Professional Documents
Culture Documents
Panjang = 41.40
Lebar = 0.80
Tinggi = 0.55
41.40 x 0.80
33.12 x 0.55
18.22 X 2.00
Panjang = 42.00
Lebar = 0.80
Tinggi = 0.05
42.00 x 0.80
33.60 x 0.05
1.68 X 2.00
VOLUME = LA X LB
X
2
Volume
VOLUME = LA X LB
X
2
Volume
3 Timbunan Paving
Panjang = 30.00
Lebar = 2.50 +
Tebal = 0.30
30.00 x 9.70
291.00 x 0.30
Panjang = 30.00
Lebar = 0.30
Tebal = 0.05
30.00 x 0.30
9.00 x 0.05
0.45 X 2.00
III PEKERJAAN BETON
1 Beton Cansteen
P X
= 30.00
= 1.8
= 3.6
2 Plat Beton
P X
= 12.00
= 2.88
3 Paving Block
VOLUME = LA X LB
X
2
4 Manhol
VOLUME = P X
0.50 X
1.00 x
3 Pek. Uskup
VOLUME = P :
62.00 :
206.65 x
IV PEKERJAAN PASANGAN
1 Plesteran Biasa dan acian
Plester Atas
= 0.15 x
Plester Dinding
= 0.30 x
9.00
Volume = 18.00
= 22.50
Volume 29.70
3 Pegangan Galvanis
Panjang 8.00 x
Buah
T X
Panjang Bawah 1.00 X
5.00 X
Buah
T=0.10
L=3.25
P=6.93
Volume
= 16.00 +
= 26.00 m
= 4.33 Ujung
= 5.00 Ujung
Ls 1.00
Ls 1.00
M³ 36.43
= 33.12
= 18.22
= 36.432
M³ 3.36
= 33.60
= 1.68
= 3.36
M3 7.75
P =
9.6 = 16.320
6.4 = 35.840
42.20
5 = 11.000
8.8 = 34.320
3.4 = 7.480
0.90
9 = 49.950 0.90
Volume = 154.91 M2
= 154.91 x Tebal
= 154.910 x 0.05
= 7.75 19.7
M³ 3.75 0.75
P =
30 = 75.000
Volume = 75.00 M2
= 75.00 x Tebal
= 75.000 x 0.05
= 3.75
M³ 87.30
= 291.00
= 87.30
M³ 0.90
= 9.00
= 0.45
= 0.9
M³ 3.600
L x T
0.2 0.3
2.00
M³ 2.880
L x T
2.4 0.1
M2 60.08
P =
-
30 = 61.995
= 62.00 M2
Manhol
1.92
M2 9.00
L
0.50 = 1.00
9 = 9.00
M2 413.30
L
0.3 = 206.65
2 = 413.30
M² 22.50
30.00 = 4.50
30.00 = 9.00
2.00 = 18.00
+ 4.50 0.36
M² 29.70
30.00 = 9.00
3.3 = 29.70
Ujung 5.00
2.00 = 16.00 m
Buah = 2.67 ujung
Bh
5.00 = 5.00 m
2.00 = 10.00 m
Buah = 1.67 Ujung
10.00
M² 60.08
0.00
0
-
3,500.00 44
2800
- 148,200.00 11,885,640.00
3,368.18
270,128.18
2.9
0.39
0.695
30.7
18
48.70
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
PROGRAM : PENINGKATAN SARANA DAN PRASARANA KELURAHAN
: PEMBANGUNAN / PEMBUATAN, PEMELIHARAAN DAN REHABILITASI
KEGIATAN
SARANA DAN PRASARANA LINGKUNGAN PEMUKIMAN
PEKERJAAN : PEMBUATAN PAVING BLOCK RT 01 / RW 04 Vol 50 M
KELURAHAN : SIENDENG
KECAMATAN : HULONTHALANGI
TAHUN : 2020
###
NO URAIAN PEKERJAAN JUMLAH HARGA
I PEKERJAAN PERSIAPAN Rp 450,000.00
II PEKERJAAN TANAH Rp 9,869,550.00
III PEKERJAAN BETON CANSTEEN Rp 5,399,280.00
III PEKERJAAN PAVING Rp 13,511,625.00
IV PEKERJAAN PASANGAN Rp 8,469,900.00
V PEKERJAAN AKHIR ( Finishing ) Rp 900,750.00
A JUMLAH Rp 38,601,105.00
B PPN 11.5 % (11.5% x A ) Rp 4,439,127.08
C JUMLAH HARGA ( A + B ) Rp 43,040,232.08
DIBULATKAN Rp 43,000,000.00
Mengetahui
Kuasa Pengguna Anggaran
KOTA GORONTALO
URAIAN SAT. HARGA SATUAN (Rp.)
MINIMUM MAKSIMUM
Batu
- Batu Dasar / Kali M3 151,500.00 163,115.00
3
- Batu Belah / Gunung M 151,500.00 163,115.00
3
- Batu Pecah 5/7 cm M 151,500.00 163,115.00
3
- Batu Pecah 3/5 cm M 151,500.00 163,115.00
3
- Batu Pecah 1/3 cm M 151,500.00 163,115.00
3
- Split M 353,500.00 373,700.00
- Kerikil M3 151,500.00 161,600.00
3
- Kerikil Halus M 148,167.00 165,135.00
3
- Bata Standart M 707.00 808.00
- Bata Biasa Buah 606.00 757.50
- Batu Gamping Palimanan 10 x 20 Buah 6,060.00 6,565.00
- Paving Blok UK 10 x 21 x 7 Buah 3,030.00 3,535.00
- Uskup Buah 8,000.00 10,000.00
0.00 0.00
Pasir 0.00 0.00
- Pasir Pasang M3 121,200.00 136,350.00
3
- Pasir Urug M 136,350.00 151,500.00
- Pasir Batu M3 136,350.00 166,650.00
0.00 0.00
Domato M3 55,550.00 58,075.00
3
Timbunan Biasa M 57,570.00 75,750.00
3
Timbunan Pilihan M 82,315.00 85,850.00
Tanah Urug M3 60,600.00 69,923.31
Kayu 0.00 0.00
a Kayu Lingua Kls I 0.00 0.00
- Papan M3 3,787,500.00 4,141,000.00
3
- Balok M 3,535,000.00 4,040,000.00
b Kayu Klas II 0.00 0.00
- Papan M3 2,878,500.00 2,979,500.00
3
- Balok M 2,878,500.00 2,979,500.00
c Kayu Klas III 0.00 0.00
- Papan M3 2,272,500.00 2,752,250.00
- Balok M3 2,272,500.00 2,752,250.00
d Kayu Klas IV 0.00 0.00
- Papan M3 1,843,250.00 2,020,000.00
3
- Balok M 1,843,250.00 2,020,000.00
e Dolken diameter (dia. 8 s/d 10 cm) Btg 45,450.00 55,045.00
a Tripleks
- Ukuran 3 mm Lembar 53,025.00 54,287.50
- Ukuran 4 mm Lembar 69,185.00 74,235.00
b Multipleks 0.00 0.00
- Ukuran 6 mm Lembar 87,617.50 96,960.00
- Ukuran 9 mm Lembar 121,200.00 143,925.00
- Ukuran 12 mm Lembar 156,550.00 196,950.00
c Lambrisering 0.00 0.00
- Ukuran 7 mm Lembar 14,140.00 16,160.00
- Ukuran 9 mm Lembar 17,675.00 18,180.00
d Teakwood Lembar 80,800.00 95,950.00
e List Profil 0.00 0.00
- Sp. 2 cm Batang 8,585.00 15,150.00
- Sp. 3 cm Batang 9,595.00 11,110.00
- Sp. 4 cm Batang 11,110.00 11,615.00
f Gypsum Board 9 mm M2 63,125.00 65,650.00
g Profil Gypsum 14 cm M1 19,695.00 24,240.00
2
h Rangka Plafon Metal Furing M 34,340.00 38,380.00
0.00
a Amplas Kayu Lembar 3,535.00 4,545.00
b Kwas Cat bh 17,675.00 25,250.00
c Dempul Kayu Kg 25,250.00 40,400.00
d Cat Kayu Kg 53,530.00 56,560.00
e Minyak Cat Kg 42,925.00 45,450.00
f Politur Kg 35,350.00 47,470.00
g Oker Kg 40,400.00 60,600.00
h Lem Kayu Kg 17,170.00 18,180.00
i Meni Kayu (5Kg) Kg 106,050.00 114,130.00
j Meni Besi (glotek) Kg 106,050.00 114,130.00
k Seal Tape bh 4,040.00 5,555.00
l Minyak Begesting Ltr 2,020.00 2,525.00
m Cat Tembok 0.00 0.00
- Metrolite (5Kg) Kaleng 90,900.00 94,435.00
- Jotun (5Kg) Kaleng 376,225.00 382,790.00
- Komilex (5Kg) Kaleng 44,440.00 62,115.00
- Kimex (5Kg) Kaleng 50,500.00 57,570.00
- Plamur (5Kg) Kaleng 34,340.00 37,875.00
- Residu (5L) Kaleng 55,550.00 58,580.00
- Cat Vernis Kg 40,400.00 47,470.00
0.00 0.00
- Solar Subsidi Ltr 4,545.00 4,545.00
- Solar Industri Ltr 11,413.00 11,413.00
- Aspal (150Kg) Drum 191,900.00 1,969,500.00
0.00 0.00
a Pipa PVC 0.00 0.00
- Ukuran 1/2" Batang 17,675.00 20,200.00
- Ukuran 3/4" Batang 22,220.00 27,270.00
- Ukuran 1" Batang 0.00 0.00
- Ukuran 2" Batang 52,520.00 65,650.00
- Ukuran 3" Batang 68,175.00 121,200.00
- Ukuran 4" Batang 103,020.00 188,870.00
b Pipa Galvanis 0.00 0.00
- Ukuran 1/2" Batang 121,200.00 136,350.00
- Ukuran 3/4" Batang 161,600.00 181,800.00
- Ukuran 1" Batang 202,000.00 277,750.00
- Ukuran 1 1/2" Batang 353,500.00 378,750.00
- Ukuran 2" Batang 515,100.00 580,750.00
- Kran air Bh 20,200.00 25,250.00
- Stop Kran 1/2 Bh 21,210.00 27,775.00
- Stop Kran 3/4 Bh 26,260.00 30,300.00
- Stop Kran 1 Bh 121,200.00 151,500.00
- Klep dia. 3/4" Bh 25,250.00 30,300.00
- Pelampung Otomatis Bh 303,000.00 383,800.00
- Roof Drain Metal Bh 35,350.00 42,420.00
c Asessories (knee,sock,tee,neuvel) 0.00 0.00
- Ukuran 1/2" Bh 2,020.00 3,030.00
- Ukuran 3/4" Bh 2,525.00 3,535.00
- Ukuran 1" Bh 3,030.00 4,545.00
- Ukuran 1 1/2" Bh 4,040.00 5,050.00
- Ukuran 2" Bh 6,060.00 7,070.00
- Ukuran 2 1/2" Bh 6,565.00 10,100.00
- Ukuran 3" Bh 10,100.00 12,625.00
- Ukuran 4" Bh 13,130.00 19,190.00
- Tangki Hidran Polyetheline Kap 2 m3 Bh 1,363,500.00 1,464,500.00
- Tangki Hidran Polyetheline Kap 3 m3 Bh 2,777,500.00 2,878,500.00
- Pelampung Otomatis Bh 0.00
- Roof Drain Metal Bh 0.00
d Tempat Cuci Piring Alumunium (Kitchen Zink) 0.00 0.00
- 1 Lubang Bh 227,250.00 252,500.00
- 2 Lubang Bh 353,500.00 404,000.00
- 2 Lubang (warna) Bh 404,000.00 419,150.00
- Urinoir (Merk KIA, TOTO) Bh 363,600.00 414,100.00
- Wastafel Lengkap (Merk KIA, TOTO) Bh 202,000.00 555,500.00
0.00 0.00
a Polos 0.00 0.00
- Uk. 3 mm" M2 80,800.00 95,950.00
- Uk. 4.5 mm" M2 101,000.00 107,060.00
- Uk. 8 mm" M2 353,500.00 373,700.00
b Rayband 0.00 0.00
- Asahi M2 106,050.00 121,200.00
- Degree M2 111,100.00 126,250.00
0.00 0.00
PENGUNCI 0.00 0.00
a Kunci Tanam 2 slaag 0.00 0.00
- Royal Bh 40,400.00 46,460.00
- Kuda Terbang Bh 58,075.00 65,650.00
- Anchor Bh 55,550.00 57,570.00
- Yale Bh 65,650.00 70,700.00
- Ised Bh 106,050.00 124,735.00
b Kunci Tanam 3 slaag 0.00 0.00
- Royal Bh 161,600.00 183,315.00
- Kuda Terbang Bh 65,650.00 90,900.00
- Anchor Bh 60,600.00 70,700.00
- Yale Bh 164,125.00 176,750.00
- Ised Bh 164,125.00 176,750.00
c Kunci Kupu-kupu Bh 2,020.00 3,030.00
d Penggantung 0.00 0.00
- Hak Angin Kuningan Bh 4,545.00 12,625.00
- Hak Angin Biasa Bh 1,262.50 2,020.00
- Engsel Kupu--kupu Besar Bh 15,150.00 22,725.00
- Engsel Kupu--kupu Kecil Bh 8,080.00 15,150.00
- Engsel Kuningan Bh 22,220.00 30,300.00
- Grendel Bh 2,222.00 10,100.00
- Espagnyolet Bh 20,200.00 35,350.00
0.00 0.00
a Closet Jongkok 0.00 0.00
-
Merk KIA Bh 95,950.00 267,650.00
-
Merk Toto Bh 121,200.00 242,400.00
-
Merk INA Bh 95,950.00 166,650.00
-
Merk Toho Bh 90,900.00 126,250.00
-
Lokal Bh 80,800.00 90,900.00
b Floor Drain 0.00 0.00
- Kuningan Bh 25,250.00 58,075.00
- Besi Bh 17,675.00 29,290.00
c Closet Duduk Set 353,500.00 1,767,500.00
d Bak Air Fibreglass Bh 252,500.00 303,000.00
e Shower Spray Unit 212,100.00 272,700.00
f Shower Set Unit 606,000.00 808,000.00
g Tempat Sabun Bh 45,450.00 50,500.00
h Kran Zink Bh 262,600.00 324,210.00
i Kran Dinding Bh 29,290.00 45,450.00
0.00 0.00
- Paku Biasa Kg 20,200.00 22,725.00
- Paku Tripleks Kg 19,190.00 30,300.00
- Paku Seng Kg 20,200.00 25,250.00
- Angker Bout 3/4 x 20 Bh 20,200.00 25,250.00
- Angker Bout 5/8 x 20 Bh 17,675.00 22,220.00
- Baut Mur 1/2 x 2" Bh 2,020.00 4,040.00
- Baut Mur 3/8 x 2" Bh 1,010.00 2,020.00
- Baut River Bh 75.75 85.85
- Baut Sekrup Bh 252.50 303.00
0.00 0.00
Tegel PC 0.00 0.00
a Polos Abu-abu 0.00 0.00
- Uk. 20 x 20 cm Dos 42,925.00 47,975.00
- Uk. 30 x 30 cm Dos 45,955.00 53,530.00
b Warna 0.00 0.00
- Uk. 20 x 20 cm Dos 48,480.00 55,550.00
- Uk. 30 x 30 cm Dos 45,450.00 55,550.00
c Wafel Warna 0.00 0.00
- Uk. 20 x 20 cm Dos 45,450.00 60,600.00
- Uk. 30 x 30 cm Dos 45,450.00 50,500.00
d Plint Polos 0.00 0.00
- Uk. 10 x 20 cm Dos 1,050.40 1,171.60
- Uk. 10 x 30 cm Dos 1,560.45 1,683.67
- Uk. 10 x 40 cm Dos 2,222.00 2,525.00
- Granit tile 10 x 40 cm Dos 8,484.00 8,686.00
e Plint Warna 0.00 0.00
- Uk. 10 x 20 cm Bh 909.00 1,010.00
- Uk. 10 x 30 cm Bh 1,377.64 1,530.15
- Uk. 10 x 40 cm Bh 2,222.00 2,525.00
- Plint Granit tile 10 x 40 Bh 8,484.00 8,686.00
f Tegel Keramik 0.00 0.00
- Uk. 10 x 20 cm Dos 55,550.00 62,620.00
- Uk. 20 x 20 cm Dos 68,175.00 79,790.00
- Uk. 30 x 30 cm Dos 68,175.00 79,790.00
- Uk. 40 x 40 cm Dos 68,175.00 111,100.00
- Ex. Granito tile 40/40 cm M2 212,100.00 217,150.00
0.00 0.00
a Paving Stone Bh 4,292.50 7,070.00
b Roster Bh 15,150.00 30,300.00
0.00 0.00
- Daun Jendela Aluminium Set 454,500.00 474,700.00
- Daun Pintu Aluminium Double Set 1,717,000.00 1,818,000.00
- Daun Pintu Aluminium Single Set 858,500.00 898,900.00
- Kosen Aluminium Set M1 80,800.00 85,850.00
- Daun Pintu PVC / Toilet Set 303,000.00 353,500.00
Handle Pintu Bh 92,920.00 122,210.00
Selinder Bh 247,450.00 254,520.00
Door Stoper Bh 62,115.00 72,720.00
Door Closer Bh 393,900.00 489,850.00
Slot Tanam Bh 73,730.00 82,315.00
- Gagang Nako Set 10,100.00 28,280.00
- GRC 4 mm Lbr 60,600.00 65,650.00
- GRC 6 mm Lbr 111,100.00 131,300.00
- GRC 8 mm Lbr 131,300.00 141,400.00
HARGA SATUAN UPAH PEKERJA
TAHUN ANGGARAN 2020
HARGA UPAH
NO JENIS PEKERJA BANGUNAN Rp. SATUAN WAKTU
Max Min
JUMLAH Rp 38,601,105
PPN 11.5 % Rp 4,439,127
Total Rp 43,040,232
Di Bulatkan Rp 43,000,000
Terbilang : Empat puluh tiga juta rupiah
Gorontalo, 4 Mei 2020
Di Periksa Di Buat
Mengetahui
Kuasa Pengguna Anggaran
NO URAIAN PEKERJAAN SAT VOL HARGA SATUAN JUMLAH HARGA
Jumlah B Rp 10,000.00
Jumlah (A + B) Rp 10,000.00
Keuntungan Maksimal 10 % Rp
Jumlah Rp 10,000.00
Dibulatkan Rp 10,000.00
Jumlah A Rp 13,314.75
B Tenaga
0.100 O/H Tukang Kayu Rp 100,000.00 Rp 10,000.00
0.010 O/H Kepala Tukang Rp 150,000.00 Rp 1,500.00
Jumlah B Rp 11,500.00
Jumlah (A + B) Rp 24,814.75
Keuntungan Maksimal 10 % Rp 2,481.48
Jumlah Rp 27,296.23
Dibulatkan Rp 27,000.00
Rp -
1,350,000.00
Jenis Pekerjaan : 1 M3 Urugan Kembali
Kode Pembayaran : M3
No Index Sat Kebutuhan Harga Satuan Jumlah Harga
A. Bahan
1.200 M3 Tanah Urug Rp 60,600.00 Rp 72,720.00
B Tenaga Jumlah A 72,720.00
0.300 O/H Pekerja Rp 100,000.00 Rp 30,000.00
Jumlah B Rp 30,000.00
Jumlah (A + B) Rp 102,720.00
Keuntungan Maksimal 10 % Rp
Jumlah Rp 102,720.00
Dibulatkan Rp 102,000.00
Jumlah B Rp 32,250.00
Jumlah (A + B) Rp 42,601.69
Keuntungan Maksimal 10 % Rp
Jumlah Rp 42,601.69
Dibulatkan Rp 42,000.00
B Tenaga
0.100 O/H Pekerja Rp 100,000.00 Rp 10,000.00
0.010 O/H Tukang Rp 150,000.00 Rp 1,500.00
Jumlah B Rp 11,500.00
Jumlah (A + B) Rp 15,767.25
Keuntungan Maksimal 10 % Rp
Jumlah Rp 15,767.25
Dibulatkan Rp 15,000.00
B Tenaga
Jumlah B Rp -
Jumlah (A + B) Rp 155,540.00
Keuntungan Maksimal 10 % Rp
Jumlah Rp 155,540.00
Dibulatkan Rp 155,000.00
ANALISA PEK. KUNSEN PINTU DAN JENDELA ALMUNIUM
1 Pasang ( Bumbungan )
A. Bahan
1.10 Lbr Nok steel ( Bumbungan ) Rp 11,483.47 Rp 12,631.82
0.20 Kg Paku biasa Rp 2,060.00 Rp 412.00
Jumlah A Rp 13,043.82
B Tenaga
0.25 O/H Pekerja Rp 90,000.00 Rp 22,500.00
0.01 O/H Mandor Rp 150,000.00 Rp 1,950.00
Jumlah B Rp 24,450.00
Jumlah (A + B) Rp 37,493.82
Keuntungan Maksimal 10 % Rp 3,749.38
Jumlah Rp 41,243.20
Dibulatkan Rp 41,000.00
Jenis Pekerjaan : 1 Unit Membuat septictank ukuran 1,5 x 1 x 1,5 m + rembesan (Type rumah kecil)
Kode Pembayaran : Unit
No Index Sat Kebutuhan Harga Satuan Jumlah Harga
4.50 m³ Galian Tanah Rp 75,000.00 Rp 337,500.00
0.11 m³ Urugan Pasir urug Rp 211,000.00 Rp 22,598.10
0.10 m² Lantai kerja beton Rp 811,000.00 Rp 81,100.00
6.00 m² Pas. Batako Rp 2,800.00 Rp 16,800.00
0.15 m³ Plat beton penutup & balok Rp 370,000.00 Rp 55,500.00
0.60 m' Pipa PVC 1/2" Rp 188,870.00 Rp 113,322.00
0.53 m³ Urugan kerikil 3-5 cm. Rp 211,000.00 Rp 110,775.00
0.56 m³ Urugan kembali perataan tanah Rp 19,000.00 Rp 10,687.50
Jumlah A Rp 748,282.60
B Tenaga
0.07 Ls Tambahan Upah Rp 100,000.00 Rp 6,500.00
Jumlah B Rp 6,500.00
Jumlah (A + B) Rp 754,782.60
Keuntungan Maksimal 10 % Rp
Jumlah Rp 754,782.60
Dibulatkan Rp 754,000.00
B Tenaga
1.50 O/H Tukang Rp 135,000.00 Rp 202,500.00
Jumlah B Rp 202,500.00
Jumlah (A + B) Rp 332,432.46
Keuntungan Maksimal 10 % Rp 33,243.25
Jumlah Rp 365,675.71
Dibulatkan Rp 365,000.00
Kode Analisa : 10.4 RSNI T-15 : 2002
Jenis Pekerjaan : 1 Bh Pamasangan urinoir
Kode Pembayaran : Bh
No Index Sat Kebutuhan Harga Satuan Jumlah Harga
A. Bahan
1.00 Bh Urinoir 1 Set Rp 363,600.00 Rp 363,600.00
0.03 Bh Pipa Kran Rp 26,260.00 Rp 656.50
Jumlah A Rp 364,256.50
B Tenaga
1.00 O/H Pekerja Rp 90,000.00 Rp 90,000.00
Jumlah B Rp 90,000.00
Jumlah (A + B) Rp 454,256.50
Keuntungan Maksimal 10 % Rp 45,425.65
Jumlah Rp 499,682.15
Dibulatkan Rp 499,000.00
ANALISA SANITA AIR BERSIH
No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1
4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm = ( 1 : 0.10 : 0.15 ) = 66.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 165.33 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 205.01 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.10 ) x (( 2 x 0.15 ) + ( = 600.00 kg ( C )
Harga Toko
No Tanggal Nota Uraian Bahan Volume Sat
Rp
A. Pek. Persiapan
1 Papan nama proyek 1.00 Ls 200,000.00
2 Air Kerja 1.00 Ls 250,000.00
Sub Total
B. Bahan Toko ( Pajak )
Semen 75 Sak 70,000.00
200,000.00
250,000.00
Rp 450,000.00
5,250,000.00
Err:509
8,550,000.00
6,935,670.00
1,085,750.00
2,575,500.00