Professional Documents
Culture Documents
TALUD ( POT. I - I )
I Galian tanah biasa
1 Pondasi 0.40 X 0.40 X
0.40 X 0.40 X
LENING ( POT. II - II )
I Galian tanah biasa
ALI MAKRUP
Nip. 500 088 236
N KECAMATAN MANDIRAJA ( KLPK TANI " HIDAYAH INSANI " )
35.72 m Ka / Ki )
23.00 kn = 3.680 m3
0.00 Kr = 0.000 3.680 m3
23.00 = 3.680 m3
23.00 = 6.440 m3
0.00 = 0.000 m3
0.00 = 0.000 10.120 m3
p. 1 : 2 :3
6.75 = 1.890 1.890 m3
= 25.30 m2
= 12.15 37.45 m2
5.36 5.36 m3
= 3.12 3.12 m3
E PEKRJN :
= 10.328 m3
= 28.40 m3
p. 1 : 2 :3 1.89
= 83.16 m2
= 8.47 m3
9.60 kn = 1.536 m3
9.60 Kr = 1.536 m3
= 3.275 6.347 m3
9.60 = 1.536 m3
9.60 = 2.688 m3
9.60 = 1.536 m3
9.60 = 1.680 m3
= 3.275 10.715 m3
= 10.56 m2
= 10.56 m2
= 9.60 30.72 m2
2.53 2.53 m3
E PEKRJN :
= 6.347 m3
= 10.72 m3
= 30.72 m2
= 2.53 m3
35.72 m Ka / Ki )
35.72 kn = 5.715 m3
35.72 Kr = 5.715 11.430 m3
35.72 = 5.715 m3
35.72 = 10.001 m3
35.72 = 5.715 m3
35.72 = 10.001 31.432 m3
= 39.29 m2
= 39.29 78.58 m2
5.36 5.36 m3
E PEKRJN :
= 11.430 m3
= 31.43 m3
= 78.58 m2
= 5.36 m3
Banjarnegara Tgl : 2009
KONTRAKTOR PELAKSANA
NURBAGYO
Pelaksana
42.63
1.66
40.97
0.53
41.5
0.69
40.81 0.74 41.55
PEMERINTAH KABUPATEN BANJARNEGARA
DINAS PENGELOLAAN SUMBER DAYA AIR DAN
ENERGI, SUMBER DAYA MINERAL
Jl. Mayjend. Panjaitan No. 08 Telp. (0286) 591011 Banjarnegara 53415, Fax. (0286) 591298
Pemadat Timbunan
1 E.31 sewa-hari 0.0500 125,100.00 6,255.00
(Stamper
11 P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC : 5 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 2.7000 45,000.00 121,500.00
2 Tukang Batu L.02 OH 0.9000 55,000.00 49,500.00
3 Kepala Tukang L.03 OH 0.0900 65,000.00 5,850.00
4 Mandor L.04 OH 0.2700 65,000.00 17,550.00
JUMLAH TENAGA KERJA KERJA 194,400.00
B. BAHAN
1 Batu kali M.05 m3 1.2000 154,500.00 185,400.00
2 Pasir Pasang M.14.b m3 0.5440 167,300.00 91,011.20
3 Portland Cement M.15 kg 135.0000 1,450.00 195,750.00
JUMLAH BAHAN 472,161.20
C PERALATAN
1 Molen E.28.b unit/hari 0.1670 110,700.00 18,486.90
JUMLAH HARGA PERALATAN 18,486.90
12 P.03.a 1 m2. Siaran dengan mortar tipe M (untuk mutu PP tertentu setara dengan campuran 1 PC : 2 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 45,000.00 13,500.00
2 Tukang Batu L.02 OH 0.1500 55,000.00 8,250.00
3 Kepala Tukang L.03 OH 0.0150 65,000.00 975.00
4 Mandor L.04 OH 0.0300 65,000.00 1,950.00
JUMLAH TENAGA KERJA KERJA 24,675.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0120 167,300.00 2,007.60
2 Portland Cement M.15 kg 6.3400 1,450.00 9,193.00
JUMLAH BAHAN 11,200.60
C PERALATAN
JUMLAH HARGA PERALATAN 0.00
13 P.03.b 1 m2. Siaran dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 45,000.00 13,500.00
2 Tukang Batu L.02 OH 0.1500 55,000.00 8,250.00
3 Kepala Tukang L.03 OH 0.0150 65,000.00 975.00
4 Mandor L.04 OH 0.0300 65,000.00 1,950.00
JUMLAH TENAGA KERJA KERJA 24,675.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0180 167,300.00 3,011.40
2 Portland Cement M.15 kg 4.8400 1,450.00 7,018.00
JUMLAH BAHAN 10,029.40
C PERALATAN
14 P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 45,000.00 13,500.00
2 Tukang Batu L.02 OH 0.1500 55,000.00 8,250.00
3 Kepala Tukang L.03 OH 0.0150 65,000.00 975.00
4 Mandor L.04 OH 0.0150 65,000.00 975.00
JUMLAH TENAGA KERJA KERJA 23,700.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0160 167,300.00 2,676.80
2 Portland Cement M.15 kg 5.8400 1,450.00 8,468.00
JUMLAH BAHAN 11,144.80
C PERALATAN
15 P.04.e 1 m2. Plesteran tebal 1,5 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3840 45,000.00 17,280.00
2 Tukang Batu L.02 OH 0.1920 55,000.00 10,560.00
3 Kepala Tukang L.03 OH 0.0190 65,000.00 1,235.00
4 Mandor L.04 OH 0.0380 65,000.00 2,470.00
JUMLAH TENAGA KERJA KERJA 31,545.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0300 167,300.00 5,019.00
2 Portland Cement M.15 kg 7.7760 1,450.00 11,275.20
JUMLAH BAHAN 16,294.20
C PERALATAN
24 B.21 1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.2000 45,000.00 9,000.00
2 Tukang Kayu L.06 OH 0.6000 55,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.0600 65,000.00 3,900.00
4 Mandor L.04 OH 0.0200 65,000.00 1,300.00
JUMLAH TENAGA KERJA KERJA 47,200.00
B. BAHAN
1 Multiflex 12 mm M.38.d lbr 0.3500 159,300.00 55,755.00
2 Kaso 5/7 cm kayu tahu M.33.d m3 0.0200 2,565,000.00 51,300.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.2500 14,400.00 3,600.00
4 Minyak bekisting M.129 L 0.2000 34,200.00 6,840.00
JUMLAH BAHAN 117,495.00
C PERALATAN
25 B.22 1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 (tanpa perancah)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.2200 45,000.00 9,900.00
2 Tukang Kayu L.06 OH 0.6600 55,000.00 36,300.00
3 Kepala Tukang L.03 OH 0.0660 65,000.00 4,290.00
4 Mandor L.04 OH 0.0220 65,000.00 1,430.00
JUMLAH TENAGA KERJA KERJA 51,920.00
B. BAHAN
1 Papan 3/20 kayu tahun M.35.e m3 0.0400 2,565,000.00 102,600.00
2 Kaso 5/7 cm kayu tahu M.33.d m3 0.0200 2,565,000.00 51,300.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.4000 14,400.00 5,760.00
4 Minyak bekisting M.129 L 0.2000 34,200.00 6,840.00
JUMLAH BAHAN 166,500.00
C PERALATAN
JUMLAH HARGA PERALATAN 0.00
Diperiksa Direncana
Kepala Bidang PSDA Kepala Seksi Irigasi
Dinas PSDA dan ESDM Kab. Banjarnegara Dinas PSDA dan ESDM Kab. Banjarnegara
Mengetahui / Setuju :
Kepala Dinas Pengelolaan Sumber Daya Air dan
Energi, Sumber Daya mineral
Kabupaten Banjarnegara
kerikil
kg 1350 kg
m3
pasir beton
kg 1400 kg
m3 1 m3 1.8421052632
kerikil
kg 1350 kg
m3
pasir beton
kg 1400 kg
m3 1 m3 2.0231213873
kerikil
kg 1350 kg
m3
1765500
0.0105 26932.5
2,857,142.86
MUNDUR MENU MAJU
HARGA SATUAN
NO URAIAN SATUAN KODE
DASAR (Rp)
I. UPAH PEKERJA
1 Pekerja OH L.01 45,000.00
2 Mandor OH L.04 65,000.00
3 Tukang batu OH L.02 55,000.00
4 Kepala tukang OH L.03 65,000.00
5 Tukang Besi OH L.02 55,000.00
6 Tukang Kayu OH L.02 55,000.00
7 Tukang Gali OH L.02 45,000.00
Mengetahui / Setuju :
Kepala Dinas Pengelolaan Sumber Daya Air dan
Energi, Sumber Daya mineral
Kabupaten Banjarnegara
164,800.00 -10,300.00
167,800.00 -13,300.00
155,700.00 -35,700.00
161,700.00 5,600.00
204,900.00 -4,900.00
1,500.00 -50.00
203,900.00 66,100.00
15,400.00 -2,800.00
17,500.00 6,800.00
425,600.00 -14,600.00
2,781,000.00 -216,000.00
15,900.00 -1,500.00
370,000.00 -158,500.00
159,300.00 0.00
2,565,000.00 0.00
125,100.00 0.00
110,700.00 0.00
27,000.00 0.00
56,250.00 0.00
34,200.00 0.00
RENCANA ANGGARAN BIAYA ( RAB )
KECAMATAN : PURWANEGARA
DESA : MERTASARI
KOPTAN/GAPOKTAN/P3A/GP3A : MINA REJEKI
DI (DAERAH IRIGASI) : BLIMBING
VOLUME : 64.08 M3
HARGA SATUAN
No. URAIAN PEKERJAAN Sat Vol Analis Harga Satuan Jumlah Harga
Bahan (Rp.) Upah (Rp.) Bahan (Rp.) Upah (Rp.)
1 2 3 4 5 6 7 8 9
A PEKERJAAN SALURAN PJ. = 246.50 M' ( Ka = 123.25 M' dan Kiri = 123.25 M' )
1 Galian tanah biasa m³. 29.57 T.06.a 28,150.00 0.00 832,508.79
2 Pas. Bt belah camp. 1:4 m³. 64.08 P.01.d 462,600.00 189,000.00 29,642,044.66 12,110,562.99
3 Plesteran Camp 1:3 m². 172.52 P.04.b 10,576.00 24,000.00 1,824,520.15 4,140,363.42
4 Timbunan tanah kembali m³. 0.00 T.14.a 16,500.00 0.00 -
5 Alat Kerja Paket 0 Taksir
SUDONO SUSANTO
HARGA SATUAN
No. URAIAN PEKERJAAN Sat Vol Analis Harga Satuan Jumlah Harga
Bahan (Rp.) Upah (Rp.) Bahan (Rp.) Upah (Rp.)
1 2 3 4 5 6 7 8 9
A PEKERJAAN SALURAN PJ. = 239.90 M' ( Ka = 119.95 M' dan Kiri = 119.95 M' )
1 Galian tanah biasa m³. 28.78 T.06.a 28,150.00 0.00 810,217.10
2 Pas. Bt belah camp. 1:4 m³. 62.36 P.01.d 462,600.00 189,000.00 28,848,333.88 11,786,284.27
3 Plesteran Camp 1:3 m². 167.90 P.04.b 10,576.00 24,000.00 1,775,665.85 4,029,498.90
4 Timbunan tanah kembali m³. 0.00 T.14.a 16,500.00 0.00 -
5 Alat Kerja Paket 0 Taksir
SUDONO SUSANTO
HARGA SATUAN
No. URAIAN PEKERJAAN Sat Vol Analis Harga Satuan Jumlah Harga
Bahan (Rp.) Upah (Rp.) Bahan (Rp.) Upah (Rp.)
1 2 3 4 5 6 7 8 9
A PEKERJAAN SALURAN PJ. = 207.70 M' ( Ka = 103.85 M' dan Kiri = 103.85 M' )
1 Galian tanah biasa m³. 24.92 T.06.a 28,150.00 0.00 701,587.99
2 Pas. Bt belah camp. 1:4 m³. 54.00 P.01.d 462,600.00 189,000.00 24,980,520.23 10,206,049.12
3 Plesteran Camp 1:3 m². 145.39 P.04.b 10,576.00 24,000.00 1,537,595.09 3,489,247.56
4 Timbunan tanah kembali m³. T.14.a 16,500.00 0.00 -
5 Alat Kerja Paket 0 Taksir
SUDONO SUSANTO
B LAIN-LAIN
1 Alat Kerja Paket 0.00 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 29,366,619 15,633,381
DIBULATKAN 29,366,000.00 15,633,000.00
Terbilang "Empat Puluh Lima Juta Lima Ratus Sembilan Puluh Lima Ribu Rupiah"
SUKIRMAN
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 22,676,260 12,323,740
DIBULATKAN 22,676,000.00 12,323,000.00
Terbilang "Tiga Puluh Lima Juta Enam Ratus Ribu Rupiah"
SARIBUN
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 18,805,539.49 11,194,460.51
DIBULATKAN 18,805,000.00 11,194,000.00
Terbilang "Tiga Puluh Juta Enam Ratus Lima Ribu Rupiah"
Mandiraja Kulon, Maret 2015
……………………….
WASIRUN
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 29,193,108.97 15,806,891.03
DIBULATKAN 29,193,000.00 15,806,000.00
Terbilang "Empat Puluh Lima Juta Lima Ratus Delapan Puluh Ribu Rupiah"
KECAMATAN : MANDIRAJA
DESA : PANGGISARI
KOPTAN/GAPOKTAN/P3A/GP3A : KRIDA MARTANI 2A
DI (DAERAH IRIGASI) : SINGOMERTO
VOLUME : 48.68 M3
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 21,895,846.25 13,104,153.75
DIBULATKAN 21,895,000.00 13,104,000.00
Terbilang "Tiga Puluh Enam Juta Tiga Puluh Ribu Rupiah"
,
SURATNO
RENCANA ANGGARAN BIAYA ( RAB )
KECAMATAN : MANDIRAJA
DESA : BANJENGAN
KOPTAN/GAPOKTAN/P3A/GP3A : BERSATU 2
DI (DAERAH IRIGASI) : SINGOMERTO
VOLUME : 41.40 M3
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 18,918,977.46 11,081,022.54
DIBULATKAN 18,918,000.00 11,081,000.00
Terbilang "Tiga Puluh Juta Enam Ratus Lima Ribu Rupiah"
SUPANGAT
KECAMATAN :
DESA :
KOPTAN/GAPOKTAN/P3A/GP3A :
DI (DAERAH IRIGASI) :
VOLUME :
B LAIN-LAIN
1 Alat Kerja Paket 0 Taksir
2 Prasasti Bh 1.00 Taksir
JUMLAH 40,034,755.20 19,965,244.80
DIBULATKAN 40,034,000.00 19,965,000.00
1.1
,
Swadaya
1,800,000
1,550,000.00
AN
Harga Jumlah Semua 48,550,000.00 PJ. T= 0.40
Paket Alat (Rp.) 29.57 246.45 Galian tanah biasa 0.120 28,150.00
10 11 64.08 246.45 Pas. Bt belah camp. 1:5 0.260 651,600.00
172.52 246.45 Plesteran Camp 1:3 0.700 34,576.00
0.00 246.45 Timbunan tanah kembali 16,500.00
832,508.79
41,752,607.65
5,964,883.56 KEBUTUAN MATRIAL
- MACAM PEKERJAAN VOL. Bt. Belah pasir pas. Splait PC
250000 250,000.00 Galian tanah biasa 29.57
Pas. Bt. Belah camp. 1 : 5 64.08 76.89 34.86 8,650.402
Siaran camp. 1 : 2
250,000.00 48,800,000.00 Plesteran camp. 1 : 3 172.52 2.76 1,007.49
250,000.00 48,800,000.00 Timbunan tanah kembali -
76.89 37.62 0.00 9657.89
EDI PRAYITNO
1500000
1250000.00
AN
Harga Jumlah Semua 47,250,000.00 PJ. T= 0.40
Paket Alat (Rp.) 28.78 239.85 Galian tanah biasa 0.120 28,150.00
10 11 62.36 239.85 Pas. Bt belah camp. 1:5 0.260 651,600.00
167.90 239.85 Plesteran Camp 1:3 0.700 34,576.00
0.00 239.85 Timbunan tanah kembali 16,500.00
810,217.10
40,634,618.16
5,805,164.74 KEBUTUAN MATRIAL
- MACAM PEKERJAAN VOL. Bt. Belah pasir pas. Splait PC
250000.00 250,000.00 Galian tanah biasa 28.78
Pas. Bt. Belah camp. 1 : 5 62.36 74.83 33.92 8,418.774
250,000.00 47,500,000.00 Siaran camp. 1 : 2
250,000.00 47,500,000.00 Plesteran camp. 1 : 3 167.90 2.69 980.51
Timbunan tanah kembali -
74.83 36.61 0.00 9399.29
Mertasari, Maret 2015
KEBUTUAN UPAH
Diukur dan dihitung oleh : MACAM PEKERJAAN VOL Pelaksana Pengawas Mandor Tukang
Ketua Kelompok Tani Galian tanah biasa 28.78 1.62
BUMI MULYO Pas. Bt. Belah camp. 1 : 4 62.36 16.84 56.13
Siaran camp. 1 : 2 -
Plesteran camp. 1 : 3 167.90 2.52 25.18
Timbunan tanah dipadatka - 0.00
81.31
SEKHUN
1200000
915000.00
AN
Harga Jumlah Semua 40,915,000.00 PJ. T= 0.40
Paket Alat (Rp.) 24.92 207.69 Galian tanah biasa 0.120 28,150.00
10 11 54.00 207.69 Pas. Bt belah camp. 1:5 0.260 651,600.00
145.39 207.69 Plesteran Camp 1:3 0.700 34,576.00
0.00 207.69 Timbunan tanah kembali 16,500.00
701,587.99
35,186,569.35
5,026,842.66 KEBUTUAN MATRIAL
- MACAM PEKERJAAN VOL. Bt. Belah pasir pas. Splait PC
285000.00 285,000.00 Galian tanah biasa 24.92
Pas. Bt. Belah camp. 1 : 5 54.00 64.80 29.38 7,290.035
285,000.00 41,200,000.00 Siaran camp. 1 : 2
285,000.00 41,200,000.00 Plesteran camp. 1 : 3 145.39 2.33 849.05
Timbunan tanah kembali -
64.80 31.70 0.00 8139.09
Mertasari, Maret 2015
1200000
Err:509
Harga Jumlah Semua
Paket Alat (Rp.)
10 11 45,000,000.00 PJ. T= 0.60
25.85 161.54 Galian tanah biasa 0.160 28,150.00
59.77 161.54 Pas. Bt belah camp. 1:4 0.370 654,600.00
727,581.06 145.39 161.54 Plesteran Camp 1:3 0.900 34,576.00
39,125,574.50 7.27 161.54 Timbunan tanah dipadatkan 0.045 16,500.00
5,026,900.18
119,944.26
KEBUTUAN MATRIAL
MACAM PEKERJAAN VOL. Bt. Belah pasir pas. Splait PC
245000.00 245,000.00 Galian tanah biasa 25.85
350,000.00 350,000.00 Pas. Bt. Belah camp. 1 : 5 59.77 71.72 32.51 8,068.977
595,000.00 45,595,000.00 Siaran camp. 1 : 2
595,000.00 45,595,000.00 Plesteran camp. 1 : 3 145.39 2.33 849.06
Timbunan tanah kembali 7.27
71.72 34.84 0.00 8918.04
Purwasaba, Maret 2015 178.3607456593
1200000
1200000.00
1200000
1200000.00
1200000
1200000.00
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
m' No Uraian Kode Satuan Koefisien
(Rp)
3,378.00 123.23 A. TENAGA KERJA
169,416.00 1 Pekerja L.01 OH 2.7000 50,000.00
24,203.20 2 Tukang Batu L.02 OH 0.9000 60,000.00
- 3 Kepala Tukang L.03 OH 0.0900
196,997.20 4 Mandor L.04 OH 0.2700
JUMLAH TENAGA KERJA KERJA
2.59 51.75
0.00
241.41
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
m' A. TENAGA KERJA
3,378.00 1 Pekerja L.01 OH 2.7000 50,000.00
169,416.00 2 Tukang Batu L.02 OH 0.9000 60,000.00
24,203.20 3 Kepala Tukang L.03 OH 0.0900
- 4 Mandor L.04 OH 0.2700
196,997.20 JUMLAH TENAGA KERJA KERJA
B. BAHAN
besi beton 1 Batu kali M.05 m3 1.2000 160,000.00
2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
0.00 JUMLAH HARGA PERALATAN
Tukang kep Pekrja
16.20
5.61 168.38
2.52 50.37
0.00
234.95
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
m' A. TENAGA KERJA
3,378.00 103.85 1 Pekerja L.01 OH 2.7000 50,000.00
169,416.00 2 Tukang Batu L.02 OH 0.9000 60,000.00
24,203.20 3 Kepala Tukang L.03 OH 0.0900
- 4 Mandor L.04 OH 0.2700
196,997.20 JUMLAH TENAGA KERJA KERJA
B. BAHAN
besi beton 1 Batu kali M.05 m3 1.2000 160,000.00
2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
0.00 JUMLAH HARGA PERALATAN
2.18 43.62
0.00
203.45
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m 1 Pekerja L.01 OH 2.7000 50,000.00
4,504.00 80.77 2 Tukang Batu L.02 OH 0.9000 60,000.00
242,202.00 3 Kepala Tukang L.03 OH 0.0900
31,118.40 4 Mandor L.04 OH 0.2700
742.50 JUMLAH TENAGA KERJA KERJA
278,566.90
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
2.18 43.62
2.40
221.95
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m' 1 Pekerja L.01 OH 2.7000 50,000.00
3,378.00 88.26 2 Tukang Batu L.02 OH 0.9000 60,000.00
170,196.00 3 Kepala Tukang L.03 OH 0.0900
24,203.20 4 Mandor L.04 OH 0.2700
495.00 JUMLAH TENAGA KERJA KERJA
198,272.20
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m' 1 Pekerja L.01 OH 2.7000 50,000.00
3,378.00 70.89 2 Tukang Batu L.02 OH 0.9000 60,000.00
180,245.00 3 Kepala Tukang L.03 OH 0.0900
27,340.80 4 Mandor L.04 OH 0.2700
618.75 JUMLAH TENAGA KERJA KERJA
211,582.55
B. BAHAN
1 Batu kali M.05 m3 1.2000 137,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 125,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
1.70 34.03
1.75
158.30
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m' 1 Pekerja L.01 OH 2.7000 50,000.00
3,378.00 66.74 2 Tukang Batu L.02 OH 0.9000 60,000.00
193,107.00 3 Kepala Tukang L.03 OH 0.0900
27,660.80 4 Mandor L.04 OH 0.2700
618.75 JUMLAH TENAGA KERJA KERJA
224,764.55
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
1.60 32.03
1.65
149.01
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m' 1 Pekerja L.01 OH 2.7000 50,000.00
3,378.00 100.10 2 Tukang Batu L.02 OH 0.9000 60,000.00
193,107.00 3 Kepala Tukang L.03 OH 0.0900
27,660.80 4 Mandor L.04 OH 0.2700
618.75 JUMLAH TENAGA KERJA KERJA
224,764.55
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 150,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
2.40 48.05
2.48
223.52
1.99 39.87
2.64
185.58
T.06.a 1 m3. Galian tanah biasa sedalam ≤ 1 m
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.5630 50,000.00
2 Mandor L.04 OH 0.0563
JUMLAH TENAGA KERJA KERJA
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A. TENAGA KERJA
m' 1 Pekerja L.01 OH 2.7000 50,000.00
3,378.00 70.18 2 Tukang Batu L.02 OH 0.9000 60,000.00
182,251.00 3 Kepala Tukang L.03 OH 0.0900
27,500.80 4 Mandor L.04 OH 0.2700
618.75 JUMLAH TENAGA KERJA KERJA
213,748.55
B. BAHAN
1 Batu kali M.05 m3 1.2000 137,500.00
besi beton 2 Pasir Pasang M.14.b m3 0.5440 137,500.00
3 Portland Cement M.15 kg 135.0000 1,400.00
JUMLAH BAHAN
C PERALATAN
1 Molen E.28.b unit/hari 0.1670
JUMLAH HARGA PERALATAN
0.00
1.68 33.68
1.74
156.69
Harga Satuan
2,546,400 No Uraian Kode Satuan Koefisien
(Rp)
646,520 A. TENAGA KERJA
3,294,260 3,294,260 1 Pekerja L.01 OH 0.5630 45,000.00
m' 2 Mandor L.04 OH 0.0563
8,613.90 35.84 617,461.96 24.37 24.37 JUMLAH TENAGA KERJA KERJA
439,254.00 27.84 31,486,624.42 49.46
67,884.60 4,866,106.86 150.53 P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan cam
Harga Satuan
371.25 26,611.96 1.79 No Uraian Kode Satuan Koefisien
(Rp)
516,123.75 40,291,065 A. TENAGA KERJA
m' (291,065.20) 1 Pekerja L.01 OH 2.7000 45,000.00
3,040.20 92.06 1,061,331.16 2 Tukang Batu L.02 OH 0.9000 55,000.00
187,797.00 51,424,936.42 3 Kepala Tukang L.03 OH 0.0900
25,860.80 7,406,930.46 4 Mandor L.04 OH 0.2700
556.88 106,801.96 JUMLAH TENAGA KERJA KERJA
217,254.88 60,000,000
B. BAHAN
3.44 68.74
2.37
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
No Uraian Kode Satuan Koefisien
Jumlah Harga (Rp) A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000
28,150.00 2 Tukang Batu L.02 OH 0.1500
0.00 3 Kepala Tukang L.03 OH 0.0150
28,150.00 4 Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA KERJ
ntu setara dengan campuran 1 PC : 5 PP) B. BAHAN
Jumlah Harga (Rp) 1 Pasir Pasang M.14.b m3 0.0160
2 Portland Cement M.15 kg 5.8400
135,000.00 JUMLAH BAHA
54,000.00 C PERALATAN
0.00
0.00 JUMLAH HARGA PERALATA
189,000.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
No Uraian Kode Satuan Koefisien
Jumlah Harga (Rp) A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000
28,150.00 2 Tukang Batu L.02 OH 0.1500
0.00 3 Kepala Tukang L.03 OH 0.0150
28,150.00 4 Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA KERJ
ntu setara dengan campuran 1 PC : 5 PP) B. BAHAN
Jumlah Harga (Rp) 1 Pasir Pasang M.14.b m3 0.0160
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
No Uraian Kode Satuan Koefisien
Jumlah Harga (Rp) A. TENAGA KERJA
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
No Uraian Kode Satuan Koefisien
Jumlah Harga (Rp) A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000
28,150.00 2 Tukang Batu L.02 OH 0.1500
0.00 3 Kepala Tukang L.03 OH 0.0150
28,150.00 4 Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA KERJ
ntu setara dengan campuran 1 PC : 5 PP) B. BAHAN
Jumlah Harga (Rp) 1 Pasir Pasang M.14.b m3 0.0160
2 Portland Cement M.15 kg 5.8400
135,000.00 JUMLAH BAHA
54,000.00 C PERALATAN
0.00
0.00 JUMLAH HARGA PERALATA
189,000.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu set
No Uraian Kode Satuan Koefisien
Jumlah Harga (Rp) A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000
28,150.00 2 Tukang Batu L.02 OH 0.1500
0.00 3 Kepala Tukang L.03 OH 0.0150
28,150.00 4 Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA KERJ
ntu setara dengan campuran 1 PC : 5 PP) B. BAHAN
Jumlah Harga (Rp) 1 Pasir Pasang M.14.b m3 0.0160
2 Portland Cement M.15 kg 5.8400
135,000.00 JUMLAH BAHA
54,000.00 C PERALATAN
0.00
0.00 JUMLAH HARGA PERALATA
189,000.00
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
KEBUTUAN MATRIAL
k mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Harga Satuan Jumlah Harga
(Rp) (Rp)
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
#REF!
AH HARGA PERALATAN 0.00
34,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
JUMLAH BAHAN 0.00
16,500.00
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
k mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Harga Satuan Jumlah Harga
(Rp) (Rp)
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
125,000.00 2,000.00
1,400.00 8,176.00
JUMLAH BAHAN 10,176.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
JUMLAH BAHAN 0.00
16,500.00
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
16,500.00
50,000.00 15,000.00
60,000.00 9,000.00
0.00
0.00
TENAGA KERJA KERJA 24,000.00
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
AH HARGA PERALATAN 0.00
34,576.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
125,000.00 2,000.00
1,400.00 8,176.00
JUMLAH BAHAN 10,176.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
LANTAI
Galian 0.3 X 0.6 X 8 = 1.44
50,000.00 15,000.00 Pas 0.3 X 0.6 X 8 = 1.44
60,000.00 9,000.00 Plesteran 0.6 X 8 = 4.8
0.00
0.00
TENAGA KERJA KERJA 24,000.00
137,500.00 2,200.00
1,400.00 8,176.00
JUMLAH BAHAN 10,376.00
50,000.00 16,500.00
0.00
TENAGA KERJA KERJA 16,500.00
16,500.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
LANTAI
150,000.00 2,400.00
1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
14,850.00
RENCANA USULAN KERJA KELOMPOK ( RUKK )
KEGIATAN PENGEMBANGAN JARINGAN IRIGASI TANAMAN PANGAN
KECAMATAN : PURWANEGARA
DESA : MERTASARI
POKTAN/GAPOKTAN/P3A/GP3A : MINA REJEKI
DI (DAERAH IRIGASI) : BLIMBING
VOLUME 64.08 M3
Mertasari, Mar
KECAMATAN : PURWANEGARA
DESA : MERTASARI
POKTAN/GAPOKTAN/P3A/GP3A : BUMI MULYO
DI (DAERAH IRIGASI) : BLIMBING
VOLUME 62.36 M3
Mertasari, Mare
KECAMATAN : MANDIRAJA
DESA : PURWASABA
POKTAN/GAPOKTAN/P3A/GP3A : MEKAR SARI
DI (DAERAH IRIGASI)
VOLUME 59.77 M3
Kaliwungu, Mare
SARIBUN SARYOTO
KECAMATAN : MANDIRAJA
DESA : MANDIRAJA KULON
POKTAN/GAPOKTAN/P3A/GP3A : MASTUTI I
DI (DAERAH IRIGASI)
VOLUME 41.83 M3
Mandiraja Kulon, M
………………………. SADULAH
KECAMATAN : MANDIRAJA
DESA : SOMAWANGI
POKTAN/GAPOKTAN/P3A/GP3A : SETYA MULYA TANI
DI (DAERAH IRIGASI)
VOLUME 39.37 M3
Somawangi, Mar
WASIRUN SUJERI
KECAMATAN : MANDIRAJA
DESA : SIMBANG
POKTAN/GAPOKTAN/P3A/GP3A : KRIDA CANDRA TANI
DI (DAERAH IRIGASI)
VOLUME 59.06 M3
Simbang, Mare
KECAMATAN : MANDIRAJA
DESA : PANGGISARI
POKTAN/GAPOKTAN/P3A/GP3A : KRIDA MARTANI 2A
DI (DAERAH IRIGASI) : SINGOMERTO
VOLUME 48.68 M3
1. Bahan
1.1 Portland Cemen ( PC ) 147 0 147 Zak 70,000.00 -
1.2 Batu Kali 58 0 58 M³ 137,500.00 -
1.3 Pasir Pasang 29 0 29 M³ 125,000.00 -
(Sub Total 1) -
2. Upah
2.1 Pekerja 186 0.00 186 OH 50,000.00 -
2.2 Tukang Batu 64 0.00 64 OH 60,000.00 -
(Sub Total 2) -
3. Alat
3.1 Ember 18.00 18.00 0 Bh. 10,000.00 180,000.00
3.2 Benang 8.00 8.00 0 Rol 2,500.00 20,000.00
3.3 Angkong 1.00 1.00 0 Bh. 450,000.00 450,000.00
3.4 Ayakan pasir 1.50 1.50 0 M' 20,000.00 30,000.00
(Sub Total 3) 680,000.00
4. Lain-lain
4.1 Prasasti 1.00 1.00 0 Bh. 350,000.00 350,000.00
Panggisari, Mare
SURATNO
KECAMATAN : MANDIRAJA
DESA : BANJENGAN
POKTAN/GAPOKTAN/P3A/GP3A : BERSATU 2
DI (DAERAH IRIGASI) : SINGOMERTO
VOLUME 41.40 M3
1. Bahan
1.1 Portland Cemen ( PC ) 125 0 125 Zak 70,000.00 -
1.2 Batu Kali 50 0 50 M³ 137,500.00 -
1.3 Pasir Pasang 24 0 24 M³ 137,500.00 -
(Sub Total 1) -
2. Upah
2.1 Pekerja 157 0.00 157 OH 50,000.00 -
2.2 Tukang Batu 54 0.00 54 OH 60,000.00 -
(Sub Total 2) -
3. Alat
3.1 Ember 20.00 20.00 0 Bh. 10,000.00 200,000.00
3.2 Benang 10.00 10.00 0 Rol 2,500.00 25,000.00
3.3 Ayakan pasir 1.50 1.50 0 M' 20,000.00 30,000.00
Banjengan, Mare
Mengetahui Dan menyetujui, Diukur dan dihitun
Kepala Desa Banjengan Ketua Kelompok
Kecamatan Mandiraja
Dari
Bantuan Jumlah Total
Pemerintah
13,521,046.80 13,521,046.80
12,302,794.15 12,302,794.15
5,642,723.86 5,642,723.86
31,466,564.80 31,466,564.80
10,520,638.06 12,070,638.06
5,012,797.14 5,012,797.14
15,533,435.20 17,083,435.20
0.00 200,000.00
0.00 30,000.00
0.00 20,000.00
- 250,000.00
47,000,000.00 48,800,000.00
DARI SWADAYA 1,800,000.00
DARI DANA BANTUAN 47,000,000.00
JUMLAH TOTAL 48,800,000.00
Rupiah
EDI PRAYITNO
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
13,159,000.23 13,159,000.23
11,973,368.15 11,973,368.15
5,491,631.35 5,491,631.35
30,623,999.73 30,623,999.73
10,497,428.39 11,747,428.39
4,878,571.88 4,878,571.88
15,376,000.27 16,626,000.27
0.00 200,000.00
0.00 20,000.00
0.00 30,000.00
- 250,000.00
46,000,000.00 47,500,000.00
DARI SWADAYA 1,500,000.00
DARI DANA BANTUAN 46,000,000.00
JUMLAH TOTAL 47,500,000.00
piah"
Mertasari, Maret 2015
SEKHUN
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
11,394,719.46 11,394,719.46
10,368,049.90 10,368,049.90
4,755,345.96 4,755,345.96
26,518,115.32 26,518,115.32
9,257,402.81 10,172,402.81
4,224,481.87 4,224,481.87
13,481,884.68 14,396,884.68
0.00 200,000.00
0.00 25,000.00
0.00 60,000.00
- 285,000.00
40,000,000.00 41,200,000.00 915000.00
DARI SWADAYA 1,200,000.00 18.3
DARI DANA BANTUAN 40,000,000.00
JUMLAH TOTAL 41,200,000.00
ah"
PUJI RIYADI
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
11,097,307.33 11,097,307.33
4,536,073.74 4,536,073.74
15,633,381.07 15,633,381.07
- 200,000.00
- 15,000.00
- 30,000.00
- 245,000.00
- -
- -
45,000,000.00 45,245,000.00
DARI SWADAYA 595,000.00
DARI DANA BANTUAN 45,000,000.00
JUMLAH TOTAL 45,595,000.00
a Ribu Rupiah"
Purwasaba, Maret 2015
SUYUD
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
9,684,726.35 9,684,726.35
8,949,817.47 8,949,817.47
4,041,716.39 4,041,716.39
22,676,260.21 22,676,260.21
8,733,221.30 8,733,221.30
3,590,518.49 3,590,518.49
12,323,739.79 12,323,739.79
- 200,000.00
- 20,000.00
- 30,000.00
- 250,000.00
- -
- -
35,000,000.00 35,250,000.00
DARI SWADAYA 600,000.00
DARI DANA BANTUAN 35,000,000.00
JUMLAH TOTAL 35,600,000.00
ah"
SARYOTO
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
8,832,836.17 8,832,836.17
6,901,561.59 6,901,561.59
3,071,141.74 3,071,141.74
18,805,539.49 18,805,539.49
7,914,889.48 7,914,889.48
3,279,571.02 3,279,571.02
11,194,460.51 11,194,460.51
- 200,000.00
- 25,000.00
- 30,000.00
- 255,000.00
- -
- -
30,000,000.00 30,255,000.00
DARI SWADAYA 605,000.00
DARI DANA BANTUAN 30,000,000.00
JUMLAH TOTAL 30,605,000.00
ah"
SADULAH
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
8,314,807.65 8,314,807.65
7,678,034.64 7,678,034.64
3,469,230.36 3,469,230.36
19,462,072.64 19,462,072.64
7,450,696.74 7,450,696.74
3,087,230.62 3,087,230.62
10,537,927.36 10,537,927.36
- 150,000.00
- 20,000.00
- 30,000.00
- 200,000.00
- 350,000.00
-
- 350,000.00
30,000,000.00 30,550,000.00
DARI SWADAYA 550,000.00
DARI DANA BANTUAN 30,000,000.00
JUMLAH TOTAL 30,550,000.00
upiah"
SUJERI
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan Jumlah Total
Pemerintah
12,472,211.48 12,472,211.48
11,517,051.96 11,517,051.96
5,203,845.54 5,203,845.54
29,193,108.97 29,193,108.97
11,176,045.11 11,176,045.11
4,630,845.92 4,630,845.92
15,806,891.03 15,806,891.03
- 180,000.00
- 20,000.00
- 30,000.00
- 230,000.00
- 350,000.00
-
- 350,000.00
45,000,000.00 45,580,000.00
DARI SWADAYA 580,000.00
DARI DANA BANTUAN 45,000,000.00
JUMLAH TOTAL 45,580,000.00
ibu Rupiah"
HANTOPO
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan
Jumlah Total
Pemerintah
10,287,372.08 10,287,372.08
8,032,350.32 8,032,350.32
3,576,123.84 3,576,123.84
21,895,846.25 21,895,846.25
9,279,186.05 9,279,186.05
3,824,967.70 3,824,967.70
13,104,153.75 13,104,153.75
- 180,000.00
- 20,000.00
- 450,000.00
- 30,000.00
- 680,000.00
- 350,000.00
-
- 350,000.00
35,000,000.00 36,030,000.00
DARI SWADAYA 1,030,000.00
DARI DANA BANTUAN 35,000,000.00
JUMLAH TOTAL 36,030,000.00
ah"
ADI KURNIAWAN
ALI MAKRUP
NIP. 19600302 198811 1 001
KK )
MAN PANGAN
Dari
Bantuan
Jumlah Total
Pemerintah
8,743,329.49 8,743,329.49
6,831,625.29 6,831,625.29
3,344,022.68 3,344,022.68
18,918,977.46 18,918,977.46
7,834,684.73 7,834,684.73
3,246,337.81 3,246,337.81
11,081,022.54 11,081,022.54
- 200,000.00
- 25,000.00
- 30,000.00
- 255,000.00
- 350,000.00
-
- 350,000.00
30,000,000.00 30,605,000.00
DARI SWADAYA 605,000.00
DARI DANA BANTUAN 30,000,000.00
JUMLAH TOTAL 30,605,000.00
ah"
Achmad Nursalim
ALI MAKRUP
NIP. 19600302 198811 1 001
RENCANA USULAN KERJA KELOMPOK ( RUKK )
KEGIATAN PENGEMBANGAN JARINGAN IRIGASI TANAMAN PANGAN
KECAMATAN : PURWANEGARA
DESA : MERTASARI
POKTAN/GAPOKTAN/P3A/GP3A : MINA REJEKI
DI (DAERAH IRIGASI) : BLIMBING
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 13,521,046.80 13,521,046.80
1.2 Batu Kali - 12,302,794.15 12,302,794.15
1.3 Pasir Pasang - 5,642,723.86 5,642,723.86
(Sub Total 1) - 31,466,564.80 31,466,564.80
II Upah
2.1 Pekerja 1,550,000.00 10,520,638.06 12,070,638.06
2.2 Tukang Batu - 5,012,797.14 5,012,797.14
(Sub Total 2) 1,550,000.00 15,533,435.20 17,083,435.20
III Alat
3.1 Ember 200,000.00 0.00 200,000.00
3.2 Benang 30,000.00 0.00 30,000.00
3.3 Ayakan pasir 20,000.00 0.00 20,000.00
(Sub Total 3) 250000.00 0.00 250000.00
Total Biaya ( 1 + 2+3 ) 1,800,000.00 47,000,000.00 48,800,000.00
DARI SWADAYA 1,800,000.00
DARI DANA BANTUAN 47,000,000.00
JUMLAH TOTAL 48,800,000.00
Terbilang " Empat Puluh Delapan Juta Delapan Ratus Ribu Rupiah
KECAMATAN : PURWANEGARA
DESA : MERTASARI
POKTAN/GAPOKTAN/P3A/GP3A : BUMI MULYO
DI (DAERAH IRIGASI) : BLIMBING
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 13,159,000.23 13,159,000.23
1.2 Batu Kali - 11,973,368.15 11,973,368.15
1.3 Pasir Pasang - 5,491,631.35 5,491,631.35
(Sub Total 1) - 30,623,999.73 30,623,999.73
II Upah
2.1 Pekerja 1,250,000.00 10,497,428.39 11,747,428.39
2.2 Tukang Batu - 4,878,571.88 4,878,571.88
(Sub Total 2) 1,250,000.00 15,376,000.27 16,626,000.27
III Alat
3.1 Ember 200,000.00 - 200,000.00
3.2 Benang 20,000.00 - 20,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 250,000.00 - 250,000.00
Total Biaya ( 1 + 2+3 ) 1,500,000.00 46,000,000.00 47,500,000.00
DARI SWADAYA 1,500,000.00
DARI DANA BANTUAN 46,000,000.00
JUMLAH TOTAL 47,500,000.00
Terbilang " Empat Puluh Tujuh Juta Lima Ratus Ribu Rupiah"
KECAMATAN : PURWANEGARA
DESA : MERTASARI
POKTAN/GAPOKTAN/P3A/GP3A : TIRTA SARI TANI
DI (DAERAH IRIGASI) : BLIMBING
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 11,394,719.46 11,394,719.46
1.2 Batu Kali - 10,368,049.90 10,368,049.90
1.3 Pasir Pasang - 4,755,345.96 4,755,345.96
(Sub Total 1) - 26,518,115.32 26,518,115.32
II Upah
2.1 Pekerja 915,000.00 9,257,402.81 10,172,402.81
2.2 Tukang Batu - 4,224,481.87 4,224,481.87
(Sub Total 2) 915,000.00 13,481,884.68 14,396,884.68
III Alat
3.1 Ember 200,000.00 0.00 200,000.00
3.2 Benang 25,000.00 0.00 25,000.00
3.3 Ayakan pasir 60,000.00 0.00 60,000.00
(Sub Total 3) 285000.00 0.00 285000.00
Total Biaya ( 1 + 2+3 ) 1200000.00 40000000.00 41200000.00
DARI SWADAYA 1,200,000.00
DARI DANA BANTUAN 40,000,000.00
JUMLAH TOTAL 41,200,000.00
Terbilang "Empat Puluh Satu Juta Dua Ratus Ribu Rupiah"
KECAMATAN : MANDIRAJA
DESA : PURWASABA
POKTAN/GAPOKTAN/P3A/GP3A : MEKAR SARI
DI (DAERAH IRIGASI)
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 12,485,252.20 12,485,252.20
1.2 Batu Kali - 11,655,189.47 11,655,189.47
1.3 Pasir Pasang - 5,226,177.27 5,226,177.27
(Sub Total 1) - 29,366,618.93 29,366,618.93
II Upah
2.1 Pekerja - 11,097,307.33 11,097,307.33
2.2 Tukang Batu - 4,536,073.74 4,536,073.74
(Sub Total 2) - 15,633,381.07 15,633,381.07
III Alat
3.1 Ember 200,000.00 - 200,000.00
3.2 Benang 15,000.00 - 15,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 245,000.00 - 245,000.00
IV 4. Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
KECAMATAN : MANDIRAJA
DESA : KALIWUNGU
POKTAN/GAPOKTAN/P3A/GP3A : MARSUDI TANI
DI (DAERAH IRIGASI)
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
i Bahan
1.1 Portland Cemen ( PC ) - 9,684,726.35 9,684,726.35
1.2 Batu Kali - 8,949,817.47 8,949,817.47
1.3 Pasir Pasang - 4,041,716.39 4,041,716.39
(Sub Total 1) - 22,676,260.21 22,676,260.21
II 2. Upah
2.1 Pekerja - 8,733,221.30 8,733,221.30
2.2 Tukang Batu - 3,590,518.49 3,590,518.49
(Sub Total 2) - 12,323,739.79 12,323,739.79
III Alat
3.1 Ember 200,000.00 - 200,000.00
3.2 Benang 20,000.00 - 20,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 250,000.00 - 250,000.00
IV Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
SARIBUN SARYOTO
KECAMATAN : MANDIRAJA
DESA : MANDIRAJA KULON
POKTAN/GAPOKTAN/P3A/GP3A : MASTUTI I
DI (DAERAH IRIGASI)
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 8,832,836.17 8,832,836.17
1.2 Batu Kali - 6,901,561.59 6,901,561.59
1.3 Pasir Pasang - 3,071,141.74 3,071,141.74
(Sub Total 1) - 18,805,539.49 18,805,539.49
II Upah
2.1 Pekerja - 7,914,889.48 7,914,889.48
2.2 Tukang Batu - 3,279,571.02 3,279,571.02
(Sub Total 2) - 11,194,460.51 11,194,460.51
III Alat
3.1 Ember 200,000.00 - 200,000.00
3.2 Benang 25,000.00 - 25,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 255,000.00 - 255,000.00
IV Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
………………………. SADULAH
KECAMATAN : MANDIRAJA
DESA : SOMAWANGI
POKTAN/GAPOKTAN/P3A/GP3A : SETYA MULYA TANI
DI (DAERAH IRIGASI)
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 8,314,807.65 8,314,807.65
1.2 Batu Kali - 7,678,034.64 7,678,034.64
1.3 Pasir Pasang - 3,469,230.36 3,469,230.36
(Sub Total 1) - 19,462,072.64 19,462,072.64
II Upah
2.1 Pekerja - 7,450,696.74 7,450,696.74
2.2 Tukang Batu - 3,087,230.62 3,087,230.62
(Sub Total 2) - 10,537,927.36 10,537,927.36
III Alat
3.1 Ember 150,000.00 - 150,000.00
3.2 Benang 20,000.00 - 20,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 200,000.00 - 200,000.00
IV Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
WASIRUN SUJERI
KECAMATAN : MANDIRAJA
DESA : SIMBANG
POKTAN/GAPOKTAN/P3A/GP3A : KRIDA CANDRA TANI
DI (DAERAH IRIGASI)
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 12,472,211.48 12,472,211.48
1.2 Batu Kali - 11,517,051.96 11,517,051.96
1.3 Pasir Pasang - 5,203,845.54 5,203,845.54
(Sub Total 1) - 29,193,108.97 29,193,108.97
II Upah
2.1 Pekerja - 11,176,045.11 11,176,045.11
2.2 Tukang Batu - 4,630,845.92 4,630,845.92
(Sub Total 2) - 15,806,891.03 15,806,891.03
III Alat
3.1 Ember 180,000.00 - 180,000.00
3.2 Benang 20,000.00 - 20,000.00
3.3 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 230,000.00 - 230,000.00
IV Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
KECAMATAN : MANDIRAJA
DESA : PANGGISARI
POKTAN/GAPOKTAN/P3A/GP3A : KRIDA MARTANI 2A
DI (DAERAH IRIGASI) : SINGOMERTO
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 10,287,372.08 10,287,372.08
1.2 Batu Kali - 8,032,350.32 8,032,350.32
1.3 Pasir Pasang - 3,576,123.84 3,576,123.84
(Sub Total 1) - 21,895,846.25 21,895,846.25
II Upah
2.1 Pekerja - 9,279,186.05 9,279,186.05
2.2 Tukang Batu - 3,824,967.70 3,824,967.70
(Sub Total 2) - 13,104,153.75 13,104,153.75
III Alat
3.1 Ember 180,000.00 - 180,000.00
3.2 Benang 20,000.00 - 20,000.00
3.3 Angkong 450,000.00 -
3.4 Ayakan pasir 30,000.00 - 30,000.00
(Sub Total 3) 680,000.00 - 230,000.00
IV Lain-lain
4.1 Prasasti 350,000.00 - 350,000.00
KECAMATAN : MANDIRAJA
DESA : BANJENGAN
POKTAN/GAPOKTAN/P3A/GP3A : BERSATU 2
DI (DAERAH IRIGASI) : SINGOMERTO
Biaya (Rupiah)
No. Kegiatan Partisipasi Jumlah Total Keterangan
Pemerintah
Masyarakat
1 2 3 4 5 6
I Bahan
1.1 Portland Cemen ( PC ) - 8,743,329.49 8,743,329.49
1.2 Batu Kali - 6,831,625.29 6,831,625.29
1.3 Pasir Pasang - 3,344,022.68 3,344,022.68
(Sub Total 1) - 18,918,977.46 18,918,977.46
II Upah
2.1 Pekerja - 7,834,684.73 7,834,684.73
2.2 Tukang Batu - 3,246,337.81 3,246,337.81
(Sub Total 2) - 11,081,022.54 11,081,022.54
III Alat
3.1 Ember 200,000.00 - 200,000.00
3.2 Benang 25,000.00 - 25,000.00
3.3 Ayakan pasir 30,000.00 -
2 PASANGAN BATU
1 GALIAN TANAH
1). 0.30 X 0.40 X 80.07 kanan 9.61
JUMLAH GALIAN :
2 PASANGAN BATU
1) 0.30 X 0.40 X 80.07 kanan 9.61
2) 0.30 + 0.40 X 0.50 X 80.07 kanan 14.01
JUMLAH PASANGAN :
3 PLESTERAN
0.50 + 0.30 X 80.07 kanan 64.06
0,40 0,60 0,40 0.50 + 0.30 X 80.07 kiri 64.06
JUMLAH PLESTERAN :
4 TIMBUNAN
0.20 X 0.50 X 80.07 4.00
2.0
0.20 X 0.50 X 80.07 4.00
2.0
POTONGAN I - I
JUMLAH TIMBUNAN :
Volume Lening :
Galian
Pasangan
Plesteran
Timbunan
Total Volume
Galian
Pasangan
Plesteran
Timbunan
MENGETAHUI : Panggisari, Maret 2015
KEPALA DESA PANGGISARI KETUA KELOMPOK TANI
KRIDA MARTANI 2A
VOLUME
No. SKET GAMBAR URAIAN PERHITUNGAN
SUB TOTAL
LENING 1 GALIAN TANAH
1). 0.30 X 0.40 X 70.18 kanan 8.42
JUMLAH GALIAN :
Pj. 140.40 m' 2 PASANGAN BATU
1) 0.30 X 0.40 X 70.18 kanan 8.42
JUMLAH PASANGAN :
0,30 3 PLESTERAN
1) 0.50 + 0.30 X 70.18 kanan 56.14
2) 0.50 + 0.30 X 70.18 kiri 56.14
JUMLAH PLESTERAN :
0,40 4 TIMBUNAN
1) 0.15 X 0.50 X 70.18 2.63
2.0
2) 0.15 X 0.50 X 70.18 2.63
2.0
POTONGAN I - I
JUMLAH TIMBUNAN :
SKALA 1 : 50
Volume Pot. I - I
Galian
Pasangan
Plesteran
Timbunan
1.44
1.44
4.80
19.22 M³
47.24 M³
128.11 M²
8.01 M³
19.22
47.24
128.11
8.01
20.66
48.68
132.91
8.01
VOLUME
TOTAL
16.84 M³
41.40 M³
112.28 M²
5.26 M³
16.84
41.40
112.28
5.26
DAFTAR ANALISA PEKERJAAN
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC : 5 PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 2.7000 50,000.00 135,000.00
2 Tukang Batu L.02 OH 0.9000 60,000.00 54,000.00
3 Kepala Tukang L.03 OH 0.0900 0.00
4 Mandor L.04 OH 0.2700 0.00
JUMLAH TENAGA KERJA KERJA 189,000.00
B. BAHAN
1 Batu kali M.05 m3 1.2000 137,500.00 165,000.00
2 Pasir Pasang M.14.b m3 0.5440 125,000.00 68,000.00
3 Portland Cement M.15 kg 135.0000 1,400.00 189,000.00
JUMLAH BAHAN 422,000.00
C PERALATAN
1 Molen E.28.b nit/hari 0.1670 0.00
JUMLAH HARGA PERALATAN 0.00
611,000.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 50,000.00 15,000.00
2 Tukang Batu L.02 OH 0.1500 60,000.00 9,000.00
3 Kepala Tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA KERJA 24,000.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0160 125,000.00 2,000.00
2 Portland Cement M.15 kg 5.8400 1,400.00 8,176.00
JUMLAH BAHAN 10,176.00
C PERALATAN
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC : 5 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 2.7000 50,000.00 135,000.00
2 Tukang Batu L.02 OH 0.9000 60,000.00 54,000.00
3 Kepala Tukang L.03 OH 0.0900 0.00
4 Mandor L.04 OH 0.2700 0.00
JUMLAH TENAGA KERJA KERJA 189,000.00
B. BAHAN
1 Batu kali M.05 m3 1.2000 137,500.00 165,000.00
2 Pasir Pasang M.14.b m3 0.5440 137,500.00 74,800.00
3 Portland Cement M.15 kg 135.0000 1,400.00 189,000.00
JUMLAH BAHAN 428,800.00
C PERALATAN
1 Molen E.28.b it/hari 0.1670 0.00
JUMLAH HARGA PERALATAN 0.00
617,800.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 50,000.00 15,000.00
2 Tukang Batu L.02 OH 0.1500 60,000.00 9,000.00
3 Kepala Tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA KERJA 24,000.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0160 137,500.00 2,200.00
2 Portland Cement M.15 kg 5.8400 1,400.00 8,176.00
JUMLAH BAHAN 10,376.00
C PERALATAN
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC : 5 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 2.7000 50,000.00 135,000.00
2 Tukang Batu L.02 OH 0.9000 60,000.00 54,000.00
3 Kepala Tukang L.03 OH 0.0900 0.00
4 Mandor L.04 OH 0.2700 0.00
JUMLAH TENAGA KERJA KERJA 189,000.00
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00 195,000.00
2 Pasir Pasang M.14.b m3 0.5440 150,000.00 81,600.00
3 Portland Cement M.15 kg 135.0000 1,400.00 189,000.00
JUMLAH BAHAN 465,600.00
C PERALATAN
1 Molen E.28.b it/hari 0.1670 0.00
JUMLAH HARGA PERALATAN 0.00
654,600.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 50,000.00 15,000.00
2 Tukang Batu L.02 OH 0.1500 60,000.00 9,000.00
3 Kepala Tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA KERJA 24,000.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0160 150,000.00 2,400.00
2 Portland Cement M.15 kg 5.8400 1,400.00 8,176.00
JUMLAH BAHAN 10,576.00
C PERALATAN
P.01.d 1 m3. Pasangan batu dengan mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC : 5 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 2.7000 50,000.00 135,000.00
2 Tukang Batu L.02 OH 0.9000 60,000.00 54,000.00
3 Kepala Tukang L.03 OH 0.0900 0.00
4 Mandor L.04 OH 0.2700 0.00
JUMLAH TENAGA KERJA KERJA 189,000.00
B. BAHAN
1 Batu kali M.05 m3 1.2000 162,500.00 195,000.00
2 Pasir Pasang M.14.b m3 0.5440 150,000.00 81,600.00
3 Portland Cement M.15 kg 135.0000 1,400.00 189,000.00
JUMLAH BAHAN 465,600.00
C PERALATAN
1 Molen E.28.b it/hari 0.1670 0.00
JUMLAH HARGA PERALATAN 0.00
654,600.00
P.04.b 1 m2. Plesteran tebal 1 cm dengan mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC : 3 PP)
Satua
No Uraian Kode Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
n
A. TENAGA KERJA
1 Pekerja L.01 OH 0.3000 50,000.00 15,000.00
2 Tukang Batu L.02 OH 0.1500 60,000.00 9,000.00
3 Kepala Tukang L.03 OH 0.0150 0.00
4 Mandor L.04 OH 0.0150 0.00
JUMLAH TENAGA KERJA KERJA 24,000.00
B. BAHAN
1 Pasir Pasang M.14.b m3 0.0160 150,000.00 2,400.00
2 Portland Cement M.15 kg 5.8400 1,400.00 8,176.00
MANDIRAJA
PANGGISARI
KRIDA MARTANI 2A
n 1 PC : 3 PP)
MANDIRAJA
BANJENGAN
BERSATU 2
puran 1 PC : 5 PP)
n 1 PC : 3 PP)
PURWANEGARA
DANARAJA
SUMBER REJEKI II
puran 1 PC : 5 PP)
n 1 PC : 3 PP)
puran 1 PC : 5 PP)
n 1 PC : 3 PP)