DINAS ………………….
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
I UPAH KERJA
Mandor Oh 120,000.00
Pekerja Oh 100,000.00
Kepala Tukang Oh 150,000.00
Tukang Kayu Oh 120,000.00
Tukang Batu Oh 120,000.00
Tukang Cat Oh 120,000.00
Tukang Las Biasa Oh 120,000.00
Tukang las Konstruksi Oh 120,000.00
Tukang Gali Oh 120,000.00
Tukang Besi Konstruksi Oh 120,000.00
Tukang Khusus alluminium Oh 120,000.00
Tukang Oh 120,000.00
Tukang Alluminium/Kaca Oh 120,000.00
Tukang Pipa Oh 120,000.00
II HARGA BAHAN BANGUNAN
Semen Portland Kg 1,702.00
Semen Abu-abu Kg 3,200.00
Semen Merah M3 3,200.00
Semen Warna Kg 3,200.00
Semen Nat Kg 3,200.00
Kapur Pasang Kg 5,525.00
Kapur Sirih Kg 5,525.00
Kawat Bidrat/ kawat beton Kg 23,675.00
Besi Beton Polos (D16) Kg 9,791.67
Besi Beton Polos Kg 13,500.00
Rangka Metal hollow 40.40.2 mm M 40,000.00
Rangka Metal hollow 20.40.2 mm M 30,000.00
Assesoris rangka besi hollow dinding partisi Ls 14,000.00
Assesoris rangka besi hollow plafond Ls 10,500.00
Besi Beton Ulir Kg 19,000.00
Besi strip tebal 5 mm Kg 25,100.00
Paku Biasa Kg 15,000.00
Paku Pancing Kg 20,000.00
Paku Hak Panjang 15 cm Kg 20,000.00
Paku Sekrup Doz 35,750.00
Paku sekrup Alderon Kg 32,000.00
Paku Campuran (5 , 7, 10 cm) Kg 19,820.00
Paku 12 cm Kg 17,000.00
Paku tripleks Kg 46,750.00
Paku Seng Kg 35,596.00
Paku Asbes Kg 47,667.00
Skrup fixer bh 700.00
Baut/Mur Kg 30,525.00
Kawat Harmonika 2mm x 2 mm, 2,1 mm m2 75,000.00
Kawat Duri Kg 25,100.00
Kawat Kassa Uk. 2.0 x 2.0, 2 mm M2 25,100.00
kawat las Stainlesteel kg 275,000.00
Stainlesteel Kotak 40/40 mm M 75,000.00
Stainlesteel Kotak 20/40 mm M 55,000.00
Besi Plat 2.2x30 mm M 12,000.00
Besi Siku 40x40 mm M 14,600.00
Besi Siku 50.50.4 mm Kg 15,000.00
Besi Baja WF 300x150 Kg 50,000.00
Besi Baja WF 300x100 Kg 45,000.00
Besi Baja WF 200x100 Kg 30,000.00
Besi Baja Cnp 125 Kg 7,500.00
Foolding Door Harmonika M2 550,000.00
Rolling Door Aluminium tebal 0,8 M2 620,000.00
Kusen Aluminium Natural 3" M2 1,000,000.00
Daun Pintu Aluminium Kaca m2 2,200,000.00
Kawat las listrik kg 28,000.00
Jaring kawat baja dilas Kg 88,000.00
Truss C75.35.7 chord m1 18,000.00
Reng Botton U33.045 m1 9,750.00
Strap Bracing m1 5,950.00
Screw 12-14x20 HolDip Galvanized buah 500.00
Screw 10-16x16 HolDip Galvanized buah 400.00
Dynabol dia-12 x 120 mm Bh 2,100.00
Keramik warna 40 x 40 cm Bh 14,698.00
Keramik putih 40 x 40 cm Bh 13,002.17
Keramik warna 30 x30 cm Bh 7,295.85
Keramik putih 30 x 30 cm Bh 6,657.30
Keramik Warna 20 x 25 cm Bh 4,567.50
Keramik Putih 20 x 25 cm Bh 3,798.90
Keramik Warna 20 x 20 cm Bh 3,243.32
Keramik Putih 20 x 20 cm Bh 3,039.12
Keramik Putih 20 x33 cm Bh 6,266.49
Keramik Warna 60 x 60 Cm Bh 58,289.50
Keramik warna Lis 10 x 40 cm Bh 3,674.50
Keramik warna lis 10 x 60 cm Bh 9,714.92
Keramik Artistik 10 x 20 cm Bh 1,600.00
Keramik Artistik 5 x 20 cm Bh 6,293.75
Ubin Keramik 20 x 20 cm Bh 2,600.00
Kaca Bening 5 mm M2 233,109.00
Kaca Rayband, Tebal 5 mm M2 258,990.00
Kaca Buram, Tebal 12 mm M2 644,000.00
Kaca Cermin, Tebal 5 mm M2 450,000.00
Kaca Naco bening 5 mm M2 350,000.00
Triplex 3 mm (122x244 Cm) lbr 70,450.00
Plywood 3 mm (122 x 244 cm) Lbr 65,000.00
Plywood Tebal 9 mm Lbr 308,710.00
Gypsum Board (120x240x9) mm Lbr 96,838.00
Tepung gypsum kg 17,000.00
Kalsiboard (120x240x4)mm lbr 80,570.00
List gypsum profil 10/10 cm m 35,000.00
List Kayu Profil 4/4 cm klas II M 15,000.00
List gypsum profil 12/12 cm m 65,000.00
List Gypsum 2/5 M 25,000.00
Atap UPVC Rooftop Alderon m2 130,000.00
Atap Alderon type Transparan m2 160,000.00
Nok Alderon M' 90,000.00
Seng Gelombang Bjls.20 kaki 17,600.00
Seng Gelombang Bjls. 20, Uk. 90 x 240 cm Lbr 138,900.00
Seng Gelombang Galvalum, 0,25 mm M' 51,000.00
Seng Plat 3' x 6" Bjls. 28 (50x 180) cm Lbr 50,250.00
Seng Plat, lebar 55 cm Bjls.20 M' 38,500.00
Genteng Beton Bh 12,235.00
Genteng Metal Sakura Roof Lbr 40,283.00
Genteng Palentong. Bh 2,200.00
Nok Metal Sakura Roof Bh 33,150.00
Atap Metal Soka lbr 80,801.00
Nok Mertal Soka Bh 51,200.00
Genteng Decra Bond Bh 33,150.00
Nok Genteng Beton Bh 14,375.00
Talang Air PVC Abu-abu M' 16,500.00
Sambungan Talang Air PVC Bh 8,000.00
Penutup Talang Air PVC Bh 7,000.00
Cat Dasar Kayu Kg 45,000.00
Cat Penutup Kayu Kg 55,100.00
Cat Dasar Tembok (standart) Kg 23,100.00
Cat Penutup Tembok (standart) Kg 23,100.00
Cat Dasar Tembok (anti lumut) Kg 53,500.00
Cat Penutup Tembok (anti lumut) Kg 59,920.00
Cat Baja Kg 55,100.00
Cat Meni Kg 45,000.00
Meni (Read Lead) A Kg 20,100.00
Meni (Read Lead) B Kg 20,100.00
Meni Besi Kg 45,000.00
Plamir / dempul Kayu Kg 72,500.00
Plamir Tembok Kg 10,900.00
Politur Ltr 72,500.00
Politur Jadi Ltr 50,100.00
Soda Api Kg 100,000.00
Sabun Kg 15,000.00
Dempul Jadi Kg 20,100.00
Dempul Kg 20,100.00
Ampelas Lbr 7,875.00
Kuas Bh 25,567.00
Residu Ltr 58,750.00
Pengencer Ltr 25,100.00
air Ltr 100.00
Minyak Bekisting/ minyak cat Ltr 25,000.00
Lem Kayu Kg 10,000.00
Dempul fiber Kg 87,000.00
Cat dasar fiber Kg 97,500.00
Cat penutup fiber Kg 97,500.00
Tiner/ pengencer Ltr 30,700.00
Vernis Ltr 50,100.00
Kunci Tanam 2 x putar Bh 160,967.00
Kunci Tanam Antik Bh 203,000.00
Kunci Tanam Biasa Bh 150,100.00
Kunci Tanam Kamar Mandi Bh 203,000.00
Kunci Selot Pintu Bh 20,075.00
Kunci Selot Jendela Bh 10,000.00
Pengadaan Kunci selot Folding Door (plus Gembok Uk. Besar) Bh 250,000.00
Engsel Pintu Bh 20,533.00
Engsel Jendela Bh 20,533.00
Grendel Jendela Bh 20,533.00
Kait Angin Bh 15,400.00
Kloset Duduk Porselen (lengkap) Bh 2,997,000.00
Kloset Jongkok Porselen Bh 203,000.00
Wastafel Bh 463,333.00
Bak Fibreglass Bh 175,000.00
Bak Cuci Stainless Steel Bh 251,500.00
Badkip Kg 3,250,000.00
Seal Tape Bh 5,000.00
Floor Drain stainlesteel Bh 25,000.00
Sealent Kg 27,500.00
Pipa PVC Tipe AW Diameter 1/2" M' 8,748.25
Pipa PVC Tipe AW Diameter 3/4" M' 10,004.25
Pipa PVC Tipe AW Diameter 1" M' 11,562.50
Pipa PVC Tipe AW Diameter 1 1/2" M' 18,941.75
Pipa PVC Tipe AW Diameter 2" M' 26,504.25
Pipa PVC Tipe AW Diameter 2 1/2" M' 34,250.00
Pipa PVC Tipe AW Diameter 3" M' 43,050.00
Pipa PVC Tipe AW Diameter 4" M' 70,916.75
Kran Air 3/4" Bh 15,750.00
Kran Air1/2" Bh 12,500.00
Tanah Timbunan Pilihan M3 85,000.00
Tanah Timbunan Biasa M3 84,000.00
Pasir Urug M3 212,500.00
Pasir Beton Maligano M3 261,724.00
Pasir Pasang M3 212,500.00
Batu Belah M3 165,000.00
Batu Pecah / Splite 2-3 cm M3 287,500.00
Kerikil Beton (Pecah Maligano) M3 479,680.00
Batu Merah 5 x 11 x 22 cm Bh 1,000.00
Bata Tempel Hitam Bh 21,061.50
Roster motif kotak uk. 20 x 20 cm Bh 20,000.00
Lisplank GRC 30 CM M 16,875.00
Papan kayu jati M3 4,283,094.00
Papan kayu kelas I M3 2,762,469.00
Papan kayu kelas II m3 1,875,438.00
Papan kayu kelas III M3 1,400,000.00
Balok kayu jati M4 4,283,094.00
Balok kayu kelas I M3 2,762,469.00
Balok kayu kelas II M3 1,875,438.00
Balok Kayu Kelas III M3 1,400,000.00
Reng (3 x 4) cm Kelas II M3 1,875,438.00
Kayu 5/7 klas II M3 1,875,438.00
List Profil Kayu 4 x 4 cm M' 8,500.00
Bambu Dia. 6 - 8/600 cm Btg 35,988.00
Dolken dia. 7 cm Btg 17,500.00
Dolken dia. 8 - 9 cm Btg 30,500.00
Dolken dia.10 cm Btg 30,000.00
Ijuk M3 28,400.00
Parquet M2 187,250.00
Lem vinyl Kg 15,000.00
Formite/penjaga jarak bekisting/spacer btg 17,000.00
Alluminium strip m 30,000.00
Instalasi Titik Lampu titik 95,000.00
Lampu Philips PLC - 18 Watt Bh 35,000.00
Saklar Ganda Bh 22,880.00
Saklar Tunggal Bh 18,700.00
Stop Kontak Bh 16,500.00
Kabel Listrik Eterna NYY 2 x 2,5 M' 19,000.00
Penyambungan PLN Ls 7,500,000.00
MCB Bh 91,000.00
III SEWA ALAT
Sewa alat perakitan jam
Sewa alat las listrik jam
Gambar Desain M2 2,350.00
Alat Bantu Pengecatan Ls 2,000.00
Alat bantu pasang baja ringan Ls 4,500.00
Mobilisasi alat baja ringan Ls 9,000.00
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN PERSIAPAN
- Membuat Pagar Sementara dari Kayu Tinggi 2 meter M 323,256.12 -
- Membuat Pagar Sementara dari Seng Gelombang Tinggi 2 Meter M 343,513.37 -
- Membuat Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter M 838,729.20 -
- Mengukur dan Memasang Bouwplank M 58,650.00 -
- Membuat Kantor Sementara dengan Lantai Plesteran M2 1,387,275.07 -
- Membuat Gudang Semen dan Alat-alat M2 1,143,136.48 -
- Membuat Rumah Jaga / Konstruksi Kayu M2 1,156,037.50 -
- Membersihkan Lapangan dan Perataan M2 18,400.00 -
- Membuat Bedeng Buruh M2 1,193,236.23 -
- Membuat Bak Adukan Ukuran (40 x 50 x 20) cm M2 105,915.00 -
- Membuat Stegger dari Bambu, Ukuran (40 x 50 x 20) cm M2 490,549.75 -
- Membuat Jalan Sementara M2 176,352.50 -
- Membongkar Beton Bertulang M3 1,625,318.00 -
- Membongkar Dinding Tembok Bata Merah M3 812,659.00 -
- Memasang 1 m2 Pagar Kawat Jaring Galvanis, panjang 240 cm M 11,523.00 -
- Memasang Panel Beton Pracetak (5 x 50 x 213) cm M 255,956.48 -
PEKERJAAN TANAH
- Menggali Tanah Biasa Sedalam 1 Meter M2 89,700.00 -
- Menggali Tanah Biasa Sedalam 2 Meter M3 109,710.00 -
- Menggali Tanah Biasa Sedalam 3 Meter M3 129,996.00 -
- Menggali Tanah Keras Sedalam 1 Meter M3 119,416.00 -
- Menggali Tanah Cadas Sedalam 1 Meter M3 180,780.00 -
- Menggali Tanah Lumpur Sedalam 1 Meter M3 144,210.00 -
- Mengerjakan Stripping Setinggi 1 Meter M2 6,440.00 -
- Membuang Tanah Sejauh 30 Meter M3 39,330.00 -
- Mengurug tanah biasa sedalam 1 meter M3 29,895.40 -
- Mengurug tanah biasa sedalam 2 meter M3 36,570.00 -
- Mengurug tanah biasa sedalam 3 meter M3 43,327.40 -
- Mengurug tanah keras sedalam 1 meter M3 39,792.30 -
- Mengurug tanah cadas sedalam 1 meter M3 60,260.00 -
- Mengurug tanah lumpur sedalam 1 meter M3 48,070.00 -
- Memadatkan Tanah (per 20 cm) M3 64,400.00 -
- Mengurug Pasir M3 329,130.00 -
- Membuat Lapisan Pudel Campuran 1 Kp : 3 Psr : 7 TL untuk stabilisasi tanah. M3 209,214.76 -
- Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 M3 1,400,453.20 -
- Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 M3 1,441,279.54 -
- Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 M3 1,262,141.84 -
- Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 M3 1,490,645.52 -
- Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 M3 1,536,117.92 -
- Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1,572,749.89 -
- Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 M3 1,593,635.93 -
- Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 M3 1,629,664.62 -
- Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 M3 1,640,677.67 -
- Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 M3 1,749,416.87 -
- Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 M3 1,763,935.91 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:24 PP 339,883.19 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:25 PP 333,568.31 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:26 PP 331,213.80 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PCM:23 KP : 10 PP 307,699.00 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 2 PP 178,972.09 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 3 PP 170,496.40 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 4 PP 165,612.08 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 5 PP 162,538.54 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 6 PP 160,854.11 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) tebal ½ bata, campuran spesi 1 PC : 8MPP
2
157,536.20 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC
M:2 3 KP : 10 PP 153,716.91 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP
M2: 1 SM : 1 PP 137,174.36 -
- Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP
M2: 1 SM : 2 PP 139,577.97 -
- Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi M2 246,456.50 -
- Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
M2 657,178.43 -
- Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PCM: 23 PP 95,079.70 -
- Memasang rangka dinding pemisah (60 x 120) cm kayu kelas III M2 136,715.45 -
- Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II M2 #NAME? #NAME?
- Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) M2 17,253.68 -
- Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II M3 6,153,995.69 -
- Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas III M3 5,497,891.25 -
- Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sementara M2 271,286.15 -
- Membuat dan memasang pintu dan jendela kaca, kayu kelas II M2 525,332.09 -
- Membuat dan memasang pintu dan jendela jalusi kayu kelas I M2 796,717.72 -
- Membuat dan memasang pintu dan jendela jalusi kayu kelas II M2 731,432.24 -
- Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai
M2 90 cm) 546,291.34 -
- Memasang konstruksi kuda-kuda konvensional, kayu kelas III bentang 6 meter M3 4,664,055.00 -
- Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm M' 91,310.00 -
- Memasang Bak Kontrol Pasangan Batu Bata Ukuran 45 x 45 Cm, Tinggi 50 Cm Buah 888,717.42 -
- Memasang Bak Kontrol Pasangan Batu Bata Ukuran 60 x 60 Cm, Tinggi 65 Cm Buah 1,100,646.97 -
3 - Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual M2 19,216.50 -
9 - Mengecat Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup M2 80,446.72 -
15 - Mengecat Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 18,124.00 -
22 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 4 Lapis Cat M2 15,493.57 -
23 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 1 Lapis Cat Mutakhir
M2 12,036.67 -
24 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Manual sistem 3 Lapis Cat Konvensional
M2 322,582.67 -
25 - Mengecat Permukaan Baja Lapis Seng (Galbani) secara Semprot (airless) dengan sistem 1MLapis
2
Cat Mutakhir
157,723.65 -
REKAPITULASI
PEKERJAAN :
LOKASI :
ANGGARAN :
TAHUN ANGGARAN :
JUMLAH
NO URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
1 2 3
I PEKERJAAN PERSIAPAN Rp 9,200,000.00
II PEKERJAAN TANAH DAN PASIR Rp 8,696,782.54
III PEKERJAAN PONDASI Rp 22,090,260.95
IV PEKERJAAN PASANGAN BATU DAN PLESTERAN Rp 71,002,362.33
V PEKERJAAN BETON Rp 40,690,473.73
VI PEKERJAAN LANTAI Rp 18,341,323.48
VII PEKERJAAN ATAP Rp 47,425,788.69
VIII PEKERJAAN PLAFOND DAN RANGKA Rp 37,245,471.69
IX PEKERJAAN KUSEN, PINTU, JENDELA Rp 23,283,552.01
X PEKERJAAN KUNCI DAN GANTUNGAN Rp 3,839,938.55
XI PEKERJAAN INSTALASI DAN TITIK LAMPU Rp 4,279,060.00
XII PEKERJAAN SANITASI Rp 5,689,300.23
XIII PEKERJAAN PENGECETAN Rp 16,303,062.49
XIV PEK. SALURAN & RABAT LT. KELILING BANGUNAN Rp 9,095,270.21
XV PEKERJAAN FINISHING DAN LAIN-LAIN Rp 1,000,000.00
TOTAL Rp 318,182,646.90
PPN 10 % Rp 31,818,264.69
DIBULATKAN Rp 350,000,000.00
HARGA JUMLAH
NO URAIAN DAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan Ls 1.00 300,000 300,000.00
2 Pegukuran Dan Pemasangan Baowpalnk Ls 1.00 1,200,000 1,200,000.00
3 Air Kerja Ls 1.00 1,500,000 1,500,000.00
4 Listrik Kerja Ls 1.00 1,700,000 1,700,000.00
5 Laporan Ls 1.00 2,500,000 2,500,000.00
6 Administrasi dan Dokumntasi Ls 1.00 2,000,000 2,000,000.00
Sub Total I 9,200,000.00
II PEKERJAAN TANAH DAN PASIR L.PONDAS
1 Pek. Galian Tanah Pondasi M3 15.82 89,700 1,419,054.00 L.KUSEN
2 Pek. Urugan Kembali Bekas Galian M3 4.75 29,895 142,003.15 L.TEMBOK
3 Pek. Urugan Pasir bawah Pondasi M3 2.26 329,130 743,833.80
4 Pek. Urugan Pasir bawah lantai M3 5.94 329,130 1,956,019.59 L.SLOOF
5 Pek. Urugan /Pemadatan Tanah Didatangkan M3 24.60 180,320 4,435,872.00 L.LANTAI
Sub Total II 8,696,782.54 L.TOTAL L
III PEKERJAAN PONDASI L.PENAMP
1 Pek. Pas. Batu Kosong Bawah Pondasi M3 8.14 488,900 3,977,686.33 L.ATAP
2 Pek. Pas. Pondasi Batu Gunung 1 Pc : 5 Psr M3 19.56 926,120 18,112,574.61 P.GORDIN
Sub Total III 22,090,260.95
IV PEKERJAAN PASANGAN BATU DAN PLESTERAN
1 Pek. Pasangan Bata Dinding 1 : 3 M2 13.23 351,921 4,655,916.95
2 Pek. Pasangan Bata Dinding 1 : 5 M2 123.23 333,568 41,105,622.84
3 Pek. Plesteran Dinding dan Kolom 1:3 M2 50.72 90,613 4,595,886.87
4 Pek. Plesteran Dinding 1:5 M2 246.84 76,358 18,848,182.36
5 Pek. Plesteran Pondasi Bangunan 1:5 M2 17.50 76,358 1,336,263.13
6 Pek. Acian Pondasi Bangunan M2 17.50 26,314 460,490.19
Sub Total IV 71,002,362.33
###
V PEKERJAAN BETON ###
1 Pek. Sloof Beton 15/20 M3 1.56 5,549,483 8,657,192.81
2 Pek. Sloof Beton 15/15 M3 0.14 5,549,483 749,180.15
3 Pek. Kolom Praktis 15/15 M' 64.00 160,551 10,275,285.70
4 Pek. Kolom Beton Teras 20/20 M3 0.32 7,454,956 2,385,585.89
5 Pek. Balok Latei M' 21.00 160,308 3,366,466.05
6 Pek. Balok Latei Teras M3 0.23 7,550,201 1,698,795.24
7 Pek. Balok Ringbalk M' 56.50 160,308 9,057,396.75
9 Pek. Rabat Beton Bawah Lantai M3 3.57 1,262,142 4,500,545.36
Sub Total V 40,690,473.73
###
VI PEKERJAAN LANTAI ###
1 Pek. Pas. Lantai Keramik 40 x 40 M2 53.36 287,431 15,337,308.34
###
2 Pek. Pas. Lantai KM/WC 20/20 ( Anti Slip ) M2 2.50 256,217 640,542.24
###
3 Pek. Pas. Dinding Tehel KM/WC 20/25 M2 7.75 304,964 2,363,472.90
Sub Total VI 18,341,323.48
###
VII PEKERJAAN ATAP TRAS
1 Pek. Kuda - Kuda Rangka Baja Ringan M2 123.69 239,137 29,578,824.61 P.KOSEN
2 Pek. Atap Soka Abadi M2 123.69 89,807 11,108,167.59
3 Pek. Nok Soka Abadi M' 31.00 48,247 1,495,654.40
4 Pek. Talang Air M' 14.00 125,203 1,752,847.25
5 Pek. Listplank Kayu Kelas I M' 44.00 79,325 3,490,294.85
Sub Total VII 47,425,788.69
VIII PEKERJAAN PLAFOND DAN RANGKA
1 Pek. Rangka Plafond Besi Hollow M2 100.50 293,147 29,461,223.25
2 Pek. Plafond Kalsiboar 4 mm M2 100.50 58,201 5,849,248.44
3 Pek. List Profil Kayu 4 x 4 cm M' 129.00 15,000 1,935,000.00
Sub Total VIII 37,245,471.69
IX PEKERJAAN KUSEN, PINTU, JENDELA
1 Pek. Kusen Kayu Kelas I M3 0.76 7,648,065 5,812,529.05
2 Pek. Pintu Panel Kayu Kelas I M2 14.81 720,474 10,670,213.63
3 Pek. Daun Jendela Kayu Kelas I M2 3.78 720,474 2,723,390.11
4 Pek. Pasangan Kaca Mati 5 mm M2 12.64 322,581 4,077,419.23
Sub Total IX 23,283,552.01
X PEKERJAAN KUNCI DAN GANTUNGAN
1 Pek. Pas. Kunci Pintu Unit 6.00 252,080 1,512,480.00
2 Pek. Pas. Engsel Pintu Psg 8.00 48,736 389,886.80
3 Pek. Pas. Engsel Jendela Psg 15.00 40,357 605,354.25
4 Pek. Pas. Grendel Jendela Psg 15.00 44,988 674,820.00
5 Pek. Pas. Hak Angin Psg 15.00 43,827 657,397.50
Sub Total X 3,839,938.55
XI PEKERJAAN INSTALASI DAN TITIK LAMPU
1 Pek. Pas. Instalasi Lampu Titik 16.00 95,000 1,520,000.00
2 Pek. Pas. Saklar Tunggal Bh 4.00 18,700 74,800.00
3 Pek. Pas. Saklar Ganda Bh 2.00 22,880 45,760.00
4 Pek. Pas. Stop Kontak Bh 5.00 16,500 82,500.00
5 Pek. Pas. Lampu PLC 18 Watt Bh 11.00 35,000 385,000.00
6 Pek. Pas. Fitting Plafond Bh 9.00 20,000 180,000.00
7 MCB Bh 1.00 91,000 91,000.00
8 Kabel NYY 2 x 2,5 mm SNI Roll 2.00 950,000 1,900,000.00
Sub Total XI 4,279,060.00
XII PEKERJAAN SANITASI
1 Pek. Saluran Air Bersih PVC 1/2' M' 8.00 30,029 240,231.92
2 Pek. Saluran Air Kotor/WC, PVC 2' M' 12.00 69,974 839,687.01
3 Pek. Pas. Kloset Jongkok Unit 1.00 617,593 617,592.55
4 Pek. Pas. Bak Fiber Unit 1.00 913,330 913,330.00
5 Pek. Pas. Kran Air Bh 1.00 78,459 78,458.75
6 Pek. Septictank dan Resapan Ls 1.00 3,000,000 3,000,000.00
Sub Total XII 5,689,300.23
XIII PEKERJAAN PENGECETAN
1 Pek. Cat Dinding dan Kolom Anti Lumut M2 297.56 37,817 11,252,775.93
2 Pek. Cat Plafond M2 94.00 37,817 3,554,782.02
3 Pek. Cat Kusen, Daun Pintu, Jendela dan Listplank M2 18.59 80,447 1,495,504.53
Sub Total XIII 16,303,062.49
XIV PEK. SALURAN & RABAT LT. KELILING BANGUNAN
1 Pek. Galian Tanah Saluran M3 2.64 89,700 236,808.00
2 Pek. Pas. Saluran Bata 1:5 M2 13.20 333,568 4,403,101.69
3 Pek. Plesteran Saluran 1:5 M2 13.20 76,358 1,007,924.19
4 Pek. Acian Dinding Saluran M2 13.20 26,314 347,341.17
5 Pek. Urugan Pasir Bawah Lantai Rabat Kel. Bangunan M3 1.32 329,130 434,451.60
6 Pek. Lantai Rabat Beton Kel. Bangunan 1 : 3 : 5 M3 2.11 1,262,142 2,665,643.56
Sub Total XIV 9,095,270.21
XV PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pek. Pembersihan akhir Ls 1.00 1,000,000 1,000,000.00
Sub Total XV 1,000,000.00
###
ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN
Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 3.4 OH 100,000.00 340,000.00
Tukang Batu L.02 0.85 OH 120,000.00 102,000.00
Kepala Tukang L.03 0.085 OH 150,000.00 12,750.00
Mandor L.04 0.17 OH 120,000.00 20,400.00
JUMLAH HARGA TENAGA 475,150.00
B BAHAN
Batu Belah 0.48 M3 165,000.00 79,200.00
Semen Portland 194 Kg 1,702.00 330,188.00
Pasir Beton Maligano 0.312 M3 261,724.00 81,657.89
Kerikil Beton (Pecah Maligano) 0.468 M3 479,680.00 224,490.24
Besi Beton Ulir 126 kg 19,000.00 2,394,000.00
Kawat Beton 1.8 Kg 23,675.00 42,615.00
JUMLAH HARGA BAHAN 3,152,151.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,627,301.13
E Overhead dan Provit 15 % 544,095.17
F Harga Satuan Pekerjaan (D+E) 4,171,396.30
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 2.4 OH 100,000.00 240,000.00
Tukang Batu L.02 0.8 OH 120,000.00 96,000.00
Kepala Tukang L.03 0.08 OH 150,000.00 12,000.00
Mandor L.04 0.119 OH 120,000.00 14,280.00
JUMLAH HARGA TENAGA 362,280.00
B BAHAN
Batu Belah 0.45 M3 165,000.00 74,250.00
Semen Portland 194 Kg 1,702.00 330,188.00
Pasir Beton Maligano 0.312 M3 261,724.00 81,657.89
Kerikil Beton (Pecah Maligano) 0.468 M3 479,680.00 224,490.24
JUMLAH HARGA BAHAN 710,586.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,072,866.13
E Overhead dan Provit 15 % 160,929.92
F Harga Satuan Pekerjaan (D+E) 1,233,796.05
ANALISA HARGA SATUAN
PEKERJAAN BETON
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 247 kg 1,702.00 420,394.00
Pasir Beton Maligano 869 kg 186.95 162,455.83
Kerikil Beton (Pecah Maligano) 999 kg 355.32 354,963.20
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 959,313.03
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,171,473.03
E Overhead dan Provit 15 % 175,720.95
F Harga Satuan Pekerjaan (D+E) 1,347,193.98
Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 276 kg 1,702.00 469,752.00
Pasir Beton Maligano 828 kg 186.95 154,791.05
Kerikil Beton (Pecah Maligano) 1012 kg 355.32 359,582.34
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,005,625.39
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,217,785.39
E Overhead dan Provit 15 % 182,667.81
F Harga Satuan Pekerjaan (D+E) 1,400,453.20
Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 299 kg 1,702.00 508,898.00
Pasir Beton Maligano 799 kg 186.95 149,369.63
Kerikil Beton (Pecah Maligano) 1017 kg 355.32 361,358.93
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,041,126.56
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,253,286.56
E Overhead dan Provit 15 % 187,992.98
F Harga Satuan Pekerjaan (D+E) 1,441,279.54
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.2 OH 100,000.00 120,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.06 OH 120,000.00 7,200.00
JUMLAH HARGA TENAGA 154,200.00
B BAHAN
Semen Portland 230 kg 1,702.00 391,460.00
Pasir Beton Maligano 893 kg 186.95 166,942.52
Kerikil Beton (Pecah Maligano) 1027 kg 355.32 364,912.12
air 200 Liter 100.00 20,000.00
JUMLAH HARGA BAHAN 943,314.64
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,097,514.64
E Overhead dan Provit 15 % 164,627.20
F Harga Satuan Pekerjaan (D+E) 1,262,141.84
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.65 OH 100,000.00 165,000.00
Tukang Batu L.02 0.275 OH 120,000.00 33,000.00
Kepala Tukang L.03 0.028 OH 150,000.00 4,200.00
Mandor L.04 0.083 OH 120,000.00 9,960.00
JUMLAH HARGA TENAGA 212,160.00
B BAHAN
Semen Portland 326 kg 1,702.00 554,852.00
Pasir Beton Maligano 760 kg 186.95 142,078.74
Kerikil Beton (Pecah Maligano) 1029 kg 355.32 365,622.76
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,084,053.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,296,213.50
E Overhead dan Provit 15 % 194,432.02
F Harga Satuan Pekerjaan (D+E) 1,490,645.52
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,954,680.11
E Overhead dan Provit 15 % 593,202.02
F Harga Satuan Pekerjaan (D+E) 4,547,882.13
Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.65 OH 100,000.00 65,000.00
Tukang Las Biasa L.02 0.65 OH 120,000.00 78,000.00
Kepala Tukang L.03 0.065 OH 150,000.00 9,750.00
Mandor L.04 0.032 OH 120,000.00 3,840.00
JUMLAH HARGA TENAGA 156,590.00
B BAHAN
Besi scuare tube 4.76 M - -
Besi lis kaca (1 x 1) cm 4.522 M - -
Pengelasan 20 Cm - -
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 156,590.00
E Overhead dan Provit 15 % 23,488.50
F Harga Satuan Pekerjaan (D+E) 180,078.50
Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.2 OH 100,000.00 20,000.00
Tukang L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.01 OH 120,000.00 1,200.00
JUMLAH HARGA TENAGA 48,200.00
B BAHAN
Seng Plat, lebar 55 cm Bjls.20 1.05 m’ 38,500.00 40,425.00
Paku 1 cm - 2 cm 0.015 kg 15,000.00 225.00
Papan kayu kelas II 0.019 m3 1,875,438.00 35,633.32
JUMLAH HARGA BAHAN 76,283.32
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 124,483.32
E Overhead dan Provit 15 % 18,672.50
F Harga Satuan Pekerjaan (D+E) 143,155.82
Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm SNI 7393 : 2008
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.15 OH 100,000.00 15,000.00
Tukang L.02 0.3 OH 120,000.00 36,000.00
Kepala Tukang L.03 0.03 OH 150,000.00 4,500.00
Mandor L.04 0.008 OH 120,000.00 960.00
JUMLAH HARGA TENAGA 56,460.00
B BAHAN
Seng Plat, lebar 55 cm Bjls.20 1.05 m 38,500.00 40,425.00
Paku 1 cm - 2 cm 0.01 kg 15,000.00 150.00
Kawat Bidrat/ kawat beton 0.5 kg 23,675.00 11,837.50
JUMLAH HARGA BAHAN 52,412.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 108,872.50
E Overhead dan Provit 15 % 16,330.88
F Harga Satuan Pekerjaan (D+E) 125,203.38
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.25 OH 100,000.00 25,000.00
Tukang Besi Konstruksi L.02 0.25 OH 120,000.00 30,000.00
Kepala Tukang L.03 0.025 OH 150,000.00 3,750.00
Mandor L.04 0.013 OH 120,000.00 1,560.00
JUMLAH HARGA TENAGA 60,310.00
B BAHAN
Rangka Metal hollow 40.40.2 mm 3.5 m’ 40,000.00 140,000.00
Assesoris rangka besi hollow dinding partisi 1 LS 14,000.00 14,000.00
JUMLAH HARGA BAHAN 154,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 214,310.00
E Overhead dan Provit 15 % 32,146.50
F Harga Satuan Pekerjaan (D+E) 246,456.50
2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 32.95 Kg 1,702.00 56,080.90
Pasir Pasang 0.091 M3 212,500.00 19,337.50
JUMLAH HARGA BAHAN 215,418.40
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 306,018.40
E Overhead dan Provit 15 % 45,902.76
F Harga Satuan Pekerjaan (D+E) 351,921.16
3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 26.55 Kg 1,702.00 45,188.10
Pasir Pasang 0.093 M3 212,500.00 19,762.50
JUMLAH HARGA BAHAN 204,950.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 295,550.60
E Overhead dan Provit 15 % 44,332.59
F Harga Satuan Pekerjaan (D+E) 339,883.19
4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.6 OH 100,000.00 60,000.00
Tukang Batu L.02 0.2 OH 120,000.00 24,000.00
Kepala Tukang L.03 0.02 OH 150,000.00 3,000.00
Mandor L.04 0.03 OH 120,000.00 3,600.00
JUMLAH HARGA TENAGA 90,600.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 140 Bh 1,000.00 140,000.00
Semen Portland 22.2 Kg 1,702.00 37,784.40
Pasir Pasang 0.102 M3 212,500.00 21,675.00
JUMLAH HARGA BAHAN 199,459.40
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 290,059.40
E Overhead dan Provit 15 % 43,508.91
F Harga Satuan Pekerjaan (D+E) 333,568.31
7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 18.95 Kg 1,702.00 32,252.90
Pasir Pasang 0.038 M3 212,500.00 8,075.00
JUMLAH HARGA BAHAN 110,327.90
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 155,627.90
E Overhead dan Provit 15 % 23,344.19
F Harga Satuan Pekerjaan (D+E) 178,972.09
8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 14.37Kg 1,702.00 24,457.74
Pasir Pasang 0.04M3 212,500.00 8,500.00
JUMLAH HARGA BAHAN 102,957.74
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 148,257.74
E Overhead dan Provit 15 % 22,238.66
F Harga Satuan Pekerjaan (D+E) 170,496.40
9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 11.5Kg 1,702.00 19,573.00
Pasir Pasang 0.043M3 212,500.00 9,137.50
JUMLAH HARGA BAHAN 98,710.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 144,010.50
E Overhead dan Provit 15 % 21,601.58
F Harga Satuan Pekerjaan (D+E) 165,612.08
10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Portland 9.68Kg 1,702.00 16,475.36
Pasir Pasang 0.045M3 212,500.00 9,562.50
JUMLAH HARGA BAHAN 96,037.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 141,337.86
E Overhead dan Provit 15 % 21,200.68
F Harga Satuan Pekerjaan (D+E) 162,538.54
14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 1 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Merah 0.018 Kg 3,200.00 57.60
Kapur Pasang 0.018 M3 5,525.00 99.45
Pasir Pasang 0.018 M3 212,500.00 3,825.00
JUMLAH HARGA BAHAN 73,982.05
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 119,282.05
E Overhead dan Provit 15 % 17,892.31
F Harga Satuan Pekerjaan (D+E) 137,174.36
15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 KP : 1 SM : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 1,000.00 70,000.00
Semen Merah 0.014Kg 3,200.00 44.80
Kapur Pasang 0.014M3 5,525.00 77.35
Pasir Pasang 0.028M3 212,500.00 5,950.00
JUMLAH HARGA BAHAN 76,072.15
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 121,372.15
E Overhead dan Provit 15 % 18,205.82
F Harga Satuan Pekerjaan (D+E) 139,577.97
28 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Roster/Terawang 30 Buah - -
Semen Portland 11 kg 1,702.00 18,722.00
Pasir Pasang 0.035 m3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 26,159.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 71,459.50
E Overhead dan Provit 15 % 10,718.93
F Harga Satuan Pekerjaan (D+E) 82,178.43
29 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 100,000.00 30,000.00
Tukang Batu L.02 0.1 OH 120,000.00 12,000.00
Kepala Tukang L.03 0.01 OH 150,000.00 1,500.00
Mandor L.04 0.015 OH 120,000.00 1,800.00
JUMLAH HARGA TENAGA 45,300.00
B BAHAN
Roster/Terawang 25 Buah 20,000.00 500,000.00
Semen Portland 11 kg 1,702.00 18,722.00
Pasir Pasang 0.035 m3 212,500.00 7,437.50
JUMLAH HARGA BAHAN 526,159.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 571,459.50
E Overhead dan Provit 15 % 85,718.93
F Harga Satuan Pekerjaan (D+E) 657,178.43
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN
Memasang 1 m2 acian
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 100,000.00 10,000.00
Tukang Batu L.02 0.050 OH 120,000.00 6,000.00
Kepala Tukang L.03 0.005 OH 150,000.00 750.00
Mandor L.04 0.005 OH 120,000.00 600.00
JUMLAH HARGA TENAGA 17,350.00
B BAHAN
Semen Portland 3.25 kg 1,702.00 5,531.50
-
JUMLAH HARGA BAHAN 5,531.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 22,881.50
E Overhead dan Provit 15 % 3,432.23
F Harga Satuan Pekerjaan (D+E) 26,313.73
ANALISA HARGA SATUAN
PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 7 OH 100,000 700,000.00
Tukang Kayu 21 OH 120,000 2,520,000.00
Kepala Tukang 2.1 OH 150,000 315,000.00
Mandor 0.35 OH 120,000 42,000.00
JUMLAH HARGA TENAGA 3,577,000.00
B BAHAN
Balok kayu kelas I 1.1 M3 2,762,469 3,038,715.90
Paku 10 cm 1.25 Kg 19,820 24,775.00
Lem Kayu 1 Kg 10,000 10,000.00
JUMLAH HARGA BAHAN 3,073,490.90
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,650,490.90
E Overhead dan Provit 15 % 997,573.64
F Harga Satuan Pekerjaan (D+E) 7,648,064.54
2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 6 OH 100,000 600,000.00
Tukang Kayu 18 OH 120,000 2,160,000.00
Kepala Tukang 1.8 OH 150,000 270,000.00
Mandor 0.3 OH 120,000 36,000.00
JUMLAH HARGA TENAGA 3,066,000.00
B BAHAN
Balok kayu kelas II 1.2 M3 1,875,438 2,250,525.60
Paku 10 cm 1.25 Kg 19,820 24,775.00
Lem Kayu 1 Kg 10,000 10,000.00
JUMLAH HARGA BAHAN 2,285,300.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 5,351,300.60
E Overhead dan Provit 15 % 802,695.09
F Harga Satuan Pekerjaan (D+E) 6,153,995.69
6 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 100,000 100,000.00
Tukang Kayu 3 OH 120,000 360,000.00
Kepala Tukang 0.3 OH 150,000 45,000.00
Mandor 0.05 OH 120,000 6,000.00
JUMLAH HARGA TENAGA 511,000.00
B BAHAN
Papan kayu kelas I 0.04 M3 2,762,469 110,498.76
Lem Kayu 0.5 kg 10,000 5,000.00
JUMLAH HARGA BAHAN 115,498.76
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 626,498.76
E Overhead dan Provit 15 % 93,974.81
F Harga Satuan Pekerjaan (D+E) 720,473.57
7 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 100,000 100,000.00
Tukang Kayu 3 OH 120,000 360,000.00
Kepala Tukang 0.3 OH 150,000 45,000.00
Mandor 0.05 OH 120,000 6,000.00
JUMLAH HARGA TENAGA 511,000.00
B BAHAN
Papan kayu kelas II 0.04 M3 1,875,438 75,017.52
Lem Kayu 0.5 kg 10,000 5,000.00
JUMLAH HARGA BAHAN 80,017.52
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 591,017.52
E Overhead dan Provit 15 % 88,652.63
F Harga Satuan Pekerjaan (D+E) 679,670.15
8 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 100,000 80,000.00
Tukang Kayu 2.4 OH 120,000 288,000.00
Kepala Tukang 0.24 OH 150,000 36,000.00
Mandor 0.04 OH 120,000 4,800.00
JUMLAH HARGA TENAGA 408,800.00
B BAHAN
Papan kayu kelas I 0.024 M3 2,762,469 66,299.26
Lem Kayu 0.3 kg 10,000 3,000.00
JUMLAH HARGA BAHAN 69,299.26
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 478,099.26
E Overhead dan Provit 15 % 71,714.89
F Harga Satuan Pekerjaan (D+E) 549,814.14
9 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 100,000 80,000.00
Tukang Kayu 2.4 OH 120,000 288,000.00
Kepala Tukang 0.24 OH 150,000 36,000.00
Mandor 0.04 OH 120,000 4,800.00
JUMLAH HARGA TENAGA 408,800.00
B BAHAN
Papan kayu kelas II 0.024 M3 1,875,438 45,010.51
Lem Kayu 0.3 kg 10,000 3,000.00
JUMLAH HARGA BAHAN 48,010.51
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 456,810.51
E Overhead dan Provit 15 % 68,521.58
F Harga Satuan Pekerjaan (D+E) 525,332.09
30 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
Papan kayu kelas I 0.0108 M3 2,762,469 29,834.67
Paku 5 dan 7 cm 0.1 kg 19,820 1,982.00
JUMLAH HARGA BAHAN 31,816.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 69,416.67
E Overhead dan Provit 15 % 10,412.50
F Harga Satuan Pekerjaan (D+E) 79,829.16
31 Memasang 1 m' lisplank ukuran (3 x 20) cm, kayu kelas II SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
-
Papan kayu kelas II 0.0108 M3 1,875,438 20,254.73
Paku 5 dan 7 cm 0.1 kg 19,820 1,982.00
-
JUMLAH HARGA BAHAN 22,236.73
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 59,836.73
E Overhead dan Provit 15 % 8,975.51
F Harga Satuan Pekerjaan (D+E) 68,812.24
32 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I SNI 3434 : 2008
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100,000 10,000.00
Tukang Kayu 0.2 OH 120,000 24,000.00
Kepala Tukang 0.02 OH 150,000 3,000.00
Mandor 0.005 OH 120,000 600.00
JUMLAH HARGA TENAGA 37,600.00
B BAHAN
Papan kayu kelas I 0.011 M3 2,762,469 30,387.16
Paku 5 dan 7 cm 0.05 kg 19,820 991.00
JUMLAH HARGA BAHAN 31,378.16
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 68,978.16
E Overhead dan Provit 15 % 10,346.72
F Harga Satuan Pekerjaan (D+E) 79,324.88
ANALISA HARGA SATUAN
PEKERJAAN LANGIT-LANGIT
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm SNI 2839 : 2008
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 100000 10,000.00
Tukang Kayu 0.1 OH 120000 12,000.00
Kepala Tukang 0.01 OH 150000 1,500.00
Mandor 0.005 OH 120000 600.00
JUMLAH HARGA TENAGA 24,100.00
B BAHAN
Triplex 3 mm (122x244 Cm) 0.375 Lembar 70,450.00 26,418.75
Paku tripleks 0.03 kg 46,750.00 1,402.50
JUMLAH HARGA BAHAN 27,821.25
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 51,921.25
E Overhead dan Provit 15 % 7,788.19
F Harga Satuan Pekerjaan (D+E) 59,709.44
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 60,846.89
E Overhead dan Provit 15 % 9,127.03
F Harga Satuan Pekerjaan (D+E) 69,973.92
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 82,290.00
E Overhead dan Provit 15 % 12,343.50
F Harga Satuan Pekerjaan (D+E) 94,633.50
34 Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm RSNIT 15-2002
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.080 OH 100,000 8,000.00
Tukang Batu 0.040 OH 120,000 4,800.00
Kepala Tukang 0.004 OH 150,000 600.00
Mandor 0.004 OH 120,000 480.00
JUMLAH HARGA TENAGA 13,880.00
B BAHAN
Pipa Tanah 1.600 Bh - -
Semen Portland 35.000 Kg 1,702 59,570.00
Pasir Pasang 0.014 M3 212,500 2,975.00
Pasir Urug 0.014 M3 212,500 2,975.00
JUMLAH HARGA BAHAN 65,520.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 79,400.00
E Overhead dan Provit 15 % 11,910.00
F Harga Satuan Pekerjaan (D+E) 91,310.00
35 Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm RSNIT 15-2002
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.060 OH 100,000 6,000.00
Tukang Batu 0.030 OH 120,000 3,600.00
Kepala Tukang 0.003 OH 150,000 450.00
Mandor 0.003 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,410.00
B BAHAN
Pipa Tanah 1.600 Bh - -
Semen Portland 0.680 Kg 1,702 1,157.36
Pasir Pasang 0.013 M3 212,500 2,762.50
Pasir Urug 0.011 M3 212,500 2,337.50
JUMLAH HARGA BAHAN 6,257.36
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 16,667.36
E Overhead dan Provit 15 % 2,500.10
F Harga Satuan Pekerjaan (D+E) 19,167.46
ANALISA HARGA SATUAN
PEKERJAAN KUNCI DAN KACA
6.8. 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Lapis Cat Penutup
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.070 OH 100,000 7,000.00
Tukang Cat 0.009 OH 120,000 1,080.00
Kepala Tukang 0.006 OH 150,000 900.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 9,340.00
B BAHAN
Cat Meni 0.200 Kg 45,000 9,000.00
Plamir / dempul Kayu 0.150 Kg 72,500 10,875.00
Cat Dasar Kayu 0.170 Kg 45,000 7,650.00
Cat Penutup Kayu (2 Kali) 0.260 Kg 55,100 14,326.00
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.030 Kg 25,100 753.00
Ampelas 0.200 Lbr 7,875 1,575.00
JUMLAH HARGA BAHAN 44,434.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 53,774.67
E Overhead dan Provit 15 % 8,066.20
F Harga Satuan Pekerjaan (D+E) 61,840.87
6.9. 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 3 Lapis Cat Penutup
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.070 100,000 7,000.00
Tukang Cat 0.105 120,000 12,600.00
Kepala Tukang 0.004 150,000 600.00
Mandor 0.0030 120,000 360.00
-
JUMLAH HARGA TENAGA 20,560.00
B BAHAN
Cat Meni 0.200 Kg 45,000 9,000.00
Plamir / dempul Kayu 0.150 Kg 72,500 10,875.00
Cat Dasar Kayu 0.170 Kg 45,000 7,650.00
Cat Penutup Kayu (3 Kali) 0.350 Kg 55,100 19,285.00
Kuas 0.010 Bh 25,567 255.67
Pengencer 0.030 Kg 25,100 753.00
Ampelas 0.200 Lbr 7,875 1,575.00
JUMLAH HARGA BAHAN 49,393.67
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 69,953.67
E Overhead dan Provit 15 % 10,493.05
F Harga Satuan Pekerjaan (D+E) 80,446.72
6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Cat 0.063 OH 120,000 7,560.00
Kepala Tukang 0.0063 OH 150,000 945.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,865.00
B BAHAN
Plamir Tembok 0.100 Kg 10,900 1,090.00
Cat Dasar Tembok (standart) 0.100 Kg 23,100 2,310.00
Cat Penutup Tembok (standart) 0.260 Kg 23,100 6,006.00
JUMLAH HARGA BAHAN 9,406.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 20,271.00
E Overhead dan Provit 15 % 3,040.65
F Harga Satuan Pekerjaan (D+E) 23,311.65
6.15. 1 m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.028 OH 100,000 2,800.00
Tukang Cat 0.042 OH 120,000 5,040.00
Kepala Tukang 0.0042 OH 150,000 630.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 8,830.00
B BAHAN
- Cat Dasar Tembok (standart) 0.120 Kg 23,100 2,772.00
- Cat Penutup Tembok (standart) 0.180 Kg 23,100 4,158.00
JUMLAH HARGA BAHAN 6,930.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 15,760.00
E Overhead dan Provit 15 % 2,364.00
F Harga Satuan Pekerjaan (D+E) 18,124.00
6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup) Anti Lumut
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.020 OH 100,000 2,000.00
Tukang Cat 0.063 OH 120,000 7,560.00
Kepala Tukang 0.0063 OH 150,000 945.00
Mandor 0.0030 OH 120,000 360.00
JUMLAH HARGA TENAGA 10,865.00
B BAHAN
Plamir Tembok 0.100 Kg 10,900 1,090.00
Cat Dasar Tembok (standart) 0.100 Kg 53,500 5,350.00
Cat Penutup Tembok (standart) 0.260 Kg 59,920 15,579.20
JUMLAH HARGA BAHAN 22,019.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 32,884.20
E Overhead dan Provit 15 % 4,932.63
F Harga Satuan Pekerjaan (D+E) 37,816.83
6.14. 1 m2 Pengecatan Atap Fiber (1 Lapis dempul, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)sejenis cat mobil
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.250 OH 100,000 25,000.00
Tukang Cat 0.225 OH 120,000 27,000.00
Kepala Tukang 0.0225 OH 150,000 3,375.00
Mandor 0.0075 OH 120,000 900.00
JUMLAH HARGA TENAGA 56,275.00
B BAHAN
Dempul fiber 0.100 Kg 87,000 8,700.00
Cat dasar fiber 0.100 Kg 97,500 9,750.00
Cat penutup fiber 0.260 Kg 97,500 25,350.00
Tiner/ pengencer 0.100 Kg 30,700 3,070.00
JUMLAH HARGA BAHAN 46,870.00
C PERALATAN
Alat Bantu Pengecatan 2,000.00
-
JUMLAH HARGA ALAT 2,000.00
D JUMLAH (A+B+C) 105,145.00
E Overhead dan Provit 15 % 15,771.75
F Harga Satuan Pekerjaan (D+E) 120,916.75