TAHUN 2011
I PEKERJAAN GORONG-GORONG
1 Galian tanah : 0.70 x 0.70 x 7.50 ( 2.00 ) = 7.35 m3
: 0.30 x 0.60 x 7.50 = 1.35 m3
= 8.70 m3
7 Penulangan beton :
f 12mm balok : 0.888 x 7.60 x 4.00 ( 2.00 ) = 53.99 kg
f 8mm balok : 0.395 x 0.65 x 37.50 ( 2.00 ) = 19.26 kg
f 12mm pokok : 0.888 x 1.10 x 37.50 ( 1.00 ) = 36.63 kg
f 12mm bengkok : 0.888 x 1.25 x 37.50 ( 1.00 ) = 41.63 kg
f 10mm susut : 0.617 x 1.10 x 37.50 ( 1.00 ) = 25.45 kg
f 10mm bagi : 0.617 x 7.60 x 5.00 ( 2.00 ) = 46.89 kg
= 223.84 kg
9 Pembersihan lokasi : = LS
II PEKERJAAN TALUD
1 Galian tanah : 0.50 x 0.50 x 11.50 ( 1.00 ) = 2.88 m3
REKAPITULASI
I PEKERJAAN GORONG-GORONG 14,980,364.07
II PEKERJAAN TALUD 4,019,635.93
JUMLAH 19,000,000.00