P = 72.00 m
L = 1.20 m
T = 0.15 m
0.15
0.05
1.20
HARGA SATUAN
NO. MATERIAL KENA PAJAK VOLUME PPN 10 % PPh 1,5 % PPN + PPh
(RP)
1 Semen 84 Zak 65,000 6,500 975 7,475
2 Batu Koral 10 M3 280,000 28,000 4,200 32,200
3 Pasir Urug 5 M4 110,000 11,000 1,650 12,650
4 Pasir Pasangan/Beton 7 M5 120,000 12,000 1,800 13,800
5 Kayu Kls III 1 M3 2,000,000 200,000 30,000 230,000
6 Paku 3 Kg 20,000 2,000 300 2,300
7 Trolly/Gerobak 2 Bh 500,000 50,000 7,500 57,500
8 Ember Cor 15 Bh 15,000 1,500 225 1,725
9 Cangkul 2 Bh 100,000 10,000 1,500 11,500
10 Sekop 2 Bh 100,000 10,000 1,500 11,500
11 Meteran 5 m 1 Bh 20,000 2,000 300 2,300
12 Meteran 100 m Bh 175,000 17,500 2,625 20,125
JUMLAH
JUMLAH PAJAK
DIBAYAR (RP)
627,900
322,000
63,250
96,600
115,000
6,900
115,000
25,875
23,000
23,000
2,300
-
1,420,825