95 Pipa Galvanised Ø 1" Bh
96 Pipa Galvanised Ø 2" Bh
97 Pipa Galvanised Ø 3" Bh
98 Pipa Galvanised Ø 4" Bh
98 Pipa Stainless Steel Ø 1" m
99 Pipa Stainless Steel Ø 1½" m
100 Pipa Stainless Steel Ø 2" m
101 Pipa Stainless Steel Ø 3" m
102 Plamur Tembok Kg
103 Plat Bondex 0.7 BMT Galvanize m2
104 Playwood 9 mm Lbr
105 Plesteran 1:4 m2
106 Profil C-75, 08 Baja Ringan m'
107 Profil C-75, 06 Baja Ringan m'
108 Profil Reng Baja Ringan m'
108 Profil Talang Jurai (Rangka Baja Ringan) m'
109 Rooster Keramik 30/30 Bh
110 Rol Cat Bh
111 Saklar Tunggal Bh
112 Saklar Ganda Bh
113 Sealant Putih Tube
114 Sekrup Fixer Bh
115 Semen Portland Kg
116 Semen Warna Kg
117 Seng Gelombang 3"-5" Lbr
118 Sincalnium 2x4x400 m
119 Sincalume Lbr
119 Spandek Lbr
120 Sterofoam m2
121 Stifenner Bh
122 Stiker Kaca Sand blast m2
123 Stop Kontak Bh
124 Stop Kran Ø ½" Bh
125 Stop Kran Ø 1" Bh
126 Solar Ltr
127 T. Dos PVC Bh
128 Tanah Urug m3
129 Tegel Keramik 20 x 20 cm (anti slip) Bh
129 Tegel Keramik 20 x 25 cm Bh
130 Tegel Keramik 40 x 40 cm Bh
131 Tegel Keramik 25 x 30 cm Bh
132 Tegel Keramik 25 x 40 cm Bh
133 Tegel Keramik 30 x 30 cm Bh
134 Tegel Keramik 30 x 30 cm (anti slip) Bh
135 Tegel Keramik 60 x 60 cm Bh
136 Thinner Ltr
137 Varnis / Politur Kg
138 Wall Paper L. 50 cm m
139 Wastafel KeramikGantung Bh
139 Waterproofing Coating Sistem Kg
140 Waterproofing Membrane Sheelt Sistem M2
141 Water Drain + Accesoris Bh
142 Wiremesh M8 Lbr
143 Wiremesh M8/Kg Kg
144 Wood Filler / Dumpul Kayu Kg
PERALATAN
III. ALAT
1 Mesin Las + Gurinda Potong 1 Set Jam
2 Concrete Pump Jam
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG STAIN
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
JUMLAH 4,060,459,777.88
PPN 10 % 406,045,977.79
JUMLAH TOTAL 4,466,505,755.66
DIBULATKAN 4,466,505,000.00
B PEKERJAAN GEDUNG
C PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR 620,000.00
1 Pembersihan Ls 1.000 620,000.00 620,000.00
JUMLAH 409,088,645.93
PPN 10 % 40,908,864.59
JUMLAH TOTAL 449,997,510.52
DIBULATKAN 449,997,000.00
TERBILANG : EMPAT RATUS EMPAT PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH TUJUH RIBU RUPIAH
JUMLAH 409,088,645.93
PPN 10% 40,908,864.59
TOTAL 449,997,510.52
DIBULATKAN 449,997,000.00
Terbilang : EMPAT RATUS EMPAT PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH
TUJUH RIBU RUPIAH
Dibuat Oleh
PT. ELJIREH KONSULTAN
V PEKERJAAN PLAFOND -
1 Pek. Rangka Plafond Hollow Galvanized M² 627.130 -
2 Pek. Plafond Gipsum M² 527.410 -
3 Pek. Plafond GRC M² 99.720 -
4 Pas. List Plafond Gipsum M' 388.000 -
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI -
1 Pas. Kusen P-1 (1 bh)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.080 -
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 11.680 -
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.580 -
- Pas. Kaca Rayben 5mm M² 7.140 -
- Pas. Expanoulet Bh 2.000 -
- Pas. Engsel Pintu Bh 6.000 -
- Pas. Engsel Jendela Bh 4.000 -
- Pas. Kunci Tanam 2 Slaag Bh 1.000 -
- Pas. Handle Pintu Bh 4.000 -
- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
2 Pas. Kusen P - 2 (8 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 71.600 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 87.040 -
- Pas. Kaca Rayben 5mm M² 22.400 -
- Pas. Expanoulet Bh 16.000 -
'- Pas. Engsel Pintu Bh 48.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 8.000 -
'- Pas. Handle Pintu Bh 32.000 -
3 Pas. Kusen P - 3 (5 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 37.500 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 29.200 -
- Pas. Kaca Rayben 5mm M² 9.900 -
'- Pas. Engsel Pintu Bh 15.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 5.000 -
'- Pas. Handle Pintu Bh 10.000 -
4 Pas. Kusen P - 4 (7 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.090 -
- Daun Pintu Panel Aluminium M² 9.800 -
'- Pas. Engsel Pintu Bh 21.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 7.000 -
'- Pas. Handle Pintu Bh 14.000 -
5 Pas. Kusen J - 1 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 279.720 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.840 -
- Pas. Kaca Rayben 5mm M² 101.280 -
'- Pas. Engsel Jendela Bh 96.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 48.000 -
6 Pas. Kusen J - 2 (5 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 75.400 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.000 -
- Pas. Kaca Rayben 5mm M² 28.300 -
'- Pas. Engsel Jendela Bh 40.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 20.000 -
7 Pas. Kusen J - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 8.440 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 6.060 -
- Pas. Kaca Rayben 5mm M² 1.730 -
'- Pas. Engsel Jendela Bh 4.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
8 Pas. Kusen J - 4 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 18.040 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
9 Pas. Kusen J - 5 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 13.280 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 3.000 -
10 Pas. Kusen J - 6 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.680 -
- Pas. Kaca Rayben 5mm M² 5.140 -
11 Pas. Kusen V - 1 (8 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 60.000 -
- Pas. Kaca Rayben 5mm M² 13.440 -
12 Pas. Kusen V - 2 (4 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 23.200 -
- Pas. Kaca Rayben 5mm M² 4.880 -
13 Pas. Kusen V - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.100 -
- Pas. Kaca Rayben 5mm M² 0.810 -
14 Pas. Kusen V - 4 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 14.400 -
- Pas. Kaca Rayben 5mm M² 2.880 -
15 Pas. Kusen V - 5 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.240 -
- Pas. Kaca Rayben 5mm M² 0.600 -
16 Pas. Jendela Acrylic J-7 (8 Bh) M² 3.440 -
17 Pas. Jendela Acrylic J-8 (8 Bh) M² 0.800 -
18 Pas. Jendela Acrylic J-9 (8 Bh) M² 1.920 -
VII PEKERJAAN PENUTUP LANTAI DAN DINDING -
1 Pek. Pasang Tegel Lantai Granito 60/60 M² 622.881 -
2 Pek. Pasang Tegel Keramik 30/30 WC/KM (Anti Selip) M² 38.038 -
3 Pek. Pasang dinding keramik 30/30. T: 180Cm M² 91.282 -
4 Pek. Pasang Tegel Granit Meja Wastafel 60/60 M² 2.700 -
5 Pek. Pasang keramik Car Port 40/40 (Tipe Batu) M² 24.280 -
IX PEKERJAAN SANITAIR -
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 42.400 -
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 20.000 -
3 Pipa Air Bersih PVC Dia. 3/4" AW M¹ 32.000 -
4 Pipa AirHujan PVC Dia. 3" AW M¹ 42.000 -
5 Pipa Air Kotor PVC Dia. 4" AW M¹ 58.000 -
6 Pipa Air Kotor PVC Dia. 2" AW M¹ 48.000 -
7 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 17.000 -
8 Pasang Stop Kran Dia. 1" PVC Bh 2.000 -
9 Pasang Floor Drain Stainleesteel Bh 9.000 -
10 Pas. Closed Jongkok Ex. Toto Bh 7.000 -
11 Pas. Urinoir Ex. Toto Bh 4.000 -
12 Pas.Westafel Ex. Toto Bh 5.000 -
13 Septiktank Lengkap dengan Peresapan Unit 3.000 -
X PEKERJAAN LISTRIK -
1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 82.000 -
2 Pas. Lampu - SL 14 Watt Vitting Tempel Bh 12.000 -
3 Saklar Tunggal Ex. Panasonic Bh 7.000 -
4 Saklar Ganda Ex. Panasonic Bh 44.000 -
5 Instalasi Stop Kontak Stop Kontak Ex. Panasonic Bh 24.000 -
6 Panel Box Sekring + Instalasi + MCB Lengkap Unit 2.000 -
7 Instalasi Lampu Penerangan Ttk 94.000 -
8 Biaya Sambungan Listrik PLN Ls 1.000 -
XI PEKERJAAN ATAP -
1 Pas. Rangka Atap Baja Ringan M² 376.549 -
2 Pas. Atap Serat Bitumen Ex. Ondu Line M² 376.549 -
3 Pas. Bubungan dan Jurai Serat Bitumen Ex. OnduLine M' 85.520 -
4 Pas. Flashing M' 35.040 -
5 Pas. Kubah Rangka Stainlees Steel M² 19.217 -
6 Pas. Penutup Kubah Acrylic Roman M² 19.217 -
V PEKERJAAN PLAFOND -
1 Pek. Rangka Plafond Hollow Galvanized M² 627.130 -
2 Pek. Plafond Gipsum M² 527.410 -
3 Pek. Plafond GRC M² 99.720 -
4 Pas. List Plafond Gipsum M' 402.000 -
IX PEKERJAAN SANITAIR -
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400 -
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 22.000 -
3 Pipa Air Bersih PVC Dia. 3/4" AW M¹ 34.000 -
4 Pipa AirHujan PVC Dia. 3" AW M¹ 42.000 -
5 Pipa Air Kotor PVC Dia. 4" AW M¹ 58.000 -
6 Pipa Air Kotor PVC Dia. 2" AW M¹ 48.000 -
7 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 19.000 -
8 Pasang Stop Kran Dia. 1" PVC Bh 2.000 -
9 Pasang Floor Drain Stainleesteel Bh 9.000 -
10 Pas. Closed Jongkok Ex. Toto Bh 7.000 -
11 Pas. Urinoir Ex. Toto Bh 4.000 -
12 Pas.Westafel Ex. Toto Bh 3.000 -
13 Septiktank Lengkap dengan Peresapan Unit 3.000 -
X PEKERJAAN LISTRIK -
1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 82.000 -
2 Pas. Lampu - SL 14 Watt Vitting Tempel Bh 12.000 -
3 Saklar Tunggal Ex. Panasonic Bh 7.000 -
4 Saklar Ganda Ex. Panasonic Bh 44.000 -
5 Instalasi Stop Kontak Stop Kontak Ex. Panasonic Bh 24.000 -
6 Panel Box Sekring + Instalasi + MCB Lengkap Unit 2.000 -
7 Instalasi Lampu Penerangan Ttk 94.000 -
8 Biaya Sambungan Listrik PLN Ls 1.000 -
XI PEKERJAAN ATAP -
1 Pas. Rangka Atap Baja Ringan M² 376.549 -
2 Pas. Atap Serat Bitumen Ex. Ondu Line M² 376.549 -
3 Pas. Bubungan dan Jurai Serat Bitumen Ex. OnduLine M' 85.520 -
4 Pas. Flashing M' 35.040 -
5 Pas. Kubah Rangka Stainlees Steel M² 19.217 -
6 Pas. Penutup Kubah Acrylic Roman M² 19.217 -
II PENERANGAN TAMAN -
1 Pas. Lampu PJU Solar Cell, 50 Watt (pada Taman) + Acc Lengkap Titik 1.000 -
E PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR -
1 Pembersihan Ls 1.000 -
JUMLAH -
PPN 10 % -
JUMLAH TOTAL -
DIBULATKAN -
TERBILANG :
Dibuat Oleh
CV/PT. ....................................
____________________
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
A PEKERJAAN UMUM
I. PEKERJAAN PERSIAPAN
B VOLUME PEKERJAAN GEDUNG STAKN
I PEKERJAAN TANAH
II PEKERJAAN PONDASI
III PEKERJAAN BETON
IV PEKERJAAN DINDING & PROFIL BETON
V PEKERJAAN PLAFOND
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN DAN FINISHING
IX PEKERJAAN SANITAIR
X PEKERJAAN LISTRIK
XII PEKERJAAN ATAP
XIII PEKERJAAN LAIN-LAIN GEDUNG STAKN
C VOLUME PEKERJAAN GEDUNG STAIN
I PEKERJAAN TANAH
II PEKERJAAN PONDASI
III PEKERJAAN BETON
IV PEKERJAAN DINDING & PROFIL BETON
V PEKERJAAN PLAFOND
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN DAN FINISHING
IX PEKERJAAN SANITAIR
X PEKERJAAN LISTRIK
XII PEKERJAAN ATAP
XIII PEKERJAAN LAIN-LAIN GEDUNG STAIN
D PEKERJAAN LAHAN PARKIR DAN JALAN MASUK
I Err:509
II PENERANGAN TAMAN
E PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR
JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang :
Dibuat Oleh
CV/PT. ....................................
____________________
BILL OF QUANTITY
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
III.PEKERJAAN PONDASI
1 Pasangan Batu Kosong M³ 6.975
2 Pasangan Batu Kali 1:4 M³ 21.158
3 Pondasi Telapak Beton K-225
- Beton Cor K.225 M³ 12.348
- Besi Beton U-24 Kg 1,746.638
- Bekisting M² 35.280
4 Kaki Kolom Beton K-225
- Beton Cor K.225 M³ 4.382
- Besi Beton U-24 Kg 997.191
- Bekisting M² 42.336
V PEKERJAAN DINDING
1 Pasangan Batu Bata ½, 1:5 M² 452.069
2 Plesteran Dinding & Beton 1 : 4 M² 1,131.833
3 Plesteran Jalan Beton 1 : 3 M² 15.000
4 Acian Dinding Gedung M² 1,146.833
X PEKERJAAN LAIN-LAIN
4 Cor Meja Beton K-175 M³ 0.243
5 Pembesian Meja Beton U-24 Kg 29.962
6 Bekisting Meja Beton M² 2.430
XI PEKERJAAN AKHIR
1 Pembersihan Ls 1.000
JUMLAH -
PPN 10 % -
JUMLAH TOTAL -
DIBULATKAN -
TERBILANG: :
ANALISA HARGA SATUAN PEKERJAAN
UTAMA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
1 m³ Urugan Tanah
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Tanah Urug m³ 1.200 -
Pekerja OH 0.300 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m³ Urugan Pasir
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Pasir Urug m³ 1.200 -
Pekerja OH 0.300 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m' Pagar Keliling dari Seng Gelombang Tinggi 2,1 Meter
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Dolken Kayu Ø 8-10/400 cm Btg 1.250 -
Semen Portland (PC) Kg 2.500 -
Seng Gelombang 3"-5", 7 Fit Lbr 1.200 -
Pasir Beton M3 0.005 -
Koral Beton M3 0.009 -
Kayu 5/7 M3 0.072 -
Paku biasa 2"-5" Kg 0.060 -
Meni besi Kg 0.450 -
Upah
Pekerja Oh 0.400 -
Tukang Kayu Oh 0.200 -
Kepala Tukang Oh 0.020 -
Mandor Oh 0.020 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Acian
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Semen Portland (PC) Kg 3.250 - -
Pekerja OH 0.200 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Waterproofing
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Waterproofing Kg 0.360 -
Bahan
Kertas Amplas m2 0.100 -
Pekerja OH 0.100 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.080 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Rooster 30/30
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Rooster 30.30.10 Bh 11.111 -
Bahan Semen Portland Kg 3.500 - -
Pasir Pasang m³ 0.035 - -
Pekerja OH 0.300 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Rooster Keramik -
1 m² Pas. Paving Stone T= 8 cm. K-300
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Paving Stone Bh 43.000 -
Bahan
Pasir Urug Kg 0.200 -
Pekerja OH 0.135 -
Tukang OH 0.014 -
Tenaga Kerja
Kepala Tukang OH 0.720 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 M' BALOK LATAI / PRAKTIS / RING BALK BETON BERTULANG K-175 11/15
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Portland Cement kg 5.500 - -
Pasir Beton m3 0.009 - -
Kerikil m3 0.009 - -
Bahan Kayu Klas III m3 0.003 - -
Paku Campur kg 0.020 - -
Besi Beton U24 kg 3.600 - -
Kawat Beton kg 0.050 - -
Minyak Bekesting ltr 0.200 - -
Playwood tebal 9 mm lbr 0.240 - -
Pekerja Org 0.297 - -
Tenaga Kerja Tukang Org 0.990 - -
Kepala Tukang Batu Org 0.010 - -
Mandor Org 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 cm Biaya Pengelasan
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kawat Las Kg 0.040 -
Bahan
Solar Ltr 0.030 -
Pekerja OH 0.004 - -
Tukang Las OH 0.002 - -
Tenaga Kerja
Kepala Tukang OH 0.0002 - -
Mandor OH 0.0002 - -
Alat Mesin Las + Gurinda Potong 1 Set Jam 0.017 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m¹ Pas. Ralling tangga Stainless Steel Ø 1" - 1½". Tinggi 1,1 Meter
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Stainless Steel Ø 1½" m' 3.200 -
Bahan Pipa Stainless Steel Ø 1" m' 6.125 -
Pengelasan cm 246.446 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Plafond Gypsum 9 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Gypsum 9 mm Lbr 0.375 -
Bahan
Paku Skrup Kg 0.030 - -
Pekerja OH 0.070 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.004 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Plafond Kalsiborad 6 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kalsiboard 6 mm Lbr 0.375 -
Bahan
Paku Skrup Kg 0.030 - -
Pekerja OH 0.070 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.004 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Atap Spandek
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Spndek Lbr 0.890 -
Bahan
Paku Sekrup Kg 0.200 - -
Pekerja OH 0.200 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.001 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Cat Tembok 3x
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 -
Bahan Cat Dasar Kg 0.250 -
Cat Penutup Kg 0.260 -
Pekerja OH 0.020 - -
Tukang OH 0.003 - -
Tenaga Kerja
Kepala Tukang OH 0.060 - -
Mandor OH 0.006 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Cat Mengkilap
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Cat Minyak Kg 0.100 -
Cat Menie Kg 0.100 -
Wood Filler / Dumpul Kayu Kg 0.083 -
Bahan
Thinner Ltr 0.050 -
Kuas 3" Bh 0.050 -
Amplas Bh 0.400 -
Pekerja OH 0.120 - -
Tukang OH 0.210 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Cat Menie
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Cat Menie Kg 0.060 - -
Thinner Ltr 0.020 - -
Kuas 3" Bh 0.050 - -
Amplas Bh 0.400 - -
Pekerja OH 0.120 - -
Tukang OH 0.210 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Pas. Wastafel
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Wastafel Bh 1.000 -
Perlengkapan % 6.000 -
Bahan
Semen Portland (PC) Kg 6.000 -
Pasir Pasang m³ 0.010 - -
Pekerja OH 1.200 - -
Tukang OH 1.450 - -
Tenaga Kerja
Kepala Tukang OH 0.150 - -
Mandor OH 0.100 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Floor Drain
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Floor Drain Bh 1.000 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.100 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Saklar Tunggal
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Saklar Tunggal Bh 1.000 -
Bahan Pipa PVC Ø5/8" 4m Btg 0.500 - -
T. Dos PVC Bh 1.000 - -
Pekerja OH 0.023 - -
Tukang OH 0.047 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -