COST ESTIMATING
PADA SETIAP TAHAPAN SIKLUS PROYEK
BASIC
BUSINESS
ANALISYS
1
12/28/2010
2
12/28/2010
3
12/28/2010
Resume :
1. Pasangan Batu Kali 1:4 = 36.05 m3
2. Siaran = 85.25 m2
2
3. Plesteran = 14.26 m
4. Galian = 58.01 m3
5. Timbunan = - m3
3
6. Beton Bertulang 1:2:3 = 0.24 m
7. Besi f8-20 = 12.00 m'
Besi f12-18 = 13.33 m,
8. Pintu = 2 bh
KUBIKASI JALAN
TABEL PERHITUNGAN
100.00 80.00
4 0 + 150 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
5 0 + 200 Ki & Ka 1.20 0.80 0.80 0.800 b
50.00 40.00
6 0 + 250 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
7 0 + 300 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
8 0 + 350 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
9 0 + 400 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
10 0 + 450 Ki & Ka 1.20 0.80 0.80 0.800
100.00 80.00
GALIAN TIMBUNAN
NO STA JARAK LUAS M2 VOLUME JARAK LUAS M2 VOLUME
Ka Ki Ka Ki M3 Ka Ki Ka Ki M3
1 0 + 000 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
2 0 + 050 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
3 0 + 100 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
4 0 + 150 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
5 0 + 200 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
6 0 + 250 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
7 0 + 300 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
8 0 + 350 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
9 0 + 400 0.56 0.56 0.56 0.56
40 50 50.4 40 50 50.4
10 0 + 450 0.56 0.56 0.56 0.56
4
12/28/2010
TABEL PERHITUNGAN
1 526 + 060 - 526 + 070 L 10.00 1.00 1.50 2.00 2.50 0.50 1.00 5.75 57.50
Jumlah -
Sketsa
REKAPITULASI
PEKERJAAN : PEMBANGUNAN RUMAH
LOKASI : DESA LAMGUGOP KEC. SYIAH KUALA BANDA ACEH
JUMLAH 806,207,048.72
DIBULATKAN 806,207,000.00
Terbilang : Delapan Ratus Enam Juta Dua Ratus Tujuh Ribu Rupiah,-
5
12/28/2010
I. PEKERJAAN PERSIAPAN
1 Membersihkan lapangan - Ls Taksir 150,000.00 150,000.00
2 Pengukuran dan bouwplank - Ls Taksir 500,000.00 500,000.00
650,000.00
A. PEKERJAAN TANAH/PASIR
1 Galian tanah pondasi 96.66 m3 A. 1 27,250.00 2,633,985.00
2 Urug kembali bekas galian 24.17 m3 SNI T-01 D 7,480.00 180,754.20
3 Urugan pasir bawah pondasi 5.90 m3 A. 18 40,900.00 241,207.75
4 Urugan tanah bawah lantai 276.58 m3 A. 18 a 46,900.00 12,971,367.50
5 Urugan pasir bawah lantai 25.60 m3 A. 18 40,900.00 1,047,040.00
17,074,354.45
B. PEKERJAAN PONDASI
1 Beton tumbuk alas pondasi tapak 1.94 m2 G. 44 703,497.00 1,361,970.19
2 Pondasi Tapak 5.60 m3 Supl. Vd 1,704,588.00 9,545,692.80
3 Pondasi Batu Gunung 62.90 m2 G 32 h 539,920.00 33,960,968.00
44,868,630.99
C. PEKERJAAN BETON BERTULANG
1 Sloof Induk 8.80 m3 Supl. Vf 4,044,845.00 35,594,636.00
2 Sloof 15/25 3.46 m3 Supl. Ve 4,038,274.00 13,969,904.12
3 Kolom Induk 3.60 m3 Supl. Vg 3,852,315.00 13,868,334.00
4 Kolom praktis 11/11 1.70 m3 Supl. Vc 5,205,105.00 8,842,640.58
5 Ring Balk 15/25 5.74 m3 Supl. Ve 4,038,274.00 23,169,597.08
95,445,111.77
Upah
0.010 Mandor @Rp. 40,000.00 Rp. 400.00
0.300 Pekerja @Rp. 35,000.00 Rp. 10,500.00
Jumlah Rp. 40,900.00
Dibulatkan Rp. 40,900.00
6
12/28/2010
7
12/28/2010
KONTROL
ESTIMASI
CEK BIAYA INDUK
PONDASI = Rp /m2
STRUKTUR = Rp /m2
ARSITEKTUR = Rp /m2
M/E = Rp /m2
INTERIOR = Rp /m2