I. PEKERJAAN PERSIAPAN
II PEKERJAAN PENGECATAN
PERHITUNGAN VOLUME
= 1.00 Ls
11.1
m x 4.00 Bh = 7.62 m2
m x 2.00 R/L = 23.54 m2
m x 4.00 R/L = 27.20 m2
m x 2.00 Bh x 2.0 R/L = 1.92 m2
m x 4.00 Bh x 2.0 R/L = 1.28 m2
m x 2.00 R/L = 55.00 m2
total 116.56 m2
m x 4.00 Bh = 4.14 m2
m x 2.00 R/L = 1.48 m2
m x 3.00 Bh x 2.0 R/L = 0.84 m2
m x 2.00 R/L = 11.40 m2 9.5
total 17.86 m 2
m x 4.00 Bh = 10.75 m2
m x 2.00 R/L = 3.84 m2
m x 4.00 R/L = 14.56 m2
m x 2.00 Bh x 2.0 R/L = 15.36 m2
m x 4.00 Bh x 2.0 R/L = 1.28 m2
m x 2.00 R/L = 48.00 m2
total 93.79 m2
I UMUM
1 Beton K - 300 M3
2 Beton K - 225 M3
3 Baja Tulangan Kg
4 Pasangan Batu dengan mortar M3
5 Pemancangan kayu ulin uk. 10 /10 M'
6 Pasangan Kerb Beton / Kansteen PU : 15 x 20 x 30 x 50 M1
7 Plesteran 1: 2 Tebal 15 mm M2
8 Pengecatan ( Cat Minyak ) M2 264.92 91,190.00 24,157,872.42
A. TENAGA
1 Pekerja Tidak Terlatih L.101 Jam 3.0000 7,800.00 23,400.00
2 Pekerjan Terlatih L.106 Jam 0.3000 10,000.00 3,000.00
3 Mandor L.061 Jam 0.0300 15,000.00 450.00
B. BAHAN
1 Cat Anti Korosit Mutu Tinggi Kg 0.3000 150,000.00 45,000.00
2 Thinner Liter 0.0900 45,000.00 4,050.00
C. PERALATAN
Jumlah Harga
No Uraian Pekerjaan
(Rupiah)
II Pekerjaan Drainase
IV Perkerasan Berbutir
(I) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 24,657,872.42
(II) Pajak Pertambahan Nilai ( PPN ) = 10% x ( I ) 2,465,787.24
(III) JUMLAH TOTAL HARGA PEKERJAAN = ( I ) + ( II ) 27,123,659.66
(IV) PEMBULATAN 27,123,000.00
Terbilang "Dua Puluh Tujuh Juta Seratus Dua Puluh Tiga Ribu Rupiah"
A UMUM
B PEKERJAAN DRAINASE
JUMLAH HARGA B -
C PEKERJAAN TANAH
1 Galian biasa M3
2 Galian Keras M3
3 Urugan Biasa M3
4 Urugan Pilihan M3
5 Urugan Pasir M3
JUMLAH HARGA C
D PERKERASAN BERBUTIR
JUMLAH HARGA D
1 Beton K - 300 M3
2 Beton K - 225 M3
3 Baja Tulangan Kg
4 Pasangan Batu dengan mortar M3
5 Pemancangan kayu ulin uk. 10 /10 M'
6 Pasangan Kerb Beton / Kansteen PU : 15 x 20 x 30 x 50 M1
7 Plesteran 1: 2 Tebal 15 mm M2
8 Pengecatan ( Cat Minyak ) M2 264.92 89,540.00 23,720,757.72
JUMLAH HARGA E 23,720,757.72
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Jumlah Harga
No Uraian Pekerjaan
(Rupiah)
B Pekerjaan Drainase
C Pekerjaan Tanah
D Perkerasan Berbutir
(I) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 24,270,757.72
(II) Pajak Pertambahan Nilai ( PPN ) = 10% x ( I ) 2,427,075.77
(III) JUMLAH TOTAL HARGA PEKERJAAN = ( I ) + ( II ) 26,697,833.49
(IV) PEMBULATAN 26,697,000.00
Terbilang "Dua Puluh Enam Juta Enam Ratus Sembilan Puluh Tujuh Ribu Rupiah"
PANITIA
KETUA,
A. TENAGA
1 Pekerja Tidak Terlatih L.101 Jam 3.0000 7,800.00 23,400.00
2 Pekerjan Terlatih L.106 Jam 0.3000 10,000.00 3,000.00
3 Mandor L.061 Jam 0.0300 15,000.00 450.00
B. BAHAN
1 Cat Anti Korosit Mutu Tinggi Kg 0.2900 150,000.00 43,500.00
2 Thinner Liter 0.0900 45,000.00 4,050.00
C. PERALATAN
A PEKERJAAN UMUM
1 Papan Nama Kegiatan Ls 1.00 550,000.00 550,000.00 500,000.00 500,000.00 500,000.00 500,000.00 Nego
B STRUKTUR
1 Pengecatan ( Cat Minyak ) M2 264.92 89,540.00 23,720,757.72 91,190.00 24,157,872.42 89,540.00 23,720,757.72 Tetap
MENGETAHUI,
KONTRAKTOR
CV. CREMONA PROFESIONAL ENGINEERING
Evaluasi harga dilakukan terhadap Penawaran yang memenuhi Persyaratan (Evaluasi) Administrasi dan Teknis, dengan penilaian terhadap Harga Penawaran
meliputi :
a. Koreksi Aritmatika
b. Kewajaran Harga
I UMUM
1 Papan Nama Kegiatan Ls 1.00 500,000.00 500,000.00 500,000.00 500,000.00 0.00
II STRUKTUR
1 Pengecatan ( Cat Minyak ) M2 264.92 89,540.00 23,720,757.72 89,540.00 23,720,757.72 0.00
b. Kewajaran harga
I. PEKERJAAN PERSIAPAN
1 Galian Lumpur dan Pembuangan Sta 0+000 s/d 0+040 150.00 m x 2.00 m
1.6
0.03
13.3333333333333
UN 2009
PERHITUNGAN VOLUME
6.25
3.125
1.00 Ls
0.7
0.35
x 1.00 m = 300.00 m³ 254.56
300.00 m³
6.8
3.4
3 = 123.00 M1 123
= 3.46 M3 60
13.33333 11.666666667
26.66667 23.333333333
1 60
41
50
0.01
0.7 0.8
56
DAFTAR KUANTITAS DAN HARGA
I UMUM
II PEKERJAAN DRAINASE
2.2 Pekerjaan Galian Untuk Selokan Drainase dan Saluran Air M3 300.0 82,106.00 24,631,799.69
Jumlah Harga
No Uraian Pekerjaan
(Rupiah)
iV Perkerasan Berbutir
(I) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 72,865,283.73
(II) Pajak Pertambahan Nilai ( PPN ) = 10% x ( I ) 7,286,528.37
(III) JUMLAH TOTAL HARGA PEKERJAAN = ( I ) + ( II ) 80,151,812.10
(IV) PEMBULATAN 80,151,000.00
Terbilang : "Delapan Puluh Juta Seratus Lima Puluh Satu Ribu Rupiah"
A. TENAGA
1 Pekerja Tidak Terlatih L.101 Jam 0.8000 7,800.00 6,240.00
2 Mandor L.061 Jam 0.2000 15,000.00 3,000.00
A UMUM
B PEKERJAAN DRAINASE
1 Pekerjaan Galian Untuk Selokan Drainase dan Saluran Air M3 300.0 81,432.20 24,429,660.53
Jumlah Harga
No Uraian Pekerjaan
(Rupiah)
C Pekerjaan Tanah
D Perkerasan Berbutir
(I) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 72,606,866.67
(II) Pajak Pertambahan Nilai ( PPN ) = 10% x ( I ) 7,260,686.67
(III) JUMLAH TOTAL HARGA PEKERJAAN = ( I ) + ( II ) 79,867,553.33
(IV) PEMBULATAN 79,867,000.00
Terbilang : "Tujuh Puluh Sembilan Juta Delapan Ratus Enam Puluh Tujuh Ribu Rupiah"
ASNOPY PIRADE,SHut
Direktur
H. THAMRIN. B, ST
Alat - 1
Kegiatan :
Kabupaten/Kota :
Lokasi :
Tahun Anggaran : 0
SUMARY 1 3 6 10 15
KOEFISIEN AWAL 1.000 1.000 1.000 1.000 1.000
DECLINING
TAHUN 2003 1.000 0.000 0.667 0.333 0.500 0.500 0.400 0.600 0.333 0.667
TAHUN 2004 AKHIR 0.333 0.000 0.333 0.167 0.300 0.300 0.267 0.400
TAHUN 2005 AKHIR 0.167 0.000 0.200 0.100 0.200 0.200
TAHUN 2006 AKHIR 0.100 0.000 0.133 0.067
TAHUN 2007 AKHIR 0.067 0.000
TAHUN 2008 AKHIR
Alat - 2
ISKANDAR, ST
Direktur
BINA MARGA DAN PENGAIRAN KOTA SAMARINDA
1,139,458,333.33
621,833,333.33
27,121,500.00 1 2 3 4 5
40,897,500.00 1 Asphat Mixing Plant E.010 150 50 Ton/Jam
267,284,637.50 2 Batcing Plant E.020 150 150 Ton
21,484,533.00 3 Asphalt Finisher E.020 47 6 Ton
2,140,200.00 4 Concret Finisher 30 6 Ton
164,666,250.00 5 Asphalt Sprayer E.030 150 800 Liter
95,217,682.50 6 Air Compressor 4000-6500 L/m3 E.040 50 ---
111,611,020.00 7 Bulldozer 100-150 HP E.050 150 ---
128,827,125.00 8 Concrete Mixer 0,3-0,6 m3 E.060 15 500 Liter
86,907,187.50 9 Concrete Vibrator E.070 30 ---
3,013,500.00 10 Dump Truck 3-4 m3 E.080 100 6 Ton
396,870,313.75 11 Dump Truck 3-4 m3 E.080 100 6 Ton
511,344,312.50 12 Dump Truck Mixer E.090 100 6 Ton
196,630,875.00 13 Excavator 80-140 HP E.100 50 0.5 m3
62,935,751.67 14 Flat Bed Truck 3-4 m3 E.110 100 4 m3
160,217,750.00 15 Generator Set E.120 175 125 KVA
114,441,250.00 16 Jack Hammer E.130 3 ---
2,905,875.00 17 Motor Grader > 100 HP E.140 125 ---
2,789,640.00 18 Stone Crusher E.150 220 50 Ton/Jam
361,942,875.00 19 Track Loader 75-100 HP E.160 90 2 m3
121,078,125.00 20 Three Wheel Roller 6-8 Ton E.170 55 8 Ton
123,469,245.00 21 Tandem Roller 6-8 Ton E.180 50 8 Ton
22 Tire Roller 8-10 Ton E.190 50 10 Ton
23 Tamper Vibrator Plate E.200 5 0 Ton
116,590.62 24 Water Pump 70-100 mm E.210 6 ---
25 Wheel Loader 1,0-1,6 m3 E.220 105 2 m3
26 Water Tanker 3000-4500 Liter E.230 100 4,000 Liter
INA PRATAMA 27 Vibratory Roller 5-8 Ton E.240 75 7 Ton
28 Concrete Cuter E.250 2
29 Fulvi Mixer E.250 75 ---
30 Concrete Pump E.260 125 ---
31 Mesin Pancang E.270 100 ---
KETERANGAN
Tingkat Suku Bunga i = 20 %
Upah Operator / Sopir U1
Upah Pembantu Operator / Sopir U2
Bahan Bakar Bensin Mb
Bahan Bakar Solar Ms
Minyak Pelumas Mp
ANALISA BIAYA SEWA
= 0.20 / Tahun
= Rp. 1,400.00 Rp. / Jam
= Rp. 10,000.00 Rp. / Jam
= Rp. 6,000.00 Liter
= Rp. 8,500.00 Liter
= Rp. 3,045,230.68 Liter
A BIAYA SEWA PERALATAN PER JAM KERJA
Rp.
O P A B C
G+N
1 Mandor Lapangan L.061
2 Mekanik L.071
25 26 3 Mekanik Pembantu L.072
4,393,108.93 5 Tahun 4 Kepala Tukang L.073
326,233.53 10 Tahun 5 Tukang L.079
140,792.20 6 Tahun 6 Operator Terlatih L.081
116,590.62 8 Tahun 7 Operator Semi Terlatih L.082
191,257.49 8 Tahun 8 Pembantu Operator L.089
89,789.78 8 Tahun 9 Sopir Truck L.091
370,400.20 6 Tahun 10 Sopir Personil L.092
24,342.28 5 Tahun 11 Pembantu Sopir L.099
54,205.20 6 Tahun 12 Pekerja Tak Terlatih L.101
179,640.54 10 Tahun 13 Pekerja Semi Terlatih L.103
189,640.54 10 Tahun 14 Pekerja Terlatih L.106
194,485.62 5 Tahun
184,196.03 4 Tahun
194,485.62 5 Tahun
302,062.70 10 Tahun
7,739.45 4 Tahun
337,729.37 5 Tahun
460,441.03 8 Tahun
198,390.20 7 Tahun
177,198.95 7 Tahun
177,571.03 8 Tahun
152,727.28 7 Tahun
8,669.99 3 Tahun
10,559.64 5 Tahun
288,771.87 6 Tahun
203,933.53 5 Tahun
225,825.20 7 Tahun
4,828.45 4 Tahun DAFTAR ANALISA HARGA SATUAN DAS
111,887.70 5 Tahun
303,146.03 5 Tahun
213,808.53 5 Tahun Kegiatan : Pembangunan Jalan Dalam Kota Samarinda
Lokasi : Samarinda
Tahun Anggaran : 2011
NO BAHAN / MATERIAL
A B
NO PERALATAN
A B
m Kota Samarinda
NO TENAGA
HARGA HARGA
SAT SATUAN SATUAN DASAR UPAH 1 Mandor Lapangan
DASAR TENAGA KERJA 2 Mekanik
PER HARI PER JAM PEMBULATAN 3 Mekanik Pembantu
Rp. Rp. Rp. 4 Kepala Tukang
D E F=E÷7 G 5 Tukang
6 Operator Terlatih
Jam 84,000.00 12,000.00 12,000.00 7 Operator Semi Terlatih
Jam 76,000.00 10,857.14 10,800.00
Jam 70,000.00 10,000.00 10,000.00 NO MATERIAL
Jam 75,000.00 10,714.29 10,700.00
Jam 91,000.00 13,000.00 13,000.00
Jam 91,000.00 13,000.00 13,000.00
Jam 67,000.00 9,571.43 9,500.00 A B
Jam 10,000.00 1,428.57 1,400.00 1 Agregat Kasar Pondasi Kela
Jam 70,000.00 10,000.00 10,000.00 2 Agregat Halus Pondasi Kela
Jam 70,000.00 10,000.00 10,000.00 3 Agregat Kasar Pondasi Kela
Jam 65,000.00 9,285.71 9,200.00 4 Agregat Halus Pondasi Kela
Jam 52,500.00 7,500.00 7,500.00 5 Agregat Kasar Untuk Hotm
Jam 70,000.00 10,000.00 10,000.00 6 Agregat Halus Untuk Hotm
Jam 70,000.00 10,000.00 10,000.00 7 Agregat Untuk Beton (P)
8 Aspal Bitumen
9 Batu Pecah 15 - 20 cm (L)
10 Batu Pecah 10 - 15 cm (L)
Dibuat Oleh, 11 Batu Pecah 5 - 7 cm (L)
Konsultan Perencana 12 Batu Pecah 3 - 5 cm (L)
CV. KALTIKONS DESAIN 13 Batu Pecah 2 - 3 cm (L)
289,920.00 14 Batu Pecah 1 - 2 cm (L)
15 Batu Pecah 0,5 - 1 cm (L)
0.00 16 Batu Gunung (L)
1368431.98 17 Batu Padas (L)
HADRIYANI, ST 18 Besi Galvanis
Direktur 19 Baja Konstruksi
869559 20 Besi Tulangan Beton
21 Filler / Debu Batu (P)
22 Beton Ready Mix K-350
#DIV/0! 23 Kayu Ulin 10/10-4 (L)
SA HARGA SATUAN DASAR BAHAN / MATERIAL 24 Kawat Bronjong (Gabions)
25 Kawat Beton
26 Kayu Perancah / Bekisting
m Kota Samarinda 27 Kayu Ulin Konstruksi Jemb
28 Kerikil / Sirtu (L)
29 Kerikil Sungai (L)
30 Pasir Ayak Untuk Beton (P)
HARGA 31 Pasir Pasangan (L)
KODE SAT SATUAN DASAR 32 Tanah Urug (L)
BAHAN / MATERIAL 33 Paku Biasa
PEMBULATAN 34 Paku Ulin
Rp. Rp. 35 Baut
C D E F 36 Plat Beugel
37 Semen PC
M.031 M3 340,000.00 340,000.00 38 Tanah Pilihan (L)
M.033 M3 340,000.00 340,000.00 39 Minyak Flux / Kerosene
M.035 M3 286,000.00 286,000.00 40 Minyak Tanah
M.036 M3 286,000.00 286,000.00 41 Minyak Diesel / Solar
M.090 M3 302,000.00 302,000.00 42 Minyak Pelumas
M.161 M3 286,000.00 286,000.00 43 Bensin / Premium
M.082 M3 364,477.27 364,477.27 44 Besi Wearmes Diameter 10 m
M.061 Kg 8,604.43 8,604.43 45 Agregat Kelas C (L)
M.020 M3 246,120.45 246,120.45 46 Joint Sealent
M.021 M3 261,720.45 261,720.45 47 Diamond Blade
M.022 M3 269,000.45 269,000.45 48 Plastik Sheet
M.023 M3 303,320.45 303,320.45 49 Kayu Segitiga
M.024 M3 313,720.45 313,720.45 50 Pipa PVC 1"
M.025 M3 331,920.45 331,920.45 51 Karung Goni
M.026 M3 334,520.45 334,520.45 52 Beton Ready Mix K-250
M.010 M3 227,627.27 227,627.27 53 Beton Ready Mix K-300
M.011 Kg 106,575.00 106,575.00
M.164 Kg 99,193.18 99,193.18 Beton Ready Mix K-175
M.165 Kg 19,515.68 19,515.68
M.167 Kg 7,285.99 7,285.99
M.062 Kg 821.23 821.23
M.070 Titik 145,692.27 145,692.27
M.162 Kg 27,635.68 27,635.68
M.170 Kg 14,672.73 14,672.73
M.180 M3 2,342,306.82 2,342,306.82
M.181 M3 3,642,306.82 3,642,306.82
M.011 M3 261,720.45 261,720.45
M.012 M3 282,520.45 282,520.45
M.041 M3 344,177.27 344,177.27
M.040 M3 130,000.00 130,000.00
M.050 M3 37,606.25 37,606.25
M.166 Kg 15,455.68 15,455.68
M.167 Kg 24,590.68 24,590.68
M.168 Buah 4,290.68 4,290.68
M.169 Buah 25,605.68 25,605.68
M.080 Kg 1,420.77 1,420.77
M.081 M3 37,606.25 37,606.25
M.063 Liter < ---------------- > 6,000.00
M.065 Liter < ---------------- > 3,000.00
M.183 Liter < ---------------- > 7,527.50
M.185 Liter < ---------------- > 26,000.00
M.184 Liter < ---------------- > 6,000.00
M.186 M2 3,045,230.68 3,045,230.68
M.187 M3 141,177.27 141,177.27
M.189 Kg 9,349.40 9,349.40
M.190 Buah 862,750.00 862,750.00
M.191 M2 8,627.50 8,627.50
M.192 M1 3,552.50 3,552.50
Lbr 5,075.00 5,075.00
M.195 M3 1,007,133.75 1,007,133.75
M.196 M3 1,205,820.00 1,205,820.00
Dibuat Oleh,
Konsultan Perencana
CV. KALTIKONS DESAIN
HADRIYANI, ST
Direktur
m Kota Samarinda
HARGA SATUAN
KODE SAT PERALATAN
HARGA BELI HARGA SEWA
SESUAI TAHUN ALAT PER JAM
Rp. Rp.
C D E F
Dibuat Oleh,
Konsultan Perencana
CV. KALTIKONS DESAIN
HADRIYANI, ST
Direktur
MARGA DAN PENGAIRAN KOTA SAMARINDA
Kegiatan
Item Pembayaran
Jenis Kegiatan
TENAGA KERJA KODE HARGA Satuan Pembayaran
UPAH
(Rp. / HARI)
Pembantu Operator L.089 10,000.00 NO
Sopir Truck L.091 60,000.00
Sopir Personil L.092 60,000.00
Pembantu Sopir L.099 10,000.00 I
Pekerja Tak Terlatih L.101 52,500.00 1
Pekerja Semi Terlatih L.103 70,000.00 2
Pekerja Terlatih L.106 70,000.00 3
4
JUMLAH PROFIT PAJAK JUMLAH 5
HARGA 1,5 % 2,5 % HARGA
TANPA PAJAK / SATUAN 20 x E / SATUAN PASARAN II
(Rp.) (Rp.) (Rp.) (Rp.) 1
H I J K 2
299,090.91 4,486.36 303,577.27
314,090.91 4,711.36 318,802.27 3
254,090.91 3,811.36 257,902.27
264,090.91 3,961.36 268,052.27 4
324,090.91 4,861.36 328,952.27
344,090.91 5,161.36 349,252.27 III
359,090.91 5,386.36 364,477.27 1
8,477.27 127.16 8,604.43
236,818.18 3,552.27 5,750.00 Galian C 246,120.45 2
251,818.18 3,777.27 6,125.00 Galian C 261,720.45 2.a.
258,818.18 3,882.27 6,300.00 Galian C 269,000.45
291,818.18 4,377.27 7,125.00 Galian C 303,320.45
301,818.18 4,527.27 7,375.00 Galian C 313,720.45
319,318.18 4,789.77 7,812.50 Galian C 331,920.45
321,818.18 4,827.27 7,875.00 Galian C 334,520.45
219,090.91 3,286.36 5,250.00 Galian C 227,627.27
105,000.00 1,575.00 106,575.00
97,727.27 1,465.91 99,193.18
19,227.27 288.41 19,515.68
8,227.27 123.41 8,350.68
809.09 12.14 821.23
1,311,090.91 19,666.36 1,330,757.27 2.b.
140,090.91 2,101.36 3,500.00 SAKO 145,692.27
27,227.27 408.41 27,635.68
12,227.27 2,445.45 14,672.73
2,252,272.73 33,784.09 56,250.00 SAKO 2,342,306.82
3,502,272.73 52,534.09 87,500.00 SAKO 3,642,306.82
251,818.18 3,777.27 6,125.00 Galian C 261,720.45
271,818.18 4,077.27 6,625.00 Galian C 282,520.45
339,090.91 5,086.36 344,177.27
106,818.18 1,602.27 2,500.00 Galian C 110,920.45
36,250.00 543.75 812.50 Galian C 37,606.25
15,227.27 228.41 15,455.68
24,227.27 363.41 24,590.68
4,227.27 63.41 4,290.68
25,227.27 378.41 25,605.68
1,235.45 185.32 1,420.77 Catatan = Lr di sesuaikan dengan kondis
48,750.00 731.25 1,125.00 Galian C 50,606.25
6,000.00
3,000.00
7,527.50 Kegiatan
26,000.00 Item Pembayaran
6,000.00 Jenis Kegiatan
3,000,227.27 45,003.41 3,045,230.68 Satuan Pembayaran
139,090.91 2,086.36 141,177.27
17,000.00 255.00 17,255.00
850,000.00 12,750.00 862,750.00 NO
8,500.00 127.50 8,627.50
3,500.00 52.50 3,552.50
12,500.00 187.50 12,687.50 2.c.
5,000.00 75.00 5,075.00
992,250.00 14,883.75 1,007,133.75
1,188,000.00 17,820.00 1,205,820.00
75115
23 3
ilir
sambutan permai
cf 16
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
III
1
1.a.
1.b.
1.c.
2
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
II
1
2
3
III
1
2
2.a.
2.b.
NO
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
4
5
III
1
1.a.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
2.d.
2.e.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
4
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
NO
I
1
2
3
4
5
II
1
2
3
III
1
2
2.c.
2.d.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.e.
2.f.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.g.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
III
1
1.a.
1.b.
2
2.a.
2.b.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
III
1
1.a.
1.b.
1.c.
1.d.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
2.d.
2.e.
2.f.
2.g.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
II
1
2
3
III
1
1.a
1.b.
1.c.
1.d.
5 2
11.2 2.a.
2.24
2.b.
2.c
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
II
1
2
3
III
1
1.a
1.b.
1.c.
1.d.
2
2.a.
2,b
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
III
1
1.a.
1.b.
1.c.
1.d.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
III
1
1.1.
1.2.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
III
1
1.1.
1.2
2
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
III
1
1.1.
1.2.
2
2.a.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
III
1
1.a.
1.b.
1.d.
2
2.a.
NO
2.b.
2.c.
2.d.
2.e.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
8
9
II
1
III
1
1.a.
1.b.
1.c.
2
3
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
5
III
1
1.a.
2
2.a.
2.b.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.f.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
III
1
1
2.a.
2.b.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
9
II
1
2
III
1
1
2
2.a.
NO
I
1
2
3
4
5
6
7
8
9
II
1
2
3
4
III
1
1.a.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
2.d.
2.e.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.f
2.g
2.f.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
III
1
1.a
1.b
1.c
1.d
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
2.d
2.e.
2.f.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.g
2.h.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
III
1
1.a.
1.b.
1.c.
1.d.
2
2.a.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
II
1
2
3
III
1
2
2.a.
2.b.
NO
2.c.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
II
1
3
III
1
2
2.c.
2.d.
NO
I
1
2
3
4
5
6
II
1
III
1
1.b.
1.c.
2
3
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
III
1
1.1.
1.2.
2
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
III
1
1.1.
1.2.
1.3.
2
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
III
1
1.a.
1.b.
1.c.
1.d.
1.e.
2
2.a.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Kegiatan
NO
2.b.
2.c.
3
NO
I
1
2
3
4
5
6
7
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.d.
2.e.
2.f.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
III
1
1.a.
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.c.
2.g.
3
NO
I
1
2
3
4
5
6
7
8
9
II
1
III
1
1
2
2.a.
3
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
9
II
1
2
3
4
III
1
1.a.
2
2.a.
NO
2.b.
2.c.
2.d.
2.e.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.f
2.g
2.f.
NO
I
1
2
3
4
5
II
1
III
1
1.a.
1.b.
2
3
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
4
5
III
1
1.a.
2
2.a.
2.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
4
III
1
1.a.
2.a.
2.b.
NO
I
1
2
3
4
5
II
1
III
1
1.a.
1.b.
1.c.
2
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
III
1
1.a.
1.b.
1.c.
2
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
3
III
1
1.a.
1.b.
1.c.
2
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
II
1
III
1
1.a.
1.b.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
II
1
2
III
1
1.a.
1.b.
1.d.
2
2.a.
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
2.b.
2.c.
2.d.
2.e.
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
I
1
2
3
4
5
6
7
8
II
1
2
3
III
1
1.a.
1.b.
2
2.a.
NO
3
Catatan = Lr di sesuaikan dengan kondis
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO
1
2
3
4
5
6
II
1
2
III
1
1.a.
2.
2.a.
3.
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
METODE PELAKSANAAN
Penggalian di lakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil galian
ke dalam Dump Truck
Dump Truck membuang hasil galian keluar lokasi jalan
sejauh Lpmb
Sekelompok pekerjan akan merapikan hasil galian
METODE PELAKSANAAN
URAIAN KODE
ALAT BANTU
Di Perlukan Alat-Alat Bantu Kecil
- Sekop
- Keranjang + Sapu
TENAGA
Produksi Menentukan = EXCAVATOR Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (batu gunung, semen, pasir pasangan) di terima
seluruhnya di lokasi Kegiatan
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Perbandingan pasir & semen - Volume pasir Ps
- Volume semen Sm
Perbandingan batu & mortar
- Batu gunung Bt
- Mortar (campuran pasir & semen) Mr
Berat jenis bahan
- Pasangan batu dengan mortar D1
- Batu gunung D2
- Adukan (mortar) D3
- Pasir D4
- Semen PC D5
Faktor kehilangan bahan - Batu Fh1
- Pasir / Semen Fh2
METODE PELAKSANAAN
Semen, pasir dan air di campur dan di aduk menjadi mortar
dengan menggunakan alat bantu
Batu di bersihkan dan di basahi seluruh permukaannya
sebelum di pasang
Penyelesaian dan perapihan setelah pemasangan
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
METODE PELAKSANAAN
Tanah yang di potong umumnya berada di sisi jalan
Penggalian di lakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil galian
ke dalam Dump Truck
Dump Truck membuang material hasil galian keluar lokasi
jalan sejauh Lpmb
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk
Koefisien Alat / M3 = 1 : Q2
METODE PELAKSANAAN
Kegiatan : Pembangunan Jalan Dan Jembatan
Item Pembayaran : 3.1.(1)
Jenis Kegiatan : Galian Biasa
Satuan Pembayaran : M3
URAIAN KODE
ALAT BANTU
Di Perlukan Alat-Alat Bantu Kecil
- Sekop
- Keranjang + Sapu
TENAGA
Produksi Menentukan = EXCAVATOR Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
METODE PELAKSANAAN
Wheel Loader memuat ke dalam Dump Truck
Dump Truck mengangkut ke lapangan dengan jarak Lq
Material di hampar dengan menggunakan Motor Greader
Hamparan material di siram air dengan Water Tank Truck
(sebelum pemadatan) dan di padatkan dengan Vibratory Roller
Selama pemadatan sekelompok pekerja akan merapikan tepi
hamparan dan level permukaan dengan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Tanah Urug = 1 x Fk M.081
ALAT
WHEEL LOADER E.220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fa x Fb x 60 Q1
Ts1 x Fk
Koefisien Alat / M3 = 1 : Q1
METODE PELAKSANAAN
URAIAN KODE
MOTOR GREADER E.140
Panjang Hamparan Lh
Lebar Efektif Kerja Blade b
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Alat v
Jumlah Lintasan n
Waktu Siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-Lain T2
Ts3
Kap. Prod. / Jam = Lh x b x t x Fa x 60 Q3
Ts2 x n
Koefisien Alat / M3 = 1 : Q3
VIBRATORY ROLLER E.240
Kecepatan Rata-Rata Alat v
Lebar Efektif Pemadatan b
Jumlah Lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4
n
Koefisien Alat / M3 = 1 : Q4
WATER TANK TRUCK E.230
Volume Tangki Air V
Kebutuhan Air / M3 Material Padat Wc
Pengisian Tangki / Jam n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = V x n x Fa Q5
Wc
Koefisien Alat / M3 = 1 : Q5
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Sekop = 3 buah
TENAGA
Produksi Menentukan = WHEEL LOADER Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
METODE PELAKSANAAN
Wheel Loader memuat ke dalam Dump Truck
Dump Truck mengangkut ke lapangan dengan jarak Lq
Material di hampar dengan menggunakan Motor Greader
Hamparan material di siram air dengan Water Tank Truck
(sebelum pemadatan) dan di padatkan dengan Vibratory Roller
Selama pemadatan sekelompok pekerja akan merapikan tepi
hamparan dan level permukaan dengan alat bantu
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk
Koefisien Alat / M3 = 1 : Q2
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
Kegiatan : Pembangunan Jalan Dan Jembatan
Item Pembayaran : 3.3
Jenis Kegiatan : Penyiapan Badan Jalan
Satuan Pembayaran : M2
URAIAN KODE
ASUMSI
Kegiatan di laksanakan hanya pada tanah galian
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Kegiatan di lakukan secara mekanis
METODE PELAKSANAAN
Motor Greader meratakan permukaan hasil galian
Vibratory Roller memadatkan permukaan yang telah rata
Sekelompok pekerja akan membantu meratakan badan jalan
dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
Lebar bahu jalan Lb
METODE PELAKSANAAN
Wheel Loader memuat timbunan ke dalam Dump Truck
Timbunan kemudian di hampar dengan Motor Greader
Hamparan timbunan di basahi dengan Water Tank Truck
Pemadatan di laksanakan dengan Vibratory Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
Lebar bahu jalan Lb
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Motor Greader
Hamparan agregat di basahi dengan Water Tank Truck
Pemadatan di laksanakan dengan Vibratory Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Motor Greader
Hamparan agregat di basahi dengan Water Tank Truck
Pemadatan di laksanakan dengan Vibratory Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Motor Greader
Hamparan agregat di basahi dengan Water Tank Truck
Pemadatan di laksanakan dengan Vibratory Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Tenaga Manusia
Hamparan agregat / Batu Disusun Bediri
Pemadatan di laksanakan dengan Three Whell Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Jarak rata-rata ke Base Camp Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fh
Komposisi campuran
- Aspal AC-10 atau AC-20 As
- Minyak Flux / Pencair K
Berat jenis bahan
- Aspal AC-10 atau AC-20 D1
- Minyak Flux / Pencair D2
Bahan dasar (aspal & minyak pencair) semuanya di lokasi
METODE PELAKSANAAN
Aspal dan minyak flux di campur dan di panaskan sehingga
menjadi campuran aspal cair
Permukaan yang akan di lapis di bersihkan dari kotoran debu
dengan menggunakan Air Compressor
Campuran aspal cair di semprotkan dengan Asphalt Sprayer
ke atas permukaan yang akan di lapis
Angkutan aspal dan minyak flux menggunakan Dump Truck
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan, Kondisi : sedang
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Tebal Lapis Pengikat Aspal Beton (AC-BC) t
Jam kerja efektif per hari Tk
Faktor kehilangan material - Agregat Fh1
- Aspal Fh2
Komposisi campuran Lapis Pengikat Aspal Beton (Spesifikasi)
- Coarse agregat = 40,0 - 60,0 % CA
- Fine agregat = 26,0 - 49,5 % FA
- Fraksi filler = 4,5 - 7,5 % FF
- Asphalt = minimum 7,0 % AS
Berat jenis bahan
- Lapis Pengikat Aspal Beton (AC-BC) D1
- Coarse agregat & Fine agregat D2
- Fraksi filler D3
- Asphalt D4
METODE PELAKSANAAN
Wheel Loader memuat agregat + aspal ke dalam Cold Bin AMP
Agregat + aspal di campur dan di panaskan dengan AMP untuk
di muat langsung ke dalam Dump Truck dan di angkut ke lokasi
Campuran panas ATB di hampar dengan Asphalt Finisher dan
di padatkan dengan Tandem Roller & Pneumatic Tire Roller
Selama pemadatan sekelompok pekerja akan merapikan tepi
hamparan dengan menggunakan alat bantu
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
TENAGA
Produksi Menentukan = ASPHALT MIXING PLANT Q2
Produksi Per Hari = Tk x Q2 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Beton Redy Mix di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Tebal Beton t
Jam kerja efektif per hari Tk
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Batching Plant dan diaduk dalam perjalanan ke lokasi
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapian setelah selesai beton readimix dituang
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Beton Ready Mix K- 350 M555
Plastik Sheet M.191
Paku
Karung
ALAT
CONCRETE VIBRATOR E.070
Kebutuhan alat penggetar beton (Concrte Vibrator) ini di
sesuaikan dengan kapasitas produksi dari Alat Pencampur
(Concrete Mixer)
Koefisien Alat / M3 = 1 : Q2
CONCRETE FINISHER E.070
Kebutuhan alat penghampar beton ini disesuaikan dengan kapasitas produksi
dari baching plant
Koefisien Alat / M3
Alat Bantu -
TENAGA
Produksi Menentukan = Ready Mix Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Pekerja Terlatih Tb
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Pekerja Terlatih = (Tk x Tb) : Qt L.106
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Beton Redy Mix di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Tebal Beton t
Jam kerja efektif per hari Tk
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Batching Plant dan diaduk dalam perjalanan ke lokasi
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapian setelah selesai beton readimix dituang
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Beton Ready Mix K- 300 M.196
Plastik Sheet M.191
Karung
Pipa PVC 1" 0.00
ALAT
CONCRETE VIBRATOR E.070
Kebutuhan alat penggetar beton (Concrte Vibrator) ini di
sesuaikan dengan kapasitas produksi dari Alat Pencampur
(Concrete Mixer)
Koefisien Alat / M3 = 1 : Q2
Alat Bantu -
TENAGA
Produksi Menentukan = Ready Mix Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Pekerja Terlatih Tb
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Pekerja Terlatih = (Tk x Tb) : Qt L.106
- Mandor = (Tk x M) : Qt L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (koral, pasir dan semen) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Kadar semen (Spesifikasi) - Minimum Ks1
- Maksimum Ks2
Perbandingan air, semen maksimum (Spesifikasi) Wcr
Perbandingan campuran = 1 : Semen Sm
= 2.5 : Pasir beton Ps
= 3 : Koral Kr
Berat jenis material
- Beton D1
- Semen (PC) D2
- Pasir beton D3
- Koral D4
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Concrete Mixer
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapihan setelah pemasangan
ALAT
CONCRETE MIXER E.060
Kapasitas Alat V
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll T4
Ts1
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di lakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (besi dan kawat) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Faktor kehilangan besi tulangan Fk
METODE PELAKSANAAN
Besi tulangan di potong dan di bengkokan sesuai dengan yang
di perlukan atau sesuai dengan gambar rencana
Batang tulangan di pasang / di sesuaikan dengan gambar
Sambungan di beri kekuatan pengikat dari kawat besi
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di lakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (kayu ulin 10/10) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fk
METODE PELAKSANAAN
Kayu ulin 10/10 di perlukan sesuai dengan gambar rencana
Pemancangan mempergunakan alat-alat bantu
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di lakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (anyaman kawat danbatu) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fk
METODE PELAKSANAAN
Keranjang kawat bronjong di rentangkan dan di bentuk
sesuai dengan konstruksi yang di inginkan
Batu di tempatkan satu demi satu sehingga rongga tertutup
Anyaman kawat di tutup dan ikat
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan, Kondisi : sedang
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Tebal rata-rata Lapen Macadam t
Jam kerja efektif per hari Tk
Faktor kehilangan material - Agregat Fh1
- Aspal Fh2
Komposisi campuran ATB (Spesifikasi)
- Agregat Kasar (3-5 cm) Ak
- Agregat Pengunci (1-2 cm) Ap
- Aspal As1
As2
Berat jenis bahan
- Agregat D1
- Aspal D2
METODE PELAKSANAAN
mukaan dasar di bersihkan dan di semprot aspal cair
Agregat kasar di muat ke dalam Dump Truck menggunakan
Wheel Loader (di Base Camp)
Agregat kasar di tebarkan (manual) sesuai tebal yang di perlukan
dan di padatkan dengan Three Wheel Roller minimal 6 lintasan
Aspal di semprotkan di atas agregat kasar yang telah di ratakan
menggunakan Asphalt Sprayer (merata)
Agregat pengunci di tebarkan dan di padatkan dengan cara
yang sama dengan pemadatan agregat kasar
ALAT
WHEEL LOADER E.220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fb x Fa x 60 Q1
Ts1
Koefisien Alat / M3 = 1 : Q1
METODE PELAKSANAAN
Kegiatan : Pembangunan Jalan Dan Jembatan
Item Pembayaran : 6.5.(1)
Jenis Kegiatan : Lapen Macadam
Satuan Pembayaran : M2
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (batu padas, semen, pasir pasangan) di terima
seluruhnya di lokasi Kegiatan
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Perbandingan pasir & semen - Volume pasir Ps
- Volume semen Sm
Perbandingan batu & mortar
- Batu padas Bt
- Mortar (campuran pasir & semen) Mr
Berat jenis bahan
- Pasangan batu dengan mortar D1
- Batu padas D2
- Adukan (mortar) D3
- Pasir D4
- Semen PC D5
Faktor kehilangan bahan - Batu Fh1
- Pasir / Semen Fh2
METODE PELAKSANAAN
Semen, pasir dan air di campur dan di aduk menjadi mortar
dengan menggunakan alat bantu
Batu di bersihkan dan di basahi seluruh permukaannya
sebelum di pasang
Penyelesaian dan perapihan setelah pemasangan
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
METODE PELAKSANAAN
Wheel Loader memuat ke dalam Dump Truck
Dump Truck mengangkut ke lapangan dengan jarak Lq
Hamparan material di padatkan dengan Vibratory Roller
Selama pemadatan sekelompok pekerja akan merapikan tepi
hamparan dan level permukaan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Sekop = 3 buah
TENAGA
Produksi Menentukan = WHEEL LOADER Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Jarak rata-rata ke Base Camp Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fh
Komposisi campuran
- Aspal AC-10 atau AC-20 As
- Minyak Flux / Pencair K
Berat jenis bahan
- Aspal AC-10 atau AC-20 D1
Err:509 D2
Bahan dasar (aspal & minyak pencair) semuanya di lokasi
METODE PELAKSANAAN
Aspal dan minyak flux di campur dan di panaskan sehingga
menjadi campuran aspal cair
Permukaan yang akan di lapis di bersihkan dari kotoran debu
dengan menggunakan Air Compressor
Campuran aspal cair di semprotkan dengan Asphalt Sprayer
ke atas permukaan yang akan di lapis
Angkutan aspal dan minyak flux menggunakan Dump Truck
Campuran = 1 liter x Fh PC
Aspal = As x PC x D1 M.061
Gasoline = K x PC M.184
ALAT
ASPHALT SPRAYER E.030
Kapasitas Alat V
Faktor Efesiensi Alat Fa
Waktu Siklus (Termasuk Proses Pemanasan) Ts
Kap. Prod. / Jam = V x Fa Q1
Ts
Koefisien Alat / Liter = 1 : Q1
METODE PELAKSANAAN
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan dilakukan secaramanal
Lokasi Kegiatan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jarak rata-rata ke Base Camp ke lokasi Kegiatan L
Jam kerja efektif per hari Tk
Semen diangkut dari Base Camp ke lapangan dengan menggunakan dump truck
Satu hari dapat diselesaikan hamparan Soil Cement Sepanjang Ls
Faktor hilang material Fh
Tebal hamparan t
METODE PELAKSANAAN
Dump truck mengangkut seen dari Base Camp
ke lokasi Kegiatan
Semen diatur/disusun di tempat hamparan
soil/tanah oleh tenaga manusia
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Semen yang diperlukan /ton = (1 x Fh : 40) x 1000 M.12
ALAT
DUMP TRUCK E.080
Kapasitas bak V
Faktor Efesiensi Alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts1
- Waktu tempuh isi T1
- Waktu tempuh kosong T2
- Waktu mengisi T3
- Waktu bongkar T4
- Lain-lain T5
Ts1
Kap. Prod. / Jam = V x Fa x 60
Fh x Ts1
TENAGA
Lebar Hamparan Soil Cement b
Kadar semen (3-12) % s
Berat jenis tanah = V x Ap BJ
Setiap hari dengan produksi = {(s:100) x t x b x Ls} x Bj Qt
Kebutuhan tenaga :
- Pekerja Tidak Terlatih P
- Mandor M
URAIAN KODE
ASUMSI
Kegiatan dilakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jarak rata-rata ke Base Camp ke lokasi Kegiatan L
Jam kerja efektif per hari Tk
Harga pembayaran tidak termasuk semen (semen dibayar dalam item tersendiri)
Satu hari dapat diselesaikan hamparan Soil Cement Sepanjang Ls
Faktor kembang material (padat-lepas) Fk
Tebal hamparan padat t
METODE PELAKSANAAN
Sheel loader memuat material ke dalam dump truck di lokasi sumber bahan
Dump truck menangkut material kelokasi Kegiatan
Motor Grader menghampar material di lokasi Kegiatan
Semen dan material tanah diaduk ditempat dengan
menggunakan Vulvi mixer
Sebelum pemadatan material dibasahi dengan
menggunakan water tank truck
Pemadatan dilakukan dengan menggunakan
Vibrator Roller dan pneumatic Tire Roller
Selama pelaksanaan Kegiatan sekelompok pekerja
akan merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
ALAT
WHEEL LOADER E220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fa x Fb x 60 Q1
Ts1 x Fk
Koefisien Alat / M3 = 1 : Q1 E220
METODE PELAKSANAAN
URAIAN KODE
DUMP TRUCK
Kapasitas Bak V
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Bermuatan v1
Kecepatan Rata-Rata Kosong v2
Waktu Siklus Ts2
- Waktu Tempuh Isi = (L : v1) x 60 T1
- Waktu Tempuh Kosong = (L : v2) x 60 T2
- Lain-Lain T4
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk
Koefisien Alat / M3 = 1 : Q2
MOTOR GREADER
Panjang Hamparan Lh
Lebar Efektif Kerja Blade b
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Alat v
Jumlah Lintasan n
Waktu Siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-Lain T2
Ts3
Kap. Prod. / Jam = Lh x b x t x Fa x 60 Q3
Ts3 x n
Koefisien Alat / M3 = 1 : Q3
TANDEM ROLLER
Kecepatan Rata-Rata Alat v
Lebar Efektif Pemadatan b
Jumlah Lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4
n
Koefisien Alat / M3 = 1 : Q4
PNEUMATIC TIRE ROLLER
Kecepatan rata-rata alat V
Lebar efektif pemadatan b
Jumlah lintasan n
Faktor efesiensi alat Fa
METODE PELAKSANAAN
URAIAN KODE
FULVI MIXER
Kecepatan rata-rata alat V
Lebar efektif pemadatan Wc
Jumlah lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (V x 1000 ) x b x t x Fa Q7
n
Koefisien Alat / M3 = 1 : Q7
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Kereta dorong = 2 buah
- Sekop = 3 buah
TENAGA
Produksi Menentukan = VIBRATOR ROLLER Q4
Produksi Per Hari = Tk x Q4 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jarak rata-rata ke Base Camp ke lokasi Kegiatan L
Tebal lapis (AC) padat t
Jam kerja efektif per hari T
Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
Komposisi campuran AC (spesifikasi) :
- Coarse Agregat 30 - 50 % CA
- Fine Agregat 39 - 59 % FA
- Fraksi Filler 4.5 - 7.5 % FF
- Asphalt minimum 6.7 % As
Berat jenis bahan :
- AC D1
- Coarse Agregat & Fine Agregat D2
- Fraksi Filler D3
- Asphalt D4
METODE PELAKSANAAN
Wheel loader memuat agregat dan asphalt ke dalam cold bin AMP
Agregat dan aspal dicampur dan dipanaskan dengan
AMP untuk dimuat langsung kedalam Dump truck dan
diangkut ke lokasi Kegiatan
Campuran panas AC dihampar dengan finisher dan dipadatkan
dengan Tandem & Pneumatic Tire Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan degan menggunakan alat
bantu
WHEEL LOADER
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = D2 x V x Fb x Fa x 60 Q1
D1 x t x Ts1
Koefisien Alat / M3 = 1 : Q1 E220
METODE PELAKSANAAN
URAIAN KODE
DUMP TRUCK
Kapasitas Bak V
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Bermuatan v1
Kecepatan Rata-Rata Kosong v2
Kapasitas AMP / batch Q2b
Waktu menyiapkan 1 batch AC Tb
Waktu Siklus Ts2
- Mengisi bak = (V : Q2b) x Tb T1
- Angkut = (L : v1) x 60 menit T2
- Tunggu + dump + putar T3
- Kembali = (L : v2) x 60 menit T4
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk x D1
Koefisien Alat / M3 = 1 : Q2
Asphalt Mixing Plant (AMP)
Kapasitas produksi v
Faktor Efesiensi alat Fa
Kap. Prod. / Jam = V x Fa Q3
D1 x t
Koefisien Alat / M3 = 1 : Q3
GENERATOR SET
Kap. Prod. / Jam = Sama dengan AMP
Koefisien Alat / M3 = 1 : Q4 Q4
TANDEM ROLLER
Kecepatan Rata-Rata Alat v
Lebar Efektif Pemadatan b
Jumlah Lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q5
nxt
Koefisien Alat / M3 = 1 : Q5
ASPHALT FINISHER
Kapasitas produksi V
Faktor efesiensi alat Fa
Kap. Prod. / Jam = V x Fa
D1 x t
Koefisien Alat / M3 = 1 : Q3 Q6
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
PNEUMATIC TIRE ROLLER
Kecepatan rata-rata alat V
Lebar efektif pemadatan b
Jumlah lintasan n
Faktor efesiensi alat Fa
Kap. Prod. / Jam = (V x 1000) x bx t x Fa Q7
nxt
Koefisien Alat / M3 = 1 : Q7
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Rambu = 2 buah
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garfu = 2 buah
- Tongkat Kontrol Ketebalan hamparan
TENAGA
Produksi Menentukan = ASPHALT MIXING PLANT (AMP) Q4
Produksi Per Hari = Tk x Q2 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
METODE PELAKSANAAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (koral, pasir dan semen) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Kadar semen (Spesifikasi) - Minimum Ks1
- Maksimum Ks2
Perbandingan air, semen maksimum (Spesifikasi) Wcr
Perbandingan campuran = 1 : Semen Sm
= 3 : Pasir Ayak Ps
= 4.4 : Batu Kerikil Kr
Berat jenis material
- Beton D1
- Semen (PC) D2
- Pasir beton D3
- Koral D4
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Concrete Mixer
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapihan setelah pemasangan
ALAT
CONCRETE MIXER E.060
Kapasitas Alat V
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll T4
Ts1
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan dilakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
METODE PELAKSANAAN
Tanah /batu yang dipotong umumnya berada disisi jalan
Penggalian di lakukan dengan menggunakan compressor dan jack hammer
Dump Truck membuang material hasil galian keluar lokasi
jalan sejauh
Lpmb
Koefisien Alat / M3 = 1 : Q1
URAIAN KODE
ALAT BANTU
Di Perlukan Alat-Alat Bantu Kecil
- Pahat / tatah = 2 Buah
- Palu Besar = 2 Buah
TENAGA
Produksi Menentukan = JACK HAMMER Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di laksanakan hanya pada tanah badan jalan
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Kegiatan di lakukan secara mekanis
METODE PELAKSANAAN
Motor Greader mengupas semak yang ada disepanjang jalan dan bahu jalan
Sekelompok pekerja akan membantu meratakan badan jalan dengan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Tidak Di Perlukan Bahan / Material
ALAT
MOTOR GREADER E.140
Panjang Hamparan Lh
Lebar Efektif Kerja Blade b
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Alat v
Jumlah Lintasan n
Waktu Siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = Lh x b x Fa x 60 Q1
Ts1 x n
Koefisien Alat / M3 = 1 : Q1
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Sekop = 3
TENAGA = 3
Kebutuhan Tenaga
- Pekerja Tidak Terlatih L.101
- Mandor L.061
- Operator Terlatih L.081
- Pembantu Operator L.089
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
- Operator Terlatih = (Tk x P) : Qt L.081
- Pembantu Operator = (Tk x M) : Qt L.089
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (semen, pasir pasangan) di terima seluruhnya di lkasi Kegiatan
Jarak rata-rata Base Camp ke lokasi Kegiatan
Jam kerja efektif per hari
Perbandingan pasir & semen - Volume pasir Ps
- Volume semen Sm
Berat jenis bahan
- Pasir D1
- Semen PC D2
Faktor kehilangan bahan - Pasir / Semen Fh
METODE PELAKSANAAN
Semen, pasir dan air di campur dan di aduk menjadi mortar
dengan menggunakan alat bantu
Penyelesaian dan perapihan setelah pemasangan
ALAT
TENAGA
Produksi Per Hari = MORTAR
Kebutuhan Tenaga
- Pekerja Tidak Terlatih L.101
- Pekerja Terlatih L.106
- Mandor L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di lakukan secara manual
Lokasi Kegiatan : pada gorong-gorong, box culvert dan lain-lain Kegiatan struktur
Bahan dasar kayu meranti/bekisitng yang memenuhi syarat
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fk
METODE PELAKSANAAN
Ukuran kayu di perlukan sesuai dengan gambar rencana
Pemasangan mempergunakan alat-alat bantu
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan di lakukan secara manual
Lokasi Kegiatan : pada Kegiatan semennisasi/rijid
Bahan dasar sealent dan diamond blade
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Faktor kehilangan bahan Fk
METODE PELAKSANAAN
Kegiatan pemotongan dilaksanakan dengan cutter
Pemasangan mempergunakan alat-alat bantu
Koefisien Alat / M3 = 1 : Q1
Alat-Alat Kerja Lainnya (@ 3 set)
TENAGA
Produksi Per Hari Qt
Kebutuhan Tenaga
- Pekerja Semi Terlatih (Tk x P) : Qt P
- Mandor (Tk x M) : Qt M
URAIAN KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (koral, pasir dan semen) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Kadar semen (Spesifikasi) - Minimum Ks1
- Maksimum Ks2
Perbandingan air, semen maksimum (Spesifikasi) Wcr
Perbandingan campuran = 1 : Semen Sm
= 2.5 : Pasir beton Ps
= 3 : Koral Kr
Berat jenis material
- Beton D1
- Semen (PC) D2
- Pasir pasangan D3
- Kerikil sungai D4
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Concrete Mixer
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapihan setelah pemasangan
ALAT
CONCRETE MIXER E.060
Kapasitas Alat V
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll T4
Ts1
Kap. Prod. / Jam = V x Fa x 60 Q1
Ts1 x 1000
Koefisien Alat / M3 = 1 : Q1
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
Kegiatan : Pembangunan Jalan Dan Jembatan
Item Pembayaran : 5.1.(2).
Jenis Kegiatan : Lapis Pondasi Kelas C
Satuan Pembayaran : M3
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Motor Greader
Hamparan agregat di basahi dengan Water Tank Truck
Pemadatan di laksanakan dengan Vibratory Roller
Sekelompok pekerja merapikan dengan alat bantu
ALAT
WHEEL LOADER E.220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fa x Fb x 60 Q1
Ts1 x Fk
Koefisien Alat / M3 = 1 : Q1
DUMP TRUCK E.080
Kapasitas Bak V
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Bermuatan v1
Kecepatan Rata-Rata Kosong v2
Waktu Siklus Ts2
- Waktu Tempuh Isi = (L : v1) x 60 T1
- Waktu Tempuh Kosong = (L : v2) x 60 T2
- Lain-Lain T4
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk
Koefisien Alat / M3 = 1 : Q2
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat Manual
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
METODE PELAKSANAAN
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Sekop = 3 buah
TENAGA
Produksi Menentukan = Pekerja Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Wheel Loader memuat agregat ke dalam Dump Truck
Aggregat kemudian di hampar dengan Tenaga Manusia
Hamparan Agregat/ Telford Dipasang Berdiri
Pemadatan di laksanakan dengan Three Whell Roller
Sekelompok pekerja merapikan dengan alat bantu
METODE PELAKSANAAN
URAIAN KODE
URAIAN KODE
ASUMSI
Kegiatan dilakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jarak rata-rata ke Base Camp ke lokasi Kegiatan L
Jam kerja efektif per hari Tk
Semen diangkut dari Base Camp ke lapangan dengan menggunakan dump truck
Satu hari dapat diselesaikan hamparan Soil Stabilizer Ecomix Sepanjang Ls
Faktor hilang material Fh
Tebal hamparan t
METODE PELAKSANAAN
Dump truck mengangkut seen dari Base Camp
ke lokasi Kegiatan
Semen diatur/disusun di tempat hamparan
soil/tanah oleh tenaga manusia
ALAT
DUMP TRUCK E.080
Kapasitas bak V
Faktor Efesiensi Alat Fa
Kecepatan rata-rata bermuatan v1
Kecepatan rata-rata kosong v2
Waktu siklus Ts1
- Waktu tempuh isi T1
- Waktu tempuh kosong T2
- Waktu mengisi T3
- Waktu bongkar T4
- Lain-lain T5
Ts1
Kap. Prod. / Jam = V x Fa x 60
Fh x Ts1
TENAGA
Lebar Hamparan Soil Cement b
Kadar semen (3-12) % s
Berat jenis tanah = V x Ap BJ
Setiap hari dengan produksi = {(s:100) x t x b x Ls} x Bj Qt
Kebutuhan tenaga :
- Pekerja Tidak Terlatih P
- Mandor M
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Kegiatan dilakukan secara manual
Lokasi Kegiatan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jarak rata-rata ke Base Camp ke lokasi Kegiatan L
Jam kerja efektif per hari Tk
Harga pembayaran tidak termasuk semen (semen dibayar dalam item tersendiri)
Satu hari dapat diselesaikan hamparan Soil Cement Sepanjang Ls
Faktor kembang material (padat-lepas) Fk
Tebal hamparan padat t
METODE PELAKSANAAN
Sheel loader memuat material ke dalam dump truck di lokasi sumber bahan
Dump truck menangkut material kelokasi Kegiatan
Motor Grader menghampar material di lokasi Kegiatan
Semen dan material tanah diaduk ditempat dengan
menggunakan Vulvi mixer
Sebelum pemadatan material dibasahi dengan
menggunakan water tank truck
Pemadatan dilakukan dengan menggunakan
Vibrator Roller dan pneumatic Tire Roller
Selama pelaksanaan Kegiatan sekelompok pekerja
akan merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
ALAT
WHEEL LOADER E220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fa x Fb x 60 Q1
Ts1 x Fk
Koefisien Alat / M3 = 1 : Q1 E220
URAIAN KODE
DUMP TRUCK
Kapasitas Bak V
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Bermuatan v1
Kecepatan Rata-Rata Kosong v2
Waktu Siklus Ts2
- Waktu Tempuh Isi = (L : v1) x 60 T1
- Waktu Tempuh Kosong = (L : v2) x 60 T2
- Lain-Lain T4
Ts2
Kap. Prod. / Jam = V x Fa x 60 Q2
Ts2 x Fk
Koefisien Alat / M3 = 1 : Q2
MOTOR GREADER
Panjang Hamparan Lh
Lebar Efektif Kerja Blade b
Faktor Efesiensi Alat Fa
Kecepatan Rata-Rata Alat v
Jumlah Lintasan n
Waktu Siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1
- Lain-Lain T2
Ts3
Kap. Prod. / Jam = Lh x b x t x Fa x 60 Q3
Ts3 x n
Koefisien Alat / M3 = 1 : Q3
TANDEM ROLLER
Kecepatan Rata-Rata Alat v
Lebar Efektif Pemadatan b
Jumlah Lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4
n
Koefisien Alat / M3 = 1 : Q4
PNEUMATIC TIRE ROLLER
Kecepatan rata-rata alat V
Lebar efektif pemadatan b
Jumlah lintasan n
Faktor efesiensi alat Fa
METODE PELAKSANAAN
URAIAN KODE
FULVI MIXER
Kecepatan rata-rata alat V
Lebar efektif pemadatan Wc
Jumlah lintasan n
Faktor Efesiensi Alat Fa
Kap. Prod. / Jam = (V x 1000 ) x b x t x Fa Q7
n
Koefisien Alat / M3 = 1 : Q7
ALAT BANTU
Di perlukan Alat-Alat Bantu Kecil
- Kereta dorong = 2 buah
- Sekop = 3 buah
TENAGA
Produksi Menentukan = VIBRATOR ROLLER Q4
Produksi Per Hari = Tk x Q4 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Bahan Dasar Karet
Menggunakan alat bantu berupa lem/perekat/baut
Jam kerja efektif per hari
METODE PELAKSANAAN
Rubeering diletakan pada posisi sesuai gambar yang sebelumnya diberi lem atau
perekat yang kuat sehingga tidak mudah geser
Penyelesaian dan perapihan setelah pemasangan
ALAT
TENAGA
Produksi Per Hari = Bearing Pad
Kebutuhan Tenaga
- Pekerja Tidak Terlatih L.101
- Pekerja Terlatih L.106
- Mandor L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Tiang Pancang Diangkat Dan Didirikan Oleh Crane
Kemudian Crane Memancang Dengan Diesel Hammer
Digunakan Las-lasan Untuk Penyambungan Tiang
Digunakan Driver Untuk Penyesuaian Kedalaman Pancang
Pekerja Merapikan Dengan Alat Bantu Dan Menghancurkan Kepala Pancang
TENAGA
Kebutuhan Tenaga
Produksi Per Hari = Tk x Q1 Qt
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan mesin las, besi siku dan besi plat
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Jarak rata-rata ke Base Camp Lr
METODE PELAKSANAAN
Untuk pekerjaan las-lasan pada sambungan tiang pancang, sambungan dan sekur
Dikerjakan oleh tukang las yang sudah berpengalaman
Kawat Las 3 mm - 5 mm
Bagian permukan yang kurang baik harus dibevel terlebih dahulu sehingga mendapatkan
sambungan yang baik
ALAT
WELDING MACHINE E.280
- Produksi
- Waktu T3
Q2
Koefisien Alat / M3 = 1 : Q2
TENAGA
Kebutuhan Tenaga
Produksi Per Hari = Tk x Q1 Qt
- Pekerja Tidak Terlatih P
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Mandor = (Tk x M) : Qt L.061
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Cat anti korosit mutu tinggi
Menggunakan alat bantu berupa kuas
Jam kerja efektif per hari
METODE PELAKSANAAN
Rubeering diletakan pada posisi sesuai gambar yang sebelumnya diberi lem atau
perekat yang kuat sehingga tidak mudah geser
Penyelesaian dan perapihan setelah pemasangan
TENAGA
Produksi Per Hari = Pengecatan
Kebutuhan Tenaga
- Pekerja Tidak Terlatih L.101
- Pekerja Terlatih L.106
- Mandor L.061
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (batu gunung, semen, pasir pasangan) di terima
seluruhnya di lokasi Kegiatan
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Perbandingan pasir & semen - Volume pasir Ps
- Volume semen Sm
Perbandingan batu & mortar
- Batu gunung Bt
- Mortar (campuran pasir & semen) Mr
Berat jenis bahan
- Pasangan batu dengan mortar D1
- Batu gunung D2
- Adukan (mortar) D3
- Pasir D4
- Semen PC D5
Faktor kehilangan bahan - Batu Fh1
- Pasir / Semen Fh2
METODE PELAKSANAAN
Semen, pasir dan air di campur dan di aduk menjadi mortar
dengan menggunakan alat bantu
Batu di bersihkan dan di basahi seluruh permukaannya
sebelum di pasang
Penyelesaian dan perapihan setelah pemasangan
URAIAN KODE
ASUMSI
Menggunakan alat Manual
Lokasi Kegiatan : sepanjang jalan
Kondisi jalan : sedang / baik
Jam kerja efektif per hari Tk
Faktor pengembangan material Fk
Tebal hamparan padat t
METODE PELAKSANAAN
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan buruh (cara manual)
Lokasi Kegiatan : sepanjang jalan
Cat tembok anti lumut
Menggunakan alat bantu berupa kuas
Jam kerja efektif per hari
METODE PELAKSANAAN
Rubeering diletakan pada posisi sesuai gambar yang sebelumnya diberi lem atau
perekat yang kuat sehingga tidak mudah geser
Penyelesaian dan perapihan setelah pemasangan
TENAGA
Produksi Per Hari = Pengecatan
Kebutuhan Tenaga
- Pekerja Tidak Terlatih L.101
- Pekerja Terlatih L.106
- Mandor L.061
METODE PELAKSANAAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan, Kondisi : sedang
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Tebal rata-rata Lapen Macadam t
Jam kerja efektif per hari Tk
Faktor kehilangan material - Agregat Fh1
- Aspal Fh2
Komposisi campuran ATB (Spesifikasi)
- Agregat Kasar (1-2 cm) Ak
- Debu Batu Ap
- Aspal As1
As2
Berat jenis bahan
- Agregat D1
- Aspal D2
METODE PELAKSANAAN
mukaan dasar di bersihkan dan di semprot aspal cair
Agregat kasar di muat ke dalam Dump Truck menggunakan
Wheel Loader (di Base Camp)
Agregat kasar di tebarkan (manual) sesuai tebal yang di perlukan
dan di padatkan dengan Three Wheel Roller minimal 6 lintasan
Aspal di semprotkan di atas agregat kasar yang telah di ratakan
menggunakan Asphalt Sprayer (merata)
Agregat pengunci di tebarkan dan di padatkan dengan cara
yang sama dengan pemadatan agregat kasar
ALAT
WHEEL LOADER E.220
Kapasitas Bucket V
Faktor Bucket Fb
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Lain-Lain T2
Ts1
Kap. Prod. / Jam = V x Fb x Fa x 60 Q1
Ts1
Koefisien Alat / M3 = 1 : Q1
METODE PELAKSANAAN
URAIAN KODE
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi Kegiatan : sepanjang jalan
Bahan dasar (koral, pasir dan semen) di terima di lokasi
Jarak rata-rata Base Camp ke lokasi Kegiatan Lr
Jam kerja efektif per hari Tk
Kadar semen (Spesifikasi) - Minimum Ks1
- Maksimum Ks2
Perbandingan air, semen maksimum (Spesifikasi) Wcr
Perbandingan campuran = 1 : Semen Sm
= 3 : Pasir Ayak Ps
METODE PELAKSANAAN
Semen, pasir, koral dan air di campur dan di aduk menjadi
beton dengan menggunakan Concrete Mixer
Beton di cor ke dalam perancah yang telah di siapkan
Penyelesaian dan perapihan setelah pemasangan
ALAT
CONCRETE MIXER E.060
Kapasitas Alat V
Faktor Efesiensi Alat Fa
Waktu Siklus Ts1
- Memuat T1
- Mengaduk T2
- Menuang T3
- Menunggu, dll T4
Ts1
URAIAN KODE
TENAGA
Produksi Menentukan = CONCRETE MIXER Q1
Produksi Per Hari = Tk x Q1 Qt
Kebutuhan Tenaga
- Pekerja Tidak Terlatih P
- Pekerja Terlatih Tb
- Mandor M
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih = (Tk x P) : Qt L.101
- Pekerja Terlatih = (Tk x Tb) : Qt L.106
- Mandor = (Tk x M) : Qt L.061
Catatan = Lr di sesuaikan dengan kondisi setempat (lihat INFORMASI UMUM)
METODE PELAKSANAAN
URAIAN KODE
ASUMSI
METODE PELAKSANAAN
Dowel D 20 - 30 yang telah selesai dipabrikasi sebelah sisinya di cat dengan
cat anti karat
Kemudian dowel D 20 - 30 yang telah dicat anti karat sebelah sisinya di beri
atau dimasuki pipa PVC 1"
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Pipa PVC 1"
ALAT
GERGAJI BESI
Kapasitas memotong V
Koefisine alat Fa
Kapasitas produksi / jam = V x Fa Q
Koefisine alat / M3 = 1 / Q
TENAGA
Produksi kerja satu hari Qt
dibutuhkan - Mandor M
- Pekerja Tidak Terlatih P
Koefisine tenaga kerja/kg :
- Mandor = ( M x Tk ) : Qt L101
- Pekerja = ( P x Tk ) : Qt L106
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
B. BAHAN
1.00 Km
0.50 M3
0.90 ---
0.75 --- C. PERALATAN
0.85 --- 1 Dump Truck
2 Excavator Hydraulic
0.50 menit 3 Alat Bantu
0.50 menit
1.00 menit
14.34 M3/Jam
0.0697 Jam
4.00 M3
0.80 ---
40.00 Km/Jam D. JUMLAH HARGA TENAGA, BAHAN D
65.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
1.50 menit
1.00 menit
10.00 menit
1.00 menit
13.50 menit
11.85 M3/Jam
0.0844 Jam
AN
14.34 M3/Jam
100.41 M3
3.00 orang
1.00 orang
0.2092 Jam
0.0697 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
1 Pekerja Tidak Terlatih
10.000 Km 2 Pekerja Terlatih
7.00 Jam 3 Mandor
0.72 72%
0.28 28%
C. PERALATAN
1 Alat Bantu
0.9504 M3
0.1054 M3
151.7824 Kg
0.2921 M3
D. JUMLAH HARGA TENAGA, BAHAN D
5.00 M3 E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
10.00 orang
5.00 orang
1.00 orang
14.0000 Jam
7.0000 Jam
1.4000 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
B. BAHAN
3.00 Km
0.50 M3
0.90 ---
0.75 --- C. PERALATAN
0.85 --- 1 Dump Truck
2 Excavator Hydraulic
0.50 menit 3 Alat Bantu
0.50 menit
1.00 menit
14.34 M3/Jam
0.0697 Jam
4.00 M3
0.80 ---
40.00 Km/Jam D. JUMLAH HARGA TENAGA, BAHAN D
65.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
4.50 menit
2.77 menit
12.55 menit
19.82 menit
8.07 M3/Jam
0.1239 Jam
AN
KOEFISIEN SATUAN KET
14.34 M3/Jam
100.41 M3
4.00 orang
1.00 orang
0.2789 Jam
0.0697 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.15 M
3.00 Km B. BAHAN
1.2000 M3
1.50 M3 C. PERALATAN
0.90 --- 1 Wheel Loader
0.83 --- 2 Motor Greader
3 Water Tank Truck
0.50 menit 4 Vibratory Roller
0.50 menit 5 Alat Bantu
1.00 menit
56.03 M3/Jam
0.0178 Jam
AN
0.36 menit
0.50 menit
0.86 menit
131.86 M3/Jam
0.0076 Jam
4.00 Km/Jam
1.20 M
6.00 lintasan
0.80 ---
96.00 M3/Jam
0.0104 Jam
2.00 M3
0.07 M3
3.00 kali
0.75 ---
64.29 M3/Jam
0.0156 Jam
56.03 M3/Jam
392.18 M3
6.00 orang
1.00 orang
0.1071 Jam
0.0178 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.15 M
2.50 Km B. BAHAN
1 Tanah Urug
1.2000 M3
3.50 M3 C. PERALATAN
0.90 --- 1 Dump Truck
0.75 --- 2 Water Tank Truck
3 Alat Bantu
0.50 menit
0.25 menit
0.75 menit
157.50 M3/Jam
0.0063 Jam
4.00 M3
0.85 --- D. JUMLAH HARGA TENAGA, BAHAN D
65.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
70.00 Km/Jam F. HARGA SATUAN Kegiatan
2.31 menit
2.14 menit
4.45 menit
38.20 M3/Jam
0.0262 Jam
AN
60.00 M
2.40 M
0.90 ---
5.00 Km/Jam
5.00 lintasan
0.72 menit
0.50 menit
1.22 menit
191.21 M3/Jam
0.0052 Jam
4.00 Km/Jam
1.20 M
4.00 lintasan
0.83 ---
149.40 M3/Jam
0.0067 Jam
4.00 M3
0.07 M3
3.00 kali
0.83 ---
142.29 M3/Jam
0.0070 Jam
157.50 M3/Jam
1,102.50 M3
4.00 orang
1.00 orang
0.0254 Jam
0.0063 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
2 Mandor
B. BAHAN
40.00 M
2.40 M
0.70 ---
3.00 Km/Jam
4.00 lintasan C. PERALATAN
1 Motor Greader
0.80 menit 2 Water Tank Truck
1.00 menit 3 Vibratory Roller
1.80 menit 4 Alat Bantu
560.00 M3/Jam
0.0018 Jam
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
3.00 Km/Jam
1.20 M
12.00 lintasan
0.75 ---
225.00 M3/Jam
0.0044 Jam
AN
3.00 M3
0.09 M3
2.00 kali
0.75 ---
50.00 M3/Jam
0.0200 Jam
225.00 M3/Jam
1,575.00 M3
4.00 orang
1.00 orang
0.0178 Jam
0.0044 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.25 M
1.000 Km
1.00 M
B. BAHAN
1 Tanah Urug
1.2000 M3
3.50 M3 C. PERALATAN
0.85 --- 1 Dump Truck
0.85 --- 2 Motor Grader
3 Water Tank Truck
0.50 menit 4 Wheel Loader
0.25 menit 5 Tandem Roller
0.75 menit 6 Alat Bantu
168.58 M3/Jam
0.0059 Jam
6.00 M3
0.85 --- D. JUMLAH HARGA TENAGA, BAHAN D
40.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
65.00 Km/Jam F. HARGA SATUAN Kegiatan
1.50 menit
0.92 menit
2.00 menit
4.42 menit
57.65 M3/Jam
0.0173 Jam
AN
60.00 M
3.50 M
0.85 ---
4.00 Km/Jam
6.00 lintasan
0.90 menit
1.00 menit
1.90 menit
234.87 M3/Jam
0.0043 Jam
3.00 Km/Jam
1.20 M
8.00 lintasan
0.85 ---
95.63 M3/Jam
0.0105 Jam
5.00 M3
0.07 M3
1.00 kali
0.85 ---
60.71 M3/Jam
0.0165 Jam
168.58 M3/Jam
1,180.08 M3
7.00 orang
1.00 orang
0.0415 Jam
0.0059 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.15 M
10.000 Km
1.00 M
B. BAHAN
1 Agregat Kasar Kelas B
1.2000 M3
1.50 M3 C. PERALATAN
0.90 --- 1 Dump Truck
0.72 --- 2 Motor Greader
3 Water Tank Truck
0.50 menit 4 Wheel Loader
0.50 menit 5 Tandem Roller
1.00 menit 6 Alat Bantu
48.60 M3/Jam
0.0206 Jam
6.00 M3
0.72 --- D. JUMLAH HARGA TENAGA, BAHAN D
45.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
60.00 Km/Jam F. HARGA SATUAN Kegiatan
13.33 menit
10.00 menit
3.00 menit
26.33 menit
8.20 M3/Jam
0.1219 Jam
AN
50.00 M
2.40 M
0.72 ---
4.00 Km/Jam
4.00 lintasan
0.75 menit
1.00 menit
1.75 menit
111.09 M3/Jam
0.0090 Jam
3.00 Km/Jam
1.20 M
6.00 lintasan
0.72 ---
64.80 M3/Jam
0.0154 Jam
4.00 M3
0.07 M3
1.00 kali
0.72 ---
41.14 M3/Jam
0.0243 Jam
48.60 M3/Jam
340.20 M3
4.00 orang
1.00 orang
0.0823 Jam
0.0206 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.10 M
5.000 Km
B. BAHAN
1 Agregat Kasar Kelas A
2 Agregat Halus Kelas A
0.7800 M3
0.4200 M3
1.50 M3 C. PERALATAN
0.90 --- 1 Dump Truck
0.85 --- 2 Motor Greader
3 Water Tank Truck
0.50 menit 4 Wheel Loader
0.25 menit 5 Vibratory Roller
0.75 menit 6 Alat Bantu
76.50 M3/Jam
0.0131 Jam
4.00 M3
0.72 --- D. JUMLAH HARGA TENAGA, BAHAN D
60.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
65.00 Km/Jam F. HARGA SATUAN Kegiatan
5.00 menit
4.62 menit
1.00 menit
10.62 menit
13.57 M3/Jam
0.0737 Jam
AN
KOEFISIEN SATUAN KET
50.00 M
2.40 M
0.72 ---
4.00 Km/Jam
6.00 lintasan
0.75 menit
1.00 menit
1.75 menit
49.37 M3/Jam
0.0203 Jam
2.00 Km/Jam
1.20 M
8.00 lintasan
0.75 ---
225.00 M3/Jam
0.0044 Jam
4.00 M3
0.07 M3
1.00 kali
0.72 ---
41.14 M3/Jam
0.0243 Jam
76.50 M3/Jam
535.50 M3
3.00 orang
1.00 orang
0.0392 Jam
0.0131 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 3 Mandor
0.15 M
3.000 Km
B. BAHAN
1 Agregat Kasar Kelas B
2 Agregat Halus Kelas B
1.0200 M3
0.1800 M3
1.50 M3 C. PERALATAN
0.90 --- 1 Dump Truck
0.90 --- 2 Motor Greader
3 Water Tank Truck
0.25 menit 4 Wheel Loader
0.25 menit 5 Vibratory Roller
0.50 menit 6 Alat Bantu
121.50 M3/Jam
0.0082 Jam
4.00 M3
0.90 --- D. JUMLAH HARGA TENAGA, BAHAN D
60.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
65.00 Km/Jam F. HARGA SATUAN Kegiatan
3.00 menit
2.77 menit
0.25 menit
6.02 menit
29.90 M3/Jam
0.0334 Jam
AN
40.00 M
3.50 M
0.85 ---
4.00 Km/Jam
6.00 lintasan
0.60 menit
0.25 menit
0.85 menit
210.00 M3/Jam
0.0048 Jam
2.00 Km/Jam
1.20 M
8.00 lintasan
0.75 ---
225.00 M3/Jam
0.0044 Jam
5.00 M3
0.07 M3
1.00 kali
0.85 ---
60.71 M3/Jam
0.0165 Jam
121.50 M3/Jam
850.50 M3
8.00 orang
1.00 orang
0.0658 Jam
0.0082 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.20 M3/M2
5.000 Km
B. BAHAN
1 Batu Gunung
1.2000 M3
1.50 M3 C. PERALATAN
0.95 --- 1 Dump Truck
0.83 --- 2 Wheel Loader
3 Three Wheel Roller
1.50 menit 4 Alat Bantu
0.50 menit
2.00 menit
177.41 M3/Jam
0.0056 Jam
4.00 M3
0.90 --- D. JUMLAH HARGA TENAGA, BAHAN D
65.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
70.00 Km/Jam F. HARGA SATUAN Kegiatan
4.62 menit
4.29 menit
0.25 menit
9.15 menit
19.67 M3/Jam
0.0508 Jam
AN
3.00 Km/Jam
1.20 M
6.00 lintasan
0.83 ---
99.60 M3/Jam
0.0100 Jam
177.41 M3/Jam
1,241.89 M3
20.00 orang
2.00 orang
0.1127 Jam
0.0113 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.10 --- 2 Mandor
0.56 56 %
0.44 44 %
C. PERALATAN
1 Asphalt Sprayer
2 Air Compressor
3 Dump Truck
1.10 Liter 4 Alat Bantu
0.6468 Kg
0.4840 Liter
700.00 Liter
0.75 ---
2.75 Jam
190.91 Liter/Jam D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
0.0052 Jam F. HARGA SATUAN Kegiatan
350.00 M2/Jam
0.80 Liter/M2
280.00 Liter/Jam
0.0036 Jam
AN
190.91 Liter
280.00 Liter/Jam
0.0036 Jam
190.91 Liter/Jam
1,336.36 Liter
12.00 orang
2.00 orang
0.0718 Jam
0.0120 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
30.000 Km A. TENAGA
0.05 M 1 Pekerja Tidak Terlatih
7.00 Jam 2 Mandor
1.20 ---
1.05 ---
0.600 50,0 %
0.440 40,0 % B. BAHAN
0.060 6,2 % 1 Agregat Kasar Hotmix
0.070 7,0 % 2 Agregat Halus Hotmix
3 Filler
2.40 Ton/M3 4 Aspal
1.80 Ton/M3
2.00 Ton/M3
1.05 Ton/M3
C. PERALATAN
1 Asphalt Mixing Plant
2 Asphalt Finisher
3 Dump Truck
4 Generator Set
5 Tandem Roller
6 Tire Pneumatic Roller
7 Wheel Loader
0.9600 M3 8 Alat Bantu
0.7040 M3
172.8000 Kg
176.4000 Kg
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
1.70 M3 F. HARGA SATUAN Kegiatan
0.90 ---
0.85 ---
1.50 menit
0.50 menit
2.00 menit
29.26 M3/Jam
0.0342 Jam
AN
KOEFISIEN SATUAN KET
70.00 Ton/Jam
0.90 ---
26.25 M3/Jam
0.0381 Jam
0.0381 Jam
4.00 M3
0.90 ---
40.00 Km/Jam
50.00 Km/Jam
0.40 Ton
2.00 menit
20.00 menit
30.00 menit
17.00 menit
15.00 menit
82.00 menit
1.10 M3/Jam
0.9111 Jam
40.00 Ton/Jam
0.85 ---
14.17 M3/Jam
0.0706 Jam
4.00 Km/Jam
3.00 M
4.00 lintasan
0.75 ---
112.50 M3/Jam
0.0089 Jam
4.00 Km/Jam
2.00 M
4.00 lintasan
0.85 ---
85.00 M3/Jam
0.0118 Jam
AN
26.25 M3 /Jam
183.75 M3
7.00 orang
1.00 orang
0.2667 Jam
0.0381 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
0.2 M 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
3 Mandor
B. BAHAN
C. PERALATAN
1 Concrete Wibrator
2 Concrete Finisher
0.3500 Jam 3 Alat Bantu
0.5000 Jam
1.00 Ls
8.00 M3 /Jam
56.00 M3 D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
29.00 orang F. HARGA SATUAN Kegiatan
12.00 orang
3.00 orang
3.6250 Jam
1.5000 Jam
0.3750 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
0.2 M 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
3 Mandor
B. BAHAN
C. PERALATAN
1 Concrete Wibrator
2 Alat Bantu
0.3500 Jam
1.00 Ls
8.00 M3 /Jam
56.00 M3
D. JUMLAH HARGA TENAGA, BAHAN D
40.00 orang E. BIAYA UMUM DAN KEUNTUNGAN
14.00 orang F. HARGA SATUAN Kegiatan
3.00 orang
5.0000 Jam
1.7500 Jam
0.3750 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
1.05 ---
0.57
0.111 11,1 %
0.333 33,3 % B. BAHAN
0.556 55,6 % 1 Semen (PC)
2 Pasir Beton (Palu)
2.50 Ton/M3 3 Koral Palu
1.44 Ton/M3 4 Air
1.67 Ton/M3
1.80 Ton/M3
C. PERALATAN
1 Concrete Mixer
2 Concrete Vibrator
3 Water Tank Truck
305.2500 Kg 4 Alat Bantu
0.5484 M3
0.8494 M3
30.0000 Liter
350.00 Liter
0.75 --- D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
7.00 menit F. HARGA SATUAN Kegiatan
5.00 menit
4.00 menit
3.00 menit
19.00 menit
0.83 M3/Jam
1.2063 Jam
AN
KOEFISIEN SATUAN KET
1.2063 Jam
2.00 M3
0.16 M3
1.00 kali
0.75 ---
9.38 M3/Jam
0.1067 Jam
0.83 M3 /Jam
5.80 M3
10.00 orang
6.00 orang
1.00 orang
12.0635 Jam
7.2381 Jam
1.2063 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
B. BAHAN
1 Besi Beton
2 Kawat Beton
1.1000 Kg
0.2200 Kg
C. PERALATAN
1 Alat Bantu
200.00 Kg
3.00 orang
1.00 orang
1.00 orang
0.1050 Jam
0.0350 Jam
0.0350 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
B. BAHAN
1 Kayu Ulin 10/10
2 Kayu Ulin 5/10
1.0000 Titik
0.0075 M3
12.00 Titik
3.00 orang
1.00 orang C. PERALATAN
1.00 orang 1 Alat Bantu
1.7500 Jam
0.5833 Jam
0.5833 Jam
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
B. BAHAN
1 Kawat Bronjong
2 Batu Gunung
0.4200 Kg
1.2000 M3
C. PERALATAN
1.60 M2 1 Alat Bantu
8.00 orang
2.00 orang
1.00 orang
35.0000 Jam
8.7500 Jam
4.3750 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
0.05 M 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerjan Terlatih
1.20 --- 2 Mandor
1.15 ---
150.00 50,0 %
35.00 38,0 % B. BAHAN
6.00 6,5 % 1 Agregat 3-5 cm
55.00 2 Agregat 1-2 cm
3 Aspal
1.80 Ton/M3
1.01 Ton/M3
C. PERALATAN
1 Dump Truck
2 Wheel Loader
3 Three Wheel Roller
4 Asphalt Sprayer
5 Alat Bantu
1.6667 M3
0.3889 M3
63.2500 Kg
2.00 menit
1.00 menit
3.00 menit
20.25 M3/Jam
0.0494 Jam
AN
71,146.30
6.00 M3
0.75 ---
40.00 Km/Jam
50.00 Km/Jam
15.00 menit
12.00 menit
30.00 menit
57.00 menit
4.74 M3/Jam
0.2111 Jam
1,200.00 Liter
0.75 ---
1.50 Jam
11.02 Liter/Jam
0.0908 Jam
3.00 Km/Jam
1.20 M
8.00 lintasan
0.70 ---
15.75 M3/Jam
0.0635 Jam
20.25 M3 /Jam
141.75 M3
24.00 orang
6.00 orang
2.00 orang
1.1852 Jam
0.2963 Jam
0.0988 Jam
71,146.30
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
1 Pekerja Tidak Terlatih
10.000 Km 2 Pekerja Terlatih
7.00 Jam 3 Mandor
0.75 75 %
0.25 25 %
0.80 80 % B. BAHAN
0.20 20 % 1 Batu Padas
2 Semen (PC)
2.00 Ton/M3 3 Pasir Pasangan
1.40 Ton/M3
1.60 Ton/M3
1.47 Ton/M3
1.24 Ton/M3
1.00 ---
1.00 ---
C. PERALATAN
1 Alat Bantu
1.1429 M3
0.0625 M3
77.5000 Zak
0.2041 M3
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
4.00 M3 F. HARGA SATUAN Kegiatan
5.00 orang
1.00 orang
1.00 orang
8.7500 Jam
1.7500 Jam
1.7500 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.15 M
1.50 Km B. BAHAN
1 Batu Padas
1.0000 M3
1.00 M3
0.90 ---
0.75 --- C. PERALATAN
1 Dump Truck
1.00 menit 2 Wheel Loader
1.00 menit 3 Vibratory Roller
2.00 menit 4 Alat Bantu
16.88 M3/Jam
0.0593 Jam
3.00 M3
0.75 --- D. JUMLAH HARGA TENAGA, BAHAN D
45.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
60.00 Km/Jam F. HARGA SATUAN Kegiatan
4.00 menit
2.00 menit
2.00 menit
8.00 menit
14.06 M3/Jam
0.0711 Jam
AN
4.00 Km/Jam
1.20 M
6.00 lintasan
0.75 ---
90.00 M3/Jam
0.0111 Jam
16.88 M3/Jam
118.13 M3
4.00 orang
1.00 orang
0.2370 Jam
0.0593 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.10 --- 2 Mandor
0.40 56 %
0.60 44 %
C. PERALATAN
1 Asphalt Sprayer
2 Air Compressor
3 Dump Truck
1.10 Liter 4 Alat Bantu
0.4620 Kg
0.6600 Liter
200.00 Liter
0.75 ---
2.50 Jam
60.00 Liter/Jam D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
0.0167 Jam F. HARGA SATUAN Kegiatan
300.00 M2/Jam
0.70 Liter/M2
210.00 Liter/Jam
0.0048 Jam
AN
KOEFISIEN SATUAN KET
60.00 Liter
210.00 Liter/Jam
0.0048 Jam
60.00 Liter/Jam
420.00 Liter
12.00 orang
2.00 orang
0.1143 Jam
0.0190 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
20.000 Km A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
2 Mandor
400.00 M
1.05 -
0.15 M
B. BAHAN
1 Semen
C. PERALATAN
1 Dump Truck
1,050.00 Kg
6.00 Ton
0.80 -
45.00 Km/Jam
60.00 Km/Jam
D. JUMLAH HARGA TENAGA, BAHAN D
26.65 menit E. BIAYA UMUM DAN KEUNTUNGAN
19.99 menit F. HARGA SATUAN Kegiatan
40.00 menit
30.00 menit
10.00 menit
126.64 menit
0.4450 Jam
6.00 M
7.50 %
1.60 Ton/M3
43.2000 Ton
15.00 Orang
1.00 Orang
2.4300 Jam
0.1620 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
20.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Mandor
400.00 M
1.20 -
0.15 M
B. BAHAN
1 Tanah Timbunan
C. PERALATAN
1 Dump Truck
2 Motor Greader
3 Water Tank Truck
4 Wheel Loader
5 Tandem Roller
6 P. Tire Roller
7 Fulvi Mixer
6 Alat Bantu
0.50 menit
0.50 menit
1.00 menit
55.09 M3
0.0182 Jam
AN
3.50 M3
0.80 ---
45.00 Km/Jam 143,972.91
60.00 Km/Jam
24.00 menit
19.99 menit
3.00 menit
46.99 menit
2.98 M3
0.2991 Jam
50.00 M
2.40 M
0.75 ---
4.00 Km/Jam
6.00 lintasan
1.15 menit
1.00 menit
2.15 menit
119.52 M3/Jam
0.0084 Jam
3.00 Km/Jam
1.20 M
8.00 lintasan 4 x pp
0.83 ---
56.03 M3
0.0178 Jam
5.00 Km/jam
1.50 M
8.00 Lintasan 4 x pp
0.83 ---
AN
116.72 M3
0.0086 Jam
4.00 M3
0.07 M3
3.00 kali
0.88 ---
142.29 M3
0.0070 Jam
2.50 Km/jam
1.00 M3
6.00 lintasan 3xpp
0.83 ---
51.88 M3
0.0193 Jam
55.09 M3/Jam
392.18 M3
7.00 orang
1.00 orang
1.2249 Jam
0.0178 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.000 Km 1 Pekerja Tidak Terlatih
0.04 M 2 Mandor
7.00 Jam
1.10 -
1.05 -
50.00 % B. BAHAN
39.00 % 1 Agregat Kasar
4.85 % 2 Agregat Halus
6.70 % 3 Filler
4 Aspal
2.25 ton/M3
1.80 ton/M3
2.00 ton/M3
1.03 ton/M3 C. PERALATAN
1 Dump Truck
2 Genset
3 Wheel Loader
4 Tandem Roller
5 P. Tire Roller
6 AMP
7 Asphalt Finisher
8 Alat Bantu
0.024 M3
0.060 M3 D. JUMLAH HARGA TENAGA, BAHAN D
3.502 Kg E. BIAYA UMUM DAN KEUNTUNGAN
2.850 Kg F. HARGA SATUAN Kegiatan
1.50 M3
0.90 ---
0.83 ---
1.50 menit
0.50 menit
2.00 menit
672.30 M3
0.0015 Jam
AN
6.00 M3
0.95 ---
50.00 Km/Jam
60.00 Km/Jam
0.50 tn
1.00 menit
6.00 menit
8.40 menit
2.00 menit
7.00 menit
23.40 menit
5.41 M3
0.1847 Jam
50.00 M
0.83 M
461.11 ton/Jam
0.0022 Jam
461.11 m2
0.0022 Jam
2.50 Km/Jam
1.20 M
4.00 lintasan
0.83 ---
622.50 M2
0.0016 Jam
40.00 ton/jam
0.83 M
368.89
0.0027
AN
0.0023 Jam
461.11 M2/Jam
3,227.78 M3
10.00 orang
1.00 orang
0.0217 Jam
0.0022 Jam
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
7.00 Jam 1 Mandor Lapangan
1.10 --- 2 Kepala Tukang
1.05 --- 3 Pekerja Tak Terlatih
0.57 4 Pekerja Terlatih
0.119 11.9 %
0.357 35.7 %
0.524 52,4 % B. BAHAN
1 Pasir Ayak
2.40 Ton/M3 2 Semen PC
1.44 Ton/M3 3 Kayu Acuan
1.67 Ton/M3 4 Batu Kerikil
1.80 Ton/M3
C. PERALATAN
1 Concrete Mixer
325.0000 Kg 2 Concrete Vibrator
0.5389 M3 3 Water Pump
0.7124 M3 4 Alat Bantu
0.0217 M3
655.00 Liter
0.90 --- D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
4.00 menit F. HARGA SATUAN Kegiatan
3.00 menit
2.00 menit
2.00 menit
11.00 menit
3.22 M3/Jam
0.3110 Jam
AAN
0.3110 Jam
3.57 M3
0.16 M3
1.00 kali
0.75 ---
16.75 M3/Jam
0.0597 Jam
3.22 M3 /Jam
22.51 M3
4.00 orang
2.00 orang
1.00 orang
1.2440 Jam
0.6220 Jam
0.0833 Jam
0.3110 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
B. BAHAN
1.00 Km
2.00 M3/Jam
1.33 menit
1.09 menit
20.00 menit
10.00 menit D. JUMLAH HARGA TENAGA, BAHAN D
32.42 menit E. BIAYA UMUM DAN KEUNTUNGAN
3.70 M3/Jam F. HARGA SATUAN Kegiatan
0.2702 Jam
AN
2.50 M3/Jam
17.50 M3
6.00 orang
1.00 orang
2.4000 Jam
0.4000 Jam
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
KOEFISIEN SATUAN KET
A. TENAGA
1 Pekerja Tidak Terlatih
2 Mandor
3 Operator Terlatih
7.00 Jam 4 Pembantu Operator
B. BAHAN
65.00 M
3.75 M C. PERALATAN
0.90 --- 1 Motor Grader
2.00 Km/Jam 2 Alat Bantu
6.00 lintasan
6.00 menit
2.00 menit
8.00 menit
274.22 M3/Jam
0.0036 Jam
8.00 orang
1.00 orang
1.00 orang
1.00 orang
0.0280 Jam
0.0040 Jam
0.0080 Jam
0.0070 Jam
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
KOEFISIEN SATUAN KET
A. TENAGA
1 Pekerja Tidak Terlatih
2 Pekerjan Terlatih
3 Mandor
7.00
0.75
0.25 B. BAHAN
Portland Cement
1.67 Pasir Pasangan
1.44
1.05
C. PERALATAN
8.00 Kg
0.10 M3 1 Alat Bantu
0.25 Jam
0.15 Jam
0.01 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
B. BAHAN
1 Kayu Meranti /Perancah
2 Paku Biasa
0.0400 M3
0.4000 Kg
12.00 Titik
6.00 orang
1.00 orang
1.00 orang C. PERALATAN
1 Alat Bantu
3.5000 Jam
0.5833 Jam
0.5833 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Mandor
1.10 ---
B. BAHAN
1 Sealent
2 Diamnod Blade
2 Kayu Segitiga
0.2000 Kg
0.0012 Buah
1.0000 M1
30.00 M2/Jam
0.0333 Jam
C. PERALATAN
1 Compressor
2 Alat Bantu
40.00 M
1.00 orang
1.00 orang
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
10.000 Km 1 Pekerja Tidak Terlatih
7.00 Jam 2 Pekerja Terlatih
1.10 --- 3 Mandor
1.05 ---
0.50
0.154 15,4 %
0.385 38,5 % B. BAHAN
0.462 46,2 % 1 Semen (PC)
2 Pasir Beton (Palu)
2.40 Ton/M3 3 Koral Eks Palu
1.44 Ton/M3 4 Air
1.67 Ton/M3 5 Plastik Sheet
2.00 Ton/M3
C. PERALATAN
1 Concrete Mixer
2 Concrete Vibrator
3 Water Tank Truck
425.0400 Kg 4 Alat Bantu
0.6640 M3
0.6376 M3
30.0000 Liter
5.0000 M2
3.00 menit
2.00 menit
2.00 menit
1.00 menit
8.00 menit
3.15 M3/Jam
0.3175 Jam
AN
0.3175 Jam
6.00 M3 1,425,216.58
0.15 M3
1.00 kali
0.85 ---
34.00 M3/Jam
0.0294 Jam
3.15 M3 /Jam
22.05 M3
30.00 orang
14.00 orang
3.00 orang
9.5238 Jam
4.4444 Jam
0.9524 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.10 --- 2 Mandor
0.15 M
10.000 Km
B. BAHAN
1 Agregat Kelas C
1.1000 M3
1.50 M3 C. PERALATAN
0.90 --- 1 Dump Truck
0.75 --- 2 Motor Greader
3 Water Tank Truck
0.50 menit 4 Wheel Loader
0.50 menit 5 Vibratory Roller
1.00 menit 6 Alat Bantu
55.23 M3/Jam
0.0181 Jam
6.00 M3
0.75 --- D. JUMLAH HARGA TENAGA, BAHAN D
45.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
60.00 Km/Jam F. HARGA SATUAN Kegiatan
13.33 menit
10.00 menit
3.00 menit
26.33 menit
9.32 M3/Jam
0.1073 Jam
AN
50.00 M
2.40 M
0.75 ---
4.00 Km/Jam
6.00 lintasan
0.75 menit
1.00 menit
1.75 menit
77.14 M3/Jam
0.0130 Jam
2.00 Km/Jam
1.20 M
8.00 lintasan
0.75 ---
225.00 M3/Jam
0.0044 Jam
4.00 M3
0.07 M3
1.00 kali
0.75 ---
42.86 M3/Jam
0.0233 Jam
55.23 M3/Jam
386.59 M3
7.00 orang
1.00 orang
0.1267 Jam
0.0181 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.05 --- 2 Mandor
0.15 M
4.00 Km B. BAHAN
1 Pasir Urug Pasangan
1.0500 M3
C. PERALATAN
1 Alat Bantu
4.00 M3/Jam
28.00 M3
4.00 orang
1.00 orang
1.0000 Jam
0.2500 Jam
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.20 M3/M2
10.000 Km
B. BAHAN
1 Batu Padas
1.0000 M3
1.00 M3 C. PERALATAN
0.80 --- 1 Dump Truck
0.80 --- 2 Wheel Loader
3 Three Wheel Roller
1.50 menit 4 Alat Bantu
0.50 menit
2.00 menit
96.00 M3/Jam
0.0104 Jam
5.00 M3
0.85 --- D. JUMLAH HARGA TENAGA, BAHAN D
40.00 Km/Jam E. BIAYA UMUM DAN KEUNTUNGAN
60.00 Km/Jam F. HARGA SATUAN Kegiatan
10.00 menit
7.00 menit
26.00 menit
43.00 menit
4.94 M3/Jam
0.2024 Jam
AN
3.00 Km/Jam
1.20 M
8.00 lintasan
0.75 ---
67.50 M3/Jam
0.0148 Jam
96.00 M3/Jam
672.00 M3
20.00 orang
2.00 orang
0.2083 Jam
0.0208 Jam
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
- Serobong Kerja
G. Demobilisasi
H. HARGA SATUAN Kegiatan
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
G. Demobilisasi
2,200.00 Kg
6.00 Ton
0.83 -
45.00 Km/Jam
60.00 Km/Jam
26.65 menit
19.99 menit
40.00 menit
30.00 menit
10.00 menit
126.64 menit H. HARGA SATUAN Kegiatan
0.4450 Jam
6.00 M Lermbar No
7.50 % Kegiatan
1.60 Ton/M3
43.2000 Ton
NO JENIS ALAT
15.00 Orang
1.00 Orang B. PERALATAN
2.4300 Jam
0.1620 Jam 1 Concrete Vibrator
2 Dump Truck 3-4 m3
3 Concrete Mixer
4 Dump Truck Mixer
5 Concrete Pump
AN
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
1.25 M3 G. Demobilisasi
0.85 --- Pemuatan Ringan
0.83 ---
0.50 menit
0.50 menit
1.00 menit
44.09 M3
0.0227 Jam
AN
Lermbar No
3.50 M3 Kegiatan
0.80 ---
45.00 Km/Jam
60.00 Km/Jam NO JENIS ALAT
26.65 menit
19.99 menit B. PERALATAN
3.00 menit
49.64 menit
2.82 M3
1 Concrete Vibrator
0.2991 Jam 2 Dump Truck 3-4 m3
3 Concrete Mixer
50.00 M 4 Dump Truck Mixer
2.40 M 5 Concrete Pump
0.75 ---
4.00 Km/Jam
6.00 lintasan
1.15 menit
1.00 menit
2.15 menit
119.52 M3/Jam
0.0084 Jam
C. HARGA SATUAN Kegiatan
3.00 Km/Jam
1.20 M
8.00 lintasan 4 x pp
0.83 ---
56.03 M3
0.0178 Jam
Kegiatan
5.00 Km/jam Item Pembayaran
1.50 M Jenis Kegiatan
8.00 Lintasan 4 x pp Satuan Pembayaran
0.83 ---
NO KOMPONEN
AN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
0.0070 Jam
2.50 Km/jam
1.00 M3
6.00 lintasan 3xpp
0.83 ---
51.88 M3
0.0193 Jam
H. HARGA SATUAN Kegiatan
44.09 M3/Jam
392.18 M3
7.00 orang
1.00 orang Lermbar No
Kegiatan
1.2249 Jam
0.0178 Jam
NO JENIS ALAT
B. PERALATAN
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
G. Demobilisasi
H. HARGA SATUAN Kegiatan
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
NO KOMPONEN
KOEFISIEN SATUAN KET
A. TENAGA
1 Pekerja Tidak Terlatih
2 Pekerjan Terlatih
3 Mandor
7.00
B. BAHAN
Bearing Pad Uk. 406 x 406 x 50
Perekat/Baut
C. PERALATAN
1.00 Buah
1.00 Ls 1 Alat Bantu
4 Jam
0.4 Jam
0.04 Jam
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.00 --- 2 Mandor
15.000 Km
B. BAHAN
1 Kawat Las
10.0000 Inch
0.3500 Kg
0.2450 Jam C. PERALATAN
1 Mesin Pancang
2 Welding Machine
4 Alat Bantu
0.80 ---
5.00 menit
9.60 Inch/Jam
0.1042 Jam
30.00 Jam
10.00 menit
2.33 M3/Jam
0.4286 Jam D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
40.00 M
20.00 orang
2.00 orang
3.5000 Jam
0.3500 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.00 --- 2 Mandor
15.000 Km
B. BAHAN
1 Kawat Las
2 Besi Siku 100.100.10 mm
3 Besi Plat
18.0000 M1
5.0000 Kg
2.0000 M1
1.0000 Ls C. PERALATAN
0.5556 Jam 1 Welding Machine
2 Alat Bantu
7.00 Jam
5.00 menit
5.00 InchJam
0.2000 Jam
1.7500 Jam
0.3500 Jam
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
KOEFISIEN SATUAN KET
A. TENAGA
1 Pekerja Tidak Terlatih
2 Pekerjan Terlatih
3 Mandor
7.00
B. BAHAN
Cat Anti Korosit Mutu Tinggi
Thinner
C. PERALATAN
0.20 Kg
0.09 Liter 1 Alat Bantu
1.00 Ls
3 Jam
0.3 Jam
0.03 Jam
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
1 Pekerja Tidak Terlatih
10.000 Km 2 Pekerja Terlatih
7.00 Jam 3 Mandor
0.69 69%
0.31 31%
C. PERALATAN
1 Alat Bantu
0.9108 M3
0.1292 M3
186.0496 Kg
0.3100 M3
D. JUMLAH HARGA TENAGA, BAHAN D
5.00 M3 E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
10.00 orang
5.00 orang
1.00 orang
14.0000 Jam
7.0000 Jam
1.4000 Jam
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
G. Demobilisasi
H. HARGA SATUAN Kegiatan
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
G. Demobilisasi
H. HARGA SATUAN Kegiatan
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
G. Demobilisasi
H. HARGA SATUAN Kegiatan
Lermbar No
Kegiatan
NO JENIS ALAT
B. PERALATAN
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.05 --- 2 Pekerja Terlatih
0.15 M 3 Mandor
4.00 Km B. BAHAN
1 Pasir Urug
2 Tanah Urug
3 Paving
0.0425 M3
0.0425 M3
35.00 Buah
C. PERALATAN
1 Alat Bantu
3.00 M2/Jam
21.00 M2
3.00 orang
2.00 orang
1.00 orang
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
NO KOMPONEN
KOEFISIEN SATUAN KET
A. TENAGA
1 Pekerja Tidak Terlatih
2 Pekerjan Terlatih
3 Mandor
7.00
B. BAHAN
Cat Tembok Anti Lumut
C. PERALATAN
0.20 Kg
1.00 Ls 1 Alat Bantu
2.5 Jam
0.25 Jam
0.025 Jam
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
10.000 Km
0.05 M A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Pekerjan Terlatih
1.15 --- 2 Mandor
75.00 68.18%
30.00 27.27%
5.00 4.54% B. BAHAN
55.00
1 Debu Batu
1.80 Ton/M3 2 Aspal
1.01 Ton/M3
C. PERALATAN
1 Dump Truck
2 Wheel Loader
3 Three Wheel Roller
4 Asphalt Sprayer
5 Alat Bantu
0.8333 M3
0.3333 M3
63.2500 Kg
0.0494 Jam
AN
6.00 M3
0.75 ---
40.00 Km/Jam
60.00 Km/Jam
15.00 menit
10.00 menit
30.00 menit
55.00 menit
4.91 M3/Jam
0.2037 Jam
1,200.00 Liter
0.75 ---
1.50 Jam
11.02 Liter/Jam
0.0908 Jam
8.00 Km/Jam
1.20 M
8.00 lintasan
0.75 ---
45.00 M3/Jam
0.0222 Jam
20.25 M3 /Jam
141.75 M3
24.00 orang
4.00 orang
2.00 orang
1.1852 Jam
0.1975 Jam
0.0988 Jam
AAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KOEFISIEN SATUAN KET
NO KOMPONEN
10.000 Km A. TENAGA
7.00 Jam 1 Mandor Lapangan
1.10 --- 2 Pekerja Tak Terlatih
1.05 --- 3 Pekerja Terlatih
0.57
0.250 11.9 %
0.750 35.7 %
B. BAHAN
1 Kerb Beton K350
2.00 Buah 2 Pasir Ayak
1.44 Ton/M3 3 Semen PC
1.67 Ton/M3
C. PERALATAN
1 Concrete Mixer
0.0500 Kg 2 Alat Bantu
0.0200 M3
655.00 Liter
0.90 --- D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
3.00 menit F. HARGA SATUAN Kegiatan
3.00 menit
2.00 menit
2.00 menit
10.00 menit
3.54 M3/Jam
0.2827 Jam
AAN
3.54 M3 /Jam
24.76 M3
4.00 orang
2.00 orang
1.00 orang
1.1309 Jam
0.5655 Jam
0.2827 Jam
AN
Kegiatan
Item Pembayaran
Jenis Kegiatan
KOEFISIEN SATUAN KET Satuan Pembayaran
NO KOMPONEN
A. TENAGA
7.00 Jam 1 Pekerja Tidak Terlatih
1.20 --- 2 Mandor
0.000 Km
B. BAHAN
1 Pipa 1"
1.00 M
250.00 M1/hari
1.00 Orang
2.00 Orang
0.03
0.06
D. JUMLAH HARGA TENAGA, BAHAN D
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN Kegiatan
ENGINEER'S ESTIMATE
Ls 1.0000 5,000.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 300.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 1,000.00
Ls 1.0000 1,500.00
JUMLAH HARGA PERALATAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 500.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M3 0.0240 340,000.00
M3 0.0600 340,000.00
M3 3.5020 821.23
Kg 2.8500 8,604.43
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
: Pembangunan Jalan Dan Jembatan
: Perkiraan Kuantitas :
: Kegiatan Plesteran Total Harga :
: M2 % Harga Jumlah Seluruh :
Kg 8.0000 1,420.77
M3 0.1000 130,000.00
Ls 1.0000 2,700.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 2,500.00
JUMLAH HARGA PERALATAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 500.00
M2 400.00 0.00
Direksi Teknis
- - - -
LS 1.00 9,593,195.70
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
M2 400.00
Direksi Teknis
- -
LS 1.00
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M2 400.00 6,000.00
Direksi Teknis
- - - -
LS 1.00 2,302,324.30
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M2 400.00 6,000.00
Direksi Teknis
- - - -
LS 1.00 2,472,584.54
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M2 400.00 5,000.00
Direksi Teknis
- - - -
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
: Pembangunan Jalan Dan Jembatan
: 1.2 Perkiraan Kuantitas :
: Mobilisasi Total Harga :
: Ls % Harga Jumlah Seluruh :
M2 400.00 0.00
Direksi Teknis
- - - -
LS 1.00 812,767.36
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ATUAN Kegiatan
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
: Pembangunan Jalan Dan Jembatan
: 7.12.(2) Perkiraan Kuantitas :
: Bearing Pad (406 x 406 x 50) Total Harga :
: Buah % Harga Jumlah Seluruh :
Ls 1.0000 2,500.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 2,500.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
REKAMAN ANALISA HARGA SATUAN
: Pembangunan Jalan Dan Jembatan
: 2.2 Perkiraan Kuantitas :
: Pasangan Batu Dengan Mortar Total Harga :
: M3 % Harga Jumlah Seluruh :
Ls 1.0000 5,000.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Direksi Teknis
- - - -
LS 1.00 4,722,566.12
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M2
Direksi Teknis
- - - -
LS 1.00 4,138,035.74
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
M2 400.00 5,000.00
Direksi Teknis
- - - -
LS 1.00 4,877,217.60
ATUAN Kegiatan
: 1.2-2
: MOBILISASI
Harga
JENIS ALAT KODE ALAT SATUAN Kuantitas Satuan
(Rp.)
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
Ls 1.0000 2,500.00
ENGINEER'S ESTIMATE
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN
NO URAIAN
JUMLAH
HARGA I ASUMSI
(Rp.) 1 Menggunakan alat berat (cara mekanik)
2 Lokasi Kegiatan : sepanjang jalan
3 Kondisi jalan : sedang / baik
1,568.63 4 Jam kerja efektif per hari
836.60 5 Faktor pengembangan material
II METODE PELAKSANAAN
2,405.23 1 Penggalian di lakukan dengan menggunakan Tenaga Manusia
2 Sekelompok pekerjan akan melakukan penggalian
3 Sekelompok pekerjan akan merapikan hasil galian
4 Sisa galian dia angkat ke atas Truck dan di buang ke tempat terentu
dan diijinkan oleh Direksi
1 ALAT BANTU
Di Perlukan Alat-Alat Bantu Kecil
- Cangkul
- Sekop
- Keranjang + Sapu
2 TENAGA
Produksi Menentukan =
16,000.92 Produksi Per Hari = Tk x Q1
12,841.55 Kebutuhan Tenaga
2,000.00 - Pekerja Tidak Terlatih
- Mandor
Koefisien Tenaga / M3
- Pekerja Tidak Terlatih= (Tk x P) : Qt
- Mandor = (Tk x M) : Qt
30,842.47
33,247.70
3,324.77
36,572.47
JUMLAH
HARGA
(Rp.)
105,000.00
70,000.00
16,800.00
191,800.00
216,336.96
215,648.29
37,978.06
469,963.31
5,000.00
5,000.00
666,763.31
66,676.33
733,439.65
1.00 M3
JUMLAH
HARGA
(Rp.)
2,091.50
836.60
2,928.10
23,489.65
12,841.55
5,000.00
41,331.20
44,259.31
4,425.93
48,685.24
1.00 M3
JUMLAH
HARGA
(Rp.)
803.21
214.19
1,017.40
19474.0948002259
0.00
5,154.34
2,561.26
3,172.30
2,352.35
2,500.00
15,740.25
16,757.65
1,675.77
18,433.42
1.00 M3
JUMLAH
HARGA
(Rp.)
190.48
76.19
266.67
45,127.50
45,127.50
4,964.73
1,433.27
1,500.00
7,898.00
53,292.17
5,329.22
58,621.38
1.00 M2
JUMLAH
HARGA
(Rp.)
133.33
53.33
186.67
603.09
4,078.67
1,003.67
400.00
6,085.43
6,272.09
627.21
6,899.30
1.00 M3
JUMLAH
HARGA
(Rp.)
311.42
71.18
382.60
60,727.50
60,727.50
3,289.39
1,437.95
3,358.91
1,712.93
1,856.95
200.00
11,856.13
72,966.23
7,296.62
80,262.86
1.00 M3
JUMLAH
HARGA
(Rp.)
617.28
246.91
864.20
343,200.00
343,200.00
23,119.76
3,040.26
4,956.72
5,941.81
2,740.29
200.00
39,998.84
384,063.03
38,406.30
422,469.34
1.00 M3
JUMLAH
HARGA
(Rp.)
294.12
156.86
450.98
265,200.00
142,800.00
408,000.00
13,979.91
6,840.58
4,956.72
3,774.80
1,003.67
2,000.00
32,555.68
441,006.66
44,100.67
485,107.32
1.00 M3
JUMLAH
HARGA
(Rp.)
493.83
98.77
592.59
291,720.00
51,480.00
343,200.00
6,341.61
1,608.24
3,358.91
2,376.72
1,003.67
500.00
15,189.14
358,981.74
35,898.17
394,879.91
1.00 M3
JUMLAH
HARGA
(Rp.)
845.49
135.28
980.77
273,152.73
273,152.73
9,641.22 6.67
1,627.69 766,000.00
1,782.84
500.00
13,551.75
287,685.24
28,768.52
316,453.76
1.00 Liter
JUMLAH
HARGA
(Rp.)
538.78
143.67
682.45
5,565.35
2,904.00
8,469.35
1,001.82
320.68
677.29
400.00
2,399.79
11,551.59
1,155.16
12,706.74
1.00 M3
JUMLAH
HARGA
(Rp.)
2,000.00
457.14
2,457.14
289,920.00
201,344.00
141,908.07
1,517,821.77
2,150,993.85
167,356.53
9,938.27
172,783.60
11,507.15
1,578.41
1,796.79
9,868.75
5,000.00
379,829.51
2,533,280.49
253,328.05
2,786,608.54
1.00 M3
JUMLAH
HARGA
(Rp.)
27,187.50
15,000.00
4,500.00
46,687.50
1,330,757.27
43,137.50
30,450.00
1,404,344.77
18,971.82
58,295.31
1,289.47
78,556.60
1,529,588.87
152,958.89
1,682,547.76
1.00 M3
JUMLAH
HARGA
(Rp.)
37,500.00
17,500.00
4,500.00
59,500.00
1,205,820.00
43,137.50
30,450.00
0.00
1,279,407.50
18,971.82
15,000.00
33,971.82
1,372,879.32
137,287.93
1,510,167.25
1.00 M3
JUMLAH
HARGA
(Rp.)
90,476.19
72,380.95
14,476.19
177,333.33
433,690.88
188,730.74
309,603.19
4,500.00
936,524.81
29,365.29
65,390.40
21,752.91
5,000.00
121,508.60
1,235,366.75
123,536.67
1,358,903.42
1.00 Kg
JUMLAH
HARGA
(Rp.)
787.50
350.00
420.00
1,557.50
8,014.59
3,228.00
;
11,242.59
300.00
300.00
13,100.09
1,310.01
14,410.10
1.00 Titik
JUMLAH
HARGA
(Rp.)
13,125.00
5,833.33
7,000.00
25,958.33
145,692.27
27,317.30
173,009.57
1,000.00
1,000.00
199,967.91
19,996.79
219,964.70
1.00 M3
JUMLAH
HARGA
(Rp.)
262,500.00
87,500.00
52,500.00
402,500.00
11,606.99
273,152.73
284,759.71
1,500.00
1,500.00
688,759.71
68,875.97
757,635.69
1.00 M2
JUMLAH
HARGA
(Rp.)
8,888.89
11,851.85
3,555.56
24,296.30
505,534.09
129,080.18
544,230.31
1,178,844.58
40,035.23
14,260.34
11,274.35
17,358.35
7,500.00
90,428.27
1,293,569.15
129,356.91
1,422,926.06
71,146.30
1.00 M3
JUMLAH
HARGA
(Rp.)
65,625.00
17,500.00
21,000.00
104,125.00
121,800.00
110,109.89
26,530.61
258,440.50
500.00
500.00
363,065.50
36,306.55
399,372.05
1.00 M3
JUMLAH
HARGA
(Rp.)
1,777.78
711.11
2,488.89
106,575.00
106,575.00
13,485.55
17,112.41
2,509.17
2,100.00
35,207.13
144,271.01
14,427.10
158,698.12
1.00 Ltr
JUMLAH
HARGA
(Rp.)
857.14
228.57
1,085.71
3,975.25
3,960.00
7,935.25
3,187.62
427.57
903.05
450.00
4,968.25
13,989.21
1,398.92
15,388.13
Ton
JUMLAH
HARGA
(Rp.)
18,225.00
1,944.00
20,169.00
1,491,811.36
1,491,811.36
84,390.04
84,390.04
1,596,370.40
159,637.04
1,756,007.44
M3
JUMLAH
HARGA
(Rp.)
9,186.75
213.60
9,400.35
45,127.50
45,127.50
56,721.49
2,825.71
1,433.22
5,241.82
3,169.21
1,308.49
2,156.66
3,500.00
76,356.61
130,884.46
13,088.45
143,972.91
M2
JUMLAH
HARGA
(Rp.)
162.75
26.40
189.15
8,160.00
20,400.00
2,875.94
24,522.63
55,958.57
35,033.59
655.08
429.53
285.25
350.49
9,527.25
380.14
1,500.00
48,161.33
104,309.05
10,430.91
114,739.96
M3
JUMLAH
HARGA
(Rp.)
3,731.98
891.31
9,329.94
6,219.96
20,173.19
185,484.76
461,751.14
50,828.06
201,262.19
899,326.14
7,570.40
16,857.71
630.40
10,000.00
35,058.51
954,557.84
95,455.78
1,050,013.62
1.00 M3
JUMLAH
HARGA
(Rp.)
18,000.00
4,800.00
22,800.00
51,241.26
3,869.73
44,894.89
4,000.00
104,005.87
126,805.87
12,680.59
139,486.46
1.00 M2
JUMLAH
HARGA
(Rp.)
210.00
48.00
104.00
9.80
371.80
1,231.61
250.00
1,481.61
1,853.41
185.34
2,038.75
1.00 M2
JUMLAH
HARGA
(Rp.)
1,875.00
1,800.00
130.00
3,805.00
11,366.18
13,000.00
24,366.18
2,700.00
2,700.00
30,871.18
3,087.12
33,958.30
1.00 M2
JUMLAH
HARGA
(Rp.)
26,250.00
5,833.33
7,000.00
39,083.33
93,692.27
6,182.27
99,874.55
2,500.00
2,500.00
141,457.88
14,145.79
155,603.67
JUMLAH
HARGA
(Rp.)
1,312.50
330.00
1,642.50
1,869.88
1,035.30
3,552.50
6,457.68
2,992.99
750.00
3,742.99
11,843.17
1,184.32
13,027.49
1.00 M3
JUMLAH
HARGA
(Rp.)
71,428.57
44,444.44
11,428.57
127,301.59
603,885.24
228,517.22
232,376.13
4,500.00
43,137.50
1,112,416.09
7,727.71
17,208.00
5,998.05
25,000.00
55,933.75
1,295,651.43
129,565.14
1,425,216.58
1.00 M3
JUMLAH
HARGA
(Rp.)
950.62
217.28
1,167.90
155,295.00
155,295.00
20,345.39
4,377.97
4,758.45
5,228.79
1,003.67
4,000.00
39,714.27
196,177.17
19,617.72
215,794.89
1.00 M3
JUMLAH
HARGA
(Rp.)
7,500.00
3,000.00
10,500.00
136,500.00
136,500.00
500.00
500.00
147,500.00
14,750.00
162,250.00
1.00 M3
JUMLAH
HARGA
(Rp.)
1,562.50
250.00
1,812.50
106,575.00
106,575.00
38,374.32
3,008.04
2,630.68
500.00
44,513.04
152,900.54
15,290.05
168,190.60
JALAN PENDEKAT MAHKOTA
JUMLAH
HARGA
(Rp.)
- #REF!
9,593,195.70 4,388,230.30
4,800,000.00 4,800,000.00
- #REF!
-
500,000.00 500,000.00
37,500,000.00 37,500,000.00
4,388,230.30
9,593,195.70
61,986,391.40 #REF!
JUMLAH
HARGA
(Rp.)
-
-
314,264.24 314,264.24
1,896,405.41 1,896,405.41
703,961.00 703,961.00
1,296,400.70 1,296,400.70
1,182,052.78 177,198.95
644,686.12
790,388.20
54,205.20
816,134.32
111,887.70
713,767.37
1,069,042.67
9,593,195.70 4,388,230.30
JALAN TURAP
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
-
-
-
-
#REF!
JUMLAH
HARGA
(Rp.)
-
-
-
-
-
-
-
-
JEMBATAN BENANGA
JUMLAH
HARGA
(Rp.)
2,400,000.00 #REF!
2,302,324.30 1,999,178.27
4,000,000.00 4,000,000.00
- #REF!
300,000.00 300,000.00
500,000.00 500,000.00
500,000.00 500,000.00
24,000,000.00 1,999,178.27
7,000,000.00
2,302,324.30
43,304,648.61 #REF!
JUMLAH
HARGA
(Rp.)
-
-
54,205.20 54,205.20
948,202.70 948,202.70
24,342.28 24,342.28
972,428.08 972,428.08
303,146.03 -
2,302,324.30 1,999,178.27
JEMBATAN UNMUL
Ls
JUMLAH
HARGA
(Rp.)
2,400,000.00 #REF!
2,472,584.54 2,169,438.51
2,480,000.00 2,480,000.00
- #REF!
150,000.00 150,000.00
500,000.00 500,000.00
352,500.00 352,500.00
2,500,000.00 2,169,438.51
2,472,584.54
13,327,669.09 #REF!
JUMLAH
HARGA
(Rp.)
-
-
54,205.20 54,205.20
1,896,405.41 1,896,405.41
24,342.28 24,342.28
194,485.62 194,485.62
303,146.03 -
-
-
-
2,472,584.54 2,169,438.51
JEMBATAN KAPIH
Ls
JUMLAH
HARGA
(Rp.)
2,000,000.00 #REF!
1,137,843.25 1,137,843.25
3,600,000.00 3,600,000.00
- #REF!
150,000.00 150,000.00
500,000.00 500,000.00
250,000.00 250,000.00
4,000,000.00 1,137,843.25
11,716,000.00
1,137,843.25
24,491,686.49 #REF!
JUMLAH
HARGA
(Rp.)
-
-
-
1,137,843.25 1,137,843.25
-
-
-
1,137,843.25 1,137,843.25
JEMBATAN SEGIRI
Ls Jln Elang, Puspita
JUMLAH
HARGA
(Rp.)
- #REF!
812,767.36 812,767.36
3,600,000.00 3,600,000.00
- #REF!
150,000.00 150,000.00
500,000.00 500,000.00
246,000.00 246,000.00
- 812,767.36
812,767.36
6,121,534.73 #REF!
JUMLAH
HARGA
(Rp.)
-
-
-
54,205.20 54,205.20
758,562.16 758,562.16
- -
- -
-
-
-
-
812,767.36 812,767.36
1.00 Buah
JUMLAH
HARGA
(Rp.)
30,000.00
4,000.00
480.00
34,480.00
2,283,750.00
25,000.00
2,308,750.00
2,500.00
2,500.00
2,345,730.00
234,573.00
2,580,303.00
1.00 M
JUMLAH
HARGA
(Rp.)
26,250.00
4,200.00
30,450.00
12,433.75
12,433.75
22,271.72
19,629.73
5,000.00
46,901.45
89,785.20
8,978.52
98,763.72
1.00 M
JUMLAH
HARGA
(Rp.)
13,125.00
4,200.00
17,325.00
174,292.93
84,583.33
35,000.00
293,876.26
26,992.84
200.00
27,192.84
338,394.10
33,839.41
372,233.51
1.00 M2
JUMLAH
HARGA
(Rp.)
22,500.00
3,000.00
360.00
25,860.00
24,000.00
4,050.00
28,050.00
2,500.00
2,500.00
56,410.00
5,641.00
62,051.00
1.00 M3
JUMLAH
HARGA
(Rp.)
105,000.00
70,000.00
16,800.00
191,800.00
207,322.92
264,334.20
40,295.17
511,952.29
5,000.00
5,000.00
708,752.29
70,875.23
779,627.52
JALAN ANGGI
JUMLAH
HARGA
(Rp.)
#REF!
4,722,566.12 3,740,920.43
- #REF!
-
600,000.00 600,000.00
-
3,740,920.43
4,722,566.12
10,045,132.24 #REF!
JUMLAH
HARGA
(Rp.)
-
-
314,264.24 314,264.24
948,202.70 948,202.70
1,296,400.70 1,296,400.70
1,182,052.78 1,182,052.78
790,388.20 -
191,257.49
4,722,566.12 3,740,920.43
JUMLAH
HARGA
(Rp.)
#REF!
4,138,035.74 2,229,450.52
- #REF!
-
600,000.00 600,000.00
-
2,229,450.52
4,138,035.74
8,876,071.48 #REF!
JUMLAH
HARGA
(Rp.)
-
-
314,264.24 314,264.24
758,562.16 758,562.16
972,428.08 972,428.08
184,196.03 184,196.03
790,388.20 -
302,062.70
816,134.32
4,138,035.74 2,229,450.52
LOKASI TERSEBAR
JUMLAH
HARGA
(Rp.)
2,000,000.00 #REF!
4,877,217.60 2,968,632.38
2,560,000.00 2,560,000.00
- #REF!
300,000.00 300,000.00
500,000.00 500,000.00
322,000.00 322,000.00
2,968,632.38
4,877,217.60
15,436,435.20 #REF!
JUMLAH
HARGA
(Rp.)
-
-
314,264.24 314,264.24
2,275,686.49 2,275,686.49
194,485.62 194,485.62
184,196.03 184,196.03
790,388.20 -
302,062.70
816,134.32
4,877,217.60 2,968,632.38
1.00 M2
JUMLAH
HARGA
(Rp.)
7,500.00
3,333.33
300.00
11,133.33
1,598.27
1,598.27
96,250.00
99,446.53
500.00
500.00
111,079.86
11,107.99
122,187.85
1.00 M2
JUMLAH
HARGA
(Rp.)
18,750.00
2,500.00
300.00
21,550.00
13,000.00
13,000.00
2,500.00
2,500.00
37,050.00
3,705.00
40,755.00
1.00 M2
JUMLAH
HARGA
(Rp.)
8,888.89
1,975.31
1,185.19
12,049.38
273.74
544,230.31
544,504.05
38,630.48
14,260.34
3,946.02
17,358.35
7,500.00
81,695.20
638,248.63
63,824.86
702,073.50
35,103.67
M1
JUMLAH
HARGA
(Rp.)
3,392.71
8,481.76
5,654.51
17,528.98
100,000.00
6,883.55
71.04
106,954.58
6,882.18
2,500.00
9,382.18
133,865.75
13,386.57
147,252.32
1.00 M1
JUMLAH
HARGA
(Rp.)
420.00
336.00
756.00
12,687.50
12,687.50
285.71
285.71
13,729.21
1,372.92
15,102.14
METODE PELAKSANAAN
Kegiatan
Item Pembayaran
Jenis Kegiatan
Satuan Pembayaran
KODE KOEFISIEN SATUAN KET
NO
A.
Tk 7.00 Jam 1
Fk 1.20 --- 2
Q1 1.00 M3/Jam 1
Qt 7.00 M3
P 5.00 orang
M 1.00 orang
L.101 5.0000 Jam
L.061 1.0000 Jam
D.
E.
F.
ORMASI UMUM)
ENGINEER'S ESTIMATE
TENAGA
Pekerja Tidak Terlatih L.101 Jam 5.0000
Mandor L.061 Jam 1.0000
NO KOMPONEN
A. Sewa Tanah
B. Peralatan
Lihat Lembar 1.2-2
C. Fasilitas Kantor (Barak Kerja)
-Barak Kerja
Pembayaran No : : 1.2
Kegiatan : MOBILISASI
NO JENIS ALAT
HARGA JUMLAH
SATUAN HARGA 1 1 Titik Pancangan (1.a. + 1.b. + 1.c.)
(Rp.) (Rp.) 1.a. 1 Titik Kepala & meruncing Tiang
Tukang Orang
Kepala Tukang Orang
7,500.00 37,500.00 Pekerja Tak Terlatih Orang
12,000.00 12,000.00 Mandor Orang
1.b. 1 Titik Memancang Kedalaman 4 m
Tukang Orang
ARGA TENAGA 49,500.00 Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
Kayu Ulin M3
1.c. 1 Titik Menumbuk Tiang
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
2 1 m3 Kegiatan Kasar Gelagar
Tukang Orang
Kepala Tukang Orang
ARGA BAHAN Pekerja Tak Terlatih Orang
Mandor Orang
1,500.00 1,500.00 Kayu Ulin M3
Paku Ulin Kg
3 1 m2 Papan Lantai Jembatan
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
Kayu Ulin M3
Paku Ulin Kg
(A + B + C) 51,000.00 Perhitungan
10 % x D 5,100.00 Tiang Pancang 10/10 =
(D + E) 56,100.00 Sloop 10/10 =
Gelagar 10/10 =
Balok 5/10 =
Papan lantai 5/20 =
Papan Turap 3/20 =
Plat Beugel =
Bout =
Kebutuhan Biaya Pembulatan 1 Buah Goron
PROPINSI KODE
KALIMANTAN TIMUR
NO KOMPONEN
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
1.b. 1 Titik Memancang Kedalaman 4 m
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
Kayu Ulin M3
1.c. 1 Titik Menumbuk Tiang
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
2 1 m3 Kegiatan Kasar Gelagar
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
Kayu Ulin M3
Paku Ulin Kg
3 1 m2 Papan Lantai Jembatan
Tukang Orang
Kepala Tukang Orang
Pekerja Tak Terlatih Orang
Mandor Orang
Kayu Ulin M3
Paku Ulin Kg
Perhitungan
Tiang Pancang 15/15 =
Sloop 15/15 =
Balok, dll =
Papan lantai 5/20 =
Papan Turap 3/20 =
Plat Beugel =
Bout =
62.000 (2/20)
25.000 (5/20)
71.000 (5/7)
50.000 (5/10)
34.000 (6/12)
39.000 (8/8)
25.000 (10/10)
NO KOMPONEN
Perhitungan
Tiang Pancang 10/10 =
Baut =
Kebutuhan Biaya Pembuatan Turap Kayu
PROPINSI KODE
KALIMANTAN TIMUR
NO KOMPONEN
Perhitungan
Gelagar 25/25 =
Gelagar 10/10 =
Balok Pengaku, dll =
Papan lantai 5/20 =
Balok Klam 10/30 =
Plat Beugel =
Baut =
NO KOMPONEN
Perhitungan
Tiang Pancang 25/25 =
ENGINEER'S ESTIMATE
RMULIR STANDAR UNTUK
MAN ANALISA HARGA SATUAN
###
Harga JUMLAH
KODE ALAT SATUAN Kuantitas Satuan HARGA
(2/20) Keping
(5/20) Keping
(5/7) Keping
(5/10) Keping
(6/12) Keping
(8/8) Keping
(10/10) Keping ITEM PEMBAYARAN NO
JENIS Kegiatan
SATUAN PEMBAYARAN
MARGA ANALISA SATUAN BIAYA
AN KOTA PEMBUATAN TURAP KAYU ULIN KODE
DA TRP 001
/ KOTA (MENGGUNAKAN BURUH)
KODE KOTA KODE DI SIAPKAN
KOTA SAMARINDA
A. MOBILISASI PERALATAN
1 Dump Truck E.080 Unit 8.00 100,000.00
2 Excavator E.09 Unit 1.00 500,000.00
3 Motor Greader E.11 Unit 1.00 250,000.00
4 Water Tank Truck E.15 Unit 1.00 100,000.00
5 Wheel Loader E.16 Unit 1.00 350,000.00
6 Vibratory Roller E.17 Unit 1.00 350,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 405,000.00
4 Pengujian Laboratorium Ls 1.00 200,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 587,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Mixing Plant E.01 Unit 1.00 0.00
2 Asphalt Finisher E.02 Unit 1.00 350,000.00
3 Asphalt Sprayer E.030 Unit 1.00 350,000.00
4 Air Compressor E.040 Unit 1.00 50,000.00
5 Dump Truck E.080 Unit 8.00 100,000.00
6 Excavator Hydraulic E.10 Unit 1.00 500,000.00
7 Generator Set E.120 Unit 1.00 100,000.00
8 Motor Grader E.140 Unit 1.00 350,000.00
9 Tire Pneumatic Roller E.190 Unit 1.00 250,000.00
10 Water Tank Truck E.230 Unit 1.00 100,000.00
11 Wheel Loader E.220 Unit 1.00 350,000.00
12 Vibartory Roller E.240 Unit 1.00 350,000.00
13 Concrete Mixer E.060 Unit 1.00 50,000.00
14 Concrete Vibrator E.070 Unit 1.00 50,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 1,000,000.00
4 Pengujian Laboratorium Ls 1.00 588,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 912,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Mixing Plant E.01 Unit 1.00 0.00
2 Asphalt Finisher E.02 Unit 1.00 350,000.00
3 Asphalt Sprayer E.030 Unit 1.00 350,000.00
4 Air Compressor E.040 Unit 1.00 50,000.00
5 Dump Truck E.080 Unit 8.00 100,000.00
6 Excavator Hydraulic E.10 Unit 1.00 500,000.00
7 Generator Set E.120 Unit 1.00 100,000.00
8 Motor Grader E.140 Unit 1.00 350,000.00
9 Tire Pneumatic Roller E.190 Unit 1.00 250,000.00
10 Water Tank Truck E.230 Unit 1.00 100,000.00
11 Wheel Loader E.220 Unit 1.00 350,000.00
12 Vibartory Roller E.240 Unit 1.00 350,000.00
13 Concrete Mixer E.060 Unit 1.00 50,000.00
14 Concrete Vibrator E.070 Unit 1.00 50,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 1,000,000.00
4 Pengujian Laboratorium Ls 1.00 568,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 912,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Sprayer E.030 Unit 1.00 350,000.00
2 Dump Truck E.080 Unit 8.00 100,000.00
3 Excavator Hydraulic E.10 Unit 1.00 500,000.00
4 Three Wheel Roller E.17 Unit 1.00 150,000.00
5 Water Tank Truck E.230 Unit 1.00 100,000.00
6 Wheel Loader E.220 Unit 1.00 350,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 482,000.00
4 Pengujian Laboratorium Ls 1.00 250,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 562,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Mixing Plant E.01 Unit 1.00 0.00
2 Asphalt Finisher E.02 Unit 1.00 350,000.00
3 Asphalt Sprayer E.030 Unit 1.00 350,000.00
4 Air Compressor E.040 Unit 1.00 50,000.00
5 Dump Truck E.080 Unit 8.00 100,000.00
6 Excavator Hydraulic E.10 Unit 1.00 500,000.00
7 Generator Set E.120 Unit 1.00 100,000.00
8 Motor Grader E.140 Unit 1.00 350,000.00
9 Tire Pneumatic Roller E.190 Unit 1.00 250,000.00
10 Water Tank Truck E.230 Unit 1.00 100,000.00
11 Wheel Loader E.220 Unit 1.00 350,000.00
12 Vibartory Roller E.240 Unit 1.00 350,000.00
13 Concrete Mixer E.060 Unit 1.00 50,000.00
14 Concrete Vibrator E.070 Unit 1.00 50,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 1,000,000.00
4 Pengujian Laboratorium Ls 1.00 991,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 912,500.00
JUMLAH C
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)
E. BIAYA UMUM DAN KEUNTUNGAN 15 % x D
F. HARGA SATUAN Kegiatan (D + E)
A. MOBILISASI PERALATAN
1 Asphalt Sprayer E.030 Unit 1.00 350,000.00
2 Concrete Mixer E.060 Unit 1.00 50,000.00
3 Concrete Vibrator E.070 Unit 1.00 50,000.00
4 Dump Truck E.080 Unit 8.00 100,000.00
5 Excavator Hydraulic E.10 Unit 1.00 500,000.00
6 Three Wheel Roller E.17 Unit 1.00 150,000.00
7 Water Tank Truck E.230 Unit 1.00 100,000.00
8 Wheel Loader E.220 Unit 1.00 350,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 510,000.00
4 Pengujian Laboratorium Ls 1.00 250,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 587,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Sprayer E.030 Unit 1.00 350,000.00
2 Dump Truck E.080 Unit 8.00 100,000.00
3 Three Wheel Roller E.17 Unit 1.00 150,000.00
4 Water Tank Truck E.230 Unit 1.00 100,000.00
5 Wheel Loader E.220 Unit 1.00 350,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pengendalian Lalu Lintas Ls 1.00 226,500.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 437,500.00
JUMLAH C
A. MOBILISASI PERALATAN
1 Asphalt Sprayer E.030 Unit 1.00 350,000.00
2 Concrete Mixer E.060 Unit 1.00 50,000.00
3 Concrete Vibrator E.070 Unit 1.00 50,000.00
4 Dump Truck E.080 Unit 8.00 100,000.00
5 Excavator Hydraulic E.10 Unit 1.00 500,000.00
6 Three Wheel Roller E.17 Unit 1.00 150,000.00
7 Water Tank Truck E.230 Unit 1.00 100,000.00
8 Wheel Loader E.220 Unit 1.00 350,000.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00 40,000.00
2 Papan Nama Kegiatan Buah 2.00 150,000.00
3 Pengendalian Lalu Lintas Ls 1.00 1,000,000.00
4 Pengujian Laboratorium Ls 1.00 520,000.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00 587,500.00
JUMLAH C
KOP PERUSAHAAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN MOBILISASI (LUMPSUM)
Kegiatan
: PENINGKATAN JALAN POROS DESA / KECAMATAN (PPJPD/K)
PAKET : PENINGKATAN RUAS JALAN AIR TERJUN TANAH MERAH
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
ITEM PEMBAYARAN NO : 1.1.
JENIS Kegiatan : MOBILISASI
SATUAN PEMBAYARAN : Lumpsum
A. MOBILISASI PERALATAN
1 Asphalt Mixing Plant E.01 Unit 1.00 0.00
2 Asphalt Finisher E.02 Unit 1.00
3 Asphalt Sprayer E.030 Unit 1.00
4 Air Compressor E.040 Unit 1.00
5 Dump Truck E.080 Unit 8.00
6 Excavator Hydraulic E.10 Unit 1.00
7 Generator Set E.120 Unit 1.00
8 Motor Grader E.140 Unit 1.00
9 Tire Pneumatic Roller E.190 Unit 1.00
10 Water Tank Truck E.230 Unit 1.00
11 Wheel Loader E.220 Unit 1.00
12 Vibartory Roller E.240 Unit 1.00
13 Concrete Mixer E.060 Unit 1.00
14 Concrete Vibrator E.070 Unit 1.00
JUMLAH A
B. FASILITAS LAIN-LAIN
1 Pembuatan Direksi Keet M2 36.00
2 Papan Nama Kegiatan Buah 2.00
3 Pengendalian Lalu Lintas Ls 1.00
4 Pengujian Laboratorium Ls 1.00
JUMLAH B
C. DEMOBILISASI
1 Demobilisasi Peralatan (25 %) Ls 1.00
JUMLAH C
( NAMA JELAS )
Jabatan
Cap Perusahaan
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
800,000.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
500,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
250,000.00 10 Jangka waktu pelaksanaan (hari kalender)
100,000.00
350,000.00
350,000.00 11 Jarak rata-rata Base Camp ke lokasi
Perhitungan di dasarkan pada sketsa di bawah ini
a' = (c + a/2) x a = 0.677
A 1.068 Km = a C
0.100
5,282,500.00
792,375.00 12 Mobilisasi di laksanakan sesuai dengan ketentuan yang tercantum dalam lampiran
6,074,875.00 13 Kegiatan Drainase dengan produk akhir Galian Parit
14 Kegiatan Tanah di laksanakan untuk Persiapan Badan Jalan (Land Clearing)
15 Kegiatan Tanah selanjutnya adalah Urugan Biasa dan Urugan Pilihan
16 Kegiatan Perkerasan Berbutir adalah Agregat Kelas B
17 Kegiatan Struktur adalah Jembatan Kayu Ulin dan Gorong-Gorong Kayu Ulin
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
A 3.500 Km = a C
3,650,000.00 Sta 0+000 Sta 3+500
0.100
7,890,500.00
1,183,575.00 12 Mobilisasi di laksanakan sesuai dengan ketentuan yang tercantum dalam lampiran
9,074,075.00 13 Kegiatan drainase dengan produk akhir parit pasangan dengan mortar
15 Kegiatan bahu jalan di perkuatan dengan Lapis Pondasi Kelas B dan Timbunan Tanah Pil
16 Kegiatan berbutir Lapis Pondasi Agregat Kelas A dan Telford Batu Gunung sebagai dasar
17 Kegiatan Lapis Pengikat sebelum Kegiatan Hotmix ATB
18 Produk akhir Kegiatan ATB (Asphalt Treated Base) dan Lapen Macadam
INFORMASI UMUM
UMPSUM)
NO URAIAN
1 Kegiatan : Perhubungan Dan Penanganan Jalan Kotamadya Dati II Samarinda
2 Paket : Peningkatan Jalan Mugirejo - Lubuk Sawa
3 Nomor Paket :
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
0.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
350,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
350,000.00 10 Jangka waktu pelaksanaan (hari kalender)
50,000.00
800,000.00
500,000.00 11 Jarak rata-rata Base Camp ke lokasi
100,000.00 Perhitungan di dasarkan pada sketsa di bawah ini
350,000.00 a' = (c + a/2) x a = 7.771
250,000.00 b' = (c + b/2) x b = 7.771
100,000.00 Leff = (a + b) = 7.687 kilometer
350,000.00 L = (a' + b') / Leff = 2.022 kilometer
350,000.00 Lq = Jarak penumpukan (Quary)
50,000.00 Lpmb = Jarak pembuangan
50,000.00 Lr = Jarak rata-rata = (Leff + L + Lq + Lpmb) =
Lr = Jarak rata-rata = (di ambil sebesar)
A 3.844 Km = a C
3,650,000.00 Sta 0+000 Sta 3+8435
0.100
7,870,500.00
#REF! 13 Kegiatan drainase dengan produk akhir parit pasangan dengan mortar
14 Kegiatan tanah di laksanakan untuk persiapan badan jalan
15 Kegiatan bahu jalan di perkuatan dengan Lapis Pondasi Kelas B dan Timbunan Tanah Pil
16 Kegiatan berbutir Lapis Pondasi Agregat Kelas A dan Telford Batu Gunung sebagai dasar
17 Kegiatan Lapis Pengikat sebelum Kegiatan Hotmix ATB
18 Produk akhir Kegiatan ATB (Asphalt Treated Base) dan Lapen Macadam
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
350,000.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
800,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
500,000.00 10 Jangka waktu pelaksanaan (hari kalender)
150,000.00
100,000.00
350,000.00 11 Jalan Muang-Bayur (127) = Perkerasan Subbase
Jalan Pampang (126) = Pacthing Lapen Mcadam
Jalan Damanhuri (128) = Pacthing Lapen Mcadam
Jalan Elang (172) = Pacthing Lapen Mcadam
(*) Target Menyesuaikan Dengan Harga Pasar
2,250,000.00
1,440,000.00
300,000.00
482,000.00
250,000.00
2,472,000.00
ENGINEER'E ESTIMATE
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
0.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
350,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
350,000.00 10 Jangka waktu pelaksanaan (hari kalender)
50,000.00
800,000.00
500,000.00 11 Jarak rata-rata Base Camp ke lokasi
100,000.00 Perhitungan di dasarkan pada sketsa di bawah ini
350,000.00 a' = (c + a/2) x a = 0.096
A 0.350 Km = a C
0.100
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
350,000.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
50,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
50,000.00 10 Jangka waktu pelaksanaan (hari kalender)
800,000.00
500,000.00
150,000.00 11 Jarak rata-rata Base Camp ke lokasi
100,000.00 Perhitungan di dasarkan pada sketsa di bawah ini
350,000.00 a' = (c + a/2) x a = 3.708
A 2.625 Km = a C
0.100
300,000.00
510,000.00
250,000.00
2,500,000.00
Jam kerja efektif dalam 1 hari
Asuransi, pajak untuk peralatan
587,500.00 Tingkat suku bunga investasi alat = 20 %
587,500.00 Biaya umum dan keuntungan = 15 %
5,437,500.00
815,625.00 12 Mobilisasi di laksanakan sesuai dengan ketentuan yang tercantum dalam lampiran
6,253,125.00 13 Kegiatan tanah di laksanakan untuk persiapan badan jalan
14 Kegiatan berbutir dengan Telford Batu Gunung sebagai dasar perkuatan
15 Kegiatan Lapen Macadam sebagai produk akhir ruas jalan ini
INFORMASI UMUM
UMPSUM)
( LANJUTAN ) NO URAIAN
A 2.625 Km = a C
1,750,000.00 Sta 0+000 Sta 2+625
0.100
226,500.00
Jam kerja efektif dalam 1 hari
Asuransi, pajak untuk peralatan
437,500.00 Tingkat suku bunga investasi alat = 20 %
437,500.00 Biaya umum dan keuntungan = 15 %
2,414,000.00
362,100.00 12 Mobilisasi di laksanakan sesuai dengan ketentuan yang tercantum dalam lampiran
2,776,100.00 13 Kegiatan tanah di laksanakan untuk persiapan badan jalan
14 Kegiatan berbutir dengan Telford Batu Gunung sebagai dasar perkuatan
15 Kegiatan Lapen Macadam sebagai produk akhir ruas jalan ini
16 Lokasi Quary (Material on Site)
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
350,000.00 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
50,000.00 9 Penampang jalan, jenis dan volume Kegiatan pokok
50,000.00 10 Jangka waktu pelaksanaan (hari kalender)
800,000.00
500,000.00
150,000.00 11 Jarak rata-rata Base Camp ke lokasi
100,000.00 Perhitungan di dasarkan pada sketsa di bawah ini
350,000.00 a' = (c + a/2) x a = 0.178
A 0.505 Km = a C
6,197,500.00
929,625.00 12 Mobilisasi di laksanakan sesuai dengan ketentuan yang tercantum dalam lampiran
7,127,125.00 13 Kegiatan berbutir Telford Batu Gunung sebagai dasar perkuatan
14 Produk akhir Kegiatan Lapen Macadam
15 Kegiatan struktur Slab Duiker dan Dinding Penahan Tanah
INFORMASI UMUM
UMPSUM)
NO URAIAN
JUMLAH
HARGA 4 Lokasi Kegiatan
(Rp.) 5 Kondisi Jalan Lama
6 Panjang Efektif (lihat sketsa di bawah ini)
7 Lebar Jalan Lama (bahu + perkerasan + bahu) dalam (m)
( hasil = nol ) 8 Lebar Rencana (bahu + perkerasan + bahu) dalam (m)
9 Penampang jalan, jenis dan volume Kegiatan pokok
10 Jangka waktu pelaksanaan (hari kalender)
11 Jarak rata-rata Base Camp ke lokasi
Perhitungan di dasarkan pada sketsa di bawah ini
a' = (c + a/2) x a = 0.096
A 0.350 Km = a C
Base Camp
bahu) dalam (m) ( Jalan setapak / Semak ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 4.5 + 26 + 4.5 )
DIV. II DRAINASE
2.1. Galian Parit
Pembuangan
7.00 Jam
2% x Harga Alat
0.20
0.15
Land Clearing)
Periksa lampiran
LOKASI
TAHUN ANGGARAN
adya Dati II Samarinda
MATA KOMPONEN Kegiatan
PEMBA-
YARAN
bahu) dalam (m) ( 0.5 + 4+ 0.5 ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 0.5 + 4+ 0.5 )
DIV. II PERKERASAN BERBUTIR
5.1.(1). Lapis Pondasi Aggregat Kelas A
5.1.(3). Lapis Telford Batu Gunung
Jumlah Harga Kegiatan Divisi 2 (Di pindahkan ke Rek
7.00 Jam
2% x Harga Alat
0.20
0.15
Periksa lampiran
bahu) dalam (m) ( 0.5 + 4+ 0.5 ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 0.5 + 4+ 0.5 )
DIV. II PERKERASAN BERBUTIR
5.1.(1). Lapis Pondasi Aggregat Kelas A
5.1.(2). Lapis Pondasi Aggregat Kelas B
5.1.(3). Lapis Telford Batu Gunung
Periksa lampiran
bahu) dalam (m) ( 1+ L + 1) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 1+ L + 1)
DIV. II PERKERASAN BERBUTIR, ASPAL
JALAN PAMPANG (120 m2)
5.1.(3). Lapis Telford Batu Gunung 20 %
8.1.(7). Lapen Macadam
( 100 % x 3.000 m)
( 15 % x 30 m) JALAN ELANG (1.056 m2)
( 100 % x 155 m) 5.1.(3). Lapis Telford Batu Gunung 80 %
( 100 % x 264 m) 8.1.(7). Lapen Macadam
7.00 Jam
2% x Harga Alat
0.20
0.15
Periksa lampiran
ESTIMATE
bahu) dalam (m) ( 0.5 + 3+ 0.5 ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 0.5 + 3+ 0.5 )
DIV. II PERKERASAN BERBUTIR
5.1.(1). Lapis Pondasi Aggregat Kelas A
5.1.(2). Lapis Pondasi Aggregat Kelas B
7.00 Jam
2% x Harga Alat
0.20
0.15
ntum dalam lampiran
Periksa lampiran
bahu) dalam (m) ( 1+ 3+ 1) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 1+ 3+ 1)
DIV. II PERKERASAN BERBUTIR
3.3. Penyiapan Badan Jalan
5.1.(3). Lapis Telford Batu Gunung
7.00 Jam
2% x Harga Alat
0.20
0.15
Periksa lampiran
bahu) dalam (m) ( 1+ 3+ 1) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 1+ 3+ 1)
DIV. II PERKERASAN BERBUTIR
3.3. Penyiapan Badan Jalan
5.1.(3). Lapis Telford Batu Gunung
Quary
Km
10.000 Km Lq 2 Km
2.625 Km = b B
Sta 5+250
Km = c Lpmb 1 Km
Pembuangan
7.00 Jam
2% x Harga Alat
0.20
0.15
bahu) dalam (m) ( 0.5 + 5+ 0.5 ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 0.5 + 5+ 0.5 )
DIV. II DRAINASE
2.1. Galian Parit
2.2. Pasangan Batu Mortar
Periksa lampiran
KOP PERUSA
SI UMUM HASIL PEREKAMAN ANALISA M
DAFTAR KUANTITAS
Kegiatan : PENINGKATAN JALA
INFORMASI PAKET : PENINGKATAN RUAS JALAN
LOKASI
TAHUN ANGGARAN
bahu) dalam (m) ( 0.5 + 3+ 0.5 ) Jumlah Harga Kegiatan Divisi 1 (Di pindahkan ke Rek
bahu) dalam (m) ( 0.5 + 3+ 0.5 )
DIV. II PERKERASAN BERBUTIR
5.1.(1). Lapis Pondasi Aggregat Kelas A
5.1.(2). Lapis Pondasi Aggregat Kelas B
7.00 Jam
2% x Harga Alat
0.20
0.15
Periksa lampiran
PEREKAMAN ANALISA MASING-MASING HARGA R
DAFTAR KUANTITAS DAN HARGA
RHUBUNGAN DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA Kegiatan
NINGKATAN JALAN RING ROAD III (TAHAP II) PAKET
: DATI II KOMAS LOKASI
: 1999/2000 TAHUN ANGGARAN
DIVISI. I
Ls 1.00 6,074,875.00 6,074,875.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) 6,074,875.00 DIVISI. IV
A
M3 1,878.80 36,572.47 68,712,362.68 B
C
Divisi 2 (Di pindahkan ke Rekapitulasi Biaya) 68,712,362.68 D
KEP
Ir. D
DIVISI. I
Ls 1.00 9,074,075.00 9,074,075.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) 9,074,075.00 DIVISI. IV
A
M3 1,006.25 485,107.32 488,139,242.72 B
M3 716.63 316,453.76 226,778,677.73 C
D
Divisi 2 (Di pindahkan ke Rekapitulasi Biaya) 714,917,920.45
ENAM RATUS EMPAT PULUH ENA
Buah 9.00
M3 29.16 36,572.47 1,066,453.32 ACHMAD NAWAWI, ST
M3 147.78 66,676.33 9,853,428.26 Nip. 550.011.214
Titik 288.00 219,964.70 63,349,833.00
Kg 4,202.10 14,410.10 60,552,672.39
M3 27.90 1,682,547.76 46,943,082.45
M3 9.00 58,621.38 527,592.46 KEP
Ir. D
DIVISI. I
Ls 1.00 #REF! #REF! DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) #REF! DIVISI. IV
A
M3 207.75 485,107.32 100,781,046.14 B
M3 146.25 394,879.91 57,751,186.74 C
M3 1,140.00 316,453.76 360,757,289.54 D
DIVISI. I
Ls 1.00 6,077,175.00 6,077,175.00 DIVISI. II
Ir. D
DIVISI. I
Ls 1.00 9,537,525.00 9,537,525.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) 9,537,525.00 DIVISI. IV
A
M3 216.45 485,107.32 105,001,479.84 B
M3 288.60 394,879.91 113,962,341.84 C
D
Divisi 2 (Di pindahkan ke Rekapitulasi Biaya) 218,963,821.68
SERATUS LIMA PULUH JU
Buah 2.00
M3 6.48 36,572.47 236,989.63
M3 32.84 66,676.33 2,189,650.72 ACHMAD NAWAWI, ST
Titik 64.00 219,964.70 14,077,740.67 Nip. 550.011.214
Kg 933.80 14,410.10 13,456,149.42
M3 6.20 1,682,547.76 10,431,796.10
M3 2.00 58,621.38 117,242.77
KEP
Divisi 4 (Di pindahkan ke Rekapitulasi Biaya) 40,509,569.31
Ir. D
PEREKAMAN ANALISA MASING-MASING HARGA R
DAFTAR KUANTITAS DAN HARGA
: PENINGKATAN JALAN POROS DESA / KECAMATAN (PPJPD/K) Kegiatan
NINGKATAN RUAS JALAN BUKUAN ( PALARAN ) PAKET
: DATI II KOMAS LOKASI
: 1999/2000 TAHUN ANGGARAN
DIVISI. I
Ls 1.00 6,253,125.00 6,253,125.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) 6,253,125.00 DIVISI. IV
A
M2 9,002.00 6,899.30 62,107,519.74 B
M3 1,350.30 316,453.76 427,307,515.84 C
D
Divisi 2 (Di pindahkan ke Rekapitulasi Biaya) 489,415,035.58
EMPAT RATUS ENAM BELAS JU
Ir. D
ACHMAD NAWAWI, ST
Nip. 550.011.214
KEP
Ir. D
PEREKAMAN ANALISA MASING-MASING HARGA R
DAFTAR KUANTITAS DAN HARGA
RHUBUNGAN DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA Program
NINGKATAN JALAN PELITA IV PAKET Kegiatan
: DATI II KOMAS LOKASI
: 1999/2000 TAHUN ANGGARAN
DIVISI. I
Ls 1.00 7,127,125.00 7,127,125.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) 7,127,125.00 DIVISI. IV
DIVISI. V
TIGA RATUS T
M3 577.20 48,685.24 28,101,118.80
M3 972.13 58,621.38 56,987,313.10
M2 2,075.00 6,899.30 14,316,052.37
M3 583.80 485,107.32 283,205,654.56 DI PERIKSA OLEH :
Liter 1,239.00 15,388.13 19,065,890.55 KASUBSIE PERENCANAAN
M3 744.00 316,453.76 235,441,599.49 DATI II KOMAS
ACHMAD NAWAWI, ST
M3 289.80 1,422,926.06 412,363,972.17 Nip. 550.011.214
Divisi 4 (Di pindahkan ke Rekapitulasi Biaya) 412,363,972.17
KEP
Buah 1.00
M3 3.24 36,572.47 118,494.81
M3 16.42 66,676.33 1,094,825.36
Titik 32.00 219,964.70 7,038,870.33
Kg 466.90 14,410.10 6,728,074.71 Ir. D
M3 3.10 1,682,547.76 5,215,898.05
M3 1.00 58,621.38 58,621.38
M1 156.00
M3 295.78 399,372.05 118,124,667.01
Titik 314.00 219,964.70 69,068,915.15
KOP PERUSAHAAN KO
PEREKAMAN ANALISA MASING-MASING HARGA R
DAFTAR KUANTITAS DAN HARGA
: PENINGKATAN JALAN POROS DESA / KECAMATAN (PPJPD/K) Kegiatan
NINGKATAN RUAS JALAN AIR TERJUN TANAH MERAH PAKET
: DATI II KOMAS LOKASI
: 1999/2000 TAHUN ANGGARAN
DIVISI. I
Ls 1.00 DIVISI. II
DIVISI. III
Divisi 1 (Di pindahkan ke Rekapitulasi Biaya) DIVISI. IV
A
M3 216.45 B
M3 288.60 C
D
Divisi 2 (Di pindahkan ke Rekapitulasi Biaya)
TERBILANG : ( .....
Liter 1,010.10
M3 72.15
Buah 2.00
M3 6.48
M3 32.84
Titik 64.00
Kg 933.80
M3 6.20
M3 2.00
( NAMA JELAS )
Jabatan
Cap Perusahaan
REKAPITULASI Kegiatan
1.
MAD NAWAWI, ST H. THAMRIN. B
Nip. 550.011.214 Nip. 550.009.381
2.
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
Ir. DADANG AIRLANGGA. N
Nip. 550.013.096
REKAPITULASI Kegiatan
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
REKAPITULASI Kegiatan
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
REKAPITULASI Kegiatan
: PENINGKATAN JALAN POROS DESA / KECAMATAN (PPJPD/K) Kegiatan
: PENINGKATAN RUAS JALAN AIR TERJUN TANAH MERAH PAKET
: DATI II KOMAS LOKASI
: 1999/2000 TAHUN ANGGARA
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
REKAPITULASI Kegiatan
III
8.1.(7).
PERIKSA OLEH : DI SIAPKAN OLEH :
SIE PERENCANAAN PEMIMPIN Kegiatan
ATI II KOMAS PERHUBUNGAN DAN PENANGANAN
JALAN KOTAMADYA (PPJK)
DI SETUJUI OLEH :
KEPALA SEKSI BINA MARGA
DPU DATI II KOMAS
2.3.
Ir. DADANG AIRLANGGA. N 7.3.
Nip. 550.013.096
KOP PERUSAHAAN
REKAPITULASI Kegiatan
( NAMA JELAS )
Jabatan
Cap Perusahaan
PERHITUNGAN VOLUME Kegiatan
: PERHUBUNGAN
KegiatanDAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
: PENINGKATAN JALAN RING ROAD III (TAHAP II)
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
DRAINASE
Galian Parit = [(1,30 x 0,9) ÷ 2] x 0,8 x 2.135) = 1,878.80
PERKERASAN BERBUTIR
Penyiapan Badan Jalan = 135 x 30 = 4,050.00
Urugan Tanah Biasa = 135 x 30 x 0,73 = 2,956.50
Urugan Tanah Pilihan = 135 x 30 x 2.0 = 8,100.00
Lapis Pondasi Aggregat Kelas B = (0,15 x 6,7) x 2.135 = 2,145.68
STRUKTUR
Gorong-Gorong Kayu Ulin = = 2.00
Jembatan Kayu Ulin = = 1.00
Biaya Kegiatan untuk galian biasa di limpahkan untuk pembayaran hutang ganti rugi tanam tumbuh yang
belum terselesaikan pada Kegiatan BPJK T.A. 1998 / 1999 sebesar Rp. 39.000,000-
Biaya Kegiatan untuk gorong-gorong kayu ulin (1,00 x 1,00) di limpahkan untuk pembayaran pada
Kegiatan serupa menanggulangi banjir pada Kegiatan BPJK T.A. 1998 / 1999 sebesar Rp. 23.000,000-
Perihal ini saya buat berdasarkan hasil permasalahan yang terjadi, di mana kedua permasalahan ini
keperluannya sangat mendesak, sedangkan dana sangat terbatas. Sehingga CV. JAYA PERKASA ABADI
bersedia menanggulangi beban tersebut namun dengan syarat akan di realisasikan dalam T.A. sekarang.
Perihal ini kemungkinan belum di sampaikan oleh Pemimpin Kegiatan sebelumnya, namun karena saya di
saat Kegiatan tersebut berlangsung bertindak sebagai Konsultan Pengawas, sehingga permasalahan
tersebut saya mengerti duduk persoalannya.
Adapun perihal ini saya sampaikan dengan tujuan untuk mengantisipasi kemungkinan, apabila terjadi
permasalahan penuntutan hak tersebut di atas oleh Kontraktor Pelaksana.
Demikian perihal yang saya sampaikan.
PERHUBUNGAN
Kegiatan
DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
: PENINGKATAN JALAN M. SAID
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Kelas A = (0,35 x 2,5 x 100) + (0,10 x 4) x 1.750 = 1,006.25
Lapis Pondasi Telford Batu Gunung = (0,15 x 3,5) x 1.365 = 716.63
PERKERASAN ASPAL
Lapis Pengikat = (0,7 Lt/m2 x 3,5) x 1.750 = 4,287.50
Asphalt Treated Base = (0,05 x 3,5) x 1.750 = 306.25
Lapen Macadam = (0,05 x 3,5) x 1.365 = 238.88
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 9.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
PERHUBUNGAN
Kegiatan
DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
: PENINGKATAN JALAN MUGIREJO - LUBUK SAWA
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Kelas A = (0.1 x 3 x 3.675 x 10 %)+(0.1 x 3 x 325) = 207.75
Lapis Pondasi Aggregat Kelas B = (0,15 x 3) x 325 = 146.25
Lapis Pondasi Telford Batu Gunung = (0,20 x 3) x 1.900 = 1,140.00
PERKERASAN ASPAL
Lapis Pengikat = (0,7 Lt/m2 x 3) x 4.000 = 8,400.00
Asphalt Treated Base = (0,05 x 3) x 4.000 = 600.00
Lapen Macadam = (0,05 x 3) x 1.900 = 285.00
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 5.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
Komponen Dinding Penahan = = 36.20
Bronjong (Gabions)
Pancangan Kayu Ulin
PERHITUNGAN VOLUME Kegiatan
PERHUBUNGAN
Kegiatan
DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
: PEMELIHARAAN PERIODIK JALAN DALAM KOTA
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Kelas A = (0,15 x 3 x 481) = 216.45
Lapis Pondasi Aggregat Kelas B = (0,20 x 3 x 481) = 288.60
PERKERASAN ASPAL
Lapis Pengikat = (0,7 Lt/m2 x 3) x 481 = 1,010.10
Asphalt Treated Base = (0,05 x 3) x 481 = 72.15
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 2.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
PERHITUNGAN VOLUME Kegiatan
: PENINGKATAN
Kegiatan JALAN POROS DESA / KECAMATAN (PPJPD/K)
: PENINGKATAN RUAS JALAN BUKUAN ( PALARAN )
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Penyiapan Badan Jalan = (3,5) x 2.572 = 9,002.00
Lapis Pondasi Telford Batu Gunung = (0,15 x 3,5) x 2.572 = 1,350.30
PERKERASAN ASPAL
Lapen Macadam = (0,05 x 3,5) x 2.572 = 450.10
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 9.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
PERHITUNGAN VOLUME Kegiatan
PERHUBUNGAN
Kegiatan
DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
: PENINGKATAN RUAS JALAN BUKUAN ( PALARAN ) ( LANJUTAN )
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Penyiapan Badan Jalan
Ruas I = (1,050 x 3) = 3,150.00
Ruas II = (1,400 x 3) + (560 x 3) = 5,880.00
= 9,030.00
PERKERASAN ASPAL
Lapen Macadam
Ruas I = (1,050 x 3 x 0,05) = 157.50
Ruas II = (1,400 x 3 x 0,05) + (560 x 3 x 0,05) = 294.00
= 451.50
PERHITUNGAN VOLUME Kegiatan
PERHUBUNGAN
Program
DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
KET Kegiatan : PENINGKATAN JALAN PELITA IV
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
DRAINASE
Galian Parit = [(1,1 x 0,7) ÷ 2] x 0,8 x 83 m) = 59.76
Pasangan Batu Mortar = [(1,1 x 0,7) ÷ 2] x 0,8 -
[(0,7 x 0,3) ÷ 2] x 0,6 x 83 m) = 34.86
PERKERASAN BERBUTIR
Galian Biasa = (1,443 x 8 x 50) = 577.20
Urugan Pilihan = (5.05 x 192,5) = 972.13
Penyiapan Badan Jalan = (415 x 5) = 2,075.00
Lapis Pondasi Aggregat Kelas A = =
Jalan Ke RSS = (490 x 3,0 x 0,20) = 294.00
Jalan PELITA IV = (920 x 4,5 x 0,07) = 289.80
= 583.80
Lapis Pengikat + Debu Batu = (590 x 3 x 0,7) = 1,239.00
Lapis Pondasi Telford Batu Gunung = (440 x 4,5 x 0,20) = 396.00
= (480 x 1,0 x 0,20) = 96.00
= (480 x 3,5 x 0,15) = 252.00
= 744.00
PERKERASAN ASPAL
Lapen Macadam = (920 x 4,5 x 0,07) = 289.8
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 1.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
Komponen Dinding Penahan = = 156.00
Pasangan Batu Padas
Pancangan Kayu Ulin
KOP PERUSAHAAN
PERHITUNGAN VOLUME Kegiatan
: PENINGKATAN
Kegiatan JALAN POROS DESA / KECAMATAN (PPJPD/K)
: PENINGKATAN RUAS JALAN AIR TERJUN TANAH MERAH
LOKASI : DATI II KOMAS
TAHUN ANGGARAN : 1999/2000
MOBILISASI
Mobilisasi = = 1.00
PERKERASAN BERBUTIR
Lapis Pondasi Aggregat Kelas A = (0,15 x 3 x 481) = 216.45
Lapis Pondasi Aggregat Kelas B = (0,20 x 3 x 481) = 288.60
PERKERASAN ASPAL
Lapis Pengikat = (0,7 Lt/m2 x 3) x 481 = 1,010.10
Asphalt Treated Base = (0,05 x 3) x 481 = 72.15
Kegiatan STRUKTUR
Komponen Slab Duiker (1 x 1) = = 2.00
Galian Parit
Pasangan Batu Mortar
Pancangan Kayu Ulin
Baja Tulangan
Beton K-225
Urugan Pilihan
SAMARINDA, 29 SEPTEMBER 1999
DI SIAPKAN OLEH :
PENAWAR
PT / CV. ............................
( NAMA JELAS )
Jabatan
Cap Perusahaan
atan PERHUBUNGAN DAN PENANGANAN JALAN KOTAMADYA DATI II SAMARINDA
DAFTAR USULAN RENCANA KERJA Kegiatan : 1999/2000
Kegiatan DAERAH TINGKAT I : KALIMANTAN TIMUR
KOTAMADYA DAERAH TINGKAT II : SAMARINDA
NOMOR Kegiatan : 01
10 Pemimpin Kegiatan
ran pada
alahan ini
ASA ABADI
A. sekarang.
arena saya di
masalahan
bila terjadi
NOMOR Kegiatan : 02
1 Nama Kegiatan : Peningkatan Jalan Air Terjun Tanah Merah 11 Bendahara Kegiatan
Pangkat : D
Ls
M3
M3
Liter
M3
Buah
TEMBER 1999
OLEH :
AR
...............
AS )
aan
DURP
DAFTAR USULAN RENCANA Kegiatan
Kegiatan
BANTUAN PENINGKATAN JALAN KABUPATEN / KOTAM
(BPJK)
TAHUN ANGGARAN 1999 / 2000
PAKET NO : 08
PEMELIHARAAN PERIODIK JALAN DALAM KOTA
SAMARINDA
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Nip. 550007460
Prop. Daerah Tingkat I Prop. Daerah Tingkat I Bina Marga DPU Tk. I
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Nip. 550007460
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Nip. 550007460
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Mengetahui :
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Nip. 550007460
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Nip. 550007460
Bendahara Kegiatan
Nama :
Pangkat :
Jabatan :
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
Prop. Daerah Tingkat I Prop. Daerah Tingkat I Bina Marga DPU Tk. I
Kalimantan Timur Kalimantan Timur Kalimantan Timur
Kabid Fisik & Prasarana
Lampiran
Lembar Rencana Kerja
Analisa Biaya & Kegiatan
Daftar Upah
MENGETAHUI :
Kepala Seksi Kepala Sub. Seski Pemimpin Kegiatan
Bina Marga DPU Dati II Perencanaan Bina Marga Perhubungan Dan Penanganan
Nip. 550.007.460
URP
N RENCANA Kegiatan
giatan
LAN KABUPATEN / KOTAMADYA
PJK)
ARAN 1999 / 2000
T NO : 08
DIK JALAN DALAM KOTA
ARINDA
giatan UMUM
OTAMADYA SAMARINDA
FORMULIR STANDAR UNTUK
REKAMAN ANALISA HARGA SATUAN
A. TENAGA
1 Pekerja Tidak Terlatih L.101 Jam 1.1667 9,000.00 10,500.00
2 Mandor L.061 Jam 0.1667 14,000.00 2,333.33
A PEKERJAAN UMUM
1 Papan Nama Kegiatan Ls 1.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 Tetap
B PEKERJAAN DRAINASE
1 Pekerjaan Galian Untuk Selokan Drainase dan Saluran Air M3 300.00 81,432.20 24,429,660.53 82,106.00 24,631,799.69 81,432.20 24,429,660.53 Tetap
C STRUKTUR
1 Pemancangan kayu ulin uk. 10 /10 M1 123.00 79,071.67 9,725,815.00 76,254.44 9,379,296.67 76,254.44 9,379,296.67 Nego
2 Papan Dinding 2/20 - 4M M2 120.00 132,336.11 15,880,333.33 134,004.44 16,080,533.33 132,336.11 15,880,333.33 Tetap
3 Struktur Kayu Ulin M3 3.46 6,375,233.33 22,071,057.80 6,433,753.33 22,273,654.04 6,375,233.33 22,071,057.80 Tetap
ASNOPY PIRADE,S.Hut
Direktur
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULLE)
2 PEKERJAAN DRAINASE
Pekerjaan Galian Untuk Selokan Drainase dan Saluran Air 300.00 M3 24,429,660.53 33.81% 33.81%
3 DIVISI 7 STRUKTUR
Pemancangan kayu ulin uk. 10 /10 123.00 M1 9,379,296.67 12.98% 6.49% 6.49% 50%
MENGETAHUI,
KONTRAKTOR
CV. BAMBU BORNEO
72,260,348.33
34,308,957.20
KEGIATAN : UPTD WILAYAH II KOTA SAMARINDA
PEKERJAAN : PENURAPAN DAN NORMALISASI JL. PANG. BENDAHARA
LOKASI : KECAMATAN SAMARINDA SEBERANG
PAGU DANA Rp 80,151,000.00
Evaluasi harga dilakukan terhadap Penawaran yang memenuhi Persyaratan (Evaluasi) Administrasi dan Teknis, dengan penilaian terhadap Harga Penawaran
meliputi :
a. Koreksi Aritmatika
b. Kewajaran Harga
I UMUM
1 Papan Nama Kegiatan Ls 1.00 500,000.00 500,000.00 500,000.00 500,000.00 0.00
II PEKERJAAN DRAINASE
1 Pekerjaan Galian Untuk Selokan Drainase dan Saluran Air M3 300.00 81,432.20 24,429,660.53 81,432.20 24,429,660.53 0.00
III STRUKTUR
1 Pemancangan kayu ulin uk. 10 /10 M1 123.00 76,254.44 9,379,296.67 76,254.44 9,379,296.67 0.00
2 Papan Dinding 2/20 - 4M M2 120.00 132,336.11 15,880,333.33 132,336.11 15,880,333.33
3 Struktur Kayu Ulin M3 3.46 6,375,233.33 22,071,057.80 6,375,233.33 22,071,057.80
b. Kewajaran harga