Professional Documents
Culture Documents
6,950,000.00
TOTAL 6,950,000.00
REKAPITULASI
KEGIATAN : PEMELIHARAAN RUTIN /BERKALA KANTOR GUBERNUR
PEKERJAAN : PERBAIKAN PINTU PAGAR BESI
LOKASI : JL. SUDIRMAN
TAHUN : 2013
NO URAIAN JUMLAH
Total 6,950,000.00
PPN 10 % 695,000.00
Jumlah 7,645,000.00
Dibulatkan 7,645,000.00
Padang, 2013
ACTUAL CHECK
PEKERJAAN : PERENCANAAN RUMAH TINGGAL
LOKASI : PONDOK INDAH-PARAK GADANG
TH. ANGG : 2013
PEKERJAAN PERMULAAN
2 Pasangan Kolom Praktis 13/13 = 0.13 x 0.13 x 6.00 x 1.00 x 13.00 = 1.32 m3
Pasangan Kolom Praktis 13/13 Jumlah 1.32 m3
6 Pasangan Balok Pinggang 13/20 x = 0.13 x 0.20 x 54.00 x 1.00 x 1.00 = 1.40 m3
= x x 4.70 x 1.00 x 1.00 = 0.00 m3
= x x 8.93 x 1.00 x 1.00 = 0.00 m3
= x x 18.50 x 1.00 x 1.00 = 0.00 m3
7 Pasangan Ring Balok 13/20 x = 0.13 x 0.30 x 54.00 x 1.00 x 1.00 = 2.11 m3
= x x 4.70 x 1.00 x 1.00 = 0.00 m3
= x x 8.93 x 1.00 x 1.00 = 0.00 m3
= x x 18.50 x 1.00 x 1.00 = 0.00 m3
11 Pasangan Kuzen
0.05 x 0.15 x 6.70 x 1.00 x 1.00 = 0.05 m3
0.05 x 0.15 x 20.80 x 1.00 x 1.00 = 0.16 m3
Type PJ 2 = 1 Unit
x 0.15 x 2.10 x 2.00 x 1.00 = 0.00 m3
x 0.15 x 1.50 x 1.00 x 1.00 = 0.00 m3
x 0.15 x 1.75 x 1.00 x 1.00 = 0.00 m3
x 0.15 x 0.80 x 1.00 x 1.00 = 0.00 m3
2 Pasangan List Plank Kayu Double = 20.20 x 0.30 x 2.00 x 1.00 x 1.00 = 12.12 m2
dipropil = 9.95 x 0.30 x 2.00 x 1.00 x 1.00 = 5.97 m2
Pasangan List Plank Kayu Double dipropil Jumlah 18.09 m2
4 Pasangan Atap Genteng Metal Volume Atap Sama dengan Rangka Atap
5 Pasangan Nok Genteng Metal = 1.25 x 4.53 x 1.00 x 1.00 x 1.00 = 5.67 ,m1
= 1.25 x 6.65 x 2.00 x 1.00 x 1.00 = 16.63 ,m1
= 1.25 x 5.59 x 2.00 x 1.00 x 1.00 = 13.98 ,m1
= 1.25 x 5.06 x 2.00 x 1.00 x 1.00 = 12.66 ,m1
= 1.25 x 2.65 x 1.00 x 1.00 x 1.00 = 3.31 ,m1
2.00 + 6.50 + 2.50 + 0.75 + 0.00 = 11.75 ,m1
Pasangan Nok Genteng Metal Jumlah 64.00 m1
Pasangan Dak Beton t. 10 cm = 0.10 x 2.59 x 1.00 x 1.00 x 1.00 = 0.26 ,m1
= 0.10 x x 3.75 x 1.00 x 1.00 = 0.00 ,m1
Pasangan Dak Beton t. 10 cm Jumlah 0.26 m1
PEKERJAAN LANTAI
Pasangan Keramik lantai WC = 1.10 x 1.50 x 2.00 x 1.00 x 1.00 = 3.30 ,m1
= 1.50 x 1.50 x 1.00 x 1.00 x 1.00 = 2.25 ,m1
Pasangan Keramik lantai WC Jumlah 5.55 m1
Pasangan Keramik Teras 40 X 40 CM = 1.30 x 1.00 x 1.00 x 1.00 x 1.00 = 1.30 ,m1
= x 6.75 x 1.00 x 1.00 x 1.00 = 0.00 ,m1
PEKERJAAN LOTENG
5 R. Registasi
Pasangan List Profil loteng 4 x 4 dalam = 3.50 + 3.00 x 2.00 x 1.00 x 1.00 = 13.00 m1
R. Periksa
= 2.25 + 3.00 x 2.00 x 1.00 x 1.00 = 10.50 m1
R.Posyandu
= 4.75 + 3.00 x 2.00 x 1.00 x 1.00 = 15.50 m1
R.Bersali
= 5.00 + 3.50 x 2.00 x 1.00 x 1.00 = 17.00 m1
WC
= 1.50 + 2.00 x 2.00 x 2.00 x 1.00 = 14.00 m1
= 1.00 + 2.00 x 2.00 x 2.00 x 1.00 = 12.00 m1
R. Tamu
= 4.00 + 4.25 x 2.00 x 1.00 x 1.00 = 16.50 m1
KTU
= 4.00 + 3.00 x 2.00 x 1.00 x 1.00 = 14.00 m1
KTA
= 3.00 + 3.00 x 2.00 x 1.00 x 1.00 = 12.00 m1
R. Makan & Keluarga
= 7.00 + 4.25 x 2.00 x 1.00 x 1.00 = 22.50 m1
WC
= 2.00 + 2.00 x 2.00 x 1.00 x 1.00 = 8.00 m1
6 Pasangan List Profil loteng 4 x 4 luar = 8.15 + 18.40 x 2.00 x 1.00 x 1.00 = 53.10 m1
= 19.28 + 9.91 x 2.00 x 1.00 x 1.00 = 58.38 m1
Pasangan List Profil loteng 4 x 4 luar Jumlah 111.48 m1
Pasangan Jendela rangka kaca = 1.22 x 0.70 x 11.00 x 1.00 x 1.00 = 9.39 ,m1
= 1.62 x 0.52 x 2.00 x 1.00 x 1.00 = 1.68 ,m1
= 1.42 x 0.72 x 7.00 x 1.00 x 1.00 = 7.16 ,m1
Pasangan Jendela rangka kaca Jumlah 18.24 m1
PEKERJAAN CAT
Galian Tanah Sal Keliling = 0.60 x 0.30 x 20.70 x 1.00 x 2.00 = 7.45 ,m1
= 0.60 x 0.30 x 11.05 x 1.00 x 2.00 = 3.98 ,m1
Galian Tanah Sal Keliling Jumlah 11.43 m1
Lantai Kerja Saluran = 0.60 x 0.05 x 20.70 x 1.00 x 2.00 = 1.24 ,m1
= 0.60 x 0.05 x 11.05 x 1.00 x 2.00 = 0.66 ,m1
Lantai Kerja Saluran Jumlah 1.91 m1
Pasangan Kastin = 0.15 x 0.37 x 24.35 x 1.00 x 2.00 = 2.70 m2
= 0.60 x 0.37 x 10.60 x 1.00 x 2.00 = 4.71 m2
Plesteran saluran dan Kastin = 1.00 x 1.20 x 20.70 x 1.00 x 2.00 = 49.68 ,m1
= 1.00 x 1.20 x 11.05 x 1.00 x 2.00 = 26.52 ,m1
Plesteran saluran dan Kastin Jumlah 76.20 m1
Urugan Pasir Rabat 23.06 x 0.11 x 1.00 x 1.00 x 1.00 = 2.54 ,m1
21.24 x 0.11 x 1.00 x 1.00 x 1.00 = 2.34 ,m1
Urugan Pasir Rabat Jumlah 4.87 m1
Cor lantai rabat 23.06 x 0.07 x 1.00 x 1.00 x 1.00 = 1.61 ,m1
21.24 x 0.07 x 1.00 x 1.00 x 1.00 = 1.49 ,m1
Cor lantai rabat Jumlah 3.10 m1
Pasangan Pondasi
=( 0.30 + 0.56 ) x 1.30 x 30.00 x 1.00 = 16.77 m3
2 0.43
PEKERJAAN PAGAR
Pasangan Ring Balok 13/20 0.13 x 0.20 x 4.45 x 1.00 x 1.00 = 0.12 m3
0.13 x 0.20 x 30.00 x 1.00 x 1.00 = 0.78 m3
0.13 x 0.20 x 8.00 x 1.00 x 1.00 = 0.21 m3
Pasangan Ring Balok 13/20 Jumlah 1.10 m3
7 Pasangan Bata Pelapis tiang 0.55 x 0.55 x 9.00 x 1.00 x 1.00 = 2.72 m3
0.55 x 0.60 x 9.00 x 1.00 x 1.00 = 2.97 m3
I PEKERJAAN PERMULAAN
1 Pembersihan Lapangan 120.00 m2 9,500.00 1,140,000.00
2 Pasangan Bowplank 38.40 m1 57,670.00 2,214,528.00
3 Galian Tanah Pondasi 55.89 m3 43,250.00 2,417,294.40
4 Urugan Pasir 3.49 m3 65,300.00 228,105.96
5 Pasangan Aanstampang 13.9728 m3 260,325.00 3,637,469.16
6 Pasangan Pondasi batu kali 28.03 m3 512,920.00 14,379,250.57
7 Pasangan Pondasi Plat 8.00 Ttk 1,896,000.00 15,168,000.00
8 Urugan Kembali 13.97 m3 14,416.67 201,441.20
SUB TOTAL I 39,386,089.29
II PEKERJAAN BETON & DINDING
1 Pasangan Sloof 25/40 5.40 m3 7,491,040.42 40,451,618.29
2 Pasangan Kolom Praktis 13/13 1.32 m3 9,898,845.11 13,048,657.62
3 Pasangan Kolom 15/30 7.20 m3 6,150,867.20 44,286,243.84
4 Pasangan Kolom 20/50 0.44 m3 4,571,733.87 2,028,706.91
5 Pasangan Kolom 25/100 0.81 m3 5,243,728.30 4,260,529.24
6 Pasangan Balok Pinggang 13/20 1.40 m3 8,397,420.45 11,789,978.31
7 Pasangan Ring Balok 13/20 2.11 m3 8,397,420.45 17,684,967.46
8 Pas. Plat Jendela 1.29 m3 3,073,724.52 3,965,104.64
9 Pasangan Bata 1 : 2 76.36 M2 111,198.00 8,490,968.08
10 Pasangan Bata 1 : 4 392.24 M2 103,850.00 40,733,708.60
11 Pasangan Kuzen 4.04 m3 4,079,000.00 16,495,476.00
12 Meni Kunzen 20.70 m2 15,000.00 310,555.80
13 Pasangan Anggker Kuzen 60.66 kg 23,400.00 1,419,444.00
SUB TOTAL II 204,965,958.77
III PEKERJAAN ATAP
1 Pasangan Kuda kuda Rangka Atap Baja Ringan 117.04 m2 160,000.00 18,727,056.00
2 Pasangan List Plank Kayu Double dipropil 18.09 m2 80,600.00 1,458,054.00
3 Pasangan Khilgot 18.98 m1 86,125.00 1,635,032.90
4 Pasangan Atap Genteng Metal 117.04 m2 72,850.00 8,526,662.69
5 Pasangan Nok Genteng Metal 64.00 m1 50,465.00 3,229,806.33
6 Pasangan Dak Beton t. 10 cm 0.26 m3 3,073,724.52 796,094.65
SUB TOTAL III 34,372,706.57
IV PEKERJAAN LANTAI
1 Urugan Tanah 18.75 m3 50,416.67 945,312.50
2 Urugan Pasir 13.75 m3 65,300.00 897,875.00
3 Cor Lantai 0.09 m3 338,207.14 29,593.13
4 Pasangan Keramik Lantai 40 X 40 CM 119.45 m2 136,125.00 16,260,131.25
5 Pasangan Keramik Teras 40 X 40 CM 1.30 m2 136,125.00 176,962.50
6 Pasangan Keramik lantai WC 5.55 m2 132,141.00 733,382.55
SUB TOTAL IV 19,043,256.93
NO URAIAN VOLUME H. SATUAN JUMLAH SATUAN
V PEKERJAAN PLESTERAN
1 Plesteran 1 : 2 152.72 m2 35,657.96 5,445,612.34
2 Plesteren 1 : 4 784.47 m2 31,834.60 24,973,352.33
3 Acian 937.19 m2 20,020.00 18,762,543.80
4 Afwerking Beton 36.72 m2 39,549.16 1,452,245.16
5 Pas. Keramik Dinding KM / WC uk. 20/25 29.85 m2 138,587.00 4,136,821.95
SUB TOTAL V 54,770,575.57
VI PEKERJAAN LOTENG
1 Pasangan Rangka Loteng Dalam 125.00 m2 76,965.00 9,620,625.00
2 Pasangan Rangka Loteng Luar 49.83 m2 76,965.00 3,834,827.30
3 Pasangan Loteng Triplek t=4mm Dalam 125.00 m2 31,772.50 3,971,562.50
4 Pasangan Loteng Triplek t=4mm Luar 49.83 m2 31,772.50 1,583,083.88
5 Pasangan List Profil loteng 4 x 4 dalam 155.00 m1 12,275.00 1,902,625.00
6 Pasangan List Profil loteng 4 x 4 luar 111.48 m1 12,275.00 1,368,417.00
SUB TOTAL VI 22,281,140.68
VII PEKERJAAN PINTU & JENDELA
1 Pasangan Pintu Panil 19.15 m2 336,250.00 6,439,860.00
2 Pasang Pintu WC (Fiber) 3.00 set 286,000.00 858,000.00
3 Pasangan Jendela rangka kaca 18.24 m2 259,700.00 4,735,785.32
4 Pasangan Kunci tanam 2 x slagh' 9.00 bh 208,670.00 1,878,030.00
5 Pasangan Kunci Tanam bodi Pelor 1.00 bh 208,670.00 208,670.00
6 Pasangan Engsel pintu 4" 33.00 bh 24,510.00 808,830.00
7 Pasangan Engsel Jendela 3" 40.00 bh 18,340.00 733,600.00
8 Pasang Tangan Pintu 2.00 ps 210,000.00 420,000.00
9 Pasangan Tangan - tangan Jendela 20.00 bh 21,680.00 433,600.00
10 Pasangan Grendel Jendela 40.00 bh 24,680.00 987,200.00
11 Pasangan Grendel Tanam Pintu 1.00 ps 127,500.00 127,500.00
12 Pasangan Kait angin Jendela 40.00 bh 17,510.00 700,400.00
SUB TOTAL VII 18,331,475.32
VIII PEKERJAAN CAT
1 Pengecatan Kuzen (cat minyak) 69.01 m2 24,655.00 1,701,500.72
2 Pengecatan Pintu & Jendela (cat minyak) 54.98 m2 24,655.00 1,355,630.52
3 Pengecatan List Plank (cat minyak) 18.09 m2 24,655.00 446,008.95
4 Pengecatan dinding (cat air) 973.91 m2 13,532.50 13,179,437.08
5 Pengecatan Loteng (cat air) 174.83 m2 13,532.50 2,365,827.43
SUB TOTAL VIII 19,048,404.70
IX PEKERJAAN INSTALASI LISTRIK
1 Pasangan Instalasi Listrik 26 ttk 140,000.00 3,640,000.00
2 Pasangan Saklar Tunggal 10 bh 22,000.00 220,000.00
3 Pasangan Saklar Ganda 3 bh 25,000.00 75,000.00
4 Pasangan Stop Kontak 9 bh 22,000.00 198,000.00
5 Pasangan Lampu xl 23 watt 12 bh 32,000.00 384,000.00
6 Pasangan Lampu xl 18 watt 5 bh 25,000.00 125,000.00
7 Memasukan Daya Listrik 900 watt 1 Ls 1,200,000.00 1,200,000.00
SUB TOTAL IX 5,842,000.00
X PEKERJAAN INSTALASI AIR
1 Pasangan Pipa Tinja 4" 24 m1 - -
2 Pasangan Pipa Air Kotor 3" 7 m1 34,241.00 239,687.00
3 Pasangan Pipa saluran 2 " 9 m1 20,336.50 183,028.50
4 Pasangan Pipa 1/2" 27 m1 13,524.00 365,148.00
5 Pasangan Pipa 1" Ke Sumber Air 30 m1 13,524.00 405,720.00
6 Pasangan Kran Air 3 bh 39,825.00 119,475.00
7 Pasangan Kran Air Bebek Angsa 1 nh 39,825.00 39,825.00
NO URAIAN VOLUME H. SATUAN JUMLAH SATUAN
PEKERJAAN PAGAR
33000
1.4
46200
31000
1.62
50220
3
3.75
125
131.75
###