DAFTAR HARGA UPAH, BAHAN DAN PERALATAN

KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI


SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp. )

UPAH
1 Pekerja OH 110,000.00
2 Tukang OH 130,000.00
3 Kepala Tukang OH 150,000.00
4 Mandor OH 125,000.00

BAHAN
1 Alumunium Frame/Bingkai Jendela+Siku+Profil Kaca m' 26,700.00
2 Alumunium Profil Daun Pintu Warna Coklat m' 27,600.00
3 Alumunium Profil 4" Warna Coklat m' 36,250.00
4 Air Kerja m3 1,000.00
5 Seng Gelombang BJLS 30 (uk. 180 x 90 x 0,3 cm) Lbr 65,000.00
6 Amplas Bh 2,500.00
7 Batu Bata Bh 800.00
8 Batu Kali/Belah m3 245,000.00
9 Batu Pecah 20-30 mm m3 355,000.00
10 Baut Rangka Baja Ringan (Screw Driver) Bh 500.00
11 Besi Beton Kg 9,550.00
12 Besi Holow 2x4 Galvanis Btg 32,000.00
13 Besi Holow 2x4 Galvanis/m m 8,000.00
14 Besi Holow 4x4 Galvanis Btg 64,000.00
15 Besi Holow 4x4 Galvanis/m m 16,000.00
16 Beton 1pc : 2psr : 3krl m3 1,288,691.25
17 Beton K.225 m3 1,288,691.25
18 Bubungan/Nok Genteng Metal (Setara Multi Roof) Bh 64,800.00
19 Cat Dasar tembok/Alkali Ex. Catylac Kg 25,500.00
20 Cat Dasar tembok/Alkali Ex. Catylac Kg 21,875.00
21 Cat Tembok Interior (Ex. Catylac) Kg 30,000.00
22 Dolken Kayu Ø 8-10/400 cm Btg 21,500.00
23 Dolken/Bambu Ø 8-10 cm P = 4m Btg 21,500.00
24 Dynabolt Bh 1,800.00
25 Down Light 6" Bh 75,000.00
26 Engsel Pintu Aluminium Bh 22,000.00
27 Engsel Jendela Aluminium Bh 17,400.00
28 Door Closer Bh 227,500.00
29 Floor Drain Stainlees Steel Bh 85,000.00
30 GRC 4 mm m2 79,000.00
31 Gypsum 9 mm Lbr 65,000.00
32 Ekspanoulet/ Grendle Pintu Tanam Bh 59,500.00
33 Grendle JendelaAluminium/Rambuncis Bh 19,000.00
34 Handle Pintu Aluminium Bh 95,000.00
35 Kabel NYM 2x2,25 M' 8,250.00
36 Kabel NYM 1x2,26 M' 8,000.00
37 Kaca Rayben 5 mm m2 96,000.00
38 Kawat Beton Kg 23,100.00
39 Kayu 5/7 m3 7,500,000.00
40 Kayu Kls. II m3 7,500,000.00
41 Kayu Kls. III m3 3,500,000.00
42 Kerikil m3 355,000.00
43 Kunci Tanam 2 Slaag Bh 145,000.00
44 Kunci Cylinder Bh 125,000.00
45 Kloset Duduk Bh 950,000.00
46 Koral Beton m3 355,000.00
47 Kuas 3" Bh 12,500.00
48 Lampu SL 23 Watt Bh 86,000.00
49 Lampu SL 14 Watt Bh 56,000.00
50 List Karet Kaca M' 6,500.00
51 List Profil Gypsum m 32,500.00
52 Mata Kran Ø ½" Bh 33,000.00
53 Minyak Bekisting Ltr 11,000.00
54 Paku Kg 22,350.00
55 Paku Sekrup Kg 60,000.00
56 Panel Box MCB Unit 175,000.00
57 Pasir Beton m3 125,000.00
58 Pasir Pasang m3 125,000.00
59 Pasir Urug m3 75,000.00
60 Pembesian Kg 14,495.00
61 Penggantung Kawat Aluminium. + Ramzet Bh 9,500.00
62 Pipa PVC Ø1/2" AW m 4,200.00
63 Pipa PVC Ø3/4" AW m 4,730.00
64 Pipa PVC Ø1" m 6,500.00
65 Pipa PVC Ø1 1/5" m 10,500.00
66 Pipa PVC Ø2" m 15,750.00
67 Pipa PVC Ø3" m 26,250.00
68 Pipa PVC Ø4" m 58,750.00
69 Multypleks 9 mm Lbr 135,500.00
70 Profil C-75, 08 Baja Ringan m' 14,166.67
71 Profil C-75, 06 Baja Ringan m' 13,333.33
72 Profil Reng Baja Ringan Uk.40/45 m' 8,833.33
73 Profil Talang Jurai (Rangka Baja Ringan) m' 8,833.33
74 Rol Cat Bh 17,000.00
75 Rumput Gajah Mini m2 70,000.00
76 Saklar Tunggal Ex. Panasonic Bh 45,000.00
77 Saklar Ganda Bh 49,000.00
78 Sealant Putih Tube 35,000.00
79 Sekrup Fixer Bh 22,000.00
80 Semen Portland Kg 1,200.00
81 Semen Warna Kg 2,630.00
82 Stifenner Bh 1,200.00
83 Stop Kontak Ex. Panasonic Bh 45,000.00
84 Stop Kran Ø ½" Bh 36,750.00
85 Stop Kran Ø 1" Bh 78,750.00
86 T. Dos PVC Bh 1,200.00
87 Tanah Urug m3 60,000.00
88 Tegel Keramik 20 x 20 cm (anti slip) Bh 2,478.00
89 Tegel Keramik 25 x 40 cm Bh 5,500.00
90 Tegel Keramik 30 x 30 cm Bh 6,500.00
91 Tegel Keramik 30 x 30 cm (anti slip) Bh 6,830.00
92 Tegel Keramik 40 x 40 cm Bh 15,000.00
93 Tegel Keramik 50 x 50 cm Bh 20,500.00
94 Thinner Ltr 15,000.00
95 Wastafel Keramik Gantung Bh 650,000.00
ANALISA HARGA SATUAN PEKERJAAN
UTAMA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

1 m' Pengukuran & Pemasangan Bouplank


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan
Kayu 5/7 Btg 0.012 3,500,000.00 42,000.00
Paku biasa 2"-5" Kg 0.020 22,350.00 447.00
Kayu papan 3/20 Lbr 0.007 3,500,000.00 24,500.00
Upah
Pekerja Oh 0.100 110,000.00 11,000.00
Tukang Kayu Oh 0.100 130,000.00 13,000.00
Kepala Tukang Oh 0.010 150,000.00 1,500.00
Mandor Oh 0.005 125,000.00 625.00
Sub Jumlah 93,072.00
Over Head, Keuntungan, DLL 9,307.20
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 102,379.20

1 m³ Galian Tanah Biasa sedalam 1 m


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.750 110,000.00 82,500.00
Tenaga Kerja
Mandor OH 0.025 125,000.00 3,125.00
Sub Jumlah 85,625.00
Over Head, Keuntungan, DLL 8,562.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 94,188.00

1 m³ Galian Tanah Biasa sedalam 2 m


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.900 110,000.00 99,000.00
Tenaga Kerja
Mandor OH 0.045 125,000.00 5,625.00
Sub Jumlah 104,625.00
Over Head, Keuntungan, DLL 10,462.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 115,088.00

1 m³ Urugan Kembali Galian Tanah


Dihitung 1/3 Kali Indeks Galian Tanah 31,396.00

1 m³ Memadatkan Tanah (per 20 cm)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.500 110,000.00 55,000.00
Tenaga Kerja
Mandor OH 0.050 125,000.00 6,250.00
Sub Jumlah 61,250.00
Over Head, Keuntungan, DLL 6,125.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 67,375.00
1 m2 Memadatkan Tanah /per 20 cm 13,475.00

1 m³ Urugan Tanah
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Tanah Urug m³ 1.200 60,000.00 72,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 106,250.00
Over Head, Keuntungan, DLL 10,625.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 116,875.00

1 m³ Urugan Pasir
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Pasir Urug m³ 1.200 75,000.00 90,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 124,250.00
Over Head, Keuntungan, DLL 12,425.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 136,675.00
1 m2 Pasangan Batu Bata 1pc : 5psr
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 800.00 56,000.00
Bahan Semen Portland (PC) Kg 9.680 1,200.00 11,616.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.300 110,000.00 33,000.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 122,616.00
Over Head, Keuntungan, DLL 12,261.60
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 134,878.00

1 m2 Pasangan Batu Bata 1pc : 3psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 800.00 56,000.00
Bahan Semen Portland (PC) Kg 14.370 1,200.00 17,244.00
Pasir Pasang m³ 0.040 125,000.00 5,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 127,619.00
Over Head, Keuntungan, DLL 12,761.90
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 140,381.00

1 m2 Pasangan Batu Bata Tebal: 1 BT. 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 140.000 800.00 112,000.00
Bahan Semen Portland (PC) Kg 26.550 1,200.00 31,860.00
Pasir Pasang m³ 0.093 125,000.00 11,625.00
Pekerja OH 0.650 110,000.00 71,500.00
Tukang OH 0.200 130,000.00 26,000.00
Tenaga Kerja
Kepala Tukang OH 0.020 150,000.00 3,000.00
Mandor OH 0.030 125,000.00 3,750.00
Sub Jumlah 259,735.00
Over Head, Keuntungan, DLL 25,973.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 285,709.00

1 m³ Pasangan Batu Belah 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Kali/Belah m³ 1.200 245,000.00 294,000.00
Bahan Semen Portland (PC) Kg 163.000 1,200.00 195,600.00
Pasir Pasang m³ 0.520 125,000.00 65,000.00
Pekerja OH 1.500 110,000.00 165,000.00
Tukang OH 0.750 130,000.00 97,500.00
Tenaga Kerja
Kepala Tukang OH 0.075 150,000.00 11,250.00
Mandor OH 0.075 125,000.00 9,375.00
Sub Jumlah 837,725.00
Over Head, Keuntungan, DLL 83,772.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 921,498.00

1 m² Plesteran 1pc : 3psr T = 15mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Semen Portland (PC) Kg 7.776 1,200.00 9,331.20
Bahan
Pasir Pasang m³ 0.023 125,000.00 2,875.00
Pekerja OH 0.300 110,000.00 33,000.00
Tukang OH 0.150 130,000.00 19,500.00
Tenaga Kerja
Kepala Tukang OH 0.015 150,000.00 2,250.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 68,831.20
Over Head, Keuntungan, DLL 6,883.12
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 75,714.00
1 m² Plesteran 1pc : 4psr T = 15mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Semen Portland (PC) Kg 6.240 1,200.00 7,488.00
Bahan
Pasir Pasang m³ 0.024 125,000.00 3,000.00
Pekerja OH 0.300 110,000.00 33,000.00
Tukang OH 0.150 130,000.00 19,500.00
Tenaga Kerja
Kepala Tukang OH 0.015 150,000.00 2,250.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 67,113.00
Over Head, Keuntungan, DLL 6,711.30
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 73,824.00

1 m² Acian
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Semen Portland (PC) Kg 1.250 1,200.00 1,500.00
Pekerja OH 110,000.00 -
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 17,250.00
Over Head, Keuntungan, DLL 1,725.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 18,975.00

1 m³ Beton Tumbuk 1pc : 3psr : 5krl


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.870 355,000.00 308,850.00
Bahan Semen Portland (PC) Kg 218.000 1,200.00 261,600.00
Pasir Pasang m³ 0.520 125,000.00 65,000.00
Pekerja OH 1.650 110,000.00 181,500.00
Tukang OH 0.250 130,000.00 32,500.00
Tenaga Kerja
Kepala Tukang OH 0.025 150,000.00 3,750.00
Mandor OH 0.080 125,000.00 10,000.00
Sub Jumlah 863,200.00
Over Head, Keuntungan, DLL 86,320.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 949,520.00

1 m² Beton Tumbuk 1pc : 3psr : 5krl T = 5 cm (lantai kerja)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.044 355,000.00 15,620.00
Bahan Semen Portland (PC) Kg 10.000 1,200.00 12,000.00
Pasir Pasang m³ 0.026 125,000.00 3,250.00
Pekerja OH 1.150 110,000.00 126,500.00
Tukang OH 0.020 130,000.00 2,600.00
Tenaga Kerja
Kepala Tukang OH 0.002 150,000.00 300.00
Mandor OH 0.006 125,000.00 750.00
Sub Jumlah 161,020.00
Over Head, Keuntungan, DLL 16,102.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 177,122.00

1 M' KOLOM/BALOK PRAKTIS BETON BERTULANG K-175 11/11


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Portland Cement kg 4.000 1,200.00 4,800.000
Pasir Beton m3 0.006 125,000.00 750.000
KerikIl m3 0.009 355,000.00 3,195.000
Bahan Kayu Klas III m3 0.020 3,500,000.00 70,000.000
Paku Campur kg 0.010 22,350.00 223.500
Besi Beton U24 kg 3.000 9,550.00 28,650.000
Kawat Beton kg 0.045 23,100.00 1,039.500
Minyak Bekesting ltr 0.200 11,000.00 2,200.000
Playwood tebal 9 mm lbr 0.240 135,500.00 32,520.000
Pekerja Org 0.018 110,000.00 1,980.000
Tenaga Kerja Tukang Org 0.060 130,000.00 7,800.000
Kepala Tukang Batu Org 0.060 150,000.00 9,000.000
Mandor Org 0.009 125,000.00 1,125.000
Sub Jumlah 163,283.00
Over Head, Keuntungan, DLL 16,328.30
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 179,611.00
1 M' BALOK LATAI / PRAKTIS / RING BALK BETON BERTULANG K-175 11/15
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Portland Cement kg 5.500 1,200.00 6,600.000
Pasir Beton m3 0.009 125,000.00 1,125.000
Kerikil m3 0.009 355,000.00 3,195.000
Bahan Kayu Klas III m3 0.003 3,500,000.00 10,500.000
Paku Campur kg 0.020 22,350.00 447.000
Besi Beton U24 kg 3.600 9,550.00 34,380.000
Kawat Beton kg 0.050 23,100.00 1,155.000
Minyak Bekesting ltr 0.200 11,000.00 2,200.000
Playwood tebal 9 mm lbr 0.240 135,500.00 32,520.000
Pekerja Org 0.297 110,000.00 32,670.000
Tenaga Kerja Tukang Org 0.990 130,000.00 128,700.000
Kepala Tukang Batu Org 0.010 150,000.00 1,500.000
Mandor Org 0.015 125,000.00 1,875.000
Sub Jumlah 256,867.00
Over Head, Keuntungan, DLL 25,686.70
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 282,554.00

1 m³ Beton Bertulang K.175 (fc'=9,8 Mpa)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.710 355,000.00 252,050.00
Bahan Semen Portland (PC) Kg 326.000 1,200.00 391,200.00
Pasir Pasang m³ 0.543 125,000.00 67,875.00
Air Kerja Ltr 215.000 1.00 215.00
Pekerja OH 1.650 110,000.00 181,500.00
Tukang OH 0.275 130,000.00 35,750.00
Tenaga Kerja
Kepala Tukang OH 0.028 150,000.00 4,200.00
Mandor OH 0.083 125,000.00 10,375.00
Sub Jumlah 943,165.00
Over Head, Keuntungan, DLL 94,316.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 1,037,482.00

1 Kg Pembesian dengan Besi Polos atau Ulir


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Beton Kg 1.050 9,550.00 10,027.50
Bahan
Kawat Beton Kg 0.015 23,100.00 346.50
Pekerja OH 0.007 110,000.00 770.00
Tukang OH 0.007 130,000.00 910.00
Tenaga Kerja
Kepala Tukang OH 0.0007 150,000.00 105.00
Mandor OH 0.0004 125,000.00 50.00
Sub Jumlah 12,209.00
Over Head, Keuntungan, DLL 1,220.90
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 13,430.00

1 m² Bekisting untuk Pondasi Telapak & Jalan Beton


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 3,500,000.00 140,000.00
Bahan Paku Kg 0.300 22,350.00 6,705.00
Minyak Bekisting Ltr 0.100 11,000.00 1,100.00
Pekerja OH 0.520 110,000.00 57,200.00
Tukang OH 0.260 130,000.00 33,800.00
Tenaga Kerja
Kepala Tukang OH 0.026 150,000.00 3,900.00
Mandor OH 0.026 125,000.00 3,250.00
Sub Jumlah 245,955.00
Over Head, Keuntungan, DLL 24,595.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 270,551.00

1 m² Bekisting untuk Sloof


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.045 3,500,000.00 157,500.00
Bahan Paku Kg 0.300 22,350.00 6,705.00
Minyak Bekisting Ltr 0.100 11,000.00 1,100.00
Pekerja OH 0.520 110,000.00 57,200.00
Tukang OH 0.260 130,000.00 33,800.00
Tenaga Kerja
Kepala Tukang OH 0.026 150,000.00 3,900.00
Mandor OH 0.026 125,000.00 3,250.00
Sub Jumlah 263,455.00
Over Head, Keuntungan, DLL 26,345.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 289,801.00
1 m² Bekisting untuk Kolom
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 3,500,000.00 140,000.00
Paku Kg 0.400 22,350.00 8,940.00
Minyak Bekisting Ltr 0.200 11,000.00 2,200.00
Bahan
Balok Kayu Kls. III m³ 0.015 3,500,000.00 52,500.00
Playwood 9mm Lbr 0.350 135,500.00 47,425.00
Dolken/Bambu Ø 8-10 cm P = 4m Btg 2.000 21,500.00 43,000.00
Pekerja OH 0.660 110,000.00 72,600.00
Tukang OH 0.330 130,000.00 42,900.00
Tenaga Kerja
Kepala Tukang OH 0.033 150,000.00 4,950.00
Mandor OH 0.033 125,000.00 4,125.00
Sub Jumlah 418,640.00
Over Head, Keuntungan, DLL 41,864.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 460,504.00

1 m² Bekisting untuk Balok, List Plank Beton


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 3,500,000.00 140,000.00
Paku Kg 0.400 22,350.00 8,940.00
Minyak Bekisting Ltr 0.200 11,000.00 2,200.00
Bahan
Balok Kayu Kls. III m³ 0.018 3,500,000.00 63,000.00
Playwood 9 mm Lbr 0.350 135,500.00 47,425.00
Dolken/Bambu Ø 8-10 cm P = 4m Btg 2.000 21,500.00 43,000.00
Pekerja OH 0.660 110,000.00 72,600.00
Tukang OH 0.330 130,000.00 42,900.00
Tenaga Kerja
Kepala Tukang OH 0.033 150,000.00 4,950.00
Mandor OH 0.033 125,000.00 4,125.00
Sub Jumlah 429,140.00
Over Head, Keuntungan, DLL 42,914.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 472,054.00

1 m² Bekisting untuk Lantai,


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.080 3,500,000.00 280,000.00
Paku Kg 0.600 22,350.00 13,410.00
Minyak Bekisting Ltr 0.200 11,000.00 2,200.00
Bahan
Balok Kayu Kls. III m³ 0.036 3,500,000.00 126,000.00
Playwood 9mm Lbr 0.350 135,500.00 47,425.00
Dolken/Bambu Ø 8-10 cm P = 4m Btg 6.000 21,500.00 129,000.00
Pekerja OH 0.660 110,000.00 72,600.00
Tukang OH 0.330 130,000.00 42,900.00
Tenaga Kerja
Kepala Tukang OH 0.033 150,000.00 4,950.00
Mandor OH 0.033 125,000.00 4,125.00
Sub Jumlah 722,610.00
Over Head, Keuntungan, DLL 72,261.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 794,871.00

1 m² Pasangan Bata ½ Bata, 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 800.00 56,000.00
Bahan Semen Portland (PC) Kg 11.500 1,200.00 13,800.00
Pasir Pasang m³ 0.043 125,000.00 5,375.00
Pekerja OH 0.320 110,000.00 35,200.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.015 125,000.00 1,875.00
Sub Jumlah 126,750.00
Over Head, Keuntungan, DLL 12,675.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 139,425.00

1 m² Pasangan Lantai Tegel Keramik 40 x 40 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 40 x 40 cm Bh 6.630 55,500.00 367,965.00
Semen Portland (PC) Kg 9.800 1,200.00 11,760.00
Bahan
Semen Warna Kg 1.300 2,630.00 3,419.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.250 110,000.00 27,500.00
Tukang OH 0.125 130,000.00 16,250.00
Tenaga Kerja
Kepala Tukang OH 0.013 150,000.00 1,950.00
Mandor OH 0.013 125,000.00 1,625.00
Sub Jumlah 436,094.00
Over Head, Keuntungan, DLL 43,609.40
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 479,703.00
1 m² Pasangan Lantai Tegel Granit 30 x 30 cm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Granit 30 x 30 cm Bh 11.870 2,761.50 32,779.01
Semen Portland (PC) Kg 10.000 1,200.00 12,000.00
Bahan
Semen Warna Kg 1.500 2,630.00 3,945.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.250 110,000.00 27,500.00
Tukang OH 0.125 130,000.00 16,250.00
Tenaga Kerja
Kepala Tukang OH 0.013 150,000.00 1,950.00
Mandor OH 0.013 125,000.00 1,625.00
Sub Jumlah 101,674.01
Over Head, Keuntungan, DLL 10,167.40
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 111,841.00

1 m² Pasangan Lantai Tegel Keramik 30 x 30 cm (Anti Selip)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 30 x 30 cm Bh 11.870 6,830.00 81,072.10
Semen Portland (PC) Kg 10.000 1,200.00 12,000.00
Bahan
Semen Warna Kg 1.500 2,630.00 3,945.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.700 110,000.00 77,000.00
Tukang OH 0.350 130,000.00 45,500.00
Tenaga Kerja
Kepala Tukang OH 0.035 150,000.00 5,250.00
Mandor OH 0.035 125,000.00 4,375.00
Sub Jumlah 234,767.10
Over Head, Keuntungan, DLL 23,476.71
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 258,244.00

1 m² Pasangan Dinding Tegel Keramik 20 x 25 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 20 x 25 cm Bh 21.500 2,761.50 59,372.25
Semen Portland (PC) Kg 10.400 1,200.00 12,480.00
Bahan
Semen Warna Kg 1.620 2,630.00 4,260.60
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.620 110,000.00 68,200.00
Tukang OH 0.350 130,000.00 45,500.00
Tenaga Kerja
Kepala Tukang OH 0.035 150,000.00 5,250.00
Mandor OH 0.030 125,000.00 3,750.00
Sub Jumlah 204,437.85
Over Head, Keuntungan, DLL 20,443.79
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 224,882.00

1 m² Pasangan Dinding Tegel Keramik 30 x 30 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 30 x 30 cm Bh 11.870 6,500.00 77,155.00
Semen Portland (PC) Kg 10.400 1,200.00 12,480.00
Bahan
Semen Warna Kg 1.620 2,630.00 4,260.60
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.620 110,000.00 68,200.00
Tukang OH 0.350 130,000.00 45,500.00
Tenaga Kerja
Kepala Tukang OH 0.035 150,000.00 5,250.00
Mandor OH 0.030 125,000.00 3,750.00
Sub Jumlah 222,220.60
Over Head, Keuntungan, DLL 22,222.06
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 244,443.00

1 m² Pasangan Lantai Tegel Keramik 30 x 30 cm (Anti Slip)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 30 x 30 cm (anti slip) Bh 11.870 6,830.00 81,072.10
Semen Portland (PC) Kg 10.000 1,200.00 12,000.00
Bahan
Semen Warna Kg 1.500 2,630.00 3,945.00
Pasir Pasang m³ 0.045 125,000.00 5,625.00
Pekerja OH 0.620 110,000.00 68,200.00
Tukang OH 0.350 130,000.00 45,500.00
Tenaga Kerja
Kepala Tukang OH 0.035 150,000.00 5,250.00
Mandor OH 0.030 125,000.00 3,750.00
Sub Jumlah 225,342.10
Over Head, Keuntungan, DLL 22,534.21
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 247,876.00
1 m' Pasangan Plint Keramik T. 10 CM
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plint Keramik Bh 2.500 13,875.00 34,687.50
Bahan Semen Portland (PC) Kg 1.140 1,200.00 1,368.00
Pasir Pasang m³ 0.003 125,000.00 375.00
Pekerja OH 0.090 110,000.00 9,900.00
Tukang OH 0.090 130,000.00 11,700.00
Tenaga Kerja
Kepala Tukang OH 0.009 150,000.00 1,350.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 60,005.50
Over Head, Keuntungan, DLL 6,000.55
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 66,006.00

1 m¹ Pas. Besi Holow 4x4


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Holow 4x4 m¹ 1.100 21,000.00 23,100.00
Bahan
Pengelasan cm 16.000 2,948.00 47,168.00
Pekerja OH 0.150 110,000.00 16,500.00
Tukang OH 0.015 130,000.00 1,950.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 91,468.00
Over Head, Keuntungan, DLL 9,146.80
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 100,615.00

1 m¹ Pas. Besi Holow 2x4


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Holow 2x4 m¹ 1.100 18,500.00 20,350.00
Bahan
Pengelasan cm 12.000 2,948.00 35,376.00
Pekerja OH 0.150 110,000.00 16,500.00
Tukang OH 0.015 130,000.00 1,950.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 76,926.00
Over Head, Keuntungan, DLL 7,692.60
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 84,619.00

1 m² Pasang Kaca rayben 5 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Rayben 5mm M² 1.100 96,000.00 105,600.00
Pekerja OH 0.750 110,000.00 82,500.00
Tukang OH 0.500 130,000.00 65,000.00
Tenaga Kerja
Kepala Tukang OH 0.025 150,000.00 3,750.00
Mandor OH 0.025 125,000.00 3,125.00
Sub Jumlah 259,975.00
Over Head, Keuntungan, DLL 25,997.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 285,973.00

1 m² Rangka Plafond Metal Panel 40 x 40 cm Kombinasi 40 x 20 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Metal Furing Ujg 1.200 55,000.00 66,000.00
Pekerja OH 0.833 110,000.00 91,630.00
Tukang OH 0.250 130,000.00 32,500.00
Tenaga Kerja
Kepala Tukang OH 0.025 150,000.00 3,750.00
Mandor OH 0.025 125,000.00 3,125.00
Sub Jumlah 197,005.00
Over Head, Keuntungan, DLL 19,700.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 216,706.00

1 m¹ Kosen Pintu/Jendela/Ventilasi Alumunium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Profil 5/10 (4") M¹ 1.100 36,250.00 39,875.00
Bahan Sekrup Fixer Bh 2.000 22,000.00 44,000.00
Sealant Putih Tb 0.060 35,000.00 2,100.00
Pekerja OH 0.030 110,000.00 3,300.00
Tukang OH 0.430 130,000.00 55,900.00
Tenaga Kerja
Kepala Tukang OH 0.043 150,000.00 6,450.00
Mandor OH 0.021 125,000.00 2,625.00
Sub Jumlah 154,250.00
Over Head, Keuntungan, DLL 15,425.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 169,675.00
1 m¹ Bingkai Daun Pintu Alumunium
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Profil 3/10 M¹ 1.100 27,600.00 30,360.00
Bahan List Karet Kaca M¹ 1.050 6,500.00 6,825.00
Sealant Putih Tb 0.060 35,000.00 2,100.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 169,085.00
Over Head, Keuntungan, DLL 16,908.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 185,994.00

1 m¹ Bingkai Jendela/Ventilasi (Aluminium Frame)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Frame M¹ 1.100 26,700.00 29,370.00
Bahan List Karet Kaca M¹ 1.050 6,500.00 6,825.00
Sealant Putih Tb 0.060 35,000.00 2,100.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 168,095.00
Over Head, Keuntungan, DLL 16,809.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 184,905.00

1 Bh Kunci Tanam 2x Slaag


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kunci Tanam 2x Slaag Bh 1.000 145,000.00 145,000.00
Pekerja OH 0.060 110,000.00 6,600.00
Tukang OH 0.600 130,000.00 78,000.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.003 125,000.00 375.00
Sub Jumlah 238,975.00
Over Head, Keuntungan, DLL 23,897.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 262,873.00

1 Bh Handle Pintu Pull Fush


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Handle Pintu Pull Fush Bh 1.000 270,000.00 270,000.00
Pekerja OH 0.060 110,000.00 6,600.00
Tukang OH 0.600 130,000.00 78,000.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.003 125,000.00 375.00
Sub Jumlah 363,975.00
Over Head, Keuntungan, DLL 36,397.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 400,373.00

1 Bh Pas. Door Closer


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Door Closer Bh 1.000 227,500.00 227,500.00
Pekerja OH 0.015 110,000.00 1,650.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.015 150,000.00 2,250.00
Mandor OH 0.00075 125,000.00 93.75
Sub Jumlah 237,993.75
Over Head, Keuntungan, DLL 23,799.38
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 261,793.00

1 Bh Pas. Engsel Pintu Aluminium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Engsel Pintu Aluminium Bh 1.000 22,000.00 22,000.00
Pekerja OH 0.015 110,000.00 1,650.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.015 150,000.00 2,250.00
Mandor OH 0.00075 125,000.00 93.75
Sub Jumlah 32,493.75
Over Head, Keuntungan, DLL 3,249.38
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 35,743.00
1 Bh Pas. Engsel Jendela Aluminium
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Engsel Jendela Aluminium Bh 1.000 17,400.00 17,400.00
Pekerja OH 0.010 110,000.00 1,100.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.00050 125,000.00 62.50
Sub Jumlah 26,562.50
Over Head, Keuntungan, DLL 2,656.25
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 29,219.00

1 Bh Pas. Grendle Tanam Pintu / expanoulet


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Grendle Pintu Bh 1.000 59,500.00 59,500.00
Pekerja OH 0.010 110,000.00 1,100.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.00050 125,000.00 62.50
Sub Jumlah 75,162.50
Over Head, Keuntungan, DLL 7,516.25
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 82,679.00

1 Bh Pas. Grendle Jendela Aluminium/Rambuncis


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Grendle Jendela Aluminium/Rambuncis Bh 1.000 19,000.00 19,000.00
Pekerja OH 0.010 110,000.00 1,100.00
Tukang OH 0.100 130,000.00 13,000.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.00050 125,000.00 62.50
Sub Jumlah 34,662.50
Over Head, Keuntungan, DLL 3,466.25
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 38,129.00

1 m2 Rangka Plafond Besi Hollow Galvanis


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Rangka Hollow 2x4 cm Galvanis Btg 1.025 32,000.00 32,800.00
Stifenner Bh 3.000 1,200.00 3,600.00
Bahan
Paku keling / Paku Sekrup Kg 0.110 60,000.00 6,600.00
Penggantung dan Ramzet Bh 4.000 9,500.00 38,000.00
Pekerja OH 0.050 110,000.00 5,500.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 94,375.00
Over Head, Keuntungan, DLL 9,437.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 103,813.00

1 m¹ List Profil Gypsum


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
List Profil Gypsum m¹ 1.050 32,500.00 34,125.00
Bahan
Paku Sekrup Kg 0.010 60,000.00 600.00
Pekerja OH 0.050 110,000.00 5,500.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 48,100.00
Over Head, Keuntungan, DLL 4,810.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 52,910.00

1 m² Plafond Gypsum 9 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Gypsum 9 mm Lbr 0.364 65,000.00 23,660.00
Bahan
Paku Skrup Kg 0.110 60,000.00 6,600.00
Pekerja OH 0.100 110,000.00 11,000.00
Tukang OH 0.050 130,000.00 6,500.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 49,135.00
Over Head, Keuntungan, DLL 4,913.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 54,049.00
1 m² Cat Tembok Exterior 3x, 1 Lap. Cat Dasar & 2 Lap. Cat Penutup Setara Catylac
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 44,500.00 6,675.00
Bahan Cat Dasar Ex. Dulux Kg 0.250 25,500.00 6,375.00
Cat Penutup Ex. Dulux Kg 0.260 67,200.00 17,472.00
Pekerja OH 0.020 110,000.00 2,200.00
Tukang OH 0.003 130,000.00 325.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.006 125,000.00 750.00
Sub Jumlah 42,797.00
Over Head, Keuntungan, DLL 4,279.70
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 47,077.00

1 m² Cat Tembok Interior 3x, 1 Lap. Cat Dasar & 2 Lap. Cat Penutup Setara Catylac
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 44,500.00 6,675.00
Bahan Cat Dasar Ex. Catylac Kg 0.250 21,875.00 5,468.75
Cat Penutup Ex. Catylac Kg 0.260 30,000.00 7,800.00
Pekerja OH 0.020 110,000.00 2,200.00
Tukang OH 0.003 130,000.00 325.00
Tenaga Kerja
Kepala Tukang OH 0.060 150,000.00 9,000.00
Mandor OH 0.006 125,000.00 750.00
Sub Jumlah 32,218.75
Over Head, Keuntungan, DLL 3,221.88
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 35,441.00

1 Unit Pas. Kloset Duduk


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kloset Duduk Bh 1.000 950,000.00 950,000.00
Perlengkapan % 6.000 950,000.00 57,000.00
Bahan
Semen Portland (PC) Kg 6.000 1,200.00 7,200.00
Pasir Pasang m³ 0.010 125,000.00 1,250.00
Pekerja OH 1.000 110,000.00 110,000.00
Tukang OH 1.000 130,000.00 130,000.00
Tenaga Kerja
Kepala Tukang OH 0.100 150,000.00 15,000.00
Mandor OH 0.100 125,000.00 12,500.00
Sub Jumlah 1,282,950.00
Over Head, Keuntungan, DLL 128,295.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 1,411,245.00

1 Bh Pas. Wastafel
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Wastafel Bh 1.000 650,000.00 650,000.00
Perlengkapan % 12.000 650,000.00 78,000.00
Bahan
Semen Portland (PC) Kg 6.000 1,200.00 7,200.00
Pasir Pasang m³ 0.010 125,000.00 1,250.00
Pekerja OH 1.200 110,000.00 132,000.00
Tukang OH 1.450 130,000.00 188,500.00
Tenaga Kerja
Kepala Tukang OH 1.450 150,000.00 217,500.00
Mandor OH 0.100 125,000.00 12,500.00
Sub Jumlah 1,286,950.00
Over Head, Keuntungan, DLL 128,695.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 1,415,645.00

1 Bh Stop Kran ½"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Stop Kran ½" Bh 1.000 36,750.00 36,750.00
Bahan
Perlengkapan % 35.000 36,750.00 12,862.50
Pekerja OH 0.100 110,000.00 11,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 61,862.50
Over Head, Keuntungan, DLL 6,186.25
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 68,049.00

1 Bh Stop Kran 1"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Stop Kran Ø 1" Bh 1.000 78,750.00 78,750.00
Bahan
Perlengkapan % 35.000 78,750.00 27,562.50
Pekerja OH 0.100 110,000.00 11,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 118,562.50
Over Head, Keuntungan, DLL 11,856.25
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 130,419.00
1 Bh Mata Kran ½"
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Mata Kran Ø ½" Bh 1.000 33,000.00 33,000.00
Bahan
Perlengkapan % 35.000 33,000.00 11,550.00
Pekerja OH 0.100 110,000.00 11,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 56,800.00
Over Head, Keuntungan, DLL 5,680.00
Jumlah Harga Per Satuan Satuan Pekerjaan (dibulatkan) 62,480.00

1 Bh Floor Drain
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Floor Drain Bh 1.000 85,000.00 85,000.00
Bahan
Perlengkapan % 35.000 85,000.00 29,750.00
Pekerja OH 0.100 110,000.00 11,000.00
Tenaga Kerja
Mandor OH 0.010 125,000.00 1,250.00
Sub Jumlah 127,000.00
Over Head, Keuntungan, DLL 12,700.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 139,700.00

1 m¹ Pas. Pipa PVC Ø ½" AW


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø ½" Bh 1.200 4,200.00 5,040.00
Bahan
Perlengkapan % 35.000 4,200.00 1,470.00
Pekerja OH 0.036 110,000.00 3,960.00
Tukang OH 0.060 130,000.00 7,800.00
Tenaga Kerja
Kepala Tukang OH 0.006 150,000.00 900.00
Mandor OH 0.0018 125,000.00 225.00
Sub Jumlah 19,395.00
Over Head, Keuntungan, DLL 1,939.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 21,335.00

1 m¹ Pas. Pipa PVC Ø ¾" AW


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø ¾" Bh 1.200 4,730.00 5,676.00
Bahan
Perlengkapan % 35.000 4,730.00 1,655.50
Pekerja OH 0.036 110,000.00 3,960.00
Tukang OH 0.060 130,000.00 7,800.00
Tenaga Kerja
Kepala Tukang OH 0.006 150,000.00 900.00
Mandor OH 0.0018 125,000.00 225.00
Sub Jumlah 20,216.50
Over Head, Keuntungan, DLL 2,021.65
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 22,238.00

1 m¹ Pas. Pipa PVC Ø 1" AW


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø 1" Bh 1.200 6,500.00 7,800.00
Bahan
Perlengkapan % 35.000 6,500.00 2,275.00
Pekerja OH 0.036 110,000.00 3,960.00
Tukang OH 0.060 130,000.00 7,800.00
Tenaga Kerja
Kepala Tukang OH 0.006 150,000.00 900.00
Mandor OH 0.0018 125,000.00 225.00
Sub Jumlah 22,960.00
Over Head, Keuntungan, DLL 2,296.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 25,256.00

1 m¹ Pas. Pipa PVC Ø 2" AW


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø 2" Bh 1.200 15,750.00 18,900.00
Bahan
Perlengkapan % 35.000 15,750.00 5,512.50
Pekerja OH 0.054 110,000.00 5,940.00
Tukang OH 0.090 130,000.00 11,700.00
Tenaga Kerja
Kepala Tukang OH 0.009 150,000.00 1,350.00
Mandor OH 0.0027 125,000.00 337.50
Sub Jumlah 43,740.00
Over Head, Keuntungan, DLL 4,374.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 48,114.00
1 m¹ Pas. Pipa PVC Ø 3" AW
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø 3" Bh 1.200 26,250.00 31,500.00
Bahan
Perlengkapan % 35.000 26,250.00 9,187.50
Pekerja OH 0.081 110,000.00 8,910.00
Tukang OH 0.135 130,000.00 17,550.00
Tenaga Kerja
Kepala Tukang OH 0.135 150,000.00 20,250.00
Mandor OH 0.0041 125,000.00 512.50
Sub Jumlah 87,910.00
Over Head, Keuntungan, DLL 8,791.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 96,701.00

1 m¹ Pas. Pipa PVC Ø 4" AW


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa PVC Ø 4" Bh 1.200 58,750.00 70,500.00
Bahan
Perlengkapan % 35.000 58,750.00 20,562.50
Pekerja OH 0.081 110,000.00 8,910.00
Tukang OH 0.135 130,000.00 17,550.00
Tenaga Kerja
Kepala Tukang OH 0.135 150,000.00 20,250.00
Mandor OH 0.0041 125,000.00 512.50
Sub Jumlah 138,285.00
Over Head, Keuntungan, DLL 13,828.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 152,114.00

1 Titik Instalasi Lampu Penerangan


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kabel NYM 2x2,5 M¹ 10.000 8,250.00 82,500.00
Pipa PVC Ø5/8" 4m Btg 1.000 32,750.00 32,750.00
T. Dos PVC Bh 2.000 1,200.00 2,400.00
Bahan
Semen Abu-abu Kg 0.850 1,200.00 1,020.00
Pasir Pasang M3 0.026 125,000.00 3,250.00
Alat Bantu Ls 1.000 10,000.00 10,000.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 261,720.00
Over Head, Keuntungan, DLL 26,172.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 287,892.00

1 Titik Instalasi Stop Kontak


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kabel NYM 2x2,5 M¹ 10.000 8,250.00 82,500.00
Pipa PVC Ø5/8" 4m Btg 0.200 32,750.00 6,550.00
Bahan
T. Dos PVC Bh 1.000 1,200.00 1,200.00
Stop Kontak Bh 1.000 45,000.00 45,000.00
Pekerja OH 0.050 110,000.00 5,500.00
Tukang OH 0.500 130,000.00 65,000.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 207,125.00
Over Head, Keuntungan, DLL 20,712.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 227,838.00

1 Bh Saklar Tunggal
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Saklar Tunggal Bh 1.000 45,000.00 45,000.00
Pekerja OH 0.023 110,000.00 2,530.00
Tukang OH 0.047 130,000.00 6,110.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 55,015.00
Over Head, Keuntungan, DLL 5,501.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 60,517.00
1 Bh Saklar Ganda
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Saklar Tunggal Bh 1.000 49,000.00 49,000.00
Pekerja OH 0.023 110,000.00 2,530.00
Tukang OH 0.047 130,000.00 6,110.00
Tenaga Kerja
Kepala Tukang OH 0.005 150,000.00 750.00
Mandor OH 0.005 125,000.00 625.00
Sub Jumlah 59,015.00
Over Head, Keuntungan, DLL 5,901.50
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 64,917.00

1 Unit Panel Box Lengkap


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Chasing Panel Box + Pipa PVC 5/8" Bh 1.000 175,000.00 175,000.00
Tenaga Kerja Upah (10% dari harga bahan) LS 0.100 175,000.00 17,500.00
Sub Jumlah 192,500.00
Over Head, Keuntungan, DLL 19,250.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 211,750.00

1 Titik Downlight Stainless 6" + Lampu SL 23 Watt


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Down Light 6" Bh 1.000 75,000.00 75,000.00
Bahan
Lampu SL 23 Watt Bh 1.000 86,000.00 86,000.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 290,800.00
Over Head, Keuntungan, DLL 29,080.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 319,880.00

1 Titik Downlight Stainless 6" + Lampu SL 14 Watt


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Down Light 6" Bh 1.000 75,000.00 75,000.00
Bahan
Lampu SL 18 Watt Bh 1.000 56,000.00 56,000.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 260,800.00
Over Head, Keuntungan, DLL 26,080.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 286,880.00

1 Titik Vitting Tempel + Lampu SL 14 Watt


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Vitting Tempel Bh 1.000 15,000.00 15,000.00
Bahan
Lampu SL 14 Watt Bh 1.000 56,000.00 56,000.00
Pekerja OH 0.080 110,000.00 8,800.00
Tukang OH 0.800 130,000.00 104,000.00
Tenaga Kerja
Kepala Tukang OH 0.080 150,000.00 12,000.00
Mandor OH 0.040 125,000.00 5,000.00
Sub Jumlah 200,800.00
Over Head, Keuntungan, DLL 20,080.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 220,880.00

1 M2 Pas. Rangka Atap Baja Ringan


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
C-75, 08 M' 1.488 14,166.67 21,080.00
C-75, 06 M' 2.232 13,333.33 29,760.00
Baut (Screw Driver) Bh 28.000 500.00 14,000.00
Bahan
Dynabolt Bh 1.600 1,800.00 2,880.00
Reng M' 2.200 8,833.33 19,433.33
Talang Jurai M' 0.124 8,833.33 1,095.33
Pekerja OH 0.200 110,000.00 22,000.00
Tukang OH 0.450 130,000.00 58,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 150,000.00 1,500.00
Mandor OH 0.050 125,000.00 6,250.00
Sub Jumlah 176,498.67
Over Head, Keuntungan, DLL 17,649.87
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 194,149.00
1 M2 Pas. Atap seng gelombang
Kebutuhan Satuan Indeks Harga Satuan Jumlah
(Rp.) (Rp.)
Bahan Atap Seng Gelombang M2 1.050 65,000.00 68,250.00
Paku Sekrup 2''-5'' Kg 0.120 60,000.00 7,200.00
Tenaga Kerja Pekerja OH 0.140 110,000.00 15,400.00
Tukang OH 0.075 130,000.00 9,750.00
Kepala Tukang OH 0.008 150,000.00 1,200.00
Mandor OH 0.008 125,000.00 1,000.00
Sub Jumlah 102,800.00
Over Head, Keuntungan, DLL 10,280.00
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) 113,080.00
DAFTAR HARGA SATUAN JADI
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN: 2019

NO. URAIAN JENIS PEKERJAAN SATUAN

1 Galian Tanah Biasa sedalam 1 m m³


2 Galian Tanah Biasa sedalam 2 m m³
###
3 Pemadatan Tanah m³
###
4 Timbunan Tanah Bekas Galian m³
###
5 Urugan Tanah m³
###
6 Urugan Pasir m³
###
7 1 m' Pagar sementara dari seng gelombang tinggi 2 meter m'
###
8 Pas. Batu Kosong (aanstamping) m³
###
9 Pas. Batu Belah 1 : 4 m³
###
10 Plesteran 1 : 3 tebal 15 mm m²
###
11 Plesteran 1 : 4 tebal 15 mm m²
###
12 Acian m²
###
13 Waterproofing m²
###
14 Beton Tumbuk 1 : 3 : 5 (Lantai Kerja) m2
###
15 Beton Tumbuk 1 : 3 : 5 m³
###
16 Plat Bondex Lysaght 0.7 BMT Galvanize Z275 m²
###
17 Pasangan Bata ½ Bata, 1pc : 4psr m²
###
18 Pasang Lantai Granit 60 x 60cm m²
###
19 Pasang Lantai Granit 40 x 40cm m²
###
20 Pasang Lantai Granit 30 x 30cm m²
###
21 Pasang Lantai Tegel Keramik 30 x 30cm m²
###
22 Pasang Lantai Tegel Keramik 30 x 30cm (anti slip) m²
###
23 Pasang Lantai Tegel Keramik 25 x 30cm m²
###
24 Pasang Dinding Tegel Keramik 25 x 40cm m²
###
25 Kolkolan Dinding m²
###
26 Pasang Wall Paper m²
###
29 Pasang Stainless Steel Ø 3" m¹
###
30 Pasang Stainless Steel Ø 1½" m¹
###
31 Pasang Stainless Steel Ø 1" m¹
###
32 Pemb. Kuda-kuda Pipa Black Steel Ø 3" Medium A m¹
###
33 Pas. Pipa Black Steel Ø 3" Kaso m¹
###
34 Pas.Canal C 1.25x.50 Med A m¹
###
35 Pasang Besi Holow 8x8 m¹
###
36 Pasang Besi Holow 4x4 m¹
###
37 Pasang Besi Holow 2x4 m¹
###
38 Pasang Batu Alam / Bunga m²
###
39 Rangka Kuda-Kuda/Atap Baja Siku Kg
###
40 Rangka Plafond Metal Panel 40 x 40 cm m²
###
41 Kosen Pintu/Jendela/Ventilasi Alumunium m¹
42 Bingkai Daun Pintu/Jendela/Ventilasi Panel Alumunium m¹
43 Frame Jepit Daun Pintu/Jendela/Ventilasi Panel Alumunium m¹
44 Pasang Kaca Bening 15 mm m²
45 Pasang Kaca Bening 12 mm m²
46 Pasang Kaca Tempered 12 mm m²
47 Pasang Kaca Tempered 8 mm m²
48 Pasang Kaca Sandblast 8 mm m²
49 Pasang Stiker kaca Sandblast m²
50 Talang Alumunium m¹
51 Listplank Alumunium m¹
52 List Profil Gypsum m¹
53 List Profil Kalsiboard m¹
54 Plafond Gypsum 9 mm m²
55 Plafond GRC 6 mm m²
56 Atap Spandek m²
57 Cat Tembok 3 x m²
58 Cat Mengkilap m²
59 Cat Menie m²
60 Cat Varnis / Politur m²
61 Pas. Kloset Duduk Bh
62 Pas. Kloset Jongkok Bh
63 Pas. Wastafel Bh
###
64 Pas. Stop Kran ½ Bh
###
65 Pas. Stop Kran Ø 1" Bh
###
66 Pas. Mata Kran Ø ½" Bh
###
67 Pas. Floor Drain Bh
###
68 Pas. Pipa PVC Ø ½" m¹
###
69 Pas. Pipa PVC Ø ¾" m¹
###
70 Pas. Pipa PVC Ø 1" m¹
###
71 Pas. Pipa PVC Ø 2" m¹
###
72 Pas. Pipa PVC Ø 3" m¹
###
73 Pas. Pipa PVC Ø 4" m¹
74 Pasang Bikesting Lantai m²
75 Pintu Komposite Aluminium kaca buram m²
JADI

HARGA SATUAN

(Rp.)

94,188.00
115,088.00
67,375.00
31,396.00
116,875.00
136,675.00
776,887.10
520,988.00
921,498.00
75,714.00
73,824.00
18,975.00
53,955.00
177,122.00
949,520.00
445,963.00
139,425.00
124,179.00
479,703.00
111,841.00
258,244.00
247,876.00
225,943.00
66,006.00
146,754.00
113,630.00
191,123.00
158,757.00

542,333.00
164,142.00
85,468.00
169,440.00
100,615.00
84,619.00
306,363.00
34,372.00
216,706.00
169,675.00
185,994.00
184,905.00
266,338.00
220,138.00
585,613.00
510,538.00
510,538.00
45,100.00
240,719.00
200,357.00
52,910.00
47,135.00
54,049.00
59,950.00
104,885.00
35,441.00
60,173.00
52,800.00
72,600.00
1,411,245.00
665,170.00
1,415,645.00
68,049.00
130,419.00
62,480.00
139,700.00
21,335.00
22,238.00
25,256.00
48,114.00
96,701.00
152,114.00
432,284.00
464,530.00
DAFTAR HARGA SATUAN JADI
KEGIATAN : PEMBANGUNAN GEDUNG BALAI KESEHATAN MATA MASYARAKAT
PEKERJAAN : DETAIL ENGINEERING DRAWING (DED)
LOKASI : KOTA MANADO
TAHUN ANGGARAN : 2015 (APBD MURNI)

NO. URAIAN JENIS PEKERJAAN SATUAN

1 Galian Tanah Biasa sedalam 1 m m³


2 Galian Tanah Biasa sedalam 2 m m³
3 Pemadatan Tanah m³
4 Urugan Tanah m³
5 Urugan Pasir m³
6 1 m' Pagar sementara dari seng gelombang tinggi 2 meter m'
7 Pas. Batu Kosong (aanstamping) m³
8 Pas. Batu Belah 1 : 4 m³
9 Plesteran 1 : 3 tebal 15 mm m²
10 Plesteran 1 : 4 tebal 15 mm m²
11 Acian m²
12 Waterproofing m²
13 Beton Tumbuk 1 : 3 : 5 (Lantai Kerja) m2
14 Beton Tumbuk 1 : 3 : 5 m³
15 Plat Bondex Lysaght 0.7 BMT Galvanize Z275 m²
16 Cor Plat Lantai Beton Bertulang K225 (200 Kg Besi + Bekesting) m³
17 Pondasi Beton Bertulang K.350 (200 kg Besi + Bekisting) m³
18 Sloof Beton Bertulang K.225 (200 kg Besi + Bekisting) m³
19 Kolom Beton Bertulang K.225 (200 kg Besi + Bekisting) m³
20 Balok Beton Bertulang K.225 (200 kg Besi + Bekisting) m³
21 Pasangan Bata ½ Bata, 1pc : 4psr m²
22 Pasang Lantai Granit 60 x 60cm m²
23 Pasang Lantai Granit 40 x 40cm m²
24 Pasang Lantai Granit 30 x 30cm m²
25 Pasang Lantai Tegel Keramik 30 x 30cm m²
26 Pasang Lantai Tegel Keramik 30 x 30cm (anti slip) m²
27 Pasang Lantai Tegel Keramik 25 x 30cm m²
28 Pasang Dinding Tegel Keramik 25 x 40cm m²
29 Kolkolan Dinding m²
30 Pasang Wall Paper m²
31 Pasang Cladding (Alumunium Composite Panel) Rangka Sincalnium m²
32 Pasang Dinding Partisi GRC 4mm Isi Steriofoam Rangka Sincalnium m²
33 Pasang Stainless Steel Ø 3" m¹
34 Pasang Stainless Steel Ø 1½" m¹
35 Pasang Stainless Steel Ø 1" m¹
36 Pemb. Kuda-kuda Pipa Black Steel Ø 3" Medium A m¹
37 Pas. Pipa Black Steel Ø 3" Kaso m¹
38 Pas.Canal C 1.25x.50 Med A m¹
39 Pasang Besi Holow 8x8 m¹
40 Pasang Besi Holow 4x4 m¹
41 Pasang Besi Holow 2x4 m¹
42 Pasang Batu Alam / Bunga m²
43 Rangka Kuda-Kuda/Atap Baja Siku Kg
44 Rangka Plafond Metal Panel 40 x 40 cm m²
45 Kosen Pintu/Jendela/Ventilasi Alumunium m¹
NO. URAIAN JENIS PEKERJAAN SATUAN

46 Bingkai Daun Pintu/Jendela/Ventilasi Panel Alumunium m¹


47 Frame Jepit Daun Pintu/Jendela/Ventilasi Panel Alumunium m¹
48 Pasang Kaca Bening 15 mm m²
49 Pasang Kaca Bening 12 mm m²
50 Pasang Kaca Tempered 12 mm m²
51 Pasang Kaca Tempered 8 mm m²
52 Pasang Kaca Sandblast 8 mm m²
53 Talang Alumunium m¹
54 Listplank Alumunium m¹
55 List Profil Gypsum m¹
56 List Profil Kalsiboard m¹
57 Plafond Gypsum 9 mm m²
58 Plafond Kalsibord 6 mm m²
59 Atap Spandek m²
60 Cat Tembok 3 x m²
61 Cat Mengkilap m²
62 Cat Menie m²
63 Cat Varnis / Politur m²
64 Pas. Kloset Duduk Bh
65 Pas. Kloset Jongkok Bh
66 Pas. Wastafel Bh
###
67 Pas. Stop Kran ½ Bh
###
68 Pas. Stop Kran Ø 1" Bh
###
69 Pas. Mata Kran Ø ½" Bh
###
70 Pas. Floor Drain Bh
###
71 Pas. Pipa PVC Ø ½" m¹
###
72 Pas. Pipa PVC Ø ¾" m¹
###
73 Pas. Pipa PVC Ø 1" m¹
###
74 Pas. Pipa PVC Ø 2" m¹
###
75 Pas. Pipa PVC Ø 3" m¹
###
76 Pas. Pipa PVC Ø 4" m¹
76 Pasang Bikesting Lantai m²
77 Tiang Bore Pile m¹
78 Pintu Komposite Aluminium kaca buram m²
79 Baja H Beam m¹
80 ### m³
81 ### m³

Manado, 27 Januari 2015

Mengetahui/Menyetujui : Dibuat oleh :


CV. TRIJAYA KARYA
Ir. RONALD LUMEMPOUW FERDY TULUNGEN, ST
DIREKTUR Cost Estimator
JADI
MATA MASYARAKAT

HARGA SATUAN

(Rp.)

61,875.00
74,250.00
41,250.00
103,950.00
123,750.00
534,260.10
293,453.00
718,603.00
59,968.00
57,806.00
33,880.00
19,360.00
131,835.00
881,348.00
594,790.00
4,916,689.00
5,284,267.00
5,394,267.00
5,951,899.00
6,503,648.00
126,836.00
129,679.00
227,007.00
220,292.00
259,078.00
252,478.00
237,628.00
247,082.00
111,046.00
93,638.00
647,268.00
363,468.00
317,878.00
177,364.00
206,773.00
749,953.00
206,773.00
77,017.00
278,278.00
151,074.00
120,483.00
209,407.00
20,790.00
172,260.00
133,623.00
HARGA SATUAN

(Rp.)

130,295.00
129,690.00
239,250.00
193,050.00
385,963.00
351,313.00
333,988.00
190,053.00
160,234.00
42,295.00
42,295.00
49,748.00
51,810.00
84,673.00
41,635.00
44,388.00
39,105.00
59,565.00
1,383,525.00
554,400.00
523,600.00
82,500.00
45,375.00
52,800.00
112,200.00
31,708.00
40,233.00
57,283.00
100,843.00
176,495.00
295,845.00
354,899.00
1,252,824.00
402,325.00
33,743.00
1,429,623.00
6,681,523.00

nado, 27 Januari 2015

Dibuat oleh :
RDY TULUNGEN, ST
Cost Estimator
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
LANTAI 1, Elv. -1,62 - 4,00 M
I. PEKERJAAN PERSIAPAN 59,464,128.00
1 Bongkaran Bangunan Existing + Buang Keluar Lokasi Ls 1.000 15,000,000.00 15,000,000.00
2 Pembuatan Direksi Keet M2 15.000 1,300,000.00 19,500,000.00
4 Pengukuran dan Pas. Bouplank M' 90.000 102,379.20 9,214,128.00
6 Papan Proyek Bh 1.000 750,000.00 750,000.00
7 Mobilisasi & Demobilisasi Ls 1.000 15,000,000.00 15,000,000.00

II. PEKERJAAN TANAH 29,357,822.99


1 Galian Pondasi Pelat Poer M³ 66.679 115,088.00 7,673,975.77
2 Galian Tanah Pondasi Batu Kali M³ 43.896 94,188.00 4,134,476.45
3 Galian Tanah Saluran M³ 23.883 94,188.00 2,249,510.84
4 Galian Tanah Sloof M³ 6.900 94,188.00 649,897.20
5 Galian Tanah Septic Tank + Bak Serapan M³ 0.000 115,088.00 -
6 Urugan Tanah Bekas Galian M³ 35.340 31,396.00 1,109,522.08
7 Urugan Tanah bawah Lantai M³ 87.958 116,875.00 10,280,058.53
8 Urugan Pasir di bawah Pondasi M³ 4.383 136,675.00 599,046.53
9 Urugan Pasir di bawah Saluran Keliling M³ 2.024 136,675.00 276,630.20
10 Urugan Pasir di bawah lantai M³ 17.448 136,675.00 2,384,705.40

III.PEKERJAAN PONDASI 107,683,477.60


1 Pasangan Batu Kosong M³ 6.975 520,988.00 3,633,891.30
2 Pasangan Batu Kali 1:4 M³ 21.158 921,498.00 19,496,593.94
3 Pondasi Telapak Beton K-225
- Beton Cor K.225 M³ 12.348 1,115,488.00 13,774,045.82
- Besi Beton U-24 Kg 1,746.638 13,430.00 23,457,351.13
- Bekisting M² 35.280 270,551.00 9,545,039.28
4 Kaki Kolom Beton K-225
- Beton Cor K.225 M³ 4.382 1,115,488.00 4,888,380.75
- Besi Beton U-24 Kg 997.191 13,430.00 13,392,278.03
- Bekisting M² 42.336 460,504.00 19,495,897.34

IV. PEKERJAAN BETON Elv.-10 - 400 cm 717,561,422.65


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Poer & Sloof) M³ 4.801 949,520.00 4,558,835.42
2 Jalan Beton Rabat K-225, T: 20 Cm M³ 3.600 1,037,482.00 3,734,935.20
- Bekisting M² 2.200 270,551.00 595,212.20
3 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 11.170 1,115,488.00 12,460,447.16
- Besi Beton Kg 2,920.287 13,430.00 39,219,447.96
- Bekisting M² 111.704 289,801.00 32,371,930.90
4 Sloof Beton Bertulang K.225, Uk. 20/30
- Beton Cor K.225 M³ 2.180 1,115,488.00 2,431,540.74
- Besi Beton Kg 519.981 13,430.00 6,983,341.61
- Bekisting M² 21.798 289,801.00 6,317,082.20
5 Sloof Beton Bertulang K.225, Uk.15/15
- Beton Cor K.225 M³ 0.092 1,115,488.00 102,903.77
- Besi Beton U-24 Kg 21.898 13,430.00 294,091.21
- Bekisting M² 1.230 289,801.00 356,455.23
6 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 14.535 1,115,488.00 16,213,129.50
- Besi Beton U-24 Kg 2,682.165 13,430.00 36,021,479.23
- Bekisting M² 140.414 460,504.00 64,661,392.86
7 Kolom Beton Bertulang K.225 20/20
- Beton Cor K.225 M³ 0.230 1,115,488.00 256,611.32
- Besi Beton U-24 Kg 85.793 13,430.00 1,152,201.69
- Bekisting M² 5.413 460,504.00 2,492,616.05
8 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 97.200 179,611.00 17,458,189.20
9 Balok Beton Bertulang Tipe I. K.225 35/70
- Beton Cor K.225 M³ 9.067 1,115,488.00 10,114,263.55
- Besi Beton U-24 Kg 2,057.384 13,430.00 27,630,664.43
- Bekisting M² 56.670 472,054.00 26,751,064.15
10 Balok Beton Bertulang Type-2 K.225 25/50
- Beton Cor K.225 M³ 6.413 1,115,488.00 7,153,354.60
- Besi Beton U-24 Kg 2,597.586 13,430.00 34,885,576.76
- Bekisting M² 58.298 472,054.00 27,519,709.68
11 Balok Beton Bertulang Type Anak K.225 20/30
- Beton Cor K.225 M³ 2.119 1,115,488.00 2,363,291.28
- Besi Beton U-24 Kg 1,392.718 13,430.00 18,704,201.24
- Bekisting M² 24.925 472,054.00 11,765,898.74
12 Balok Latai K.175 11/15 + Besi + Bekisting M' 112.100 282,554.00 31,674,303.40
13 Tangga Beton Bertulang K.225
- Beton Cor K.225 M³ 1.748 1,115,488.00 1,949,315.28
- Besi Beton U-24 Kg 318.435 13,430.00 4,276,576.41
- Bekisting M² 26.766 421,399.00 11,279,165.63
14 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 38.599 1,115,488.00 43,056,944.41
- Wire Mesh M8 Kg 1,692.189 16,529.00 27,970,190.79
- Pelat Bondek/Metal Deck M² 321.660 445,963.00 143,448,458.58
15 List Plank Beton K-225
- Beton Cor K.225 M³ 2.481 1,115,488.00 2,767,124.15
- Wire Mesh M8 Kg 254.886 16,529.00 4,213,006.73
- Bekisting M² 68.544 472,054.00 32,356,469.38

V PEKERJAAN DINDING 184,782,584.57


1 Pasangan Batu Bata ½, 1:5 M² 452.069 134,878.00 60,974,095.14
2 Plesteran Dinding & Beton 1 : 4 M² 1,131.833 73,824.00 83,556,454.16
3 Plesteran Jalan Beton 1 : 3 M² 15.000 75,714.00 1,135,710.00
4 Acian Dinding Gedung M² 1,146.833 18,975.00 21,761,159.97
5 Waterproofing Pelat Dak M² 321.660 53,955.00 17,355,165.30

VI PEKERJAAN PLAFOND 74,891,500.58


1 Pek. Rangka Plafond Hollow Galvanized M² 336.660 103,813.00 34,949,684.58
2 Pek. Plafond Gipsum M² 229.500 54,049.00 12,404,245.50
3 Pek. Plafond GRC M² 93.660 59,950.00 5,614,917.00
4 Pas. List Plafond Gipsum M' 263.250 52,910.00 13,928,557.50
5 Pas.List Plafond Kalsiboard M' 169.600 47,135.00 7,994,096.00

VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 172,018,083.68


1 Pek. Kosen Pintu, Jendela dan Ventilasi Aluminium M' 229.910 169,675.00 39,009,979.25
2 Pas. Pintu PVC Km/Wc Unit 4 1,200,000.00 4,800,000.00
3 Pas. Bingkai Pintu PV1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 41.520 169,675.00 7,044,906.00
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 33.120 185,994.00 6,160,121.28
- Pas. Bingkai Daun Jendela Aluminium Frame M' 14.280 184,905.00 2,640,443.40
- Pas. Kaca Bening 5mm M² 9.595 333,163.00 3,196,765.62
- Pas. Stiker Standblast M² 3.960 45,100.00 178,596.00
- Pas. Engsel Pintu Bh 18.000 35,743.00 643,374.00
- Pas. Engsel Jendela Bh 12.000 29,219.00 350,628.00
- Pas. Kunci Tanam 2 Slaag Bh 6.000 262,873.00 1,577,238.00
- Pas. Handle Pintu Bh 12.000 400,373.00 4,804,476.00
- Pas. Grendle Aluminium/Rambuncis Bh 6.000 38,129.00 228,774.00
4 Pas. Bingkai Pintu PV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 25.890 169,675.00 4,392,885.75
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 31.860 185,994.00 5,925,768.84
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.960 184,905.00 2,396,368.80
- Pas. Kaca Bening 5mm M² 8.106 333,163.00 2,700,719.23
- Pas. Stiker Standblast M² 3.330 45,100.00 150,183.00
- Pas. Engsel Pintu Bh 18.000 35,743.00 643,374.00
- Pas. Engsel Jendela Bh 12.000 29,219.00 350,628.00
- Pas. Kunci Tanam 2 Slaag Bh 3.000 262,873.00 788,619.00
- Pas. Handle Pintu Bh 12.000 400,373.00 4,804,476.00
- Pas. Grendle Aluminium/Rambuncis Bh 6.000 38,129.00 228,774.00
- Pas. Grendle Pintu Tanam M² 3.000 82,679.00 248,037.00
5 Pas. Bingkai Jendela JV1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 11.200 169,675.00 1,900,360.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 11.220 184,905.00 2,074,634.10
- Pas. Kaca Bening 5mm M² 1.872 333,163.00 623,814.40
- Pas. Engsel Jendela Bh 8.000 29,219.00 233,752.00
- Pas. Grendle Aluminium/Rambuncis Bh 4.000 38,129.00 152,516.00
6 Pas. Bingkai Jendela JV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.400 169,675.00 2,952,345.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 22.440 184,905.00 4,149,268.20
- Pas. Kaca Bening 5mm M² 3.745 333,163.00 1,247,628.80
- Pas. Engsel Jendela Bh 16.000 29,219.00 467,504.00
- Pas. Grendle Aluminium/Rambuncis Bh 8.000 38,129.00 305,032.00
7 Pas. Bingkai Jendela JV3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 97.600 169,675.00 16,560,280.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 134.640 184,905.00 24,895,609.20
- Pas. Kaca Bening 5mm M² 22.469 333,163.00 7,485,772.81
- Pas. Engsel Jendela Bh 96.000 29,219.00 2,805,024.00
- Pas. Grendle Aluminium/Rambuncis Bh 48.000 38,129.00 1,830,192.00
8 Pas. Bingkai Jendela V1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 7.200 169,675.00 1,221,660.00
- Pas. Ventilasi Kaca Bening 5mm M² 1.080 333,163.00 359,816.04
9 Pas. Bingkai Jendela V2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.300 169,675.00 729,602.50
- Pas. Ventilasi Kaca Bening 5mm M² 0.720 333,163.00 239,877.36
10 Pas. Bingkai Jendela V3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 24.800 169,675.00 4,207,940.00
- Pas. Ventilasi Kaca Bening 5mm M² 4.320 333,163.00 1,439,264.16
11 Pas. Bingkai Pintu P4 (Pintu Saff)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 5.150 169,675.00 873,826.25
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 4.790 185,994.00 890,911.26
- Pas. Kaca Rayben 5mm M² 0.991 285,973.00 283,356.35
- Pas. Engsel Pintu Bh 3.000 35,743.00 107,229.00
- Pas. Kunci Tanam 2 Slaag Bh 1.000 262,873.00 262,873.00
- Pas. Handle Pintu Bh 1.000 400,373.00 400,373.00
12 Pas. Rooster Keramik 30/30 Bh 1.000 52,487.08 52,487.08

VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22


1 Pek. Pasang Tegel Lantai Keramik 40/40 M² 346.324 479,703.00 166,132,541.85
2 Pek. Pasang Tegel Keramik 20/20 WC/KM M² 14.625 231,806.00 3,390,162.75
3 Pek. Pasang dinding keramik 20/25 M² 67.095 244,443.00 16,400,903.09
4 Pek. Pasang keramik meja wastafel 40/40 M² 2.345 479,703.00 1,124,903.54

IX PEKERJAAN PENGECATAN DAN FINISHING 51,566,414.00


1 Cat Dinding dan Beton M² 1,131.833 35,441.00 40,113,300.44
2 Cat Plafond M² 323.160 35,441.00 11,453,113.56

X PEKERJAAN SANITAIR 35,701,956.00


1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400 21,335.00 968,609.00
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 32.000 25,256.00 808,192.00
3 Pipa Air Kotor PVC Dia. 3" AW M¹ 46.000 96,701.00 4,448,246.00
4 Pipa Air Kotor PVC Dia. 4" AW M¹ 42.000 152,114.00 6,388,788.00
5 Pipa Air Kotor PVC Dia. 2" AW M¹ 36.000 48,114.00 1,732,104.00
6 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 8.000 62,480.00 499,840.00
7 Pasang Stop Kran Dia. 1/2" Bh 4.000 68,049.00 272,196.00
8 Pasang Floor Drain Stainleesteel Bh 5.000 139,700.00 698,500.00
9 Pas. Closed duduk Jongkok Bh 4.000 665,170.00 2,660,680.00
10 Bak Cuci Piring Stainleesteel Bh 1.000 393,511.00 393,511.00
11 Pas.Westafel Kaca Lengkap + Accesoris Bh 2.000 1,415,645.00 2,831,290.00
12 Septiktank Lengkap dengan Peresapan Unit 2.000 7,000,000.00 14,000,000.00

XI PEKERJAAN LISTRIK 31,594,608.00


1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 37.000 319,880.00 11,835,560.00
2 Pas. Lampu Downlight Stainless 6" - SL 18 Watt Bh 9.000 220,880.00 1,987,920.00
3 Saklar Tunggal Broco Bh 3.000 60,517.00 181,551.00
4 Saklar Ganda Broco Bh 9.000 64,917.00 584,253.00
5 Instalasi Stop Kontak Stop Kontak Broco Bh 9.000 227,838.00 2,050,542.00
6 MCB/Panel Box Sekring Unit 1.000 211,750.00 211,750.00
7 Instalasi Lampu Penerangan Ttk 46.000 287,892.00 13,243,032.00
8 Instalasi Sambungan Listrik dari Sumber Ls 1.000 1,500,000.00 1,500,000.00

XII PEKERJAAN SALURAN KELILING 20,827,145.68


1 Pas. Bata 1/2, 1:3 M2 78.320 140,381.00 10,994,639.92
2 Plesteran Dinding dan Lantai Saluran 1:3 M2 103.840 75,714.00 7,862,141.76
2 Acian Saluran M2 103.840 18,975.00 1,970,364.00

XIII PEKERJAAN AKHIR 5,000,000.00


1 Pembersihan Ls 1.000 5,000,000.00 5,000,000.00
JUMLAH 1,677,497,654.97
PPN 10 % 167,749,765.50
JUMLAH TOTAL 1,845,247,420.47
DIBULATKAN 1,845,247,000.00

TERBILANG : Dua Milyar Dua Ratus Dua Juta Tiga Ratus Sembilan Ribu Rupiah
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI


PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)

I. PEKERJAAN PERSIAPAN 59,464,128.00


II. PEKERJAAN TANAH 29,357,822.99
III. PEKERJAAN PONDASI 107,683,477.60
IV. PEKERJAAN BETON Elv.-10 - 400 cm 717,561,422.65
V PEKERJAAN DINDING 184,782,584.57
VI PEKERJAAN PLAFOND 74,891,500.58
VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 172,018,083.68
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22
IX PEKERJAAN PENGECATAN DAN FINISHING 51,566,414.00
X PEKERJAAN SANITAIR 35,701,956.00
XI PEKERJAAN LISTRIK 31,594,608.00
XII PEKERJAAN SALURAN KELILING 20,827,145.68
XII PEKERJAAN AKHIR 5,000,000.00
JUMLAH 1,677,497,654.97

PPN 10% 167,749,765.50

TOTAL 1,845,247,420.47

DIBULATKAN 1,845,247,000.00

Terbilang : (Tujuh Belas Milyar Empat ratus Lima Puluh Delapan Juta Sembilan Ratus Enam
Puluh Dua Ribu Rupiah )
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 52,964,128.00
1 Bongkaran Bangunan Existing + Buang Keluar Lokasi Ls 1.000 15,000,000.00 15,000,000.00
2 Pembuatan Direksi Keet M2 15.000 1,200,000.00 18,000,000.00
4 Pengukuran dan Pas. Bouplank M' 90.000 102,379.20 9,214,128.00
6 Papan Proyek Bh 1.000 750,000.00 750,000.00
7 Mobilisasi & Demobilisasi Ls 1.000 10,000,000.00 10,000,000.00

II. PEKERJAAN TANAH 26,831,681.95


1 Galian Pondasi Pelat Poer M³ 66.679 115,088.00 7,673,975.77
2 Galian Tanah Pondasi Batu Kali M³ 43.896 94,188.00 4,134,476.45
3 Galian Tanah Sloof M³ 6.900 94,188.00 649,897.20
4 Urugan Tanah Bekas Galian M³ 35.340 31,396.00 1,109,522.08
5 Urugan Tanah bawah Lantai M³ 87.958 116,875.00 10,280,058.53
6 Urugan Pasir di bawah Pondasi M³ 4.383 136,675.00 599,046.53
7 Urugan Pasir di bawah lantai M³ 17.448 136,675.00 2,384,705.40

III.PEKERJAAN PONDASI 107,683,477.60


1 Pasangan Batu Kosong M³ 6.975 520,988.00 3,633,891.30
2 Pasangan Batu Kali 1:4 M³ 21.158 921,498.00 19,496,593.94
3 Pondasi Telapak Beton K-225
- Beton Cor K.225 M³ 12.348 1,115,488.00 13,774,045.82
- Besi Beton U-24 Kg 1,746.638 13,430.00 23,457,351.13
- Bekisting M² 35.280 270,551.00 9,545,039.28
4 Kaki Kolom Beton K-225
- Beton Cor K.225 M³ 4.382 1,115,488.00 4,888,380.75
- Besi Beton U-24 Kg 997.191 13,430.00 13,392,278.03
- Bekisting M² 42.336 460,504.00 19,495,897.34

IV. PEKERJAAN BETON Elv.+30 - 440 cm 717,561,422.65


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Poer & Sloof) M³ 4.801 949,520.00 4,558,835.42
2 Jalan Beton Rabat K-175, T: 20 Cm M³ 3.600 1,037,482.00 3,734,935.20
- Bekisting M² 2.200 270,551.00 595,212.20
3 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 11.170 1,115,488.00 12,460,447.16
- Besi Beton Kg 2,920.287 13,430.00 39,219,447.96
- Bekisting M² 111.704 289,801.00 32,371,930.90
4 Sloof Beton Bertulang K.225, Uk. 20/30
- Beton Cor K.225 M³ 2.180 1,115,488.00 2,431,540.74
- Besi Beton Kg 519.981 13,430.00 6,983,341.61
- Bekisting M² 21.798 289,801.00 6,317,082.20
5 Sloof Beton Bertulang K.225, Uk.15/15
- Beton Cor K.225 M³ 0.092 1,115,488.00 102,903.77
- Besi Beton Kg 21.898 13,430.00 294,091.21
- Bekisting M² 1.230 289,801.00 356,455.23
6 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 14.535 1,115,488.00 16,213,129.50
- Besi Beton Kg 2,682.165 13,430.00 36,021,479.23
- Bekisting M² 140.414 460,504.00 64,661,392.86
7 Kolom Beton Bertulang K.225 20/20
- Beton Cor K.225 M³ 0.230 1,115,488.00 256,611.32
- Besi Beton Kg 85.793 13,430.00 1,152,201.69
- Bekisting M² 5.413 460,504.00 2,492,616.05
8 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 97.200 179,611.00 17,458,189.20
9 Balok Beton Bertulang Tipe I. K.225 35/70
- Beton Cor K.225 M³ 9.067 1,115,488.00 10,114,263.55
- Besi Beton Kg 2,057.384 13,430.00 27,630,664.43
- Bekisting M² 56.670 472,054.00 26,751,064.15
10 Balok Beton Bertulang Type-2 K.225 25/50
- Beton Cor K.225 M³ 6.413 1,115,488.00 7,153,354.60
- Besi Beton Kg 2,597.586 13,430.00 34,885,576.76
- Bekisting M² 58.298 472,054.00 27,519,709.68
11 Balok Beton Bertulang Type Anak K.225 20/30
- Beton Cor K.225 M³ 2.119 1,115,488.00 2,363,291.28
- Besi Beton Kg 1,392.718 13,430.00 18,704,201.24
- Bekisting M² 24.925 472,054.00 11,765,898.74
12 Balok Latai K.175 11/15 + Besi + Bekisting M' 112.100 282,554.00 31,674,303.40
13 Tangga Beton Bertulang K.225
- Beton Cor K.225 M³ 1.748 1,115,488.00 1,949,315.28
- Besi Beton Kg 318.435 13,430.00 4,276,576.41
- Bekisting M² 26.766 421,399.00 11,279,165.63
14 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 38.599 1,115,488.00 43,056,944.41
- Wire Mesh M8 Kg 1,692.189 16,529.00 27,970,190.79
- Pelat Bondek/Metal Deck M² 321.660 445,963.00 143,448,458.58
15 List Plank Beton K-225
- Beton Cor K.225 M³ 2.481 1,115,488.00 2,767,124.15
- Wire Mesh M8 Kg 254.886 16,529.00 4,213,006.73
- Bekisting M² 68.544 472,054.00 32,356,469.38

V PEKERJAAN DINDING 167,427,419.27


1 Pasangan Batu Bata ½, 1:5 M² 452.069 134,878.00 60,974,095.14
2 Plesteran Dinding & Beton 1 : 4 M² 1,131.833 73,824.00 83,556,454.16
3 Plesteran Jalan Beton 1 : 3 M² 15.000 75,714.00 1,135,710.00
4 Acian Dinding Gedung M² 1,146.833 18,975.00 21,761,159.97

VI PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22


1 Pek. Pasang Tegel Lantai Keramik 40/40 M² 346.324 479,703.00 166,132,541.85
2 Pek. Pasang Tegel Keramik 20/20 WC/KM M² 14.625 231,806.00 3,390,162.75
3 Pek. Pasang dinding keramik 20/25 M² 67.095 244,443.00 16,400,903.09
4 Pek. Pasang keramik Meja Beton 40/40 M² 2.345 479,703.00 1,124,903.54

VII PEKERJAAN SANITAIR 33,679,822.00


1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400 21,335.00 968,609.00
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 32.000 25,256.00 808,192.00
3 Pipa Air Kotor PVC Dia. 3" AW M¹ 46.000 96,701.00 4,448,246.00
4 Pipa Air Kotor PVC Dia. 4" AW M¹ 42.000 152,114.00 6,388,788.00
5 Pipa Air Kotor PVC Dia. 2" AW M¹ 36.000 48,114.00 1,732,104.00
6 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 8.000 62,480.00 499,840.00
7 Pasang Stop Kran Dia. 1/2" Bh 4.000 68,049.00 272,196.00
8 Pasang Floor Drain Stainleesteel Bh 5.000 139,700.00 698,500.00
9 Pas. Closed Jongkok Bh 4.000 665,170.00 2,660,680.00
10 Bak Cuci Piring Stainleesteel Bh 1.000 1,415,645.00 1,415,645.00
11 Pas.Westafel Keramik Gantung Bh 2.000 393,511.00 787,022.00
12 Septiktank Lengkap dengan Peresapan Unit 2.000 6,500,000.00 13,000,000.00

VIII PEKERJAAN LISTRIK 3,164,724.00


3 Saklar Tunggal Ex. Broco + Instalasi Pipa Listrik + T. Doz Bh 3.000 147,895.00 443,685.00
4 Saklar Ganda Ex. Broco + Instalasi Pipa Listrik + T. Doz Bh 9.000 151,333.00 1,361,997.00
5 Stop Kontak + Instalasi Pipa Listrik + T. Doz Bh 9.000 134,338.00 1,209,042.00
6 Chasing Panel Box + Instalasi Pipa Listrik Unit 1.000 150,000.00 150,000.00

IX PEKERJAAN ATAP DEPAN 10,286,033.44


1 Pas. Rangka Atap Baja Ringan M² 26.820 194,149.00 5,207,076.18
2 Pas. Atap Genteng Metal M² 26.820 113,080.00 3,032,805.60
3 Pas. Bubungan Genteng Metal M' 4.500 137,671.00 619,519.50
4 Pas. Flashing M' 11.920 88,633.00 1,056,505.36
5 Pas. List Plank 2/20 M² 3.600 102,813.00 370,126.80

X PEKERJAAN LAIN-LAIN 1,801,587.66


1 Cor Meja Beton K-175 M³ 0.243 1,037,482.00 252,108.13
2 Pembesian Meja Beton Kg 29.962 13,430.00 402,388.32
3 Bekisting Meja Beton M² 2.430 472,054.00 1,147,091.22

XI PEKERJAAN AKHIR 3,000,000.00


1 Pembersihan Ls 1.000 3,000,000.00 3,000,000.00
JUMLAH 1,311,448,807.79
PPN 10 % 131,144,880.78
JUMLAH TOTAL 1,442,593,688.57
DIBULATKAN 1,442,593,000.00

SATU MILYAR EMPAT RATUS EMPAT PULUH DUA JUTA EMPAT RATUS LIMA PULUH DELAPAN RIBU
TERBILANG: :
RUPIAH

Mengetahui/Menyetujui Dibuat Oleh


PT. ASRI ABADI KONSULTAN

Alifa Samir, ST Zainal Arifin S, ST


Direktur Utama Cost Estimator
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI


PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 52,964,128.00
II. PEKERJAAN TANAH 26,831,681.95
III. PEKERJAAN PONDASI 107,683,477.60
IV. PEKERJAAN BETON Elv.+30 - 440 cm 717,561,422.65
V PEKERJAAN DINDING 167,427,419.27
VI PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22
VII PEKERJAAN SANITAIR 33,679,822.00
VIII PEKERJAAN LISTRIK 3,164,724.00
IX PEKERJAAN ATAP DEPAN 10,286,033.44
X PEKERJAAN LAIN-LAIN 1,801,587.66
XI PEKERJAAN AKHIR 3,000,000.00
JUMLAH 1,311,448,807.79

PPN 10% 131,144,880.78

TOTAL 1,442,593,688.57

DIBULATKAN 1,442,593,000.00

Terbilang : SATU MILYAR EMPAT RATUS EMPAT PULUH DUA JUTA EMPAT RATUS LIMA PULUH
DELAPAN RIBU RUPIAH
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG Kls III
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
A. LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 73,542,531.20
1 Bongkaran Bangunan Existing + Buang Keluar Lokasi Ls 1.000 15,000,000.00 15,000,000.00
2 Pembuatan Direksi Keet M2 15.000 1,200,000.00 18,000,000.00
3 Pengukuran dan Pas. Bouplank M' 90.000 102,379.20 9,214,128.00
4 Pengukuran dan Pas. Bouplank Tahap II M' 96.000 102,379.20 9,828,403.20
5 Papan Proyek Tahap Bh 1.000 750,000.00 750,000.00
6 Papan Proyek Tahap II Bh 1.000 750,000.00 750,000.00
7 Mobilisasi & Demobilisasi Ls 1.000 20,000,000.00 20,000,000.00

II. PEKERJAAN TANAH 26,831,681.95


1 Galian Pondasi Pelat Poer M³ 66.679 115,088.00 7,673,975.77
2 Galian Tanah Pondasi Batu Kali M³ 43.896 94,188.00 4,134,476.45
3 Galian Tanah Sloof M³ 6.900 94,188.00 649,897.20
4 Urugan Tanah Bekas Galian M³ 35.340 31,396.00 1,109,522.08
5 Urugan Tanah bawah Lantai M³ 87.958 116,875.00 10,280,058.53
6 Urugan Pasir di bawah Pondasi M³ 4.383 136,675.00 599,046.53
7 Urugan Pasir di bawah lantai M³ 17.448 136,675.00 2,384,705.40

III. PEKERJAAN PONDASI 107,683,477.60


1 Pasangan Batu Kosong M³ 6.975 520,988.00 3,633,891.30
2 Pasangan Batu Kali 1:4 M³ 21.158 921,498.00 19,496,593.94
3 Pondasi Telapak Beton K-225
- Beton Cor K.225 M³ 12.348 1,115,488.00 13,774,045.82
- Besi Beton U-24 Kg 1,746.638 13,430.00 23,457,351.13
- Bekisting M² 35.280 270,551.00 9,545,039.28
4 Kaki Kolom Beton K-225
- Beton Cor K.225 M³ 4.382 1,115,488.00 4,888,380.75
- Besi Beton U-24 Kg 997.191 13,430.00 13,392,278.03
- Bekisting M² 42.336 460,504.00 19,495,897.34

IV. PEKERJAAN BETON Elv.-10 - 400 cm 717,561,422.65


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Poer & Sloof) M³ 4.801 949,520.00 4,558,835.42
2 Jalan Beton Rabat K-175, T: 20 Cm M³ 3.600 1,037,482.00 3,734,935.20
- Bekisting M² 2.200 270,551.00 595,212.20
3 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 11.170 1,115,488.00 12,460,447.16
- Besi Beton Kg 2,920.287 13,430.00 39,219,447.96
- Bekisting M² 111.704 289,801.00 32,371,930.90
4 Sloof Beton Bertulang K.225, Uk. 20/30
- Beton Cor K.225 M³ 2.180 1,115,488.00 2,431,540.74
- Besi Beton Kg 519.981 13,430.00 6,983,341.61
- Bekisting M² 21.798 289,801.00 6,317,082.20
5 Sloof Beton Bertulang K.225, Uk.15/15
- Beton Cor K.225 M³ 0.092 1,115,488.00 102,903.77
- Besi Beton Kg 21.898 13,430.00 294,091.21
- Bekisting M² 1.230 289,801.00 356,455.23
6 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 14.535 1,115,488.00 16,213,129.50
- Besi Beton Kg 2,682.165 13,430.00 36,021,479.23
- Bekisting M² 140.414 460,504.00 64,661,392.86
7 Kolom Beton Bertulang K.225 20/20
- Beton Cor K.225 M³ 0.230 1,115,488.00 256,611.32
- Besi Beton Kg 85.793 13,430.00 1,152,201.69
- Bekisting M² 5.413 460,504.00 2,492,616.05
8 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 97.200 179,611.00 17,458,189.20
9 Balok Beton Bertulang Tipe I. K.225 35/70
- Beton Cor K.225 M³ 9.067 1,115,488.00 10,114,263.55
- Besi Beton Kg 2,057.384 13,430.00 27,630,664.43
- Bekisting M² 56.670 472,054.00 26,751,064.15
10 Balok Beton Bertulang Type-2 K.225 25/50
- Beton Cor K.225 M³ 6.413 1,115,488.00 7,153,354.60
- Besi Beton Kg 2,597.586 13,430.00 34,885,576.76
- Bekisting M² 58.298 472,054.00 27,519,709.68
11 Balok Beton Bertulang Type Anak K.225 20/30
- Beton Cor K.225 M³ 2.119 1,115,488.00 2,363,291.28
- Besi Beton Kg 1,392.718 13,430.00 18,704,201.24
- Bekisting M² 24.925 472,054.00 11,765,898.74
12 Balok Latai K.175 11/15 + Besi + Bekisting M' 112.100 282,554.00 31,674,303.40
13 Tangga Beton Bertulang K.225
- Beton Cor K.225 M³ 1.748 1,115,488.00 1,949,315.28
- Besi Beton Kg 318.435 13,430.00 4,276,576.41
- Bekisting M² 26.766 421,399.00 11,279,165.63
14 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 38.599 1,115,488.00 43,056,944.41
- Wire Mesh M8 Kg 1,692.189 16,529.00 27,970,190.79
- Pelat Bondek/Metal Deck M² 321.660 445,963.00 143,448,458.58
15 List Plank Beton K-225
- Beton Cor K.225 M³ 2.481 1,115,488.00 2,767,124.15
- Wire Mesh M8 Kg 254.886 16,529.00 4,213,006.73
- Bekisting M² 68.544 472,054.00 32,356,469.38

V PEKERJAAN DINDING 167,427,419.27


1 Pasangan Batu Bata ½, 1:5 M² 452.069 134,878.00 60,974,095.14
2 Plesteran Dinding & Beton 1 : 4 M² 1,131.833 73,824.00 83,556,454.16
3 Plesteran Jalan Beton 1 : 3 M² 15.000 75,714.00 1,135,710.00
4 Acian Dinding Gedung M² 1,146.833 18,975.00 21,761,159.97

VI PEKERJAAN PLAFOND 74,891,500.58


1 Pek. Rangka Plafond Hollow Galvanized M² 336.660 103,813.00 34,949,684.58
2 Pek. Plafond Gipsum M² 229.500 54,049.00 12,404,245.50
3 Pek. Plafond GRC M² 93.660 59,950.00 5,614,917.00
4 Pas. List Plafond Gipsum M' 263.250 52,910.00 13,928,557.50
5 Pas.List Plafond Kalsiboard M' 169.600 47,135.00 7,994,096.00

VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 133,008,104.43


1 Pas. Pintu PVC Km/Wc Unit 4 1,200,000.00 4,800,000.00
2 Pas. Bingkai Pintu PV1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 41.520 169,675.00 7,044,906.00
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 33.120 185,994.00 6,160,121.28
- Pas. Bingkai Daun Jendela Aluminium Frame M' 14.280 184,905.00 2,640,443.40
- Pas. Kaca Bening 5mm M² 9.595 333,163.00 3,196,765.62
- Pas. Stiker Standblast M² 3.960 45,100.00 178,596.00
- Pas. Engsel Pintu Bh 18.000 35,743.00 643,374.00
- Pas. Engsel Jendela Bh 12.000 29,219.00 350,628.00
- Pas. Kunci Tanam 2 Slaag Bh 6.000 262,873.00 1,577,238.00
- Pas. Handle Pintu Bh 12.000 400,373.00 4,804,476.00
- Pas. Grendle Aluminium/Rambuncis Bh 6.000 38,129.00 228,774.00
3 Pas. Bingkai Pintu PV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 25.890 169,675.00 4,392,885.75
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 31.860 185,994.00 5,925,768.84
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.960 184,905.00 2,396,368.80
- Pas. Kaca Bening 5mm M² 8.106 333,163.00 2,700,719.23
- Pas. Stiker Standblast M² 3.330 45,100.00 150,183.00
- Pas. Engsel Pintu Bh 18.000 35,743.00 643,374.00
- Pas. Engsel Jendela Bh 12.000 29,219.00 350,628.00
- Pas. Kunci Tanam 2 Slaag Bh 3.000 262,873.00 788,619.00
- Pas. Handle Pintu Bh 12.000 400,373.00 4,804,476.00
- Pas. Grendle Aluminium/Rambuncis Bh 6.000 38,129.00 228,774.00
- Pas. Grendle Pintu Tanam M² 3.000 82,679.00 248,037.00
4 Pas. Bingkai Jendela JV1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 11.200 169,675.00 1,900,360.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 11.220 184,905.00 2,074,634.10
- Pas. Kaca Bening 5mm M² 1.872 333,163.00 623,814.40
- Pas. Engsel Jendela Bh 8.000 29,219.00 233,752.00
- Pas. Grendle Aluminium/Rambuncis Bh 4.000 38,129.00 152,516.00
5 Pas. Bingkai Jendela JV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.400 169,675.00 2,952,345.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 22.440 184,905.00 4,149,268.20
- Pas. Kaca Bening 5mm M² 3.745 333,163.00 1,247,628.80
- Pas. Engsel Jendela Bh 16.000 29,219.00 467,504.00
- Pas. Grendle Aluminium/Rambuncis Bh 8.000 38,129.00 305,032.00
6 Pas. Bingkai Jendela JV3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 97.600 169,675.00 16,560,280.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 134.640 184,905.00 24,895,609.20
- Pas. Kaca Bening 5mm M² 22.469 333,163.00 7,485,772.81
- Pas. Engsel Jendela Bh 96.000 29,219.00 2,805,024.00
- Pas. Grendle Aluminium/Rambuncis Bh 48.000 38,129.00 1,830,192.00
7 Pas. Bingkai Jendela V1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 7.200 169,675.00 1,221,660.00
- Pas. Ventilasi Kaca Bening 5mm M² 1.080 333,163.00 359,816.04
8 Pas. Bingkai Jendela V2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.300 169,675.00 729,602.50
- Pas. Ventilasi Kaca Bening 5mm M² 0.720 333,163.00 239,877.36
9 Pas. Bingkai Jendela V3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 24.800 169,675.00 4,207,940.00
- Pas. Ventilasi Kaca Bening 5mm M² 4.320 333,163.00 1,439,264.16
10 Pas. Bingkai Pintu P4 (Pintu Saff)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 5.150 169,675.00 873,826.25
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 4.790 185,994.00 890,911.26
- Pas. Kaca Rayben 5mm M² 0.991 285,973.00 283,356.35
- Pas. Engsel Pintu Bh 3.000 35,743.00 107,229.00
- Pas. Kunci Tanam 2 Slaag Bh 1.000 262,873.00 262,873.00
- Pas. Handle Pintu Bh 1.000 400,373.00 400,373.00
11 Pas. Rooster Keramik 30/30 Bh 1.000 52,487.08 52,487.08

VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22


1 Pek. Pasang Tegel Lantai Keramik 40/40 M² 346.324 479,703.00 166,132,541.85
2 Pek. Pasang Tegel Keramik 20/20 WC/KM M² 14.625 231,806.00 3,390,162.75
3 Pek. Pasang dinding keramik 20/25 M² 67.095 244,443.00 16,400,903.09
4 Pek. Pasang keramik meja wastafel 40/40 M² 2.345 479,703.00 1,124,903.54

IX PEKERJAAN PENGECATAN DAN FINISHING 51,783,036.80


1 Cat Dinding dan Beton M² 1,131.833 35,441.00 40,113,300.44
2 Cat Plafond M² 323.160 35,441.00 11,453,113.56
3 Cat List Plank M² 3.600 60,173.00 216,622.80

X PEKERJAAN SANITAIR 33,679,822.00


1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400 21,335.00 968,609.00
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 32.000 25,256.00 808,192.00
3 Pipa Air Kotor PVC Dia. 3" AW M¹ 46.000 96,701.00 4,448,246.00
4 Pipa Air Kotor PVC Dia. 4" AW M¹ 42.000 152,114.00 6,388,788.00
5 Pipa Air Kotor PVC Dia. 2" AW M¹ 36.000 48,114.00 1,732,104.00
6 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 8.000 62,480.00 499,840.00
7 Pasang Stop Kran Dia. 1/2" Bh 4.000 68,049.00 272,196.00
8 Pasang Floor Drain Stainleesteel Bh 5.000 139,700.00 698,500.00
9 Pas. Closed Jongkok Bh 4.000 665,170.00 2,660,680.00
10 Bak Cuci Piring Stainleesteel Bh 1.000 1,415,645.00 1,415,645.00
11 Pas.Westafel Keramik Gantung Bh 2.000 393,511.00 787,022.00
12 Septiktank Lengkap dengan Peresapan Unit 2.000 6,500,000.00 13,000,000.00

XI PEKERJAAN LISTRIK 37,422,736.00


1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 37.000 319,880.00 11,835,560.00
2 Pas. Lampu Downlight Stainless 6" - SL 18 Watt Bh 9.000 220,880.00 1,987,920.00
3 Saklar Tunggal Ex. Broco + Instalasi Pipa Listrik Bh 3.000 147,895.00 443,685.00
4 Saklar Ganda Broco Ex. Broco + Instalasi Pipa Listrik Bh 9.000 151,333.00 1,361,997.00
5 Instalasi Stop Kontak Stop Kontak Broco Bh 9.000 227,838.00 2,050,542.00
6 Panel Box Sekring + Instalasi Pipa Unit 1.000 5,000,000.00 5,000,000.00
7 Instalasi Lampu Penerangan Ttk 46.000 287,892.00 13,243,032.00
8 Instalasi Sambungan Listrik dari Sumber Ls 1.000 1,500,000.00 1,500,000.00

XII PEKERJAAN ATAP DEPAN 10,286,033.44


1 Pas. Rangka Atap Baja Ringan M² 26.820 194,149.00 5,207,076.18
2 Pas. Atap Genteng Metal M² 26.820 113,080.00 3,032,805.60
3 Pas. Bubungan Genteng Metal M' 4.500 137,671.00 619,519.50
4 Pas. Flashing M' 11.920 88,633.00 1,056,505.36
5 Pas. List Plank 2/20 M² 3.600 102,813.00 370,126.80

XIII PEKERJAAN LAIN-LAIN LT. 1 25,154,874.38


1 Pas. Bata Saluran Bt 1/2, 1:3 M² 78.320 140,381.00 10,994,639.92
2 Plesteran Dinding dan Lantai Saluran 1:3 M² 103.840 75,714.00 7,862,141.76
3 Acian Saluran M² 103.840 18,975.00 1,970,364.00
4 Galian Saluran M³ 23.883 94,188.00 2,249,510.84
5 Urugan Pasir Bawah Saluran M³ 2.024 136,675.00 276,630.20
4 Cor Meja Beton K-175 M³ 0.243 1,037,482.00 252,108.13
5 Pembesian Meja Beton U-24 Kg 29.962 13,430.00 402,388.32
6 Bekisting Meja Beton M² 2.430 472,054.00 1,147,091.22

B. LANTAI 2, Elv. + 4,40 - 10,35 M

I. PEKERJAAN BETON Elv.+ 440 cm - + 790 cm 191,234,330.59


1 Kolom Beton Bertulang K.225 30/30
- Beton Cor K.225 M³ 5.358 1,115,488.00 5,976,952.03
- Besi Beton Kg 2,071.699 13,430.00 27,822,916.63
- Bekisting M² 79.380 460,504.00 36,554,807.52
2 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 102.100 179,611.00 18,338,283.10
3 Ring Balk Beton Bertulang Type Anak K.225 15/20
- Beton Cor K.225 M³ 1.043 1,115,488.00 1,162,896.24
- Besi Beton Kg 272.427 13,430.00 3,658,697.83
- Bekisting M² 19.113 472,054.00 9,022,132.08
4 Ring Balk Beton Bertulang Type Anak K.225 20/30
- Beton Cor K.225 M³ 5.291 1,115,488.00 5,901,756.98
- Besi Beton Kg 1,525.320 13,430.00 20,485,042.77
- Bekisting M² 80.104 472,054.00 37,813,413.62
5 Balok Latai/praktis K.175 11/15 + Besi + Bekisting M' 86.700 282,554.00 24,497,431.80
II. PEKERJAAN DINDING 148,802,474.29
1 Pasangan Batu Bata ½, 1:5 M² 459.223 134,878.00 61,939,079.79
2 Plesteran Dinding & Beton 1 : 4 M² 915.107 73,824.00 67,556,859.17
3 Acian Dinding Gedung M² 915.107 18,975.00 17,364,155.33
4 Waterproofing Area Km/wc M² 36.000 53,955.00 1,942,380.00

III. PEKERJAAN PLAFOND 70,877,975.08


1 Pek. Rangka Plafond Hollow Galvanized M² 335.160 103,813.00 34,793,965.08
2 Pek. Plafond Gipsum M² 243.000 54,049.00 13,133,907.00
3 Pek. Plafond GRC M² 92.160 59,950.00 5,524,992.00
4 Pas. List Plafond Gipsum M' 192.500 52,910.00 10,185,175.00
5 Pas.List Plafond GRC M' 153.600 47,135.00 7,239,936.00

IV. PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 135,530,492.84


1 Pas. Pintu PVC Km/Wc Unit 4.000 1,200,000.00 4,800,000.00
2 Pas. Bingkai Pintu PV1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 34.600 169,675.00 5,870,755.00
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 27.600 185,994.00 5,133,434.40
- Pas. Bingkai Daun Jendela Aluminium Frame M' 11.900 184,905.00 2,200,369.50
- Pas. Kaca Bening 5mm M² 7.996 333,163.00 2,663,971.35
- Pas. Stiker Standblast M² 3.300 45,100.00 148,830.00
- Pas. Engsel Pintu Bh 15.000 35,743.00 536,145.00
- Pas. Engsel Jendela Bh 10.000 29,219.00 292,190.00
- Pas. Kunci Tanam 2 Slaag Bh 5.000 262,873.00 1,314,365.00
- Pas. Handle Pintu Bh 10.000 400,373.00 4,003,730.00
- Pas. Grendle Aluminium/Rambuncis Bh 5.000 38,129.00 190,645.00
3 Pas. Bingkai Pintu PV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 25.890 169,675.00 4,392,885.75
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 31.860 185,994.00 5,925,768.84
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.960 184,905.00 2,396,368.80
- Pas. Kaca Bening 5mm M² 8.106 333,163.00 2,700,719.23
- Pas. Stiker Standblast M² 3.330 45,100.00 150,183.00
- Pas. Engsel Pintu Bh 18.000 35,743.00 643,374.00
- Pas. Engsel Jendela Bh 12.000 29,219.00 350,628.00
- Pas. Kunci Tanam 2 Slaag Bh 3.000 262,873.00 788,619.00
- Pas. Handle Pintu Bh 12.000 400,373.00 4,804,476.00
- Pas. Grendle Aluminium/Rambuncis Bh 6.000 38,129.00 228,774.00
- Pas. Grendle Pintu Tanam M² 3.000 82,679.00 248,037.00
4 Pas. Bingkai Jendela JV2
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 34.800 169,675.00 5,904,690.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 44.880 184,905.00 8,298,536.40
- Pas. Kaca Bening 5mm M² 7.490 333,163.00 2,495,257.60
- Pas. Engsel Jendela Bh 32.000 29,219.00 935,008.00
- Pas. Grendle Aluminium/Rambuncis Bh 16.000 38,129.00 610,064.00
5 Pas. Bingkai Jendela JV3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 109.800 169,675.00 18,630,315.00
- Pas. Bingkai Daun Jendela Aluminium Frame M' 151.470 184,905.00 28,007,560.35
- Pas. Kaca Bening 5mm M² 25.277 333,163.00 8,421,494.42
- Pas. Engsel Jendela Bh 108.000 29,219.00 3,155,652.00
- Pas. Grendle Aluminium/Rambuncis Bh 54.000 38,129.00 2,058,966.00
6 Pas. Bingkai Jendela V1
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 7.200 169,675.00 1,221,660.00
- Pas. Ventilasi Kaca Bening 5mm M² 1.080 333,163.00 359,816.04
7 Pas. Bingkai Jendela V3
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 24.800 169,675.00 4,207,940.00
- Pas. Ventilasi Kaca Bening 5mm M² 4.320 333,163.00 1,439,264.16

V. PEKERJAAN PENUTUP LANTAI DAN DINDING 180,974,332.35


1 Pek. Pasang Tegel Lantai dan Tangga Keramik 40/40 M² 307.035 479,703.00 147,285,610.61
2 Pek. Pasang Tegel Keramik 20/20 WC/KM M² 14.625 231,806.00 3,390,162.75
3 Pek. Pasang dinding keramik 20/25 M² 67.095 244,443.00 16,400,903.09
4 Pek. Pasang keramik meja wastafel 40/40 M² 2.250 479,703.00 1,079,331.75
5 Pek. Pasang keramik Tangga 40/40 M² 19.485 657,856.00 12,818,324.16

VI. PEKERJAAN PENGECATAN DAN FINISHING 45,783,747.79


1 Cat Dinding dan Beton M² 915.107 35,441.00 32,432,307.19
2 Cat Plafond M² 335.160 35,441.00 11,878,405.56
3 Cat List Plank M² 24.480 60,173.00 1,473,035.04
VII. PEKERJAAN SANITAIR 9,468,536.00
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 12.200 21,335.00 260,287.00
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 6.000 25,256.00 151,536.00
3 Pipa Air Kotor PVC Dia. 3" AW M¹ 8.000 96,701.00 773,608.00
4 Pipa Air Kotor PVC Dia. 4" AW M¹ 12.000 152,114.00 1,825,368.00
5 Pipa Air Kotor PVC Dia. 2" AW M¹ 8.000 48,114.00 384,912.00
6 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 6.000 62,480.00 374,880.00
7 Pasang Stop Kran Dia. 1/2" Bh 2.000 68,049.00 136,098.00
8 Pasang Floor Drain Stainleesteel Bh 5.000 139,700.00 698,500.00
9 Pas. Closed Jongkok Bh 4.000 665,170.00 2,660,680.00
10 Bak Cuci Piring Stainleesteel Bh 1.000 1,415,645.00 1,415,645.00
11 Pas.Westafel Keramik Gantung Bh 2.000 393,511.00 787,022.00

VIII. PEKERJAAN LISTRIK 42,435,793.00


1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 36.000 319,880.00 11,515,680.00
2 Pas. Lampu Downlight Stainless 6" - SL 18 Watt Bh 9.000 220,880.00 1,987,920.00
3 Saklar Tunggal Ex. Broco + Instalasi Pipa Listrik Bh 3.000 147,895.00 443,685.00
4 Saklar Ganda Broco Ex. Broco + Instalasi Pipa Listrik Bh 8.000 151,333.00 1,210,664.00
5 Instalasi Stop Kontak Stop Kontak Broco Bh 8.000 227,838.00 1,822,704.00
6 Panel Box Sekring + MCB LENGKAP + Instalasi Kabel Tray Unit 1.000 12,500,000.00 12,500,000.00
7 Instalasi Lampu Penerangan Ttk 45.000 287,892.00 12,955,140.00

IX. PEKERJAAN PENUTUP ATAP 144,421,993.52


1 Pas. Rangka Atap Baja Ringan M² 433.018 194,149.00 84,070,062.16
2 Pas. Atap Genteng Metal M² 440.247 113,080.00 49,783,083.27
3 Pas. Bubungan Genteng Metal M' 57.824 137,671.00 7,960,687.90
4 Pas. List Plank 2/20 M² 25.368 102,813.00 2,608,160.18

X. PEKERJAAN LAIN-LAIN LT. 2 29,500,763.66


1 Pekerjaan Meja Beton K-175
- Cor Meja Beton K-175 M³ 0.243 1,037,482.00 252,108.13
- Pembesian Meja Beton U-24 Kg 29.962 13,430.00 402,388.32
- Bekisting Meja Beton M² 2.430 472,054.00 1,147,091.22
2 Ralling Tangga Stainlees Steel M' 8.600 1,323,160.00 11,379,176.00
3 Profil Dinding Pagar Balkon M' 81.600 200,000.00 16,320,000.00

XI. PEKERJAAN JALAN MASUK DAN PARKIR 86,589,747.26


1 Pekerjaan Pelat Duicker
- Cor Beton Pelat Duicker K-225 M³ 2.295 1,115,488.00 2,560,044.96
- Besi Beton Kg 499.039 13,430.00 6,702,100.32
- Bekisting Pelat M² 7.650 472,054.00 3,611,213.10
- Pas. Batu Kali Pondasi Pelat Duicker M³ 10.170 921,498.00 9,371,634.66
- Galian Pondasi Pelat Duicker M³ 11.610 115,088.00 1,336,171.68
- Beton Rabat K-175 M³ 0.338 1,037,482.00 350,150.18
- Pas. Batu bata Tebal. 1 Bt, Camp. 1:4 M² 2.040 285,709.00 582,846.36
2 Pekerjaan Paving Block
- Pas. Paving Block M² 156.000 379,429.00 59,190,924.00
3 Pas. Canstain M' 18.000 160,259.00 2,884,662.00

XII. PEKERJAAN AKHIR 7,000,000.00


1 Pembersihan Ls 1.000 7,000,000.00 7,000,000.00

JUMLAH 2,738,941,337.89
PPN 10 % 273,894,133.79
JUMLAH TOTAL 3,012,835,471.68
DIBULATKAN 3,012,835,000.00

TERBILANG : Dua Milyar Sembilan Ratus Enam Puluh Tiga Juta Tiga Ratus Enam Puluh Tujuh Ribu Rupiah

Mengetahui/Menyetujui Dibuat Oleh


PT. ASRI ABADI KONSULTAN

Alifa Samir, ST Zainal Arifin S, ST


Direktur Utama Cost Estimator
REKAPITULASI DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN GEDUNG Kls III 0


PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
A. LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN 73,542,531.20
II. PEKERJAAN TANAH 26,831,681.95
III. PEKERJAAN PONDASI 107,683,477.60
IV. PEKERJAAN BETON Elv.-10 - 400 cm 717,561,422.65
V PEKERJAAN DINDING 167,427,419.27
VI PEKERJAAN PLAFOND 74,891,500.58
VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 133,008,104.43
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 187,048,511.22
IX PEKERJAAN PENGECATAN DAN FINISHING 51,783,036.80
X PEKERJAAN SANITAIR 33,679,822.00
XI PEKERJAAN LISTRIK 37,422,736.00
XII PEKERJAAN ATAP DEPAN 10,286,033.44
XIII PEKERJAAN LAIN-LAIN LT. 1 25,154,874.38

B. LANTAI 2, Elv. + 4,40 - 10,35 M


I PEKERJAAN BETON Elv.+ 440 cm - + 790 cm 191,234,330.59
II PEKERJAAN DINDING 148,802,474.29
III PEKERJAAN PLAFOND 70,877,975.08
IV PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 135,530,492.84
V PEKERJAAN PENUTUP LANTAI DAN DINDING 180,974,332.35
VI PEKERJAAN PENGECATAN DAN FINISHING 45,783,747.79
VII PEKERJAAN SANITAIR 9,468,536.00
VIII PEKERJAAN LISTRIK 42,435,793.00
IX PEKERJAAN PENUTUP ATAP 144,421,993.52
X PEKERJAAN LAIN-LAIN LT. 2 29,500,763.66
XI PEKERJAAN JALAN MASUK DAN PARKIR 86,589,747.26
XII PEKERJAAN AKHIR 7,000,000.00

JUMLAH 2,738,941,337.89

PPN 10% 273,894,133.79

TOTAL 3,012,835,471.68

DIBULATKAN 3,012,835,000.00

Terbilang : (Dua Milyar Sembilan Ratus Enam Puluh Tiga Juta Tiga Ratus Enam Puluh Tujuh Ribu
Rupiah)
REKAPITULASI BILL OF QUANTITY

KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI


PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
LANTAI 1, Elv. -1,62 - 4,40 M
I. PEKERJAAN PERSIAPAN -
II. PEKERJAAN TANAH -
III. PEKERJAAN PONDASI -
IV. PEKERJAAN BETON Elv.+30 - 440 cm -
V PEKERJAAN DINDING -
VI PEKERJAAN PENUTUP LANTAI DAN DINDING -
VII PEKERJAAN SANITAIR -
VIII PEKERJAAN LISTRIK -
IX PEKERJAAN ATAP DEPAN -
X PEKERJAAN LAIN-LAIN -
XI PEKERJAAN AKHIR -
JUMLAH -

PPN 10% -

TOTAL -

DIBULATKAN -

Terbilang :

Dibuat Oleh
CV/PT. ....................................

_________________________
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN
KEGIATAN : PEMBANGUNAN GEDUNG Kls III TAHAP I
SKPD : RUMAH SAKIT JIWA PROF. Dr. V. L. RATUMBUYSANG
LOKASI : MANADO
TAHUN ANGGARAN : 2015

HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
( Rp. )

UPAH
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH

BAHAN
1 Alumunium Frame/Bingkai Jendela+Siku+Profil Kaca m'
2 Alumunium Profil Daun Pintu Warna Coklat m'
3 Alumunium Profil 4" Warna Coklat m'
4 Air Kerja m3
5 Atap Genteng Metal (Setara Multi Roof) m2
6 Amplas Bh
7 Baja H Beam Kg
8 Bak Cuci Piring Stainless Steel (1 Lubang) Bh
9 Batu Alam/Bunga m2
10 Batu Bata Bh
11 Batu Kali/Belah m3
12 Batu Pecah 20-30 mm m3
13 Baut Rangka Baja Ringan (Screw Driver) Bh
18 Besi Beton Kg
19 Besi Holow 2x4 m
20 Besi Holow 4x4 m
21 Besi Holow 8x8 m
22 Besi Holow 2x4 Galvanis Btg
23 Besi Holow 2x4 Galvanis/m m
24 Besi Holow 4x4 Galvanis Btg
25 Besi Holow 4x4 Galvanis/m m
25 Besi Siku 50.50.5 Kg
28 Bubungan/Nok Genteng Metal (Setara Multi Roof) Bh
29 Canal C Uk.1.25x0.50 m
30 Canstain 15x30x50 Bh
31 Cat Menie Kg
32 Cat Minyak Kg
33 Cat Dasar tembok Kg
34 Cat Tembok (Metrolite/Catylac/Setara) Kg
35 Cladding (Alumunium Composite Panel) m2
36 Dolken Kayu Ø 8-10/400 cm Btg
36 Dolken/Bambu Ø 8-10 cm P = 4m Btg
37 Dynabolt Bh
38 Down Light 6" Bh
39 Electric Air Conditioning; City Multi R410a Inverter Unit
40 Engsel Pintu Aluminium Bh
41 Engsel Jendela Aluminium Bh
42 Floor Drain Stainlees Steel Bh
43 Flashing Genteng Metal (setara Multi roof) M'
44 GRC 4 mm m2
45 Gypsum 9 mm Lbr
46 Grendle Pintu Tanam Bh
46 Grendle JendelaAluminium/Rambuncis Bh
47 Hollow Breeck kw 1 Bh
48 Handle Solid Type HP 61.04 Silver(Stainleesteell) Bh
49 Kabel NYM 2x2,25 M'
50 Kabel NYM 1x2,26 M'
51 Kaca Bening 12 mm m2
52 Kaca Bening 15 mm m2
53 Kaca Bening 5 mm m2
54 Kaca Rayben 5 mm m2
55 Kaca Sandblast 8 mm m2
56 Kaca Tempered 12 mm m2
56 Kaca Tempered 8 mm m2
57 Kalsiboard 6 mm Lbr
58 Kawat Beton Kg
59 Kawat Las Kg
60 Kayu 5/7 m3
61 Kayu Kls. II m3
62 Kayu Kls. III m3
63 Kerikil m3
64 Kunci Tanam 2 Slaag Bh
65 Kunci Cylinder Bh
66 Kusen PVC Best Quality Unit
67 Kloset Duduk Bh
67 Kloset Jongkok Unit
68 Koral Beton m3
69 Kuas 3" Bh
70 Lampu SL 23 Watt Bh
71 Lampu SL 18 Watt Bh
72 Lem Kg
73 List Karet Kaca M'
74 List Profil Gypsum m
75 List Profil Kalsiboard m
76 Mata Kran Ø ½" Bh
77 Meni besi Kg
77 Metal Furing Ujg
78 Minyak Bekisting Ltr
79 Nok Samping Genteng Metal (Setara multi roof) Bh
80 Paku Kg
81 Paku Sekrup Kg
82 Panel Box MCB Unit
83 Pasir Beton m3
84 Pasir Pasang m3
85 Pasir Urug m3
86 Paving Stone Bh
87 Pembesian Kg
88 Pengelasan cm
88 Penggantung Kawat Aluminium. + Ramzet Bh
89 Pintu Km PVC Lengkap + Kunci Unit
90 Pipa Black Steel Ø 2 ½ " Medium A m
91 Pipa Black Steel Ø 3 " Medium A m
92 Pipa PVC Ø5/8" Btg
93 Pipa Galvanised Ø ½" Bh
94 Pipa Galvanised Ø ¾" Bh
95 Pipa Galvanised Ø 1" Bh
96 Pipa Galvanised Ø 2" Bh
97 Pipa Galvanised Ø 3" Bh
98 Pipa Galvanised Ø 4" Bh
98 Pipa Stainless Steel Ø 1" m
99 Pipa Stainless Steel Ø 1½" m
100 Pipa Stainless Steel Ø 2" m
101 Pipa Stainless Steel Ø 3" m
102 Plamur Tembok Kg
103 Plat Bondex 0.7 BMT Galvanize m2
104 Playwood 9 mm Lbr
105 Plesteran 1:4 m2
106 Profil C-75, 08 Baja Ringan m'
107 Profil C-75, 06 Baja Ringan m'
108 Profil Reng Baja Ringan m'
108 Profil Talang Jurai (Rangka Baja Ringan) m'
109 Rooster Keramik 30/30 Bh
110 Rol Cat Bh
111 Saklar Tunggal Bh
112 Saklar Ganda Bh
113 Sealant Putih Tube
114 Sekrup Fixer Bh
115 Semen Portland Kg
116 Semen Warna Kg
117 Seng Gelombang 3"-5" Lbr
118 Sincalnium 2x4x400 m
119 Sincalume Lbr
119 Spandek Lbr
120 Sterofoam m2
121 Stifenner Bh
122 Stiker Kaca Sand blast m2
123 Stop Kontak Bh
124 Stop Kran Ø ½" Bh
125 Stop Kran Ø 1" Bh
126 Solar Ltr
127 T. Dos PVC Bh
128 Tanah Urug m3
129 Tegel Keramik 20 x 20 cm (anti slip) Bh
129 Tegel Keramik 20 x 25 cm Bh
130 Tegel Keramik 40 x 40 cm Bh
131 Tegel Keramik 25 x 30 cm Bh
132 Tegel Keramik 25 x 40 cm Bh
133 Tegel Keramik 30 x 30 cm Bh
134 Tegel Keramik 30 x 30 cm (anti slip) Bh
135 Tegel Keramik 60 x 60 cm Bh
136 Thinner Ltr
137 Varnis / Politur Kg
138 Wall Paper L. 50 cm m
139 Wastafel KeramikGantung Bh
139 Waterproofing Coating Sistem Kg
140 Waterproofing Membrane Sheelt Sistem M2
141 Water Drain + Accesoris Bh
142 Wiremesh M8 Lbr
143 Wiremesh M8/Kg Kg
144 Wood Filler / Dumpul Kayu Kg
PERALATAN
III. ALAT
1 Mesin Las + Gurinda Potong 1 Set Jam
2 Concrete Pump Jam
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG STAIN
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)

I. PEKERJAAN PERSIAPAN 86,239,283.26


1 Pekerjaan Pembersihan Lokasi Ls 1.000 15,000,000.00 15,000,000.00
2 Pembuatan Direksi Kit M2 20.000 700,000.00 14,000,000.00
3 Pembuatan Gudang dan Barak M2 40.000 700,000.00 28,000,000.00
4 Pengukuran dan Pas. Bouplank Ls 82.920 102,379.20 8,489,283.26
5 Papan Proyek Tahap Bh 1.000 750,000.00 750,000.00
6 Mobilisasi & Demobilisasi Ls 1.000 20,000,000.00 20,000,000.00

II. PEKERJAAN TANAH 45,265,354.74


1 Galian Tanah M³ 141.378 94,188.00 13,316,111.06
2 Urugan Tanah Bekas Galian M³ 47.126 31,396.00 1,479,567.90
3 Urugan Tanah bawah Lantai M³ 163.500 116,875.00 19,109,062.50
4 Urugan Tanah bawah Car Port M³ 64.000 116,875.00 7,480,000.00
5 Urugan Pasir di bawah lantai M³ 16.350 136,675.00 2,234,636.25
6 Urugan Pasir di bawah Car Port M³ 3.200 136,675.00 437,360.00
7 Urugan Pasir di bawah Pondasi M³ 8.843 136,675.00 1,208,617.03

III.PEKERJAAN PONDASI 125,963,870.99


1 Pasangan Batu Kosong M³ 27.524 520,988.00 14,339,673.71
2 Pasangan Batu Kali 1:4 M³ 38.370 921,498.00 35,357,878.26
3 Pondasi Telapak Beton K-225, Uk. 150x120 Cm
- Beton Cor K.225 M³ 13.600 1,115,488.00 15,170,636.80
- Besi Beton Kg 2,346.827 13,430.00 31,517,887.92
- Bekisting M² 79.200 270,551.00 21,427,639.20
4 Pondasi Telapak Beton K-225, Uk. 90x90 Cm
- Beton Cor K.225 M³ 1.224 1,115,488.00 1,365,357.31
- Besi Beton Kg 306.968 13,430.00 4,122,575.94
- Bekisting M² 9.840 270,551.00 2,662,221.84

IV. PEKERJAAN BETON 1,455,348,645.93


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Telapak) M³ 3.924 949,520.00 3,725,916.48
2 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 12.272 1,115,488.00 13,689,268.74
- Besi Beton Kg 3,202.177 13,430.00 43,005,243.10
- Bekisting M² 122.720 289,801.00 35,564,378.72
3 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 21.200 1,115,488.00 23,648,345.60
- Besi Beton Kg 3,526.424 13,430.00 47,359,879.53
- Bekisting M² 190.800 460,504.00 87,864,163.20
4 Kolom Beton Bertulang K.225 30/30
- Beton Cor K.225 M³ 3.060 1,115,488.00 3,413,393.28
- Besi Beton Kg 580.240 13,430.00 7,792,622.34
- Bekisting M² 40.800 460,504.00 18,788,563.20
5 Kolom Beton Bertulang K.225 30/40
- Beton Cor K.225 M³ 7.680 1,115,488.00 8,566,947.84
- Besi Beton Kg 1,376.225 13,430.00 18,482,705.51
- Bekisting M² 89.600 460,504.00 41,261,158.40
6 Kolom Beton Bertulang K.225 20/20 (Elv. 8,50-12,70)
- Beton Cor K.225 M³ 1.344 1,115,488.00 1,499,215.87
- Besi Beton Kg 579.076 13,430.00 7,776,990.47
- Bekisting M² 26.880 460,504.00 12,378,347.52
7 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 991.350 179,611.00 178,057,364.85
8 Kolom/Balok Variasi Beton Bertulang K.225 10/35
- Beton Cor K.225 M³ 3.023 1,115,488.00 3,372,064.45
- Besi Beton Kg 463.250 13,430.00 6,221,445.00
- Bekisting M² 35.412 472,054.00 16,716,234.63
9 Balok Beton Bertulang K.225 30/60
- Beton Cor K.225 M³ 29.700 1,115,488.00 33,129,993.60
- Besi Beton Kg 4,264.207 13,430.00 57,268,302.70
- Bekisting M² 207.900 472,054.00 98,140,026.60
10 Balok Beton Bertulang K.225 20/40
- Beton Cor K.225 M³ 3.760 1,115,488.00 4,194,234.88
- Besi Beton Kg 880.855 13,430.00 11,829,885.34
- Bekisting M² 35.720 472,054.00 16,861,768.88
11 Balok Beton Bertulang K.225 20/30
- Beton Cor K.225 M³ 2.580 1,115,488.00 2,877,959.04
- Besi Beton Kg 748.628 13,430.00 10,054,077.80
- Bekisting M² 24.080 472,054.00 11,367,060.32
12 Balok Beton Bertulang K.225 25/50
- Beton Cor K.225 M³ 4.438 1,115,488.00 4,949,978.00
- Besi Beton Kg 707.347 13,430.00 9,499,676.12
- Bekisting M² 35.855 472,054.00 16,925,496.17
13 Ring Balok Beton Bertulang K.225 15/20
- Beton Cor K.225 M³ 3.327 1,115,488.00 3,711,228.58
- Besi Beton Kg 1,159.553 13,430.00 15,572,792.17
- Bekisting M² 60.995 472,054.00 28,792,933.73
14 Ring Balok Beton Bertulang K.225 10/15
- Beton Cor K.225 M³ 1.632 1,115,488.00 1,820,476.42
- Besi Beton Kg 382.776 13,430.00 5,140,679.10
- Bekisting M² 32.640 472,054.00 15,407,842.56
15 Talang/List plank Beton Bertulang
- Beton Cor K.225 M³ 16.755 1,115,488.00 18,690,224.54
- Besi Beton Kg 2,381.170 13,430.00 31,979,107.73
- Bekisting M² 126.208 472,054.00 59,576,991.23
16 Tangga Beton Bertulang K.225
- Beton Cor K.225 Tangga M³ 2.376 1,115,488.00 2,650,399.49
- Besi Beton Kg 319.857 13,430.00 4,295,674.68
- Bekisting M² 14.400 421,399.00 6,068,145.60
Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.240 1,115,488.00 267,717.12
- Besi Beton Kg 34.563 13,430.00 464,187.21
- Bekisting M² 1.040 270,551.00 281,373.04
Kaki Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.760 1,115,488.00 847,770.88
- Besi Beton Kg 72.269 13,430.00 970,567.24
- Bekisting M² 8.360 270,551.00 2,261,806.36
17 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 34.186 1,115,488.00 38,133,626.57
- Besi Beton Kg 4,433.436 13,430.00 59,541,051.52
- Bekisting M² 284.880 794,871.00 226,442,850.48
18 Pelat Dak K.225
- Beton Cor K.225 M³ 6.167 1,115,488.00 6,879,526.83
- Besi Beton Kg 1,071.393 13,430.00 14,388,810.09
- Bekisting M² 57.929 794,871.00 46,045,923.18
19 Pelat Lengkung Beton Variasi Atas Jendela Kubah 24Bh
- Beton Cor K.225 M³ 0.672 1,115,488.00 749,607.94
- Besi Beton Kg 82.858 16,529.00 1,369,553.27
- Bekisting M² 8.448 794,871.00 6,715,070.21

V PEKERJAAN DINDING & PROFIL BETON 460,179,020.59


1 Pasangan Batu Bata ½, 1:5 M² 1,130.992 134,878.00 152,545,906.61
2 Plesteran Dinding & Beton 1 : 4 M² 2,261.984 73,824.00 166,988,671.38
3 Acian Dinding M² 2,261.984 18,975.00 42,921,137.29
4 Pekerjaan Profil Beton List Plank + Aci + Cat M' 82.920 225,000.00 18,657,000.00
5 Pekerjaan Profil (l= 10cm, t= 2 cm) + Aci + Cat Ls 79.520 225,000.00 17,892,000.00
6 Pekerjaan Profil Beton Kaki Pilar Ttk 21.000 350,000.00 7,350,000.00
7 Pekerjaan Ornamen Beton (Bentuk Bintang) Ls 1.000 250,000.00 250,000.00
8 Pekerjaan Profil Kubah Atas M' 12.240 225,000.00 2,754,000.00
9 Pekerjaan Profil Kubah bawah M' 22.000 225,000.00 4,950,000.00
10 Pekerjaan Pas. Batu Bunga (Alam) M² 79.200 66,006.00 5,227,675.20
11 Pekerjaan Plesteran Variasi Kolom M' 105.950 148,824.00 15,767,902.80
12 Pekerjaan Water Proofing Area Km/Wc (Coating) M² 21.679 53,955.00 1,169,679.65
13 Pekerjaan Water Proofing Area Dak & Talang (Coating) M² 131.837 179,806.00 23,705,047.66

VI PEKERJAAN PLAFOND 120,117,523.78


1 Pek. Rangka Plafond Hollow Galvanized M² 627.130 103,813.00 65,104,246.69
2 Pek. Plafond Gipsum M² 527.410 54,049.00 28,505,983.09
3 Pek. Plafond GRC M² 99.720 59,950.00 5,978,214.00
4 Pas. List Plafond Gipsum M' 388.000 52,910.00 20,529,080.00

VII PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI 308,967,093.45


1 Pas. Kusen P-1 (1 bh)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.080 169,675.00 3,407,074.00
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 11.680 185,994.00 2,172,409.92
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.580 184,905.00 2,326,104.90
- Pas. Kaca Rayben 5mm M² 7.140 285,973.00 2,041,847.22
- Pas. Expanoulet Bh 2.000 261,793.00 523,586.00
- Pas. Engsel Pintu Bh 6.000 35,743.00 214,458.00
- Pas. Engsel Jendela Bh 4.000 29,219.00 116,876.00
- Pas. Kunci Tanam 2 Slaag Bh 1.000 262,873.00 262,873.00
- Pas. Handle Pintu Bh 4.000 400,373.00 1,601,492.00
- Pas. Grendle Aluminium/Rambuncis Bh 2.000 38,129.00 76,258.00
2 Pas. Kusen P - 2 (8 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 71.600 169,675.00 12,148,730.00
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 87.040 185,994.00 16,188,917.76
- Pas. Kaca Rayben 5mm M² 22.400 285,973.00 6,405,795.20
- Pas. Expanoulet Bh 16.000 261,793.00 4,188,688.00
'- Pas. Engsel Pintu Bh 48.000 35,743.00 1,715,664.00
'- Pas. Kunci Tanam 2 Slaag Bh 8.000 262,873.00 2,102,984.00
'- Pas. Handle Pintu Bh 32.000 400,373.00 12,811,936.00
3 Pas. Kusen P - 3 (6 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 37.500 169,675.00 6,362,812.50
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 29.200 185,994.00 5,431,024.80
- Pas. Kaca Rayben 5mm M² 9.900 285,973.00 2,831,132.70
'- Pas. Engsel Pintu Bh 15.000 35,743.00 536,145.00
'- Pas. Kunci Tanam 2 Slaag Bh 5.000 262,873.00 1,314,365.00
'- Pas. Handle Pintu Bh 10.000 400,373.00 4,003,730.00
4 Pas. Kusen P - 4 (7 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.090 169,675.00 3,408,770.75
- Daun Pintu Panel Aluminium M² 9.800 185,994.00 1,822,741.20
'- Pas. Engsel Pintu Bh 21.000 35,743.00 750,603.00
'- Pas. Kunci Tanam 2 Slaag Bh 7.000 262,873.00 1,840,111.00
'- Pas. Handle Pintu Bh 14.000 400,373.00 5,605,222.00
5 Pas. Kusen J - 1 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 279.720 169,675.00 47,461,491.00
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.840 184,905.00 27,891,070.20
- Pas. Kaca Rayben 5mm M² 101.280 285,973.00 28,963,345.44
'- Pas. Engsel Jendela Bh 96.000 29,219.00 2,805,024.00
'- Pas. Grendle Aluminium/Rambuncis Bh 48.000 38,129.00 1,830,192.00
6 Pas. Kusen J - 2 (5 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 75.400 169,675.00 12,793,495.00
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.000 184,905.00 27,735,750.00
- Pas. Kaca Rayben 5mm M² 28.300 285,973.00 8,093,035.90
'- Pas. Engsel Jendela Bh 40.000 29,219.00 1,168,760.00
'- Pas. Grendle Aluminium/Rambuncis Bh 20.000 38,129.00 762,580.00
7 Pas. Kusen J - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 8.440 169,675.00 1,432,057.00
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 6.060 184,905.00 1,120,524.30
- Pas. Kaca Rayben 5mm M² 1.730 285,973.00 494,733.29
'- Pas. Engsel Jendela Bh 4.000 29,219.00 116,876.00
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 38,129.00 76,258.00
8 Pas. Kusen J - 4 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 18.040 169,675.00 3,060,937.00
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 184,905.00 1,680,786.45
- Pas. Kaca Rayben 5mm M² 2.590 285,973.00 740,670.07
'- Pas. Engsel Jendela Bh 6.000 29,219.00 175,314.00
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 38,129.00 76,258.00
9 Pas. Kusen J - 5 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 13.280 169,675.00 2,253,284.00
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 184,905.00 1,680,786.45
- Pas. Kaca Rayben 5mm M² 2.590 285,973.00 740,670.07
'- Pas. Engsel Jendela Bh 6.000 29,219.00 175,314.00
'- Pas. Grendle Aluminium/Rambuncis Bh 3.000 38,129.00 114,387.00
10 Pas. Kusen J - 6 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.680 169,675.00 2,999,854.00
- Pas. Kaca Rayben 5mm M² 5.140 285,973.00 1,469,901.22
11 Pas. Kusen V - 1 (8 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 60.000 169,675.00 10,180,500.00
- Pas. Kaca Rayben 5mm M² 13.440 285,973.00 3,843,477.12
12 Pas. Kusen V - 2 (4 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 23.200 169,675.00 3,936,460.00
- Pas. Kaca Rayben 5mm M² 4.880 285,973.00 1,395,548.24
13 Pas. Kusen V - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.100 169,675.00 695,667.50
- Pas. Kaca Rayben 5mm M² 0.810 285,973.00 231,638.13
14 Pas. Kusen V - 4 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 14.400 169,675.00 2,443,320.00
- Pas. Kaca Rayben 5mm M² 2.880 285,973.00 823,602.24
15 Pas. Kusen V - 5 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.240 169,675.00 719,422.00
- Pas. Kaca Rayben 5mm M² 0.600 285,973.00 171,583.80
16 Pas. Jendela Acrylic J-7 (8 Bh) M² 3.440 714,313.00 2,457,236.72
17 Pas. Jendela Acrylic J-8 (8 Bh) M² 0.800 714,313.00 571,450.40
18 Pas. Jendela Acrylic J-9 (8 Bh) M² 1.920 714,313.00 1,371,480.96

VIII PEKERJAAN PENUTUP LANTAI DAN DINDING 121,467,554.48


1 Pek. Pasang Tegel Lantai Granito 60/60 M² 622.881 124,179.00 77,348,690.03
2 Pek. Pasang Tegel Keramik 30/30 WC/KM (Anti Selip) M² 38.038 258,244.00 9,823,085.27
3 Pek. Pasang dinding keramik 30/30. T: 180Cm M² 91.282 244,443.00 22,313,307.04
4 Pek. Pasang Tegel Granit Meja Wastafel 60/60 M² 2.700 124,179.00 335,283.30
5 Pek. Pasang keramik Car Port 40/40 (Tipe Batu) M² 24.280 479,703.00 11,647,188.84

IX PEKERJAAN PENGECATAN DAN FINISHING 115,553,292.38


2 Cat Dinding Exterior (Ex. Dulux) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,130.992 47,077.00 53,243,699.09
3 Cat Dinding Interior (Ex. Catylac) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,130.992 35,441.00 40,083,478.97
4 Cat Plafond (Ex. Catylac) M² 627.130 35,441.00 22,226,114.33
X PEKERJAAN SANITAIR 65,600,959.00
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 42.400 21,335.00 904,604.00
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 20.000 25,256.00 505,120.00
3 Pipa Air Bersih PVC Dia. 3/4" AW M¹ 32.000 22,238.00 711,616.00
4 Pipa AirHujan PVC Dia. 3" AW M¹ 42.000 96,701.00 4,061,442.00
5 Pipa Air Kotor PVC Dia. 4" AW M¹ 58.000 152,114.00 8,822,612.00
6 Pipa Air Kotor PVC Dia. 2" AW M¹ 48.000 48,114.00 2,309,472.00
7 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 17.000 62,480.00 1,062,160.00
8 Pasang Stop Kran Dia. 1" PVC Bh 2.000 130,419.00 260,838.00
9 Pasang Floor Drain Stainleesteel Bh 9.000 139,700.00 1,257,300.00
10 Pas. Closed Jongkok Ex. Toto Bh 7.000 665,170.00 4,656,190.00
11 Pas. Urinoir Ex. Toto Bh 4.000 3,617,845.00 14,471,380.00
12 Pas.Westafel Ex. Toto Bh 5.000 1,415,645.00 7,078,225.00
13 Septiktank Lengkap dengan Peresapan Unit 3.000 6,500,000.00 19,500,000.00

XI PEKERJAAN LISTRIK 147,890,647.00


1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 82.000 319,880.00 26,230,160.00
2 Pas. Lampu - SL 14 Watt Vitting Tempel Bh 12.000 220,880.00 2,650,560.00
3 Saklar Tunggal Ex. Panasonic Bh 7.000 60,517.00 423,619.00
4 Saklar Ganda Ex. Panasonic Bh 44.000 64,917.00 2,856,348.00
5 Instalasi Stop Kontak Stop Kontak Ex. Panasonic Bh 24.000 227,838.00 5,468,112.00
6 Panel Box Sekring + Instalasi + MCB Lengkap Unit 2.000 1,600,000.00 3,200,000.00
7 Instalasi Lampu Penerangan Ttk 94.000 287,892.00 27,061,848.00
8 Biaya Sambungan Listrik PLN Ls 1.000 80,000,000.00 80,000,000.00

XII PEKERJAAN ATAP 134,726,022.25


1 Pas. Rangka Atap Baja Ringan M² 376.549 194,149.00 73,106,650.63
2 Pas. Atap Serat Bitumen Ex. Ondu Line M² 376.549 113,080.00 42,580,183.54
3 Pas. Bubungan dan Jurai Serat Bitumen Ex. OnduLine M' 85.520 186,313.00 15,933,487.76
4 Pas. Flashing M' 35.040 88,633.00 3,105,700.32

XIII PEKERJAAN LAIN-LAIN 868,140,510.03


1 Pas. Railing Tangga + Selasar Stainlees Steel M' 23.850 1,323,160.00 31,557,366.00
2 Pas. Kubah Rangka Stainlees Steel M² 19.217 1,323,160.00 25,426,901.09
3 Pas. Penutup Kubah Acrylic Roman M² 19.217 714,313.00 13,726,810.06
4 Pas. Kaligrafi Stainlees Steel Diatas Kubah Ls 1.000 5,900,000.00 5,900,000.00
5 Pas. Papan Nama Stainlees Steel Ls 1.000 18,475,000.00 18,475,000.00
6 Pas. Logo (Bahan Acrylic + Lampu dalam) Ls 1.000 3,614,313.00 3,614,313.00
7 Pas. Acrylic t= 5 mm, jendela Kubah (warna Putih Susu) M² 5.600 714,313.00 4,000,152.80
8 Pas. Pot. Bunga M' 45.800 134,878.00 6,177,412.40
9 Pek. Saluran Air M' 113.500 167,534.00 19,015,109.00
10 Pek, Sumur Bor + ACC Lengkap Unit 1.000 35,000,000.00 35,000,000.00
11 Pek, Pas. Water Tank Cap. 1100 Lt. (Stainlees Steel) 2 Bh Bh 2.000 3,455,000.00 6,910,000.00
12 Pek. Pas. Penangkal Petir LS 1.000 15,500,000.00 15,500,000.00
13 Pek. Pas. Griil Besi Beton ø 16 M' 20.000 500,000.00 10,000,000.00
14 Pek. Meja Loket LS 1.000 5,000,000.00 5,000,000.00
15 Pek. Pas. Penutup Lubang Kontrol Plat Dak Bh 2.000 1,037,482.00 2,074,964.00
(rangka siku 4x4, Besi Plat t= 2mm)
16 Pump Submersible 1PK Bh 1.000 2,500,000.00 2,500,000.00
17 Pek. Paving Stone
- Pek. Pemadatan Tanah Area Pas. Paving Stone M² 1,514.222 13,475.00 20,404,141.45
- Pas. Paving Stone, T. 8cm M² 1,514.222 379,429.00 574,539,739.24
18 Pas. Canstain Uk. 15x30x50 M' 381.000 160,259.00 61,058,679.00
19 Pas. Gorong-gorong Beton Bertulang Dia. 100cm M' 6.000 1,209,987.00 7,259,922.00

XIV PEKERJAAN AKHIR 5,000,000.00


1 Pembersihan Ls 1.000 5,000,000.00 5,000,000.00

JUMLAH 4,060,459,777.88
PPN 10 % 406,045,977.79
JUMLAH TOTAL 4,466,505,755.66
DIBULATKAN 4,466,505,000.00

TERBILANG : EMPAT MILYAR SERATUS LIMA PULUH JUTA RUPIAH

Mengetahui/Menyetujui Dibuat Oleh


PT. ASRI ABADI KONSULTAN

Alifa Samir, ST Zainal Arifin S, ST


Direktur Utama Cost Estimator
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
A PEKERJAAN UMUM
I. PEKERJAAN PERSIAPAN 1,100,000.00
1 Pekerjaan Pembersihan Lokasi Ls 1.000 750,000.00 750,000.00
2 Papan Nama Proyek Ls 1.000 350,000.00 350,000.00

B PEKERJAAN GEDUNG

I PEKERJAAN PLAFOND 114,552,560.30


1 Pek. Rangka Plafond Hollow Galvanized M² 725.650 103,813.00 75,331,903.45
2 Pek. Plafond Gipsum M² 725.650 54,049.00 39,220,656.85

II PEKERJAAN PENGECATAN DAN FINISHING 25,717,761.65


1 Cat Plafond (Ex. Catylac) M² 725.650 35,441.00 25,717,761.65

III PEKERJAAN LISTRIK 21,950,280.00


1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 5.000 319,880.00 1,599,400.00
2 Pas. Lampu Downlight Stainless 6" - SL 18 Watt Bh 40.000 220,880.00 8,835,200.00
3 Instalasi Lampu Penerangan Ttk 40.000 287,892.00 11,515,680.00

IV PEKERJAAN ATAP 245,148,043.98


1 Pas. Rangka Atap Baja Ringan M² 750.620 194,149.00 145,732,122.38
2 Pas. Atap Seng Gelombang M² 750.620 113,080.00 84,880,109.60
4 Pas. Flashing M' 164.000 88,633.00 14,535,812.00

C PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR 620,000.00
1 Pembersihan Ls 1.000 620,000.00 620,000.00

JUMLAH 409,088,645.93
PPN 10 % 40,908,864.59
JUMLAH TOTAL 449,997,510.52
DIBULATKAN 449,997,000.00

TERBILANG : EMPAT RATUS EMPAT PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH TUJUH RIBU RUPIAH

Mengetahui/Menyetujui Dibuat Oleh


CV. AKSI KARYA PT. ELJIREH KONSULTAN

JULIANDA ASTARI KAWULUSAN Ir. GERREL H.TULUNGEN, MMT


Direktur Direktur
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
A PEKERJAAN UMUM
I. PEKERJAAN PERSIAPAN 1,100,000.00
B PEKERJAAN GEDUNG
I PEKERJAAN PLAFOND 114,552,560.30
II PEKERJAAN PENGECATAN DAN FINISHING 25,717,761.65
II PEKERJAAN LISTRIK 21,950,280.00
IV PEKERJAAN ATAP 245,148,043.98
C PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR 620,000.00

JUMLAH 409,088,645.93
PPN 10% 40,908,864.59
TOTAL 449,997,510.52
DIBULATKAN 449,997,000.00
Terbilang : EMPAT RATUS EMPAT PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH
TUJUH RIBU RUPIAH

Dibuat Oleh
PT. ELJIREH KONSULTAN

Ir. GERREL H.TULUNGEN, MMT


Direktur
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PASCA SARJANA STAKN & STAIN
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
A PEKERJAAN UMUM
I. PEKERJAAN PERSIAPAN -
1 Pekerjaan Pembersihan Lokasi Ls 1.000 -
2 Pembuatan Direksi Kit M2 20.000 -
3 Pembuatan Gudang dan Barak M2 40.000 -
4 Pengukuran dan Pas. Bouplank Ls 82.920 -
5 Papan Proyek Tahap Bh 1.000 -
6 Mobilisasi & Demobilisasi Ls 1.000 -

B VOLUME PEKERJAAN GEDUNG STAKN


I. PEKERJAAN TANAH -
1 Galian Tanah M³ 141.378 -
2 Urugan Tanah Bekas Galian M³ 47.126 -
3 Urugan Tanah bawah Lantai M³ 163.500 -
4 Urugan Tanah bawah Car Port M³ 64.000 -
5 Urugan Pasir di bawah lantai M³ 16.350 -
6 Urugan Pasir di bawah Car Port M³ 3.200 -
7 Urugan Pasir di bawah Pondasi M³ 8.843 -

II. PEKERJAAN PONDASI -


1 Pasangan Batu Kosong M³ 27.524 -
2 Pasangan Batu Kali 1:4 M³ 38.370 -
3 Pondasi Telapak Beton K-225, Uk. 150x120 Cm
- Beton Cor K.225 M³ 13.600 -
- Besi Beton Kg 2,346.827 -
- Bekisting M² 79.200 -
4 Pondasi Telapak Beton K-225, Uk. 90x90 Cm
- Beton Cor K.225 M³ 1.224 -
- Besi Beton Kg 306.968 -
- Bekisting M² 9.840 -

III. PEKERJAAN BETON -


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Telapak) M³ 3.924 -
2 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 12.272 -
- Besi Beton Kg 3,202.177 -
- Bekisting M² 122.720 -
3 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 21.200 -
- Besi Beton Kg 3,526.424 -
- Bekisting M² 190.800 -
4 Kolom Beton Bertulang K.225 30/30
- Beton Cor K.225 M³ 3.060 -
- Besi Beton Kg 580.240 -
- Bekisting M² 40.800 -
5 Kolom Beton Bertulang K.225 30/40
- Beton Cor K.225 M³ 7.680 -
- Besi Beton Kg 1,376.225 -
- Bekisting M² 89.600 -
6 Kolom Beton Bertulang K.225 20/20 (Elv. 8,50-12,70)
- Beton Cor K.225 M³ 1.344 -
- Besi Beton Kg 579.076 -
- Bekisting M² 26.880 -
7 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 991.350 -
8 Kolom/Balok Variasi Beton Bertulang K.225 10/35
- Beton Cor K.225 M³ 3.023 -
- Besi Beton Kg 463.250 -
- Bekisting M² 35.412 -
9 Balok Beton Bertulang K.225 30/60
- Beton Cor K.225 M³ 29.700 -
- Besi Beton Kg 4,264.207 -
- Bekisting M² 207.900 -
10 Balok Beton Bertulang K.225 20/40
- Beton Cor K.225 M³ 3.760 -
- Besi Beton Kg 880.855 -
- Bekisting M² 35.720 -
11 Balok Beton Bertulang K.225 20/30
- Beton Cor K.225 M³ 2.580 -
- Besi Beton Kg 748.628 -
- Bekisting M² 24.080 -
12 Balok Beton Bertulang K.225 25/50
- Beton Cor K.225 M³ 4.438 -
- Besi Beton Kg 707.347 -
- Bekisting M² 35.855 -
13 Ring Balok Beton Bertulang K.225 15/20
- Beton Cor K.225 M³ 3.327 -
- Besi Beton Kg 1,159.553 -
- Bekisting M² 60.995 -
14 Ring Balok Beton Bertulang K.225 10/15
- Beton Cor K.225 M³ 1.632 -
- Besi Beton Kg 382.776 -
- Bekisting M² 32.640 -
15 Talang/List plank Beton Bertulang
- Beton Cor K.225 M³ 16.755 -
- Besi Beton Kg 2,381.170 -
- Bekisting M² 126.208 -
16 Tangga Beton Bertulang K.225
- Beton Cor K.225 Tangga M³ 2.376 -
- Besi Beton Kg 319.857 -
- Bekisting M² 14.400 -
Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.240 -
- Besi Beton Kg 34.563 -
- Bekisting M² 1.040 -
Kaki Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.760 -
- Besi Beton Kg 72.269 -
- Bekisting M² 8.360 -
17 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 34.186 -
- Besi Beton Kg 4,433.436 -
- Bekisting M² 284.880 -
18 Pelat Dak K.225
- Beton Cor K.225 M³ 6.167 -
- Besi Beton Kg 1,071.393 -
- Bekisting M² 57.929 -
19 Pelat Lengkung Beton Variasi Atas Jendela Kubah 24Bh
- Beton Cor K.225 M³ 0.672 -
- Besi Beton Kg 82.858 -
- Bekisting M² 8.448 -

IV PEKERJAAN DINDING & PROFIL BETON -


1 Pasangan Batu Bata ½, 1:5 M² 1,130.992 -
2 Plesteran Dinding & Beton 1 : 4 M² 2,261.984 -
3 Acian Dinding M² 2,261.984 -
4 Pekerjaan Profil Beton List Plank + Aci + Cat M' 82.920 -
5 Pekerjaan Profil (l= 10cm, t= 2 cm) + Aci + Cat Ls 79.520 -
6 Pekerjaan Profil Beton Kaki Pilar Ttk 21.000 -
7 Pekerjaan Ornamen Beton (Bentuk Bintang) Ls 1.000 -
8 Pekerjaan Profil Kubah Atas M' 12.240 -
9 Pekerjaan Profil Kubah bawah M' 22.000 -
10 Pekerjaan Pas. Batu Bunga (Alam) M² 79.200 -
11 Pekerjaan Plesteran Variasi Kolom M' 105.950 -
12 Pekerjaan Water Proofing Area Km/Wc (Coating) M² 21.679 -
13 Pekerjaan Water Proofing Area Dak & Talang (Coating) M² 131.837 -

V PEKERJAAN PLAFOND -
1 Pek. Rangka Plafond Hollow Galvanized M² 627.130 -
2 Pek. Plafond Gipsum M² 527.410 -
3 Pek. Plafond GRC M² 99.720 -
4 Pas. List Plafond Gipsum M' 388.000 -
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI -
1 Pas. Kusen P-1 (1 bh)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.080 -
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 11.680 -
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.580 -
- Pas. Kaca Rayben 5mm M² 7.140 -
- Pas. Expanoulet Bh 2.000 -
- Pas. Engsel Pintu Bh 6.000 -
- Pas. Engsel Jendela Bh 4.000 -
- Pas. Kunci Tanam 2 Slaag Bh 1.000 -
- Pas. Handle Pintu Bh 4.000 -
- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
2 Pas. Kusen P - 2 (8 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 71.600 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 87.040 -
- Pas. Kaca Rayben 5mm M² 22.400 -
- Pas. Expanoulet Bh 16.000 -
'- Pas. Engsel Pintu Bh 48.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 8.000 -
'- Pas. Handle Pintu Bh 32.000 -
3 Pas. Kusen P - 3 (5 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 37.500 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 29.200 -
- Pas. Kaca Rayben 5mm M² 9.900 -
'- Pas. Engsel Pintu Bh 15.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 5.000 -
'- Pas. Handle Pintu Bh 10.000 -
4 Pas. Kusen P - 4 (7 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.090 -
- Daun Pintu Panel Aluminium M² 9.800 -
'- Pas. Engsel Pintu Bh 21.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 7.000 -
'- Pas. Handle Pintu Bh 14.000 -
5 Pas. Kusen J - 1 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 279.720 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.840 -
- Pas. Kaca Rayben 5mm M² 101.280 -
'- Pas. Engsel Jendela Bh 96.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 48.000 -
6 Pas. Kusen J - 2 (5 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 75.400 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.000 -
- Pas. Kaca Rayben 5mm M² 28.300 -
'- Pas. Engsel Jendela Bh 40.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 20.000 -
7 Pas. Kusen J - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 8.440 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 6.060 -
- Pas. Kaca Rayben 5mm M² 1.730 -
'- Pas. Engsel Jendela Bh 4.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
8 Pas. Kusen J - 4 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 18.040 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
9 Pas. Kusen J - 5 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 13.280 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 3.000 -
10 Pas. Kusen J - 6 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.680 -
- Pas. Kaca Rayben 5mm M² 5.140 -
11 Pas. Kusen V - 1 (8 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 60.000 -
- Pas. Kaca Rayben 5mm M² 13.440 -
12 Pas. Kusen V - 2 (4 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 23.200 -
- Pas. Kaca Rayben 5mm M² 4.880 -
13 Pas. Kusen V - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.100 -
- Pas. Kaca Rayben 5mm M² 0.810 -
14 Pas. Kusen V - 4 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 14.400 -
- Pas. Kaca Rayben 5mm M² 2.880 -
15 Pas. Kusen V - 5 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.240 -
- Pas. Kaca Rayben 5mm M² 0.600 -
16 Pas. Jendela Acrylic J-7 (8 Bh) M² 3.440 -
17 Pas. Jendela Acrylic J-8 (8 Bh) M² 0.800 -
18 Pas. Jendela Acrylic J-9 (8 Bh) M² 1.920 -
VII PEKERJAAN PENUTUP LANTAI DAN DINDING -
1 Pek. Pasang Tegel Lantai Granito 60/60 M² 622.881 -
2 Pek. Pasang Tegel Keramik 30/30 WC/KM (Anti Selip) M² 38.038 -
3 Pek. Pasang dinding keramik 30/30. T: 180Cm M² 91.282 -
4 Pek. Pasang Tegel Granit Meja Wastafel 60/60 M² 2.700 -
5 Pek. Pasang keramik Car Port 40/40 (Tipe Batu) M² 24.280 -

VIII PEKERJAAN PENGECATAN DAN FINISHING -


2 Cat Dinding Exterior (Ex. Dulux) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,130.992 -
3 Cat Dinding Interior (Ex. Catylac) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,130.992 -
4 Cat Plafond (Ex. Catylac) M² 627.130 -

IX PEKERJAAN SANITAIR -
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 42.400 -
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 20.000 -
3 Pipa Air Bersih PVC Dia. 3/4" AW M¹ 32.000 -
4 Pipa AirHujan PVC Dia. 3" AW M¹ 42.000 -
5 Pipa Air Kotor PVC Dia. 4" AW M¹ 58.000 -
6 Pipa Air Kotor PVC Dia. 2" AW M¹ 48.000 -
7 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 17.000 -
8 Pasang Stop Kran Dia. 1" PVC Bh 2.000 -
9 Pasang Floor Drain Stainleesteel Bh 9.000 -
10 Pas. Closed Jongkok Ex. Toto Bh 7.000 -
11 Pas. Urinoir Ex. Toto Bh 4.000 -
12 Pas.Westafel Ex. Toto Bh 5.000 -
13 Septiktank Lengkap dengan Peresapan Unit 3.000 -

X PEKERJAAN LISTRIK -
1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 82.000 -
2 Pas. Lampu - SL 14 Watt Vitting Tempel Bh 12.000 -
3 Saklar Tunggal Ex. Panasonic Bh 7.000 -
4 Saklar Ganda Ex. Panasonic Bh 44.000 -
5 Instalasi Stop Kontak Stop Kontak Ex. Panasonic Bh 24.000 -
6 Panel Box Sekring + Instalasi + MCB Lengkap Unit 2.000 -
7 Instalasi Lampu Penerangan Ttk 94.000 -
8 Biaya Sambungan Listrik PLN Ls 1.000 -

XI PEKERJAAN ATAP -
1 Pas. Rangka Atap Baja Ringan M² 376.549 -
2 Pas. Atap Serat Bitumen Ex. Ondu Line M² 376.549 -
3 Pas. Bubungan dan Jurai Serat Bitumen Ex. OnduLine M' 85.520 -
4 Pas. Flashing M' 35.040 -
5 Pas. Kubah Rangka Stainlees Steel M² 19.217 -
6 Pas. Penutup Kubah Acrylic Roman M² 19.217 -

XII PEKERJAAN LAIN-LAIN GEDUNG STAKN -


1 Pas. Railing Tangga + Selasar Stainlees Steel M' 23.850 -
2 Pas. Salib Stainlees Steel Diatas Kubah Ls 1.000 -
3 Pas. Papan Nama Stainlees Steel Ls 1.000 -
4 Pas. Logo (Bahan Acrylic + Lampu dalam) Ls 1.000 -
5 Pas. Acrylic t= 5 mm, jendela Kubah (warna Putih Susu) M² 5.600 -
6 Pas. Pot. Bunga M' 45.800 -
7 Pek. Saluran Air M' 113.500 -
8 Pek, Sumur Bor + ACC Lengkap Unit 1.000 -
9 Pek, Pas. Water Tank Cap. 1100 Lt. (Stainlees Steel) 2 Bh Bh 2.000 -
10 Pek. Pas. Penangkal Petir LS 1.000 -
11 Pek. Pas. Griil Besi Beton ø 16 M' 20.000 -
12 Pek. Meja Loket LS 1.000 -
13 Pek. Pas. Penutup Lubang Kontrol Plat Dak Bh 2.000 -
(rangka siku 4x4, Besi Plat t= 2mm)
14 Pump Submersible 1PK Bh 1.000 -

C. VOLUME PEKERJAAN GEDUNG STAIN


I. PEKERJAAN TANAH -
1 Galian Tanah M³ 141.378 -
2 Urugan Tanah Bekas Galian M³ 47.126 -
3 Urugan Tanah bawah Lantai M³ 163.500 -
4 Urugan Tanah bawah Car Port M³ 64.000 -
5 Urugan Pasir di bawah lantai M³ 16.350 -
6 Urugan Pasir di bawah Car Port M³ 3.200 -
7 Urugan Pasir di bawah Pondasi M³ 8.843 -

II. PEKERJAAN PONDASI -


1 Pasangan Batu Kosong M³ 27.524 -
2 Pasangan Batu Kali 1:4 M³ 38.370 -
3 Pondasi Telapak Beton K-225, Uk. 150x120 Cm
- Beton Cor K.225 M³ 13.600 -
- Besi Beton Kg 2,346.827 -
- Bekisting M² 79.200 -
4 Pondasi Telapak Beton K-225, Uk. 90x90 Cm
- Beton Cor K.225 M³ 1.224 -
- Besi Beton Kg 306.968 -
- Bekisting M² 9.840 -
III. PEKERJAAN BETON -
1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Telapak) M³ 3.924 -
2 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 12.272 -
- Besi Beton Kg 3,202.177 -
- Bekisting M² 122.720 -
3 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 21.200 -
- Besi Beton Kg 3,526.424 -
- Bekisting M² 190.800 -
4 Kolom Beton Bertulang K.225 30/30
- Beton Cor K.225 M³ 3.060 -
- Besi Beton Kg 580.240 -
- Bekisting M² 40.800 -
5 Kolom Beton Bertulang K.225 30/40
- Beton Cor K.225 M³ 7.680 -
- Besi Beton Kg 1,376.225 -
- Bekisting M² 89.600 -
6 Kolom Beton Bertulang K.225 20/20 (Elv. 8,50-12,70)
- Beton Cor K.225 M³ 1.344 -
- Besi Beton Kg 579.076 -
- Bekisting M² 26.880 -
7 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 1,000.350 -
8 Kolom/Balok Variasi Beton Bertulang K.225 10/35
- Beton Cor K.225 M³ 3.023 -
- Besi Beton Kg 463.250 -
- Bekisting M² 35.412 -
9 Balok Beton Bertulang K.225 30/60
- Beton Cor K.225 M³ 29.700 -
- Besi Beton Kg 4,264.207 -
- Bekisting M² 207.900 -
10 Balok Beton Bertulang K.225 20/40
- Beton Cor K.225 M³ 3.760 -
- Besi Beton Kg 880.855 -
- Bekisting M² 35.720 -
11 Balok Beton Bertulang K.225 20/30
- Beton Cor K.225 M³ 2.580 -
- Besi Beton Kg 748.628 -
- Bekisting M² 24.080 -
12 Balok Beton Bertulang K.225 25/50
- Beton Cor K.225 M³ 4.438 -
- Besi Beton Kg 707.347 -
- Bekisting M² 35.855 -
13 Ring Balok Beton Bertulang K.225 15/20
- Beton Cor K.225 M³ 3.327 -
- Besi Beton Kg 1,159.553 -
- Bekisting M² 60.995 -
14 Ring Balok Beton Bertulang K.225 10/15
- Beton Cor K.225 M³ 1.632 -
- Besi Beton Kg 382.776 -
- Bekisting M² 32.640 -
15 Talang/List plank Beton Bertulang
- Beton Cor K.225 M³ 16.755 -
- Besi Beton Kg 2,381.170 -
- Bekisting M² 126.208 -
16 Tangga Beton Bertulang K.225
- Beton Cor K.225 Tangga M³ 2.376 -
- Besi Beton Kg 319.857 -
- Bekisting M² 14.400 -
Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.240 -
- Besi Beton Kg 34.563 -
- Bekisting M² 1.040 -
Kaki Pondasi Telapak Tangga
- Beton Cor K.225 M³ 0.760 -
- Besi Beton Kg 72.269 -
- Bekisting M² 8.360 -
17 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 34.186 -
- Besi Beton Kg 4,433.436 -
- Bekisting M² 284.880 -
18 Pelat Dak K.225
- Beton Cor K.225 M³ 6.167 -
- Besi Beton Kg 1,071.393 -
- Bekisting M² 57.929 -
19 Pelat Lengkung Beton Variasi Atas Jendela Kubah 24Bh
- Beton Cor K.225 M³ 0.672 -
- Besi Beton Kg 82.858 -
- Bekisting M² 8.448 -
IV PEKERJAAN DINDING & PROFIL BETON -
1 Pasangan Batu Bata ½, 1:5 M² 1,155.666 -
2 Plesteran Dinding & Beton 1 : 4 M² 2,311.333 -
3 Acian Dinding M² 2,311.333 -
4 Pekerjaan Profil Beton List Plank + Aci + Cat M' 82.920 -
5 Pekerjaan Profil (l= 10cm, t= 2 cm) + Aci + Cat Ls 79.520 -
6 Pekerjaan Profil Beton Kaki Pilar Ttk 21.000 -
7 Pekerjaan Ornamen Beton (Bentuk Bintang) Ls 1.000 -
8 Pekerjaan Profil Kubah Atas M' 12.240 -
9 Pekerjaan Profil Kubah bawah M' 22.000 -
10 Pekerjaan Pas. Batu Bunga (Alam) M² 79.200 -
11 Pekerjaan Plesteran Variasi Kolom M' 105.950 -
12 Pekerjaan Water Proofing Area Km/Wc (Coating) M² 21.679 -
13 Pekerjaan Water Proofing Area Dak & Talang (Coating) M² 131.837 -

V PEKERJAAN PLAFOND -
1 Pek. Rangka Plafond Hollow Galvanized M² 627.130 -
2 Pek. Plafond Gipsum M² 527.410 -
3 Pek. Plafond GRC M² 99.720 -
4 Pas. List Plafond Gipsum M' 402.000 -

VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI -


1 Pas. Kusen P-1 (1 bh)
- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.080 -
- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 11.680 -
- Pas. Bingkai Daun Jendela Aluminium Frame M' 12.580 -
- Pas. Kaca Rayben 5mm M² 7.140 -
- Pas. Expanoulet Bh 2.000 -
- Pas. Engsel Pintu Bh 6.000 -
- Pas. Engsel Jendela Bh 4.000 -
- Pas. Kunci Tanam 2 Slaag Bh 1.000 -
- Pas. Handle Pintu Bh 4.000 -
- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
2 Pas. Kusen P - 2 (8 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 71.600 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 87.040 -
- Pas. Kaca Rayben 5mm M² 22.400 -
- Pas. Expanoulet Bh 16.000 -
'- Pas. Engsel Pintu Bh 48.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 8.000 -
'- Pas. Handle Pintu Bh 32.000 -
3 Pas. Kusen P - 3 (6 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 45.000 -
'- Pas. Bingkai Daun Pintu Aluminium 3/10 M' 35.040 -
- Pas. Kaca Rayben 5mm M² 11.880 -
'- Pas. Engsel Pintu Bh 18.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 6.000 -
'- Pas. Handle Pintu Bh 12.000 -
4 Pas. Kusen P - 4 (7 Bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 20.090 -
- Daun Pintu Panel Aluminium M² 9.800 -
'- Pas. Engsel Pintu Bh 21.000 -
'- Pas. Kunci Tanam 2 Slaag Bh 7.000 -
'- Pas. Handle Pintu Bh 14.000 -
5 Pas. Kusen J - 1 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 279.720 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.840 -
- Pas. Kaca Rayben 5mm M² 101.280 -
'- Pas. Engsel Jendela Bh 96.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 48.000 -
6 Pas. Kusen J - 2 (5 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 75.400 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 150.000 -
- Pas. Kaca Rayben 5mm M² 28.300 -
'- Pas. Engsel Jendela Bh 40.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 20.000 -
7 Pas. Kusen J - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 8.440 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 6.060 -
- Pas. Kaca Rayben 5mm M² 1.730 -
'- Pas. Engsel Jendela Bh 4.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
8 Pas. Kusen J - 4 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 18.040 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 2.000 -
9 Pas. Kusen J - 5 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 13.280 -
'- Pas. Bingkai Daun Jendela Aluminium Frame M' 9.090 -
- Pas. Kaca Rayben 5mm M² 2.590 -
'- Pas. Engsel Jendela Bh 6.000 -
'- Pas. Grendle Aluminium/Rambuncis Bh 3.000 -
10 Pas. Kusen J - 6 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 17.680 -
- Pas. Kaca Rayben 5mm M² 5.140 -
11 Pas. Kusen V - 1 (8 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 60.000 -
- Pas. Kaca Rayben 5mm M² 13.440 -
12 Pas. Kusen V - 2 (4 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 23.200 -
- Pas. Kaca Rayben 5mm M² 4.880 -
13 Pas. Kusen V - 3 (1 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.100 -
- Pas. Kaca Rayben 5mm M² 0.810 -
14 Pas. Kusen V - 4 (6 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 14.400 -
- Pas. Kaca Rayben 5mm M² 2.880 -
15 Pas. Kusen V - 5 (2 bh)
'- Pas. Rangka Kusen Aluminium 4" (Brown) M' 4.240 -
- Pas. Kaca Rayben 5mm M² 0.600 -
16 Pas. Jendela Acrylic J-7 (8 Bh) M² 3.440 -
17 Pas. Jendela Acrylic J-8 (8 Bh) M² 0.800 -
18 Pas. Jendela Acrylic J-9 (8 Bh) M² 1.920 -

VII PEKERJAAN PENUTUP LANTAI DAN DINDING -


1 Pek. Pasang Tegel Lantai Granito 60/60 M² 622.881 -
2 Pek. Pasang Tegel Keramik 30/30 WC/KM (Anti Selip) M² 38.038 -
3 Pek. Pasang dinding keramik 30/30. T: 180Cm M² 91.282 -
4 Pek. Pasang Tegel Granit Meja Wastafel 60/60 M² 2.700 -
5 Pek. Pasang keramik Car Port 40/40 (Tipe Batu) M² 24.280 -

VIII PEKERJAAN PENGECATAN DAN FINISHING -


2 Cat Dinding Exterior (Ex. Dulux) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,155.666 -
3 Cat Dinding Interior (Ex. Catylac) 1 Lap. Cat Dasar 2 Lap. Cat Penut M² 1,155.666 -
4 Cat Plafond (Ex. Catylac) M² 627.130 -

IX PEKERJAAN SANITAIR -
1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400 -
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 22.000 -
3 Pipa Air Bersih PVC Dia. 3/4" AW M¹ 34.000 -
4 Pipa AirHujan PVC Dia. 3" AW M¹ 42.000 -
5 Pipa Air Kotor PVC Dia. 4" AW M¹ 58.000 -
6 Pipa Air Kotor PVC Dia. 2" AW M¹ 48.000 -
7 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 19.000 -
8 Pasang Stop Kran Dia. 1" PVC Bh 2.000 -
9 Pasang Floor Drain Stainleesteel Bh 9.000 -
10 Pas. Closed Jongkok Ex. Toto Bh 7.000 -
11 Pas. Urinoir Ex. Toto Bh 4.000 -
12 Pas.Westafel Ex. Toto Bh 3.000 -
13 Septiktank Lengkap dengan Peresapan Unit 3.000 -

X PEKERJAAN LISTRIK -
1 Pas. Lampu Downlight Stainless 6" - SL 23 Watt Bh 82.000 -
2 Pas. Lampu - SL 14 Watt Vitting Tempel Bh 12.000 -
3 Saklar Tunggal Ex. Panasonic Bh 7.000 -
4 Saklar Ganda Ex. Panasonic Bh 44.000 -
5 Instalasi Stop Kontak Stop Kontak Ex. Panasonic Bh 24.000 -
6 Panel Box Sekring + Instalasi + MCB Lengkap Unit 2.000 -
7 Instalasi Lampu Penerangan Ttk 94.000 -
8 Biaya Sambungan Listrik PLN Ls 1.000 -

XI PEKERJAAN ATAP -
1 Pas. Rangka Atap Baja Ringan M² 376.549 -
2 Pas. Atap Serat Bitumen Ex. Ondu Line M² 376.549 -
3 Pas. Bubungan dan Jurai Serat Bitumen Ex. OnduLine M' 85.520 -
4 Pas. Flashing M' 35.040 -
5 Pas. Kubah Rangka Stainlees Steel M² 19.217 -
6 Pas. Penutup Kubah Acrylic Roman M² 19.217 -

XII PEKERJAAN LAIN-LAIN -


1 Pas. Railing Tangga + Selasar Stainlees Steel M' 23.850 -
2 Pas. Kaligrafi Stainlees Steel Diatas Kubah Ls 1.000 -
3 Pas. Papan Nama Stainlees Steel Ls 1.000 -
4 Pas. Logo (Bahan Acrylic + Lampu dalam) Ls 1.000 -
5 Pas. Acrylic t= 5 mm, jendela Kubah (warna Putih Susu) M² 5.600 -
6 Pas. Pot. Bunga M' 45.800 -
7 Pek. Saluran Air M' 113.500 -
8 Pek, Sumur Bor + ACC Lengkap Unit 1.000 -
9 Pek, Pas. Water Tank Cap. 1100 Lt. (Stainlees Steel) 2 Bh Bh 2.000 -
10 Pek. Pas. Penangkal Petir LS 1.000 -
11 Pek. Pas. Griil Besi Beton ø 16 M' 20.000 -
12 Pek. Meja Loket LS 1.000 -
13 Pek. Pas. Penutup Lubang Kontrol Plat Dak Bh 2.000 -
(rangka siku 4x4, Besi Plat t= 2mm)
14 Pump Submersible 1PK Bh 1.000 -
D PEKERJAAN LAHAN PARKIR DAN JALAN MASUK
I JALAN MASUK DAN TAMAN -
1 Pek. Paving Stone
- Pek. Pemadatan Tanah Area Pas. Paving Stone M² 3,028.444 -
- Pas. Paving Stone, T. 8cm M² 3,028.444 -
2 Pas. Canstain Uk. 15x30x50 M' 790.296 -
3 Pas. Gorong-gorong Beton Bertulang Dia. 100cm M' 12.000 -
4 Urugan Tanah Subur M³ 19.076 -
5 Pas. Rumput Gajah Mini M² 63.585 -

II PENERANGAN TAMAN -
1 Pas. Lampu PJU Solar Cell, 50 Watt (pada Taman) + Acc Lengkap Titik 1.000 -

E PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR -
1 Pembersihan Ls 1.000 -

JUMLAH -
PPN 10 % -
JUMLAH TOTAL -
DIBULATKAN -

TERBILANG :

Dibuat Oleh
CV/PT. ....................................

____________________
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019
JUMLAH
No. URAIAN JENIS PEKERJAAN
(Rp.)
A PEKERJAAN UMUM
I. PEKERJAAN PERSIAPAN
B VOLUME PEKERJAAN GEDUNG STAKN
I PEKERJAAN TANAH
II PEKERJAAN PONDASI
III PEKERJAAN BETON
IV PEKERJAAN DINDING & PROFIL BETON
V PEKERJAAN PLAFOND
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN DAN FINISHING
IX PEKERJAAN SANITAIR
X PEKERJAAN LISTRIK
XII PEKERJAAN ATAP
XIII PEKERJAAN LAIN-LAIN GEDUNG STAKN
C VOLUME PEKERJAAN GEDUNG STAIN
I PEKERJAAN TANAH
II PEKERJAAN PONDASI
III PEKERJAAN BETON
IV PEKERJAAN DINDING & PROFIL BETON
V PEKERJAAN PLAFOND
VI PEKERJAAN KOSEN PINTU, JENDELA DAN VENTILASI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN DAN FINISHING
IX PEKERJAAN SANITAIR
X PEKERJAAN LISTRIK
XII PEKERJAAN ATAP
XIII PEKERJAAN LAIN-LAIN GEDUNG STAIN
D PEKERJAAN LAHAN PARKIR DAN JALAN MASUK
I Err:509
II PENERANGAN TAMAN
E PEKERJAAN AKHIR
I PEKERJAAN PEMBERSIHAN AKHIR

JUMLAH -
PPN 10% -
TOTAL -
DIBULATKAN -
Terbilang :

Dibuat Oleh
CV/PT. ....................................

____________________
BILL OF QUANTITY
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
SKPD : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH


NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
LANTAI 1, Elv. -1,62 - 4,00 M
I. PEKERJAAN PERSIAPAN
1 Bongkaran Bangunan Existing + Buang Keluar Lokasi Ls 1.000
2 Pembuatan Direksi Keet M2 15.000
4 Pengukuran dan Pas. Bouplank M' 90.000
6 Papan Proyek Bh 1.000
7 Mobilisasi & Demobilisasi Ls 1.000

II. PEKERJAAN TANAH


1 Galian Pondasi Pelat Poer M³ 66.679
2 Galian Tanah Pondasi Batu Kali M³ 43.896
3 Galian Tanah Sloof M³ 6.900
4 Urugan Tanah Bekas Galian M³ 35.340
5 Urugan Tanah bawah Lantai M³ 87.958
6 Urugan Pasir di bawah Pondasi M³ 4.383
7 Urugan Pasir di bawah lantai M³ 17.448

III.PEKERJAAN PONDASI
1 Pasangan Batu Kosong M³ 6.975
2 Pasangan Batu Kali 1:4 M³ 21.158
3 Pondasi Telapak Beton K-225
- Beton Cor K.225 M³ 12.348
- Besi Beton U-24 Kg 1,746.638
- Bekisting M² 35.280
4 Kaki Kolom Beton K-225
- Beton Cor K.225 M³ 4.382
- Besi Beton U-24 Kg 997.191
- Bekisting M² 42.336

IV. PEKERJAAN BETON Elv.+30 - 440 cm


1 Lantai Kerja Beton, Camp. 1:3:5 (bawah Poer & Sloof) M³ 4.801
2 Jalan Beton Rabat K-175, T: 20 Cm M³ 3.600
- Bekisting M² 2.200
3 Sloof Beton Bertulang K.225 Uk. 20/40
- Beton Cor K.225 M³ 11.170
- Besi Beton Kg 2,920.287
- Bekisting M² 111.704
4 Sloof Beton Bertulang K.225, Uk. 20/30
- Beton Cor K.225 M³ 2.180
- Besi Beton Kg 519.981
- Bekisting M² 21.798
5 Sloof Beton Bertulang K.225, Uk.15/15
- Beton Cor K.225 M³ 0.092
- Besi Beton Kg 21.898
- Bekisting M² 1.230
6 Kolom Beton Bertulang K.225 40/50
- Beton Cor K.225 M³ 14.535
- Besi Beton Kg 2,682.165
- Bekisting M² 140.414
7 Kolom Beton Bertulang K.225 20/20
- Beton Cor K.225 M³ 0.230
- Besi Beton Kg 85.793
- Bekisting M² 5.413
8 Kolom Praktis K-175 11/11 + Besi + Bekisting M' 97.200
9 Balok Beton Bertulang Tipe I. K.225 35/70
- Beton Cor K.225 M³ 9.067
- Besi Beton Kg 2,057.384
- Bekisting M² 56.670
10 Balok Beton Bertulang Type-2 K.225 25/50
- Beton Cor K.225 M³ 6.413
- Besi Beton Kg 2,597.586
- Bekisting M² 58.298
11 Balok Beton Bertulang Type Anak K.225 20/30
- Beton Cor K.225 M³ 2.119
- Besi Beton Kg 1,392.718
- Bekisting M² 24.925
12 Balok Latai K.175 11/15 + Besi + Bekisting M' 112.100
13 Tangga Beton Bertulang K.225
- Beton Cor K.225 M³ 1.748
- Besi Beton Kg 318.435
- Bekisting M² 26.766
14 Pelat Lantai t=12 cm K.225
- Beton Cor K.225 M³ 38.599
- Wire Mesh M8 Kg 1,692.189
- Pelat Bondek/Metal Deck M² 321.660
15 List Plank Beton K-225
- Beton Cor K.225 M³ 2.481
- Wire Mesh M8 Kg 254.886
- Bekisting M² 68.544

V PEKERJAAN DINDING
1 Pasangan Batu Bata ½, 1:5 M² 452.069
2 Plesteran Dinding & Beton 1 : 4 M² 1,131.833
3 Plesteran Jalan Beton 1 : 3 M² 15.000
4 Acian Dinding Gedung M² 1,146.833

VI PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pek. Pasang Tegel Lantai Keramik 40/40 M² 346.324
2 Pek. Pasang Tegel Keramik 20/20 WC/KM M² 14.625
3 Pek. Pasang dinding keramik 20/25 M² 67.095
4 Pek. Pasang keramik Meja Beton 40/40 M² 2.345

VII PEKERJAAN SANITAIR


1 Pipa Air Bersih PVC Dia. 1/2" AW M¹ 45.400
2 Pipa Air Bersih PVC Dia. 1" AW M¹ 32.000
3 Pipa Air Kotor PVC Dia. 3" AW M¹ 46.000
4 Pipa Air Kotor PVC Dia. 4" AW M¹ 42.000
5 Pipa Air Kotor PVC Dia. 2" AW M¹ 36.000
6 Pasang mata kran Dia. 1/2" Stainleesteel Ex. Toto Bh 8.000
7 Pasang Stop Kran Dia. 1/2" Bh 4.000
8 Pasang Floor Drain Stainleesteel Bh 5.000
9 Pas. Closed Jongkok Bh 4.000
10 Bak Cuci Piring Stainleesteel Bh 1.000
11 Pas.Westafel Keramik Gantung Bh 2.000
12 Septiktank Lengkap dengan Peresapan Unit 2.000

VIII PEKERJAAN LISTRIK


3 Saklar Tunggal Ex. Broco + Instalasi Pipa Listrik + T. Doz Bh 3.000
4 Saklar Ganda Ex. Broco + Instalasi Pipa Listrik + T. Doz Bh 9.000
5 Stop Kontak + Instalasi Pipa Listrik + T. Doz Bh 9.000
6 Chasing Panel Box + Instalasi Pipa Listrik Unit 1.000

IX PEKERJAAN ATAP DEPAN


1 Pas. Rangka Atap Baja Ringan M² 26.820
2 Pas. Atap Genteng Metal M² 26.820
3 Pas. Bubungan Genteng Metal M' 4.500
4 Pas. Flashing M' 11.920
5 Pas. List Plank 2/20 M² 3.600

X PEKERJAAN LAIN-LAIN
4 Cor Meja Beton K-175 M³ 0.243
5 Pembesian Meja Beton U-24 Kg 29.962
6 Bekisting Meja Beton M² 2.430

XI PEKERJAAN AKHIR
1 Pembersihan Ls 1.000
JUMLAH -
PPN 10 % -
JUMLAH TOTAL -
DIBULATKAN -

TERBILANG: :
ANALISA HARGA SATUAN PEKERJAAN
UTAMA
KEGIATAN : REHABILITASI KANTOR BALAI LATIHAN DINAS KOPRASI
PEKERJAAN : BALAI LATIHAN DINAS KOPRASI
LOKASI : MANADO
TAHUN ANGGARAN : 2019

1 m' Pengukuran & Pemasangan Bouplank


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan
Kayu 5/7 Btg 0.012 -
Paku biasa 2"-5" Kg 0.020 -
Kayu papan 3/20 Lbr 0.007 -
Upah
Pekerja Oh 0.100 -
Tukang Kayu Oh 0.100 -
Kepala Tukang Oh 0.010 -
Mandor Oh 0.005 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Galian Tanah Biasa sedalam 1 m


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.750 -
Tenaga Kerja
Mandor OH 0.025 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Galian Tanah Biasa sedalam 2 m


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.900 - -
Tenaga Kerja
Mandor OH 0.045 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Urugan Kembali Galian Tanah


Dihitung 1/3 Kali Indeks Galian Tanah -

1 m³ Memadatkan Tanah (per 20 cm)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pekerja OH 0.500 - -
Tenaga Kerja
Mandor OH 0.050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Urugan Tanah
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Tanah Urug m³ 1.200 -
Pekerja OH 0.300 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Urugan Pasir
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Pasir Urug m³ 1.200 -
Pekerja OH 0.300 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m' Pagar Keliling dari Seng Gelombang Tinggi 2,1 Meter
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Dolken Kayu Ø 8-10/400 cm Btg 1.250 -
Semen Portland (PC) Kg 2.500 -
Seng Gelombang 3"-5", 7 Fit Lbr 1.200 -
Pasir Beton M3 0.005 -
Koral Beton M3 0.009 -
Kayu 5/7 M3 0.072 -
Paku biasa 2"-5" Kg 0.060 -
Meni besi Kg 0.450 -
Upah
Pekerja Oh 0.400 -
Tukang Kayu Oh 0.200 -
Kepala Tukang Oh 0.020 -
Mandor Oh 0.020 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Pasangan Batu Kosong (Aanstamping)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Kali/Belah m³ 1.200 -
Bahan
Pasir Urug m³ 0.432 - -
Pekerja OH 0.780 - -
Tukang OH 0.390 - -
Tenaga Kerja
Kepala Tukang OH 0.039 - -
Mandor OH 0.039 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m2 Pasangan Batu Bata 1pc : 5psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 -
Bahan Semen Portland (PC) Kg 9.680 -
Pasir Pasang m³ 0.045 -
Pekerja OH 0.300 -
Tukang OH 0.100 -
Tenaga Kerja
Kepala Tukang OH 0.010 -
Mandor OH 0.015 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m2 Pasangan Batu Bata 1pc : 3psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 -
Bahan Semen Portland (PC) Kg 14.370 -
Pasir Pasang m³ 0.040 -
Pekerja OH 0.300 -
Tukang OH 0.100 -
Tenaga Kerja
Kepala Tukang OH 0.010 -
Mandor OH 0.015 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m2 Pasangan Batu Bata Tebal: 1 BT. 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 140.000 - -
Bahan Semen Portland (PC) Kg 26.550 - -
Pasir Pasang m³ 0.093 - -
Pekerja OH 0.650 - -
Tukang OH 0.200 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m³ Pasangan Batu Belah 1pc : 4psr
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Kali/Belah m³ 1.200 - -
Bahan Semen Portland (PC) Kg 163.000 - -
Pasir Pasang m³ 0.520 - -
Pekerja OH 1.500 - -
Tukang OH 0.750 - -
Tenaga Kerja
Kepala Tukang OH 0.075 - -
Mandor OH 0.075 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Plesteran 1pc : 3psr T = 15mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Semen Portland (PC) Kg 7.776 - -
Bahan
Pasir Pasang m³ 0.023 - -
Pekerja OH 0.300 - -
Tukang OH 0.150 - -
Tenaga Kerja
Kepala Tukang OH 0.015 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Plesteran 1pc : 4psr T = 15mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Semen Portland (PC) Kg 6.240 - -
Bahan
Pasir Pasang m³ 0.024 - -
Pekerja OH 0.300 - -
Tukang OH 0.150 - -
Tenaga Kerja
Kepala Tukang OH 0.015 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Acian
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Semen Portland (PC) Kg 3.250 - -
Pekerja OH 0.200 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Waterproofing
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Waterproofing Kg 0.360 -
Bahan
Kertas Amplas m2 0.100 -
Pekerja OH 0.100 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.080 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Rooster 30/30
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Rooster 30.30.10 Bh 11.111 -
Bahan Semen Portland Kg 3.500 - -
Pasir Pasang m³ 0.035 - -
Pekerja OH 0.300 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Rooster Keramik -
1 m² Pas. Paving Stone T= 8 cm. K-300
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Paving Stone Bh 43.000 -
Bahan
Pasir Urug Kg 0.200 -
Pekerja OH 0.135 -
Tukang OH 0.014 -
Tenaga Kerja
Kepala Tukang OH 0.720 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m' Pas. Canstain Uk. 15x30x50


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Canstain Bh 2.000 -
Bahan Semen Kg 1.200 -
Pasir Pasang M3 0.003 -
Pekerja OH 0.300 -
Tukang OH 0.100 -
Tenaga Kerja
Kepala Tukang OH 0.010 -
Mandor OH 0.015 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Beton Tumbuk 1pc : 3psr : 5krl


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.870 - -
Bahan Semen Portland (PC) Kg 218.000 - -
Pasir Pasang m³ 0.520 - -
Pekerja OH 1.650 - -
Tukang OH 0.250 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.080 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Beton Tumbuk 1pc : 3psr : 5krl T = 5 cm (lantai kerja)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.044 - -
Bahan Semen Portland (PC) Kg 10.000 - -
Pasir Pasang m³ 0.026 - -
Pekerja OH 1.150 - -
Tukang OH 0.020 - -
Tenaga Kerja
Kepala Tukang OH 0.002 - -
Mandor OH 0.006 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Plat Bondex / Metal Deck


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pelat Bondek/Metal Deck m² 1.030 -
Kayu Kls III m³ 0.040 -
Paku 5cm - 12 Cm Kg 0.100 -
Bahan Minyak Bekisting Ltr 0.050 -
Balok Kayu kls II m³ 0.0037 -
Multipleks 9mm/Playwood 9mm Lbr 0.0875 -
Dolken kayu galam (8-10) cm, panjang 4 m Btg 1.500 -
Pekerja OH 0.1650 -
Tukang OH 0.0825 -
Tenaga Kerja
Kepala Tukang OH 0.0082 -
Mandor OH 0.0082 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 M' KOLOM/BALOK PRAKTIS BETON BERTULANG K-175 11/11
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Portland Cement kg 4.000 -
Pasir Beton m3 0.006 -
KerikIl m3 0.009 -
Bahan Kayu Klas III m3 0.020 -
Paku Campur kg 0.010 -
Besi Beton U24 kg 3.000 -
Kawat Beton kg 0.045 -
Minyak Bekesting ltr 0.200 -
Playwood tebal 9 mm lbr 0.240 -
Pekerja Org 0.018 -
Tenaga Kerja Tukang Org 0.060 -
Kepala Tukang Batu Org 0.060 -
Mandor Org 0.009 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M' BALOK LATAI / PRAKTIS / RING BALK BETON BERTULANG K-175 11/15
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Portland Cement kg 5.500 - -
Pasir Beton m3 0.009 - -
Kerikil m3 0.009 - -
Bahan Kayu Klas III m3 0.003 - -
Paku Campur kg 0.020 - -
Besi Beton U24 kg 3.600 - -
Kawat Beton kg 0.050 - -
Minyak Bekesting ltr 0.200 - -
Playwood tebal 9 mm lbr 0.240 - -
Pekerja Org 0.297 - -
Tenaga Kerja Tukang Org 0.990 - -
Kepala Tukang Batu Org 0.010 - -
Mandor Org 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Beton Bertulang K.175 (fc'=9,8 Mpa)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.710 -
Bahan Semen Portland (PC) Kg 326.000 -
Pasir Pasang m³ 0.543 -
Air Kerja Ltr 215.000 -
Pekerja OH 1.650 -
Tukang OH 0.275 -
Tenaga Kerja
Kepala Tukang OH 0.028 -
Mandor OH 0.083 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Beton Bertulang K.225


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kerikil m³ 0.776 - -
Bahan Semen Portland (PC) Kg 371.000 - -
Pasir Pasang m³ 0.492 - -
Air Kerja Ltr 215.000 - -
Pekerja OH 1.650 - -
Tukang OH 0.275 - -
Tenaga Kerja
Kepala Tukang OH 0.028 - -
Mandor OH 0.083 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Kg Pembesian dengan Besi Polos atau Ulir
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Beton Kg 1.050 -
Bahan
Kawat Beton Kg 0.015 -
Pekerja OH 0.007 -
Tukang OH 0.007 -
Tenaga Kerja
Kepala Tukang OH 0.0007 -
Mandor OH 0.0004 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Kg Pas. Jaring Kawat Baja / wiremesh


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Jaring Kawat Baja diLas Kg 1.020 -
Bahan
Kawat Beton Kg 0.050 -
Pekerja OH 0.025 -
Tukang OH 0.025 -
Tenaga Kerja
Kepala Tukang OH 0.0020 -
Mandor OH 0.0010 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Pondasi Telapak & Jalan Beton


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 -
Bahan Paku Kg 0.300 -
Minyak Bekisting Ltr 0.100 -
Pekerja OH 0.520 -
Tukang OH 0.260 -
Tenaga Kerja
Kepala Tukang OH 0.026 -
Mandor OH 0.026 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Sloof


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.045 - -
Bahan Paku Kg 0.300 - -
Minyak Bekisting Ltr 0.100 - -
Pekerja OH 0.520 - -
Tukang OH 0.260 - -
Tenaga Kerja
Kepala Tukang OH 0.026 - -
Mandor OH 0.026 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Kolom


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 - -
Paku Kg 0.400 - -
Minyak Bekisting Ltr 0.200 - -
Bahan
Balok Kayu Kls. III m³ 0.015 - -
Playwood 9mm Lbr 0.350 -
Dolken/Bambu Ø 8-10 cm P = 4m Btg 2.000 - -
Pekerja OH 0.660 - -
Tukang OH 0.330 - -
Tenaga Kerja
Kepala Tukang OH 0.033 - -
Mandor OH 0.033 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Bekisting untuk Balok, List Plank Beton
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.040 - -
Paku Kg 0.400 - -
Minyak Bekisting Ltr 0.200 - -
Bahan
Balok Kayu Kls. III m³ 0.018 - -
Playwood 9 mm Lbr 0.350 - -
Dolken/Bambu Ø 8-10 cm P = 4m Btg 2.000 - -
Pekerja OH 0.660 - -
Tukang OH 0.330 - -
Tenaga Kerja
Kepala Tukang OH 0.033 - -
Mandor OH 0.033 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Lantai,


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.080 - -
Paku Kg 0.600 - -
Minyak Bekisting Ltr 0.200 - -
Bahan
Balok Kayu Kls. III m³ 0.036 - -
Playwood 9mm Lbr 0.350 - -
Dolken/Bambu Ø 8-10 cm P = 4m Btg 6.000 - -
Pekerja OH 0.660 - -
Tukang OH 0.330 - -
Tenaga Kerja
Kepala Tukang OH 0.033 - -
Mandor OH 0.033 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Tangga


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Kls. III m³ 0.030 - -
Paku Kg 0.400 - -
Minyak Bekisting Ltr 0.150 - -
Bahan
Balok Kayu Kls. III m³ 0.015 - -
Playwood 9mm Lbr 0.350 - -
Dolken/Bambu Ø 8-10 cm P = 4m Btg 2.000 - -
Pekerja OH 0.660 - -
Tukang OH 0.330 - -
Tenaga Kerja
Kepala Tukang OH 0.033 - -
Mandor OH 0.033 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Pondasi Beton Bertulang K.225 (Besi 200 Kg + Bekisting)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Beton K.225 m³ 1.000 - -
Bahan Pembesian Kg 210.000 - -
Bekisting untuk Pondasi m² 4.000 - -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Sloof Beton Bertulang K.225 (Besi 200 Kg + Bekisting)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Beton 1pc : 2psr : 3krl m³ 1.000 - -
Bahan Pembesian Kg 210.000 - -
Bekisting untuk Sloof m² 4.000 - -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Kolom Beton Bertulang K.225 (Besi 200 Kg + Bekisting)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Beton K.225 m³ 1.000 - -
Bahan Pembesian Kg 210.000 - -
Bekisting untuk Kolom m² 4.000 - -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m³ Balok Beton Bertulang K.225 (Besi 200 Kg + Bekisting)
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Beton K.225 m³ 1.000 - -
Bahan Pembesian Kg 210.000 - -
Bekisting untuk Balok m² 5.000 - -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m³ Lantai Beton Bertulang K.225 (Besi 200 Kg + Bekisting)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Beton K.225 m³ 1.000 - -
Bahan Pembesian Kg 210.000 - -
Bekisting untuk Lantai m² 1.000 - -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Bata ½ Bata, 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Bata Bh 70.000 -
Bahan Semen Portland (PC) Kg 11.500 - -
Pasir Pasang m³ 0.043 - -
Pekerja OH 0.320 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Hollow Breeck, 1pc : 4psr


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Hollow Brick KW 1 Bh 13.000 -
Bahan Semen Portland (PC) Kg 6.860 - -
Pasir Pasang m³ 0.029 - -
Pekerja OH 0.320 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 60 x 60 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 60 x 60 cm Bh 3.100 -
Semen Portland (PC) Kg 9.600 -
Bahan
Semen Warna Kg 1.500 -
Pasir Pasang m³ 0.045 -
Pekerja OH 0.240 - -
Tukang OH 0.120 - -
Tenaga Kerja
Kepala Tukang OH 0.012 - -
Mandor OH 0.012 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 40 x 40 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 40 x 40 cm Bh 6.630 -
Semen Portland (PC) Kg 9.800 - -
Bahan
Semen Warna Kg 1.300 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.250 - -
Tukang OH 0.125 - -
Tenaga Kerja
Kepala Tukang OH 0.013 - -
Mandor OH 0.013 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Pasangan Tangga Tegel Keramik 40 x 40 cm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 40 x 40 cm Bh 7.500 -
Semen Portland (PC) Kg 11.380 - -
Bahan
Semen Warna Kg 1.500 - -
Pasir Pasang m³ 0.042 - -
Pekerja OH 0.620 - -
Tukang OH 0.600 - -
Tenaga Kerja
Kepala Tukang OH 0.060 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Granit 30 x 30 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Granit 30 x 30 cm Bh 11.870 -
Semen Portland (PC) Kg 10.000 - -
Bahan
Semen Warna Kg 1.500 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.250 - -
Tukang OH 0.125 - -
Tenaga Kerja
Kepala Tukang OH 0.013 - -
Mandor OH 0.013 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 30 x 30 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 30 x 30 cm Bh 11.870 -
Semen Portland (PC) Kg 10.000 - -
Bahan
Semen Warna Kg 1.500 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.700 - -
Tukang OH 0.350 - -
Tenaga Kerja
Kepala Tukang OH 0.035 - -
Mandor OH 0.035 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 25 x 30 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 25 x 30 cm Bh 12.400 -
Semen Portland (PC) Kg 10.000 - -
Bahan
Semen Warna Kg 1.500 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.700 - -
Tukang OH 0.350 - -
Tenaga Kerja
Kepala Tukang OH 0.035 - -
Mandor OH 0.035 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 20 x 20 cm (Anti Slip)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 20 x 20 cm (anti slip) Bh 26.500 -
Semen Portland (PC) Kg 10.400 - -
Bahan
Semen Warna Kg 1.620 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.620 - -
Tukang OH 0.350 - -
Tenaga Kerja
Kepala Tukang OH 0.035 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Pasangan Dinding Tegel Keramik 20 x 25 cm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 20 x 25 cm Bh 21.500 -
Semen Portland (PC) Kg 10.400 - -
Bahan
Semen Warna Kg 1.620 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.620 - -
Tukang OH 0.350 - -
Tenaga Kerja
Kepala Tukang OH 0.035 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Lantai Tegel Keramik 30 x 30 cm (Anti Slip)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 30 x 30 cm (anti slip) Bh 11.870 -
Semen Portland (PC) Kg 10.000 - -
Bahan
Semen Warna Kg 1.500 - -
Pasir Pasang m³ 0.045 - -
Pekerja OH 0.620 - -
Tukang OH 0.350 - -
Tenaga Kerja
Kepala Tukang OH 0.035 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Dinding Tegel Keramik 25 x 40 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Tegel Keramik 25 x 40 cm Bh 11.500 -
Semen Portland (PC) Kg 9.300 - -
Bahan
Semen Warna Kg 1.940 - -
Pasir Pasang m³ 0.018 - -
Pekerja OH 0.600 - -
Tukang OH 0.450 - -
Tenaga Kerja
Kepala Tukang OH 0.045 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 cm Biaya Pengelasan
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kawat Las Kg 0.040 -
Bahan
Solar Ltr 0.030 -
Pekerja OH 0.004 - -
Tukang Las OH 0.002 - -
Tenaga Kerja
Kepala Tukang OH 0.0002 - -
Mandor OH 0.0002 - -
Alat Mesin Las + Gurinda Potong 1 Set Jam 0.017 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Stainless Steel Ø 1"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Stainless Steel Ø 1" m¹ 1.100 -
Bahan
Pengelasan cm 31.902 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m¹ Pas. Stainless Steel Ø 1½"
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Stainless Steel Ø 1½" m¹ 1.100 -
Bahan
Pengelasan cm 15.951 -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Stainless Steel Ø 3"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Stainless Steel Ø 3" m¹ 1.100 -
Bahan
Pengelasan cm 35.890 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Ralling tangga Stainless Steel Ø 1" - 1½". Tinggi 1,1 Meter
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Stainless Steel Ø 1½" m' 3.200 -
Bahan Pipa Stainless Steel Ø 1" m' 6.125 -
Pengelasan cm 246.446 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pemb. Kuda-kuda Pipa Black Steel Ø 3" Medium A


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Black Steel Ø 3" Medium A M' 3.300 -
Bahan Pipa Black Steel Ø 2 ½ " Medium A M' 1.450 -
Pengelasan cm 60.000 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa Black Steel Ø 3" Kaso


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Black Steel Ø 3 " Medium A m¹ 1.100 - -
Bahan
Pengelasan cm 15.000 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas.Canal C 1.25x.50 Med A


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Canal C Uk.1.25x0.50 m¹ 1.100 -
Bahan
Pengelasan cm 1.000 - -
Pekerja OH 0.250 - -
Tukang OH 0.025 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m¹ Pas. Besi Holow 8x8
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Holow 8x8 m¹ 1.100 -
Bahan
Pengelasan cm 32.000 - -
Pekerja OH 0.150 - -
Tukang OH 0.015 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Besi Holow 4x4


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Holow 4x4 m¹ 1.100 -
Bahan
Pengelasan cm 16.000 - -
Pekerja OH 0.150 - -
Tukang OH 0.015 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Besi Holow 2x4


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Holow 2x4 m¹ 1.100 -
Bahan
Pengelasan cm 12.000 - -
Pekerja OH 0.150 - -
Tukang OH 0.015 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca Bening 15 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Bening 15 mm M² 1.050 -
Pekerja OH 0.500 - -
Tukang OH 0.200 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca Bening 12 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Bening 12 mm M² 1.050 -
Pekerja OH 0.500 - -
Tukang OH 0.200 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca Tempered 12 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Tempered 12 mm M² 1.050 -
Pekerja OH 0.750 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Pasang Kaca Tempered 8 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Tempered 8 mm M² 1.050 -
Pekerja OH 0.750 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca Sandblast 8 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Sandblast 8 mm M² 1.050 -
Pekerja OH 0.750 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca rayben 5 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca Rayben 5mm M² 1.100 -
Pekerja OH 0.750 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Kaca Bening 5 mm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kaca bening 5mm M² 1.100 -
Pekerja OH 0.750 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasang Stiker Kaca Sand Blast


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Stiker Kaca Sand blast M² 1.100 -
Tenaga Kerja Pekerja Ls 1.000 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Pasangan Batu Alam / Bunga


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Batu Alam/Bunga m² 1.000 -
Semen Portland (PC) Kg 9.300 - -
Bahan
Semen Warna Kg 1.940 - -
Pasir Pasang m³ 0.018 - -
Pekerja OH 0.600 - -
Tukang OH 0.450 - -
Tenaga Kerja
Kepala Tukang OH 0.045 - -
Mandor OH 0.030 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Kg Pasang Rangka Kuda-Kuda/Atap Baja Siku
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Besi Siku Kg 1.100 -
Bahan
Cat Menie Kg 0.080 -
Pekerja OH 0.006 - -
Tukang OH 0.060 - -
Tenaga Kerja
Kepala Tukang OH 0.006 - -
Mandor OH 0.0003 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Rangka Plafond Metal Panel 40 x 40 cm


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Metal Furing Ujg 1.200 -
Pekerja OH 0.833 - -
Tukang OH 0.250 - -
Tenaga Kerja
Kepala Tukang OH 0.025 - -
Mandor OH 0.025 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Kosen Pintu/Jendela/Ventilasi Alumunium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Profil 5/10 (4") M¹ 1.100 -
Bahan Sekrup Fixer Bh 2.000 -
Sealant Putih Tb 0.060 -
Pekerja OH 0.030 - -
Tukang OH 0.430 - -
Tenaga Kerja
Kepala Tukang OH 0.043 - -
Mandor OH 0.021 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Bingkai Daun Pintu Alumunium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Profil 3/10 M¹ 1.100 -
Bahan List Karet Kaca M¹ 1.050 -
Sealant Putih Tb 0.060 - -
Pekerja OH 0.080 - -
Tukang OH 0.800 - -
Tenaga Kerja
Kepala Tukang OH 0.080 - -
Mandor OH 0.040 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Bingkai Jendela/Ventilasi (Aluminium Frame)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Alumunium Frame M¹ 1.100 -
Bahan List Karet Kaca M¹ 1.050 -
Sealant Putih Tb 0.060 - -
Pekerja OH 0.080 - -
Tukang OH 0.800 - -
Tenaga Kerja
Kepala Tukang OH 0.080 - -
Mandor OH 0.040 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Kunci Tanam 2x Slaag
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Kunci Tanam 2x Slaag Bh 1.000 -
Pekerja OH 0.060 - -
Tukang OH 0.600 - -
Tenaga Kerja
Kepala Tukang OH 0.060 - -
Mandor OH 0.003 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Handle Pintu Pull Fush


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Handle Pintu Pull Fush Bh 1.000 -
Pekerja OH 0.060 - -
Tukang OH 0.600 - -
Tenaga Kerja
Kepala Tukang OH 0.060 - -
Mandor OH 0.003 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Engsel Pintu Aluminium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Engsel Pintu Aluminium Bh 1.000 -
Pekerja OH 0.015 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.015 - -
Mandor OH 0.00075 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Engsel Jendela Aluminium


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Engsel Jendela Aluminium Bh 1.000 -
Pekerja OH 0.010 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.00050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Grendle Tanam Pintu


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Grendle Pintu Bh 1.000 -
Pekerja OH 0.010 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.00050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Grendle Jendela Aluminium/Rambuncis


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Grendle Jendela Aluminium/Rambuncis Bh 1.000 -
Pekerja OH 0.010 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.00050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m2 Rangka Plafond Besi Hollow Galvanis
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Rangka Hollow 2x4 cm Galvanis Btg 1.025 -
Stifenner Bh 3.000 -
Bahan
Paku keling / Paku Sekrup Kg 0.110 -
Penggantung dan Ramzet Bh 4.000 -
Pekerja OH 0.050 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ List Profil Gypsum


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
List Profil Gypsum m¹ 1.050 -
Bahan
Paku Sekrup Kg 0.010 -
Pekerja OH 0.050 -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ List Profil Kalsiboard


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
List Profil Kalsiboard m¹ 1.050 -
Bahan
Paku Sekrup Kg 0.010 - -
Pekerja OH 0.050 - -
Tukang OH 0.050 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Plafond Gypsum 9 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Gypsum 9 mm Lbr 0.375 -
Bahan
Paku Skrup Kg 0.030 - -
Pekerja OH 0.070 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.004 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Plafond Kalsiborad 6 mm
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kalsiboard 6 mm Lbr 0.375 -
Bahan
Paku Skrup Kg 0.030 - -
Pekerja OH 0.070 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.004 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m² Atap Spandek
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Spndek Lbr 0.890 -
Bahan
Paku Sekrup Kg 0.200 - -
Pekerja OH 0.200 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.001 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Cat Tembok 3x
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Plamir Kg 0.150 -
Bahan Cat Dasar Kg 0.250 -
Cat Penutup Kg 0.260 -
Pekerja OH 0.020 - -
Tukang OH 0.003 - -
Tenaga Kerja
Kepala Tukang OH 0.060 - -
Mandor OH 0.006 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Cat Mengkilap
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Cat Minyak Kg 0.100 -
Cat Menie Kg 0.100 -
Wood Filler / Dumpul Kayu Kg 0.083 -
Bahan
Thinner Ltr 0.050 -
Kuas 3" Bh 0.050 -
Amplas Bh 0.400 -
Pekerja OH 0.120 - -
Tukang OH 0.210 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Cat Menie
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Cat Menie Kg 0.060 - -
Thinner Ltr 0.020 - -
Kuas 3" Bh 0.050 - -
Amplas Bh 0.400 - -
Pekerja OH 0.120 - -
Tukang OH 0.210 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Cat Varnis / Politur


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Varnis / Politur Kg 0.500 -
Wood Filler / Dumpul Kayu Kg 0.300 - -
Bahan Thinner Ltr 0.150 - -
Kuas 3" Bh 0.050 - -
Amplas Bh 0.500 - -
Pekerja OH 0.120 - -
Tukang OH 0.210 - -
Tenaga Kerja
Kepala Tukang OH 0.020 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Unit Pas. Kloset Duduk
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kloset Duduk Bh 1.000 -
Perlengkapan % 6.000 -
Bahan
Semen Portland (PC) Kg 6.000 - -
Pasir Pasang m³ 0.010 - -
Pekerja OH 1.000 - -
Tukang OH 1.000 - -
Tenaga Kerja
Kepala Tukang OH 0.100 - -
Mandor OH 0.100 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Unit Pas. Kloset Jongkok


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kloset Jongkok Unit 1.000 -
Bahan Semen Portland (PC) Kg 6.000 - -
Pasir Pasang m³ 0.010 - -
Pekerja OH 1.000 - -
Tukang OH 1.500 - -
Tenaga Kerja
Kepala Tukang OH 0.150 - -
Mandor OH 0.150 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Wastafel
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Wastafel Bh 1.000 -
Perlengkapan % 6.000 -
Bahan
Semen Portland (PC) Kg 6.000 -
Pasir Pasang m³ 0.010 - -
Pekerja OH 1.200 - -
Tukang OH 1.450 - -
Tenaga Kerja
Kepala Tukang OH 0.150 - -
Mandor OH 0.100 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Pas. Bak Cuci Piring Stainlees Steell


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bak Cuci Stainlees Steell Bh 1.000 -
Bahan
Water drain + asesories Bh 1.000 -
Pekerja OH 0.030 - -
Tukang OH 0.300 - -
Tenaga Kerja
Kepala Tukang OH 0.030 - -
Mandor OH 0.0015 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Stop Kran ½"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Stop Kran ½" Bh 1.000 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.100 -
Tenaga Kerja
Mandor OH 0.010 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Stop Kran 1"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Stop Kran Ø 1" Bh 1.000 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.100 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Mata Kran ½"
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Mata Kran Ø ½" Bh 1.000 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.100 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Satuan Pekerjaan (dibulatkan) -

1 Bh Floor Drain
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Floor Drain Bh 1.000 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.100 - -
Tenaga Kerja
Mandor OH 0.010 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa PVC Ø ½"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø ½" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.036 - -
Tukang OH 0.060 - -
Tenaga Kerja
Kepala Tukang OH 0.006 - -
Mandor OH 0.0018 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa PVC Ø ¾"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø ¾" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.036 - -
Tukang OH 0.060 - -
Tenaga Kerja
Kepala Tukang OH 0.006 - -
Mandor OH 0.0018 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa PVC Ø 1"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø 1" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.036 - -
Tukang OH 0.060 - -
Tenaga Kerja
Kepala Tukang OH 0.006 - -
Mandor OH 0.0018 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa PVC Ø 2"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø 2" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.054 - -
Tukang OH 0.090 - -
Tenaga Kerja
Kepala Tukang OH 0.009 - -
Mandor OH 0.0027 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 m¹ Pas. Pipa PVC Ø 3"
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø 3" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.081 - -
Tukang OH 0.135 - -
Tenaga Kerja
Kepala Tukang OH 0.135 - -
Mandor OH 0.0041 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m¹ Pas. Pipa PVC Ø 4"


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Pipa Galvanised Ø 4" Bh 1.200 -
Bahan
Perlengkapan % 35.000 -
Pekerja OH 0.081 - -
Tukang OH 0.135 - -
Tenaga Kerja
Kepala Tukang OH 0.135 - -
Mandor OH 0.0041 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 m² Bekisting untuk Lantai


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Paku Kg 0.600 -
Bahan Balok Kayu Kls. III m³ 0.036 -
Dolken/Bambu Ø 8-10 cm P = 4m Btg 6.000 -
Pekerja OH 0.660 - -
Tukang OH 0.330 - -
Tenaga Kerja
Kepala Tukang OH 0.033 - -
Mandor OH 0.033 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Titik Instalasi Lampu Penerangan


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kabel NYM 2x2,5 M¹ 15.000 -
Pipa PVC Ø5/8" 4m Btg 1.000 -
T. Dos PVC Bh 2.000 -
Bahan
Semen Abu-abu Kg 0.850 -
Pasir Pasang M3 0.026 -
Alat Bantu Ls 1.000 -
Pekerja OH 0.080 - -
Tukang OH 0.800 - -
Tenaga Kerja
Kepala Tukang OH 0.080 - -
Mandor OH 0.040 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Titik Instalasi Stop Kontak Tanpa Kabel (Tahap I)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kabel NYM 2x2,5 M¹ 10.000 -
Pipa PVC Ø5/8" 4m Btg 0.200 - -
Bahan
T. Dos PVC Bh 1.000 - -
Stop Kontak Bh 1.000 -
Pekerja OH 0.050 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Titik Instalasi Stop Kontak
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kabel NYM 2x2,5 M¹ 10.000 -
Pipa PVC Ø5/8" 4m Btg 0.200 - -
Bahan
T. Dos PVC Bh 1.000 - -
Stop Kontak Bh 1.000 -
Pekerja OH 0.050 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Saklar Tunggal + Instalasi Pipa Listrik + T.Doz (Analisa Tahap I)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Saklar Tunggal Bh 1.000 -
Bahan Pipa PVC Ø5/8" 4m Btg 0.500 - -
T. Dos PVC Bh 1.000 - -
Pekerja OH 0.050 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Saklar Tunggal
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Saklar Tunggal Bh 1.000 -
Bahan Pipa PVC Ø5/8" 4m Btg 0.500 - -
T. Dos PVC Bh 1.000 - -
Pekerja OH 0.023 - -
Tukang OH 0.047 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Bh Saklar Ganda + Instalasi Pipa Listrik + T. Doz (Analisa Tahap I)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Saklar Tunggal Bh 1.000 -
Bahan Pipa PVC Ø5/8" 4m Btg 0.500 - -
T. Dos PVC Bh 1.000 - -
Pekerja OH 0.050 - -
Tukang OH 0.500 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 Bh Saklar Ganda
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Saklar Tunggal Bh 1.000 -
Pekerja OH 0.023 - -
Tukang OH 0.047 - -
Tenaga Kerja
Kepala Tukang OH 0.005 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Unit Panel Box Lengkap


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Chasing Panel Box + Pipa PVC 5/8" Bh 1.000 -
Tenaga Kerja Upah (10% dari harga bahan) LS 0.100 -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Titik Downlight Stainless 6" + Lampu SL 23 Watt


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Down Light 6" Bh 1.000 -
Bahan
Lampu SL 23 Watt Bh 1.000 -
Pekerja OH 0.080 - -
Tukang OH 0.800 - -
Tenaga Kerja
Kepala Tukang OH 0.080 - -
Mandor OH 0.040 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 Titik Downlight Stainless 6" + Lampu SL 18 Watt


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Down Light 6" Bh 1.000 -
Bahan
Lampu SL 18 Watt Bh 1.000 -
Pekerja OH 0.080 - -
Tukang OH 0.800 - -
Tenaga Kerja
Kepala Tukang OH 0.080 - -
Mandor OH 0.040 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M2 Pas. Rangka Atap Baja Ringan


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
C-75, 08 M' 1.488 -
C-75, 06 M' 2.232 -
Baut (Screw Driver) Bh 28.000 -
Bahan
Dynabolt Bh 1.600 -
Reng M' 5.400 -
Talang Jurai M' 0.124 -
Pekerja OH 0.200 - -
Tukang OH 0.450 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -
1 M2 Pas. Atap Genteng Metal
Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Genteng Metal (setara Multi Rroof) Lbr 1.620 -
Bahan
Paku 2''-5'' Kg 0.200 -
Pekerja OH 0.200 - -
Tukang OH 0.450 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M2 Pas. Bubungan Genteng Metal


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bubungan/NokGenteng Metal (ex. Multi Rroof M' 1.100 -
Bahan
Paku 2''-5'' Kg 0.050 - -
Pekerja OH 0.250 - -
Tukang OH 0.150 - -
Tenaga Kerja
Kepala Tukang OH 0.015 - -
Mandor OH 0.013 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M2 Pas. Bubungan Samping Genteng Metal


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Genteng Metal (setara Multi Rroof) M' 1.020 -
Bahan
Paku 2''-5'' Kg 0.200 -
Pekerja OH 0.200 - -
Tukang OH 0.450 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.050 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M' Pas. Flashing Genteng Metal


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Bahan Flashing M' 1.100 -
Pekerja OH 0.050 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -

1 M2 Pas. List Plank Kayu KLS II (2/20)


Harga Satuan Jumlah
Kebutuhan Satuan Indeks
(Rp.) (Rp.)
Kayu Papan Kls-II M3 0.0088 -
Bahan
Paku 2''-5'' Kg 0.060 -
Pekerja OH 0.100 - -
Tukang OH 0.100 - -
Tenaga Kerja
Kepala Tukang OH 0.010 - -
Mandor OH 0.005 - -
Sub Jumlah -
Over Head, Keuntungan, DLL -
Jumlah Harga Per Satuan Pekerjaan (dibulatkan) -