DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT

Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
I UPAH KERJA
Mandor Oh 120,000.00
Pekerja Oh 100,000.00
Kepala Tukang Oh 150,000.00
Tukang Kayu Oh 120,000.00
Tukang Batu Oh 120,000.00
Tukang Cat Oh 120,000.00
Tukang Las Biasa Oh 120,000.00
Tukang las Konstruksi Oh 120,000.00
Tukang Gali Oh 120,000.00
Tukang Besi Konstruksi Oh 120,000.00
Tukang Khusus alluminium Oh 120,000.00
Tukang Oh 120,000.00
Tukang Alluminium/Kaca Oh 120,000.00
Tukang Pipa Oh 120,000.00
II HARGA BAHAN BANGUNAN
Semen Portland Kg 1,702.00
Semen Abu-abu Kg 3,200.00
Semen Merah M3 3,200.00
Semen Warna Kg 3,200.00
Semen Nat Kg 3,200.00
Kapur Pasang Kg 5,525.00
Kapur Sirih Kg 5,525.00
Kawat Bidrat/ kawat beton Kg 23,675.00
Besi Beton Polos (D16) Kg 9,791.67
Besi Beton Polos Kg 13,500.00
Rangka Metal hollow 40.40.2 mm M 40,000.00
Rangka Metal hollow 20.40.2 mm M 30,000.00
Assesoris rangka besi hollow dinding partisi Ls 14,000.00
Assesoris rangka besi hollow plafond Ls 10,500.00
Besi Beton Ulir Kg 19,000.00
Besi strip tebal 5 mm Kg 25,100.00
Paku Biasa Kg 15,000.00
Paku Pancing Kg 20,000.00
Paku Hak Panjang 15 cm Kg 20,000.00
Paku Sekrup Doz 35,750.00
Paku sekrup Alderon Kg 32,000.00
Paku Campuran (5 , 7, 10 cm) Kg 19,820.00
Paku 12 cm Kg 17,000.00
Paku tripleks Kg 46,750.00
Paku Seng Kg 35,596.00
Paku Asbes Kg 47,667.00
Skrup fixer bh 700.00
Baut/Mur Kg 30,525.00
Kawat Harmonika 2mm x 2 mm, 2,1 mm m2 75,000.00
Kawat Duri Kg 25,100.00
Kawat Kassa Uk. 2.0 x 2.0, 2 mm M2 25,100.00
kawat las Stainlesteel kg 275,000.00
Stainlesteel Kotak 40/40 mm M 75,000.00
Stainlesteel Kotak 20/40 mm M 55,000.00
Besi Plat 2.2x30 mm M 12,000.00
Besi Siku 40x40 mm M 14,600.00
Besi Siku 50.50.4 mm Kg 15,000.00
Besi Baja WF 300x150 Kg 50,000.00
Besi Baja WF 300x100 Kg 45,000.00
Besi Baja WF 200x100 Kg 30,000.00
Besi Baja Cnp 125 Kg 7,500.00
Foolding Door Harmonika M2 550,000.00
Rolling Door Aluminium tebal 0,8 M2 620,000.00
Kusen Aluminium Natural 3" M2 1,000,000.00
Daun Pintu Aluminium Kaca m2 2,200,000.00
Kawat las listrik kg 28,000.00
Jaring kawat baja dilas Kg 88,000.00
Truss C75.35.7 chord m1 18,000.00
Reng Botton U33.045 m1 9,750.00
Strap Bracing m1 5,950.00
Screw 12-14x20 HolDip Galvanized buah 500.00
Screw 10-16x16 HolDip Galvanized buah 400.00
Dynabol dia-12 x 120 mm Bh 2,100.00
Keramik warna 40 x 40 cm Bh 14,698.00
Keramik putih 40 x 40 cm Bh 13,002.17
Keramik warna 30 x30 cm Bh 7,295.85
Keramik putih 30 x 30 cm Bh 6,657.30
Keramik Warna 20 x 25 cm Bh 4,567.50
Keramik Putih 20 x 25 cm Bh 3,798.90
Keramik Warna 20 x 20 cm Bh 3,243.32
Keramik Putih 20 x 20 cm Bh 3,039.12
Keramik Putih 20 x33 cm Bh 6,266.49
Keramik Warna 60 x 60 Cm Bh 58,289.50
Keramik warna Lis 10 x 40 cm Bh 3,674.50
Keramik warna lis 10 x 60 cm Bh 9,714.92
Keramik Artistik 10 x 20 cm Bh 1,600.00
Keramik Artistik 5 x 20 cm Bh 6,293.75
Ubin Keramik 20 x 20 cm Bh 2,600.00
Kaca Bening 5 mm M2 233,109.00
Kaca Rayband, Tebal 5 mm M2 258,990.00
Kaca Buram, Tebal 12 mm M2 644,000.00
Kaca Cermin, Tebal 5 mm M2 450,000.00
Kaca Naco bening 5 mm M2 350,000.00
Triplex 3 mm (122x244 Cm) lbr 70,450.00
Plywood 3 mm (122 x 244 cm) Lbr 65,000.00
Plywood Tebal 9 mm Lbr 308,710.00
Gypsum Board (120x240x9) mm Lbr 96,838.00
Tepung gypsum kg 17,000.00
Kalsiboard (120x240x4)mm lbr 80,570.00
List gypsum profil 10/10 cm m 35,000.00
List Kayu Profil 4/4 cm klas II M 15,000.00
List gypsum profil 12/12 cm m 65,000.00
List Gypsum 2/5 M 25,000.00
Atap UPVC Rooftop Alderon m2 130,000.00
Atap Alderon type Transparan m2 160,000.00
Nok Alderon M' 90,000.00
Seng Gelombang Bjls.20 kaki 17,600.00
Seng Gelombang Bjls. 20, Uk. 90 x 240 cm Lbr 138,900.00
Seng Gelombang Galvalum, 0,25 mm M' 51,000.00
Seng Plat 3' x 6" Bjls. 28 (50x 180) cm Lbr 50,250.00
Seng Plat, lebar 55 cm Bjls.20 M' 38,500.00
Genteng Beton Bh 12,235.00
Genteng Metal Sakura Roof Lbr 40,283.00
Genteng Palentong. Bh 2,200.00
Nok Metal Sakura Roof Bh 33,150.00
Atap Metal Soka lbr 80,801.00
Nok Mertal Soka Bh 51,200.00
Genteng Decra Bond Bh 33,150.00
Nok Genteng Beton Bh 14,375.00
Talang Air PVC Abu-abu M' 16,500.00
Sambungan Talang Air PVC Bh 8,000.00
Penutup Talang Air PVC Bh 7,000.00
Cat Dasar Kayu Kg 45,000.00
Cat Penutup Kayu Kg 55,100.00
Cat Dasar Tembok (standart) Kg 23,100.00
Cat Penutup Tembok (standart) Kg 23,100.00
Cat Dasar Tembok (anti lumut) Kg 53,500.00
Cat Penutup Tembok (anti lumut) Kg 59,920.00
Cat Baja Kg 55,100.00
Cat Meni Kg 45,000.00
Meni (Read Lead) A Kg 20,100.00
Meni (Read Lead) B Kg 20,100.00
Meni Besi Kg 45,000.00
Plamir / dempul Kayu Kg 72,500.00
Plamir Tembok Kg 10,900.00
Politur Ltr 72,500.00
Politur Jadi Ltr 50,100.00
Soda Api Kg 100,000.00
Sabun Kg 15,000.00
Dempul Jadi Kg 20,100.00
Dempul Kg 20,100.00
Ampelas Lbr 7,875.00
Kuas Bh 25,567.00
Residu Ltr 58,750.00
Pengencer Ltr 25,100.00
air Ltr 100.00
Minyak Bekisting/ minyak cat Ltr 25,000.00
Lem Kayu Kg 10,000.00
Dempul fiber Kg 87,000.00
Cat dasar fiber Kg 97,500.00
Cat penutup fiber Kg 97,500.00
Tiner/ pengencer Ltr 30,700.00
Vernis Ltr 50,100.00
Kunci Tanam 2 x putar Bh 160,967.00
Kunci Tanam Antik Bh 203,000.00
Kunci Tanam Biasa Bh 150,100.00
Kunci Tanam Kamar Mandi Bh 203,000.00
Kunci Selot Pintu Bh 20,075.00
Kunci Selot Jendela Bh 10,000.00
Pengadaan Kunci selot Folding Door (plus Gembok Uk. Besar) Bh 250,000.00
Engsel Pintu Bh 20,533.00
Engsel Jendela Bh 20,533.00
Grendel Jendela Bh 20,533.00
Kait Angin Bh 15,400.00
Kloset Duduk Porselen (lengkap) Bh 2,997,000.00
Kloset Jongkok Porselen Bh 203,000.00
Wastafel Bh 463,333.00
Bak Fibreglass Bh 175,000.00
Bak Cuci Stainless Steel Bh 251,500.00
Badkip Kg 3,250,000.00
Seal Tape Bh 5,000.00
Floor Drain stainlesteel Bh 25,000.00
Sealent Kg 27,500.00
Pipa PVC Tipe AW Diameter 1/2" M' 8,748.25
Pipa PVC Tipe AW Diameter 3/4" M' 10,004.25
Pipa PVC Tipe AW Diameter 1" M' 11,562.50
Pipa PVC Tipe AW Diameter 1 1/2" M' 18,941.75
Pipa PVC Tipe AW Diameter 2" M' 26,504.25
Pipa PVC Tipe AW Diameter 2 1/2" M' 34,250.00
Pipa PVC Tipe AW Diameter 3" M' 43,050.00
Pipa PVC Tipe AW Diameter 4" M' 70,916.75
Kran Air 3/4" Bh 15,750.00
Kran Air1/2" Bh 12,500.00
Tanah Timbunan Pilihan M3 85,000.00
Tanah Timbunan Biasa M3 84,000.00
Pasir Urug M3 212,500.00
Pasir Beton Maligano M3 261,724.00
Pasir Pasang M3 212,500.00
Batu Belah M3 165,000.00
Batu Pecah / Splite 2-3 cm M3 287,500.00
Kerikil Beton (Pecah Maligano) M3 479,680.00
Batu Merah 5 x 11 x 22 cm Bh 1,000.00
Bata Tempel Hitam Bh 21,061.50
Roster motif kotak uk. 20 x 20 cm Bh 20,000.00
Lisplank GRC 30 CM M 16,875.00
Papan kayu jati M3 4,283,094.00
Papan kayu kelas I M3 2,762,469.00
Papan kayu kelas II m3 1,875,438.00
Papan kayu kelas III M3 1,400,000.00
Balok kayu jati M4 4,283,094.00
Balok kayu kelas I M3 2,762,469.00
Balok kayu kelas II M3 1,875,438.00
Balok Kayu Kelas III M3 1,400,000.00
Reng (3 x 4) cm Kelas II M3 1,875,438.00
Kayu 5/7 klas II M3 1,875,438.00
List Profil Kayu 4 x 4 cm M' 8,500.00
Bambu Dia. 6 - 8/600 cm Btg 35,988.00
Dolken dia. 7 cm Btg 17,500.00
Dolken dia. 8 - 9 cm Btg 30,500.00
Dolken dia.10 cm Btg 30,000.00
Ijuk M3 28,400.00
Parquet M2 187,250.00
Lem vinyl Kg 15,000.00
Formite/penjaga jarak bekisting/spacer btg 17,000.00
Alluminium strip m 30,000.00
Instalasi Titik Lampu titik 95,000.00
Lampu Philips PLC - 18 Watt Bh 35,000.00
Saklar Ganda Bh 22,880.00
Saklar Tunggal Bh 18,700.00
Stop Kontak Bh 16,500.00
Kabel Listrik Eterna NYY 2 x 2,5 M' 19,000.00
Penyambungan PLN Ls 7,500,000.00
MCB Bh 91,000.00
III SEWA ALAT
Sewa alat perakitan jam
Sewa alat las listrik jam
Gambar Desain M2 2,350.00
Alat Bantu Pengecatan Ls 2,000.00
Alat bantu pasang baja ringan Ls 4,500.00
Mobilisasi alat baja ringan Ls 9,000.00
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN PERSIAPAN
- Membuat Pagar Sementara dari Kayu Tinggi 2 meter M 323,256.12 -
- Membuat Pagar Sementara dari Seng Gelombang Tinggi 2 Meter M 343,513.37 -

- Membuat Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter M 838,729.20 -
- Mengukur dan Memasang Bouwplank M 58,650.00 -
- Membuat Kantor Sementara dengan Lantai Plesteran M2 1,387,275.07 -
- Membuat Gudang Semen dan Alat-alat M2 1,143,136.48 -
- Membuat Rumah Jaga / Konstruksi Kayu M2 1,156,037.50 -
- Membersihkan Lapangan dan Perataan M2 18,400.00 -
- Membuat Bedeng Buruh M2 1,193,236.23 -
- Membuat Bak Adukan Ukuran (40 x 50 x 20) cm M2 105,915.00 -
- Membuat Stegger dari Bambu, Ukuran (40 x 50 x 20) cm M2 490,549.75 -
- Membuat Jalan Sementara M2 176,352.50 -
- Membongkar Beton Bertulang M3 1,625,318.00 -
- Membongkar Dinding Tembok Bata Merah M3 812,659.00 -
- Memasang 1 m2 Pagar Kawat Jaring Galvanis, panjang 240 cm M 11,523.00 -
- Memasang Panel Beton Pracetak (5 x 50 x 213) cm M 255,956.48 -
PEKERJAAN TANAH
- Menggali Tanah Biasa Sedalam 1 Meter M2 89,700.00 -
- Menggali Tanah Biasa Sedalam 2 Meter M3 109,710.00 -
- Menggali Tanah Biasa Sedalam 3 Meter M3 129,996.00 -
- Menggali Tanah Keras Sedalam 1 Meter M3 119,416.00 -
- Menggali Tanah Cadas Sedalam 1 Meter M3 180,780.00 -
- Menggali Tanah Lumpur Sedalam 1 Meter M3 144,210.00 -
- Mengerjakan Stripping Setinggi 1 Meter M2 6,440.00 -
- Membuang Tanah Sejauh 30 Meter M3 39,330.00 -
- Mengurug tanah biasa sedalam 1 meter M3 29,895.40 -
- Mengurug tanah biasa sedalam 2 meter M3 36,570.00 -
- Mengurug tanah biasa sedalam 3 meter M3 43,327.40 -
- Mengurug tanah keras sedalam 1 meter M3 39,792.30 -
- Mengurug tanah cadas sedalam 1 meter M3 60,260.00 -
- Mengurug tanah lumpur sedalam 1 meter M3 48,070.00 -
- Memadatkan Tanah (per 20 cm) M3 64,400.00 -
- Mengurug Pasir M3 329,130.00 -
- Membuat Lapisan Pudel Campuran 1 Kp : 3 Psr : 7 TL untuk stabilisasi tanah. M3 209,214.76 -

- Membuat Lapisan Pudel Campuran 1 Kp : 5 TL untuk stabilisasi tanah. M3 140,725.73 -

- Memasang Lapisan Ijuk tebal 10 cm, untuk bidang resapan. M3 215,280.00 -


- Mengurug Sirtu padat untuk peninggian lantai bangunan M3 32,200.00 -
- Memadatkan 1 m3 tanah didatangkan M3 180,320.00 -
PEKERJAAN PONDASI
- Memasang pondasi batu belah, campuran 1 PC : 3 PP M3 1,040,883.98 -
- Memasang pondasi batu belah, campuran 1 PC : 4 PP M3 973,102.40 -
- Memasang pondasi batu belah, campuran 1 PC : 5 PP M3 926,120.30 -
- Memasang pondasi batu belah, campuran 1 PC : 6 PP M3 893,085.98 -
- Memasang pondasi batu belah, campuran 1 PC : 8 PP M3 847,816.80 -
- Memasang Pondasi Batu Kali, 1 Kp :1 SM : 2 Ps M3 611,780.74 -
- Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP M3 767,549.30 -
- Memasang pondasi batu belah, campuran ¼ PC : 1 KP : 4 PP M3 735,877.27 -

- Memasang batu kosong (anstamping) M3 488,899.50 -


- Memasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah M3 4,171,396.30 -

- Memasang pondasi sumuran, diameter 100 cm M3 1,233,796.05 -


PEKERJAAN BETON
- Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 M3 1,347,193.98 -

- Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 M3 1,400,453.20 -

- Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 M3 1,441,279.54 -

- Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 M3 1,262,141.84 -

- Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 M3 1,490,645.52 -

- Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 M3 1,536,117.92 -

- Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1,572,749.89 -

- Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 M3 1,593,635.93 -

- Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 M3 1,629,664.62 -

- Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 M3 1,640,677.67 -

- Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 M3 1,749,416.87 -

- Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 M3 1,763,935.91 -

- Membuat beton kedap air dengan strorox – 100 M3 1,703,174.75 -


- Memasang PVC Waterstop lebar 150 mm M 11,971.50 -
- Memasang PVC Waterstop lebar 200 mm M 14,122.00 -
- Membuat PVC Waterstop lebar 230 mm – 320 mm M 15,962.00 -
- Pembesian 10 kg dengan besi polos Kg 252,978.44 -
- Pembesian 10 kg dengan besi ulir Kg 186,565.94 -
- Memasang kabel presstressed polos/strands Kg 246,074.13 -
- Memasang jaring kawat baja/wire mesh Kg 1,044,376.81 -
- Memasang bekisting untuk pondasi M2 177,865.90 -
- Memasang bekisting untuk sloof M2 185,915.90 -
- Memasang bekisting untuk kolom M2 346,357.00 -
- Memasang bekisting untuk balok M2 351,187.00 -
- Memasang bekisting untuk plat lantai M2 386,607.00 -
- Memasang bekisting untuk dinding M3 348,369.50 -
- Memasang bekisting untuk tangga M3 405,574.57 -
- Memasang jembatan untuk pengecoran beton M2 106,793.10 -
- Membuat pondasi beton bertulang (150 kg besi + bekisting) M3 4,547,882.13 -
- Membuat sloof beton bertulang (200 kg besi + bekisting) M3 5,549,482.57 -
- Membuat kolom beton bertulang (300 kg besi + bekisting) M3 7,880,774.23 -
- Membuat balok beton bertulang (200 kg besi + bekisting) M3 7,318,284.41 -
- Membuat Kolom beton bertulang (150 kg besi + bekisting) M3 7,454,955.91 -
- Membuat dinding beton bertulang (150 kg besi + bekisting) M3 8,281,839.67 -
- Membuat dinding beton bertulang (200 kg besi + bekisting) M3 7,671,309.89 -
- Membuat kolom praktis beton bertulang (11 x 11) cm M 160,551.34 -
- Membuat ring balok beton bertulang (10 x 15) cm M 160,307.91 -
PEKERJAAN DINDING
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, M2 369,882.55 -
campuran spesi 1 PC : 2 PP
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:23 PP 351,921.16 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:24 PP 339,883.19 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:25 PP 333,568.31 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:26 PP 331,213.80 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:23 KP : 10 PP 307,699.00 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 2 PP 178,972.09 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 3 PP 170,496.40 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 4 PP 165,612.08 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 5 PP 162,538.54 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 6 PP 160,854.11 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) tebal ½ bata, campuran spesi 1 PC : 8MPP
2
157,536.20 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 3 KP : 10 PP 153,716.91 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP
M2: 1 SM : 1 PP 137,174.36 -

- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP
M2: 1 SM : 2 PP 139,577.97 -

- Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi M2 246,456.50 -

- Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon M2 293,146.50 -

- Memasang dinding conblock HB 20 , campuran spesi 1 PC : 3 PP M2 303,271.84 -


- Memasang dinding conblock HB 20, campuran spesi 1 PC : 4 PP M2 302,163.10 -
- Memasang dinding conblock HB 15, campuran spesi 1 PC : 3 PP M2 236,553.25 -
- Memasang dinding conblock HB 15, campuran spesi 1 PC : 4 PP M2 235,487.11 -
- Memasang dinding conblock HB 10, campuran spesi 1 PC : 3 PP M2 170,720.17 -
- Memasang dinding conblock HB 10, campuran spesi 1 PC : 3 PP M2 170,654.55 -
- Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
M2 82,178.43 -

- Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
M2 657,178.43 -

- Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PCM: 23 PP 95,079.70 -

- Memasang teakwood rangkap, rangka expose kayu kelas I M2 Err:509 Err:509


- Memasang teakwood rangkap lapis formika, rangka expose kayu kelas II M2 Err:509 Err:509

- Memasang rangka dinding pemisah (60 x 120) cm kayu kelas II M2 152,024.55 -

- Memasang rangka dinding pemisah (60 x 120) cm kayu kelas III M2 136,715.45 -

- Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II M2 #NAME? #NAME?

- Memasang dinding pemisah plywood rangkap, rangka kayu kelas II M2 252,063.05 -

- Memasang dinding lambriziring dari papan kayu kelas I M2 383,274.05 -


- Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm M2 1,286,341.24 -

- Memasang dinding bilik, rangka kayu kelas III M2 Err:509 Err:509


- Memasang dinding bilik, rangka kayu kelas IV M2 #NAME? #NAME?
PEKERJAAN PLESTERAN
- Memasang plesteran 1 PC : 1 PP, tebal 15 mm M2 94,113.48 -
- Memasang plesteran 1 PC : 2 PP, tebal 15 mm M2 84,756.44 -
- Memasang plesteran 1 PC : 3 PP, tebal 15 mm M2 80,698.09 -
- Memasang plesteran 1 PC : 4 PP, tebal 15 mm M2 77,936.05 -
- Memasang plesteran 1 PC : 5 PP, tebal 15 mm M2 76,357.89 -
- Memasang plesteran 1 PC : 6 PP, tebal 15 mm M2 75,099.06 -
- Memasang plesteran 1 PC : 7 PP, tebal 15 mm M2 74,403.93 -
- Memasang plesteran 1 PC : 8 PP, tebal 15 mm M2 73,708.80 -
- Memasang plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm M2 76,983.98 -
- Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm M2 73,305.17 -
- Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm M2 64,803.68 -
- Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm M2 66,249.86 -
- Memasang plesteran 1 PC : 2 PP, tebal 20 mm M2 113,366.04 -
- Memasang plesteran 1 PC : 3 PP, tebal 20 mm M2 90,612.91 -
- Memasang plesteran 1 PC : 4 PP, tebal 20 mm M2 104,190.74 -
- Memasang plesteran 1 PC : 5 PP, tebal 20 mm M2 102,167.98 -
- Memasang plesteran 1 PC : 6 PP, tebal 20 mm M2 100,408.08 -
- Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm M2 92,280.05 -
- Memasang Berapen 1 PC : 5 PP, tebal 15 mm M2 46,584.39 -
- Memasang Plesteran Skoning 1 PC : 2 PP, lebar 10 mm M 76,007.53 -
- Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm M2 126,741.50 -
- Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm M2 109,514.50 -

- Memasang Plesteran Ciprat 1 PC : 2 PP M2 62,016.79 -


- Memasang finishing siar pasangan dinding bata merah (=20 m’) M2 36,167.29 -

- Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) M2 17,253.68 -

- Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP M2 75,199.28 -

- Memasang acian M2 26,313.73 -


PEKERJAAN PENUTUP LANTAI DAN DINDING
- Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm M2 80,214.92 -
- Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm M2 82,446.38 -
- Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm M2 85,379.80 -
- Memasang lantai ubin warna ukuran (40 x 40) cm M2 84,998.92 -
- Memasang lantai Ubin Warna ukuran 30 x 30 cm M2 87,966.38 -
- Memasang lantai ubin warna ukuran (20 x 20) cm M2 91,341.40 -
- Memasang lantai ubin teraso ukuran (40 x 40) cm M2 84,998.92 -
- Memasang lantai ubin teraso ukuran (30 x 30) cm M2 87,966.38 -
- Memasang lantai ubin granit ukuran (40 x 40) cm M2 84,998.92 -
- Memasang Lantai ubin granit ukuran (30 x 30) cm M2 87,966.38 -
- Memasang lantai ubin teralux ukuran (40 x 40) cm M2 84,998.92 -
- Memasang lantai ubin teralux ukuran (30 x 30) cm M2 87,966.38 -
- Memasang lantai ubin teralux marmer ukuran (60 x 60) cm M2 83,192.96 -
- Memasang lantai ubin teralux marmer ukuran (40 x 40) cm M2 84,998.92 -
- Memasang lantai ubin teralux marmer ukuran (30 x 30) cm M2 87,966.38 -
- Memasang plint ubin PC abu-abu ukuran (15 x 20) cm M' 29,219.55 -
- Memasang plint ubin PC abu-abu ukuran (10 x 30) cm M' 28,172.68 -
- Memasang PC abu-abu ukuran (10 x 40) cm M' 28,172.68 -
- Memasang plint ubin warna ukuran (10 x 20) cm M' 28,344.95 -
- Memasang plint ubin warna ukuran (10 x 30) cm M' 28,344.95 -
- Memasang Plint Ubin Warna ukuran 10 x 40 cm M' 28,344.95 -
- Memasang plint ubin teraso ukuran (10 x 30) cm M' 28,344.95 -
- Memasang plint ubin teraso ukuran (10 x 40) cm M' 28,344.95 -
- Memasang plint ubin granit ukuran (10 x 40) cm M' 28,344.95 -
- Memasang plint ubin granit ukuran (10 x 30) cm M' 28,344.95 -
- Memasang plint ubin teralux kerang ukuran (10 x 40) cm M' 28,344.95 -
- Memasang plint ubin teralux kerang ukuran (10 x 30) cm M' 28,344.95 -
- Memasang plint ubin teralux marmer ukuran (10 x 60) cm M' 28,344.95 -
- Memasang plint ubin teralux marmer ukuran (10 x 40) cm M' 28,344.95 -
- Memasang plint ubin teralux marmer ukuran (10 x 30) cm M' 28,344.95 -
- Memasang lantai teraso cor ditempat, tebal 3 cm M2 72,197.00 -
- Memasang lantai keramik artistik ukuran (10 x 20) cm M2 176,814.66 -
- Memasang lantai keramik artistik ukuran (10 x 10) cm M2 178,470.66 -
- Memasang lantai keramik artistik ukuran (5 x 20) cm M2 178,470.66 -
- Memasang plint keramik ukuran (10 x 20) cm M' 28,068.95 -
- Memasang plint keramik ukuran (10 x 10) cm M' 28,160.95 -
- Memasang plint keramik ukuran (5 x 20) cm M' 64,902.97 -
- Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm M' 211,263.95 -
- Memasang lantai keramik ukuran (20 x 20) cm M2 256,216.90 -
- Memasang lantai keramik ukuran (30 x 30) cm M2 275,349.38 -
- Memasang lantai keramik ukuran (33 x 33) cm M2 172,656.26 -
- Memasang lantai keramik ukuran (10 x 33) cm, variasi/border M2 255,916.52 -
- Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP M2 283,845.92 -
- Memasang lantai marmer ukuran (100 x 100) cm M2 Err:509 Err:509
- Memasang underlayer / Pelapis bawah karpet M2 Err:509 Err:509
- Memasang lantai karpet M2 Err:509 Err:509
- Memasang lantai parquet kayu M2 Err:509 Err:509
- Memasang lantai kayu (gymfloor) M2 Err:509 Err:509
- Memasang dinding porselen ukuran (11 x 11) cm M2 243,667.75 -
- Memasang dinding porselin ukuran (10 x 20) cm M2 228,315.25 -
- Memasang dinding porselin ukuran (20 x 20) cm M2 225,334.45 -
- Memasang dinding keramik artistik ukuran (10 x 20) cm M2 325,835.25 -
- Memasang dinding keramik artistik ukuran (5 x 20) cm M2 996,075.38 -
- Memasang dinding keramik ukuran (10 x 20) cm M 2
459,858.21 -
- Memasang dinding keramik ukuran (20 x 20) cm M2 304,964.25 -
- Memasang dinding marmer ukuran (100 x 100) cm M2 Err:509 Err:509
- Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm M2 312,553.19 -
- Memasang dinding batu paras M2 171,218.90 -
- Memasang dinding batu tempel hitam M2 197,861.70 -
- Memasang lantai Vinyl ukuran (30 x 30) cm KL. I M2 Err:509 Err:509
- Memasang wall paper, lebar 50 cm M2 Err:509 Err:509
- Memasang floor hardener M2 33,258.00 -
- Memasang plint Vinyl karet ukuran (15 x 30) cm dengan perekat M Err:509 Err:509

- Memasang plint kayu kelas II tebal 2Cm, Lebar 10 Cm M 44,844.14 -


- Memasang dinding keramik ukuran (40 x 40) cm M2 287,430.82 -
PEKERJAAN PINTU DAN JENDELA
- Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I M3 7,648,064.54 -

- Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II M3 6,153,995.69 -

- Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas III M3 5,497,891.25 -

- Membuat dan memasang pintu klamp standar, kayu kelas II M2 293,156.30 -

- Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sementara M2 271,286.15 -

- Membuat dan memasang daun pintu panel, kayu kelas I M2 720,473.57 -


- Membuat dan memasang daun pintu panel, kayu kelas II M2 679,670.15 -
- Membuat dan memasang pintu dan jendela kaca, kayu kelas I M2 549,814.14 -

- Membuat dan memasang pintu dan jendela kaca, kayu kelas II M2 525,332.09 -

- Membuat dan memasang pintu dan jendela jalusi kayu kelas I M2 796,717.72 -

- Membuat dan memasang pintu dan jendela jalusi kayu kelas II M2 731,432.24 -

- Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai
M2 90 cm) 546,291.34 -

- Membuat pintu plywood rangkap, rangka expose kayu kelas I M2 632,464.59 -

- Membuat pintu plywood rangkap, rangka expose kayu kelas II M2 632,464.59 -

- Memasang jalusi kusen, kayu kelas I M2 626,977.86 -


- Memasang jalusi kusen, kayu kelas II M2 565,772.72 -
- Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku cm 306,751.00 -

- Membuat rangka jendela besi scuare tube (25 x 5) cm M2 180,078.50 -


- Memasang pintu rolling door besi M2 1,038,128.00 -
- Memasang pintu lipat (Folding door) bahan plastik/PVC M2 754,446.00 -
- Memasang rolling door alluminium M2 662,400.00 -
- Memasang kusen pintu alluminium M 13,520.55 -
- Memasang pintu alluminium strip lebar 8 cm M2 527,250.85 -
- Memasang pintu kaca rangka alluminium M2 23,747.50 -
- Memasang terali besi strip (2 x 3) mm M2 230,860,488.05 -
- Memasang kawat nyamuk M2 59,466.50 -
- Memasang jendela nako & tralis M2 Err:509 Err:509

PEKERJAAN KUDA-KUDA, RANGKA ATAP DAN LISPLANK


- Memasang konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter M3 6,387,578.29 -

- Memasang konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter M3 5,265,484.07 -

- Memasang konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter M3 4,664,055.00 -

- Memasang konstruksi kuda-kuda expose, kayu kelas I M3 8,291,917.22 -


- Memasang rangka atap genteng keramik, kayu kelas II M2 71,372.12 -
- Memasang rangka atap genteng beton, kayu kelas II M2 79,136.43 -
- Memasang rangka atap sirap, kayu kelas II M2 Err:509 Err:509
- Memasang lisplank ukuran (3 x 20) cm, kayu kelas I M 79,829.16 -
- Memasang lisplank ukuran (3 x 20) cm, kayu kelas II M 68,812.24 -
- Memasang lisplank ukuran (3 x 30) cm, kayu kelas I M 79,324.88 -
- Memasang lisplank ukuran (3 x 30) cm, kayu kelas II M 64,318.64 -
- Memasang Bubung Stel Gelombang 0,92 m M' Err:509 Err:509
- Memasang Alluminium Foil / Sisalation M2 26,116.50 -
- Memasang besi profil kg 25,685.25 -
- Memasang rangka kuda-kuda baja IWF kg 77,004.00 -
- Memasang konstruksi gordeng, kayu kelas II M3 4,274,414.07 -
- Mengerjakan pekerjaan perakitan kg 26,162.50 -
- Mengerjakan pengelasan dengan las listrik M 20,861.00 -
- Memasang sunscreen alluminium M2 2,663,952.00 -
- Memasang venetions blinds dan Vertical blinds M2 97,071.50 -
- Memasang talang datar/ jurai seng bjls 28 lebar 90 cm M 143,155.82 -
- Memasang talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm M 125,203.38 -

- Memasang Rangka Atap Baja Ringan M2 239,136.75 -

PEKERJAAN PENUTUP ATAP


- Memasang Atap Genteng Palentong Kecil M2 104,891.50 -
- Memasang Atap Genteng Kodok / Glazzur M2 30,084.00 -
- Memasang Atap Genteng Palentong Super / Besar M2 30,084.00 -
- Memasang Genteng Bubung Palentong M2 100,804.40 -
- Memasang Genteng Bubung Kodok Glazzur M2 100,804.40 -
- Memasang Genteng Bubung Palentong Besar M2 100,804.40 -
- Memasang Roof Light Fibreglass (180 x 90) cm M2 28,382.00 -
- Memasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm M2 35,512.05 -
- Memasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm M2 35,512.05 -
- Memasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (1,5 x 1,05 m) x 4 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (3,0 x 1,08 m) x 6 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,70 x 1,08 m) x 6 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,10 x 1,08 m) x 6 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (2,10 x 1,08 m) x 6 mm M2 34,511.55 -
- Memasang Atap Asbes Gelombang (1,80 x 1,08 m) x 6 mm M2 34,511.55 -
- Memasang Atap Genteng Beton M2 Err:509 Err:509
- Memasang Atap Genteng Aspal M2 Err:509 Err:509
- Memasang Atap Genteng Metal M2 Err:509 Err:509
- Memasang Atap Sirap M2 Err:509 Err:509
- Memasang Atap Seng Gelombang M2 90,449.71 -
- Memasang Atap Nok Seng M' 47,919.17 -
- Memasang Atap Alluminium M2 135,838.00 -
- Memasang Nok Stel Gelombang 1,05 m M' Err:509 Err:509
- Memasang Nok Stel Gelombang 1,08 m M' Err:509 Err:509
- Memasang Nok Paten 0,92 m M' Err:509 Err:509
- Memasang Nok Paten 1,05 m M' Err:509 Err:509
- Memasang Nok Paten 1,08 m M' Err:509 Err:509
- Memasang Nok Stel Rata 0,92 m M' Err:509 Err:509
- Memasang Nok Stel Rata 1,05 m M' Err:509 Err:509
- Memasang Nok Genteng Beton M' Err:509 Err:509
- Memasang Nok Genteng Aspal M' Err:509 Err:509
- Memasang Nok Genteng Metal M' Err:509 Err:509
- Memasang Nok Sirap M' Err:509 Err:509
- Memasang Nok Alluminium M2 174,570.00 -
PEKERJAAN KUNCI DAN KACA
- Memasang Kunci Tanam Antik Buah 333,914.00 -
- Memasang Kunci Tanam Biasa Buah 252,080.00 -
- Memasang Kunci Tanam Kamar Mandi Buah 312,064.00 -
- Memasang Kunci Silinder Buah 78,614.00 -
- Memasang Engsel Pintu Buah 48,735.85 -
- Memasang Engsel Jendela Kupu-Kupu Buah 40,356.95 -
- Memasang Engsel Angin Buah Err:509 Err:509
- Memasang Spring Knip Buah Err:509 Err:509
- Memasang Kait Angin Buah 43,826.50 -
- Memasang Door Closer Buah 83,789.00 -
- Memasang Kunci Selot Buah 56,574.25 -
- Memasang Door Holder Buah 83,789.00 -
- Memasang Door Stop Buah 17,365.00 -
- Memasang Rel Pintu Dorong Buah Err:509 Err:509
- Memasang Kunci Lemari Buah Err:509 Err:509
- Memasang Kaca, Tebal 3 mm M2 Err:509 Err:509
- Memasang Kaca, Tebal 5 mm M2 322,580.64 -
- Memasang Kaca, Tebal 8 mm M2 29,837.90 -
- Memasang Kaca Buram, Tebal 12 mm M2 858,101.25 -
- Memasang Kaca Cermin, Tebal 5 mm M2 595,366.50 -
- Memasang Kaca Cermin, Tebal 6 mm M2 4,416.00 -
- Memasang Kaca Cermin, Tebal 8 mm M2 8,331.75 -
- Memasang Kaca "Wireglass", Tebal 5 mm M2 26,116.50 -
- Memasang Kaca Patri, Tebal 5 mm M2 25,564.50 -
PEKERJAAN SANITASI
- Memasang Kloset Duduk / Monoblok Buah 4,208,448.00 -
- Memasang Kloset Jongkok Porselen Buah 617,592.55 -
- Memasang Kloset Jongkok Teraso Buah 377,012.55 -
- Memasang Urinoir Buah 291,337.55 -
- Memasang Wastafel Buah 1,102,570.03 -
- Memasang Bak Mandi Teraso Volume 0,30 M3 Buah 1,098,825.00 -
- Memasang Bak Mandi Fibreglass Volume 0,30 M3 Buah 913,330.00 -
- Memasang Bak Mandi Batu Bata Volume 0,30 M3 Buah 1,755,903.95 -
- Memasang Badkip Porselen Buah 4,651,462.50 -
- Membuat Bak Beton Volume 1 m3 Air Buah Err:509 Err:509
- Memasang Bak Fibreglass Volume 1 m3 Air Buah 331,832.50 -
- Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm M' 19,167.46 -

- Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm M' 91,310.00 -

- Memasang Pipa Beton, Diameter 15 cm - 20 cm M' 55,187.17 -


- Memasang Pipa Beton, Diameter 30 cm - 100 cm M' 128,380.94 -
- Memasang Bak Kontrol Memasang Batu Bata Ukuran 30 x 30 Cm, Tinggi 35 Cm Buah 1,413,297.61 -

- Memasang Bak Kontrol Pasangan Batu Bata Ukuran 45 x 45 Cm, Tinggi 50 Cm Buah 888,717.42 -

- Memasang Bak Kontrol Pasangan Batu Bata Ukuran 60 x 60 Cm, Tinggi 65 Cm Buah 1,100,646.97 -

- Memasang Pipa Galvanis Diameter 1/2" M' 23,908.50 -


- Memasang Pipa Galvanis Diameter 3/4" M' 23,908.50 -
- Memasang Pipa Galvanis Diameter 1" M' 23,908.50 -
- Memasang Pipa Galvanis Diameter 1 1/2" M' 41,055.00 -
- Memasang Pipa Galvanis Diameter 3" M' 51,508.50 -
- Memasang Pipa Galvanis Diameter 4" M' 51,422.25 -
- Memasang Tipe AW Diameter 1/2" M3 30,028.99 -
- Memasang Tipe AW Diameter 3/4" M' 32,368.92 -
- Memasang Tipe AW Diameter 1" M' 35,271.94 -
- Memasang Tipe AW Diameter 1 1/2" M' 55,884.98 -
- Memasang Tipe AW Diameter 2" M' 69,973.92 -
- Memasang Tipe AW Diameter 2 1/2" M' 94,633.50 -
- Memasang Tipe AW Diameter 3" M' 111,027.90 -
- Memasang Tipe AW Diameter 4" M' 162,957.46 -
- Memasang Bak Cuci Piring Stainless Steel Buah 341,320.00 -
- Memasang Bak Cuci Piring Teraso Buah 138,189.75 -
- Memasang Kran Diameter 3/4" Buah 82,196.25 -
- Memasang Kran Diameter 1/2" Buah 78,458.75
- Memasang Floor Drain Buah 46,115.00 -
PEKERJAAN LANGIT-LANGIT
- Memasang rangka langit-langit (50 x 100) cm, kayu kelas II M2 111,947.61 -
- Memasang rangka langit-langit (50 x 100) cm, kayu kelas III M2 103,527.60 -
- Memasang rangka langit-langit (60 x 60) cm, kayu kelas II M2 111,808.34 -
- Memasang rangka langit-langit (60 x 60) cm, kayu kelas III M2 Err:509 Err:509
- Memasang langit-langit asbes semen, tebal 6 mm M2 15,407.13 -
- Memasang langit-langit asbes semen, tebal 5 mm M2 15,407.13 -
- Memasang langit-langit asbes semen, tebal 4 mm M2 15,407.13 -
- Memasang langit-langit akustik ukuran (30 x 30) cm M2 35,946.13 -
- Memasang langit-langit akustik ukuran (30 x 60) cm M2 30,403.13 -
- Memasang langit-langit akustik ukuran (60 x 120) cm M2 30,403.13 -
- Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm M2 59,709.44 -

- Memasang langit-langit lambriziring kayu, tebal 9 mm M2 269,910.22 -


- Memasang langit-langit gypsum board ukuran (1200x2400x9) mm M2 65,011.26 -

- Memasang list plafond gysum profil M 61,824.00 -


- Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium M2 151,512.50 -

- Memasang list langit-langit kayu profil M 47,046.50 -


PEKERJAAN PENGECATAN
1 - Mengikis / Mengerok Permukaan Cat Tembok Lama M2 23,414.00 -
2 - Mencuci Bidang Permukaan Tembok yang pernah Di Cat M2 18,526.50 -

3 - Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual M2 19,216.50 -

4 Menyabun Permukaan Tembok Lama M2 18,457.50 -


5 - Mengerok Karat atau Cat Lama Permukaan Baja dengan Pancar Pasir (sanblasting) dengan
M2tingkat Kebersihan
611,800.00
Sa. 2 1/2 -

6 - Mendempul dan Menggosok Kayu M2 Err:509 Err:509


7 - Mengecat Bidang Kayu Lama M2 52,114.55 -
8 - Mengecat Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup M2 61,840.87 -

9 - Mengecat Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup M2 80,446.72 -

10 - Melabur Bidang Kayu dengan Teak Oil M2 24,575.50 -


11 - Melabur Bidang Kayu dengan Politur M2 63,505.53 -
12 - Melabur Bidang Kayu dengan Cat Residu dan Ter M2 35,974.88 -
13 - Melabur Bidang Kayu dengan Vernis M2 54,651.65 -
14 - Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup) M2 23,311.65 -

15 - Mengecat Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 18,124.00 -

16 - Melabur Tembok dengan Kalkarium M2 10,154.50 -


17 - Melabur Tembok dengan Kapur Sirih M2 19,608.94 -
18 - Melabur Tembok Lama dengan Kapur Sirih (Untuk Pemeliharaan) M2 8,485.56 -
19 - Memasang Wall Paper M2 Err:509 Err:509
20 - Mengecat Permukaan Baja dengan Meni Besi M2 39,164.02 -
21 - Mengecat Permukaan Baja Dengan Meni Besi dan Perancah M 2
73,405.27 -

22 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 4 Lapis Cat M2 15,493.57 -

23 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 1 Lapis Cat Mutakhir
M2 12,036.67 -

24 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 3 Lapis Cat Konvensional
M2 322,582.67 -

25 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Semprot (airless) dengan sistem 1MLapis
2
Cat Mutakhir
157,723.65 -
REKAPITULASI
PEKERJAAN :
LOKASI :
ANGGARAN :
TAHUN ANGGARAN :

JUMLAH
NO URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)

1 2 3
I PEKERJAAN PERSIAPAN Rp 9,200,000.00
II PEKERJAAN TANAH DAN PASIR Rp 8,696,782.54
III PEKERJAAN PONDASI Rp 22,090,260.95
IV PEKERJAAN PASANGAN BATU DAN PLESTERAN Rp 71,002,362.33
V PEKERJAAN BETON Rp 40,690,473.73
VI PEKERJAAN LANTAI Rp 18,341,323.48
VII PEKERJAAN ATAP Rp 47,425,788.69
VIII PEKERJAAN PLAFOND DAN RANGKA Rp 37,245,471.69
IX PEKERJAAN KUSEN, PINTU, JENDELA Rp 23,283,552.01
X PEKERJAAN KUNCI DAN GANTUNGAN Rp 3,839,938.55
XI PEKERJAAN INSTALASI DAN TITIK LAMPU Rp 4,279,060.00
XII PEKERJAAN SANITASI Rp 5,689,300.23
XIII PEKERJAAN PENGECETAN Rp 16,303,062.49
XIV PEK. SALURAN & RABAT LT. KELILING BANGUNAN Rp 9,095,270.21
XV PEKERJAAN FINISHING DAN LAIN-LAIN Rp 1,000,000.00

TOTAL Rp 318,182,646.90
PPN 10 % Rp 31,818,264.69

TOTAL COST Rp 350,000,911.59

DIBULATKAN Rp 350,000,000.00

Terbilang : Tiga Ratus Lima Puluh Juta Rupiah

Raha, Mei 2017

Mengetahui/Menyetujui: : Disiapkan oleh


KONSULTAN PERENCANA
KEPALA DINAS KESEHATAN CV. Geometri Enggineering
KABUPATEN MUNA Pusat Kendari

LA ODE RIMBASUA, S.KM, M.Si .LA ODE MUNAJAB, ST


Nip. 19631231 198803 1 215 Direktur
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

HARGA JUMLAH
NO URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)

I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan Ls 1.00 300,000 300,000.00
2 Pegukuran Dan Pemasangan Baowpalnk Ls 1.00 1,200,000 1,200,000.00
3 Air Kerja Ls 1.00 1,500,000 1,500,000.00
4 Listrik Kerja Ls 1.00 1,700,000 1,700,000.00
5 Laporan Ls 1.00 2,500,000 2,500,000.00
6 Administrasi dan Dokumntasi Ls 1.00 2,000,000 2,000,000.00
Sub Total I 9,200,000.00
II PEKERJAAN TANAH DAN PASIR L.PONDAS
1 Pek. Galian Tanah Pondasi M3 15.82 89,700 1,419,054.00 L.KUSEN
2 Pek. Urugan Kembali Bekas Galian M3 4.75 29,895 142,003.15 L.TEMBOK
3 Pek. Urugan Pasir bawah Pondasi M3 2.26 329,130 743,833.80
4 Pek. Urugan Pasir bawah lantai M3 5.94 329,130 1,956,019.59 L.SLOOF
5 Pek. Urugan /Pemadatan Tanah Didatangkan M3 24.60 180,320 4,435,872.00 L.LANTAI
Sub Total II 8,696,782.54 L.TOTAL L
III PEKERJAAN PONDASI L.PENAMP
1 Pek. Pas. Batu Kosong Bawah Pondasi M3 8.14 488,900 3,977,686.33 L.ATAP
2 Pek. Pas. Pondasi Batu Gunung 1 Pc : 5 Psr M3 19.56 926,120 18,112,574.61 P.GORDIN
Sub Total III 22,090,260.95
IV PEKERJAAN PASANGAN BATU DAN PLESTERAN
1 Pek. Pasangan Bata Dinding 1 : 3 M2 13.23 351,921 4,655,916.95
2 Pek. Pasangan Bata Dinding 1 : 5 M2 123.23 333,568 41,105,622.84
3 Pek. Plesteran Dinding dan Kolom 1:3 M2 50.72 90,613 4,595,886.87
4 Pek. Plesteran Dinding 1:5 M2 246.84 76,358 18,848,182.36
5 Pek. Plesteran Pondasi Bangunan 1:5 M2 17.50 76,358 1,336,263.13
6 Pek. Acian Pondasi Bangunan M2 17.50 26,314 460,490.19
Sub Total IV 71,002,362.33
###
V PEKERJAAN BETON ###
1 Pek. Sloof Beton 15/20 M3 1.56 5,549,483 8,657,192.81
2 Pek. Sloof Beton 15/15 M3 0.14 5,549,483 749,180.15
3 Pek. Kolom Praktis 15/15 M' 64.00 160,551 10,275,285.70
4 Pek. Kolom Beton Teras 20/20 M3 0.32 7,454,956 2,385,585.89
5 Pek. Balok Latei M' 21.00 160,308 3,366,466.05
6 Pek. Balok Latei Teras M3 0.23 7,550,201 1,698,795.24
7 Pek. Balok Ringbalk M' 56.50 160,308 9,057,396.75
9 Pek. Rabat Beton Bawah Lantai M3 3.57 1,262,142 4,500,545.36
Sub Total V 40,690,473.73
###
VI PEKERJAAN LANTAI ###
1 Pek. Pas. Lantai Keramik 40 x 40 M2 53.36 287,431 15,337,308.34
###
2 Pek. Pas. Lantai KM/WC 20/20 ( Anti Slip ) M2 2.50 256,217 640,542.24
###
3 Pek. Pas. Dinding Tehel KM/WC 20/25 M2 7.75 304,964 2,363,472.90
Sub Total VI 18,341,323.48
###
VII PEKERJAAN ATAP TRAS
1 Pek. Kuda - Kuda Rangka Baja Ringan M2 123.69 239,137 29,578,824.61 P.KOSEN
2 Pek. Atap Soka Abadi M2 123.69 89,807 11,108,167.59
3 Pek. Nok Soka Abadi M' 31.00 48,247 1,495,654.40
4 Pek. Talang Air M' 14.00 125,203 1,752,847.25
5 Pek. Listplank Kayu Kelas I M' 44.00 79,325 3,490,294.85
Sub Total VII 47,425,788.69
VIII PEKERJAAN PLAFOND DAN RANGKA
1 Pek. Rangka Plafond Besi Hollow M2 100.50 293,147 29,461,223.25
2 Pek. Plafond Kalsiboar 4 mm M2 100.50 58,201 5,849,248.44
3 Pek. List Profil Kayu 4 x 4 cm M' 129.00 15,000 1,935,000.00
Sub Total VIII 37,245,471.69
IX PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas I M3 0.76 7,648,065 5,812,529.05
2 Pek. Pintu Panel Kayu Kelas I M2 14.81 720,474 10,670,213.63
3 Pek. Daun Jendela Kayu Kelas I M2 3.78 720,474 2,723,390.11
4 Pek. Pasangan Kaca Mati 5 mm M2 12.64 322,581 4,077,419.23
Sub Total IX 23,283,552.01
X PEKERJAAN KUNCI DAN GANTUNGAN
1 Pek. Pas. Kunci Pintu Unit 6.00 252,080 1,512,480.00
2 Pek. Pas. Engsel Pintu Psg 8.00 48,736 389,886.80
3 Pek. Pas. Engsel Jendela Psg 15.00 40,357 605,354.25
4 Pek. Pas. Grendel Jendela Psg 15.00 44,988 674,820.00
5 Pek. Pas. Hak Angin Psg 15.00 43,827 657,397.50
Sub Total X 3,839,938.55
XI PEKERJAAN INSTALASI DAN TITIK LAMPU
1 Pek. Pas. Instalasi Lampu Titik 16.00 95,000 1,520,000.00
2 Pek. Pas. Saklar Tunggal Bh 4.00 18,700 74,800.00
3 Pek. Pas. Saklar Ganda Bh 2.00 22,880 45,760.00
4 Pek. Pas. Stop Kontak Bh 5.00 16,500 82,500.00
5 Pek. Pas. Lampu PLC 18 Watt Bh 11.00 35,000 385,000.00
6 Pek. Pas. Fitting Plafond Bh 9.00 20,000 180,000.00
7 MCB Bh 1.00 91,000 91,000.00
8 Kabel NYY 2 x 2,5 mm SNI Roll 2.00 950,000 1,900,000.00
Sub Total XI 4,279,060.00
XII PEKERJAAN SANITASI
1 Pek. Saluran Air Bersih PVC 1/2' M' 8.00 30,029 240,231.92
2 Pek. Saluran Air Kotor/WC, PVC 2' M' 12.00 69,974 839,687.01
3 Pek. Pas. Kloset Jongkok Unit 1.00 617,593 617,592.55
4 Pek. Pas. Bak Fiber Unit 1.00 913,330 913,330.00
5 Pek. Pas. Kran Air Bh 1.00 78,459 78,458.75
6 Pek. Septictank dan Resapan Ls 1.00 3,000,000 3,000,000.00
Sub Total XII 5,689,300.23
XIII PEKERJAAN PENGECETAN
1 Pek. Cat Dinding dan Kolom Anti Lumut M2 297.56 37,817 11,252,775.93
2 Pek. Cat Plafond M2 94.00 37,817 3,554,782.02
3 Pek. Cat Kusen, Daun Pintu, Jendela dan Listplank M2 18.59 80,447 1,495,504.53
Sub Total XIII 16,303,062.49
XIV PEK. SALURAN & RABAT LT. KELILING BANGUNAN
1 Pek. Galian Tanah Saluran M3 2.64 89,700 236,808.00
2 Pek. Pas. Saluran Bata 1:5 M2 13.20 333,568 4,403,101.69
3 Pek. Plesteran Saluran 1:5 M2 13.20 76,358 1,007,924.19
4 Pek. Acian Dinding Saluran M2 13.20 26,314 347,341.17
5 Pek. Urugan Pasir Bawah Lantai Rabat Kel. Bangunan M3 1.32 329,130 434,451.60
6 Pek. Lantai Rabat Beton Kel. Bangunan 1 : 3 : 5 M3 2.11 1,262,142 2,665,643.56
Sub Total XIV 9,095,270.21
XV PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pek. Pembersihan akhir Ls 1.00 1,000,000 1,000,000.00
Sub Total XV 1,000,000.00
###
ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN

Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.400 OH 100,000.00 40,000.00
Tukang Kayu L.02 0.200 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.020 OH 150,000.00 3,000.00
Mandor L.04 0.020 OH 120,000.00 2,400.00
JUMLAH HARGA TENAGA 69,400.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Batang 30,500.00 38,125.00
Semen Portland 5.000 Kg 1,702.00 8,510.00
Pasir Beton Maligano 0.005 m3 261,724.00 1,308.62
Kerikil Beton (Pecah Maligano) 0.009 m3 479,680.00 4,317.12
Kayu 5/7 klas II 0.072 m3 1,875,438.00 135,031.54
Paku Biasa 0.060 Kg 15,000.00 900.00
Residu 0.400 Liter 58,750.00 23,500.00
JUMLAH HARGA BAHAN 211,692.28
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 281,092.28
E Overhead dan Provit 15 % 42,163.84
F Harga Satuan Pekerjaan (D+E) 323,256.12

Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.2000 OH 100,000.00 20,000.00
Tukang Kayu L.02 0.4000 OH 120,000.00 48,000.00
Kepala Tukang L.03 0.020 OH 150,000.00 3,000.00
Mandor L.04 0.020 OH 120,000.00 2,400.00
JUMLAH HARGA TENAGA 73,400.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Batang 30,500.00 38,125.00
Semen Portland 2.500 Kg 1,702.00 4,255.00
Seng Gelombang Bjls.20 1.200 Lbr 17,600.00 21,120.00
Pasir Beton Maligano 0.005 m3 261,724.00 1,308.62
Kerikil Beton (Pecah Maligano) 0.009 m3 479,680.00 4,317.12
Kayu 5/7 klas II 0.072 m3 1,875,438.00 135,031.54
Paku Biasa 0.060 Kg 15,000.00 900.00
Meni Besi 0.450 Liter 45,000.00 20,250.00
JUMLAH HARGA BAHAN 225,307.28
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 298,707.28
E Overhead dan Provit 15 % 44,806.09
F Harga Satuan Pekerjaan (D+E) 343,513.37
Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.2000 OH 100,000.00 20,000.00
Tukang Kayu L.02 0.3000 OH 120,000.00 36,000.00
Kepala Tukang L.03 0.020 OH 150,000.00 3,000.00
Mandor L.04 0.020 OH 120,000.00 2,400.00
JUMLAH HARGA TENAGA 61,400.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.000 Batang 30,500.00 30,500.00
Semen Portland 2.000 Kg 1,702.00 3,404.00
Kawat Duri 25.000 M’ 25,100.00 627,500.00
Pasir Beton Maligano 0.005 m3 261,724.00 1,308.62
Kerikil Beton (Pecah Maligano) 0.009 m3 479,680.00 4,317.12
Paku Biasa 0.060 Kg 15,000.00 900.00
JUMLAH HARGA BAHAN 667,929.74
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 729,329.74
E Overhead dan Provit 15 % 109,399.46
F Harga Satuan Pekerjaan (D+E) 838,729.20

Pengukuran dan pemasangan 1 m’ Bouwplank


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 100,000.00 10,000.00
Tukang Kayu L.02 0.100 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.010 OH 150,000.00 1,500.00
Mandor L.04 0.005 OH 120,000.00 600.00
JUMLAH HARGA TENAGA 24,100.00
B BAHAN
Balok Kayu Kelas III 0.012 M3 1,400,000.00 16,800.00
Paku Biasa 0.020 Kg 15,000.00 300.00
Kayu papan 3/20 kayu klas III 0.007 M3 1,400,000.00 9,800.00
JUMLAH HARGA BAHAN 26,900.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 51,000.00
E Overhead dan Provit 15 % 7,650.00
F Harga Satuan Pekerjaan (D+E) 58,650.00

Pembuatan 1 m2 kantor sementara lantai plesteran


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 2.000 OH 100,000.00 200,000.00
Tukang Kayu L.02 2.000 OH 120,000.00 240,000.00
Tukang Batu L.02 1.000 OH 120,000.00 120,000.00
Kepala Tukang L.03 0.300 OH 150,000.00 45,000.00
Mandor L.04 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 611,000.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Btg 30,500.00 38,125.00
Kayu papan 3/20 kayu klas III 0.180 M3 1,400,000.00 252,000.00
Paku Biasa 0.0800 Kg 15,000.00 1,200.00
Kawat Bidrat/ kawat beton 1.100 Kg 23,675.00 26,042.50
Semen Portland 35.000 Kg 1,702.00 59,570.00
Pasir Pasang 0.150 M3 212,500.00 31,875.00
Pasir Beton Maligano 0.100 M3 261,724.00 26,172.40
Kerikil Beton (Pecah Maligano) 0.150 M3 479,680.00 71,952.00
Batu Merah 5 x 11 x 22 cm 30.000 Bh 1,000.00 30,000.00
Seng Plat, lebar 55 cm Bjls.20 0.250 Lbr 38,500.00 9,625.00

Kaca Bening 5 mm 0.080 M2 258,990.00 20,719.20


Kunci Tanam 2 x putar 0.150 Bh 160,967.00 24,145.05
Plywood 3 mm (122 x 244 cm) 0.060 Lbr 65,000.00 3,900.00
JUMLAH HARGA BAHAN 595,326.15
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,206,326.15
E Overhead dan Provit 15 % 180,948.92
F Harga Satuan Pekerjaan (D+E) 1,387,275.07

Pembuatan 1 m2 gudang semen dan peralatan


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 100,000.00 100,000.00
Tukang Kayu L.02 2.000 OH 120,000.00 240,000.00
Kepala Tukang L.03 0.200 OH 150,000.00 30,000.00
Mandor L.04 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 376,000.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.700 Btg 30,500.00 51,850.00
Kayu papan 3/20 kayu klas III 0.210 M3 1,400,000.00 294,000.00
Paku Biasa 0.300 Kg 15,000.00 4,500.00
Semen Portland 10.500 Kg 1,702.00 17,871.00
Pasir Beton Maligano 0.030 M3 261,724.00 7,851.72
Kerikil Beton (Pecah Maligano) 0.050 M3 479,680.00 23,984.00
Seng Gelombang 1.500 Lbr 138,900.00 208,350.00
Seng Plat, lebar 55 cm Bjls.20 0.250 Lbr 38,500.00 9,625.00
JUMLAH HARGA BAHAN 618,031.72
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 994,031.72
E Overhead dan Provit 15 % 149,104.76
F Harga Satuan Pekerjaan (D+E) 1,143,136.48

Pembuatan 1 m2 rumah jaga (konstruksi kayu)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 100,000.00 100,000.00
Tukang Kayu L.02 1.500 OH 120,000.00 180,000.00
Kepala Tukang L.03 0.150 OH 150,000.00 22,500.00
Mandor L.04 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 308,500.00
B BAHAN
Dolken dia. 8 - 10/400 cm 3.000 Btg 30,500.00 91,500.00
Kayu papan 3/20 kayu klas III 0.276 M3 1,400,000.00 386,400.00
Paku Biasa 0.700 Kg 15,000.00 10,500.00
Seng Gelombang 1.500 Lbr 138,900.00 208,350.00
JUMLAH HARGA BAHAN 696,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,005,250.00
E Overhead dan Provit 15 % 150,787.50
F Harga Satuan Pekerjaan (D+E) 1,156,037.50

1 m2 Membersihkan Lapangan dan Perataan


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 100,000.00 10,000.00
Mandor L.04 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 16,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 16,000.00
E Overhead dan Provit 15 % 2,400.00
F Harga Satuan Pekerjaan (D+E) 18,400.00

Pembuatan 1 m2 bedeng pekerja


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 100,000.00 100,000.00
Tukang Kayu L.02 2.000 OH 120,000.00 240,000.00
Kepala Tukang L.03 0.200 OH 150,000.00 30,000.00
Mandor L.04 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 376,000.00
B BAHAN
Dolken dia. 8 - 10/400 cm 1.250 Btg 30,500.00 38,125.00
Kayu papan 3/20 kayu klas III 0.186 M3 1,400,000.00 260,400.00
Paku Biasa 0.300 Kg 15,000.00 4,500.00
Semen Portland 18.000 Kg 1,702.00 30,636.00
Pasir Beton Maligano 0.030 M3 261,724.00 7,851.72
Kerikil Beton (Pecah Maligano) 0.050 M3 479,680.00 23,984.00
Seng Gelombang 1.500 Lbr 138,900.00 208,350.00
Plywood 3 mm (122 x 244 cm) 1.350 Lbr 65,000.00 87,750.00
JUMLAH HARGA BAHAN 661,596.72
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,037,596.72
E Overhead dan Provit 15 % 155,639.51
F Harga Satuan Pekerjaan (D+E) 1,193,236.23

Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Tukang Kayu L.02 0.300 OH 120,000.00 36,000.00
Kepala Tukang L.03 0.0300 OH 150,000.00 4,500.00
JUMLAH HARGA TENAGA 40,500.00
B BAHAN
Papan kayu kelas III 0.036 M3 1,400,000.00 50,400.00
Paku Biasa 0.080 Kg 15,000.00 1,200.00
JUMLAH HARGA BAHAN 51,600.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 92,100.00
E Overhead dan Provit 15 % 13,815.00
F Harga Satuan Pekerjaan (D+E) 105,915.00

Pembuatan 1 m2 steger/perancah dari bambu


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.0000 OH 100,000.00 100,000.00
Tukang Kayu L.02 2.0000 OH 120,000.00 240,000.00
Kepala Tukang L.03 0.2000 OH 150,000.00 30,000.00
Mandor L.04 0.0500 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 376,000.00
B BAHAN
Bambu Dia. 6 - 8/600 cm 1.2500 Btg 35,988.00 44,985.00
Dolken dia.10 cm 0.1860 M3 30,000.00 5,580.00
JUMLAH HARGA BAHAN 50,565.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 426,565.00
E Overhead dan Provit 15 % 63,984.75
F Harga Satuan Pekerjaan (D+E) 490,549.75

Pembuatan 1 m2 jalan sementara


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 100,000.00 100,000.00
Mandor L.04 0.005 OH 120,000.00 600.00
JUMLAH HARGA TENAGA 100,600.00
B BAHAN
Batu Belah 0.150 M3 165,000.00 24,750.00
Batu Pecah / Splite 2-3 cm 0.090 M3 287,500.00 25,875.00
Pasir Pasang 0.010 M3 212,500.00 2,125.00
JUMLAH HARGA BAHAN 52,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 153,350.00
E Overhead dan Provit 15 % 23,002.50
F Harga Satuan Pekerjaan (D+E) 176,352.50

. Pembongkaran 1 m3 beton bertulang


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 13.3340 OH 100,000.00 1,333,400.00
Mandor L.04 0.6660 OH 120,000.00 79,920.00
JUMLAH HARGA TENAGA 1,413,320.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,413,320.00
E Overhead dan Provit 15 % 211,998.00
F Harga Satuan Pekerjaan (D+E) 1,625,318.00

Pembongkaran 1 m3 dinding tembok bata


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 6.667 OH 100,000.00 666,700.00
Mandor L.04 0.333 OH 120,000.00 39,960.00
JUMLAH HARGA TENAGA 706,660.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 706,660.00
E Overhead dan Provit 15 % 105,999.00
F Harga Satuan Pekerjaan (D+E) 812,659.00

Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 OH 100,000.00 4,200.00
Tukang L.02 0.004 OH 120,000.00 480.00
Kepala Tukang L.03 0.002 OH 150,000.00 300.00
Mandor L.04 0.042 OH 120,000.00 5,040.00
JUMLAH HARGA TENAGA 10,020.00
B BAHAN
Kawat Jaring 0.1434 Lbr - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 10,020.00
E Overhead dan Provit 15 % 1,503.00
F Harga Satuan Pekerjaan (D+E) 11,523.00

Pemasangan 1 m2 panel beton pracetak 5x50x213 cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.375 OH 100,000.00 37,500.00
Tukang Batu L.02 0.125 OH 120,000.00 15,000.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.019 OH 120,000.00 2,280.00
JUMLAH HARGA TENAGA 56,580.00
B BAHAN
Panel Beton Pracetak 0.986 Lbr - -
Kolom Beton Pracetak 0.525 Btg - -
Pasir Beton Maligano 0.074 M3 261,724.00 19,367.58
Kerikil Beton (Pecah Maligano) 0.146 M3 479,680.00 70,033.28
Semen Portland 45.000 Kg 1,702.00 76,590.00
JUMLAH HARGA BAHAN 165,990.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 222,570.86
E Overhead dan Provit 15 % 33,385.63
F Harga Satuan Pekerjaan (D+E) 255,956.48
ANALISA HARGA SATUAN LUAR KOTA DARATAN
PEKERJAAN BONGKARAN

L.4. 1 M3 Membongkar Beton Bertulang


L.4.1. TENAGA
Pekerja 6.667 OH x Rp. 100,000 = Rp. 666,700.00
Mandor 0.333 OH x Rp. 120,000 = Rp. 39,960.00
Jumlah 1 = Rp. 706,660.00

L.5. 10 M2 Membongkar Lantai Lama


L.5.1. TENAGA
Pekerja 1.000 OH x Rp. 100,000 = Rp. 100,000.00
Mandor 0.100 OH x Rp. 120,000 = Rp. 12,000.00
Jumlah 1 = Rp. 112,000.00
Untuk 1 M2 = Rp. 11,200.00

L.6. 10 M2 Mengupas Plesteran Lama


L.6.1. TENAGA
Pekerja 0.500 OH x Rp. 100,000 = Rp. 50,000.00
Mandor 0.025 OH x Rp. 120,000 = Rp. 3,000.00
Jumlah 1 = Rp. 53,000.00
Untuk 1 M2 = Rp. 5,300.00

L.7. 10 M2 Membongkar Dinding Bata


L.7.1. TENAGA
Pekerja 2.000 OH x Rp. 100,000 = Rp. 200,000.00
Tukang 0.600 OH x Rp. 120,000 = Rp. 72,000.00
Kepala Tukang 0.060 OH x Rp. 150,000 = Rp. 9,000.00
Mandor 0.100 OH x Rp. 120,000 = Rp. 12,000.00
Jumlah 1 = Rp. 293,000.00
Untuk 1 M2 = Rp. 29,300.00

L.8. 10 M2 Menurunkan Atap Seng


L.8.1. TENAGA
Pekerja 0.500 OH x Rp. 100,000 = Rp. 50,000.00
Mandor 0.050 OH x Rp. 120,000 = Rp. 6,000.00
Jumlah 1 = Rp. 56,000.00
Untuk 1 M2 = Rp. 5,600.00

L.9. 1 M3 Menurunkan Rangka Atap Lama


L.9.1. TENAGA
Pekerja 2.000 OH x Rp. 100,000 = Rp. 200,000.00
Tukang 6.000 OH x Rp. 120,000 = Rp. 720,000.00
Kepala Tukang 0.600 OH x Rp. 150,000 = Rp. 90,000.00
Mandor 0.100 OH x Rp. 120,000 = Rp. 12,000.00
Jumlah 1 = Rp. 1,022,000.00
ANALISA HARGA SATUAN
PEKERJAAN TANAH

Penggalian 1 m3 tanah biasa sedalam 1 m


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.75 OH 100,000.00 75,000.00
Mandor L.04 0.025 OH 120,000.00 3,000.00
JUMLAH HARGA TENAGA 78,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 78,000.00
E Overhead dan Provit 15 % 11,700.00
F Harga Satuan Pekerjaan (D+E) 89,700.00

Penggalian 1 m3 tanah biasa sedalam 2 m


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.9 OH 100,000.00 90,000.00
Mandor L.04 0.045 OH 120,000.00 5,400.00
JUMLAH HARGA TENAGA 95,400.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 95,400.00
E Overhead dan Provit 15 % 14,310.00
F Harga Satuan Pekerjaan (D+E) 109,710.00

Menggali 1 m3 tanah keras sedalam 1 meter


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 1 OH 100,000.00 100,000.00
Mandor L.04 0.032 OH 120,000.00 3,840.00
JUMLAH HARGA TENAGA 103,840.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 103,840.00
E Overhead dan Provit 15 % 15,576.00
F Harga Satuan Pekerjaan (D+E) 119,416.00
mengurug 1 m3 tanah biasa sedalam 1 meter
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 100,000.00 25,000.00
Mandor L.04 0.0083 OH 120,000.00 996.00
JUMLAH HARGA TENAGA 25,996.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 25,996.00
E Overhead dan Provit 15 % 3,899.40
F Harga Satuan Pekerjaan (D+E) 29,895.40

Mengurug 1 m3 tanah biasa sedalam 2 meter


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 31,800.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 31,800.00
E Overhead dan Provit 15 % 4,770.00
F Harga Satuan Pekerjaan (D+E) 36,570.00

Menguruug 1 m3 tanah biasa sedalam 3 meter


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.35 OH 100,000.00 35,000.00
Mandor L.04 0.0223 OH 120,000.00 2,676.00
JUMLAH HARGA TENAGA 37,676.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 37,676.00
E Overhead dan Provit 15 % 5,651.40
F Harga Satuan Pekerjaan (D+E) 43,327.40
Mengurug 1 m3 tanah keras sedalam 1 meter
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3333 OH 100,000.00 33,330.00
Mandor L.04 0.0106 OH 120,000.00 1,272.00
JUMLAH HARGA TENAGA 34,602.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 34,602.00
E Overhead dan Provit 15 % 5,190.30
F Harga Satuan Pekerjaan (D+E) 39,792.30

Mengurug 1 m3 tanah cadas sedalam 1 meter


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 100,000.00 50,000.00
Mandor L.04 0.02 OH 120,000.00 2,400.00
JUMLAH HARGA TENAGA 52,400.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 52,400.00
E Overhead dan Provit 15 % 7,860.00
F Harga Satuan Pekerjaan (D+E) 60,260.00

Mengurug 1 m3 tanah lumpur sedalam 1 meter


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.4 OH 100,000.00 40,000.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 41,800.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 41,800.00
E Overhead dan Provit 15 % 6,270.00
F Harga Satuan Pekerjaan (D+E) 48,070.00
Memadatkan 1 m3 tanah (per 20 cm) SNI 2835 : 2008
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 100,000.00 50,000.00
Mandor L.04 0.05 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 56,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 56,000.00
E Overhead dan Provit 15 % 8,400.00
F Harga Satuan Pekerjaan (D+E) 64,400.00

Pengurugan 1 m3 dengan pasir urug


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Mandor L.04 0.01 OH 120,000.00 1,200.00
-
JUMLAH HARGA TENAGA 31,200.00
B BAHAN
Pasir Urug 1.2 M3 212,500.00 255,000.00
-
JUMLAH HARGA BAHAN 255,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 286,200.00
E Overhead dan Provit 15 % 42,930.00
F Harga Satuan Pekerjaan (D+E) 329,130.00

Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.15 OH 100,000.00 15,000.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 16,800.00
B BAHAN
Ijuk 6 M3 28,400.00 170,400.00
-
JUMLAH HARGA BAHAN 170,400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 187,200.00
E Overhead dan Provit 15 % 28,080.00
F Harga Satuan Pekerjaan (D+E) 215,280.00
Mengurug 1 m3 tanah didatangkan
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.5 OH 100,000.00 50,000.00
Mandor 0.05 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 56,000.00
B BAHAN
Tanah Timbunan Biasa 1.2 84,000.00 100,800.00
-
JUMLAH HARGA BAHAN 100,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 156,800.00
E Overhead dan Provit 15 % 23,520.00
F Harga Satuan Pekerjaan (D+E) 180,320.00
ANALISA HARGA SATUAN
PEKERJAAN PONDASI

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 1.5 OH 100,000.00 150,000.00
Tukang Batu L.02 0.75 OH 120,000.00 90,000.00
Kepala Tukang L.03 0.075 OH 150,000.00 11,250.00
Mandor L.04 0.075 OH 120,000.00 9,000.00
JUMLAH HARGA TENAGA 260,250.00
B BAHAN
Batu Belah 1.2 M3 165,000.00 198,000.00
Semen Portland 202 Kg 1,702.00 343,804.00
Pasir Pasang 0.485 M3 212,500.00 103,062.50
JUMLAH HARGA BAHAN 644,866.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 905,116.50
E Overhead dan Provit 15 % 135,767.48
F Harga Satuan Pekerjaan (D+E) 1,040,883.98

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 1.5 OH 100,000.00 150,000.00
Tukang Batu L.02 0.75 OH 120,000.00 90,000.00
Kepala Tukang L.03 0.075OH 150,000.00 11,250.00
Mandor L.04 0.075OH 120,000.00 9,000.00
JUMLAH HARGA TENAGA 260,250.00
B BAHAN
Batu Belah 1.2 M3 165,000.00 198,000.00
Semen Portland 163 Kg 1,702.00 277,426.00
Pasir Pasang 0.52 M3 212,500.00 110,500.00
JUMLAH HARGA BAHAN 585,926.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 846,176.00
E Overhead dan Provit 15 % 126,926.40
F Harga Satuan Pekerjaan (D+E) 973,102.40

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 1.5 OH 100,000.00 150,000.00
Tukang Batu L.02 0.75 OH 120,000.00 90,000.00
Kepala Tukang L.03 0.075 OH 150,000.00 11,250.00
Mandor L.04 0.075 OH 120,000.00 9,000.00
JUMLAH HARGA TENAGA 260,250.00
B BAHAN
Batu Belah 1.2 M3 165,000.00 198,000.00
Semen Portland 136 Kg 1,702.00 231,472.00
Pasir Pasang 0.544 M3 212,500.00 115,600.00
JUMLAH HARGA BAHAN 545,072.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 805,322.00
E Overhead dan Provit 15 % 120,798.30
F Harga Satuan Pekerjaan (D+E) 926,120.30

Memasang 1 m3 batu kosong (anstamping)


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.78 OH 100,000.00 78,000.00
Tukang Batu L.02 0.39 OH 120,000.00 46,800.00
Kepala Tukang L.03 0.039 OH 150,000.00 5,850.00
Mandor L.04 0.039 OH 120,000.00 4,680.00
JUMLAH HARGA TENAGA 135,330.00
B BAHAN
Batu Belah 1.2 M3 165,000.00 198,000.00
Pasir Urug 0.432 M3 212,500.00 91,800.00
JUMLAH HARGA BAHAN 289,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 425,130.00
E Overhead dan Provit 15 % 63,769.50
F Harga Satuan Pekerjaan (D+E) 488,899.50

Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 3.4 OH 100,000.00 340,000.00
Tukang Batu L.02 0.85 OH 120,000.00 102,000.00
Kepala Tukang L.03 0.085 OH 150,000.00 12,750.00
Mandor L.04 0.17 OH 120,000.00 20,400.00
JUMLAH HARGA TENAGA 475,150.00
B BAHAN
Batu Belah 0.48 M3 165,000.00 79,200.00
Semen Portland 194 Kg 1,702.00 330,188.00
Pasir Beton Maligano 0.312 M3 261,724.00 81,657.89
Kerikil Beton (Pecah Maligano) 0.468 M3 479,680.00 224,490.24
Besi Beton Ulir 126 kg 19,000.00 2,394,000.00
Kawat Beton 1.8 Kg 23,675.00 42,615.00
JUMLAH HARGA BAHAN 3,152,151.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,627,301.13
E Overhead dan Provit 15 % 544,095.17
F Harga Satuan Pekerjaan (D+E) 4,171,396.30
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 2.4 OH 100,000.00 240,000.00
Tukang Batu L.02 0.8 OH 120,000.00 96,000.00
Kepala Tukang L.03 0.08 OH 150,000.00 12,000.00
Mandor L.04 0.119 OH 120,000.00 14,280.00
JUMLAH HARGA TENAGA 362,280.00
B BAHAN
Batu Belah 0.45 M3 165,000.00 74,250.00
Semen Portland 194 Kg 1,702.00 330,188.00
Pasir Beton Maligano 0.312 M3 261,724.00 81,657.89
Kerikil Beton (Pecah Maligano) 0.468 M3 479,680.00 224,490.24
JUMLAH HARGA BAHAN 710,586.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,072,866.13
E Overhead dan Provit 15 % 160,929.92
F Harga Satuan Pekerjaan (D+E) 1,233,796.05
ANALISA HARGA SATUAN
PEKERJAAN BETON

1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 247 kg 1,702.00 420,394.00
Pasir Beton Maligano 869 kg 186.95 162,455.83
Kerikil Beton (Pecah Maligano) 999 kg 355.32 354,963.20
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 959,313.03
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,171,473.03
E Overhead dan Provit 15 % 175,720.95
F Harga Satuan Pekerjaan (D+E) 1,347,193.98

Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 276 kg 1,702.00 469,752.00
Pasir Beton Maligano 828 kg 186.95 154,791.05
Kerikil Beton (Pecah Maligano) 1012 kg 355.32 359,582.34
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,005,625.39
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,217,785.39
E Overhead dan Provit 15 % 182,667.81
F Harga Satuan Pekerjaan (D+E) 1,400,453.20

Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 299 kg 1,702.00 508,898.00
Pasir Beton Maligano 799 kg 186.95 149,369.63
Kerikil Beton (Pecah Maligano) 1017 kg 355.32 361,358.93
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,041,126.56
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,253,286.56
E Overhead dan Provit 15 % 187,992.98
F Harga Satuan Pekerjaan (D+E) 1,441,279.54

Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.2 OH 100,000.00 120,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.06 OH 120,000.00 7,200.00
JUMLAH HARGA TENAGA 154,200.00
B BAHAN
Semen Portland 230 kg 1,702.00 391,460.00
Pasir Beton Maligano 893 kg 186.95 166,942.52
Kerikil Beton (Pecah Maligano) 1027 kg 355.32 364,912.12
air 200 Liter 100.00 20,000.00
JUMLAH HARGA BAHAN 943,314.64
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,097,514.64
E Overhead dan Provit 15 % 164,627.20
F Harga Satuan Pekerjaan (D+E) 1,262,141.84

Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 326 kg 1,702.00 554,852.00
Pasir Beton Maligano 760 kg 186.95 142,078.74
Kerikil Beton (Pecah Maligano) 1029 kg 355.32 365,622.76
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,084,053.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,296,213.50
E Overhead dan Provit 15 % 194,432.02
F Harga Satuan Pekerjaan (D+E) 1,490,645.52

Pembesian 10 kg dengan besi ulir


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.07 OH 100,000.00 7,000.00
Tukang Besi Konstruksi L.02 0.07 OH 120,000.00 8,400.00
Kepala Tukang L.03 0.007 OH 150,000.00 1,050.00
Mandor L.04 0.004 OH 120,000.00 480.00
JUMLAH HARGA TENAGA 16,930.00
B BAHAN
Besi Beton Ulir 10.5 kg 19,000.00 199,500.00
Kawat Beton 0.15 kg 23,675.00 3,551.25
JUMLAH HARGA BAHAN 203,051.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 219,981.25
E Overhead dan Provit 15 % 32,997.19
F Harga Satuan Pekerjaan (D+E) 252,978.44

Pembesian 10 kg dengan besi polos


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.07 OH 100,000.00 7,000.00
Tukang Besi Konstruksi L.02 0.07 OH 120,000.00 8,400.00
Kepala Tukang L.03 0.007 OH 150,000.00 1,050.00
Mandor L.04 0.004 OH 120,000.00 480.00
JUMLAH HARGA TENAGA 16,930.00
B BAHAN
Besi Beton Polos 10.5 kg 13,500.00 141,750.00
Kawat Beton 0.15 kg 23,675.00 3,551.25
JUMLAH HARGA BAHAN 145,301.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 162,231.25
E Overhead dan Provit 15 % 24,334.69
F Harga Satuan Pekerjaan (D+E) 186,565.94

Memasang 1 m2 bekisting untuk pondasi


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.52 OH 100,000.00 52,000.00
Tukang Kayu L.02 0.26 OH 120,000.00 31,200.00
Kepala Tukang L.03 0.026 OH 150,000.00 3,900.00
Mandor L.04 0.026 OH 120,000.00 3,120.00
JUMLAH HARGA TENAGA 90,220.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,400,000.00 56,000.00
Paku 5 - 10 cm 0.3 kg 19,820.00 5,946.00
Minyak Bekisting/ minyak cat 0.1 Liter 25,000.00 2,500.00
JUMLAH HARGA BAHAN 64,446.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 154,666.00
E Overhead dan Provit 15 % 23,199.90
F Harga Satuan Pekerjaan (D+E) 177,865.90

Memasang 1 m2 bekisting untuk sloof


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.52 OH 100,000.00 52,000.00
Tukang Kayu L.02 0.26 OH 120,000.00 31,200.00
Kepala Tukang L.03 0.026 OH 150,000.00 3,900.00
Mandor L.04 0.026 OH 120,000.00 3,120.00
JUMLAH HARGA TENAGA 90,220.00
B BAHAN
Papan kayu kelas II 0.045 m3 1,400,000.00 63,000.00
Paku 5 - 10 cm 0.3 kg 19,820.00 5,946.00
Minyak Bekisting/ minyak cat 0.1 Liter 25,000.00 2,500.00
JUMLAH HARGA BAHAN 71,446.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 161,666.00
E Overhead dan Provit 15 % 24,249.90
F Harga Satuan Pekerjaan (D+E) 185,915.90

Memasang 1 m2 bekisting untuk kolom


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.66 OH 100,000.00 66,000.00
Tukang Kayu L.02 0.33 OH 120,000.00 39,600.00
Kepala Tukang L.03 0.033 OH 150,000.00 4,950.00
Mandor L.04 0.033 OH 120,000.00 3,960.00
JUMLAH HARGA TENAGA 114,510.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,400,000.00 56,000.00
Paku Campuran (5 , 7, 10 cm) 0.4 kg 19,820.00 7,928.00
Minyak Bekisting/ minyak cat 0.2 Liter 25,000.00 5,000.00
Balok kayu kelas II 0.015 m3 1,400,000.00 21,000.00
Plywood Tebal 9 mm 0.2 Lbr 308,710.00 61,742.00
Dolken dia. 7 cm 2 Batang 17,500.00 35,000.00
JUMLAH HARGA BAHAN 186,670.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 301,180.00
E Overhead dan Provit 15 % 45,177.00
F Harga Satuan Pekerjaan (D+E) 346,357.00

Memasang 1 m2 bekisting untuk balok


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.66 OH 100,000.00 66,000.00
Tukang Kayu L.02 0.33 OH 120,000.00 39,600.00
Kepala Tukang L.03 0.033 OH 150,000.00 4,950.00
Mandor L.04 0.033 OH 120,000.00 3,960.00
JUMLAH HARGA TENAGA 114,510.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,400,000.00 56,000.00
Paku Campuran (5 , 7, 10 cm) 0.4 kg 19,820.00 7,928.00
Minyak Bekisting/ minyak cat 0.2 Liter 25,000.00 5,000.00
Balok kayu kelas II 0.018 m3 1,400,000.00 25,200.00
Plywood Tebal 9 mm 0.2 Lbr 308,710.00 61,742.00
Dolken dia. 7 cm 2 Batang 17,500.00 35,000.00
JUMLAH HARGA BAHAN 190,870.00
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH (A+B+C) 305,380.00
E Overhead dan Provit 15 % 45,807.00
F Harga Satuan Pekerjaan (D+E) 351,187.00

Memasang 1 m2 bekisting untuk plat lantai


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.66 OH 100,000.00 66,000.00
Tukang Kayu L.02 0.33 OH 120,000.00 39,600.00
Kepala Tukang L.03 0.033 OH 150,000.00 4,950.00
Mandor L.04 0.033 OH 120,000.00 3,960.00
JUMLAH HARGA TENAGA 114,510.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,400,000.00 56,000.00
Paku Campuran (5 , 7, 10 cm) 0.4 kg 19,820.00 7,928.00
Minyak Bekisting/ minyak cat 0.2 Liter 25,000.00 5,000.00
Balok kayu kelas II 0.015 m3 1,400,000.00 21,000.00
Plywood Tebal 9 mm 0.2 Lbr 308,710.00 61,742.00
Dolken dia. 7 cm 4 Batang 17,500.00 70,000.00
JUMLAH HARGA BAHAN 221,670.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 336,180.00
E Overhead dan Provit 15 % 50,427.00
F Harga Satuan Pekerjaan (D+E) 386,607.00
Memasang 1 m2 bekisting untuk dinding
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.66 OH 100,000.00 66,000.00
Tukang Kayu L.02 0.33 OH 120,000.00 39,600.00
Kepala Tukang L.03 0.033 OH 150,000.00 4,950.00
Mandor L.04 0.033 OH 120,000.00 3,960.00
JUMLAH HARGA TENAGA 114,510.00
B BAHAN
Papan kayu kelas II 0.03 m3 1,400,000.00 42,000.00
Paku Campuran (5 , 7, 10 cm) 0.4 kg 19,820.00 7,928.00
Minyak Bekisting/ minyak cat 0.2 Liter 25,000.00 5,000.00
Balok kayu kelas II 0.02 m3 1,400,000.00 28,000.00
Plywood Tebal 9 mm 0.2 Lbr 308,710.00 61,742.00
Dolken dia. 7 cm 2.5 Batang 17,500.00 43,750.00
Formite/penjaga jarak bekisting/spacer 4 Buah - -
JUMLAH HARGA BAHAN 188,420.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 302,930.00
E Overhead dan Provit 15 % 45,439.50
F Harga Satuan Pekerjaan (D+E) 348,369.50

Memasang 1 m2 bekisting untuk tangga


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.66 OH 100,000.00 66,000.00
Tukang Kayu L.02 0.33 OH 120,000.00 39,600.00
Kepala Tukang L.03 0.033 OH 150,000.00 4,950.00
Mandor L.04 0.033 OH 120,000.00 3,960.00
JUMLAH HARGA TENAGA 114,510.00
B BAHAN
Papan kayu kelas II 0.03 m3 1,400,000.00 42,000.00
Paku Campuran (5 , 7, 10 cm) 0.4 kg 19,820.00 7,928.00
Minyak Bekisting/ minyak cat 0.15 Liter 25,000.00 3,750.00
Balok kayu kelas I 0.015 m3 2,762,469.00 41,437.04
Plywood Tebal 9 mm 0.35 Lbr 308,710.00 108,048.50
Dolken dia. 7 cm 2 Batang 17,500.00 35,000.00
JUMLAH HARGA BAHAN 238,163.54
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 352,673.54
E Overhead dan Provit 15 % 52,901.03
F Harga Satuan Pekerjaan (D+E) 405,574.57
Memasang 1 m2 jembatan untuk pengecoran beton
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.15 OH 100,000.00 15,000.00
Tukang Kayu L.02 0.05 OH 120,000.00 6,000.00
Kepala Tukang L.03 0.005 OH 150,000.00 750.00
Mandor L.04 0.008 OH 120,000.00 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Papan kayu kelas II 0.0264 m3 1,875,438.00 49,511.56
Paku Campuran (5 , 7, 10 cm) 0.6 kg 19,820.00 11,892.00
Dolken dia. 7 cm 0.5 Batang 17,500.00 8,750.00
JUMLAH HARGA BAHAN 70,153.56
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 92,863.56
E Overhead dan Provit 15 % 13,929.53
F Harga Satuan Pekerjaan (D+E) 106,793.10

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.3 OH 100,000.00 530,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.3 OH 120,000.00 156,000.00
Tukang Besi Konstruksi L.02 1.05 OH 120,000.00 126,000.00
Kepala Tukang L.03 0.262 OH 150,000.00 39,300.00
Mandor L.04 0.265 OH 120,000.00 31,800.00
JUMLAH HARGA TENAGA 916,100.00
B BAHAN
Papan kayu kelas II 0.2 m3 1,875,438.00 375,087.60
Paku Campuran (5 , 7, 10 cm) 1.5 kg 19,820.00 29,730.00
Minyak Bekisting/ minyak cat 0.4 Liter 25,000.00 10,000.00
Besi Beton Ulir 150 kg 9,791.67 1,468,750.00
Kawat Beton 2.25 kg 23,675.00 53,268.75
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
JUMLAH HARGA BAHAN 3,038,580.11
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,954,680.11
E Overhead dan Provit 15 % 593,202.02
F Harga Satuan Pekerjaan (D+E) 4,547,882.13

Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.65 OH 100,000.00 565,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.56 OH 120,000.00 187,200.00
Tukang Besi Konstruksi L.02 1.4 OH 120,000.00 168,000.00
Kepala Tukang L.03 0.323 OH 150,000.00 48,450.00
Mandor L.04 0.283 OH 120,000.00 33,960.00
JUMLAH HARGA TENAGA 1,035,610.00
B BAHAN
Papan kayu kelas II 0.27 m3 1,875,438.00 506,368.26
Paku Campuran (5 , 7, 10 cm) 2 kg 19,820.00 39,640.00
Minyak Bekisting/ minyak cat 0.6 Liter 25,000.00 15,000.00
Besi Beton Polos 210 kg 9,791.67 2,056,250.00
Kawat Beton 3 kg 23,675.00 71,025.00
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
JUMLAH HARGA BAHAN 3,790,027.02
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4,825,637.02
E Overhead dan Provit 15 % 723,845.55
F Harga Satuan Pekerjaan (D+E) 5,549,482.57

Membuat 1 m3 kolom beton bertulang (180 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 7.05 OH 100,000.00 705,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.65 OH 120,000.00 198,000.00
Tukang Besi Konstruksi L.02 2.1 OH 120,000.00 252,000.00
Kepala Tukang L.03 0.403 OH 150,000.00 60,450.00
Mandor L.04 0.353 OH 120,000.00 42,360.00
JUMLAH HARGA TENAGA 1,290,810.00
B BAHAN
Papan kayu kelas II 0.4 m3 1,875,438.00 750,175.20
Paku Campuran (5 , 7, 10 cm) 4 kg 19,820.00 79,280.00
Minyak Bekisting/ minyak cat 2 Liter 25,000.00 50,000.00
Besi Beton Polos 180 kg 9,791.67 1,762,500.00
Kawat Beton 4.5 kg 23,675.00 106,537.50
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
Balok kayu kelas II 0.15 m3 1,875,438.00 281,315.70
Plywood Tebal 9 mm 3.5 Lembar 308,710.00 1,080,485.00
Dolken dia. 7 cm 20 Batang 17,500.00 350,000.00
JUMLAH HARGA BAHAN 5,562,037.16
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,852,847.16
E Overhead dan Provit 15 % 1,027,927.07
F Harga Satuan Pekerjaan (D+E) 7,880,774.23

Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 6.35 OH 100,000.00 635,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.65 OH 120,000.00 198,000.00
Tukang Besi Konstruksi L.02 1.4 OH 120,000.00 168,000.00
Kepala Tukang L.03 0.333 OH 150,000.00 49,950.00
Mandor L.04 0.318 OH 120,000.00 38,160.00
JUMLAH HARGA TENAGA 1,122,110.00
B BAHAN
Papan kayu kelas II 0.32 m3 1,875,438.00 600,140.16
Paku Campuran (5 , 7, 10 cm) 3.2 kg 19,820.00 63,424.00
Minyak Bekisting/ minyak cat 1.6 Liter 25,000.00 40,000.00
Besi Beton Polos 200 kg 9,791.67 1,958,333.33
Kawat Beton 3 kg 23,675.00 71,025.00
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
Balok kayu kelas II 0.14 m3 1,875,438.00 262,561.32
Plywood Tebal 9 mm 2.8 Lembar 308,710.00 864,388.00
Dolken dia. 7 cm 16 Batang 17,500.00 280,000.00
JUMLAH HARGA BAHAN 5,241,615.57
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,363,725.57
E Overhead dan Provit 15 % 954,558.84
F Harga Satuan Pekerjaan (D+E) 7,318,284.41

Membuat 1 m3 Kolom beton bertulang (170 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 7.05 OH 100,000.00 705,000.00
Tukang Batu 0.275 OH 120,000.00 33,000.00
Tukang Kayu 1.65 OH 120,000.00 198,000.00
Tukang Besi Konstruksi 2.1 OH 120,000.00 252,000.00
Kepala Tukang 0.403 OH 150,000.00 60,450.00
Mandor 0.353 OH 120,000.00 42,360.00
JUMLAH HARGA TENAGA 1,290,810.00
B BAHAN
Papan kayu kelas II 0.4 m3 1,875,438.00 750,175.20
Paku Campuran (5 , 7, 10 cm) 4 kg 19,820.00 79,280.00
Minyak Bekisting/ minyak cat 2 Liter 25,000.00 50,000.00
Besi Beton Polos 170 kg 9,791.67 1,664,583.33
Kawat Beton 4.5 kg 23,675.00 106,537.50
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
Balok kayu kelas II 0.12 m3 1,875,438.00 225,052.56
Plywood Tebal 9 mm 2.8 Lembar 308,710.00 864,388.00
Dolken dia. 7 cm 20 Batang 17,500.00 350,000.00
JUMLAH HARGA BAHAN 5,191,760.35
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,482,570.35
E Overhead dan Provit 15 % 972,385.55
F Harga Satuan Pekerjaan (D+E) 7,454,955.91

Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.3 OH 100,000.00 530,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.3 OH 120,000.00 156,000.00
Tukang Besi Konstruksi L.02 1.05 OH 120,000.00 126,000.00
Kepala Tukang L.03 0.262 OH 150,000.00 39,300.00
Mandor L.04 0.265 OH 120,000.00 31,800.00
JUMLAH HARGA TENAGA 916,100.00
B BAHAN
Papan kayu kelas II 0.24 m3 1,875,438.00 450,105.12
Paku Campuran (5 , 7, 10 cm) 3.2 kg 19,820.00 63,424.00
Minyak Bekisting/ minyak cat 1.6 Liter 25,000.00 40,000.00
Besi Beton Ulir 157.5 kg 19,000.00 2,992,500.00
Kawat Beton 2.25 kg 23,675.00 53,268.75
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
Balok kayu kelas II 0.16 m3 1,875,438.00 300,070.08
Plywood Tebal 9 mm 2.8 Lembar 308,710.00 864,388.00
Dolken dia. 7 cm 24 Batang 17,500.00 420,000.00
JUMLAH HARGA BAHAN 6,285,499.71
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 7,201,599.71
E Overhead dan Provit 15 % 1,080,239.96
F Harga Satuan Pekerjaan (D+E) 8,281,839.67

Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 5.65 OH 100,000.00 565,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Tukang Kayu L.02 1.56 OH 120,000.00 187,200.00
Tukang Kayu L.02 1.4 OH 120,000.00 168,000.00
Tukang Besi Konstruksi L.03 0.323 OH 120,000.00 38,760.00
Mandor L.04 0.283 OH 120,000.00 33,960.00
JUMLAH HARGA TENAGA 1,025,920.00
B BAHAN
Papan kayu kelas II 0.25 m3 1,875,438.00 468,859.50
Paku Campuran (5 , 7, 10 cm) 3 kg 19,820.00 59,460.00
Minyak Bekisting/ minyak cat 1.2 Liter 25,000.00 30,000.00
Besi Beton Polos 200 kg 13,500.00 2,700,000.00
Kawat Beton 3 kg 23,675.00 71,025.00
Semen Portland 336 kg 1,702.00 571,872.00
Pasir Beton Maligano 0.54 m3 261,724.00 141,330.96
Kerikil Beton (Pecah Maligano) 0.81 m3 479,680.00 388,540.80
Balok kayu kelas II 0.105 m3 1,875,438.00 196,920.99
Plywood Tebal 9 mm 2.5 Lembar 308,710.00 771,775.00
Dolken dia. 7 cm 14 Batang 17,500.00 245,000.00
JUMLAH HARGA BAHAN 5,644,784.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,670,704.25
E Overhead dan Provit 15 % 1,000,605.64
F Harga Satuan Pekerjaan (D+E) 7,671,309.89

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.18 OH 100,000.00 18,000.00
Tukang Batu L.02 0.02 OH 120,000.00 2,400.00
Tukang Kayu L.02 0.02 OH 120,000.00 2,400.00
Tukang Besi Konstruksi L.02 0.02 OH 120,000.00 2,400.00
Kepala Tukang L.03 0.006 OH 150,000.00 900.00
Mandor L.04 0.009 OH 120,000.00 1,080.00
JUMLAH HARGA TENAGA 27,180.00
B BAHAN
Papan kayu kelas II 0.002 m3 1,875,438.00 3,750.88
Paku Campuran (5 , 7, 10 cm) 0.01 kg 19,820.00 198.20
Besi Beton Ulir 3 kg 19,000.00 57,000.00
Kawat Beton 0.45 kg 23,675.00 10,653.75
Semen Portland 4 kg 1,702.00 6,808.00
Pasir Beton Maligano 0.006 m3 261,724.00 1,570.34
Balok kayu kelas II 0.015 m3 1,875,438.00 28,131.57
Kerikil Beton (Pecah Maligano) 0.009 m3 479,680.00 4,317.12
JUMLAH HARGA BAHAN 112,429.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 139,609.86
E Overhead dan Provit 15 % 20,941.48
F Harga Satuan Pekerjaan (D+E) 160,551.34

Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.297 OH 100,000.00 29,700.00
Tukang Batu L.02 0.033 OH 120,000.00 3,960.00
Tukang Kayu L.02 0.033 OH 120,000.00 3,960.00
Tukang Besi Konstruksi L.02 0.033 OH 120,000.00 3,960.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 44,880.00
B BAHAN
Papan kayu kelas II 0.003 m3 1,875,438.00 5,626.31
Paku Campuran (5 , 7, 10 cm) 0.02 kg 19,820.00 396.40
Besi Beton Ulir 3.6 kg 19,000.00 68,400.00
Kawat beton 0.05 kg 23,675.00 1,183.75
Semen Portland 5.5 kg 1,702.00 9,361.00
Pasir Beton Maligano 0.009 m3 261,724.00 2,355.52
Kerikil Beton (Pecah Maligano) 0.015 m3 479,680.00 7,195.20
JUMLAH HARGA BAHAN 94,518.18
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 139,398.18
E Overhead dan Provit 15 % 20,909.73
F Harga Satuan Pekerjaan (D+E) 160,307.91
ANALISA HARGA SATUAN
PEKERJAAN BESI DAN ALUMINIUM

Mengerjakan 10 cm pengelasan dengan las listrik SNI 7393 : 2008


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.04 OH 100,000.00 4,000.00
Tukang Besi Konstruksi L.02 0.02 OH 120,000.00 2,400.00
Kepala Tukang L.03 0.002 OH 150,000.00 300.00
Mandor L.04 0.002 OH 120,000.00 240.00
JUMLAH HARGA TENAGA 6,940.00
B BAHAN
Kawat las listrik 0.4 Kg 28,000.00 11,200.00
Solar 0.3 Liter - -
Minyak pelumas 0.04 Liter - -
JUMLAH HARGA BAHAN 11,200.00
C PERALATAN
-
Sewa alat las listrik 0.017 Jam - -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 18,140.00
E Overhead dan Provit 15 % 2,721.00
F Harga Satuan Pekerjaan (D+E) 20,861.00

Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.65 OH 100,000.00 65,000.00
Tukang Las Biasa L.02 0.65 OH 120,000.00 78,000.00
Kepala Tukang L.03 0.065 OH 150,000.00 9,750.00
Mandor L.04 0.032 OH 120,000.00 3,840.00
JUMLAH HARGA TENAGA 156,590.00
B BAHAN
Besi scuare tube 4.76 M - -
Besi lis kaca (1 x 1) cm 4.522 M - -
Pengelasan 20 Cm - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 156,590.00
E Overhead dan Provit 15 % 23,488.50
F Harga Satuan Pekerjaan (D+E) 180,078.50

Memasang 1 m2 pintu rolling door besi SNI 7393 : 2008


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.2 OH 100,000.00 120,000.00
Tukang Las Biasa L.02 1.2 OH 120,000.00 144,000.00
Kepala Tukang L.03 0.12 OH 150,000.00 18,000.00
Mandor L.04 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 282,720.00
B BAHAN
Pintu Rolling Door 1 M2 620,000.00 620,000.00
-
JUMLAH HARGA BAHAN 620,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 902,720.00
E Overhead dan Provit 15 % 135,408.00
F Harga Satuan Pekerjaan (D+E) 1,038,128.00

Memasang 1 m2 terali besi strip (2 x 3) mm SNI 7393 : 2008


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.67 OH 100,000.00 167,000.00
Tukang Las Biasa L.02 1,670 OH 120,000.00 200,400,000.00
Kepala Tukang L.03 0.167 OH 150,000.00 25,050.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 200,602,010.00
B BAHAN
Kawat Bidrat/ kawat beton 6.177 kg 23,675.00 146,240.48
Pengelasan 27.08 cm - -
JUMLAH HARGA BAHAN 146,240.48
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 200,748,250.48
E Overhead dan Provit 15 % 30,112,237.57
F Harga Satuan Pekerjaan (D+E) 230,860,488.05

Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.2 OH 100,000.00 20,000.00
Tukang L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.01 OH 120,000.00 1,200.00
JUMLAH HARGA TENAGA 48,200.00
B BAHAN
Seng Plat, lebar 55 cm Bjls.20 1.05 m’ 38,500.00 40,425.00
Paku 1 cm - 2 cm 0.015 kg 15,000.00 225.00
Papan kayu kelas II 0.019 m3 1,875,438.00 35,633.32
JUMLAH HARGA BAHAN 76,283.32
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 124,483.32
E Overhead dan Provit 15 % 18,672.50
F Harga Satuan Pekerjaan (D+E) 143,155.82

Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.15 OH 100,000.00 15,000.00
Tukang L.02 0.3 OH 120,000.00 36,000.00
Kepala Tukang L.03 0.03 OH 150,000.00 4,500.00
Mandor L.04 0.008 OH 120,000.00 960.00
JUMLAH HARGA TENAGA 56,460.00
B BAHAN
Seng Plat, lebar 55 cm Bjls.20 1.05 m 38,500.00 40,425.00
Paku 1 cm - 2 cm 0.01 kg 15,000.00 150.00
Kawat Bidrat/ kawat beton 0.5 kg 23,675.00 11,837.50
JUMLAH HARGA BAHAN 52,412.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 108,872.50
E Overhead dan Provit 15 % 16,330.88
F Harga Satuan Pekerjaan (D+E) 125,203.38

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.25 OH 100,000.00 25,000.00
Tukang Besi Konstruksi L.02 0.25 OH 120,000.00 30,000.00
Kepala Tukang L.03 0.025 OH 150,000.00 3,750.00
Mandor L.04 0.013 OH 120,000.00 1,560.00
JUMLAH HARGA TENAGA 60,310.00
B BAHAN
Rangka Metal hollow 40.40.2 mm 3.5 m’ 40,000.00 140,000.00
Assesoris rangka besi hollow dinding partisi 1 LS 14,000.00 14,000.00
JUMLAH HARGA BAHAN 154,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 214,310.00
E Overhead dan Provit 15 % 32,146.50
F Harga Satuan Pekerjaan (D+E) 246,456.50

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.35 OH 100,000.00 35,000.00
Tukang Besi Konstruksi L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.018 OH 120,000.00 2,160.00
JUMLAH HARGA TENAGA 84,410.00
B BAHAN
Rangka Metal hollow 40.40.2 mm 4 m’ 40,000.00 160,000.00
Assesoris rangka besi hollow plafond 1 LS 10,500.00 10,500.00
JUMLAH HARGA BAHAN 170,500.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 254,910.00
E Overhead dan Provit 15 % 38,236.50
F Harga Satuan Pekerjaan (D+E) 293,146.50

Memasang 1 m2 Rangka Atap Baja Ringan


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.247 OH 100,000.00 24,700.00
Tukang Besi Konstruksi 0.176 OH 120,000.00 21,120.00
Kepala Tukang 0.117 OH 150,000.00 17,550.00
JUMLAH HARGA TENAGA 63,370.00
B BAHAN
Truss C75.35.7 chord 2.8 M1 18,000.00 50,400.00
Mobilisasi 1 LS 9,000.00 9,000.00
Reng Botton U33.045 5.1 M1 9,750.00 49,725.00
Screw 12-14x20 HolDip Galvanized 25 Bh 500.00 12,500.00
Screw 10-16x16 HolDip Galvanized 35 Bh 400.00 14,000.00
Dynabol dia-12 x 120 mm 1 Bh 2,100.00 2,100.00

JUMLAH HARGA BAHAN 137,725.00


C PERALATAN
Alat Bantu 1 LS 2,350.00 2,350.00
Gambar Desain 1 M2 4,500.00 4,500.00
-
JUMLAH HARGA ALAT 6,850.00
D JUMLAH (A+B+C) 207,945.00
E Overhead dan Provit 15 % 31,191.75
F Harga Satuan Pekerjaan (D+E) 239,136.75

Membuat 1 m2 railling/ pagar (stainlesteel) SNI 7393 : 2008


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.05 OH 100,000.00 105,000.00
Tukang Las Biasa L.02 1.05 OH 120,000.00 126,000.00
Kepala Tukang L.03 0.105 OH 150,000.00 15,750.00
Mandor L.04 0.0053 OH 120,000.00 636.00
JUMLAH HARGA TENAGA 247,386.00
B BAHAN
Stainlesteel Kotak 40/40 mm 3.87 M 75,000.00 290,250.00
Stainlesteel Kotak 20/40 mm 8.02 M 55,000.00 441,100.00
Pengelasan 20 Cm 2,000.00 40,000.00
JUMLAH HARGA BAHAN 771,350.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,018,736.00
E Overhead dan Provit 15 % 152,810.40
F Harga Satuan Pekerjaan (D+E) 1,171,546.40

Membuat 1 m2 pengaman jendela (stainlesteel) SNI 7393 : 2008


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.05 OH 100,000.00 105,000.00
Tukang Las Biasa L.02 1.05 OH 120,000.00 126,000.00
Kepala Tukang L.03 0.105 OH 150,000.00 15,750.00
Mandor L.04 0.0053 OH 120,000.00 636.00
JUMLAH HARGA TENAGA 247,386.00
B BAHAN
Stainlesteel Kotak 20/40 mm 10.63 M 55,000.00 584,650.00
Pengelasan 25 Cm 2,000.00 50,000.00
JUMLAH HARGA BAHAN 634,650.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 882,036.00
E Overhead dan Provit 15 % 132,305.40
F Harga Satuan Pekerjaan (D+E) 1,014,341.40
ANALISA HARGA SATUAN
PEKERJAAN DINDING
1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 43.5 Kg 1,702.00 74,037.00
Pasir Pasang 0.08 M3 212,500.00 17,000.00
JUMLAH HARGA BAHAN 231,037.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 321,637.00
E Overhead dan Provit 15 % 48,245.55
F Harga Satuan Pekerjaan (D+E) 369,882.55

2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 32.95 Kg 1,702.00 56,080.90
Pasir Pasang 0.091 M3 212,500.00 19,337.50
JUMLAH HARGA BAHAN 215,418.40
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 306,018.40
E Overhead dan Provit 15 % 45,902.76
F Harga Satuan Pekerjaan (D+E) 351,921.16

3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 26.55 Kg 1,702.00 45,188.10
Pasir Pasang 0.093 M3 212,500.00 19,762.50
JUMLAH HARGA BAHAN 204,950.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 295,550.60
E Overhead dan Provit 15 % 44,332.59
F Harga Satuan Pekerjaan (D+E) 339,883.19

4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 22.2 Kg 1,702.00 37,784.40
Pasir Pasang 0.102 M3 212,500.00 21,675.00
JUMLAH HARGA BAHAN 199,459.40
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 290,059.40
E Overhead dan Provit 15 % 43,508.91
F Harga Satuan Pekerjaan (D+E) 333,568.31

7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 18.95 Kg 1,702.00 32,252.90
Pasir Pasang 0.038 M3 212,500.00 8,075.00
JUMLAH HARGA BAHAN 110,327.90
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 155,627.90
E Overhead dan Provit 15 % 23,344.19
F Harga Satuan Pekerjaan (D+E) 178,972.09

8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 14.37Kg 1,702.00 24,457.74
Pasir Pasang 0.04M3 212,500.00 8,500.00
JUMLAH HARGA BAHAN 102,957.74
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 148,257.74
E Overhead dan Provit 15 % 22,238.66
F Harga Satuan Pekerjaan (D+E) 170,496.40

9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 11.5Kg 1,702.00 19,573.00
Pasir Pasang 0.043M3 212,500.00 9,137.50
JUMLAH HARGA BAHAN 98,710.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 144,010.50
E Overhead dan Provit 15 % 21,601.58
F Harga Satuan Pekerjaan (D+E) 165,612.08

10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 9.68Kg 1,702.00 16,475.36
Pasir Pasang 0.045M3 212,500.00 9,562.50
JUMLAH HARGA BAHAN 96,037.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 141,337.86
E Overhead dan Provit 15 % 21,200.68
F Harga Satuan Pekerjaan (D+E) 162,538.54

14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 1 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Merah 0.018 Kg 3,200.00 57.60
Kapur Pasang 0.018 M3 5,525.00 99.45
Pasir Pasang 0.018 M3 212,500.00 3,825.00
JUMLAH HARGA BAHAN 73,982.05
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 119,282.05
E Overhead dan Provit 15 % 17,892.31
F Harga Satuan Pekerjaan (D+E) 137,174.36

15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Merah 0.014Kg 3,200.00 44.80
Kapur Pasang 0.014M3 5,525.00 77.35
Pasir Pasang 0.028M3 212,500.00 5,950.00
JUMLAH HARGA BAHAN 76,072.15
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 121,372.15
E Overhead dan Provit 15 % 18,205.82
F Harga Satuan Pekerjaan (D+E) 139,577.97

28 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Roster/Terawang 30 Buah - -
Semen Portland 11 kg 1,702.00 18,722.00
Pasir Pasang 0.035 m3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 26,159.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 71,459.50
E Overhead dan Provit 15 % 10,718.93
F Harga Satuan Pekerjaan (D+E) 82,178.43

29 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Roster/Terawang 25 Buah 20,000.00 500,000.00
Semen Portland 11 kg 1,702.00 18,722.00
Pasir Pasang 0.035 m3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 526,159.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 571,459.50
E Overhead dan Provit 15 % 85,718.93
F Harga Satuan Pekerjaan (D+E) 657,178.43
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN

Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.15 OH 120,000.00 18,000.00
Kepala Tukang L.03 0.015 OH 150,000.00 2,250.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 52,050.00
B BAHAN
Semen Portland 7.776 Kg 1,702.00 13,234.75
Pasir Pasang 0.023 M3 212,500.00 4,887.50
JUMLAH HARGA BAHAN 18,122.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 70,172.25
E Overhead dan Provit 15 % 10,525.84
F Harga Satuan Pekerjaan (D+E) 80,698.09

Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.15 OH 120,000.00 18,000.00
Kepala Tukang L.03 0.015 OH 150,000.00 2,250.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 52,050.00
B BAHAN
Semen Portland 6.24 Kg 1,702.00 10,620.48
Pasir Pasang 0.024 M3 212,500.00 5,100.00
JUMLAH HARGA BAHAN 15,720.48
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 67,770.48
E Overhead dan Provit 15 % 10,165.57
F Harga Satuan Pekerjaan (D+E) 77,936.05

Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.15 OH 120,000.00 18,000.00
Kepala Tukang L.03 0.015 OH 150,000.00 2,250.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 52,050.00
B BAHAN
Semen Portland 5.184 Kg 1,702.00 8,823.17
Pasir Pasang 0.026 M3 212,500.00 5,525.00
JUMLAH HARGA BAHAN 14,348.17
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 66,398.17
E Overhead dan Provit 15 % 9,959.73
F Harga Satuan Pekerjaan (D+E) 76,357.89

Memasang 1 m2 plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.36 OH 100,000.00 36,000.00
Tukang Batu L.02 0.12 OH 120,000.00 14,400.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.018 OH 120,000.00 2,160.00
JUMLAH HARGA TENAGA 54,360.00
B BAHAN
Semen Portland 5.76 Kg 1,702.00 9,803.52
Kapur Pasang 0.003 M3 5,525.00 16.58
Pasir Pasang 0.013 M3 212,500.00 2,762.50
JUMLAH HARGA BAHAN 12,582.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 66,942.60
E Overhead dan Provit 15 % 10,041.39
F Harga Satuan Pekerjaan (D+E) 76,983.98

Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.36 OH 100,000.00 36,000.00
Tukang Batu L.02 0.12 OH 120,000.00 14,400.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.018 OH 120,000.00 2,160.00
JUMLAH HARGA TENAGA 54,360.00
B BAHAN
Semen Portland 3 Kg 1,702.00 5,106.00
Kapur Pasang 0.005 M3 5,525.00 27.63
Pasir Pasang 0.02 M3 212,500.00 4,250.00
JUMLAH HARGA BAHAN 9,383.63
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 63,743.63
E Overhead dan Provit 15 % 9,561.54
F Harga Satuan Pekerjaan (D+E) 73,305.17

memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.36 OH 100,000.00 36,000.00
Tukang Batu L.02 0.12 OH 120,000.00 14,400.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.018 OH 120,000.00 2,160.00
JUMLAH HARGA TENAGA 54,360.00
B BAHAN
Semen Merah 0.009 M3 3,200.00 28.80
Kapur Pasang 0.009 M3 5,525.00 49.73
Pasir Pasang 0.009 M3 212,500.00 1,912.50
JUMLAH HARGA BAHAN 1,991.03
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 56,351.03
E Overhead dan Provit 15 % 8,452.65
F Harga Satuan Pekerjaan (D+E) 64,803.68
Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.36 OH 100,000.00 36,000.00
Tukang Batu L.02 0.12 OH 120,000.00 14,400.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.018 OH 120,000.00 2,160.00
JUMLAH HARGA TENAGA 54,360.00
B BAHAN
Semen Merah 0.007 M3 3,200.00 22.40
Kapur Pasang 0.007 M3 5,525.00 38.68
Pasir Pasang 0.015 M3 212,500.00 3,187.50
JUMLAH HARGA BAHAN 3,248.58
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 57,608.58
E Overhead dan Provit 15 % 8,641.29
F Harga Satuan Pekerjaan (D+E) 66,249.86

Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.4 OH 100,000.00 40,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.022 OH 120,000.00 2,640.00
JUMLAH HARGA TENAGA 69,640.00
B BAHAN
Semen Portland 13.632 Kg 1,702.00 23,201.66
Pasir Pasang 0.027 M3 212,500.00 5,737.50
JUMLAH HARGA BAHAN 28,939.16
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 98,579.16
E Overhead dan Provit 15 % 14,786.87
F Harga Satuan Pekerjaan (D+E) 113,366.04

Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.26 OH 100,000.00 26,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.013 OH 120,000.00 1,560.00
JUMLAH HARGA TENAGA 54,560.00
B BAHAN
Semen Portland 10.368 Kg 1,702.00 17,646.34
Pasir Pasang 0.031 M3 212,500.00 6,587.50
JUMLAH HARGA BAHAN 24,233.84
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 78,793.84
E Overhead dan Provit 15 % 11,819.08
F Harga Satuan Pekerjaan (D+E) 90,612.91

Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.4 OH 100,000.00 40,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.022 OH 120,000.00 2,640.00
JUMLAH HARGA TENAGA 69,640.00
B BAHAN
Semen Portland 8.32 Kg 1,702.00 14,160.64
Pasir Pasang 0.032 M3 212,500.00 6,800.00
JUMLAH HARGA BAHAN 20,960.64
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 90,600.64
E Overhead dan Provit 15 % 13,590.10
F Harga Satuan Pekerjaan (D+E) 104,190.74

Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.4 OH 100,000.00 40,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.022 OH 120,000.00 2,640.00
JUMLAH HARGA TENAGA 69,640.00
B BAHAN
Semen Portland 6.912 Kg 1,702.00 11,764.22
Pasir Pasang 0.035 M3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 19,201.72
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 88,841.72
E Overhead dan Provit 15 % 13,326.26
F Harga Satuan Pekerjaan (D+E) 102,167.98

Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.4 OH 100,000.00 40,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.022 OH 120,000.00 2,640.00
JUMLAH HARGA TENAGA 69,640.00
B BAHAN
Semen Portland 5.888 Kg 1,702.00 10,021.38
Pasir Pasang 0.036 M3 212,500.00 7,650.00
JUMLAH HARGA BAHAN 17,671.38
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 87,311.38
E Overhead dan Provit 15 % 13,096.71
F Harga Satuan Pekerjaan (D+E) 100,408.08

Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.44 OH 100,000.00 44,000.00
Tukang Batu L.02 0.22 OH 120,000.00 26,400.00
Kepala Tukang L.03 0.022 OH 150,000.00 3,300.00
Mandor L.04 0.022 OH 120,000.00 2,640.00
JUMLAH HARGA TENAGA 76,340.00
B BAHAN
Semen Merah 0.009 M3 3,200.00 28.80
Kapur Pasang 0.009 M3 5,525.00 49.73
Pasir Pasang 0.018 M3 212,500.00 3,825.00
JUMLAH HARGA BAHAN 3,903.53
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 80,243.53
E Overhead dan Provit 15 % 12,036.53
F Harga Satuan Pekerjaan (D+E) 92,280.05

Memasang 1 m2 acian
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 100,000.00 10,000.00
Tukang Batu L.02 0.050 OH 120,000.00 6,000.00
Kepala Tukang L.03 0.005 OH 150,000.00 750.00
Mandor L.04 0.005 OH 120,000.00 600.00
JUMLAH HARGA TENAGA 17,350.00
B BAHAN
Semen Portland 3.25 kg 1,702.00 5,531.50
-
JUMLAH HARGA BAHAN 5,531.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,881.50
E Overhead dan Provit 15 % 3,432.23
F Harga Satuan Pekerjaan (D+E) 26,313.73
ANALISA HARGA SATUAN
PEKERJAAN PENUTUP LANTAI DAN DINDING

Memasang 1 m2 lantai keramik ukuran (20 x 20) cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 100,000.00 70,000.00
Tukang Batu L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.035 OH 120,000.00 4,200.00
JUMLAH HARGA TENAGA 121,450.00
B BAHAN
Ubin Keramik 20 x 20 cm 26.5 Bh 2,600.00 68,900.00
Semen Portland 10.4 Kg 1,702.00 17,700.80
Semen Warna 1.62 Kg 3,200.00 5,184.00
Pasir Pasang 0.045 M3 212,500.00 9,562.50
JUMLAH HARGA BAHAN 101,347.30
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 222,797.30
E Overhead dan Provit 15 % 33,419.60
F Harga Satuan Pekerjaan (D+E) 256,216.90

Memasang 1 m2 lantai keramik mosaik ukuran (30 x 30) cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 100,000.00 70,000.00
Tukang Batu L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.035 OH 120,000.00 4,200.00
JUMLAH HARGA TENAGA 121,450.00
B BAHAN
Mosaik 30 x 30 cm 11.87 Bh 7,295.85 86,601.74
Semen Portland 14.15 Kg 1,702.00 24,083.30
Semen Warna 2 Kg 3,200.00 6,400.00
Pasir Pasang 0.039 M3 212,500.00 8,287.50
JUMLAH HARGA BAHAN 125,372.54
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 246,822.54
E Overhead dan Provit 15 % 37,023.38
F Harga Satuan Pekerjaan (D+E) 283,845.92

Memasang 1 m’ plint keramik ukuran (10 x 20) cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.09 OH 100,000.00 9,000.00
Tukang Batu L.02 0.09 OH 120,000.00 10,800.00
Kepala Tukang L.03 0.009 OH 150,000.00 1,350.00
Mandor L.04 0.005 OH 120,000.00 600.00
JUMLAH HARGA TENAGA 21,750.00
B BAHAN
Plint Keramik Artistik 10 x 20 cm 5.3 Bh - -
Semen Portland 1.14 Kg 1,702.00 1,940.28
Semen Warna 0.025 Kg 3,200.00 80.00
Pasir Pasang 0.003 M3 212,500.00 637.50
JUMLAH HARGA BAHAN 2,657.78
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 24,407.78
E Overhead dan Provit 15 % 3,661.17
F Harga Satuan Pekerjaan (D+E) 28,068.95
Memasang 1 m2 dinding keramik ukuran (20 x 25) cm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.9 OH 100,000.00 90,000.00
Tukang Batu L.02 0.45 OH 120,000.00 54,000.00
Kepala Tukang L.03 0.045 OH 150,000.00 6,750.00
Mandor L.04 0.045 OH 120,000.00 5,400.00
JUMLAH HARGA TENAGA 156,150.00
B BAHAN
Keramik Warna 20 x 25 cm 15.16 Bh 4,567.50 69,243.30
Semen Abu-abu 9.3 Kg 3,200.00 29,760.00
Pasir Pasang 0.018 M3 212,500.00 3,825.00
Semen Warna 1.94 Kg 3,200.00 6,208.00
JUMLAH HARGA BAHAN 109,036.30
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 265,186.30
E Overhead dan Provit 15 % 39,777.95
F Harga Satuan Pekerjaan (D+E) 304,964.25

Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 1 OH 100,000.00 100,000.00
Tukang Batu L.02 0.5 OH 120,000.00 60,000.00
Kepala Tukang L.03 0.05 OH 150,000.00 7,500.00
Mandor L.04 0.05 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 173,500.00
B BAHAN
Bata Pelapis Dinding 63 Bh 1,000.00 63,000.00
Semen Portland 12.44 Kg 1,702.00 21,172.88
Pasir Pasang 0.025 M3 212,500.00 5,312.50
Semen Warna 2.75 Kg 3,200.00 8,800.00
JUMLAH HARGA BAHAN 98,285.38
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 271,785.38
E Overhead dan Provit 15 % 40,767.81
F Harga Satuan Pekerjaan (D+E) 312,553.19

Memasang 1 m2 dinding batu paras


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 100,000.00 70,000.00
Tukang Batu L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.035 OH 120,000.00 4,200.00
JUMLAH HARGA TENAGA 121,450.00
B BAHAN
Bata Poros 1.1 M2 - -
Semen Portland 11.75 Kg 1,702.00 19,998.50
Pasir Pasang 0.035 M3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 27,436.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 148,886.00
E Overhead dan Provit 15 % 22,332.90
F Harga Satuan Pekerjaan (D+E) 171,218.90
Memasang 1 m2 dinding batu tempel hitam
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 100,000.00 70,000.00
Tukang L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.035 OH 120,000.00 4,200.00
JUMLAH HARGA TENAGA 121,450.00
B BAHAN
Bata Tempel Hitam 1.1 M2 21,061.50 23,167.65
Semen Portland 11.75 Kg 1,702.00 19,998.50
Pasir Pasang 0.035 M3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 50,603.65
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 172,053.65
E Overhead dan Provit 15 % 25,808.05
F Harga Satuan Pekerjaan (D+E) 197,861.70

Memasang 1 m’ plint kayu tebal 2 Cm, Lebar 10 Cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.12 OH 100,000.00 12,000.00
Tukang Kayu L.02 0.12 OH 120,000.00 14,400.00
Kepala Tukang L.03 0.012 OH 150,000.00 1,800.00
Mandor L.04 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 28,920.00
B BAHAN
Papan kayu kelas I 0.003 M3 2,762,469.00 8,287.41
Paku Sekrup 0.05 kg 35,750.00 1,787.50
JUMLAH HARGA BAHAN 10,074.91
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 38,994.91
E Overhead dan Provit 15 % 5,849.24
F Harga Satuan Pekerjaan (D+E) 44,844.14

Memasang 1 m2 lantai keramik ukuran (40 x 40) cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 100,000.00 70,000.00
Tukang Batu L.02 0.35 OH 120,000.00 42,000.00
Kepala Tukang L.03 0.035 OH 150,000.00 5,250.00
Mandor L.04 0.035 OH 120,000.00 4,200.00
JUMLAH HARGA TENAGA 121,450.00
B BAHAN
Keramik warna 40 x 40 cm 6.63 Bh 14,698.00 97,447.74
Semen Portland 9.8 Kg 1,702.00 16,679.60
Pasir Pasang 0.045 M3 212,500.00 9,562.50
Semen Warna 1.5 Kg 3,200.00 4,800.00
JUMLAH HARGA BAHAN 128,489.84
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 249,939.84
E Overhead dan Provit 15 % 37,490.98
F Harga Satuan Pekerjaan (D+E) 287,430.82
ANALISA HARGA SATUAN
PEKERJAAN KAYU

1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 7 OH 100,000 700,000.00
Tukang Kayu 21 OH 120,000 2,520,000.00
Kepala Tukang 2.1 OH 150,000 315,000.00
Mandor 0.35 OH 120,000 42,000.00
JUMLAH HARGA TENAGA 3,577,000.00
B BAHAN
Balok kayu kelas I 1.1 M3 2,762,469 3,038,715.90
Paku 10 cm 1.25 Kg 19,820 24,775.00
Lem Kayu 1 Kg 10,000 10,000.00
JUMLAH HARGA BAHAN 3,073,490.90
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,650,490.90
E Overhead dan Provit 15 % 997,573.64
F Harga Satuan Pekerjaan (D+E) 7,648,064.54

2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 6 OH 100,000 600,000.00
Tukang Kayu 18 OH 120,000 2,160,000.00
Kepala Tukang 1.8 OH 150,000 270,000.00
Mandor 0.3 OH 120,000 36,000.00
JUMLAH HARGA TENAGA 3,066,000.00
B BAHAN
Balok kayu kelas II 1.2 M3 1,875,438 2,250,525.60
Paku 10 cm 1.25 Kg 19,820 24,775.00
Lem Kayu 1 Kg 10,000 10,000.00
JUMLAH HARGA BAHAN 2,285,300.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 5,351,300.60
E Overhead dan Provit 15 % 802,695.09
F Harga Satuan Pekerjaan (D+E) 6,153,995.69

6 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 100,000 100,000.00
Tukang Kayu 3 OH 120,000 360,000.00
Kepala Tukang 0.3 OH 150,000 45,000.00
Mandor 0.05 OH 120,000 6,000.00
JUMLAH HARGA TENAGA 511,000.00
B BAHAN
Papan kayu kelas I 0.04 M3 2,762,469 110,498.76
Lem Kayu 0.5 kg 10,000 5,000.00
JUMLAH HARGA BAHAN 115,498.76
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 626,498.76
E Overhead dan Provit 15 % 93,974.81
F Harga Satuan Pekerjaan (D+E) 720,473.57

7 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 100,000 100,000.00
Tukang Kayu 3 OH 120,000 360,000.00
Kepala Tukang 0.3 OH 150,000 45,000.00
Mandor 0.05 OH 120,000 6,000.00
JUMLAH HARGA TENAGA 511,000.00
B BAHAN
Papan kayu kelas II 0.04 M3 1,875,438 75,017.52
Lem Kayu 0.5 kg 10,000 5,000.00
JUMLAH HARGA BAHAN 80,017.52
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 591,017.52
E Overhead dan Provit 15 % 88,652.63
F Harga Satuan Pekerjaan (D+E) 679,670.15

8 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 100,000 80,000.00
Tukang Kayu 2.4 OH 120,000 288,000.00
Kepala Tukang 0.24 OH 150,000 36,000.00
Mandor 0.04 OH 120,000 4,800.00
JUMLAH HARGA TENAGA 408,800.00
B BAHAN
Papan kayu kelas I 0.024 M3 2,762,469 66,299.26
Lem Kayu 0.3 kg 10,000 3,000.00
JUMLAH HARGA BAHAN 69,299.26
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 478,099.26
E Overhead dan Provit 15 % 71,714.89
F Harga Satuan Pekerjaan (D+E) 549,814.14

9 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 100,000 80,000.00
Tukang Kayu 2.4 OH 120,000 288,000.00
Kepala Tukang 0.24 OH 150,000 36,000.00
Mandor 0.04 OH 120,000 4,800.00
JUMLAH HARGA TENAGA 408,800.00
B BAHAN
Papan kayu kelas II 0.024 M3 1,875,438 45,010.51
Lem Kayu 0.3 kg 10,000 3,000.00
JUMLAH HARGA BAHAN 48,010.51
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 456,810.51
E Overhead dan Provit 15 % 68,521.58
F Harga Satuan Pekerjaan (D+E) 525,332.09

14 Memasang 1 m2 jalusi kusen, kayu kelas I SNI 3434 : 2008


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.67 OH 100,000 67,000.00
Tukang Kayu 2 OH 120,000 240,000.00
Kepala Tukang 0.2 OH 150,000 30,000.00
Mandor 0.335 OH 120,000 40,200.00
JUMLAH HARGA TENAGA 377,200.00
B BAHAN
Papan kayu kelas I 0.06 M3 2,762,469 165,748.14
Paku 1 - 2,5 cm 0.15 kg 15,000 2,250.00
JUMLAH HARGA BAHAN 167,998.14
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 545,198.14
E Overhead dan Provit 15 % 81,779.72
F Harga Satuan Pekerjaan (D+E) 626,977.86

15 Memasang 1 m2 jalusi kusen, kayu kelas II SNI 3434 : 2008


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.67 OH 100,000 67,000.00
Tukang Kayu 2 OH 120,000 240,000.00
Kepala Tukang 0.2 OH 150,000 30,000.00
Mandor 0.335 OH 120,000 40,200.00
JUMLAH HARGA TENAGA 377,200.00
B BAHAN
Papan kayu kelas II 0.06 M3 1,875,438 112,526.28
Paku 1 - 2,5 cm 0.15 kg 15,000 2,250.00
JUMLAH HARGA BAHAN 114,776.28
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 491,976.28
E Overhead dan Provit 15 % 73,796.44
F Harga Satuan Pekerjaan (D+E) 565,772.72

30 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
Papan kayu kelas I 0.0108 M3 2,762,469 29,834.67
Paku 5 dan 7 cm 0.1 kg 19,820 1,982.00
JUMLAH HARGA BAHAN 31,816.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 69,416.67
E Overhead dan Provit 15 % 10,412.50
F Harga Satuan Pekerjaan (D+E) 79,829.16

31 Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
-
Papan kayu kelas II 0.0108 M3 1,875,438 20,254.73
Paku 5 dan 7 cm 0.1 kg 19,820 1,982.00
-
JUMLAH HARGA BAHAN 22,236.73
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 59,836.73
E Overhead dan Provit 15 % 8,975.51
F Harga Satuan Pekerjaan (D+E) 68,812.24

32 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
Papan kayu kelas I 0.011 M3 2,762,469 30,387.16
Paku 5 dan 7 cm 0.05 kg 19,820 991.00
JUMLAH HARGA BAHAN 31,378.16
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 68,978.16
E Overhead dan Provit 15 % 10,346.72
F Harga Satuan Pekerjaan (D+E) 79,324.88
ANALISA HARGA SATUAN
PEKERJAAN LANGIT-LANGIT

Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm SNI 2839 : 2008
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100000 10,000.00
Tukang Kayu 0.1 OH 120000 12,000.00
Kepala Tukang 0.01 OH 150000 1,500.00
Mandor 0.005 OH 120000 600.00
JUMLAH HARGA TENAGA 24,100.00
B BAHAN
Triplex 3 mm (122x244 Cm) 0.375 Lembar 70,450.00 26,418.75
Paku tripleks 0.03 kg 46,750.00 1,402.50
JUMLAH HARGA BAHAN 27,821.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 51,921.25
E Overhead dan Provit 15 % 7,788.19
F Harga Satuan Pekerjaan (D+E) 59,709.44

Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 100000 80,000.00
Tukang Kayu 0.8 OH 120000 96,000.00
Kepala Tukang 0.08 OH 150000 12,000.00
Mandor 0.04 OH 120000 4,800.00
JUMLAH HARGA TENAGA 192,800.00
B BAHAN
Papan kayu kelas I 0.015 m3 2,762,469.00 41,437.04
Paku tripleks 0.01 kg 46,750.00 467.50
JUMLAH HARGA BAHAN 41,904.54
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 234,704.54
E Overhead dan Provit 15 % 35,205.68
F Harga Satuan Pekerjaan (D+E) 269,910.22

Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100000 10,000.00
Tukang Kayu 0.05 OH 120000 6,000.00
Kepala Tukang 0.005 OH 150000 750.00
Mandor 0.005 OH 120000 600.00
JUMLAH HARGA TENAGA 17,350.00
B BAHAN
Gypsum Board (120x240x9) mm 0.364 Lembar 96,838.00 35,249.03
Paku Sekrup 0.11 kg 35,750.00 3,932.50
JUMLAH HARGA BAHAN 39,181.53
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 56,531.53
E Overhead dan Provit 15 % 8,479.73
F Harga Satuan Pekerjaan (D+E) 65,011.26

Memasang 1 m’ list plafond gysum profil SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.06 OH 100000 6,000.00
Tukang Kayu 0.06 OH 120000 7,200.00
Kepala Tukang 0.006 OH 150000 900.00
Mandor 0.003 OH 120000 360.00
JUMLAH HARGA TENAGA 14,460.00
B BAHAN
List gypsum profil 10/10 cm 1.05 m’ 35,000.00 36,750.00
Tepung gypsum 0.15 kg 17,000.00 2,550.00
JUMLAH HARGA BAHAN 39,300.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 53,760.00
E Overhead dan Provit 15 % 8,064.00
F Harga Satuan Pekerjaan (D+E) 61,824.00

Memasang 1 m’ list langit-langit Gypsum profil SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.05 OH 100000 5,000.00
Tukang Kayu 0.05 OH 120000 6,000.00
Kepala Tukang 0.005 OH 150000 750.00
Mandor 0.003 OH 120000 360.00
JUMLAH HARGA TENAGA 12,110.00
B BAHAN
List Gypsum 2/5 1.05 m’ 25,000.00 26,250.00
Tepung gypsum 0.15 kg 17,000.00 2,550.00
JUMLAH HARGA BAHAN 28,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 40,910.00
E Overhead dan Provit 15 % 6,136.50
F Harga Satuan Pekerjaan (D+E) 47,046.50

Memasang 1 m2 langit-langit Kalsiboard ukuran (1200x2400x4) mm SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100000 10,000.00
Tukang Kayu 0.05 OH 120000 6,000.00
Kepala Tukang 0.005 OH 150000 750.00
Mandor 0.005 OH 120000 600.00
JUMLAH HARGA TENAGA 17,350.00
B BAHAN
Kalsiboard (120x240x4)mm 0.364 Lembar 80,570.00 29,327.48
Paku Sekrup 0.11 kg 35,750.00 3,932.50
JUMLAH HARGA BAHAN 33,259.98
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 50,609.98
E Overhead dan Provit 15 % 7,591.50
F Harga Satuan Pekerjaan (D+E) 58,201.48

Memasang 1 m’ list plafond gysum profil SNI 2839 : 2008


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.06 OH 100000 6,000.00
Tukang Kayu 0.06 OH 120000 7,200.00
Kepala Tukang 0.006 OH 150000 900.00
Mandor 0.003 OH 120000 360.00
JUMLAH HARGA TENAGA 14,460.00
B BAHAN
List gypsum profil 12/12 cm 1.05 m’ 65,000.00 68,250.00
Tepung gypsum 0.15 kg 17,000.00 2,550.00
JUMLAH HARGA BAHAN 70,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 85,260.00
E Overhead dan Provit 15 % 12,789.00
F Harga Satuan Pekerjaan (D+E) 98,049.00
ANALISA HARGA SATUAN
PEKERJAAN PENUTUP ATAP

6.1. 1 m2 Pasang Atap Genteng Palentong Kecil SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000.00 15,000.00
Tukang Kayu 0.075 OH 120,000.00 9,000.00
Kepala Tukang 0.075 OH 150,000.00 11,250.00
Mandor 0.008 OH 120,000.00 960.00
JUMLAH HARGA TENAGA 36,210.00
B BAHAN
Genteng Palentong 25.000 Bh 2,200.00 55,000.00
-
JUMLAH HARGA BAHAN 55,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 91,210.00
E Overhead dan Provit 15 % 13,681.50
F Harga Satuan Pekerjaan (D+E) 104,891.50

6.38.a 1 m2 Pasang Atap Seng Gelombang Galvalum SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.120 OH 100,000.00 12,000.00
Tukang Kayu 0.060 OH 120,000.00 7,200.00
Kepala Tukang 0.006 OH 150,000.00 900.00
Mandor 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 20,820.00
B BAHAN
Seng Gelombang Galvalum, 0,25 mm 1.120 m2 51,000.00 57,120.00
Paku Seng 0.020 Kg 35,596.00 711.92
JUMLAH HARGA BAHAN 57,831.92
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 78,651.92
E Overhead dan Provit 15 % 11,797.79
F Harga Satuan Pekerjaan (D+E) 90,449.71

6.39. 1 m' Pasang Atap Nok Seng SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000.00 15,000.00
Tukang Kayu 0.070 OH 120,000.00 8,400.00
Kepala Tukang 0.007 OH 150,000.00 1,050.00
Mandor 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 25,170.00
B BAHAN
Seng Plat 3' x 6" Bjls. 28 (50x 180) cm 0.300 Lbr 50,250.00 15,075.00
Paku Seng 0.040 Kg 35,596.00 1,423.84
JUMLAH HARGA BAHAN 16,498.84
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 41,668.84
E Overhead dan Provit 15 % 6,250.33
F Harga Satuan Pekerjaan (D+E) 47,919.17
6.40. 1 m2 Pasang Atap Alluminium SNI 03-3436-1994
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000.00 15,000.00
Tukang Kayu 0.750 OH 120,000.00 90,000.00
Kepala Tukang 0.080 OH 150,000.00 12,000.00
Mandor 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 117,720.00
B BAHAN
Atap Alluminium Gelombang Tebal 0,55 1.050 M2 - -
Paku Hak Panjang 15 cm 0.020 Kg 20,000.00 400.00
JUMLAH HARGA BAHAN 400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 118,120.00
E Overhead dan Provit 15 % 17,718.00
F Harga Satuan Pekerjaan (D+E) 135,838.00

6.41. 1 m2 Pasang Nok Alluminium SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.100 OH 100,000.00 10,000.00
Tukang Kayu 1.000 OH 120,000.00 120,000.00
Kepala Tukang 0.100 OH 150,000.00 15,000.00
Mandor 0.050 OH 120,000.00 6,000.00
JUMLAH HARGA TENAGA 151,000.00
B BAHAN
Nok Standar 40 cm 18, swg 22 1.200 M2 - -
Paku Hak Panjang 15 cm 0.040 Kg 20,000.00 800.00
JUMLAH HARGA BAHAN 800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 151,800.00
E Overhead dan Provit 15 % 22,770.00
F Harga Satuan Pekerjaan (D+E) 174,570.00

6.42. 1 m2 Pasang Alluminium Foil / Sisalation SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000.00 15,000.00
Tukang Kayu 0.050 OH 120,000.00 6,000.00
Kepala Tukang 0.005 OH 150,000.00 750.00
Mandor 0.008 OH 120,000.00 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Sisalation/Alluminium Foil 1.050 M2 - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,710.00
E Overhead dan Provit 15 % 3,406.50
F Harga Satuan Pekerjaan (D+E) 26,116.50
6.38.a 1 m2 Pasang Atap Metal Soka Abadi SNI 03-3436-1994
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.120 OH 100,000.00 12,000.00
Tukang Kayu 0.060 OH 120,000.00 7,200.00
Kepala Tukang 0.006 OH 150,000.00 900.00
Mandor 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 20,820.00
B BAHAN
Atap Metal Soka 0.700 m2 80,801.00 56,560.70
Paku Seng Soka 0.020 Kg 35,596.00 711.92
JUMLAH HARGA BAHAN 57,272.62
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 78,092.62
E Overhead dan Provit 15 % 11,713.89
F Harga Satuan Pekerjaan (D+E) 89,806.51

6.39. 1 m' Pasang Atap Nok Seng soka SNI 03-3436-1994


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000.00 15,000.00
Tukang Kayu 0.070 OH 120,000.00 8,400.00
Kepala Tukang 0.007 OH 150,000.00 1,050.00
Mandor 0.006 OH 120,000.00 720.00
JUMLAH HARGA TENAGA 25,170.00
B BAHAN
Nok Mertal Soka 0.300 Lbr 51,200.00 15,360.00
Paku Seng 0.040 Kg 35,596.00 1,423.84
JUMLAH HARGA BAHAN 16,783.84
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 41,953.84
E Overhead dan Provit 15 % 6,293.08
F Harga Satuan Pekerjaan (D+E) 48,246.92
ANALISA HARGA SATUAN
PEKERJAAN SANITASI

1 Memasang 1 Buah Kloset Duduk / Monoblok RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 3.300 OH 100,000 330,000.00
Tukang Batu 1.100 OH 120,000 132,000.00
Kepala Tukang 0.010 OH 150,000 1,500.00
Mandor 0.1600 OH 120,000 19,200.00
JUMLAH HARGA TENAGA 482,700.00
B BAHAN
Kloset Duduk Porselen (lengkap) 1.000 Bh 2,997,000 2,997,000.00
Perlengkapan 6% x Harga Kloset 179,820.00
JUMLAH HARGA BAHAN 3,176,820.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,659,520.00
E Overhead dan Provit 15 % 548,928.00
F Harga Satuan Pekerjaan (D+E) 4,208,448.00

2 Memasang 1 Buah Kloset Jongkok Porselen RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 1.000 OH 100,000 100,000.00
Tukang Batu 1.500 OH 120,000 180,000.00
Kepala Tukang 0.150 OH 150,000 22,500.00
Mandor 0.1600 OH 120,000 19,200.00
JUMLAH HARGA TENAGA 321,700.00
B BAHAN
Kloset Jongkok Porselen 1.000 Bh 203,000 203,000.00
Semen Portland 6.000 Kg 1,702 10,212.00
Pasir Pasang 0.010 M3 212,500 2,125.00
JUMLAH HARGA BAHAN 215,337.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 537,037.00
E Overhead dan Provit 15 % 80,555.55
F Harga Satuan Pekerjaan (D+E) 617,592.55

3 Memasang 1 Buah Wastafel RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 1.200 OH 100,000 120,000.00
Tukang Batu 1.450 OH 120,000 174,000.00
Kepala Tukang 0.150 OH 150,000 22,500.00
Mandor 0.060 OH 120,000 7,200.00
JUMLAH HARGA TENAGA 323,700.00
B BAHAN
Wastafel 1.200 Bh 463,333 555,999.60
Perlengkapan 12% x Harga Wastafel 66,719.95
Semen Portland 6.000 Kg 1,702 10,212.00
Pasir Pasang 0.010 M3 212,500 2,125.00
JUMLAH HARGA BAHAN 635,056.55
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 958,756.55
E Overhead dan Provit 15 % 143,813.48
F Harga Satuan Pekerjaan (D+E) 1,102,570.03

5 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 M3 RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 1.800 OH 100,000 180,000.00
Tukang Batu 2.700 OH 120,000 324,000.00
Kepala Tukang 0.540 OH 150,000 81,000.00
Mandor 0.110 OH 120,000 13,200.00
JUMLAH HARGA TENAGA 598,200.00
B BAHAN
Bak Fibreglass 1.000 Bh 175,000 175,000.00
Perlengkapan 12% x Harga Bak 21,000.00
JUMLAH HARGA BAHAN 196,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 794,200.00
E Overhead dan Provit 15 % 119,130.00
F Harga Satuan Pekerjaan (D+E) 913,330.00

10 Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.300 OH 100,000 30,000.00
Tukang Batu 0.450 OH 120,000 54,000.00
Kepala Tukang 0.045 OH 150,000 6,750.00
Mandor 0.015 OH 120,000 1,800.00
JUMLAH HARGA TENAGA 92,550.00
B BAHAN
Bak Fibreglass 1.000 Bh 175,000 175,000.00
Perlengkapan 12% x Harga Bak 21,000.00
-
JUMLAH HARGA BAHAN 196,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 288,550.00
E Overhead dan Provit 15 % 43,282.50
F Harga Satuan Pekerjaan (D+E) 331,832.50

19 Memasang 1 Buah Kran Diameter 3/4" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.010 OH 100,000 1,000.00
Tukang Batu 0.400 OH 120,000 48,000.00
Kepala Tukang 0.040 OH 150,000 6,000.00
Mandor 0.0050 OH 120,000 600.00
JUMLAH HARGA TENAGA 55,600.00
B BAHAN
Kran Air 3/4" 1.000 Bh 15,750 15,750.00
Seal Tape 0.025 Bh 5,000 125.00
JUMLAH HARGA BAHAN 15,875.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 71,475.00
E Overhead dan Provit 15 % 10,721.25
F Harga Satuan Pekerjaan (D+E) 82,196.25

20 Memasang 1 Buah Kran Diameter 1/2" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.010 OH 100,000 1,000.00
Tukang Batu 0.400 OH 120,000 48,000.00
Kepala Tukang 0.040 OH 150,000 6,000.00
Mandor 0.0050 OH 120,000 600.00
JUMLAH HARGA TENAGA 55,600.00
B BAHAN
Kran Air1/2" 1.000 Bh 12,500 12,500.00
Seal Tape 0.025 Bh 5,000 125.00
JUMLAH HARGA BAHAN 12,625.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 68,225.00
E Overhead dan Provit 15 % 10,233.75
F Harga Satuan Pekerjaan (D+E) 78,458.75

26 Memasang 1 M' Tipe AW Diameter 1/2" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.036 OH 100,000 3,600.00
Tukang Batu 0.060 OH 120,000 7,200.00
Kepala Tukang 0.006 OH 150,000 900.00
Mandor 0.002 OH 120,000 240.00
JUMLAH HARGA TENAGA 11,940.00
B BAHAN
Pipa PVC Tipe AW Diameter 1/2" 1.200 M' 8,748 10,497.90
Perlengkapan 35% x Harga Pipa 3,674.27
JUMLAH HARGA BAHAN 14,172.17
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 26,112.17
E Overhead dan Provit 15 % 3,916.82
F Harga Satuan Pekerjaan (D+E) 30,028.99

27 Memasang 1 M' Tipe AW Diameter 3/4" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.036 OH 100,000 3,600.00
Tukang Batu 0.060 OH 120,000 7,200.00
Kepala Tukang 0.006 OH 150,000 900.00
Mandor 0.002 OH 120,000 240.00
JUMLAH HARGA TENAGA 11,940.00
B BAHAN
Pipa PVC Tipe AW Diameter 3/4" 1.200 M' 10,004 12,005.10
Perlengkapan 35% x Harga Pipa 4,201.79
JUMLAH HARGA BAHAN 16,206.89
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 28,146.89
E Overhead dan Provit 15 % 4,222.03
F Harga Satuan Pekerjaan (D+E) 32,368.92
28 Memasang 1 M Tipe AW Diameter 1" RSNIT 15-2002
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.036 OH 100,000 3,600.00
Tukang Batu 0.060 OH 120,000 7,200.00
Kepala Tukang 0.006 OH 150,000 900.00
Mandor 0.002 OH 120,000 240.00
JUMLAH HARGA TENAGA 11,940.00
B BAHAN
Pipa PVC Tipe AW Diameter 1" 1.200 M' 11,563 13,875.00
Perlengkapan 35% x Harga Pipa 4,856.25
JUMLAH HARGA BAHAN 18,731.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 30,671.25
E Overhead dan Provit 15 % 4,600.69
F Harga Satuan Pekerjaan (D+E) 35,271.94

29 Memasang 1 M' Tipe AW Diameter 1 1/2" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.054 OH 100,000 5,400.00
Tukang Batu 0.090 OH 120,000 10,800.00
Kepala Tukang 0.009 OH 150,000 1,350.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 17,910.00
B BAHAN
Pipa PVC Tipe AW Diameter 1 1/2" 1.200 M' 18,942 22,730.10
Perlengkapan 35% x Harga Pipa 7,955.54
JUMLAH HARGA BAHAN 30,685.64
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 48,595.64
E Overhead dan Provit 15 % 7,289.35
F Harga Satuan Pekerjaan (D+E) 55,884.98

30 Memasang 1 M' Tipe AW Diameter 2" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.054 OH 100,000 5,400.00
Tukang Batu 0.090 OH 120,000 10,800.00
Kepala Tukang 0.009 OH 150,000 1,350.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 17,910.00
B BAHAN
Pipa PVC Tipe AW Diameter 2" 1.200 M' 26,504 31,805.10
Perlengkapan 35% x Harga Pipa 11,131.79
JUMLAH HARGA BAHAN 42,936.89
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 60,846.89
E Overhead dan Provit 15 % 9,127.03
F Harga Satuan Pekerjaan (D+E) 69,973.92

31 Memasang 1 M' Tipe AW Diameter 2 1/2" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.081 OH 100,000 8,100.00
Tukang Batu 0.135 OH 120,000 16,200.00
Kepala Tukang 0.014 OH 150,000 2,025.00
Mandor 0.004 OH 120,000 480.00
JUMLAH HARGA TENAGA 26,805.00
B BAHAN
Pipa PVC Tipe AW Diameter 2 1/2" 1.200 M' 34,250 41,100.00
Perlengkapan 35% x Harga Pipa 14,385.00
JUMLAH HARGA BAHAN 55,485.00
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 82,290.00
E Overhead dan Provit 15 % 12,343.50
F Harga Satuan Pekerjaan (D+E) 94,633.50

32 Memasang 1 M' Tipe AW Diameter 3" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.081 OH 100,000 8,100.00
Tukang Batu 0.135 OH 120,000 16,200.00
Kepala Tukang 0.0135 OH 150,000 2,025.00
Mandor 0.004 OH 120,000 480.00
JUMLAH HARGA TENAGA 26,805.00
B BAHAN
Pipa PVC Tipe AW Diameter 3" 1.200 M' 43,050 51,660.00
Perlengkapan 35% x Harga Pipa 18,081.00
JUMLAH HARGA BAHAN 69,741.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 96,546.00
E Overhead dan Provit 15 % 14,481.90
F Harga Satuan Pekerjaan (D+E) 111,027.90

33 Memasang 1 M' Tipe AW Diameter 4" RSNIT 15-2002


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.081 OH 100,000 8,100.00
Tukang Batu 0.135 OH 120,000 16,200.00
Kepala Tukang 0.0135 OH 150,000 2,025.00
Mandor 0.0041 OH 120,000 492.00
JUMLAH HARGA TENAGA 26,817.00
B BAHAN
Pipa PVC Tipe AW Diameter 4" 1.200 M' 70,917 85,100.10
Perlengkapan 35% x Harga Pipa 29,785.04
JUMLAH HARGA BAHAN 114,885.14
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 141,702.14
E Overhead dan Provit 15 % 21,255.32
F Harga Satuan Pekerjaan (D+E) 162,957.46

34 Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm RSNIT 15-2002
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.080 OH 100,000 8,000.00
Tukang Batu 0.040 OH 120,000 4,800.00
Kepala Tukang 0.004 OH 150,000 600.00
Mandor 0.004 OH 120,000 480.00
JUMLAH HARGA TENAGA 13,880.00
B BAHAN
Pipa Tanah 1.600 Bh - -
Semen Portland 35.000 Kg 1,702 59,570.00
Pasir Pasang 0.014 M3 212,500 2,975.00
Pasir Urug 0.014 M3 212,500 2,975.00
JUMLAH HARGA BAHAN 65,520.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 79,400.00
E Overhead dan Provit 15 % 11,910.00
F Harga Satuan Pekerjaan (D+E) 91,310.00

35 Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm RSNIT 15-2002
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.060 OH 100,000 6,000.00
Tukang Batu 0.030 OH 120,000 3,600.00
Kepala Tukang 0.003 OH 150,000 450.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,410.00
B BAHAN
Pipa Tanah 1.600 Bh - -
Semen Portland 0.680 Kg 1,702 1,157.36
Pasir Pasang 0.013 M3 212,500 2,762.50
Pasir Urug 0.011 M3 212,500 2,337.50
JUMLAH HARGA BAHAN 6,257.36
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 16,667.36
E Overhead dan Provit 15 % 2,500.10
F Harga Satuan Pekerjaan (D+E) 19,167.46
ANALISA HARGA SATUAN
PEKERJAAN KUNCI DAN KACA

6.1. 1 Buah Pasang Kunci Tanam Antik


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.060 OH 100,000 6,000.00
Tukang Kayu 0.600 OH 120,000 72,000.00
Kepala Tukang 0.060 OH 150,000 9,000.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 87,360.00
B BAHAN
Kunci Tanam Antik 1.000 Bh 203,000 203,000.00
-
JUMLAH HARGA BAHAN 203,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 290,360.00
E Overhead dan Provit 15 % 43,554.00
F Harga Satuan Pekerjaan (D+E) 333,914.00

6.2. 1 Buah Pasang Kunci Tanam Biasa


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 100,000 1,000.00
Tukang Kayu 0.500 OH 120,000 60,000.00
Kepala Tukang 0.050 OH 150,000 7,500.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 69,100.00
B BAHAN
Kunci Tanam Biasa 1.000 Bh 150,100 150,100.00
-
JUMLAH HARGA BAHAN 150,100.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 219,200.00
E Overhead dan Provit 15 % 32,880.00
F Harga Satuan Pekerjaan (D+E) 252,080.00

6.3. 1 Buah Pasang Kunci Tanam Kamar Mandi


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.005 OH 100,000 500.00
Tukang Kayu 0.500 OH 120,000 60,000.00
Kepala Tukang 0.050 OH 150,000 7,500.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 68,360.00
B BAHAN
-
Kunci Tanam Kamar Mandi 1.000 Bh 203,000 203,000.00
-
JUMLAH HARGA BAHAN 203,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 271,360.00
E Overhead dan Provit 15 % 40,704.00
F Harga Satuan Pekerjaan (D+E) 312,064.00
6.4. 1 Buah Pasang Kunci Silinder
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.005 OH 100,000 500.00
Tukang Kayu 0.500 OH 120,000 60,000.00
Kepala Tukang 0.050 OH 150,000 7,500.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 68,360.00
B BAHAN
Kunci Silinder 1.000 Bh - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 68,360.00
E Overhead dan Provit 15 % 10,254.00
F Harga Satuan Pekerjaan (D+E) 78,614.00

6.5. 1 Buah Pasang Engsel Pintu


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.0008 OH 120,000 96.00
JUMLAH HARGA TENAGA 21,846.00
B BAHAN
Engsel Pintu 1.000 Bh 20,533 20,533.00
-
JUMLAH HARGA BAHAN 20,533.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 42,379.00
E Overhead dan Provit 15 % 6,356.85
F Harga Satuan Pekerjaan (D+E) 48,735.85

6.6. 1 Buah Pasang Engsel Jendela Kupu-Kupu


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 100,000 1,000.00
Tukang Kayu 0.100 OH 120,000 12,000.00
Kepala Tukang 0.010 OH 150,000 1,500.00
Mandor 0.0005 OH 120,000 60.00
JUMLAH HARGA TENAGA 14,560.00
B BAHAN
Engsel Jendela 1.000 Bh 20,533 20,533.00
-
JUMLAH HARGA BAHAN 20,533.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 35,093.00
E Overhead dan Provit 15 % 5,263.95
F Harga Satuan Pekerjaan (D+E) 40,356.95
6.9. 1 Buah Pasang Kait Angin
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.008 OH 120,000 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Kait Angin 1.000 Bh 15,400 15,400.00
-
JUMLAH HARGA BAHAN 15,400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 38,110.00
E Overhead dan Provit 15 % 5,716.50
F Harga Satuan Pekerjaan (D+E) 43,826.50

6.11. 1 Buah Pasang Kunci Selot Pintu


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Kayu 0.200 OH 120,000 24,000.00
Kepala Tukang 0.020 OH 150,000 3,000.00
Mandor 0.001 OH 120,000 120.00
JUMLAH HARGA TENAGA 29,120.00
B BAHAN
Kunci Selot Pintu 1.000 Bh 20,075 20,075.00
-
JUMLAH HARGA BAHAN 20,075.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 49,195.00
E Overhead dan Provit 15 % 7,379.25
F Harga Satuan Pekerjaan (D+E) 56,574.25

6.17. 1 M2 Pasang Kaca, Tebal 5 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.008 OH 120,000 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Kaca Bening 5 mm 1.100 M2 233,109 256,419.90
Sealent 0.050 kg 27,500 1,375.00
JUMLAH HARGA BAHAN 257,794.90
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 280,504.90
E Overhead dan Provit 15 % 42,075.74
F Harga Satuan Pekerjaan (D+E) 322,580.64
6.18. 1 M2 Pasang Kaca, Tebal 8 mm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.017 OH 100,000 1,650.00
Tukang Kayu 0.165 OH 120,000 19,800.00
Kepala Tukang 0.017 OH 150,000 2,475.00
Mandor 0.00080 OH 120,000 96.00
JUMLAH HARGA TENAGA 24,021.00
B BAHAN
Kaca, Tebal 8 mm 1.100 M2 - -
Sealent 0.070 kg 27,500 1,925.00
JUMLAH HARGA BAHAN 1,925.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 25,946.00
E Overhead dan Provit 15 % 3,891.90
F Harga Satuan Pekerjaan (D+E) 29,837.90

6.19. 1 M2 Pasang Kaca Buram, Tebal 12 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.025 OH 100,000 2,500.00
Tukang Kayu 0.250 OH 120,000 30,000.00
Kepala Tukang 0.025 OH 150,000 3,750.00
Mandor 0.00125 OH 120,000 150.00
JUMLAH HARGA TENAGA 36,400.00
B BAHAN
Kaca Buram, Tebal 12 mm 1.100 M2 644,000 708,400.00
Sealent 0.050 Kg 27,500 1,375.00
JUMLAH HARGA BAHAN 709,775.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 746,175.00
E Overhead dan Provit 15 % 111,926.25
F Harga Satuan Pekerjaan (D+E) 858,101.25

6.20. 1 M2 Pasang Kaca Cermin, Tebal 5 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.008 OH 120,000 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Kaca Cermin, Tebal 5 mm 1.100 M2 450,000 495,000.00
-
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 517,710.00
E Overhead dan Provit 15 % 77,656.50
F Harga Satuan Pekerjaan (D+E) 595,366.50

6.11. 1 Buah Pasang Kunci Selot Jendela


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Kayu 0.200 OH 120,000 24,000.00
Kepala Tukang 0.020 OH 150,000 3,000.00
Mandor 0.001 OH 120,000 120.00
JUMLAH HARGA TENAGA 29,120.00
B BAHAN
Kunci Selot Jendela 1.000 Bh 10,000 10,000.00
-
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 39,120.00
E Overhead dan Provit 15 % 5,868.00
F Harga Satuan Pekerjaan (D+E) 44,988.00

6.21. 1 M2 Pasang Kaca Cermin, Tebal 6 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
-
Pekerja 0.015 OH 100,000 1,500.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.00075 OH 120,000 90.00
-
JUMLAH HARGA TENAGA 3,840.00
B BAHAN
-
Kaca Cermin, Tebal 6 mm 1.100 M2 - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,840.00
E Overhead dan Provit 15 % 576.00
F Harga Satuan Pekerjaan (D+E) 4,416.00

6.22. 1 M2 Pasang Kaca Cermin, Tebal 8 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.017 OH 100,000 1,650.00
Tukang Kayu 0.017 OH 120,000 2,040.00
Kepala Tukang 0.017 OH 150,000 2,475.00
Mandor 0.009 OH 120,000 1,080.00
JUMLAH HARGA TENAGA 7,245.00
B BAHAN
-
Kaca Cermin, Tebal 8 mm 1.100 M2 - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 7,245.00
E Overhead dan Provit 15 % 1,086.75
F Harga Satuan Pekerjaan (D+E) 8,331.75

6.23. 1 M2 Pasang Kaca "Wireglass", Tebal 5 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.008 OH 120,000 960.00
JUMLAH HARGA TENAGA 22,710.00
B BAHAN
Kaca Wireglass, Tebal 5 mm 1.100 M2 - -
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,710.00
E Overhead dan Provit 15 % 3,406.50
F Harga Satuan Pekerjaan (D+E) 26,116.50

6.24. 1 M2 Pasang Kaca Patri, Tebal 5 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 100,000 1,500.00
Tukang Kayu 0.150 OH 120,000 18,000.00
Kepala Tukang 0.015 OH 150,000 2,250.00
Mandor 0.004 OH 120,000 480.00
JUMLAH HARGA TENAGA 22,230.00
B BAHAN
Kaca Patri, Tebal 5 mm 1.100 M2 - -
Sealant 0.050 kg
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,230.00
E Overhead dan Provit 15 % 3,334.50
F Harga Satuan Pekerjaan (D+E) 25,564.50
ANALISA HARGA SATUAN
PEKERJAAN PENGECATAN

1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000 15,000.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 15,360.00
B BAHAN
Soda Api 0.050 Kg 100,000 5,000.00
-
JUMLAH HARGA BAHAN 5,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 20,360.00
E Overhead dan Provit 15 % 3,054.00
F Harga Satuan Pekerjaan (D+E) 23,414.00

2 1 m2 Mencuci Bidang Permukaan Tembok yang pernah Di Cat


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000 15,000.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 15,360.00
B BAHAN
Sabun 0.050 Kg 15,000 750.00
-
JUMLAH HARGA BAHAN 750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 16,110.00
E Overhead dan Provit 15 % 2,416.50
F Harga Satuan Pekerjaan (D+E) 18,526.50

3 1 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.150 OH 100,000 15,000.00
Mandor 0.0080 OH 120,000 960.00
JUMLAH HARGA TENAGA 15,960.00
B BAHAN
Sabun 0.050 Kg 15,000 750.00
-
JUMLAH HARGA BAHAN 750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 16,710.00
E Overhead dan Provit 15 % 2,506.50
F Harga Satuan Pekerjaan (D+E) 19,216.50
7 1 m2 Pengecatan Bidang Kayu Lama
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.070 OH 100,000 7,000.00
Tukang Cat 0.075 OH 120,000 9,000.00
Kepala Tukang 0.0075 OH 150,000 1,125.00
Mandor 0.0025 OH 120,000 300.00
JUMLAH HARGA TENAGA 17,425.00
B BAHAN
Plamir / dempul Kayu 0.150 Kg 72,500 10,875.00
Cat Dasar Kayu 0.170 Kg 45,000 7,650.00
Cat Penutup Kayu 0.170 Kg 55,100 9,367.00
JUMLAH HARGA BAHAN 27,892.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 45,317.00
E Overhead dan Provit 15 % 6,797.55
F Harga Satuan Pekerjaan (D+E) 52,114.55

6.8. 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.070 OH 100,000 7,000.00
Tukang Cat 0.009 OH 120,000 1,080.00
Kepala Tukang 0.006 OH 150,000 900.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 9,340.00
B BAHAN
Cat Meni 0.200 Kg 45,000 9,000.00
Plamir / dempul Kayu 0.150 Kg 72,500 10,875.00
Cat Dasar Kayu 0.170 Kg 45,000 7,650.00
Cat Penutup Kayu (2 Kali) 0.260 Kg 55,100 14,326.00
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.030 Kg 25,100 753.00
Ampelas 0.200 Lbr 7,875 1,575.00
JUMLAH HARGA BAHAN 44,434.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 53,774.67
E Overhead dan Provit 15 % 8,066.20
F Harga Satuan Pekerjaan (D+E) 61,840.87

6.9. 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.070 100,000 7,000.00
Tukang Cat 0.105 120,000 12,600.00
Kepala Tukang 0.004 150,000 600.00
Mandor 0.0030 120,000 360.00
-
JUMLAH HARGA TENAGA 20,560.00
B BAHAN
Cat Meni 0.200 Kg 45,000 9,000.00
Plamir / dempul Kayu 0.150 Kg 72,500 10,875.00
Cat Dasar Kayu 0.170 Kg 45,000 7,650.00
Cat Penutup Kayu (3 Kali) 0.350 Kg 55,100 19,285.00
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.030 Kg 25,100 753.00
Ampelas 0.200 Lbr 7,875 1,575.00
JUMLAH HARGA BAHAN 49,393.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 69,953.67
E Overhead dan Provit 15 % 10,493.05
F Harga Satuan Pekerjaan (D+E) 80,446.72

6.13. 1 m2 Pelaburan Bidang Kayu dengan Vernis


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.160 OH 100,000 16,000.00
Tukang Cat 0.160 OH 120,000 19,200.00
Kepala Tukang 0.016 OH 150,000 2,400.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 37,960.00
B BAHAN
Vernis 0.150 Ltr 50,100 7,515.00
Dempul 0.050 Kg 20,100 1,005.00
Ampelas 0.100 Lbr 7,875 787.50
Kuas 0.010 Bh 25,567 255.67
JUMLAH HARGA BAHAN 9,563.17
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 47,523.17
E Overhead dan Provit 15 % 7,128.48
F Harga Satuan Pekerjaan (D+E) 54,651.65

6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Cat 0.063 OH 120,000 7,560.00
Kepala Tukang 0.0063 OH 150,000 945.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,865.00
B BAHAN
Plamir Tembok 0.100 Kg 10,900 1,090.00
Cat Dasar Tembok (standart) 0.100 Kg 23,100 2,310.00
Cat Penutup Tembok (standart) 0.260 Kg 23,100 6,006.00
JUMLAH HARGA BAHAN 9,406.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 20,271.00
E Overhead dan Provit 15 % 3,040.65
F Harga Satuan Pekerjaan (D+E) 23,311.65

6.15. 1 m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.028 OH 100,000 2,800.00
Tukang Cat 0.042 OH 120,000 5,040.00
Kepala Tukang 0.0042 OH 150,000 630.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 8,830.00
B BAHAN
- Cat Dasar Tembok (standart) 0.120 Kg 23,100 2,772.00
- Cat Penutup Tembok (standart) 0.180 Kg 23,100 4,158.00
JUMLAH HARGA BAHAN 6,930.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 15,760.00
E Overhead dan Provit 15 % 2,364.00
F Harga Satuan Pekerjaan (D+E) 18,124.00

6.20. 1 m2 Pengecatan Permukaan Baja dengan Meni Besi


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Cat 0.200 OH 120,000 24,000.00
Kepala Tukang 0.020 OH 150,000 3,000.00
Mandor 0.0025 OH 120,000 300.00
JUMLAH HARGA TENAGA 29,300.00
B BAHAN
Meni Besi 0.100 Kg 45,000 4,500.00
Kuas 0.010 Bh 25,567 255.67
JUMLAH HARGA BAHAN 4,755.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 34,055.67
E Overhead dan Provit 15 % 5,108.35
F Harga Satuan Pekerjaan (D+E) 39,164.02

6.21. 1 m2 Pengecatan Permukaan Baja Dengan Meni Besi dan Perancah


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.250 OH 100,000 25,000.00
Tukang Cat 0.225 OH 120,000 27,000.00
Kepala Tukang 0.0225 OH 150,000 3,375.00
Mandor 0.0075 OH 120,000 900.00
JUMLAH HARGA TENAGA 56,275.00
B BAHAN
Meni Besi 0.100 Kg 45,000 4,500.00
Kuas 0.010 Bh 25,567 255.67
Perancah kayu kayu klas III 0.002 M3 1,400,000 2,800.00
JUMLAH HARGA BAHAN 7,555.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 63,830.67
E Overhead dan Provit 15 % 9,574.60
F Harga Satuan Pekerjaan (D+E) 73,405.27

1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 4


6.22.
Lapis Cat
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.006 OH 100,000 600.00
Tukang Cat 0.006 OH 120,000 720.00
Kepala Tukang 0.0225 OH 150,000 3,375.00
Mandor 0.0075 OH 120,000 900.00
JUMLAH HARGA TENAGA 5,595.00
B BAHAN
Meni (Read Lead) A 0.100 Kg 20,100 2,010.00
Meni (Read Lead) B 0.100 Kg 20,100 2,010.00
Pengencer 0.010 Ltr 25,100 251.00
Perancah kayu kayu klas III 0.002 M3 1,400,000 2,800.00
Cat Baja 0.010 Bh 55,100 551.00
Kuas 0.010 Ltr 25,567 255.67
JUMLAH HARGA BAHAN 7,877.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 13,472.67
E Overhead dan Provit 15 % 2,020.90
F Harga Satuan Pekerjaan (D+E) 15,493.57

6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup) Anti Lumut
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Cat 0.063 OH 120,000 7,560.00
Kepala Tukang 0.0063 OH 150,000 945.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,865.00
B BAHAN
Plamir Tembok 0.100 Kg 10,900 1,090.00
Cat Dasar Tembok (standart) 0.100 Kg 53,500 5,350.00
Cat Penutup Tembok (standart) 0.260 Kg 59,920 15,579.20
JUMLAH HARGA BAHAN 22,019.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 32,884.20
E Overhead dan Provit 15 % 4,932.63
F Harga Satuan Pekerjaan (D+E) 37,816.83

6.14. 1 m2 Pengecatan Atap Fiber (1 Lapis dempul, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)sejenis cat mobil
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.250 OH 100,000 25,000.00
Tukang Cat 0.225 OH 120,000 27,000.00
Kepala Tukang 0.0225 OH 150,000 3,375.00
Mandor 0.0075 OH 120,000 900.00
JUMLAH HARGA TENAGA 56,275.00
B BAHAN
Dempul fiber 0.100 Kg 87,000 8,700.00
Cat dasar fiber 0.100 Kg 97,500 9,750.00
Cat penutup fiber 0.260 Kg 97,500 25,350.00
Tiner/ pengencer 0.100 Kg 30,700 3,070.00
JUMLAH HARGA BAHAN 46,870.00
C PERALATAN
Alat Bantu Pengecatan 2,000.00
-
JUMLAH HARGA ALAT 2,000.00
D JUMLAH (A+B+C) 105,145.00
E Overhead dan Provit 15 % 15,771.75
F Harga Satuan Pekerjaan (D+E) 120,916.75

1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 1


6.23.
Lapis Cat Mutakhir
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.006 OH 100,000 600.00
Tukang Cat 0.060 OH 120,000 7,200.00
Kepala Tukang 0.012 OH 150,000 1,800.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 9,960.00
B BAHAN
Cat Permukaan Baja 0.300 Kg - -
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.010 Ltr 25,100 251.00
JUMLAH HARGA BAHAN 506.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 10,466.67
E Overhead dan Provit 15 % 1,570.00
F Harga Satuan Pekerjaan (D+E) 12,036.67

1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 3


6.24.
Lapis Cat Konvensional
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.400 OH 100,000 40,000.00
Tukang Cat 0.800 OH 120,000 96,000.00
Kepala Tukang 0.800 OH 150,000 120,000.00
Mandor 0.200 OH 120,000 24,000.00
JUMLAH HARGA TENAGA 280,000.00
B BAHAN
Cat Dasar Baja 0.110 Kg - -
Cat Antara Baja 0.170 Kg - -
Cat Penutup Baja 0.080 Kg - -
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.010 Ltr 25,100 251.00
JUMLAH HARGA BAHAN 506.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 280,506.67
E Overhead dan Provit 15 % 42,076.00
F Harga Satuan Pekerjaan (D+E) 322,582.67

1 m2 Pengecatan Permukaan Baja Lapis Seng (Galbani) secara Semprot (airless)


6.25.
dengan sistem 1 Lapis Cat Mutakhir
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.400 OH 100,000 40,000.00
Tukang Cat 0.700 OH 120,000 84,000.00
Kepala Tukang 0.070 OH 150,000 10,500.00
Mandor 0.020 OH 120,000 2,400.00
JUMLAH HARGA TENAGA 136,900.00
B BAHAN
Cat Dasar Baja 0.300 Kg - -
Pengencer 0.010 Ltr 25,100 251.00
JUMLAH HARGA BAHAN 251.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 137,151.00
E Overhead dan Provit 15 % 20,572.65
F Harga Satuan Pekerjaan (D+E) 157,723.65