You are on page 1of 73

PERHITUNGAN VOLUME PEKERJAAN

No.
Gambar Sket Perhitungan Volume

I. Pekerjaan Galian Tanah


Poer Plat 100 x 100 x 165
1.00 x 1.00 x 1.65 x 21 Bh 34.650 m3
Poer Plat 100 x 100 x 150
1.00 x 1.00 x 1.50 x 10 Bh 15.000 m3
Poer Plat 70 x 120 x 110(tangga) 96.3
0.70 x 1.20 x 1.10 x 1 Bh 0.924 m3 0
Pondasi Menerus
0.60 x 0.60 x 65.3 m 23.508 m3 96.3
74.082 m 3

II. Pekerjaan Tanah Urug Bawah Pondasi


Poer Plat 100 x 100 x 165
1.65 x 0.30 x 0.30 = 0.149
0.20 x 1.00 x 1.00 = 0.2
0.17 x 0.10 x 1.513 = 0.025
= 0.374
Jmlh = 21 Bh 26.802 m3
Poer Plat 100 x 100 x 150
1.50 x 0.30 x 0.30 = 0.135
0.20 x 1.00 x 1.00 = 0.2
0.17 x 0.10 x 1.51 = 0.025
= 0.36
Jmlh = 10 Bh 11.398 m3
Poer Plat 70 x 120 x 110(tangga)
0.20 x 0.70 x 0.80 = 0.112
0.20 x 1.00 x 1.00 = 0.2
0.17 x 0.10 x 1.508 = 0.025
= 0.337
1 0.587
Pondasi Menerus
0.30 + 0.60
x 0.60 x 65.30
2
= 17.63 m3
23.508 - 17.63 5.877 m3
44.664 m3
III. Pekerjaan Tanah Urug Bawah Lantai
0.12 x 1.35 x 1.60 x 2 0.518 m3 KM
0.12 x 1.35 x 1.75 x 2 0.567 m3 T.W
0.12 x 1.10 x 2.85 x 2 0.752 m3 DEPAN KM
0.12 x 1.43 x 31.30 x 1 5.352 m3 TERAS
0.12 x 5.85 x 2.85 x 1 2.001 m3 Bawah Tangga
0.12 x 8.85 x 11.85 x 1 12.585 m3 R. STAF
0.12 x 5.85 x 2.85 x 1 2.001 m3 R. STAF
23.776 m3

III. Pekerjaan Pas. Batu Gunung


0.30 + 0.60
x 0.60 x 65.30 17.631 m3
2
Pas. Batu Kosong
0.20 x 0.60 x 65.30 7.836 m3
IV. Pekerjaan Pas. Pasir Urug
= Pasir Urug bawah Pondasi Menerus
0.05 x 0.50 x 65.30 1.633 m3
= Pasir Urug bawah Poer Plat
0.05 x 1.00 x 1.00 x 31.00 1.550 m3
= Pasir Urug bawah Poer Plat tangga
0.05 x 1.20 x 0.70 x 1.00 0.042 m3
3.225 m3

= Pasir Urug bawah Lantai


0.05 x 1.35 x 1.60 x 2 0.216 m3
0.05 x 1.35 x 1.75 x 2 0.236 m3
0.05 x 1.10 x 2.85 x 2 0.314 m3
0.05 x 1.43 x 31.30 x 1 2.230 m3
0.05 x 5.85 x 2.85 x 1 0.834 m3
0.05 x 8.85 x 11.85 x 1 5.244 m3
0.05 x 5.85 x 2.85 x 1 0.834 m3
9.907 m3
2 0.05
4 0.1
3 0.5
V. Pekerjaan Lantai Tegel I ( Diluar KM/WC)
Teras :
1.50 x 14.75
22.125 m2 22.125 m2
Lantai I :
9.80 x 14.75
144.550 m2
KM/WC 1.65 x 3.00
4.950 m2 139.600 m2
Lantai II :
9.80 x 14.75
144.550 m2
KM/WC 3.00 x 3.00
9.000 m2
Tangga 3.00 x 4.00
12.000 m2 123.550 m2
Tangga :
1.20 x 2.00
2.400 m2
1.50 x 4.70
7.050 m2
1.65 x 3.00
4.950 m2
1.50 x 3.70
5.550 m2 19.950 m2

VI. Pekerjaan Beton Betulang


A. Poer Plat
0.20 x 1.00 x 1.00 x #REF! Bh
#REF! m3
0.09 + 1.00
x 0.10 x #REF! Bh
2
#REF! m3
0.30 x 0.30 x 1.30 x #REF! Bh
#REF! m3 #REF! m3

B. Kolom 30/30
0.30 x 0.30 x 3.80 x#REF! Bh
#REF! m3
0.30 x 0.30 x 4.00 x 14 Bh
5.040 m3 #REF! m3

C. Sloef 20/25
Vertikal
0.20 x 0.25 x 35.20
1.760 m3
Horisontal
0.20 x 0.25 x 59.78
2.989 m3 4.749 m3
D. Balok 25/35
Vertikal
0.25 x 0.35 x 59.00
5.163 m3
Horisontal
0.25 x 0.35 x 58.80
5.145 m3 10.308 m3

E. Ring Balk 12/15


1.00 x 66.90
66.900 m' 66.900 m'

F. Plat Lantai Tebal 12 cm


0.12 x 9.80 x 14.75
17.346 m3
Tangga :
0.12 x 3.00 x 4.00
1.440 m3 15.906 m3
G. Kolom Teras 25/25
0.25 x 0.25 x 4.00 x 3
0.750 m3 0.750 m3

VII. Pekerjaan ListPlank Beton


Balok Level Bawah Plat Listplank
0.15 x 0.25 x 1.20 x 12 Bh
0.540 m3
KonsTruksi Listplank
Plat Level
0.10 x 1.15 x 29.50
3.393 m3
ListPlank Beton
0.08 x 0.55 x 29.50
1.298 m3 5.231 m3

VIII. Pekerjaan Balok Latei 1& Kolom Praktis 2/15


Balok Latei
Lantai I&II 1.00 x 49.10 x 2
98.200 m'
Lantai I 1.00 x 45.86 5.75
45.860 m'
Lantai II 1.00 x 20.30
20.300 m' 164.360 m'
Kolom Praktis
Lantai II 1.00 x 4.00 x 7 Bh
28.000 m'
Lantai I 1.00 x 3.80 x 7 Bh
26.600 m' 55.600 m'
Kuda-Kuda Tembok
Ring Balk
1.00 x 6.50 x 2 Bh
13.000 m'
Kolom Praktis
1.00 x 3.65 x 1 Bh 5
3.650 m' 50
1.00 x 2.50 x 2 Bh
5.000 m' 21.650 m' 2.5

IX. Pekerjaan Tangga


Balok Beton 15/25
0.15 x 0.25 x 3.00 x 2 Bh
0.225 m3
0.15 x 0.25 x 1.65 x 2 Bh
0.124 m3 0.349 m3
Plat Bordes
0.12 x 1.65 x 3.00 x 2 Bh
1.188 m3
I. Plat Pertama
0.12 x 1.50 x 3.75
0.675 m3
0.03 x 1.50 x 10 Bh
0.450 m3
II. Plat Kedua
0.12 x 1.50 x 2.75
0.495 m3
0.03 x 1.50 x 8 Bh
0.360 m3 3.168 m3
18

Perhitungan Volume :

0.3 + 0.6
x 0.6 x 10
2
= 2.70 M3

Analisis Harga :
1M3 Pas. Pondasi Batu Gunung 1 : 5
1.100 Batu Gunung @ 135,000 Rp. 148,500
0.544 Pasir @ 105,000 Rp. 57,120
DEPAN KM 136.000 Semen Portland @ 1,360 Rp. 184,960
0.600 Tukang Batu @ 55,000 Rp. 33,000
Bawah Tangga 1.500 Pekerja @ 45,000 Rp. 67,500
Jumlah 491,080
RAB :
2.70 x ### = 1,325,916.00
PERHITUNGAN VOLUME PEKERJAAN

No. Gambar Sket Perhitungan Volume

1. Pekerjaan Beton Rabat


+ Lantai
0.05 x 1.35 x 1.60 x 2 0.216 m3
0.05 x 1.35 x 1.75 x 2 0.236 m3
0.05 x 1.10 x 2.85 x 2 0.314 m3
0.05 1.43 31.30 X 1 2.230 m3
0.05 x 5.85 x 2.85 x 1 0.834 m3
0.05 x 8.85 x 11.85 x 1 5.244 m3
0.05 x 5.85 x 2.85 x 1 0.834 m3
9.907 m3
+ Lantai Kerja Untuk Poer Plat
0.10 x 1.00 x 1.00 x 31 Bh 3.100 m3
+ Lantai Kerja Untuk Poer Plat Tangga
0.10 x 0.70 x 1.20 x 1 Bh 0.084 m3
2. Pekerjaan Beton Bertulang
A. Pandasi Poer Plat 100 x 100 x 165
1.50 x 0.30 x 0.30 x 21 Bh 2.835 m3

0.20 x 1.00 x 1.00 x 21 Bh 4.200 m3

0.17 x 0.10 x 1.51 x 21 Bh 0.529 m3


7.564 m3
Pandasi Poer Plat 100 x 100 x 150
1.35 x 0.30 x 0.30 x 10 Bh 1.215 m3

0.20 x 1.00 x 1.00 x 10 Bh 2.000 m3

0.17 x 0.10 x 1.51 x 10 Bh 0.252 m3


3.467 m3
Pandasi Poer Plat 70 x 120 x 110(tangga)
0.20 x 0.70 x 0.80 x 1 Bh 0.112 m3

0.20 x 1.00 x 1.00 x 1 Bh 0.200 m3

0.17 x 0.10 x 1.51 x 1 Bh 0.025 m3


0.337 m3
B. 1. Kolom
Lantai 1
Kolom 30/30
0.30 x 0.30 x 4.00 x 21 Bh 7.560 m3
Kolom Teras 25/25
0.30 x 0.30 x 4.00 x 10 Bh 3.600 m3
Lantai 2
Kolom 20/20
0.20 x 0.20 x 4.00 x 21 Bh 3.360 m3
Kolom Teras 20/20
0.20 x 0.20 x 4.00 x 10 Bh 1.600 m3
Kolom Praktis 11/11
0.11 x 0.11 x 4.00 x 15 Bh 0.726 m3
C. Sloef 20/25
0.20 x 0.25 x 18.00 x 3 Bh 2.700 m3
0.20 x 0.25 x 1.50 x 5 Bh 0.375 m3
0.20 x 0.25 x 3.00 x 2 Bh 0.300 m3
0.20 x 0.25 x 12.00 x 1 Bh 0.600 m3
0.20 x 0.25 x 10.50 x 4 Bh 2.100 m3
0.20 x 0.25 x 13.50 x 1 Bh 0.675 m3
0.20 x 0.25 x 3.00 x 1 Bh 0.150 m3
0.20 x 0.25 x 1.75 x 2 Bh 0.175 m3
0.20 x 0.25 x 1.50 x 1 Bh 0.075 m3
0.20 x 0.25 x 0.00 x 0 Bh 0.000 m3
0.20 x 0.25 x 0.00 x 0 Bh 0.000 m3
7.150 m3
D. Balok 20/40
0.20 x 0.40 x 10.50 x 6 Bh 5.04 m3
0.20 x 0.40 x 3.00 x 1 Bh 0.24 m3
5.280 m3
Balok 15/25
0.15 x 0.25 x 18.00 x 3 Bh 2.025 m3
0.15 x 0.25 x 12.00 x 1 Bh 0.450 m3
0.15 x 0.25 x 3.00 x 6 Bh 0.675 m3
0.15 x 0.25 x 1.50 x 1 Bh 0.056 m3
0.15 x 0.25 x 0.70 x 8 Bh 0.210 m3
3.416 m3
Balok 15/20
0.15 x 0.20 x 1.50 x 2 Bh 0.090 m3
0.15 x 0.20 x 1.75 x 2 Bh 0.105 m3
0.195 m3
E. Ring Balk 15/20
0.15 x 0.20 x 18.00 x 2 Bh 1.080 m3
0.15 x 0.20 x 16.50 x 1 Bh 0.495 m3
0.15 x 0.20 x 3.00 x 9 Bh 0.810 m3
0.15 x 0.20 x 1.75 x 1 Bh 0.053 m3
0.15 x 0.20 x 1.50 x 1 Bh 0.045 m3
0.15 x 0.20 x 1.75 x 1 Bh 0.053 m3
0.15 x 0.20 x 0.60 x 6 Bh 0.108 m3
2.643 m3
F. Ring Balk 20/25
0.20 x 0.25 x 10.50 x 6 Bh 3.150 m3
0.20 x 0.25 x 3.00 x 1 Bh 0.150 m3
0.20 x 0.25 x 0.60 x 13 Bh 0.390 m3
3.690 m3
F. Balok Latei
0.10 x 0.10 x 2.80 x 12 Bh 0.336 m3
0.336 m3
F. Plat Lantai Tebal 12 cm Lt I
0.12 x 1.35 x 1.60 x 2 0.518 m3
0.12 x 1.35 x 1.75 x 2 0.567 m3
0.12 x 1.10 x 2.85 x 2 0.752 m3
0.12 1.43 31.30 X 1 5.352 m3
0.12 x 5.85 x 2.85 x 1 2.001 m3
0.12 x 8.85 x 11.85 x 1 12.585 m3
0.12 x 5.85 x 2.85 x 1 2.001 m3
0.12 x 0.70 x 21.00 x 1 1.764 m3
25.540 m3
Pengurang
0.12 x 0.09 x 5.00 0.054 m3
25.486 m3
G. Pekerjaan Tangga
I. Plat Pertama
0.15 x 1.20 x 3.18 x 2 Bh 1.145 m3
II. Plat Kedua
0.03 x 1.20 x 9.00 x 2 Bh 0.648 m3
III. Borders
0.15 x 3.00 x 1.30 x 1 Bh 0.585 m3
2.378 m3
3. Pek. Rabat Beton Keliling Bangunan 1
0.05 x 51.50 x 1.00 2.575 m3

VII. Pekerjaan ListPlank Beton


Balok Level Bawah Plat Listplank
0.15 x 0.20 x 0.80 x 18 Bh 0.432 m3

KonsTruksi Listplank
Plat Level
0.10 x 0.80 x 51.80 4.144 m3
ListPlank Beton
0.08 x 0.70 x 51.80 2.901 m3
Kanopi
0.08 x 0.60 x 2.40 x 8 Bh 0.922 m3
0.08 x 0.60 x 0.80 x 7 Bh 0.269 m3
8.667 m3
3.18
3.1683434157

0.03
PERHITUNGAN VOLUME PEKERJAAN

No. Gambar Sket Perhitungan Volume

I. Pekerjaan Pas. Batu bata Transram


Dinding :
0.50 x 62.60 31.300 m2
31.300 m2
Luas Lubang
Pintu 1 0.50 x 1.50 x 1 Bh 0.750 m2
Pintu B.T 0.50 x 1.00 x 1 Bh 0.500 m2
Pintu 3 0.50 x 0.90 x 2 Bh 0.900 m2
Pintu WC 0.50 x 0.75 x 2 Bh 0.750 m2
2.900 m2
Total 28.400 m2
Pekerjaan Plesteran Dinding Transram
28.400 x 2 Sisi 56.800 m2

2. Pekerjaan Pas. Batu bata


Lantai I
Dinding :
3.10 x 62.60 194.060 m2
194.060 m2
Luas Lubang
JEND 1. 0.50 x 1.90 x 8 Bh 7.600 m2
vent Jen 1 0.50 x 0.50 x 8 Bh 2.000 m2
JEND 2 0.50 x 1.60 x 12 Bh 9.600 m2
vent Jen 2 0.50 x 0.50 x 12 Bh 3.000 m2
Pintu 1 1.50 x 2.25 x 1 Bh 3.375 m2
Pintu B.T 1.00 x 2.10 x 1 Bh 2.100 m2
Pintu3 0.90 x 2.15 x 2 Bh 3.870 m2
Pintu WC 0.75 x 2.00 x 2 Bh 3.000 m2
ventilasi K 0.50 x 0.50 x 4 Bh 1.000 m2
35.545 m2
Total 158.515 m2
Lantai II
Dinding :
59.95 x 3.80 227.810 m2
Selasar
1.00 x 2.75 x 6 Bh 16.500 m2
1.00 x 1.35 x 4 Bh 5.400 m2
Tangga
1.00 x 1.50 x 1 Bh 1.500 m2
251.210 m2
Luas Lubang Depan
JEND 1. 0.50 x 1.90 x 4 Bh 3.800 m2
vent Jen 1 0.50 x 0.50 x 4 Bh 1.000 m2
JEND 2 0.50 x 1.60 x 12 Bh 9.600 m2
vent Jen 2 0.50 x 0.50 x 12 Bh 3.000 m2
Pintu 1 1.50 x 2.25 x 2 Bh 6.750 m2
Pintu3 0.90 x 2.15 x 1 Bh 1.935 m2
Pintu WC 0.75 x 2.00 x 3 Bh 4.500 m2
ventilasi K 0.50 x 0.50 x 4 Bh 1.000 m2
31.585 m2
Total 219.625 m2

Volume Pekerjaan Pas. Batu bata 378.140 m2

II. Pekerjaan Plesteran Dinding Tembok


378.140 x 2 Sisi 756.280 m2
Pekerjaan Plesteran Beton
Kolom Beton
30/30 4.00 x 1.20 x 15 Bh 72.000 m2
30/30 4.00 x 0.60 x 16 Bh 38.400 m2
20/20 4.00 x 0.80 x 15 Bh 48.000 m2
20/20 4.00 x 0.50 x 16 Bh 32.000 m2
15/15 4.00 x 0.24 x 15 Bh 14.400 m2
20/40 ### x 0.40 x 1 Bh 22.800 m2
204.800 m2
8.1
4.8
1.1
48.6
62.6

0
6
44
4.05
4.8
1.1
59.95

2.7
PERHITUNGAN VOLUME PEKERJAAN

No. Gambar Sket Perhitungan Volume

1. Pekerjaan Kusen Pintu dan Jendela


+ Pekerjaan Kusen Pintu
Kusen Pintu 2 bukaan
0.05 x 0.12 x 5.90 x 3 Bh 0.106
Kusen Pintu 2
0.05 x 0.12 x 5.30 x 2 Bh 0.064
Kusen Pintu 3
0.05 x 0.12 x 5.10 x 5 Bh 0.153
Kusen Pintu (KM/WC)
0.05 x 0.12 x 4.65 x 5 Bh 0.140
0.462

+ Pekerjaan Kusen Jendela


Kusen Jendela Tipe I
0.05 x 0.12 x 4.60 x 12 Bh 0.331
Kusen Jendela Tipe 2
0.00 x 0.00 x 4.00 x 24 Bh -
Kusen Ventilasi
0.05 x 0.12 x 1.80 x 44 Bh 0.475
Kusen Ventilasi KM
0.05 x 0.12 x 2.20 x 8 Bh 0.106
0.912
Volume Kusen Pintu dan Jendel 1.374
II. Pekerjaan Daun Pintu
+ Daun Pintu 2 Bukaan
1.40 x 2.20 x 3 Bh 9.240
+ Daun Pintu 2
0.80 x 2.22 x 2 Bh 3.552
+ Daun Pintu 3
0.80 x 2.10 x 5 Bh 8.400
21.192
+ Daun Pintu Panil WC/KM
0.65 x 1.95 x 5 Bh 6.338

III. Pekerjaan Daun Jendela


+ Daun Jendela
Jendela Type I
0.05 x 4.20 x 12 Bh 2.520
Jendela Type 2
0.05 x 3.60 x 24 Bh 4.320
+ Daun Ventilasi
0.05 x 1.60 x 8 Bh 0.640
7.480

IV. Pekerjaan Kaca Mati


+ Kaca Mati Jendela
A. 0.30 x 1.70 x 12 Bh 6.120
A. 0.30 x 1.40 x 24 Bh 10.080
16.200
+ Kaca Mati Ventilasi
0.30 x 0.30 x 8 Bh 0.720

I. Pekerjaan Dinding Partisi


Dinding :
3.10 x 13.80 42.780
42.780
Luas Lubang
Pintu 1 0.90 x 2.15 x 1 Bh 1.935
1.935
Total 40.845
I. Les Plafond :
Lt I : 1.00 x 10.30 x 1 Bh 10.30
1.00 x 9.00 x 1 Bh 9.00

Lt II : 1.00 x 10.00 x 1 Bh 10.00


1.00 x 6.00 x 1 Bh 6.00
1.00 x 7.00 x 1 Bh 7.00
1.00 x 24.00 x 1 Bh 24.00
1.00 x 5.00 x 1 Bh 5.00
1.00 x 33.00 x 1 Bh 33.00

1.00 x 7.50 x 2 Bh 15.00


1.00 x 7.00 x 2 Bh 14.00
1.00 x 4.50 x 2 Bh 9.00
1.00 x 6.00 x 4 Bh 24.00

1.00 x 13.50 x 1 Bh 13.50


179.80

II. Les Kaca Mati :


Lt I : 1.00 x 8.00 x ###Bh #REF!
Lt II : 1.00 x 8.00 x ###Bh #REF!
#REF!
PERHITUNGAN VOLUME PEKERJAAN
KANTOR DIKNAS MAKASSAR

No. Gambar Sket Perhitungan Volume

I. Pekerjaan Pas. Batu bata


Lantai I
Dinding Luar :
3.80 x 88.00 334.400
Dinding Ruang Tengah :
3.80 x 12.00 45.600
Dinding WC/KM :
3.80 x 14.95 56.810

Lantai II
Dinding Luar :
4.55 x 88.00 400.400
Dinding Ruang Tengah :
3.80 x 24.50 93.100
Dinding WC/KM :
3.80 x 14.95 56.810
Tangga
1.00 x 2.75 2.750
1.00 x 12.30 12.300
Pembungkus Kolom Teras
1.00 x 3.50 x 2 Bh 7.000
Pembungkus Kolom Lt II
0.30 x 3.80 x ###Bh 20.520
Kuda-Kuda Atap
1/2 x 3.25 x 1.40 x 2 Bh 4.550
Dinding Bagian Atas Teras
1.00 x 14.00 14.000
###
Penebalan Dinding Tembok
3.15 x 9.00 x 2 Bh 56.700
0.70 x 11.10 7.770
0.70 x 4.80 3.360
0.70 x 2.85 1.995
0.70 x 4.60 3.220
1.10 x 8.00 x 2 Bh 17.600
0.50 x 8.00 x 4 Bh 16.000
106.645
Bagian Pengurang Dinding Tembok
+ Pintu:
I. PD 1.50 x 2.20 x 1 Bh 3.300
II. PT 1.50 x 2.20 x 3 Bh 9.900
III. PS 1.00 x 2.20 x 1 Bh 2.200
IV. PWC 0.80 x 2.00 x 6 Bh 9.600
+ Jendela
I. JD 0.50 x 1.20 x ###Bh 8.400
II. JS 0.50 x 1.20 x ###Bh 7.200
III. JB 0.50 x 1.20 x ###Bh 20.400
+ Ventilasi
I. VD 0.50 x 0.50 x ###Bh 5.000
II. VS 0.50 x 0.50 x ###Bh 3.000
III. VB 0.50 x 0.50 x ###Bh 6.500
III. VTrs 0.30 x 0.40 x ###Bh 1.440
+ Bukaan
0.90 x 2.00 x 4 Bh 7.200
+ Glass Blok
1.20 x 200 x 1 Bh 240.000
324.140

724.100
II. Pekerjaan Plesteran Dinding Tembok
724.100 x 2 Sisi ###
Bagian Pengurang Kuda-Kuda Dinding Tembok
+ Kuda-Kuda Dinding Tembok
1/2 x 3.25 x 1.40 x 2 Bh 4.550
###
Pekerjaan Plesteran Beton
Lisplank
0.85 x 0.00 x 1 Bh 0.000
1.25 x 0.00 x 1 Bh 0.000
Teras
1.30 x 6.50 x 1 Bh 8.450
Konsol Beton
0.45 x 0.60 x ###Bh 6.480
0.10 x 0.70 x ###Bh 0.840
0.60 x 6.00 x 4 Bh 14.400
Kolom Beton
30/30 1.20 x 3.80 x ###Bh 54.720
1.00 x 3.80 x 5 Bh 19.000
0.80 x 3.80 x 9 Bh 27.360
0.60 x 3.80 x ###Bh 27.360

20/20 0.80 x 8.00 x 6 Bh 38.400


0.80 x 4.00 x 9 Bh 28.800
0.60 x 4.00 x ###Bh 24.000
0.30 x 4.00 x 6 Bh 7.200
257.010
Pekerjaan Plesteran Pondasi
0.40 x 3.20 x 2 Bh 2.560
0.40 x 0.50 x 4 Bh 0.800
0.40 x 6.85 x 1 Bh 2.740
0.40 x 10.55 x 1 Bh 4.220
0.40 x 35.00 x 1 Bh 14.000
0.40 x 13.80 x 1 Bh 5.520
0.40 x 5.00 x 1 Bh 2.000
31.840
Volume Luasan Jendela
Type

m3

m3

m3

m3
m3

m3

m3

m3

m3
m3
m3

m2

m2

m2
m2

m2

m2

m2

m2
m2

m2
m2
m2

m2

8.4
m2 5.4
m2 13.8

m2
m2
m2
m'
m'

m'
m'
m'
m'
m'
m'

m'
m'
m'
m'

m'
m'

m'
m'
m'
Volume Luasan Jendela
Type
J1 1.80 x 1.15 x 8 Bh = 16.56
J3 1.80 x 0.70 x 4 Bh = 5.04
J4 1.15 x 0.70 x 1 Bh = 0.81
m 2
Vj1 0.4 x 0.4 x 18 Bh = 2.88
Vj3 0.4 x 0.4 x 12 Bh = 1.92
m2 Vj4 0.4 x 0.4 x 2 Bh = 0.32
= 27.53
m2 Luasan Pintu
Type
P1 1.30 x 2.1 x 5 Bh = 13.65
P3 x x 2 Bh = 0
m2 P4 0.75 x 1 x 3 Bh = 2.25
= 15.90
m 2
43.43

m2

m2
m2

m2

m2

m2

m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2

m2
m2
m2
m2

m2

m2
m2

m2

m2

m2
m2

m2
m2

m2

m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
PERHITUNGAN VOLUME PEKERJAAN

No.Gambar Sket Perhitungan Volume

I. Pekerjaan Nok Atap


Induk 22.60 x 1 Bh x 0.6 13.56 m2
` 3.70 x 2 Bh x 0.6 4.44 m2
- x 1 Bh x 0.6 - m2
18.000 m2
Pekerjaan Talang Patahan Atap
9.37 x 0.8 Bh 7.50 m'

II. Pekerjaan Atap


+ Atap Induk
16.76 x 7.55 x 2 Bh 253.076 m2
6.75 + 11.75
x 2.50 x 1 Bh 23.125 m2
2
0.5 x 2.50 x 3.50 x 2 Bh 8.750 m2
0.5 x 7.55 x 6.00 x 2 Bh 45.300 m2
330.251 m2
Jadi Luas Total Atap 330.251 m2

III. Pekerjaan Kuda-Kuda


Kuda-Kuda Induk
0.08 x 0.12 x 48.80 x 7 Bh 3.279 m3 3.841874542
0.08 x 0.12 x 3.50 x 3 Bh 0.101 m3
0.08 x 0.12 x 22.65 x 1 Bh 0.217 m3
0.08 x 0.12 x 9.60 x 2 Bh 0.184 m3 9.582
3.782 m2

IV. Pekerjaan Gording 6/12


II. Kuda-Kuda Induk
0.06 x 0.12 x 140.55 x 2 2.024 m3
0.06 x 0.12 x 37.25 0.268 m3
2.292 m3

IV. Pekerjaan Balok Angin 6/12


0.06 x 0.12 x 3.70 x 14 Bh 0.373 m3
3.716517
9.370832

2.520

150
#VALUE!

1.5 18 66
150 11 11
### ###
2 9.2
5.5
3.7
1.9
###
464 ### 11 9 6
PERHITUNGAN VOLUME PEKERJAAN

No. Gambar Sket Perhitungan Volume

I. Pekerjaan Plafon
Lt 1
1.35 x 1.60 x 2 4.320 m2
1.35 x 1.75 x 2 4.725 m2
1.10 x 2.85 x 2 6.270 m2
8.85 x 11.85 x 1 ### m2
5.85 x 2.85 x 1 16.673 m2
136.410 m2
Lantai 2 :
14.85 x 8.85 x 1 131.298 m2
1.10 x 2.85 x 1 3.135 m2
1.35 x 1.75 x 1 2.363 m2
1.35 x 1.60 x 1 2.160 m2
2.85 x 5.85 x 1 16.673 m2
17.85 x 1.50 x 1 26.775 m2
182.20 m2

Volume Plafon 318.61 m2

II. Pekerjaan Lantai Tegel :


= Tegel 30 x 30
Lantai I :

1.10 x 2.85 x 2 6.270 m2


1.43 x 22.43 x 1 31.078 m2
2.00 x 2.85 x 1 5.34 m2
8.85 x 11.85 x 1 104.873 m2
5.85 x 2.85 x 1 16.673 m2
0.15 x 1.50 x 1 0.225 m2
0.15 x 0.90 x 2 0.270 m2
164.28 m2
Lantai II :
13.35 x 8.85 x 1 104.87
1.10 x 2.85 x 1 3.14 m2
1.35 x 1.75 x 1 1.988 m2
1.43 x 6.00 x 1 8.55 m2
1.43 x 22.43 x 1 32.07 m2
0.15 x 1.50 x 2 0.450 m2
0.15 x 0.90 x 1 0.135 m2
0.30 x 8.85 x 3 7.965 m2
158.96 m2
Luas Total Tegel 30 x 30 323.24 m2
Tegel ANAK Tangga 20 x 20
0.20 x 1.20 x 18.00 Bh 4.320 m2

Tegel KM/WC 20 x 20
1.35 x 1.60 x 5 Bh 10.80 m2
1.35 x 1.75 x 2 Bh 4.73 m2
15.53 m2

Tegel Dinding KM/WC 20 x 20


1.50 x 0.80 x 3 Bh 3.60 m2
1.50 x 1.60 x 3 Bh 7.20 m2
1.50 x 1.60 x 3 Bh 6.35 m2
1.50 x 1.35 x 3 Bh 6.02 m2
23.17 m2

Pek. List Plafond Profil Kayu 4/5


V = 246.80 M 74.25 6 5.7 11 18
118.3 9.6 4
KM
T.W
DEPAN KM
R. STAF
R. STAF
0.45
Ruang kelas
AULA
DEPAN KM
T.W
KM
ATAS TANGGA
Teras
0.2

DEPAN KM
TERAS 0.99
Bawah Tangga 0.36
R. STAF
R. STAF
Pintu 1
Pintu 3
0.45

AULA
DEPAN KM
T.W 0.375
PODIUM
Teras
Pintu
Pintu
Plint
0.2

KM
KM

1
1
1
1

114.95
131.85
PEKERJAAN PENGECATAN
1 Pengecatan Dinding
V = ### M2

2 Pek. Cat Kusen, Pintu, Jendela dan Ventilasi


JEND. 1 VENTILASI KM
S = 0.05 M 0.12 S = 0.05
P = 4.60 M 4.40 P = 2.20
JMLH = 12 BH 12 JMLH = 8
V = 5.520 M2 6.336 V = ###

VENTILASI JEND. 2
S = 0.05 M 0.12 S = 0.05
P = 1.80 M 1.60 P = 4.00
JMLH = 44 BH 44 JMLH = 24
V = 7.920 M2 8.448 V = ###

PINTU 1 PINTU KM
S = 0.05 M 0.12 S = 0.05
P = 5.90 M 5.70 P = 4.65
JMLH = 3 BH 3 JMLH = 5
V = 1.770 M2 2.052 V = ###

PINTU 3 PINTU 4
S = 0.05 M 0.12 S = 0.05
P = 5.10 M 4.90 P = 5.30
JMLH = 5 BH 5 JMLH = 2
V = 2.550 M2 2.940 V = ###

TOTAL LUAS PENGECETAN KUSEN


V = 69.039 M2

5 PENGECETAN DAUN PINTU


L = 42.384 M2

6 PENGECETAN DAUN JENDELA


JEND. 1 JEND. 1
S = 0.050 M S = 0.050 M
P = 4.20 M P = 3.60 M
JMLH = 12 BH JMLH = 24 BH
V = 5.040 M2 V = ### M2

VENTILASI
S = 0.050 M
P = 1.60 M
JMLH = 8 BH
V = 1.280 M2

TOTAL LUAS PENGECETAN DAUN JENDELA


V = 14.960 M2
TOTAL VOLUME = 126.38 M2
M 0.12
M 2.00
BH 8
M2 1.920

M 0.12
M 3.80
BH 24
M2 10.944

M 0.12
M 4.45
BH 5
M2 2.670

M 0.12
M 5.10
BH 2
M2 1.224
CV. DIMENSI ORIENT PRIMA Konsultan
PERENCANAAN, P ENGAW ASAN DAN SURVEY P EM ETAAN
Kantor : Jl. Pemuda No.301 Tlp.(0405)22287 Kolaka

ENGINEERING ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN KANTOR DINAS KESEHATAN TAHAP III


LOKASI : KOLAKA
TAHUN ANGGARAN: 2009

HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA
( Rp ) ( Rp )
01 02 03 04 05 06
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek Ls 1.000 280,000.00 280,000.00
2 Pek. Pembuatan Direksi Kheet Ls 1.000 2,500,000.00 2,500,000.00
3 Administrasi dan Dokumentasi Ls 1.000 500,000.00 500,000.00
4 Pek. Bouwplank + Pengukuran Ls 1.000 500,000.00 500,000.00
Pembongkaran dan Pembersihan Bangunan
5 Ls 1.000 ### 12,500,000.00
Lama
Jumlah 16,280,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi M3 74.082 20,200.00 1,496,456.40
2 Pek. Urugan Tanah Kembali Alur Pondasi M3 44.664 9,685.00 432,570.03
3 Pek. Urugan Tanah bawah Lantai M3 23.776 62,050.00 1,475,313.21
4 Pek. Pasir Urug Bawah Pondasi M3 3.225 131,650.00 424,505.43
5 Pek. Pasir Urug Bawah Lantai M3 9.907 131,650.00 1,304,223.64
6 Pek. Pas. Batu Kosong M3 7.836 256,725.00 2,011,697.10
7 Pek. Pondasi Batu Gunung 1 : 5 M3 17.631 497,245.00 8,766,926.60
Jumlah 15,911,692.40
III PEKERJAAN STRUKTUR BETON
1 Pek. Pondasi Poer P1 (100x100x165) cm M3 7.564 3,619,125.00 27,376,418.67
2 Pek. Pondasi Poer P2 (100x100x150) cm M3 3.467 3,619,125.00 12,547,807.97
3 Pek. Pondasi Poer P3 (70x120x110) cm M3 0.337 3,619,125.00 1,220,097.52
4 Pek. Kolom Utama 30x30 cm M3 7.560 4,535,125.61 34,285,549.64
5 Pek. Kolom Utama 20x20 cm M3 3.360 5,398,162.28 18,137,825.26
6 Pek. Kolom Teras 25x25 cm M3 3.600 4,535,125.61 16,326,452.21
7 Pek. Kolom Teras 20x20 cm M3 1.600 5,398,162.28 8,637,059.65
8 Pek. Kolom Praktis 11x11 cm M3 0.726 6,389,429.11 4,638,725.53
9 Pek. Sloef (20/25) M3 7.150 4,029,696.87 28,812,332.58
10 Pek. Balok anak Lt. 2 (15/20) M3 2.643 4,496,333.17 11,883,808.56
11 Pek. Balok Lt.2 (20/25) M3 3.690 4,440,048.17 16,383,777.73
12 Pek. Balok Induk (20/40) M3 5.280 4,157,734.67 21,952,839.03
13 Pek. Balok anak (15/25) M3 3.416 5,791,125.37 19,783,932.03
14 Pek. Balok anak (15/20) M3 0.195 5,840,656.17 1,138,927.95
15 Pek. Balok Latei (10/10) M3 0.336 4,648,302.67 1,561,829.70
16 Pek. Plat Lantai T=12 cm M3 25.486 5,897,590.86 150,307,180.18
17 Pek. Dak + Leuvel + Listplank Beton + Kanop M3 8.667 4,510,131.84 39,090,214.67
18 Pek. Tangga M3 2.378 5,177,260.00 12,310,488.83
19 Pek. Lantai Kerja Beton 1 : 2 : 3 T = 10 cm M3 3.184 552,100.00 1,757,886.40
20 Pek. Rabat Beton Bawah Lantai 1 : 2 : 3 T=5 M3 9.907 552,100.00 5,469,516.68
Jumlah 433,622,670.77
IV PEKERJAAN PASANGAN / PLESTERAN DINDING
1 Pek. Pas. Batu Bata Trasram 1/2 ( 1:2 ) M2 28.400 80,800.00 2,294,720.00
2 Pek. Pas. Batu Bata ( 1:5 ) M2 378.140 69,484.00 26,274,679.76
3 Pek. Plesteran Trasram ( 1:2 ) M2 56.800 33,211.00 1,886,384.80
4 Pek. Plesteran Tembok ( 1:5 ) M2 756.280 29,210.00 22,090,938.80
5 Pek. Plesteran Beton ( 1:3 ) M2 204.800 38,211.00 7,825,612.80
6 Pek. Acian M2 39.600 15,366.60 608,517.36
Jumlah 60,980,853.52

01 02 03 04 05 06
V PEKERJAAN KUSEN PINTU, JENDELA
1 Pek. Dinding Tripleks Rangkap M2 40.845 135,950.00 5,552,877.75
2 Pek. Kusen Kayu Kelas II M3 1.374 4,236,500.00 5,822,221.95
3 Pek. Daun Pintu Panil M2 6.338 315,750.00 2,001,065.63
4 Pek. Daun Pintu 1 M2 9.240 424,532.86 3,922,683.60
5 Pek. Daun Pintu 2 M2 3.552 332,950.00 1,182,638.40
6 Pek. Daun Pintu 3 M2 8.400 295,430.00 2,481,612.00
7 Pek. Bingkai Jendela Kaca M2 7.480 259,200.00 1,938,816.00
8 Pek. Pas. Kaca Mati 5 mm Jendela M2 16.200 186,113.50 3,015,038.70
9 Pek. Pas. Kaca Mati 5 mm Ventilasi M2 0.720 186,113.50 134,001.72
10 Pek. Engsel Pintu Bh 45.000 36,516.25 1,643,231.25
11 Pek. Pas. Engsel Jendela Bh 72.000 27,677.50 1,992,780.00
12 Pek. Kunci Pintu 2 Slaag Bh 15.000 118,925.00 1,783,875.00
13 Pek. Pas. Hak Angin Bh 72.000 21,516.25 1,549,170.00
14 Pek. Pas. Grendel Jendela Bh 36.000 25,355.00 912,780.00
15 Pek. Pas. Grendel Pintu Tanam Bh 3.000 32,355.00 97,065.00
16 Pek. Pas. Reiling Tangga M2 7.200 253,330.00 1,823,976.00
17 Pek. Pas. Reiling Selasar M2 5.775 277,330.00 1,601,580.75
Jumlah 37,455,413.75
VI PEKERJAAN KM/WC/SANITASI
1 Pek. Pipa PVC Dia.3" (Air Kotor) M1 15.000 118,414.00 1,776,210.00
2 Pek. Pipa PVC Dia.1/2" (Air Bersih) M1 20.000 18,014.00 360,280.00
3 Pek. Pas. Kloset Jongkok Bh 3.000 360,150.00 1,080,450.00
4 Pek. Pas. Stop Kran Biasa Bh 7.000 48,058.75 336,411.25
5 Pek. Pas. Bak KM Bh 3.000 683,850.00 2,051,550.00
6 Pek. Pas. Floor Drain Bh 5.000 24,925.00 124,625.00
7 Pek. Septictank + Peresapan Bh 1.000 2,884,493.86 2,884,493.86
8,614,020.11
VII PEKERJAAN INSTALASI LISTRIK
1 Titik Nyala Titik 69.000 150,000.00 10,350,000.00
2 Lampu SL 18 Watt Bh 18.000 57,925.00 1,042,650.00
3 Lampu SL 10 Watt (Teras) Bh 20.000 47,925.00 958,500.00
4 Saklar Ganda Bh 6.000 36,750.00 220,500.00
5 Saklar Tunggal Bh 13.000 28,750.00 373,750.00
6 Sekring Box MCB Bh 1.000 51,750.00 51,750.00
7 Stop Kontak 100 VA Bh 11.000 34,750.00 382,250.00
Jumlah 13,379,400.00
VIII PEKERJAAN PLAFOND
1 Pek. Rangka Plafond M2 318.613 37,200.00 11,852,385.00
2 Pek. Plafond Tripleks 3 mm M2 318.613 28,827.50 9,184,801.84
3 Pek. List Plafond Profil Kayu 4/4 M1 246.800 15,565.00 3,841,442.00
Jumlah 24,878,628.84
IX PEKERJAAN LANTAI
1 Pek. Lantai Keramik 30/30 cm M2 323.241 149,914.00 48,458,276.32
2 Pek. Dinding Keramik 20/20 cm M2 23.165 136,030.00 3,151,134.95
3 Pek. Lantai Keramik KM/WC 20/20 cm M2 15.525 143,454.00 2,227,123.35
4 Pek. Lantai Keramik Anak Tangga 20/20 cm M2 4.320 143,454.00 619,721.28
Jumlah 54,456,255.90
X PEKERJAAN KONSTRUKSI ATAP
1 Pek. Kuda-kuda Kayu Kelas III 8/12 cm M3 3.818 3,596,000.00 13,730,342.25
2 Pek. Gording Kayu Kelas III 6/12 cm M3 2.292 2,346,000.00 5,377,313.52
3 Pek. Balok Angin Kayu Kelas III 6/12 cm M3 0.373 2,346,000.00 874,964.16
4 Pek. Atap Seng Gelombang BJLS 0.2 M2 330.251 40,790.00 13,470,938.29
5 Pek. Nok Seng Plat BJLS 0.2 M2 18.000 18,590.00 334,620.00
6 Pek. Talang Patahan Seng Plat BJLS 0.2 M2 7.496 57,265.00 429,258.44
7 Pek. Pas. Listplank Kayu Kelas II 2 x (2,5 x 20 M1 60.620 35,010.00 2,122,306.20
Jumlah 36,339,742.86
01 02 03 04 05 06
XI PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 ### 14,173.50 15,005,838.79
2 Pek. Cat Plafond M2 318.613 14,173.50 4,515,854.27
3 Pek. Cat Seng M2 330.251 21,773.50 7,190,720.15
4 Pek. Cat Kusen, Pintu, Jendela dan Ventilasi M2 126.383 27,792.50 3,512,499.53
Jumlah 30,224,912.73

Kolaka, 05 Januari 2009


CV. DIMENSI ORIENT PRIMA Konsultan
P ERENCANAAN, P ENGAW ASAN DAN SURVEY P EM ETAAN
Kantor : Jl. Pemuda No.301 Tlp.(0405)22287 Kolaka

REKAPITULASI ENGINEERING ESTIMATE

PEKERJAAN : PEMBANGUNAN KANTOR DINAS KESEHATAN TAHAP III


LOKASI : KOLAKA
TAHUN ANGGARAN: 2009

NO. URAIAN PEKERJAAN JUMLAH HARGA ( Rp ) KETERANGAN

I PEKERJAAN PERSIAPAN Rp. 16,280,000.00


II PEKERJAAN TANAH DAN PONDASI Rp. 15,911,692.40
III PEKERJAAN STRUKTUR BETON Rp. 433,622,670.77
IV PEKERJAAN PASANGAN / PLESTERAN DINDING Rp. 60,980,853.52
V PEKERJAAN KUSEN PINTU, JENDELA Rp. 37,455,413.75
VI PEKERJAAN KM/WC/SANITASI Rp. 8,614,020.11
VII PEKERJAAN INSTALASI LISTRIK Rp. 13,379,400.00
VIII PEKERJAAN PLAFOND Rp. 24,878,628.84
IX PEKERJAAN LANTAI Rp. 54,456,255.90
X PEKERJAAN KONSTRUKSI ATAP Rp. 36,339,742.86
XI PEKERJAAN PENGECATAN Rp. 30,224,912.73

REAL COST Rp. 732,143,590.87


PPN 10% Rp. 73,214,359.09
IMB 2% Rp. 14,642,871.82
TOTAL COST Rp. 820,000,821.78
DIBULATKAN Rp. 820,000,000.00

Terbilang : Delapan Ratus Dua Puluh Juta Rupiah

Kolaka, Maret 2009


Mengetahui, Dibuat Oleh,
Pejabat Pelaksanan Teknis Kegiatan CV. DIMENSI ORIENT PRIMA Konsultan

dr. Hj. MULIATI. H Ir. RIDWAN


Nip, 140 328 047 Direktur
0.00

0.00

20.010

0.00
0.00

16.00

3.60
3.60
0.00

10.00 5.00

0.00

0.00

0.00

0.00

0.00
0.00
820,000,000.00
0.00
CV. DIMENSI ORIENT PRIMA Konsultan
PERENCANAAN, PENGAW ASAN DAN SURVEY PEM ETAAN
Kantor : Jl. Pemuda No.301 Tlp.(0405)22287 Kolaka

ANALISA HARGA SATUAN

1 1 M3 PEKERJAAN GALIAN TANAH


0.400 Oh Pekerja @ Rp 45,000.00 = Rp 18,000.00
0.040 Oh Mandor @ Rp 55,000.00 = Rp 2,200.00
Rp 20,200.00

2 1 M3 URUGAN KEMBALI
0.192 Oh Pekerja @ Rp 45,000.00 = Rp 8,640.00
0.019 Oh Mandor @ Rp 55,000.00 = Rp 1,045.00
Rp 9,685.00

3 1 M3 URUGAN PASIR
1.200 M3 Pasir urug @ Rp 98,000.00 = Rp 117,600.00
0.300 Oh Pekerja @ Rp 45,000.00 = Rp 13,500.00
0.010 Oh Mandor @ Rp 55,000.00 = Rp 550.00
Rp 131,650.00

4 1 M3 URUGAN TANAH
1.200 M3 Tanah urug @ Rp 40,000.00 = Rp 48,000.00
0.300 Oh Pekerja @ Rp 45,000.00 = Rp 13,500.00
0.010 Oh Mandor @ Rp 55,000.00 = Rp 550.00
Rp 62,050.00

5 1 M3 PASANGAN BATU KOSONG


1.200 M3 Batu gunung @ Rp 135,000.00 = Rp 162,000.00
0.300 M3 Pasir urug @ Rp 98,000.00 = Rp 29,400.00
0.390 Oh Tukang batu @ Rp 65,000.00 = Rp 25,350.00
0.039 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,730.00
0.780 Oh Pekerja @ Rp 45,000.00 = Rp 35,100.00
0.039 Oh Mandor @ Rp 55,000.00 = Rp 2,145.00
Rp 256,725.00

6 1 M3 PASANGAN PONDASI BATU GUNUNG 1 : 5


1.100 M3 Batu gunung @ Rp 135,000.00 = Rp 148,500.00
### Kg Semen PC @ Rp 1,300.00 = Rp 176,800.00
0.544 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 57,120.00
0.600 Oh Tukang batu @ Rp 65,000.00 = Rp 39,000.00
0.060 Oh Kepala tukang @ Rp 70,000.00 = Rp 4,200.00
1.500 Oh Pekerja @ Rp 45,000.00 = Rp 67,500.00
0.075 Oh Mandor @ Rp 55,000.00 = Rp 4,125.00
Rp 497,245.00

7 1 M2 PASANGAN DINDING BATU BATA 1 : 2 ( 1/2 BATA )


70.00 Bh Batu bata @ Rp 425.00 = Rp 29,750.00
18.950 Kg Semen PC @ Rp 1,300.00 = Rp 24,635.00
0.038 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 3,990.00
0.100 Oh Tukang batu @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala tukang @ Rp 70,000.00 = Rp 700.00
0.320 Oh Pekerja @ Rp 45,000.00 = Rp 14,400.00
0.015 Oh Mandor @ Rp 55,000.00 = Rp 825.00
Rp 80,800.00
8 1 M2 PASANGAN DINDING BATU BATA 1 : 5 ( 1/2 BATA )
70.00 Bh Batu bata @ Rp 425.00 = Rp 29,750.00
9.680 Kg Semen PC @ Rp 1,300.00 = Rp 12,584.00
0.045 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 4,725.00
0.100 Oh Tukang batu @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala tukang @ Rp 70,000.00 = Rp 700.00
0.320 Oh Pekerja @ Rp 45,000.00 = Rp 14,400.00
0.015 Oh Mandor @ Rp 55,000.00 = Rp 825.00
Rp 69,484.00
9 1 M2 PLESTERAN DAN ACIAN TRASRAM 1 : 2
8.520 Kg Semen PC @ Rp 1,300.00 = Rp 11,076.00
0.017 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 1,785.00
0.150 Oh Tukang batu @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,050.00
0.200 Oh Pekerja @ Rp 45,000.00 = Rp 9,000.00
0.010 Oh Mandor @ Rp 55,000.00 = Rp 550.00
Rp 33,211.00
10 1 M2 PLESTERAN DAN ACIAN TEMBOK 1 : 4
5.200 Kg Semen PC @ Rp 1,300.00 = Rp 6,760.00
0.020 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 2,100.00
0.150 Oh Tukang batu @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,050.00
0.200 Oh Pekerja @ Rp 45,000.00 = Rp 9,000.00
0.010 Oh Mandor @ Rp 55,000.00 = Rp 550.00
Rp 29,210.00
11 10 M2 ACIAN SEMEN (SAUS SEMEN)
59.270 Kg Semen Portland @ Rp 1,300.00 = Rp 77,051.00
0.850 Oh Pekerja @ Rp 45,000.00 = Rp 38,250.00
0.500 Oh Tukang Batu @ Rp 65,000.00 = Rp 32,500.00
0.050 Oh Kepala Tukang @ Rp 70,000.00 = Rp 3,500.00
0.043 Oh Mandor @ Rp 55,000.00 = Rp 2,365.00
Rp 153,666.00
Maka 1 M2 Mengaci = 1/10 Rp 15,366.60
12 1 M2 PLESTERAN BETON 1 Pc : 3 Ps, TEBAL 15 MM
7.070 Kg Semen Portland @ Rp 1,300.00 = Rp 9,191.00
0.021 M3 Pasir Pasang @ Rp 105,000.00 = Rp 2,205.00
0.200 Oh Tukang batu @ Rp 65,000.00 = Rp 13,000.00
0.020 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,400.00
0.260 Oh Pekerja @ Rp 45,000.00 = Rp 11,700.00
0.013 Oh Mandor @ Rp 55,000.00 = Rp 715.00
Rp 38,211.00
13 1 M3 BETON TUMBUK 1 Pc : 3 Psr : 5 Kr
0.870 M3 Batu Pecah 2-3 cm @ Rp 135,000.00 = Rp 117,450.00
### Kg Semen PC @ Rp 1,300.00 = Rp 283,400.00
0.520 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 54,600.00
0.250 Oh Tukang batu @ Rp 65,000.00 = Rp 16,250.00
0.025 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,750.00
1.650 Oh Pekerja @ Rp 45,000.00 = Rp 74,250.00
0.080 Oh Mandor @ Rp 55,000.00 = Rp 4,400.00
Rp 552,100.00

14 1 M3 MEMBUAT PONDASI BETON BERTULANG ( 150 Kg BESI + BEKISTING )


0.200 M3 Kayu Terentang @ Rp 1,750,000.00 = Rp 350,000.00
1.500 Kg Paku Campur @ Rp 20,000.00 = Rp 30,000.00
0.400 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 4,000.00
### Kg Besi Beton Polos @ Rp 15,000.00 = Rp 2,250,000.00
2.250 Kg Kawat Beton @ Rp 20,000.00 = Rp 45,000.00
### Kg Semen Portland @ Rp 1,300.00 = Rp 419,900.00
0.520 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 54,600.00
0.780 M3 Batu Pecah 2-3 cm @ Rp 135,000.00 = Rp 105,300.00
0.350 Oh Tukang Batu @ Rp 65,000.00 = Rp 22,750.00
1.040 Oh Tukang Kayu @ Rp 65,000.00 = Rp 67,600.00
1.050 Oh Tukang Besi @ Rp 65,000.00 = Rp 68,250.00
0.245 Oh Kepala tukang @ Rp 70,000.00 = Rp 17,150.00
3.900 Oh Pekerja @ Rp 45,000.00 = Rp 175,500.00
0.165 Oh Mandor @ Rp 55,000.00 = Rp 9,075.00
Rp 3,619,125.00

15 1 M3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg BESI + BEKISTING )


0.250 M3 Papan Kayu Klass III @ Rp 1,750,000.00 = Rp 437,500.00
3.000 Kg Paku Campur @ Rp 20,000.00 = Rp 60,000.00
### Kg Besi Beton Polos @ Rp 15,000.00 = Rp 3,000,000.00
3.000 Kg Kawat Beton @ Rp 20,000.00 = Rp 60,000.00
### Kg Semen Portland @ Rp 1,300.00 = Rp 419,900.00
0.520 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 54,600.00
0.780 M3 Batu Pecah 2-3 cm @ Rp 135,000.00 = Rp 105,300.00
0.105 M3 Balok Kayu Klass III @ Rp 1,750,000.00 = Rp 183,750.00
2.500 Lbr Tripleks 5 mm @ Rp 87,000.00 = Rp 217,500.00
14.000 Btg Dolken Dia. 10 @ Rp 6,000.00 = Rp 84,000.00
0.350 Oh Tukang Batu @ Rp 65,000.00 = Rp 22,750.00
2.300 Oh Tukang Kayu @ Rp 65,000.00 = Rp 149,500.00
1.400 Oh Tukang Besi @ Rp 65,000.00 = Rp 91,000.00
0.405 Oh Kepala tukang @ Rp 70,000.00 = Rp 28,350.00
5.600 Oh Pekerja @ Rp 45,000.00 = Rp 252,000.00
0.202 Oh Mandor @ Rp 55,000.00 = Rp 11,110.00
Rp 5,177,260.00

16 1 M2 PASANG BEKISTING UNTUK SLOOF


0.045 M3 Kayu Kelas-III (Papan) @ Rp 1,750,000.00 = Rp 78,750.00
0.300 Kg Paku Biasa 2"-5" @ Rp 20,000.00 = Rp 6,000.00
0.100 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 1,000.00
0.260 Oh Tukang batu @ Rp 65,000.00 = Rp 16,900.00
0.026 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,820.00
0.300 Oh Pekerja @ Rp 45,000.00 = Rp 13,500.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 118,245.00

17 1 M2 PASANG BEKISTING UNTUK KOLOM


0.040 M3 Kayu Kelas-III (Papan) @ Rp 1,750,000.00 = Rp 70,000.00
0.400 Kg Paku Biasa 2"-5" @ Rp 20,000.00 = Rp 8,000.00
0.200 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 2,000.00
0.015 M3 Kayu Kelas-III (Balok) @ Rp 1,750,000.00 = Rp 26,250.00
0.350 Lbr Multipleks 9 mm @ Rp 100,000.00 = Rp 35,000.00
2.000 Btg Kayu Dolken @ Rp 6,000.00 = Rp 12,000.00
0.330 Oh Tukang batu @ Rp 65,000.00 = Rp 21,450.00
0.033 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,310.00
0.300 Oh Pekerja @ Rp 45,000.00 = Rp 13,500.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 190,840.00

18 1 M2 PASANG BEKISTING UNTUK BALOK


0.040 M3 Kayu Kelas-III (Papan) @ Rp 1,750,000.00 = Rp 70,000.00
0.400 Kg Paku Biasa 2"-5" @ Rp 20,000.00 = Rp 8,000.00
0.200 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 2,000.00
0.018 M3 Kayu Kelas-III (Balok) @ Rp 1,750,000.00 = Rp 31,500.00
0.350 Lbr Multipleks 9 mm @ Rp 100,000.00 = Rp 35,000.00
2.000 Btg Kayu Dolken @ Rp 6,000.00 = Rp 12,000.00
0.330 Oh Tukang batu @ Rp 65,000.00 = Rp 21,450.00
0.033 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,310.00
0.320 Oh Pekerja @ Rp 45,000.00 = Rp 14,400.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 196,990.00

19 1 M2 PASANG BEKISTING UNTUK RINGBALK


0.040 M3 Kayu Kelas-III (Papan) @ Rp 1,750,000.00 = Rp 70,000.00
0.400 Kg Paku Biasa 2"-5" @ Rp 20,000.00 = Rp 8,000.00
0.200 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 2,000.00
0.330 Oh Tukang batu @ Rp 65,000.00 = Rp 21,450.00
0.033 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,310.00
0.320 Oh Pekerja @ Rp 45,000.00 = Rp 14,400.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 118,490.00
20 1 M2 PASANG BEKISTING UNTUK LANTAI
0.040 M3 Kayu Kelas-III (Papan) @ Rp 1,750,000.00 = Rp 70,000.00
0.400 Kg Paku Biasa 2"-5" @ Rp 20,000.00 = Rp 8,000.00
0.200 Lt Minyak Bekisting @ Rp 10,000.00 = Rp 2,000.00
0.015 M3 Kayu Kelas-III (Balok) @ Rp 1,750,000.00 = Rp 26,250.00
0.350 Lbr Multipleks 9 mm @ Rp 100,000.00 = Rp 35,000.00
6.000 Btg Kayu Dolken @ Rp 6,000.00 = Rp 36,000.00
0.330 Oh Tukang batu @ Rp 65,000.00 = Rp 21,450.00
0.033 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,310.00
0.320 Oh Pekerja @ Rp 45,000.00 = Rp 14,400.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 215,740.00

21 1 M3 MEMBUAT BETON DENGAN MUTU K-225


### Kg Semen Portland @ Rp 1,300.00 = Rp 504,400.00
0.650 M3 Pasir Beton @ Rp 105,000.00 = Rp 68,250.00
0.650 M3 Batu Pecah 2-3 cm @ Rp 135,000.00 = Rp 87,750.00
1.000 Oh Tukang batu @ Rp 65,000.00 = Rp 65,000.00
0.100 Oh Kepala tukang @ Rp 70,000.00 = Rp 7,000.00
6.000 Oh Pekerja @ Rp 45,000.00 = Rp 270,000.00
0.300 Oh Mandor @ Rp 55,000.00 = Rp 16,500.00
Rp 1,018,900.00

22 1 M3 MEMBUAT BETON TAK BERTULANG 1 : 2 : 3


### Kg Semen Portland @ Rp 1,300.00 = Rp 419,900.00
0.520 M3 Pasir Beton @ Rp 105,000.00 = Rp 54,600.00
0.780 M3 Batu Pecah 2-3 cm @ Rp 135,000.00 = Rp 105,300.00
0.250 Oh Tukang batu @ Rp 65,000.00 = Rp 16,250.00
0.025 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,750.00
1.650 Oh Pekerja @ Rp 45,000.00 = Rp 74,250.00
0.080 Oh Mandor @ Rp 55,000.00 = Rp 4,400.00
Rp 676,450.00

23 1 KG PEMBESIAN DENGAN BESI POLOS


1.050 Kg Besi Beton Polos @ Rp 15,000.00 = Rp 15,750.00
0.015 Kg Kawat Beton @ Rp 20,000.00 = Rp 300.00
0.007 Oh Tukang batu @ Rp 65,000.00 = Rp 455.00
0.0007 Oh Kepala tukang @ Rp 70,000.00 = Rp 49.00
0.0070 Oh Pekerja @ Rp 45,000.00 = Rp 315.00
0.0003 Oh Mandor @ Rp 55,000.00 = Rp 16.50
Rp 16,885.50

HARGA SATUAN BETON


1 1 M3 PEK. KOLOM UTAMA (30/30) CM
1.000 M3 Beton K-225 @ Rp 1,018,900.00 = Rp 1,018,900.00
### Kg Pembesian @ Rp 16,885.50 = Rp 2,243,895.33
6.667 M2 Bekisting Kolom (1 x Pakai) @ Rp 190,840.00 = Rp 1,272,330.28
Rp 4,535,125.61
2 1 M3 PEK. KOLOM (20/20) CM
1.000 M3 Beton K-225 @ Rp 1,018,900.00 = Rp 1,018,900.00
### Kg Pembesian @ Rp 16,885.50 = Rp 3,106,932.00
6.667 M2 Bekisting Kolom (1 x Pakai) @ Rp 190,840.00 = Rp 1,272,330.28
Rp 5,398,162.28
3 1 M3 PEK. KOLOM PRAKTIS (11/11) CM
1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 5,076,813.97
6.667 M2 Bekisting Kolom (1 x Pakai) @ Rp 95,420.00 = Rp 636,165.14
Rp 6,389,429.11

4 1 M3 PEK. SLOOF (20/25) CM


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 2,564,907.45
6.667 M2 Bekisting Sloof (1 x Pakai) @ Rp 118,245.00 = Rp 788,339.42
Rp 4,029,696.87

5 1 M3 PEK. BALOK ANAK LT. 2 (15/20) CM


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 3,163,217.00
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 4,496,333.17

6 1 M3 PEK. BALOK INDUK LT. 2 (20/25) CM


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 3,106,932.00
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 4,440,048.17

7 1 M3 PEK. BALOK INDUK (20/40) CM


1.000 M3 Beton K-225 @ Rp 1,018,900.00 = Rp 1,018,900.00
### Kg Pembesian @ Rp 16,885.50 = Rp 2,482,168.50
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 4,157,734.67

8 1 M3 PEK. BALOK ANAK (15/25) CM


1.000 M3 Beton K-225 @ Rp 1,018,900.00 = Rp 1,018,900.00
### Kg Pembesian @ Rp 16,885.50 = Rp 4,115,559.20
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 5,791,125.37

9 1 M3 PEK. BALOK ANAK (15/20) CM


1.000 M3 Beton K-225 @ Rp 1,018,900.00 = Rp 1,018,900.00
### Kg Pembesian @ Rp 16,885.50 = Rp 4,165,090.00
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 5,840,656.17

9 1 M3 PEK. BALOK LATEI(10/10) CM


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 3,315,186.50
6.667 M2 Bekisting Balok (2 X Pakai) 50 %@ Rp 98,495.00 = Rp 656,666.17
Rp 4,648,302.67

10 1 M3 PEK. PLAT LANTAI T=12 CM


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 3,782,802.28
6.667 M2 Bekisting Lantai (1 X Pakai) 100 @ Rp 215,740.00 = Rp 1,438,338.58
Rp 5,897,590.86

11 1 M3 PEK. PLAT LEUVEL/LISTPLANK/KANOPI


1.000 M3 Beton Tak Bertulang 1 : 2 : 3 @ Rp 676,450.00 = Rp 676,450.00
### Kg Pembesian @ Rp 16,885.50 = Rp 2,395,343.26
6.667 M2 Bekisting Lantai (1 X Pakai) 100 @ Rp 215,740.00 = Rp 1,438,338.58
Rp 4,510,131.84

24 1 M2 LANTAI KERAMIK 30X30


11.000 Bh Keramik 30X30 @ Rp 4,860.00 = Rp 53,460.00
11.380 Kg Semen PC @ Rp 1,300.00 = Rp 14,794.00
1.500 Kg Semen warna @ Rp 15,000.00 = Rp 22,500.00
0.042 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 4,410.00
0.350 Oh Tukang batu @ Rp 65,000.00 = Rp 22,750.00
0.035 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,450.00
0.620 Oh Pekerja @ Rp 45,000.00 = Rp 27,900.00
0.030 Oh Mandor @ Rp 55,000.00 = Rp 1,650.00
Rp 149,914.00

25 1 M2 LANTAI KERAMIK KM / WC 20X20


25.000 Bh Keramik 20X20 @ Rp 1,880.00 = Rp 47,000.00
11.380 Kg Semen PC @ Rp 1,300.00 = Rp 14,794.00
1.500 Kg Semen warna @ Rp 15,000.00 = Rp 22,500.00
0.042 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 4,410.00
0.350 Oh Tukang batu @ Rp 65,000.00 = Rp 22,750.00
0.035 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,450.00
0.620 Oh Pekerja @ Rp 45,000.00 = Rp 27,900.00
0.030 Oh Mandor @ Rp 55,000.00 = Rp 1,650.00
Rp 143,454.00

26 1 M2 DINDING KERAMIK KM / WC 20X20


25.000 M2 Keramik 20X25 @ Rp 2,450.00 = Rp 61,250.00
9.300 Kg Semen PC @ Rp 1,300.00 = Rp 12,090.00
1.500 Kg Semen warna @ Rp 15,000.00 = Rp 22,500.00
0.018 M3 Pasir Pasangan @ Rp 105,000.00 = Rp 1,890.00
0.100 Oh Tukang batu @ Rp 65,000.00 = Rp 6,500.00
0.045 Oh Kepala tukang @ Rp 70,000.00 = Rp 3,150.00
0.600 Oh Pekerja @ Rp 45,000.00 = Rp 27,000.00
0.030 Oh Mandor @ Rp 55,000.00 = Rp 1,650.00
Rp 136,030.00
27 1 M3 KAP KUDA - KUDA
1.100 M3 Balok Kayu Klass III @ Rp 1,750,000.00 = Rp 1,925,000.00
15.000 Kg Besi Strip, baut dll @ Rp 40,000.00 = Rp 600,000.00
0.800 Kg Paku @ Rp 20,000.00 = Rp 16,000.00
12.000 Oh Tukang Kayu @ Rp 65,000.00 = Rp 780,000.00
1.200 Oh Kepala tukang @ Rp 70,000.00 = Rp 84,000.00
4.000 Oh Pekerja @ Rp 45,000.00 = Rp 180,000.00
0.200 Oh Mandor @ Rp 55,000.00 = Rp 11,000.00
Rp 3,596,000.00

28 1M3 PEKERJAAN GORDING


1.100 M3 Balok Kayu Klass III @ Rp 1,750,000.00 = Rp 1,925,000.00
0.800 Kg Paku @ Rp 40,000.00 = Rp 32,000.00
4.000 Oh Tukang Kayu @ Rp 65,000.00 = Rp 260,000.00
0.400 Oh Kepala tukang @ Rp 70,000.00 = Rp 28,000.00
2.000 Oh Pekerja @ Rp 45,000.00 = Rp 90,000.00
0.200 Oh Mandor @ Rp 55,000.00 = Rp 11,000.00
Rp 2,346,000.00

29 1 M2 PEKERJAAN PASANGAN ATAP SENG GELOMBANG KECIL


0.700 Lbr Seng Gel. Kecil BJLS 0,2 @ Rp 43,200.00 = Rp 30,240.00
0.020 Kg Paku Seng @ Rp 25,000.00 = Rp 500.00
0.060 Oh Tukang Kayu @ Rp 65,000.00 = Rp 3,900.00
0.006 Oh Kepala Tukang @ Rp 70,000.00 = Rp 420.00
0.120 Oh Pekerja @ Rp 45,000.00 = Rp 5,400.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 40,790.00

30 1 M2 NOK BUMBUNGAN ATAP SENG


0.300 M' Seng Plat BJLS 0,20 @ Rp 18,000.00 = Rp 5,400.00
0.040 Kg Paku Seng @ Rp 25,000.00 = Rp 1,000.00
0.070 Oh Tukang kayu @ Rp 65,000.00 = Rp 4,550.00
0.008 Oh Kepala tukang @ Rp 70,000.00 = Rp 560.00
0.150 Oh Pekerja @ Rp 45,000.00 = Rp 6,750.00
0.006 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 18,590.00

31 1 M2 TALANG PATAHAN ATAP SENG


0.400 M' Seng plat BJLS 0,20 @ Rp 18,000.00 = Rp 7,200.00
0.010 Bh Paku seng @ Rp 25,000.00 = Rp 250.00
0.011 M3 Papan alas @ Rp 1,750,000.00 = Rp 19,250.00
0.015 Kg Paku @ Rp 20,000.00 = Rp 300.00
0.400 Oh Tukang kayu @ Rp 65,000.00 = Rp 26,000.00
0.025 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,750.00
0.040 Oh Pekerja @ Rp 45,000.00 = Rp 1,800.00
0.0130 Oh Mandor @ Rp 55,000.00 = Rp 715.00
Rp 57,265.00

31 1 M' PASANG LISTPLANK UKURAN 2 X ( 2 X 20 ) CM


0.0088 M3 Papan Kayu Klass II @ Rp 2,200,000.00 = Rp 19,360.00
0.060 Kg Paku @ Rp 20,000.00 = Rp 1,200.00
0.100 Oh Tukang kayu @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala tukang @ Rp 70,000.00 = Rp 700.00
0.100 Oh Pekerja @ Rp 45,000.00 = Rp 4,500.00
0.050 Oh Mandor @ Rp 55,000.00 = Rp 2,750.00
Rp 35,010.00

32 1 M2 RANGKA PLAFOND 30 x 60
0.023 M3 Balok Kayu Klass III @ Rp 1,750,000.00 = Rp 40,250.00
0.150 Kg Paku @ Rp 20,000.00 = Rp 3,000.00
0.300 Oh Tukang kayu @ Rp 65,000.00 = Rp 19,500.00
0.030 Oh Kepala tukang @ Rp 70,000.00 = Rp 2,100.00
0.200 Oh Pekerja @ Rp 45,000.00 = Rp 9,000.00
0.010 Oh Mandor @ Rp 55,000.00 = Rp 550.00
Rp 74,400.00
Rangka Plapond 60 x 120 cm Rp 37,200.00

33 1 M2 PEKERJAAN PLAPOND TRIPLEKS


0.375 Lbr Tripleks 3 mm @ Rp 47,000.00 = Rp 17,625.00
0.030 kg Paku tripleks @ Rp 22,000.00 = Rp 660.00
0.100 Oh Tukang kayu @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala tukang @ Rp 70,000.00 = Rp 700.00
0.070 Oh Pekerja @ Rp 45,000.00 = Rp 3,150.00
0.0035 Oh Mandor @ Rp 55,000.00 = Rp 192.50
Rp 28,827.50

34 1 M' PEKERJAAN LES PINGGIR PLAPOND


1.100 M Kayu Profil 4x4 cm @ Rp 8,500.00 = Rp 9,350.00
0.010 Kg Paku @ Rp 20,000.00 = Rp 200.00
0.050 Oh Tukang Kayu @ Rp 65,000.00 = Rp 3,250.00
0.005 Oh Kepala Tukang @ Rp 70,000.00 = Rp 350.00
0.050 Oh Pekerja @ Rp 45,000.00 = Rp 2,250.00
0.003 Oh Mandor @ Rp 55,000.00 = Rp 165.00
Rp 15,565.00
35 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA
1.200 M3 Balok Kayu Klass II @ Rp 2,200,000.00 = Rp 2,640,000.00
18.000 Oh Tukang kayu @ Rp 65,000.00 = Rp 1,170,000.00
2.000 Oh Kepala tukang @ Rp 70,000.00 = Rp 140,000.00
6.000 Oh Pekerja @ Rp 45,000.00 = Rp 270,000.00
0.300 Oh Mandor @ Rp 55,000.00 = Rp 16,500.00
Rp 4,236,500.00
36 1 M2 PEKERJAAN PINTU PANEL
0.040 M3 Kayu Klass II @ Rp 2,200,000.00 = Rp 88,000.00
2.500 Oh Tukang kayu @ Rp 65,000.00 = Rp 162,500.00
0.250 Oh Kepala tukang @ Rp 70,000.00 = Rp 17,500.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.050 Oh Mandor @ Rp 55,000.00 = Rp 2,750.00
Rp 315,750.00
37 1 M2 PEKERJAAN PINTU PANEL 1
0.034 M3 Kayu Klass II @ Rp 2,200,000.00 = Rp 74,142.86
0.876 M2 Kaca Mati 5 mm @ Rp 140,000.00 = Rp 122,640.00
2.500 Oh Tukang kayu @ Rp 65,000.00 = Rp 162,500.00
0.250 Oh Kepala tukang @ Rp 70,000.00 = Rp 17,500.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.050 Oh Mandor @ Rp 55,000.00 = Rp 2,750.00
Rp 424,532.86

38 1 M2 PEKERJAAN PINTU PANEL 2


0.016 M3 Kayu Klass II @ Rp 2,200,000.00 = Rp 35,200.00
0.500 M2 Kaca Mati 5 mm @ Rp 140,000.00 = Rp 70,000.00
2.500 Oh Tukang kayu @ Rp 65,000.00 = Rp 162,500.00
0.250 Oh Kepala tukang @ Rp 70,000.00 = Rp 17,500.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.050 Oh Mandor @ Rp 55,000.00 = Rp 2,750.00
Rp 332,950.00

39 1 M2 PEKERJAAN PINTU PANEL 3


0.030 M3 Kayu Klass II @ Rp 2,200,000.00 = Rp 66,000.00
0.012 M2 Kaca Mati 5 mm @ Rp 140,000.00 = Rp 1,680.00
2.500 Oh Tukang kayu @ Rp 65,000.00 = Rp 162,500.00
0.250 Oh Kepala tukang @ Rp 70,000.00 = Rp 17,500.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.050 Oh Mandor @ Rp 55,000.00 = Rp 2,750.00
Rp 295,430.00
40 1 M2 PASANG BINGKAI PINTU DAN JENDELA KACA KAYU KELAS-II
0.035 M3 Kayu Klass II @ Rp 2,200,000.00 = Rp 77,000.00
2.000 Oh Tukang kayu @ Rp 65,000.00 = Rp 130,000.00
0.200 Oh Kepala tukang @ Rp 70,000.00 = Rp 14,000.00
0.800 Oh Pekerja @ Rp 45,000.00 = Rp 36,000.00
0.040 Oh Mandor @ Rp 55,000.00 = Rp 2,200.00
Rp 259,200.00

41 1 M2 PASANG DINDING PARTISI TRIPLEKS RANGKAP


0.0195 M3 Balok Kayu Klass III @ Rp 1,750,000.00 = Rp 34,125.00
0.650 Lbr Tripleks 5 mm @ Rp 87,000.00 = Rp 56,550.00
0.100 M2 Paku Campur @ Rp 20,000.00 = Rp 2,000.00
0.450 Oh Tukang kayu @ Rp 65,000.00 = Rp 29,250.00
0.045 Oh Kepala tukang @ Rp 70,000.00 = Rp 3,150.00
0.150 Oh Pekerja @ Rp 45,000.00 = Rp 6,750.00
0.075 Oh Mandor @ Rp 55,000.00 = Rp 4,125.00
Rp 135,950.00

42 1 M2 PASANG KACA BENING 5 mm


1.100 M2 Kaca 5 mm @ Rp 140,000.00 = Rp 154,000.00
4.000 M List kaca @ Rp 5,000.00 = Rp 20,000.00
0.030 Kg Paku @ Rp 20,000.00 = Rp 600.00
0.150 Oh Tukang kayu @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
0.0007 Oh Mandor @ Rp 55,000.00 = Rp 38.50
Rp 186,113.50

43 1 M2 CAT TEMBOK
0.100 Kg Plamur @ Rp 14,000.00 = Rp 1,400.00
0.100 Kg Cat dasar @ Rp 20,000.00 = Rp 2,000.00
0.260 Kg Cat tembok @ Rp 20,000.00 = Rp 5,200.00
0.063 Oh Tukang cat @ Rp 65,000.00 = Rp 4,095.00
0.0063 Oh Kepala tukang @ Rp 70,000.00 = Rp 441.00
0.020 Oh Pekerja @ Rp 45,000.00 = Rp 900.00
0.0025 Oh Mandor @ Rp 55,000.00 = Rp 137.50
Rp 14,173.50

44 1 M2 CAT PLAFOND
0.100 Kg Cat dasar @ Rp 20,000.00 = Rp 2,000.00
0.260 Kg Cat plafond @ Rp 20,000.00 = Rp 5,200.00
0.100 Kg Plamur @ Rp 14,000.00 = Rp 1,400.00
0.063 Oh Tukang cat @ Rp 65,000.00 = Rp 4,095.00
0.0063 Oh Kepala tukang @ Rp 70,000.00 = Rp 441.00
0.020 Oh Pekerja @ Rp 45,000.00 = Rp 900.00
0.0025 Oh Mandor @ Rp 55,000.00 = Rp 137.50
Rp 14,173.50

45 1 M2 CAT KAYU
0.200 Kg Cat meni @ Rp 16,500.00 = Rp 3,300.00
0.150 Kg Plamur @ Rp 20,000.00 = Rp 3,000.00
0.170 Kg Cat dasar @ Rp 40,000.00 = Rp 6,800.00
0.260 Kg Cat Kilap @ Rp 40,000.00 = Rp 10,400.00
0.009 Oh Tukang cat @ Rp 65,000.00 = Rp 585.00
0.006 Oh Kepala tukang @ Rp 70,000.00 = Rp 420.00
0.070 Oh Pekerja @ Rp 45,000.00 = Rp 3,150.00
0.0025 Oh Mandor @ Rp 55,000.00 = Rp 137.50
Rp 27,792.50

46 1 M2 CAT ATAP SENG


0.100 Kg Cat Dasar @ Rp 45,000.00 = Rp 4,500.00
0.260 Kg Cat Seng @ Rp 45,000.00 = Rp 11,700.00
0.063 Oh Tukang cat @ Rp 65,000.00 = Rp 4,095.00
0.0063 Oh Kepala tukang @ Rp 70,000.00 = Rp 441.00
0.020 Oh Pekerja @ Rp 45,000.00 = Rp 900.00
0.0025 Oh Mandor @ Rp 55,000.00 = Rp 137.50
Rp 21,773.50

47 1 Bh PASANG KUNCI TANAM BIASA


1.000 Bh Kunci tanam biasa @ Rp 85,000.00 = Rp 85,000.00
0.500 Oh Tukang @ Rp 65,000.00 = Rp 32,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 118,925.00

48 1 Bh PASANG KUNCI TANAM KM/WC


1.000 Bh Kunci tanam KM/WC @ Rp 85,000.00 = Rp 85,000.00
0.500 Oh Tukang @ Rp 65,000.00 = Rp 32,500.00
0.005 Oh Kepala Tukang @ Rp 70,000.00 = Rp 350.00
0.005 Oh Pekerja @ Rp 45,000.00 = Rp 225.00
0.0025 Oh Mandor @ Rp 55,000.00 = Rp 137.50
Rp 118,212.50

49 1 Bh PASANG ENGSEL PINTU


1.000 Bh Engsel Pintu @ Rp 25,000.00 = Rp 25,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
### Oh Mandor @ Rp 55,000.00 = Rp 41.25
Rp 36,516.25
50 1 Bh PASANG GERENDEL PINTU
1.000 Bh Gerendel @ Rp 17,000.00 = Rp 17,000.00
0.200 Oh Tukang @ Rp 65,000.00 = Rp 13,000.00
0.020 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,400.00
0.020 Oh Pekerja @ Rp 45,000.00 = Rp 900.00
0.001 Oh Mandor @ Rp 55,000.00 = Rp 55.00
Rp 32,355.00

51 1 Bh PASANG GERENDEL JENDELA


1.000 Bh Gerendel @ Rp 10,000.00 = Rp 10,000.00
0.200 Oh Tukang @ Rp 65,000.00 = Rp 13,000.00
0.020 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,400.00
0.020 Oh Pekerja @ Rp 45,000.00 = Rp 900.00
0.001 Oh Mandor @ Rp 55,000.00 = Rp 55.00
Rp 25,355.00

52 1 Bh PASANG ENGSEL JENDELA


1.000 Bh Engsel jendela @ Rp 20,000.00 = Rp 20,000.00
0.100 Oh Tukang @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.0005 Oh Mandor @ Rp 55,000.00 = Rp 27.50
Rp 27,677.50

53 1 Bh PASANG KAIT ANGIN


1.000 Bh Kait angin @ Rp 10,000.00 = Rp 10,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
### Oh Mandor @ Rp 55,000.00 = Rp 41.25
Rp 21,516.25

54 1 Bh PASANG KRAN AIR


1.000 Bh Kran air @ Rp 40,000.00 = Rp 40,000.00
0.025 Bh Seal tape @ Rp 5,350.00 = Rp 133.75
0.100 Oh Tukang @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 48,058.75

55 1 UNIT SEPTICTANK DAN PERESAPAN


8.807 M3 Galian Tanah Biasa @ Rp 20,200.00 = Rp 177,901.40
1.494 M2 Pas. Trasram 1/2 Bata 1 : 4 @ Rp 69,484.00 = Rp 103,809.10
1.281 M3 Urugan Pasir @ Rp 131,650.00 = Rp 168,643.65
2.169 M3 Urugan Tanah Kembali @ Rp 9,685.00 = Rp 21,006.77
13.440 M2 Plesteran Trasram 1 : 2 Tebal 1 @ Rp 33,211.00 = Rp 446,355.84
1.350 M2 Ijuk @ Rp 25,000.00 = Rp 33,750.00
0.281 M3 Plat Beton Bertulang 1 : 2 : 3 @ Rp 3,000,000.00 = Rp 843,000.00
13.440 M2 Acian Semen (Saus Semen) @ Rp 15,366.60 = Rp 206,527.10
0.600 M1 Pipa Hawa Galvanis Dia.1" @ Rp 25,000.00 = Rp 15,000.00
0.900 M3 Kerikil Beton @ Rp 135,000.00 = Rp 121,500.00
9.000 M1 PVC Dia.3" + Dipasang + Samb @ Rp 83,000.00 = Rp 747,000.00
Rp 2,884,493.86

56 1 Bh PASANG KLOSET JONGKOK


1.000 Bh Kloset jongkok @ Rp 95,000.00 = Rp 95,000.00
6.000 Kg Semen portland @ Rp 1,300.00 = Rp 7,800.00
0.010 M3 Pasir pasangan @ Rp 105,000.00 = Rp 1,050.00
1.500 Oh Tukang @ Rp 65,000.00 = Rp 97,500.00
1.500 Oh Kepala Tukang @ Rp 70,000.00 = Rp 105,000.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.160 Oh Mandor @ Rp 55,000.00 = Rp 8,800.00
Rp 360,150.00

57 1 M' PIPA PVC TYPE AW DIA. 1/2"


1.200 M' Pipa PVC @ Rp 7,500.00 = Rp 9,000.00
0.350 bh Assesories 35 % harga pipa @ Rp 8,500.00 = Rp 2,975.00
0.060 Oh Tukang @ Rp 65,000.00 = Rp 3,900.00
0.006 Oh Kepala Tukang @ Rp 70,000.00 = Rp 420.00
0.036 Oh Pekerja @ Rp 45,000.00 = Rp 1,620.00
0.0018 Oh Mandor @ Rp 55,000.00 = Rp 99.00
Rp 18,014.00

58 1 M' PIPA PVC TYPE AW DIA. 3"


1.200 M' Pipa PVC @ Rp 83,000.00 = Rp 99,600.00
0.350 bh Assesories 35 % harga pipa @ Rp 36,500.00 = Rp 12,775.00
0.060 Oh Tukang @ Rp 65,000.00 = Rp 3,900.00
0.006 Oh Kepala Tukang @ Rp 70,000.00 = Rp 420.00
0.036 Oh Pekerja @ Rp 45,000.00 = Rp 1,620.00
0.0018 Oh Mandor @ Rp 55,000.00 = Rp 99.00
Rp 118,414.00

59 1 BH PASANG BAK MANDI FIBER


1.000 Bh Bak Fiber @ Rp 325,000.00 = Rp 325,000.00
0.180 Bh Perlengkapan (18% x harga bak @ Rp 325,000.00 = Rp 58,500.00
1.800 Oh Pekerja @ Rp 45,000.00 = Rp 81,000.00
2.700 Oh Tukang @ Rp 65,000.00 = Rp 175,500.00
0.540 Oh Kepala Tukang @ Rp 70,000.00 = Rp 37,800.00
0.110 Oh Mandor @ Rp 55,000.00 = Rp 6,050.00
Rp 683,850.00

60 1 Bh PASANG FLOOR DRAIN


1.000 Bh Floor drain @ Rp 17,000.00 = Rp 17,000.00
0.100 Oh Tukang @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 24,925.00

61 1 Bh PASANG LAMPU SL 18 WATT


1.000 Bh Lampu SL 18 Watt @ Rp 40,000.00 = Rp 40,000.00
1.000 Bh Fitting plapond/gantung @ Rp 10,000.00 = Rp 10,000.00
0.100 Oh Tukang @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 57,925.00

62 1 Bh PASANG LAMPU SL 10 WATT


1.000 Bh Lampu SL 10 Watt @ Rp 30,000.00 = Rp 30,000.00
1.000 Bh Fitting plapond/gantung @ Rp 10,000.00 = Rp 10,000.00
0.100 Oh Tukang @ Rp 65,000.00 = Rp 6,500.00
0.010 Oh Kepala Tukang @ Rp 70,000.00 = Rp 700.00
0.010 Oh Pekerja @ Rp 45,000.00 = Rp 450.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 47,925.00
63 1 Bh PASANG STOP KONTAK
1.000 Bh Stop kontak @ Rp 23,000.00 = Rp 23,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 34,750.00
64 1 Bh PASANG SAKLAR GANDA
1.000 Bh Saklar ganda @ Rp 25,000.00 = Rp 25,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 36,750.00

65 1 Bh PASANG SAKLAR TUNGGAL


1.000 Bh Saklar tunggal @ Rp 17,000.00 = Rp 17,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 28,750.00

66 1 Bh PASANG SEKRING BOX MCB


1.000 Bh Sekring Box MCB @ Rp 40,000.00 = Rp 40,000.00
0.150 Oh Tukang @ Rp 65,000.00 = Rp 9,750.00
0.015 Oh Kepala Tukang @ Rp 70,000.00 = Rp 1,050.00
0.015 Oh Pekerja @ Rp 45,000.00 = Rp 675.00
0.005 Oh Mandor @ Rp 55,000.00 = Rp 275.00
Rp 51,750.00

67 1 M2 PASANG REILING TANGGA


2.400 M1 Pipa Galvanis Dia. 2" @ Rp 40,000.00 = Rp 96,000.00
1.600 M1 Pipa Galvanis Dia. 1" @ Rp 25,000.00 = Rp 40,000.00
1.000 Oh Tukang Las @ Rp 65,000.00 = Rp 65,000.00
0.100 Oh Kepala tukang @ Rp 70,000.00 = Rp 7,000.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.0060 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 253,330.00

68 1 M2 PASANG REILING SELASAR


4.000 M1 Pipa Galvanis Dia. 2" @ Rp 40,000.00 = Rp 160,000.00
1.000 Oh Tukang Las @ Rp 65,000.00 = Rp 65,000.00
0.100 Oh Kepala tukang @ Rp 70,000.00 = Rp 7,000.00
1.000 Oh Pekerja @ Rp 45,000.00 = Rp 45,000.00
0.0060 Oh Mandor @ Rp 55,000.00 = Rp 330.00
Rp 277,330.00
211.6
4.232

6.46
Tebal Lebar Luas Panjang/m3
Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.30 0.30 0.09 11.1111 4 16 1.58 70.2222 0.15
0.30 0.30 0.09 11.1111 0 14 1.21 0
0.30 0.30 0.09 11.1111 4 12 0.89 39.5556

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.20 0.20 0.04 25 4 16 1.58 158 0.15
0.20 0.20 0.04 25 0 0 0.89 0
0.20 0.20 0.04 25 0 0 0.89 0

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.11 0.11 0.0121 82.6446 4 12 0.89 294.215 0.2
0.11 0.11 0.0121 82.6446 0 12 0.89 0

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.20 0.25 0.05 20 4 14 1.21 96.8 0.2
0.20 0.25 0.05 20 2 12 0.89 35.6

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.15 0.20 0.03 33.3333 4 14 1.21 161.333 0.15
0.15 0.20 0.03 33.3333 0 0 0 0

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.20 0.25 0.05 20 5 14 1.58 158 0.15
0.20 0.25 0.05 20 0 0 0 0

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.20 0.40 0.08 12.5 5 16 1.58 98.75 0.15
0.20 0.40 0.08 12.5 2 12 0.89 22.25
Tebal Lebar Luas Panjang/m3
Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.15 0.25 0.0375 26.6667 4 16 1.58 168.533 0.15
0.15 0.25 0.0375 26.6667 2 12 0.89 47.4667

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.15 0.20 0.03 33.3333 4 14 1.21 161.333 0.15
0.15 0.20 0.03 33.3333 2 12 0.89 59.3333

Tebal Lebar Luas Panjang/m3


Jlh.Tul.PokokDiameter Berat/m' Berat/m3 Jrk Beugel
0.10 0.20 0.02 50 0 14 1.21 0 0.12
0.10 0.20 0.02 50 4 12 0.89 178

Tulangan Pokok Tulangan Bagi


Luas Lebar Pjg Jarak Pjg Jlh Diameter Jarak Pjg
8.33333 1.00 8.33333333 0.15 1.00 56.5556 10 0.15 8.33
8.33333 1.00 8.33333333 0.15 2.00 56.5556 10 0.15 16.67

Tebal Lebar Luas Jlh.Tul.Pokok Pjg/M3 Diameter Jrk BeugelJlh BeugelPjg Beugel
0.10 1.20 0.12 10 83.3333 12 0.2 42 110.04

0.00
0.0115

2.4
0.6
0.84
0.21
0.275 1.54

0.44 0.87662
0.15
0.865
0.02595 0.01685065

0.6 1.76
0.27 0.81
0.06 0.46023
0.0279 0.01585227

1.68 1.68
1.48 0.2 0.81
0.0444 0.11904762 0.48214
0.02643 0.01573129
0.077 0.01444
2.88 0.34722
0.65278 0.71806

1.5

0.5
90
2.4 8.1 2.36842
5.6 5.6 1.63743
5.7
13.7 3.42
4.00585

2.75
0.6 0.6 0.72727
3.35
4.06061 0.825
dia beuge Berat/m'Pnjg Beugel
Jmlh Beugel/m3
Berat/m3 Total Pjg/M3 Diameter Jrk BeugelJlh Beugel
8 0.39 0.800 74.0741 23.1111 132.889 44.4444 14 0.15 75

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total Pjg/M3 Diameter Jrk BeugelJlh Beugel
8 0.39 0.400 166.667 26 184 100 14 0.15 167

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.040 413.223 6.44628 300.661

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.500 100 19.5 151.9

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.300 222.222 26 187.333

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.500 133.333 26 184

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.800 83.3333 26 147
.
dia beuge Berat/m'Pnjg Beugel
Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.400 177.778 27.7333 243.733
.

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
8 0.39 0.300 222.222 26 246.667
.

dia beuge Berat/m'Pnjg Beugel


Jmlh Beugel/m3
Berat/m3 Total
6 0.22 0.200 416.667 18.3333 196.333
.

Berat Berat
P. Total P. Total
Total Total
Pokok Bagi
Pokok Bagi
Jlh Diameter Berat
7.66667 10 0.62 56.5556 63.8889 35.0644 39.6111
7.66667 10 0.62 113.111 127.778 70.1289 79.2222
105.193 118.833

Diameter Berat Besi


10 141.858
Pjg BeugelDiameter Berat Besi
91.5 10 110.144

Pjg BeugelDiameter Berat Besi


136.94 8 174.912
CV. DIMENSI ORIENT PRIMA Konsultan
P ERENCANAAN, P ENGAW ASAN DAN SURVEY P EM ETAAN
Kantor : Jl. Pemuda No.301 Tlp.(0405)22287 Kolaka

DAFTAR UPAH KERJA DAN HARGA BAHAN


KABUPATEN KOLAKA
2009

NOMOR URAIAN SATUAN HARGA

A. UPAH KERJA
1 Pekerja Oh Rp.
2 Tukang Kayu, Batu, Besi, Cat dan Las Oh Rp.
3 Kepala Tukang Oh Rp.
4 Mandor Oh Rp.
5 Tukang Bongkar Mal / Bekisting Oh Rp.

B. HARGA BAHAN / MATERIAL


1 Balok Kayu Kelas-II M3 Rp.
2 Balok Kayu Kelas-III M3 Rp.
3 Batu Gunung M3 Rp.
4 Batu Pecah 2-3 cm M3 Rp.
5 Batu Bata Merah Buah Rp.
6 Bak Mandi Fiber Buah Rp.
7 Besi Strip 5 mm Kg Rp.
8 Besi Beton Polos Kg Rp.
9 Cat Meny Kayu / Glotex Kg Rp.
10 Cat Meny Besi / Glotex Kg Rp.
11 Cat Dasar Tembok Avian Kg Rp.
12 Cat Tembok Fresh Kg Rp.
13 Cat Tembok Mowilex / Jotun Kg Rp.
14 Cat Residu / Alcater Ltr Rp.
15 Cat Kayu / Avian Kg Rp.
16 Cat Seng / Yoko Kg Rp.
17 Engsel Jendela Bh Rp.
18 Engsel Pintu Bh Rp.
19 Formtie / Penjaga Jarak Bekisting / Spacer Bh Rp.
20 Floor Draine Bh Rp.
21 Fithing Bh Rp.
21 Seng Gelombang BJLS 0,2 ( 80 x 180 ) cm Bh Rp.
22 Grendel Jendela / Pintu Kodok Bh Rp.
23 Grendel Tanam Bh Rp.
24 Ijuk M2 Rp.
25 Inbow Dos Bh Rp.
26 Isolasi Listrik Roll Rp.
27 Kaca Bening 5 mm M2 Rp.
28 Kaca Bening 5 mm M2 Rp.
29 Kait Angin Bh Rp.
30 Kayu Dolken Btg Rp.
31 Kawat Beton Kg Rp.
32 Karet Pelapis Genteng M2 Rp.
33 Kwas Bh Rp.
34 Kunci Pintu 2 Slaag Bh Rp.

NOMOR URAIAN SATUAN HARGA

35 Kait Angin / Hak Angin Bh Rp.


36 Kertas Amplas Lbr Rp.
37 Kloset Jongkok Ex. Toto / KIA Bh Rp.
38 Kabel NYA ( 3 x 2,5 ) mm M1 Rp.
39 Klem kabel No.10 Bh Rp.
40 Lampu TL 2 x 20 Watt Bh Rp.
41 Lampu SL 18 Watt Bh Rp.
42 Lampu SL 10 Watt Bh Rp.
43 List Plafond ( Kayu Profil 4 x 4 cm ) M1 Rp.
44 List Kaca M1 Rp.
45 Las DOP Bh Rp.
46 Lem Kayu Ltr Rp.
47 Minyak Bekisting Ltr Rp.
48 Multipleks 9 mm Lbr Rp.
49 Paku Biasa 1/2"-1" Kg Rp.
50 Paku Biasa 2"-5" Kg Rp.
51 Paku Seng Kg Rp.
52 Papan Kayu Kelas II M3 Rp.
53 Papan Kayu Kelas III M3 Rp.
54 Panel Listrik Lengkap Bh Rp.
55 Pasir Urug M3 Rp.
56 Pasir Pasang M3 Rp.
57 Pasir Beton M3 Rp.
58 Plamur Tembok Kg Rp.
59 Plamur Kayu / Dempul Jadi Kg Rp.
60 Pipa Galvanis Dia. 1/2" M1 Rp.
61 Pipa Galvanis Dia. 3/4" M1 Rp.
62 Pipa Galvanis Dia. 1" M1 Rp.
63 Pipa Galvanis Dia. 2" M1 Rp.
63 Pipa PVC Dia. 1/2" M1 Rp.
64 Pipa PVC Dia. 3" M1 Rp.
65 Pipa PVC Listrik Dia. 5/8" ( 6 M1) Btg Rp.
66 Sirtu M3 Rp.
67 Sekring Box MCB Bh Rp.
68 Saklar Tunggal Bh Rp.
69 Saklar Ganda Bh Rp.
70 Stop Kontak Bh Rp.
71 Semen Portland Kg Rp.
72 Semen Warna Kg Rp.
73 Seal Tape Bh Rp.
74 Seng Gelombang BJLS 0,20 ( 80 x 180 ) cm Lbr Rp.
75 Seng Plat BJLS 0,20 30 cm M1 Rp.
76 Seng Plat BJLS 0,20 40 cm M1 Rp.
77 Stop Kran Air Stainless Steell Bh Rp.
78 Tanah Urug M3 Rp.
79 Tripleks 3 mm Lbr Rp.
80 Tripleks 5 mm Lbr Rp.
80 Tegel Keramik 30 x 30 Bh Rp.
81 Tegel Keramik 20 x 20 Bh Rp.
82 Tegel Keramik 20 x 25 Bh Rp.
83 Tegel Keramik 10 x 20 Bh Rp.
84 T- Dos 5/8" Bh Rp.
RIMA Konsultan
N SURVEY P EM ETAAN
5)22287 Kolaka

RGA BAHAN

HARGA

45,000.00
65,000.00
70,000.00
55,000.00
45,000.00

2,200,000.00
1,750,000.00
135,000.00
135,000.00
425.00
325,000.00
40,000.00
15,000.00
16,500.00
16,500.00
8,000.00
20,000.00
80,000.00
10,000.00
40,000.00
45,000.00
20,000.00
25,000.00
5,000.00
17,000.00
10,000.00
42,000.00
10,000.00
17,000.00
25,000.00
1,500.00
7,500.00
140,000.00
140,000.00
10,000.00
6,000.00
20,000.00
20,000.00
10,000.00
85,000.00

HARGA

8,500.00
2,500.00
95,000.00
2,500.00
150.00
30,000.00
40,000.00
30,000.00
8,500.00
5,000.00
150.00
25,000.00
10,000.00
100,000.00
22,000.00
20,000.00
25,000.00
2,200,000.00
1,750,000.00
25,000.00
98,000.00
105,000.00
105,000.00
14,000.00
20,000.00
15,000.00
20,000.00
25,000.00
40,000.00
7,500.00
83,000.00
3,500.00
50,000.00
40,000.00
17,000.00
25,000.00
23,000.00
1,300.00
15,000.00
5,350.00
43,200.00
18,000.00
22,000.00
40,000.00
40,000.00
47,000.00
87,000.00
4,860.00
1,880.00
2,450.00
1,000.00
2,700.00

You might also like