TOS GORONG-GORONG

Pekerjaan galian tanah (1.7.1.a - hal. 183)

Volume = P x L x T
= 3.00 x 0.60 x 0.50
= 0.90 m3
Total volume = 0.90 x 4.00 unit
= 3.60 m3

Kebutuhan upah Vol x Koef


Pekerja = 3.6 x 0.7500 = 2.70 HOK
Mandor = 3.6 x 0.0250 = 0.09 HOK

Pekerjaan pasangan batu belah (2.1.2.a.3.b.(c) hal. 249)

Volume = P x L x T
Volume I = 3.00 x 0.10 x 1.50 x 0.50
= 0.23
Volume II = 3.00 x 0.40 x 1.50 II
= 1.80 I III 1,50

Volume III = 3.00 x 0.10 x 1.50 x 0.50


= 0.23 IV
0,50
Volume IV = 3.00 x 0.60 x 0.50
= 0.90
Total volume = 0,10 0,40 0,10
3.15 x 4.00 unit
= 12.60 m3

Kebutuhan bahan dan upah Vol x Koef


Batu belah = 12.60 x 1.2000 = 15.12 m3
Pasir pasang = 12.60 x 0.5200 = 6.55 m3
Semen 40 kg/sak = 12.60 x 4.0750 = 51.35 sak
Pekerja = 12.60 x 1.5000 = 18.90 HOK
Tukang batu = 12.60 x 0.7500 = 9.45 HOK
Kepala tukang = 12.60 x 0.0750 = 0.95 HOK
Mandor = 12.60 x 0.0750 = 0.95 HOK

Pekerjaan plesteran (3.2.2.2.12.(c) hal. 306)

Luas = 3.00 + 0.40 + 1.503 + 1.503


= 6.41 m2
Total luas = 6.41 x 4.00 unit
= 25.63 m2
1,50

Kebutuhan bahan dan upah Vol x Koef


Semen 40 kg/sak = 25.63 x 0.1944 = 4.98 sak 0,10 0,40 0,10
Pasir pasang = 25.63 x 0.0230 = 0.59 m3
Pekerja = 25.63 x 0.3000 = 7.69 HOK
Tukang batu = 25.63 x 0.1500 = 3.84 HOK
Kepala tukang = 25.63 x 0.0150 = 0.38 HOK
Mandor = 25.63 x 0.0150 = 0.38 HOK

Pekerjaan acian (3.2.2.2.35.(a) - hal 318)

Luas = 3.00 + 0.40 + 1.503 + 1.503


= 6.41 m2
Total luas = 6.41 x 4.00 unit
= 25.63 m2

Kebutuhan bahan dan upah


Semen 40 kg/sak = 25.63 x 0.0813 = 2.08 sak
Pekerja = 25.63 x 0.1000 = 2.56 HOK
Tukang batu = 25.63 x 0.1000 = 2.56 HOK
Kepala tukang = 25.63 x 0.0100 = 0.26 HOK
Mandor = 25.63 x 0.0100 = 0.26 HOK
Pekerjaan pembesian (2.2.6.1.d.(a) Hal. 280)

Lantai memenajang
Diameter besi = 10.00 mm
Panjang besi = 6.00 m'
Jml besi memanjang = 15.00 btg
Total panjang = 90.00 m'
Berat besi per m = 0.62 kg
Total berat = 55.80 kg
Total besi = 7.50 btg
Lantai melintang
Diameter besi = 10.00 mm
Panjang besi = 3.00 m'
Jml besi melintang = 30.00 btg
Total panjang = 90.00 m'
Berat besi per m = 0.62 kg
Total berat = 55.80 kg
Total besi = 7.50 btg
Tiang sandaran
Diameter besi = 10.00 mm
Panjang besi = 3.00 m'
Jumlah batang = 20.00 btg
Total panjang = 60.00 m'
Berat besi per m = 0.62 kg
Total berat = 37.20 kg
Total besi = 5.00 btg

Total panjang besi = 240.00 m'


Total berat besi = 148.80 kg

Kebutuhan bahan dan upah


Besi D10 = 240.00 : 12 = 20.00 btg
Bendrat = 148.80 x 0.0280 = 4.17 kg
Pipa besi 3" 3mm = 2.00 x 2.0000 = 4.00 btg
Pekerja = 148.80 x 0.0160 = 2.38 HOK
Tukang besi = 148.80 x 0.0160 = 2.38 HOK
Kepala Tukang = 148.80 x 0.0016 = 0.24 HOK
Mandor = 148.80 x 0.0016 = 0.24 HOK

Pekerjaan bekisting (B.11.C - HAL. 632)

Volume = 6.00 x 3.00 + 3.60


= 21.60 m2
Kebutuhan bahan dan upah
Papan 2/20 = 21.60 x 0.0140 = 0.30 m3
Kaso 5/7 = 21.60 x 0.0030 = 0.06 m3
Paku 5 & 7 cm = 21.60 x 0.3000 = 6.48 kg
Minyak Bekisting = Dihilangkan karena pakai plastik
Pekerja = 21.60 0.3000 = 6.48 HOK
Tukang Kayu = 21.60 0.1500 = 3.24 HOK
Kepala Tukang = 21.60 0.0150 = 0.32 HOK
Mandor = 21.60 0.0300 = 0.65 HOK

Pekerjaan beton K125 (2.2.1.1.c.(c) - hal. 267)


Volume lantai = 6.00 x 3.00 x 0.20
= 3.60
Volume sandaran = 0.25 x 0.20 x 1.00
= 0.05
Total volume = 3.65 m3
Kebutuhan bahan dan upah
Semen 40 kg/sak = 3.65 x 6.9000 = 25.19 sak
Pasir beton = 3.65 x 0.8280 = 3.02 m3
Split 2/3 = 3.65 x 1.0120 = 3.69 m3
Air (1 liter Air = 0,001 =m 3.65 x 0.2150 = 0.78 m3
Pekerja = 3.65 x 1.6500 = 6.02 HOK
Tukang Kayu = 3.65 x 0.2750 = 1.00 HOK
Kepala Tukang = 3.65 x 0.0275 = 0.10 HOK
Mandor = 3.65 x 0.1650 = 0.60 HOK

Angkut campuran beton (2.2.4.1.a.(a) - hal. 276)

Semen 40 kg/sak = 25.19 sak = 1.01 m3


Pasir beton = 3.02 m3 = 3.02 m3
Split 2/3 = 3.69 m3 = 3.69 m3
Air (1 liter Air = 0,001 =m 0.78 m3 = 0.78 m3
= 8.51 m3

Pekerja = 8.51 x 0.5037 = 4.29 HOK


Mandor = 8.51 0.0504 = 0.43 HOK

Upah Angkut (1.7.15.1.k (a) - hal. 222)

Batu belah = 15.12


Pasir = 10.16
Split = 3.69
Jumlah = 28.98 m3

Kebutuhan upah
Pekerja = 28.98 x 1.3777 = 39.92 HOK
Mandor = 28.98 x 0.0688 = 1.99 HOK

REKAP BAHAN DAN UPAH


Semen 40 kg/sak = 83.59 = 84.00 sak
Batu belah = 15.12 = 15.00 m3
Pasir = 10.16 = 10.00 m3
Split = 3.69 = 4.00 m3
Papan 2/20 = 0.30 = 0.30 m3
Kaso 5/7 = 0.06 = 0.10 m3
Paku = 6.48 = 6.00 kg
Besi D10 = 20.00 = 20.00 btg
Bendrat = 4.17 = 4.00 kg
Pipa besi 3" 3mm = 4.00 = 4.00 btg

Pekerja = 88.56 = 89.00 HOK


Tukang = 22.48 = 22.00 HOK
Kepala Tukang = 2.25 = 2.00 HOK
Mandor = 5.59 = 6.00 HOK
PEMERINTAH KABUPATEN PANGANDARAN
KECAMATAN CIMERAK
DESA MEKARSARI
Jln. Mekarsari No. 333 Desa Mekarsari Kec. Cimerak Kab. Pangandaran

RENCANA ANGGARAN BIAYA (RAB)

DESA : MEKARSARI No.RAB : 002


KECAMATAN : CIMERAK Bidang : PEMBANGUNAN DESA
KABUPATEN : PANGANDARAN Kegiatan : Gorong-gorog jembatan cikijing girang
PROVINSI : JAWA BARAT Lokasi : Dusun Citelu RT 03 RW 02
Volume : 6x3m

HARGA SATUAN
NO URAIAN VOLUME SATUAN
(Rp.)
I BAHAN
1 Semen 40 kg/sak 84.00 sak 65,500
2 Batu belah 15.00 m3 305,000
3 Pasir 10.00 m3 305,000
4 Split 4.00 m3 350,000
5 Papan 2/20 0.30 m3 2,025,000
6 Kaso 5/7 0.10 m3 2,025,000
7 Paku 6.00 kg 29,000
8 Besi D10 20.00 btg 81,000
9 Bendrat 4.00 kg 29,500
10 Pipa besi 3" 3mm 4.00 btg 505,000

SUB TOTAL 1
II ALAT
1 Papan Proyek 1 buah 150,000
2 Ember 10 buah 13,500
3 Benang 2 buah 5,500
4
5
SUB TOTAL 2
III UPAH
1 Pekerja 89 HOK 85,000
2 Tukang 22 HOK 100,000
3 Kepala Tukang 2 HOK 100,000
4 Mandor 6 HOK 120,000
SUB TOTAL 3
IV HONOR TPK
1 Honorarium Ketua 1 OK 175,000
2 Honorarium Sekretaris 1 OK 150,000
3 Honorarium Anggota 1 OK 125,000
SUB TOTAL 4
JUMLAH TOTAL ( Rp. )

Disetujui, Telah Diverifikasi


Pj. Kepala Desa Mekarsari PDTI

UTIS, SUTISNA, S.Kep., Ners ___________________


NIP. 19870427 201001 1 002
PANGANDARAN
ERAK
ARI
imerak Kab. Pangandaran

ANGUNAN DESA
ng-gorog jembatan cikijing girang
n Citelu RT 03 RW 02

JUMLAH (Rp.)

5,502,000
4,575,000
3,050,000
1,400,000
607,500
202,500
174,000
1,620,000
118,000
2,020,000

19,269,000

150,000
135,000
11,000
-
-
296,000

7,565,000
2,200,000
200,000
720,000
10,685,000

175,000
150,000
125,000
450,000
30,700,000

Mekarsari, 7 September 2022


Pelaksana Kegiatan

MAMAN SUDIAMAN
GAMBAR RENCANA PRASARANA

Catatan : Gambar dibuat secara manual


GAMBAR RENCANA PRASARANA

Catatan : Gambar dibuat secara manual


GAMBAR RENCANA PRASARANA

PIPA
BES
I 3"
PIPA
BES
I 3"

Catatan : Gambar dibuat secara manual


ARANA

GAMBAR RENCANA

KABUPATEN
PANGANDARAN
KECAMATAN
CIMERAK
DESA
MEKARSARI
JENIS PRASARANA
PEMBANGUNAN GORONG-GORONG
LOKASI
DUSUN CITELU RT 03 RW 02
JUDUL GAMBAR
PASANGAN BATU
Digambar Oleh
Pelaksana Kegiatan
(Kader Teknik)
Diperiksa dan Disetujui oleh :
Dinas/Instansi terkait dan/atau Tenaga Profesional
(jika tersedia)

Lembar Dari Lembar


ARANA

GAMBAR RENCANA

KABUPATEN
PANGANDARAN
KECAMATAN
CIMERAK
DESA
MEKARSARI
JENIS PRASARANA
PEMBANGUNAN GORONG-GORONG
LOKASI
DUSUN CITELU RT 03 RW 02
JUDUL GAMBAR
PENULANGAN LANTAI
Digambar Oleh
Pelaksana Kegiatan
(Kader Teknik)
Diperiksa dan Disetujui oleh :
Dinas/Instansi terkait dan/atau Tenaga Profesional
(jika tersedia)

Lembar Dari Lembar


ARANA

GAMBAR RENCANA

KABUPATEN
PANGANDARAN
KECAMATAN
CIMERAK
DESA
MEKARSARI
JENIS PRASARANA
PEMBANGUNAN GORONG-GORONG
LOKASI
DUSUN CITELU RT 03 RW 02
JUDUL GAMBAR
TIANG SANDARAN
Digambar Oleh
Pelaksana Kegiatan
(Kader Teknik)
Diperiksa dan Disetujui oleh :
Dinas/Instansi terkait dan/atau Tenaga Profesional
(jika tersedia)

Lembar Dari Lembar


HASIL SURVEI HARGA BAHAN DAN ALAT
TAHUN ANGGARAN 2023

Bidang : PEMBANGUNAN DESA


Kegiatan : Gorong-gorog jembatan cikijing girang
Lokasi : Dusun Citelu RT 03 RW 02
Volume : 6x3m

NO JENIS BAHAN/MATERIAL/ALAT SATUAN


1 Semen 40 kg/sak sak
2 Batu belah m3
3 Pasir m3
4 Split m3
5 Papan 2/20 m3
6 Kaso 5/7 m3
7 Paku kg
8 Besi D10 btg
9 Bendrat kg
10 Pipa besi 3" 3mm btg
11 Papan Proyek bh
12 Ember bh
13 Benang bh

Mengetahui, Toko/Suplier
Pj. Kepala Desa Mekarsari TB. INDO BETON

UTIS SUTISNA, S.Kep., Ners ADE IMRAN


NIP. 19870427 201001 1 002
HASIL SURVEI HARGA BAHAN DAN ALAT
TAHUN ANGGARAN 2023

Bidang : PEMBANGUNAN DESA


Kegiatan : Gorong-gorog jembatan cikijing girang
Lokasi : Dusun Citelu RT 03 RW 02
Volume : 6x3m

NO JENIS BAHAN/MATERIAL/ALAT SATUAN


1 Semen 40 kg/sak sak
2 Batu belah m3
3 Pasir m3
4 Split m3
5 Papan 2/20 m3
6 Kaso 5/7 m3
7 Paku kg
8 Besi D10 btg
9 Bendrat kg
10 Pipa besi 3" 3mm btg
11 Papan Proyek bh
12 Ember bh
13 Benang bh

Mengetahui, Toko/Suplier
Pj. Kepala Desa Mekarsari MK. AMANAH

UTIS SUTISNA, S.Kep., Ners EPI SAPEIN


NIP. 19870427 201001 1 002
HASIL SURVEI HARGA BAHAN DAN ALAT
TAHUN ANGGARAN 2023

Bidang : PEMBANGUNAN DESA


Kegiatan : Gorong-gorog jembatan cikijing girang
Lokasi : Dusun Citelu RT 03 RW 02
Volume : 6x3m

NO JENIS BAHAN/MATERIAL/ALAT SATUAN


1 Semen 40 kg/sak sak
2 Batu belah m3
3 Pasir m3
4 Split m3
5 Papan 2/20 m3
6 Kaso 5/7 m3
7 Paku kg
8 Besi D10 btg
9 Bendrat kg
10 Pipa besi 3" 3mm btg
11 Papan Proyek bh
12 Ember bh
13 Benang bh

Mengetahui, Toko/Suplier
Pj. Kepala Desa Mekarsari TB. MAMAN

UTIS SUTISNA, S.Kep., Ners H. MAMAN


NIP. 19870427 201001 1 002
HASIL SURVEI HARGA BAHAN DAN ALAT
TAHUN ANGGARAN 2023

Bidang : PEMBANGUNAN DESA


Kegiatan : Gorong-gorog jembatan cikijing girang
Lokasi : Dusun Citelu RT 03 RW 02
Volume : 6x3m

NO JENIS BAHAN/MATERIAL/ALAT SATUAN


1 Semen 40 kg/sak sak
2 Batu belah m3
3 Pasir m3
4 Split m3
5 Papan 2/20 m3
6 Kaso 5/7 m3
7 Paku kg
8 Besi D10 btg
9 Bendrat kg
10 Pipa besi 3" 3mm btg
11 Papan Proyek bh
12 Ember bh
13 Benang bh

Mengetahui,
Pj. Kepala Desa Mekarsari

UTIS SUTISNA, S.Kep., Ners


NIP. 19870427 201001 1 002
N ALAT

an cikijing girang

HARGA SATUAN SAMPAI DI


LOKASI KEGIATAN (RP)
65,000
300,000
300,000
345,000
2,000,000
2,000,000
28,000
80,000
29,000
500,000
150,000
13,000
5,000

Mekarsari, 1 September 2022


Disurvey Oleh

MAMAN SUDIAMAN
N ALAT

an cikijing girang

HARGA SATUAN SAMPAI DI


LOKASI KEGIATAN (RP)
65,500
305,000
305,000
350,000
2,025,000
2,025,000
29,000
81,000
29,500
505,000
150,000
13,500
5,500

Mekarsari, 1 September 2022


Disurvey Oleh

MAMAN SUDIAMAN
N ALAT

an cikijing girang

HARGA SATUAN SAMPAI DI


LOKASI KEGIATAN (RP)
66,000
310,000
310,000
355,000
2,050,000
2,050,000
30,000
82,000
30,000
510,000
150,000
14,000
6,000

Mekarsari, 1 September 2022


Disurvey Oleh

MAMAN SUDIAMAN
N ALAT

an cikijing girang

HARGA SATUAN SAMPAI DI


LOKASI KEGIATAN (RP)
65,500
305,000
305,000
350,000
2,025,000
2,025,000
29,000
81,000
29,500
505,000
150,000
13,500
5,500

Mekarsari, 2 September 2022


Pelaksana Kegiatan Anggaran

MAMAN SUDIAMAN