Rab Epi
PANJANG = 23.00 M
LEBAR = 16.70 M
LUAS (PXL) = (23,00x16,70) 384.10 M2
12.70
16.70
21.00
19.00
B. PEMASANGAN BLOWPLANK
PANJANG = 21.00 M
LEBAR = 14.70 M
12.70
14.70
KELILING = 2 (21,00+14,70) 71.40 M1
2 PEKERJAAN TANAH DAN PONDASI
PANJANG = 1.4 M
LEBAR
TINGGI
=
=
1.4
3
M
M
K1 Kolom30 x 40
Lantai Keramik 40x40
JUMLAH = 17 Unit Spesi Lantai
Lantai Beton Cor 1:3:5
Pasir Urug
Tanah Urug
VOLUME = (PXLXT)XUnit
± 0.00
= (1,4x1,4x3)x17 99.96 M3 ± 0.00
7
3
10
50 50
2B. Urugan Kembali Pondasi Tapak Sumuran 30
-50
VOLUME = 3/4 x volume galian tapak sumuran
= 3/4 x 99,96 74.97 M3 Sloof 25/40
Tanah Urug
2C. Pondasi Tapak Bertulang
120 12 D16
A (POER TAPAK)
150
PANJANG = 1.2 M
Ø10-100
LEBAR = 1.2 M
TINGGI = 0.3 M D16-150
JUMLAH = 17 Unit
30 D16-150
VOLUME = (PxLxT)xUnit -200 300
= (0,3x1,2x1,2)x17 7.344 M3 120
Besi Angkur Ø 10
Tapak Sumuran
2D. B (PANDESTAL TAPAK) Diameter 100cm
PANJANG = 0.4 M
Ø 12 - 125 Spiral
LEBAR = 0.3 M 135
150 Ø12 - 150
TINGGI = 1.2 M
JUMLAH = 17 Unit
Betor Cor Cyclope
VOLUME = (PxLxT)xUnit
= (0,4x0,3x1,2)x17 2.448 M3 10 Lantai Kerja
-350 5
Pasir Alas
2E. Volume Total Pondasi Tapak 10 100 10
= (A+B) 10 120 10
140
10 Lantai Kerja
-350 5
Pasir Alas
10 100 10
10 120 10
D16-150
D16-150
PANJANG = 0.1 M
LEBAR = 1.4 M 30 120
TINGGI = 1.4 M
120
10
120
10
120
Horizontal
TINGGI = 0.85 M
LEBAR = 0.9 M
PANJANG = 41 M
VOLUME = (pxlxt)
= (41x0,9x0,85) 31.37 M3
VOLUME = (p x l x t )
= (67,8,175x 0,9 x 0,05) 3.051 M3
3D. ASTAMPING
PANJANG = 67.8 M
LEBAR = 0.9 M
TINGGI = 0.1 M
VOLUME = ( p x l x t)
= (67,8 x 0,9 x 0,1) 6.102 M3
40
3E. PAS BATU GUNUNG
10 70 10
90
Aanstamping
Pasir Alas
4 PEKERJAAN BETON BERTULANG
1.80
3.50
3.50
4A. SLOOF 25/40
A
3.00
PANJANG = 67.8 M
LEBAR = 0.25 M
B
TINGGI = 0.4 M
VOLUME = (p x l x t)
4.00
= (67,8x0,25x0,4) 6.780 M3
C
1.80
4.00
19.00
PANJANG = 15.08 M
LEBAR = 0.35 M
TINGGI = 0.20 M
D
3.63
4.00
VOLUME = (P X L X T) 1.0556 M3
E
PANJANG = 15.08 M
4.00
LEBAR = 0.35 M
TINGGI = 0.10 M
F
VOLUME = (P X L X T) 0.528 M3
3.64
3.63
3.63 10.90
2
5
4D. PASIR ALAS
PANJANG = 15.08 M
LEBAR = 0.35 M
TINGGI = 0.05 M
VOLUME = (P X L X T) 0.264 M3
PANJANG = 15.08 M
35
LEBAR = 0.25 M
TINGGI = 0.40 M
35
VOLUME = ( 15,08 X 0,25 X 0,40) 1.508 M3
PANJANG = 0.40 M
LEBAR = 0.30 M
TINGGI = 3.65 M
UNIT = 17
VOLUME = (P X L X T) 7.446 M3
Kolom K1 (Lantai 2)
PANJANG = 0.40 M
LEBAR = 0.30 M
TINGGI = 3.45 M
UNIT = 17
VOLUME = (P X LX T) 7.038 M3
Kolom K2 (Lantai 2)
PANJANG = 0.25 M
LEBAR = 0.20 M
TINGGI = 3.50 M
UNIT = 8 M
VOLUME = 1.400 M3
4G. BALOK LANTAI 30/60
PANJANG = 13.74 M
LEBAR = 0.30 M
TINGGI = 0.60 M
VOLUME = (P X L X T) 2.473 M3
BALOK 25/45
PANJANG = 92.73 M
LEBAR = 0.25 M
TINGGI = 0.45 M
BALOK 20/40
PANJANG = 23.84 M
LEBAR = 0.20 M
TINGGI = 0.40 M
PANJANG = 5.40 M
LEBAR = 0.20 M
TINGGI = 0.30 M
BALOKBORDES
20/30
VOLUME = (PXLXT) 0.324 M 3
BALOKBORDES
20/30
PANJANG = 55.65 M
LEBAR = 0.13 M
TINGGI = 0.15 M
PANJANG = 66.86 M
LEBAR = 0.20 M
TINGGI = 0.35 M
PANJANG = 30.81 M
LEBAR = 0.20 M
TINGGI = 0.30 M
PANJANG = 3.60 M
LEBAR = 3.75 M
TEBAL = 0.12 M
1.80
3.50
3.50
UNIT = 8
VOLUME = ( PXLXT )UNIT 12.96 M3
A
PLAT LANTAI (TIPE 2)
Ø10-20
3.00
B
Ø10-20
Ø10-10
PANJANG = 1.52 M
B
LEBAR = 3.75 M
TEBAL = 0.12 M
UNIT = 3 Ø10-20
Ø10-20
4.00
Ø10-20
Ø10-10
VOLUME = (PXLXT)UNIT 2.052 M3
Ø10-20
Ø10-10
PLAT LANTAI (Tipe 3)
C
Ø10-20 Ø10-20
Ø10-20 Ø10-20
Ø10-20
4.00
LEBAR = 2.75 M
Ø10-20
1.78
TEBAL = 0.12 M
Ø10-20
Ø10-10
Ø10-20
Ø10-10
UNIT = 2
D
VOLUME = (PXLXT)UNIT 1.003 M3
Ø10-20
Ø10-20 Ø10-20
4.00
4.00
Ø10-20 Ø10-20
PLAT LANTAI (Tipe 4) Ø10-10 Ø10-10
Ø10-20
Ø10-10
PANJANG = 1.52 M
E
LEBAR = 1.98 M
TEBAL = 0.12 M
Ø10-20
Ø10-20
Ø10-20
4.00
4.00
Ø10-20
A
A
Ø10-10
Ø10-20
Ø10-10
Ø10-20
Ø10-10
F
B
1.665
3.635
3.635
3.635
1
5
E
Ø10-20
Ø10-20
Ø10-20
4.00
4.00
Ø10-20
A
Ø10-10
Ø10-20
Ø10-10
Ø10-20
Ø10-10
F
PLAT LANTAI (Tipe 5)
B
1.665
3.635
3.635
3.635
PANJANG = 1.52 M
5
LEBAR = 1.58 M
TEBAL = 0.12 M
PANJANG = 1.74 M
LEBAR = 1.58 M
TEBAL = 0.12 M
PANJANG = 1.40 M 10
5
LEBAR = 0.45 M 25
45
TINGGI = 0.05 M Lantai Kerja 1:3:5
Pasir Urug
PANJANG = 1.40 M 30
LEBAR = 0.45 M
TINGGI = 0.10 M 12 30
150
VOLUME = (PXLXT) 0.820 M3
Balok Bordes 20/30
10
6
Balok Bordes 20/30
350
13
30 30 30 30
12
11
TINGGI = 0.90 M 10
180
4
126 1
140
PANJANG = 64.16 M
TINGGI = 3.45 M
LUAS P, J, DAN BATU ROSTER = 39.31 M
2.70
3.00
6B. LUAS PINTU DAN JENDELA
Pintu
P1
3.24
PANJANG = 5.2
LEBAR = 0.9
3.70
4.00
J2
J1
LUAS = (PXL) 4.68 M2
Jendela
PANJANG = 19.9
LEBAR = 1.35
4.00
J2
J2
LUAS = (PXL) 26.87 M2
4.00
J2
J1
4.00
J2
J2
P1
4.00
J2
J1
6D. PLASTERAN = 2 X LUAS PAS BATA 1:4 364.09 M2
4.00
J2
J2
3.24 3.50
3.50
7 PERHITUGAN KUSEN DAN DAUN
Kusen UPVC
PANJANG = 0.64 M
4
LEBAR = 0.44 M 90
UNIT = 30
LUAS = (PXL) 8.448 M2
Kusen UPVC
135
Kaca 5Mm
Kusen UPVC
265 5
7G. VENTILASI Kusen UPVC
2.930 M
LOUVER ZET UPVC = 4 UNIT 135
Kaca 5Mm
Kusen UPVC
200
RB20/30
8B. ATAB SPANDEK (SETARA) 0.30 Reng Balk 20/35 Reng Balk 20/35
700 180
LUAS ATAS BAGIAN 1 DAN 2 880
1.00
K11.08 K11.20 K11.20 K11.20 K11.20 K1 1.20 K1 1.20 K11.20 K11.08 K1 1.00
8C. LISTPLANK
PANJANG = (13+ 12+12+9) 46 M
0.98
K11
1
11.20 K11.20 K11.20 K1 1.20 K1 1.20 K11.20 K11.08 K1 1.00
LUAS = 1/2 X 4,15 X 2,39
1.00
= 4,959 X 2 sisi 9.918 M2
1.25
= 9,918 X 2 UNIT 19.84 M
0.56 0.98
0.98
K11.13 K11.13 K11.13 K11.13 K11.13 K10.98K1 1.00
1.13
1.13
1.13
Rabung Atap Spandex (Setara) 0.35
Atap Spandex (Setara)0.30
9 PERHITUNGAN PLAFON
1.80
3.50
3.50
9A. RUANG 1
PlafondPVC PlafondPVC
PANJANG = 7.87 M
LEBAR = 6.87 M
Plafond PVC
3.00
LUAS = (PXL) 54.07 M2
9B. RUANG 2
PANJANG = 7.87 M
LEBAR = 6.87 M
4.00
LUAS = (PXL) 54.07 M2
Plafond PVC
Plafond PVC
Plafond PVC
Plafond PVC
9C. SELASAR LANTAI 2
PANJANG = 19.11 M Plafond PVC
4.00
LEBAR = 1.67 M
19.00
LUAS = 31.91 M2
PlafondPVC
9E. PLAFON ATAS TANGGA
PANJANG = 8.67 M
4.00
LEBAR = 2.87 M
Plafond PVC
LUAS = (PXL) 24.88 M2
Plafond PVC
Plafond PVC
Plafond PVC
4.00
PlafondPVC PlafondPVC
4.00
Plafond PVC
Plafond PVC
Plafond PVC
Plafond PVC
TOTAL PLAFON LANTAI 2
4.00
= (R1 + R2 + SLASAR + ATS TANGGA) 164.93 M2
PlafondPVC PlafondPVC
10 INTALASI LISTRIK
1.80
3.50
3.50
3.63
AMPERE METER = 1 UNIT
12.43
MCB = 1 UNIT
= AMPERMETER= 1 BH
STOP KONTAK = 2 UNIT
SAKLAR = - UNIT = MCB= 1 BH
SAKLAR GANDA = 3 UNIT
= STOPKONTAK= 2 BH
SAKLAR TRIPLE = - UNIT
LAMPU HE 18 W = 8 UNIT = SAKLARTUNGGAL= - BH
LAMPU HE 12 W = 3 UNIT = SAKLARGANDA= 3 BH
= SAKLARTRIPLE= - BH
= LAMPUHE18 W= 8 BH
= LAMPUHE12 W= 3 BH
11 PEMASANGAN KRAMIK (40 X 40)
11A. LANTAIN 1
1.80
3.50
3.50
Ruang 1
PANJANG = 7.87 M
LEBAR = 6.87 M
3.00
LUAS = (PXL) 54.07 M2
A
T
Ruang 2
PANJANG = 7.87 M
LEBAR = 6.87 M
4.00
LUAS = (PXL) 54.07 M2
( Keramik 40x40 )
(Keramik 40x40 )
R. Ke l a s
Se l a s a r
+4.03
+4.05
Selasar lantai 1
PANJANG = 19.11 M
4.00
LEBAR = 1.67 M
19.00
LUAS = (PXL) 31.91 M2
11B. LANTAI 2
B
Ruang 1
4.00
PANJANG = 7.87 M
(Keramik 40x40)
(Keramik 40x40 )
R. Ke l a s
Se l a s a r
LEBAR = 6.87 M
+ 4.03
+4.05
4.00
B
4.00
(Keramik 40x40)
(Keramik 40x40 )
R. Ke l a s
Se l a s a r
+4.03
+4.05
LUAS = (PXL) 54.07 M2
4.00
Ruang 2
PANJANG = 7.87 M
LEBAR = 6.87 M
LUAS = (PXL) 54.07 M2
1.80
3.50
3.50
3.63
12.43
Selasar lantai 2
PANJANG = 19.11 M
LEBAR = 1.67 M
LUAS = (PXL) 31.91 M2
12 PEKERJAAN PENGECETAN
PENGECETAN LISPLANK = 46 M
PENGECETAN DINDING = 364.1 M2
PENGECETAN PLAFON = 164.9 M2
PENGECETAN LIST PLAFON = 91.28 M
PENGECETAN KOLOM = 15.88 M2
- PEKERJAAN LANTAI
- Tanah urug elevasi 0,00 tipe 1
panjang = 7.75 M
lebar = 6.87 M
1.80
3.64
3.64
tinggi = 0.30 M
unit = 2 unit
volume = (PXLXT) 31.9 M3
3.00
A
A
Tanah urug elevasi 0,00 tipe 2
panjang = 2.75 M
1.77
lebar = 6.87 M
tinggi = 0.3 M
4.00
volume = (PXLXT) 5.67 M3
(Keramik 40x40 )
(Keramik 40x40 )
± 0.00
-0.03
Tanah urung elevasi -0,03 tipe 3
panjang = 18.5 M
lebar = 1.77 M
4.00
tinggi = 0.27 M
19.00
volume = (PXLXT) 8.84 M3
B
4.00
(Keramik 40x4
( Keramik 40x4
± 0.00
-0.03
4.00
19.00
Tanah urug elevasi -0,03 tipe 4
panjang = 1.58 M
4.00
lebar = 3.47 M
(Keramik 40x40 )
(Keramik 40x40 )
tinggi = 0.27 M
± 0.00
-0.03
volume = (PXLXT) 1.48 M3
4.00
- Pasir urug elevasi 0,00 tipe 1
panjang = 7.75 M
lebar = 6.87 M
1.80
3.64
3.64
3.63
tinggi = 0.10 M
12.70
unit = 2 unit
volume = (PXLXT) 10.65 M3
1.80
Total pasir urug = 16.36 M3 0.85
10
5
amping
Alas
etara) 0.35
30
alume PcTruss C.75
ncalume PcTruss C.75
lume
ume PcTruss C.75
/30
PERHITUNGAN BESI DAN BEKISTING
1 2 3
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 16, = 126.2592 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 10 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 10,
Panjang begel = 1.150 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 100.00 ± -------> 100.00 Btg
101 btg
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 14, = 103.5720 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.90 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.950 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 142.86 ± -------> 143.00 Btg
143 btg
1 2 3
Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 14, = 100.6950 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.850 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 166.67 ± -------> 167.00 Btg
167 btg
1 2 3
Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 14, = 100.6950 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 10.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 29.59 kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.850 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 166.67 ± -------> 167.00 Btg
167 btg
Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2
= 87.5122 kg
1 2 3
1 2 3
1 2 3
B. HARGA BAHAN
1 Air Liter 120.00
T Ampelas Lembar 3,500.00
T Besi Strip Tebal 5 mm Kg 150,000.00
T Balok Kayu Kelas II M3 3,900,000.00
2 Batu Bata Buah 950.00
3 Batu Kali/ Batu Belah (Sungai/Gunung) M3 200,000.00
4 Batu Belah 5-7 Cm M3 195,000.00
5 Batu Pecah 2-3 Cm M3 320,000.00
T Besi Baja Profil Kg 150,000.00
6 Besi Beton Polos Kg 16,000.00
7 Besi Beton Ulir Kg 19,000.00
8 Bubungan Genteng M1 50,000.00
9 Bubungan Seng M1 40,000.00
10 Cat Dasar Tembok/Sealer Setara Vinilex Kg 35,000.00
11 Cat Kayu Dasar Kg 50,000.00
12 Cat Kayu Mengkilat Kg 65,000.00
13 Cat Menie Besi Kg 35,000.00
14 Cat Tembok Setara Vinilex Kg 55,000.00
15 Dempul Kayu Kg 18,000.00
16 Dolken Kayu Ф8-10/400 Cm Batang 75,000.00
17 Door Holden Pasang 135,000.00
18 Engsel Jendela Pasang 25,000.00
19 Engsel Pintu Pasang 25,000.00
20 Floor Drain Buah 27,000.00
21 Gypsum Board Tebal 9 mm Lembar 125,000.00
22 Jaring Kawat Baja Kg 36,000.00
23 Hak Nagin Pasang 17,000.00
24 Kaca Bening Uk.2 mm M2 75,000.00
25 Kaca Bening Uk.3 mm M2 85,000.00
26 Kaca Bening Uk. 5 mm M2 120,000.00
27 Kaca Rayband Uk. 3 mm M2 130,000.00
28 kacca Rayband Uk. 5 mm M2 135,000.00
29 Kaso-Kaso (5x7) Cm M3 3,500,000.00
30 Kawat Beton Kg 20,000.00
31 Kawat Duri Kg 50,000.00
32 Kawat Harmonika M2 60,000.00
33 Kawat Nyamuk/Kasa Logam M2 40,000.00
34 Kawat Nyamuk/Kasa Plastik M2 30,000.00
T Kerawang/Rooster Bh 700,000.00
T Kayu Kaso 5 x 7 cm M3 325,000.00
T Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 70,000.00
35 Kayu Bakar M3 750,000.00
36 Kayu Bakau 10 Cm Batang 60,000.00
37 Kayu Kelas I (Seumantok/Ulim/dll) M3 5,500,000.00
38 Kayu Kelas II (Kamper/Kruing/dll) M3 4,800,000.00
39 Kayu Kelas III (Borneo/dll) M3 3,900,000.00
40 Kayu Kelas IV (Semgon/dll) M3 3,750,000.00
41 Keramik Non Pholised 20 x 20 Cm Setara Ikat Bh 3,000.00
42 Keramik Uk. 20 x 20 Cm Bh 3,500.00
43 Keramik Uk. 40 x40 Cm Bh 12,000.00
44 Keramik Uk. 20 x 25 Cm Bh 3,500.00
45 Keramik Uk. 30 x 30 Cm Bh 6,200.00
46 Kertas Amplas Lembar 3,000.00
47 Kloset Duduk Keramik Setara Toto+Tabung Buah 1,500,000.00
48 Kloset Jongkok Keramik Setara Toto Buah 350,000.00
49 Kran Air 3/4" Buah 10,000.00
50 Kuas Cat Buah 15,000.00
51 Kunci Pintu (Standar) Buah 150,000.00
52 Kunci Pintu Biasa Buah 100,000.00
53 Lampu Hemat Energi 11 Watt Setara Hannochs Buah 35,000.00
54 Lampu Hemat Energi 18 Watt Setara Hannochs Buah 40,000.00
55 Lampu Hemat Energi 20 Watt Setara Hannochs Buah 45,000.00
56 Lem Kayu Kg 18,000.00
57 List Eternit Kayu M1 8,000.00
58 Marmer M2 50,000.00
59 Minyak Cat Liter 25,000.00
60 Minyak Bekisting Liter 5,000.00
61 Multypleks 3 mm Lembar 70,000.00
62 Multypleks 4 mm Lembar 75,000.00
63 Multypleks 6 mm Lembar 125,000.00
64 Multypleks 9 mm Lembar 155,000.00
65 Pacok Jendela Dan Ventilasi Pasang 7,500.00
66 Paku Asbes Kg 20,000.00
67 Paku Beton 8 Inchi Kotak 19,000.00
68 Paku Kait Buah 1,000.00
69 Paku Kayu Kg 18,000.00
70 Paku Tripleks Kg 19,000.00
71 Paku semg Kg 20,000.00
72 Paku Sumbat Buah 1,200.00
73 Paku Skrup Kg 23,000.00
74 Pasir Batu (Sirtu) Material Jalan M3 300,000.00
75 Pasir Beton Atau Kerikil M3 200,000.00
76 Pasir Pasang M3 190,000.00
77 Pasir Urug M3 150,000.00
78 Pelumas/Oli Liter 40,000.00
79 Pipa Leading Ф 1" Glavanis Tebal 3,2 mm Batang 75,000.00
80 Pipa Leading Ф 2" Glavanis Tebal 3,2 mm Batang 85,000.00
81 Pipa Leading Ф 3" Glavanis Tebal 3,2 mm Batang 90,000.00
82 Pipa PVC Ф 1" Batang 40,000.00
83 Pipa PVC Ф 2" Batang 50,000.00
84 Pipa PVC Ф 3" Batang 60,000.00
T Plamir Kayu Kg 18,000.00
85 Plamir Tembok Kg 30,000.00
86 Plin Kramik Buah 5,000.00
87 Plywood Tebal 9 mm Lembar 150,000.00
T Profil Aluminium M 80,000.00
T Penjaga Jarak Bekisting / Spacer Bh 30,000.00
T Rabung Seng Genteng M 130,000.00
88 Pemasangan Atap Baja Ringan M2 350,000.00
89 Residu Kg 10,000.00
90 Reservoir Air 500 Liter Buah 1,500,000.00
91 Reservoir Air 1000 Liter Buah 2,500,000.00
92 Reservoir Air 500 Liter Stainless steel Buah 2,000,000.00
93 Schakelar Buah 12,500.00
94 Semen @ 40 Kg Zak 55,000.00
95 Semen @ 40 Kg Kg 1,375.00
96 Semen Putih @ 50 Kg Zak 220,000.00
97 Semen Putih @ 50 Kg Kg 4,400.00
98 Semen Warna Kg 7,500.00
99 Seng Genteng Metal M2 75,000.00
100 Seng BJLS 0,20 Cat Pabrik M2 70,000.00
101 Seng Gelombang BJLS 30 M2 50,000.00
102 Seng Gelombang BJLS 30 Cat Pabrik M2 55,000.00
103 Seng Plat BJLS 20 M2 60,000.00
104 Seng Plat BJLS 30 M2 65,000.00
104 Solar (Industri) Liter 12,500.00
106 Sekrup Fixer Buah 500.00
107 Sealant Kg 15,500.00
108 Sumur+Pompa Tangan Terpasang Unit 2,000,000.00
109 Tanah Timbun M3 75,000.00
110 Tiang Pancang m' 300,000.00
111 Teralis Besi M2 380,000.00
112 Titik Lampu/Instalasi Titik 150,000.00
113 Urinoir Keramik Unit 2,500,000.00
114 Vinyl M2 25,000.00
115 WireMesh (Ulir) Kg 175,000.00
116 Zakering (Kast Lokal 1 Zekering) Unit 350,000.00
C. ALAT
1 Stamper Hari-Sewa 40,000.00
2 Dump Truck Jam 200,000.00
3 Molen Jam 50,000.00
Catatan : Bila Bahan Tidak Tercantum Di tabel ini boleh di Tambah
1
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembersihan Lapangan
Satuan / Unit : M2
Analisa : AHSP PU A.2.2.1.9
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.1000 125,000.00 12,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 20,000.00
1 B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 20,000.00
E Overhead & Profit 10% X D 2,000.00
F Harga Satuan Pekerjaan ( D + E ) 22,000.00
5 PEKERJAAN KERAMIK
5A Ruang 1 54.07 M²
5B Ruang 2 54.07 M²
5C Selasar lantai 1 31.91 M²
LANTAI 2
1 PEKERJAAN BETON BERTULANG
1A Kolom K1 (Lantai 2) 7.04 M³
1B Kolom K2 (Lantai 2) 1.40 M³
1C BALOK LANTAI 30/60 2.47 M³
1D BALOK 25/45 10.43 M³
1E BALOK 20/40 1.91 M³
1F BALOK BORDES 20/30 0.32 M³
1G BALOK LATAI 13/15 1.09 M³
1H RENG BALOK 20/35 4.68 M³
1I RENG BALOK 20/30 1.85 M³
1J PLAT LANTAI (Tipe 1) 12.96 M³
1K PLAT LANTAI (TIPE 2) 2.05 M³
1L PLAT LANTAI (Tipe 3) 1.00 M³
1M PLAT LANTAI (Tipe 4) 0.36 M³
1N PLAT LANTAI (Tipe 5) 0.29 M³
1O PLAT LANTAI (Tipe 6) 0.33 M³
1P PLAT LANTAI (Tipe 7) 0.27 M³
2 PEKERJAAN KERAMIK
2A Ruang 1 54.07 M²
2B Ruang 2 54.07 M²
2C Selasar lantai 2 31.91 M²
4 PEKERJAAN DINDING
4A LANTAI 2 PAS BATA 1: 40 182.05 M²
4B PLASTERAN 364.09 M²
5 PEKERJAAN ATAP
5A LUAS ATAB KIRI KANAN BAGIAN 1 54.43 M²
5B LUAS ATAB KIRI KANAN BAGIAN 2 54.43 M²
5C ATAB SPANDEK (SETARA) 0.30 108.86 M²
5D LISTPLANK 46 M
5E TAWING LAYAR 19.84 M
6 PEKERJAAN PLAFON
6A RUANG 1 54.07 M²
6B RUANG 2 54.07 M²
6C SELASAR LANTAI 2 31.91 M²
6D PLAFON ATAS TANGGA 24.88 M²
6E TOTAL PLAFON LANTAI 2 164.93 M²
7 PEKERJAAN PENGECATAN
7A PENGECETAN KOLOM 15.88 M²
7B PENGECETAN DINDING 364.1 M²
7C PENGECETAN PLAFON 164.9 M²
7D PENGECETAN LIST PLAFON 91.28 M
7E PENGECETAN LISPLANK 46.00 M
SUBTOTAL Rp 43,150,578.03
C PEKERJAAN BETON BERTULANG
LANTAI 1
Beton Cor Cyclope
beton k-175 18.437 M3 AHSP PU A.4.1.1.5 Rp 1,095,061.96 Rp 20,190,152.33
besi Tulangan Pokok D 16 - 150 140.2 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 3,514,474.41
Bekesting + Perawatan beton 61.46 Kg AHSP PU A.4.1.1.20 Rp 297,209.00 Rp 18,265,922.24
SUBTOTAL Rp 84,443,589.31
D PEKERJAAN TANGGA
Beton plat tangga K250 1.312 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 1,540,169.66
Tulangan Pokok Tangga 110.9 KG AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 2,395,680.23
Bekisting plat Tangga 8.333 KG AHSP PU A.4.1.1.26 Rp 564,734.50 Rp 4,706,120.83
Beton Plat bordes K250 0.389 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 456,346.56
Tulangan pokok balok bordes 217.8 KG AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 4,704,255.27
Bekisting bordes Tangga 6.667 KG AHSP PU A.4.1.1.21 Rp 297,209.00 Rp 1,981,393.33
Relling tangga 6.930 M3 AHSP PU A.4.1.1.1 Rp 987,814.14 Rp 6,845,552.01
SUBTOTAL Rp 22,629,517.90
SUBTOTAL Rp 305,896,188.68
B PEKERJAAN PASANGAN DAN PLASTERAN
Pasangan Dinding Bata 1 PC : 4PP LT 2 182.0 M2 AHSP PU A.4.4.1.3 Rp 326,673.88 Rp 59,469,998.92
Plasteran Dinding Bata 1 PC : 4PP LT 2 364.1 M2 AHSP PU A.4.4.2.4 Rp 83,176.50 Rp 30,284,064.59
SUBTOTAL Rp 89,754,063.51
C PEKERJAAN PINTU,JENDELA DAN KUNCI
Pemasangan Pintu,jendela,dan Kunci
Pintu
KUSEN PINTU ALUMINIUM 7.0 M Taksir Rp 170,000.00 Rp 1,190,000.00
LOUVER ZET UPVC 2 Buah Taksir Rp 500,000.00 Rp 1,000,000.00
DAUN PINTU ALUMINIUM 2 Buah Taksir Rp 200,000.00 Rp 400,000.00
KACA PINTU 0.365 M2 Taksir Rp 220,000.00 Rp 80,256.00
Kunci pintu slinder 2 Buah AHSP PU A.4.6.2.4 Rp 249,507.50 Rp 499,015.00
Engsel pintu 6 Buah AHSP PU A.4.6.2.5 Rp 219,692.00 Rp 1,318,152.00
Jendela 1
KUSEN JENDELA ALUMINIUM 13.40 M Taksir Rp 170,000.00 Rp 2,278,000.00
LOUVER ZET UPVC 6 Buah Taksir Rp 500,000.00 Rp 3,000,000.00
DAUN JENDELA ALUMINIUM 6 Buah Taksir Rp 200,000.00 Rp 1,200,000.00
KACA JENDELA 1.680 M2 Taksir Rp 220,000.00 Rp 369,600.00
- Engsel Jendela 12 Buah AHSP PU A.4.6.2.6 Rp 219,692.00 Rp 2,636,304.00
- Pacok Jendela 6 Buah AHSP PU A.4.6.2.10 Rp 35,442.00 Rp 212,652.00
- Gagang Jendela J1 6 Buah TAKSIR Rp 12,000.00 Rp 72,000.00
Jendela 2
KUSEN JENDELA ALUMINIUM 48 M Taksir 170,000.00 Rp 8,160,000.00
LOUVER ZET UPVC 24 Buah Taksir 500,000.00 Rp 12,000,000.00
DAUN JENDELA ALUMINIUM 24 Buah Taksir 200,000.00 Rp 4,800,000.00
KACA JENDELA 6.750 M2 Taksir 220,000.00 Rp 1,485,000.00
Engsel Jendela 48 Buah AHSP PU A.4.6.2.6 219,692.00 Rp 10,545,216.00
Pacok Jendela 24 Buah AHSP PU A.4.6.2.10 35,442.00 Rp 850,608.00
Gagang Jendela 24 Buah TAKSIR 15,000.00 Rp 360,000.00
VENTILASI UPVC
VENTILASI 2.930 M Taksir 170,000.00 Rp 498,100.00
LOUVER ZET UPVC 4 Buah Taksir 500,000.00 Rp 2,000,000.00
SUBTOTAL Rp 54,954,903.00
D PEKERJAAN ATAP
Rangka kuda kuda baja ringan 108.9 M2 TAKSIR Rp 350,000.00 Rp 38,102,400.00
Atap Spandek 108.9 M2 AHSP PU A.4.5.2.32 Rp 143,605.00 Rp 15,633,414.72
Papan listplank 46 M AHSP PU A.4.6.1.21 Rp 106,909.00 Rp 4,917,814.00
Bubungan Atap 21.25 M2 AHSP PU A.4.5.2.39.a Rp 83,242.50 Rp 1,768,903.13
SUBTOTAL Rp 60,422,531.85
E PEKERJAAN PEMASANGAN KERAMIK
Pemasangan Keramik Ruangan 108.1 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 30,581,434.73
Pemasangan Keramik Selasar 31.91 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 9,025,864.55
SUBTOTAL Rp 39,607,299.28
F PEKERJAAN PLAFOND
Rangka plafond 108.13 M2 AHSP PU A.4.6.1.20 Rp 89,922.25 Rp 9,723,292.89
Plafond 108.13 M2 AHSP PU A.4.5.1.5 Rp 53,103.88 Rp 5,742,323.80
Rangka plafond luar 31.91 M2 AHSP PU A.4.6.1.20 Rp 89,922.25 Rp 2,869,419.00
Plafond luar 31.91 M2 AHSP PU A.4.5.1.5 Rp 53,103.88 Rp 1,694,741.14
list plafond 91.28 M2 AHSP PU A.4.5.1.9 Rp 53,103.88 Rp 4,847,321.71
SUBTOTAL Rp 24,877,098.53
G PEKERJAAN LISTRIK
AMPERE METER 1 Unit Taksir Rp 55,000.00 Rp 55,000.00
MCB 1 Unit Taksir Rp 60,000.00 Rp 60,000.00
STOP KONTAK 2 Unit Taksir Rp 45,000.00 Rp 90,000.00
SAKLAR GANDA 3 Unit Taksir Rp 60,000.00 Rp 180,000.00
LAMPU HE 18 W 8 Unit Taksir Rp 35,000.00 Rp 280,000.00
LAMPU HE 12 W 3 Unit Taksir Rp 30,000.00 Rp 90,000.00
SUBTOTAL Rp 755,000.00
H PEKERJAAN PENGECETAN
Cat Dinding Luar Dan Dalam 364.1 M2 AHSP PU A.4.7.1.10 Rp 35,221.45 Rp 12,823,918.62
PENGECETAN KOLOM 15.88 M2 AHSP PU A.4.7.1.10 Rp 35,221.45 Rp 559,457.51
Cat Plafond 164.9 M2 AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 8,809,015.13
Cat listplank 46 M AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 2,456,883.00
Cat List Profil Plafond 91.28 M2 AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 4,875,310.44
SUBTOTAL Rp 29,524,584.70
TOTAL RAB Rp 843,783,457.79
14 PLAT TANGGA
1 2 3
B. PEKERJAAN LANTAI 2
PEKERJAAN BETON BERTULANG Rp 305,896,188.68
PEKERJAAN PASANGAN DAN PLASTERAN Rp 89,754,063.51
PEKERJAAN PINTU,JENDELA DAN KUNCI Rp 54,954,903.00
PEKERJAAN ATAP Rp 60,422,531.85
PEKERJAAN PEMASANGAN KERAMIK Rp 39,607,299.28
PEKERJAAN PLAFOND Rp 24,877,098.53
PEKERJAAN LISTRIK Rp 755,000.00
PEKERJAAN PENGECETAN Rp 29,524,584.70
TOTAL BIAYA Rp 843,783,457.79
DIBULATKAN Rp 843,783,000.00
DELAPAN RATUS TIGA BELAS JUTA DUA RATUS TIGA PULUH SEMBILAN RIBU RUPIAH