NO.

STRUKTUR PERHITUNGAN VOLUME


SKETSA. Tipe double : 2 (3 X 3)
BADAN
1 Luas = 0.30 x 3.60 x 3.0 = 3.240
Volume = 3.240 x 3.5

360 30 300 30 300 30 360


3 Luas = 0.30 x 0.15 x 8.0 = 0.36

Volume = 0.360 x 3.5

30 50
TOTAL VOLUME BADAN
410

300

380
PLAT LANTAI ATAS DAN BAWAH

70 30
2 Luas = 0.30 x 3.00 x 4.0 = 3.600

100
70

Volume = 3.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 3m
t = 3m Dimensi box culvert
h = 0.3 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

30
TUMIT :
Volume = 0.40 x 0.7 x 6.90 x 2.00 = 3.864
20
30

380

WING WALL :
Volume = 1.80 x 3.90 x 4.00 x 0.30 = 8.42
300
30

KERB :
100
70

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 14.10 x 2 = 28.2
Volume = 3.81

30 360

50

80
30
380

300
30
70

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 6.90 = 0.69
Volume = 0.69 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 3

1 VOLUME BETON K350 = 41.30 m3

2 VOLUME BETON K125 = 2.97 m3

3 BERAT BESI POLOS = 2958.9 kg (d< 12)

4 BERAT BESI ULIR = 2822.4 kg (d>12)

TOTAL BERAT BESI 5781.3 5781


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 11.34 m3

m2

= 1.26 m3

TOTAL VOLUME BADAN = 12.60 m3

m2
= 12.60 m3

TOTAL VOLUME PLAT LANTAI = 12.60 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 25.20 m3

Volume box per meter' = 7.200

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.864 m3

m3 8.42 m3

m2
m
m3 3.81 m3

TOTAL VOLUME SAYAP = 16.10 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.42 m3
m2
= 0.55 m3

TOTAL = 2.97 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 300)

(d< 12)

(d>12)

6342 560.70
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (3 X 2,5)
BADAN
1 Luas = 0.30 x 3.10 x 3.0 = 2.790
Volume = 2.790 x 3.5
310 30 300 30 300 30 310

3 Luas = 0.30 x 0.15 x 8.0 = 0.36

30 50
Volume = 0.360 x 3.5
360

TOTAL VOLUME BADAN

250

330
PLAT LANTAI ATAS DAN BAWAH

70 30

100
2 Luas = 0.30 x 3.00 x 4.0 = 3.600
70

Volume = 3.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 3m
t = 2.5 m Dimensi box culvert
h = 0.3 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
Volume = 0.40 x 0.7 x 6.90 x 2.00 = 3.864
30

20
30

WING WALL :
330

Volume = 1.55 x 3.40 x 4.00 x 0.30 = 6.32


250
30

KERB :
100

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


70

2
Panjang = 13.10 x 2 = 26.2
Volume = 3.54

30 310

50

80
30
330

250
30
70

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 6.90 = 0.69
Volume = 0.69 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 2

1 VOLUME BETON K350 = 37.35 m3

2 VOLUME BETON K125 = 2.97 m3

3 BERAT BESI POLOS = 2583 kg (d< 12)

4 BERAT BESI ULIR = 2646 kg (d>12)

TOTAL BERAT BESI 5229 5229


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 9.77 m3

m2

= 1.26 m3

TOTAL VOLUME BADAN = 11.03 m3

m2
= 12.60 m3

TOTAL VOLUME PLAT LANTAI = 12.60 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 23.63 m3

Volume box per meter' = 6.750

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.864 m3

m3 6.32 m3

m2
m
m3 3.54 m3

TOTAL VOLUME SAYAP = 13.73 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.42 m3
m2
= 0.55 m3

TOTAL = 2.97 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 250)

(d< 12)

(d>12)

5197 -32.00
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (3 X 2)
BADAN
1 Luas = 0.30 x 2.60 x 3.0 = 2.340
Volume = 2.340 x 3.5
260 30 300 30 300 30 260

3 Luas = 0.30 x 0.15 x 8.0 = 0.36

30 50
Volume = 0.360 x 3.5
310

200

280
TOTAL VOLUME BADAN

70 30
PLAT LANTAI ATAS DAN BAWAH

100
70

2 Luas = 0.30 x 3.00 x 4.0 = 3.600


Volume = 3.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 3m
t = 2m Dimensi box culvert
h = 0.3 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)

10 20
TUMIT :
Volume = 0.40 x 0.7 x 6.90 x 2.00 = 3.864
30

20
30

WING WALL :
230

Volume = 1.30 x 2.90 x 4.00 x 0.30 = 4.52


200

KERB :
30

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


100
70

2
Panjang = 12.10 x 2 = 24.2
Volume = 3.27

30 260

50

80
30
280

200
30
70

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 6.90 = 0.69
Volume = 0.69 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 2

1 VOLUME BETON K350 = 33.71 m3

2 VOLUME BETON K125 = 2.97 m3

3 BERAT BESI POLOS = 2249.1 kg (d< 12)

4 BERAT BESI ULIR = 2469.6 kg (d>12)

TOTAL BERAT BESI 4718.7 4719


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 8.19 m3

m2

= 1.26 m3

TOTAL VOLUME BADAN = 9.45 m3

m2
= 12.60 m3

TOTAL VOLUME PLAT LANTAI = 12.60 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 22.05 m3

Volume box per meter' = 6.300

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.864 m3

m3 4.52 m3

m2
m
m3 3.27 m3

TOTAL VOLUME SAYAP = 11.66 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.42 m3
m2
= 0.55 m3

TOTAL = 2.97 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 200)

(d< 12)

(d>12)

4636 -82.70
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (3 X 1,5)
BADAN
1 Luas = 0.30 x 2.10 x 3.0 = 1.890
210 30 300 30 300 30 210 Volume = 1.890 x 3.5

3 Luas = 0.30 x 0.15 x 8.0 = 0.36

30 50
Volume = 0.360 x 3.5
260

150

230
TOTAL VOLUME BADAN

70 30

100
70

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.30 x 3.00 x 4.0 = 3.600
Volume = 3.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 3m
t = 1.5 m Dimensi box culvert
h = 0.3 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
Volume = 0.40 x 0.7 x 6.90 x 2.00 = 3.864
30

20
30

WING WALL :
260

Volume = 1.05 x 2.40 x 4.00 x 0.30 = 3.02


150
30

KERB :
100

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


70

2
Panjang = 11.10 x 2 = 22.2
Volume = 3.00

30 210

50

80
30
230

150
30
70

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 6.90 = 0.69
Volume = 0.69 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 6.90 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 1

1 VOLUME BETON K350 = 30.36 m3

2 VOLUME BETON K125 = 2.97 m3

3 BERAT BESI POLOS = 1957.2 kg (d< 12)

4 BERAT BESI ULIR = 2293.2 kg (d>12)

TOTAL BERAT BESI 4250.4 4250


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 6.62 m3

m2

= 1.26 m3

TOTAL VOLUME BADAN = 7.88 m3

m2
= 12.60 m3

TOTAL VOLUME PLAT LANTAI = 12.60 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 20.48 m3

Volume box per meter' = 5.850

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.864 m3

m3 3.02 m3

m2
m
m3 3.00 m3

TOTAL VOLUME SAYAP = 9.89 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.42 m3
m2
= 0.55 m3

TOTAL = 2.97 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(300 X 150)

(d< 12)

(d>12)

4354 103.60
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2,5 X 3)
BADAN
356 28 250 28 250 28 356 1 Luas = 0.28 x 3.56 x 3.0 = 2.990
Volume = 2.990 x 3.5

28 50
3 Luas = 0.28 x 0.14 x 8.0 = 0.3136

Volume = 0.314 x 3.5


406

300

378
TOTAL VOLUME BADAN

72 28

100
72

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.28 x 2.50 x 4.0 = 2.800
Volume = 2.800 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2.5 m
t = 3m Dimensi box culvert
h = 0.28 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
Volume = 0.40 x 0.72 x 5.84 x 2.00 = 3.364
30

20
28

WING WALL :
378

Volume = 1.78 x 3.84 x 4.00 x 0.30 = 8.20


300
28

KERB :
100
72

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 12.96 x 2 = 25.92
Volume = 3.50
28 356

50

78
28
378

300
28
72

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 5.84 = 0.58
Volume = 0.58 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 5.84 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 3

1 VOLUME BETON K350 = 36.43 m3

2 VOLUME BETON K125 = 2.51 m3

3 BERAT BESI POLOS = 2707 kg (d< 12)

4 BERAT BESI ULIR = 2393 kg (d>12)

TOTAL BERAT BESI 5100 5100


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 10.47 m3

m2

= 1.10 m3

TOTAL VOLUME BADAN = 11.56 m3

m2
= 9.80 m3

TOTAL VOLUME PLAT LANTAI = 9.80 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 21.36 m3

Volume box per meter' = 6.104

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.364 m3

m3 8.20 m3

m2
m
m3 3.50 m3

TOTAL VOLUME SAYAP = 15.07 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.04 m3
m2
= 0.47 m3

TOTAL = 2.51 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 300)

(d< 12)

(d>12)

4590 -510.10
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2,5 X 2,5)
BADAN
1 Luas = 0.26 x 3.02 x 3.0 = 2.356
302 26 250 26 250 26 302
Volume = 2.356 x 3.5

3 Luas = 0.26 x 0.13 x 8.0 = 0.2704

26 50
Volume = 0.270 x 3.5
352

250

326
TOTAL VOLUME BADAN

74 26

100
74

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.26 x 2.50 x 4.0 = 2.600
Volume = 2.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2.5 m
t = 2.5 m Dimensi box culvert
h = 0.26 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
Volume = 0.40 x 0.74 x 5.78 x 2.00 = 3.422
30

20
26

WING WALL :
326

Volume = 1.51 x 3.28 x 4.00 x 0.30 = 5.94


250
26

KERB :
100
74

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 11.82 x 2 = 23.64
Volume = 3.19

26 302

50

76
26
326

250
26
74

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 5.78 = 0.58
Volume = 0.58 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 2

1 VOLUME BETON K350 = 30.85 m3

2 VOLUME BETON K125 = 2.49 m3

3 BERAT BESI POLOS = 2270 kg (d< 12)

4 BERAT BESI ULIR = 2049 kg (d>12)

TOTAL BERAT BESI 4319 4319


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 8.24 m3

m2

= 0.95 m3

TOTAL VOLUME BADAN = 9.19 m3

m2
= 9.10 m3

TOTAL VOLUME PLAT LANTAI = 9.10 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 18.29 m3

Volume box per meter' = 5.226

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.422 m3

m3 5.94 m3

m2
m
m3 3.19 m3

TOTAL VOLUME SAYAP = 12.56 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.02 m3
m2
= 0.46 m3

TOTAL = 2.49 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 250)

(d< 12)

(d>12)

5692 1373.35
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2,5 X 2)
BADAN
1 Luas = 0.26 x 2.52 x 3.0 = 1.966
252 26 250 26 250 26 252
Volume = 1.966 x 3.5

3 Luas = 0.26 x 0.13 x 8.0 = 0.2704

26 50
Volume = 0.270 x 3.5
302

200

276
TOTAL VOLUME BADAN

74 26

100
74

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.26 x 2.50 x 4.0 = 2.600
Volume = 2.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2.5 m
t = 2m Dimensi box culvert
h = 0.26 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

30 TUMIT :
Volume = 0.40 x 0.74 x 5.78 x 2.00 = 3.42
20
26

276

WING WALL :
200

Volume = 1.26 x 2.78 x 4.00 x 0.30 = 4.20


26

100

KERB :
74

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 10.82 x 2 = 21.64
Volume = 2.92
26 252

50

76
26
276

200
26
74

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 5.78 = 0.58
Volume = 0.58 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 2

1 VOLUME BETON K350 = 27.47 m3

2 VOLUME BETON K125 = 2.49 m3

3 BERAT BESI POLOS = 1950 kg (d< 12)

4 BERAT BESI ULIR = 1896 kg (d>12)

TOTAL BERAT BESI 3846 3846


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 6.88 m3

m2

= 0.95 m3

TOTAL VOLUME BADAN = 7.83 m3

m2
= 9.10 m3

TOTAL VOLUME PLAT LANTAI = 9.10 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 16.93 m3

Volume box per meter' = 4.836

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.42 m3

m3 4.20 m3

m2
m
m3 2.92 m3

TOTAL VOLUME SAYAP = 10.55 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.02 m3
m2
= 0.46 m3

TOTAL = 2.49 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 200)

(d< 12)

(d>12)

4436 589.85
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2,5 X 1,5)
BADAN

202 26 250 26 250 26 202 1 Luas = 0.26 x 2.02 x 3.0 = 1.576


Volume = 1.576 x 3.5

26 50
3 Luas = 0.26 x 0.13 x 8.0 = 0.2704

Volume = 0.270 x 3.5


252

150

226
TOTAL VOLUME BADAN

74 26

100
74

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.26 x 2.50 x 4.0 = 2.600
Volume = 2.600 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2.5 m
t = 1.5 m Dimensi box culvert
h = 0.26 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
10 20 TUMIT, WING WALL, KERB (Sayap box culvert)

TUMIT :
30

20 Volume = 0.40 x 0.8 x 5.78 x 2.00 = 3.699


26

226

WING WALL :
150

Volume = 1.01 x 2.28 x 4.00 x 0.30 = 2.76


26

100
74

KERB :
Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14
2
Panjang = 9.82 x 2 = 19.64
Volume = 2.65
26 202

50

76
26
226

150
26
74

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 5.78 = 0.58
Volume = 0.58 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 5.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 1

1 VOLUME BETON K350 = 24.67 m3

2 VOLUME BETON K125 = 2.49 m3

3 BERAT BESI POLOS = 1712 kg (d< 12)

4 BERAT BESI ULIR = 1743 kg (d>12)

TOTAL BERAT BESI 3454 3454


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 5.51 m3

m2

= 0.95 m3

TOTAL VOLUME BADAN = 6.46 m3

m2
= 9.10 m3

TOTAL VOLUME PLAT LANTAI = 9.10 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 15.56 m3

Volume box per meter' = 4.446

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.699 m3

m3 2.76 m3

m2
m
m3 2.65 m3

TOTAL VOLUME SAYAP = 9.11 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 2.02 m3
m2
= 0.46 m3

TOTAL = 2.49 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(250 X 150)

(d< 12)

(d>12)

3312 -142.49
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2 X 3)
BADAN
352 26 200 26 200 26 352 1 Luas = 0.26 x 3.52 x 3.0 = 2.746
Volume = 2.746 x 3.5

26 50
3 Luas = 0.26 x 0.13 x 8.0 = 0.2704
402

Volume = 0.270 x 3.5

300

376
TOTAL VOLUME BADAN

74 26

100
74

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.26 x 2.00 x 4.0 = 2.080
Volume = 2.080 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2m
t = 3m Dimensi box culvert
h = 0.26 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
30

Volume = 0.40 x 0.74 x 4.78 x 2.00 = 2.830


20
26

402

WING WALL :
Volume = 1.76 x 3.78 x 4.00 x 0.30 = 7.98
300
26

KERB :
100
74

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 11.82 x 2 = 23.64
Volume = 3.19

26 352

50

76
26
376

300
26
74

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 4.78 = 0.48
Volume = 0.48 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 4.78 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 3

1 VOLUME BETON K350 = 31.84 m3

2 VOLUME BETON K125 = 2.06 m3

3 BERAT BESI POLOS = 2460 kg (d< 12)

4 BERAT BESI ULIR = 1998 kg (d>12)

TOTAL BERAT BESI 4458 4458


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 9.61 m3

m2

= 0.95 m3

TOTAL VOLUME BADAN = 10.56 m3

m2
= 7.28 m3

TOTAL VOLUME PLAT LANTAI = 7.28 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 17.84 m3

Volume box per meter' = 5.096

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 2.830 m3

m3 7.98 m3

m2
m
m3 3.19 m3

TOTAL VOLUME SAYAP = 14.00 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.67 m3
m2
= 0.38 m3

TOTAL = 2.06 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 300)

(d< 12)

(d>12)

4696 238.33
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2 X 2,5)
BADAN
1 Luas = 0.25 x 3.00 x 3.0 = 2.250
300 25 200 25 200 25 300
Volume = 2.250 x 3.5

3 Luas = 0.25 x 0.13 x 8.0 = 0.25

25 50
Volume = 0.250 x 3.5
350

250

325
TOTAL VOLUME BADAN

75 25

100
75

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.25 x 2.00 x 4.0 = 2.000
Volume = 2.000 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2m
t = 2.5 m Dimensi box culvert
h = 0.25 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)

10 20
TUMIT :
Volume = 0.40 x 0.75 x 4.75 x 2.00 = 2.850
30

20
25

WING WALL :
325

Volume = 1.50 x 3.25 x 4.00 x 0.30 = 5.85


250
25

KERB :
100

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


75

2
Panjang = 10.75 x 2 = 21.5
Volume = 2.9025
25 300

50

75
25
325

250
25
75

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 4.75 = 0.48
Volume = 0.48 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 4.75 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 2

1 VOLUME BETON K350 = 27.35 m3

2 VOLUME BETON K125 = 2.04 m3

3 BERAT BESI POLOS = 2065 kg (d< 12)

4 BERAT BESI ULIR = 1764 kg (d>12)

TOTAL BERAT BESI 3829 3829


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 7.88 m3

m2

= 0.88 m3

TOTAL VOLUME BADAN = 8.75 m3

m2
= 7.00 m3

TOTAL VOLUME PLAT LANTAI = 7.00 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 15.75 m3

Volume box per meter' = 4.500

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 2.850 m3

m3 5.85 m3

m2
m
m3 2.9025 m3

TOTAL VOLUME SAYAP = 11.60 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.66 m3
m2
= 0.38 m3

TOTAL = 2.04 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 250)

(d< 12)

(d>12)

4788 958.65
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2 X 2)
BADAN
1 Luas = 0.24 x 2.48 x 3.0 = 1.786
248 24 200 24 200 24 248
Volume = 1.786 x 3.5

3 Luas = 0.24 x 0.12 x 8.0 = 0.2304

24 50
Volume = 0.230 x 3.5
298

200

274
TOTAL VOLUME BADAN

76 24

100
76

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.24 x 2.00 x 4.0 = 1.920
Volume = 1.920 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2m
t = 2m Dimensi box culvert
h = 0.24 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20

TUMIT :
30

Volume = 0.40 x 0.76 x 4.72 x 2.00 = 2.870


20
24

274

WING WALL :
Volume = 1.24 x 2.72 x 4.00 x 0.30 = 4.05
200
24

KERB :
100
76

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


2
Panjang = 9.68 x 2 = 19.36
Volume = 2.61

24 248

50

74
24
274

200
24
76

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 4.72 = 0.47
Volume = 0.47 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 2

1 VOLUME BETO K350 = 23.31 m3

2 VOLUME BETO K125 = 2.03 m3

3 BERAT BESI POLOS = 1720 kg (d< 12)

4 BERAT BESI ULIR = 1543 kg (d>12)

TOTAL BERAT BESI 3263 3263


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 6.25 m3

m2

= 0.81 m3

TOTAL VOLUME BADAN = 7.06 m3

m2
= 6.72 m3

TOTAL VOLUME PLAT LANTAI = 6.72 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 13.78 m3

Volume box per meter' = 3.936

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 2.870 m3

m3 4.05 m3

m2
m
m3 2.61 m3

TOTAL VOLUME SAYAP = 9.53 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.65 m3
m2
= 0.38 m3

TOTAL = 2.03 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 200)

(d< 12)

(d>12)

3533 270.06
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2 X 1,5)
BADAN
198 24 200 24 200 24 198 1 Luas = 0.24 x 1.98 x 3.0 = 1.426
Volume = 1.426 x 3.5

24 50
3 Luas = 0.24 x 0.12 x 8.0 = 0.2304

Volume = 0.230 x 3.5


248

150

224
TOTAL VOLUME BADAN

76 24

100
76

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.24 x 2.00 x 4.0 = 1.920
Volume = 1.920 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2m
t = 1.5 m Dimensi box culvert
h = 0.24 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)
10 20
TUMIT :
Volume = 0.40 x 0.76 x 4.72 x 2.00 = 2.870
30

20
24

WING WALL :
224

Volume = 0.99 x 1.98 x 4.00 x 0.30 = 2.35


150
24

KERB :
100

Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14


76

2
Panjang = 8.68 x 2 = 17.36
Volume = 2.34

24 198

50

74
24
224

150
100 24

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 4.72 = 0.47
Volume = 0.47 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 1

1 VOLUME BETON K350 = 20.08 m3

2 VOLUME BETON K125 = 2.03 m3

3 BERAT BESI POLOS = 1410 kg (d< 12)

4 BERAT BESI ULIR = 1402 kg (d>12)

TOTAL BERAT BESI 2811 2811


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 4.99 m3

m2

= 0.81 m3

TOTAL VOLUME BADAN = 5.80 m3

m2
= 6.72 m3

TOTAL VOLUME PLAT LANTAI = 6.72 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 12.52 m3

Volume box per meter' = 3.576

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 2.870 m3

m3 2.35 m3

m2
m
m3 2.34 m3

TOTAL VOLUME SAYAP = 7.57 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.65 m3
m2
= 0.38 m3

TOTAL = 2.03 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 150)

(d< 12)

(d>12)

2997 185.58
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (2 X 1)
BADAN

148 24 200 24 200 24 148 1 Luas = 0.24 x 1.48 x 3.0 = 1.066


Volume = 1.066 x 3.5

24 50
3 Luas = 0.24 x 0.12 x 8.0 = 0.2304

Volume = 0.230 x 3.5


174

100

174
TOTAL VOLUME BADAN

76 24

100
100

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.24 x 2.00 x 4.0 = 1.920
Volume = 1.920 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 2m
t = 1m Dimensi box culvert
h = 0.24 m
lebar = 3.5 m variabel
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
10 20 TUMIT, WING WALL, KERB (Sayap box culvert)

TUMIT :
30

20 Volume = 0.40 x 0.8 x 4.72 x 2.00 = 3.021


24

174

WING WALL :
100

Volume = 0.74 x 1.72 x 4.00 x 0.30 = 1.53


24

100
76

KERB :
Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14
2
Panjang = 7.68 x 2 = 15.36
Volume = 2.07
24 148

50

74
24
174

100
100 24

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 4.72 = 0.47
Volume = 0.47 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 4.72 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 1

1 VOLUME BETON K350 = 17.88 m3

2 VOLUME BETON K125 = 2.03 m3

3 BERAT BESI POLOS = 1242 kg (d< 12)

4 BERAT BESI ULIR = 1261 kg (d>12)

TOTAL BERAT BESI 2503 2503


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 3.73 m3

m2

= 0.81 m3

TOTAL VOLUME BADAN = 4.54 m3

m2
= 6.72 m3

TOTAL VOLUME PLAT LANTAI = 6.72 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 11.26 m3

Volume box per meter' = 3.216

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 3.021 m3

m3 1.53 m3

m2
m
m3 2.07 m3

TOTAL VOLUME SAYAP = 6.62 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.65 m3
m2
= 0.38 m3

TOTAL = 2.03 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(200 X 100)

(d< 12)

(d>12)

3065 562.11
tabel
NO. STRUKTUR PERHITUNGAN VOLUME
SKETSA. Tipe double : 2 (1,5 X 1)
BADAN
1 Luas = 0.20 x 1.40 x 3.0 = 0.840
Volume = 0.840 x 3.5

3 Luas = 0.20 x 0.10 x 8.0 = 0.16

Volume = 0.160 x 3.5

TOTAL VOLUME BADAN

PLAT LANTAI ATAS DAN BAWAH


2 Luas = 0.20 x 1.50 x 4.0 = 1.200
Volume = 1.200 x 3.5

TOTAL VOLUME PLAT LANTAI

l = 1.5 m
t = 1m Dimensi box culvert
h = 0.2 m
lebar = 3.5 m
TOTAL VOLUME BADAN + PLAT LANTAI

Volume box per m

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
TUMIT, WING WALL, KERB (Sayap box culvert)

TUMIT :
Volume = 0.40 x 0.8 x 3.60 x 2.00 = 2.304

WING WALL :
Volume = 0.70 x 1.60 x 4.00 x 0.30 = 1.34

KERB :
Luas = 0.30 x 0.20 + 0.30 + 0.20 x 0.30 = 0.14
2
Panjang = 6.40 x 2 = 12.8
Volume = 1.728

TOTAL VOLUME SAYAP

NO. STRUKTUR PERHITUNGAN VOLUME


SKETSA.
VOLUME BETON K-125 (LANTAI KERJA)
1 Luas = 0.10 x 3.60 = 0.36
Volume = 0.36 x 3.50
2 Luas = 0.10 x 0.40 = 0.04
Volume = 0.04 x 3.60 x 2

TOTAL

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(150 X 1

1 VOLUME BETON K350 = 13.08 m3

2 VOLUME BETON K125 = 1.55 m3

3 BERAT BESI POLOS = 968.24 kg (d< 12)

4 BERAT BESI ULIR = 862.4 kg (d>12)

TOTAL BERAT BESI 1831 1831


PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
VOLUME m3

m2
= 2.94 m3

m2

= 0.56 m3

TOTAL VOLUME BADAN = 3.50 m3

m2
= 4.20 m3

TOTAL VOLUME PLAT LANTAI = 4.20 m3


TOTAL VOLUME BADAN + PLAT LANTAI = 7.70 m3

Volume box per meter' = 2.200

PERHITUNGAN
VOLUME
PEKERJAAN

BETON K - 350
PERHITUNGAN VOLUME VOLUME m3

m3 2.304 m3

m3 1.34 m3

m2
m
m3 1.728 m3

TOTAL VOLUME SAYAP = 5.38 m3

PERHITUNGAN
VOLUME
PEKERJAAN
BETON K - 125
VOLUME m3

m2
= 1.26 m3
m2
= 0.29 m3

TOTAL = 1.55 m3

REKAPITULASI VOLUME BOX CULVERT TIPE DOUBEL 2(150 X 100)

(d< 12)

(d>12)

2587 756.36
tabel