You are on page 1of 93

DATA VOLUME PEKERJAAN

N0 PERHITUNGAN VOLUME SATUAN GAMBAR

1 PEKERJAAN PERSIAPAN 23.00

A. PEMBERSIHAN LAPANGAN 19.00

PANJANG = 23.00 M
LEBAR = 16.70 M
LUAS (PXL) = (23,00x16,70) 384.10 M2

12.70

16.70
21.00
19.00

B. PEMASANGAN BLOWPLANK

PANJANG = 21.00 M
LEBAR = 14.70 M

12.70
14.70
KELILING = 2 (21,00+14,70) 71.40 M1
2 PEKERJAAN TANAH DAN PONDASI

2A. Galian Pondasi Tapak Sumuran 150X140 40

PANJANG = 1.4 M
LEBAR
TINGGI
=
=
1.4
3
M
M
K1 Kolom30 x 40
Lantai Keramik 40x40
JUMLAH = 17 Unit Spesi Lantai
Lantai Beton Cor 1:3:5
Pasir Urug
Tanah Urug
VOLUME = (PXLXT)XUnit
± 0.00
= (1,4x1,4x3)x17 99.96 M3 ± 0.00
7
3
10
50 50
2B. Urugan Kembali Pondasi Tapak Sumuran 30
-50
VOLUME = 3/4 x volume galian tapak sumuran
= 3/4 x 99,96 74.97 M3 Sloof 25/40
Tanah Urug
2C. Pondasi Tapak Bertulang
120 12 D16
A (POER TAPAK)
150
PANJANG = 1.2 M
Ø10-100
LEBAR = 1.2 M
TINGGI = 0.3 M D16-150
JUMLAH = 17 Unit
30 D16-150
VOLUME = (PxLxT)xUnit -200 300
= (0,3x1,2x1,2)x17 7.344 M3 120
Besi Angkur Ø 10
Tapak Sumuran
2D. B (PANDESTAL TAPAK) Diameter 100cm
PANJANG = 0.4 M
Ø 12 - 125 Spiral
LEBAR = 0.3 M 135
150 Ø12 - 150
TINGGI = 1.2 M
JUMLAH = 17 Unit
Betor Cor Cyclope

VOLUME = (PxLxT)xUnit
= (0,4x0,3x1,2)x17 2.448 M3 10 Lantai Kerja
-350 5
Pasir Alas
2E. Volume Total Pondasi Tapak 10 100 10
= (A+B) 10 120 10
140
10 Lantai Kerja
-350 5
Pasir Alas
10 100 10
10 120 10

= (7,344+2,448) 9.792 M3 140

2F. Alas Pasir


PANJANG = 0.05 M 120
LEBAR = 1.4 M
TINGGI = 1.4 M

VOLUME = (PxLxT) 0.098 M3 45

2G. Cor Lantai Kerja

D16-150
D16-150
PANJANG = 0.1 M
LEBAR = 1.4 M 30 120
TINGGI = 1.4 M

VOLUME = (PxLxT) 0.196 M3


45 D16-150
D16-150
2H. Beton Cor Cyclope
R1 = 0.6 M
R2 = 0.5 M 40 40 40
TINGGI = 3.14 M
JUMLAH PONDASI = 17 Unit
VOLUME = 3,14 (R1-R2)
= 3,14 ( 0,602-0,502) Ø 12 - 125 Spiral Ø12 - 150
= 3,14 ( 0,11) 0.345 M2
10
= (TxV) x Unit
= (0,345 x 3,14) x 17 18.437 M3
15

120

10

120
10

120

3 GALIAN PONDASI MENERUS

3A. PONDASI MENERUS

Horizontal
TINGGI = 0.85 M
LEBAR = 0.9 M
PANJANG = 41 M

VOLUME = (pxlxt)
= (41x0,9x0,85) 31.37 M3

Vertikal Lantai Keramik 40x40


Spesi Lantai
TINGGI = 0.85 M Lantai Beton Cor 1:3:5
Pasir Urug
LEBAR = 0.9 M Tanah Urug
PANJANG = 43.62 M ± 0.00
± 0.00 3 3
7 7
VOLUME = (p x l x t) 10 10
= (43,62 x 0,9 x 0,85) 33.37 M3 50 50
40
30 30

Volume Galian Total Pondasi Menerus -50


volume galian total pondasi me = (horizontal + vertikal ) Sloof 25/40 25
= (31,37 + 33,37) 64.73 M 3 35
Angker Besi D12 - 100cm 70
85 85
3B. Urugan Kembali Pondasi Menerus Pondasi Batu Gunung
VOLUME = 1,4 x volume galian
= (1/4 x 64,73) 16.18 M3 10
-135 5

3C. ALAS PASIR PONDASI MENERUS 10 70 10


90

TINGGI = 0.05 M Pasir Alas


LEBAR = 0.90 M
PANJANG = 67.8 M

VOLUME = (p x l x t )
= (67,8,175x 0,9 x 0,05) 3.051 M3
3D. ASTAMPING

PANJANG = 67.8 M
LEBAR = 0.9 M
TINGGI = 0.1 M

VOLUME = ( p x l x t)
= (67,8 x 0,9 x 0,1) 6.102 M3

40
3E. PAS BATU GUNUNG

PANJANG = 67.8 M Sloof 25/40 25


LEBAR A = 0.35 M
LEBAR B = 0.7 M
35
Angker Besi D12 - 100cm 70
TINGGI = 0.7 M
85
Pondasi Batu Gunung
VOLUME = (a + b /2) x p x t
= (0,35+0,7/2) x 67,8 x 0,7) 16.96 M3
10
5

10 70 10
90
Aanstamping
Pasir Alas
4 PEKERJAAN BETON BERTULANG

1.80

3.50

3.50
4A. SLOOF 25/40

A
3.00
PANJANG = 67.8 M
LEBAR = 0.25 M

B
TINGGI = 0.4 M
VOLUME = (p x l x t)

4.00
= (67,8x0,25x0,4) 6.780 M3

4B. GALIAN SLOOF GANTUNG

C
1.80

4.00
19.00
PANJANG = 15.08 M
LEBAR = 0.35 M
TINGGI = 0.20 M

D
3.63

4.00
VOLUME = (P X L X T) 1.0556 M3

4C. BETON COR

E
PANJANG = 15.08 M

4.00
LEBAR = 0.35 M
TINGGI = 0.10 M

F
VOLUME = (P X L X T) 0.528 M3

3.64

3.63
3.63 10.90
2

5
4D. PASIR ALAS
PANJANG = 15.08 M
LEBAR = 0.35 M
TINGGI = 0.05 M

VOLUME = (P X L X T) 0.264 M3

4E. SLOOF GANTUNG 25/40

PANJANG = 15.08 M

35
LEBAR = 0.25 M
TINGGI = 0.40 M
35
VOLUME = ( 15,08 X 0,25 X 0,40) 1.508 M3

4F. KOLOM K1 ( Lantai 1 )

PANJANG = 0.40 M
LEBAR = 0.30 M
TINGGI = 3.65 M
UNIT = 17
VOLUME = (P X L X T) 7.446 M3

Kolom K1 (Lantai 2)

PANJANG = 0.40 M
LEBAR = 0.30 M
TINGGI = 3.45 M
UNIT = 17
VOLUME = (P X LX T) 7.038 M3

Kolom K2 (Lantai 2)

PANJANG = 0.25 M
LEBAR = 0.20 M
TINGGI = 3.50 M
UNIT = 8 M
VOLUME = 1.400 M3
4G. BALOK LANTAI 30/60

PANJANG = 13.74 M
LEBAR = 0.30 M
TINGGI = 0.60 M

VOLUME = (P X L X T) 2.473 M3

BALOK 25/45

PANJANG = 92.73 M
LEBAR = 0.25 M
TINGGI = 0.45 M

VOLUME = ( PXLXT ) 10.432 M3

BALOK 20/40

PANJANG = 23.84 M
LEBAR = 0.20 M
TINGGI = 0.40 M

VOLUME = (PXLXT) 1.907 M3

BALOK BORDES 20/30

PANJANG = 5.40 M
LEBAR = 0.20 M
TINGGI = 0.30 M
BALOKBORDES
20/30
VOLUME = (PXLXT) 0.324 M 3
BALOKBORDES
20/30

BALOK LATAI 13/15

PANJANG = 55.65 M
LEBAR = 0.13 M
TINGGI = 0.15 M

VOLUME = (PXLXT) 1.085 M3

RENG BALOK 20/35

PANJANG = 66.86 M
LEBAR = 0.20 M
TINGGI = 0.35 M

VOLUME = (PXLXT) 4.680 M3

RENG BALOK 20/30

PANJANG = 30.81 M
LEBAR = 0.20 M
TINGGI = 0.30 M

VOLUME = (PXLXT) 1.849 M3


4H. PLAT LANTAI (Tipe 1)

PANJANG = 3.60 M
LEBAR = 3.75 M
TEBAL = 0.12 M

1.80

3.50

3.50
UNIT = 8
VOLUME = ( PXLXT )UNIT 12.96 M3

A
PLAT LANTAI (TIPE 2)

Ø10-20

3.00
B
Ø10-20

Ø10-10
PANJANG = 1.52 M

B
LEBAR = 3.75 M
TEBAL = 0.12 M
UNIT = 3 Ø10-20

Ø10-20

4.00
Ø10-20
Ø10-10
VOLUME = (PXLXT)UNIT 2.052 M3

Ø10-20

Ø10-10
PLAT LANTAI (Tipe 3)

C
Ø10-20 Ø10-20
Ø10-20 Ø10-20

PANJANG = 1.52 M Ø10-10 Ø10-10

Ø10-20

4.00
LEBAR = 2.75 M

Ø10-20
1.78
TEBAL = 0.12 M

Ø10-20

Ø10-10
Ø10-20

Ø10-10
UNIT = 2

D
VOLUME = (PXLXT)UNIT 1.003 M3

Ø10-20
Ø10-20 Ø10-20

4.00

4.00
Ø10-20 Ø10-20
PLAT LANTAI (Tipe 4) Ø10-10 Ø10-10

Ø10-20

Ø10-10
PANJANG = 1.52 M

E
LEBAR = 1.98 M
TEBAL = 0.12 M

Ø10-20
Ø10-20
Ø10-20
4.00

4.00
Ø10-20
A

A
Ø10-10

VOLUME = (PXLXT) 0.361 M3

Ø10-20

Ø10-10
Ø10-20

Ø10-10

F
B
1.665

3.635

3.635

3.635
1

5
E
Ø10-20
Ø10-20
Ø10-20

4.00

4.00
Ø10-20

A
Ø10-10

Ø10-20

Ø10-10
Ø10-20

Ø10-10

F
PLAT LANTAI (Tipe 5)

B
1.665

3.635

3.635

3.635
PANJANG = 1.52 M

5
LEBAR = 1.58 M
TEBAL = 0.12 M

VOLUME = (PXLXT) 0.288 M3

PLAT LANTAI (Tipe 6)

PANJANG = 1.74 M
LEBAR = 1.58 M
TEBAL = 0.12 M

VOLUME = (PXLXT) 0.330 M3

PLAT LANTAI (Tipe 7)


+ 2.05
PANJANG = 1.44 M 12
LEBAR = 1.58 M
TEBAL = 0.12 M

VOLUME = (PXLXT) 0.273 M3 Balok Bordes 20/30


4I PLAT BORDES 150
PANJANG = 1.20 M
LEBAR = 2.70 M
TEBAL = 0.12 M
Railing Besi Pipa 2"

VOLUME = (PXLXT) 0.389 M3


10 13

5 GALIAN PONDASI TANGGA 30


15 Balok 13/15
30 Pas. Bata 1:2
PANJANG = 1.40 M
30 15
12
LEBAR = 0.25 M 90
30 15 75
TINGGI = 0.65 M Tulangan Tangga 15
15
Ø12 -200
15 15
Latai - 1
± 0.00 ± 0.00
3
7
10
60
50
Sloof 25/40 30
Balok 13/15
30 Pas. Bata 1:2
30 15
12
90
30 15 75
Tulangan Tangga 15
15
Ø12 -200
15 15
Latai - 1
VOLUME = ( PXLXT ) 0.228 M3 ± 0.00 ± 0.00
3
7
10
60
5A. PASIR URUG 50
Sloof 25/40 30

PANJANG = 1.40 M 10
5
LEBAR = 0.45 M 25
45
TINGGI = 0.05 M Lantai Kerja 1:3:5
Pasir Urug

VOLUME = ( PXLXT ) 0.032 M3

5B. LANTAI KERJA

PANJANG = 1.40 M 30
LEBAR = 0.45 M
TINGGI = 0.10 M 12 30

VOLUME = ( PXLXT ) 0.063 M3 30

5C. PLAT TANGGA LT 1 DAN 2


15 15
PANJANG = 8.10 M
LEBAR = 1.35 M
TEBAL = 0.12 M
405
VOLUME = (PXLXT) 1.312 M3

5D. ANAK TANGGA LT 1 DAN 2


A B
300
PANJANG = 8.10 M
LEBAR = 1.35 M
TINGGI = 0.075 M Balok Bordes 20/30

150
VOLUME = (PXLXT) 0.820 M3
Balok Bordes 20/30

5E. RAILING TANGGA LT 1 DAN 2


350
13
30 30 30 30
12
PANJANG = 8.10 M 11

10

6
Balok Bordes 20/30

350
13

30 30 30 30
12

11
TINGGI = 0.90 M 10

VOLUME LOBANG TANGGA = 0.36 M 9

VOLUME = (PXL) - LOBANG TANGGA 6.930 M3 8

180
4

126 1
140

6 PEKERJAAN DINDING DAN PLASTERAN

6A. LANTAI 2 PAS BATA 1: 40

PANJANG = 64.16 M
TINGGI = 3.45 M
LUAS P, J, DAN BATU ROSTER = 39.31 M

LUAS = (PXL) - LUAS PINTU DAN JENDELA 182.0 M2

2.70
3.00
6B. LUAS PINTU DAN JENDELA
Pintu

P1

3.24
PANJANG = 5.2
LEBAR = 0.9

3.70
4.00
J2
J1
LUAS = (PXL) 4.68 M2

Jendela
PANJANG = 19.9
LEBAR = 1.35

4.00
J2

J2
LUAS = (PXL) 26.87 M2

6C. BATU ROSTER


PANJANG = 2.50 P1
LEBAR = 3.1
LUAS = (PXL) 7.75 M2

4.00
J2
J1

4.00
J2

J2
P1

4.00
J2
J1
6D. PLASTERAN = 2 X LUAS PAS BATA 1:4 364.09 M2

4.00
J2

J2
3.24 3.50

3.50
7 PERHITUGAN KUSEN DAN DAUN
Kusen UPVC

7A. KUSEN PINTU ALUMINIUM Louver Zet UPVC


PANJANG = 7.00 M
7.00 M

7B. KUSEN JENDELA ALUMINIUM Kaca 5 Mm


PANJANG = 25.70 M
25.70 M
7C. DAUN PINTU ALUMINIUM
Panel UPVC 260
PANEL UPVC = 2 UNIT

7D. DAUN JENDELA ALUMINIUM

PANEL UPVC = 30 UNIT

7E. KACA JENDELA

PANJANG = 0.64 M
4
LEBAR = 0.44 M 90
UNIT = 30
LUAS = (PXL) 8.448 M2
Kusen UPVC

Louver Zet UPVC


7F. KACA PINTU

135

Kaca 5Mm
Kusen UPVC

Louver Zet UPVC

PANJANG = 0.38 M 135

LEBAR = 0.24 M Kaca 5Mm


UNIT = 4
LUAS = (PXL) 0.365 M2
Kusen UPVC 5

265 5
7G. VENTILASI Kusen UPVC

PANJANG = 2.93 M Louver Zet UPVC

2.930 M
LOUVER ZET UPVC = 4 UNIT 135

Kaca 5Mm

Kusen UPVC

200

8 PEKERJAAN ATAB DAN KUDA - KUDA


Rabung Atap Spandex (Setara) 0.35
8A. KUDA-KUDA BAJA RINGAN Atap Spandex (Setara) 0.30
Gapit Zincalume PcTruss C.75
Sokong Zincalume PcTruss C.75
LUAS ATAB KIRI KANAN BAGIAN 1 Reng Zincalume
LUAS = 1/2 X 9,72 X 5,60 Bint Zincalume PcTruss C.75
= 27,216 x 2 sisi 54.432 M2
453
LUAS ATAB KIRI KANAN BAGIAN 2 278
640
289
640

LUAS = 1/2 X 9,72 X 5,60 196


204
135
127
= 27,216 X 2 sisi 54.432 M2 85 972

RB20/30

8B. ATAB SPANDEK (SETARA) 0.30 Reng Balk 20/35 Reng Balk 20/35

700 180
LUAS ATAS BAGIAN 1 DAN 2 880

LUAS = 54,432 X 2 108.9 M2

1.00
K11.08 K11.20 K11.20 K11.20 K11.20 K1 1.20 K1 1.20 K11.20 K11.08 K1 1.00
8C. LISTPLANK
PANJANG = (13+ 12+12+9) 46 M

8D. TAWING LAYAR


1.00
1.25
0.56 0.98

0.98
K11
1
11.20 K11.20 K11.20 K1 1.20 K1 1.20 K11.20 K11.08 K1 1.00
LUAS = 1/2 X 4,15 X 2,39

1.00
= 4,959 X 2 sisi 9.918 M2

1.25
= 9,918 X 2 UNIT 19.84 M

0.56 0.98

0.98
K11.13 K11.13 K11.13 K11.13 K11.13 K10.98K1 1.00
1.13
1.13
1.13
Rabung Atap Spandex (Setara) 0.35
Atap Spandex (Setara)0.30
9 PERHITUNGAN PLAFON

1.80

3.50

3.50
9A. RUANG 1
PlafondPVC PlafondPVC
PANJANG = 7.87 M
LEBAR = 6.87 M

Plafond PVC

3.00
LUAS = (PXL) 54.07 M2

9B. RUANG 2
PANJANG = 7.87 M
LEBAR = 6.87 M

4.00
LUAS = (PXL) 54.07 M2

Plafond PVC

Plafond PVC

Plafond PVC
Plafond PVC
9C. SELASAR LANTAI 2
PANJANG = 19.11 M Plafond PVC

4.00
LEBAR = 1.67 M

19.00
LUAS = 31.91 M2
PlafondPVC
9E. PLAFON ATAS TANGGA
PANJANG = 8.67 M

4.00
LEBAR = 2.87 M

Plafond PVC
LUAS = (PXL) 24.88 M2
Plafond PVC

Plafond PVC

Plafond PVC

4.00
PlafondPVC PlafondPVC
4.00
Plafond PVC
Plafond PVC

Plafond PVC

Plafond PVC
TOTAL PLAFON LANTAI 2

4.00
= (R1 + R2 + SLASAR + ATS TANGGA) 164.93 M2

PlafondPVC PlafondPVC
10 INTALASI LISTRIK

1.80

3.50

3.50

3.63
AMPERE METER = 1 UNIT

12.43
MCB = 1 UNIT
= AMPERMETER= 1 BH
STOP KONTAK = 2 UNIT
SAKLAR = - UNIT = MCB= 1 BH
SAKLAR GANDA = 3 UNIT
= STOPKONTAK= 2 BH
SAKLAR TRIPLE = - UNIT
LAMPU HE 18 W = 8 UNIT = SAKLARTUNGGAL= - BH
LAMPU HE 12 W = 3 UNIT = SAKLARGANDA= 3 BH
= SAKLARTRIPLE= - BH
= LAMPUHE18 W= 8 BH
= LAMPUHE12 W= 3 BH
11 PEMASANGAN KRAMIK (40 X 40)
11A. LANTAIN 1

1.80

3.50

3.50
Ruang 1
PANJANG = 7.87 M
LEBAR = 6.87 M

3.00
LUAS = (PXL) 54.07 M2

A
T
Ruang 2
PANJANG = 7.87 M
LEBAR = 6.87 M

4.00
LUAS = (PXL) 54.07 M2

( Keramik 40x40 )
(Keramik 40x40 )

R. Ke l a s
Se l a s a r
+4.03

+4.05
Selasar lantai 1
PANJANG = 19.11 M

4.00
LEBAR = 1.67 M

19.00
LUAS = (PXL) 31.91 M2

11B. LANTAI 2

B
Ruang 1

4.00
PANJANG = 7.87 M

(Keramik 40x40)
(Keramik 40x40 )

R. Ke l a s
Se l a s a r

LEBAR = 6.87 M
+ 4.03

+4.05

4.00
B

4.00
(Keramik 40x40)
(Keramik 40x40 )

R. Ke l a s
Se l a s a r
+4.03

+4.05
LUAS = (PXL) 54.07 M2

4.00
Ruang 2
PANJANG = 7.87 M
LEBAR = 6.87 M
LUAS = (PXL) 54.07 M2

1.80

3.50

3.50

3.63
12.43
Selasar lantai 2
PANJANG = 19.11 M
LEBAR = 1.67 M
LUAS = (PXL) 31.91 M2

12 PEKERJAAN PENGECETAN

PENGECETAN LISPLANK = 46 M
PENGECETAN DINDING = 364.1 M2
PENGECETAN PLAFON = 164.9 M2
PENGECETAN LIST PLAFON = 91.28 M
PENGECETAN KOLOM = 15.88 M2
- PEKERJAAN LANTAI
- Tanah urug elevasi 0,00 tipe 1
panjang = 7.75 M
lebar = 6.87 M

1.80

3.64

3.64
tinggi = 0.30 M
unit = 2 unit
volume = (PXLXT) 31.9 M3

3.00
A

A
Tanah urug elevasi 0,00 tipe 2
panjang = 2.75 M

1.77
lebar = 6.87 M
tinggi = 0.3 M

4.00
volume = (PXLXT) 5.67 M3

(Keramik 40x40 )

(Keramik 40x40 )
± 0.00
-0.03
Tanah urung elevasi -0,03 tipe 3
panjang = 18.5 M
lebar = 1.77 M

4.00
tinggi = 0.27 M

19.00
volume = (PXLXT) 8.84 M3
B

4.00
(Keramik 40x4

( Keramik 40x4
± 0.00
-0.03
4.00
19.00
Tanah urug elevasi -0,03 tipe 4
panjang = 1.58 M

4.00
lebar = 3.47 M

(Keramik 40x40 )

(Keramik 40x40 )
tinggi = 0.27 M

± 0.00
-0.03
volume = (PXLXT) 1.48 M3

Total tanah urug = 47.93 M3

4.00
- Pasir urug elevasi 0,00 tipe 1
panjang = 7.75 M
lebar = 6.87 M

1.80

3.64

3.64

3.63
tinggi = 0.10 M

12.70
unit = 2 unit
volume = (PXLXT) 10.65 M3

Pasir urug elevasi 0,00 tipe 2


panjang = 2.75 M
lebar = 6.87 M
tinggi = 0.10 M
volume = (PXLXT) 1.89 M3

Pasir urung elevasi -0,03 tipe 3


panjang = 18.5 M
lebar = 1.77 M
tinggi = 0.10 M
volume = (PXLXT) 3.27 M3

Pasir urug elevasi -0,03 tipe 4


panjang = 1.58 M 1.50
lebar = 3.47 M Lantai Keramik 40x40 0.07 0.07
Spesi Lantai
tinggi = 0.10 M Lantai Beton Cor 1:3:5 0.10 0.10
Pasir Urug
volume = (PXLXT) 0.55 M3 0.30 0.27

1.80
Total pasir urug = 16.36 M3 0.85

- Lantai cor elevasi 0,00 tipe 1


panjang = 7.75 M
lebar = 6.87 M
tinggi = 0.07 M
unit = 2 unit
volume = (PXLXT) 7.5 M3

Lantai cor elevasi 0,00 tipe 2


panjang = 2.75 M
lebar = 6.87 M
tinggi = 0.07 M
volume = (PXLXT) 1.32 M3

Lantai cor elevasi -0,03 tipe 3


panjang = 18.5 M
lebar = 1.77 M
tinggi = 0.07 M
volume = (PXLXT) 2.29 M3

Lantai cor elevasi -0,03 tipe 4


panjang = 1.58 M
lebar = 3.47 M
tinggi = 0.07 M
volume = (PXLXT) 0.38 M3
Total lantai cor = 11.45 M3
16.70 14.70
12.70
12.70
70
85

10
5

amping
Alas
etara) 0.35
30
alume PcTruss C.75
ncalume PcTruss C.75
lume
ume PcTruss C.75

/30
PERHITUNGAN BESI DAN BEKISTING

Pekerjaan : PEMBANGUNAN RUANG KEGIATAN BELAJAR TKN 3


Lokasi : KOTA BANDA ACEH

1 SLOOF (25 x 40)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


1 Sloof SL ( 0.25 x 0.40 ) M = 1/( b x h)
= 10.000 m'
Jumlah Tul. Pokok = 8 Batang a. Pembesian untuk 1 m beton adalah
3

Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 16, = 126.2592 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 10 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 10,
Panjang begel = 1.150 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 100.00 ± -------> 100.00 Btg
101 btg

Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2


= 71.606 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 8.000 m2 -------> 50%

Total Berat Besi = 197.87 Kg/M3


Papan mal 2 x Pakai = 4.000 M2/M3
2 BALOK LANTAI BL I (30 x 60 )

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


2 Balok Lantai ( 0.30 x 0.60 ) M = 1/( b x h)
= 5.556 m'
Jumlah Tul. Pokok = 10 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2 Batang Berat besi Ø 16, = 87.6800 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 10 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 9.864 kg
Luas Permukaan Papan = 1.26 M2
3. Tulangan Begel Besi Ø 10,
Panjang begel = 1.650 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 55.56 ± -------> 55.00 Btg
56 btg

Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2


= 56.965 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 7.000 m2 -------> 50%

Total Berat Besi = 154.51 Kg/M3


Papan mal 2 x Pakai = 3.500 M2/M3
3 BALOK LANTAI BL 2 (25 x 45 )

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


3 Balok Lantai ( 0.25 x 0.45 ) M = 1/( b x h)
= 8.89 m'
Jumlah Tul. Pokok = 8 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 16, = 112.2304 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.91 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 1.250 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 88.89 ± -------> 88.00 Btg
89 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 43.8948 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 8.09 m2 -------> 50%

Total Berat Besi = 156.13 Kg


Papan mal 2 x Pakai = 4.044 M2
4 BALOK LANTAI BL 3 ( 20 x 40)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


4 Balok Lantai ( 0.20 x 0.40 ) M = 1/( b x h)
= 12.50 m'
Jumlah Tul. Pokok = 5 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2 Batang Berat besi Ø 16, = 98.6400 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 10.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 22.19 kg
Luas Permukaan Papan = 0.76 M2
3. Tulangan Begel Besi Ø 10,
Panjang begel = 1.050 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 125.00 ± -------> 125.00 Btg
126 btg

Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2


= 81.5630 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 9.50 m2 -------> 50%

Total Berat Besi = 202.40 Kg


Papan mal 2 x Pakai = 4.750 M2
5 KOLOM K1 ( 30 x 40)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


5 Kolom K1 ( 0.30 x 0.40 ) M = 1/( b x h)
= 8.33 m'
Jumlah Tul. Pokok = 10 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 16, = 131.5200 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 10.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = kg
Luas Permukaan Papan = 1.40 M2
3. Tulangan Begel Besi Ø 10,
Panjang begel = 1.250 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 83.33 ± -------> 83.00 Btg
84 btg

Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2


= 64.7325 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 11.67 m2 -------> 50%

Total Berat Besi = 196.25 Kg


Papan mal 2 x Pakai = 5.833 M2
6 KOLOM K2 (20 x 25)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


6 Kolom K2 ( 0.20 x 0.25 ) M = 1/( b x h)
= 20.00 m'
Jumlah Tul. Pokok = 6.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 16, = 189.3888 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.90 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.750 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 200.00 ± -------> 200.00 Btg
201 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 59.4799 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 18.00 m2 -------> 50%

Total Berat Besi = 248.87 Kg


Papan mal 2 x Pakai = 9.000 M2
7 KOLOM PRAKTIS (13 x 13)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


7 Kolom Praktis ( 0.13 x 0.13 ) M = 1/( b x h)
= 59.17 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 10.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 10, = 145.9172 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.150 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.52 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.370 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 394.48 ± -------> 394.00 Btg
395 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 57.6649 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 30.77 m2 -------> 50%
Total Berat Besi = 203.58 Kg
Papan mal 2 x Pakai = 15.385 M2

8 RING BALOK RB 1 (20 x 35)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


8 Balok RB 1 ( 0.20 x 0.35 ) M = 1/( b x h)
= 14.29 m'
Jumlah Tul. Pokok = 6.00 Batang a. Pembesian untuk 1 m beton adalah
3

Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 14, = 103.5720 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.90 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.950 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 142.86 ± -------> 143.00 Btg
143 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 53.6010 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


= 12.86 m2 -------> 50%

Total Berat Besi = 157.17 Kg


Papan mal 2 x Pakai = 6.429 M2

9 RENG BALOK RB 2 (20 X 30)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


9 Balok RB 2 ( 0.20 x 0.30 ) M = 1/( b x h)
= 16.67 m'
Jumlah Tul. Pokok = 5.00 Batang a. Pembesian untuk 1 m beton adalah
3

Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 14, = 100.6950 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.850 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 166.67 ± -------> 167.00 Btg
167 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 56.0078 kg
4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 13.33 m2 -------> 50%

Total Berat Besi = 156.70 Kg


Papan mal 2 x Pakai = 6.667 M2

10 BALOK BORDES (20 x 30)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


10 Balok Bordes ( 0.20 x 0.30 ) M = 1/( b x h)
= 16.67 m'
Jumlah Tul. Pokok = 5.00 Batang a. Pembesian untuk 1 m beton adalah
3

Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 14, = 100.6950 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 10.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 29.59 kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.850 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 166.67 ± -------> 167.00 Btg
167 btg
Berat besi Ø 10, = Byk begel x Pjg begel x 0.006165 x dia.2
= 87.5122 kg

4. Papan mal = Pjg blok utk 1 m3 beton x luas permukaan papan


= 13.33 m2 -------> 50%

Total Berat Besi = 217.80 Kg


Papan mal 2 x Pakai = 6.667 M2

11 PLAT LANTAI (12 CM)

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 11,50 Meter


11 Plat Lantai = 12 cm Panjang Besi (Pjb) = 8.94 M
Jumlah Baris Besi (Jb) = 33.04 M
Bidang X = 49.56 M Jumlah Lapis (Jl) = 2.00 Lapis
Bidang Y = 8.94 M Diameter Besi (d) = 10.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 1.50 M = 363.820 Kg

2. Untuk Bidang 6,00 Meter


Panjang Besi (Pjb) = 49.56 M
Jumlah Baris Besi (Jb) = 5.96 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm
Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d
= 363.820 Kg

Total Berat Besi = 727.64 Kg

Berat Besi Untuk 1 m3 Beton = 13.69 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 8.333 M2 / M3 Beton

12 PONDASI TAPAK PT 1 (120 x 120 )

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 1.60 Meter


12 Pondasi Tapak (120X120) = 30.0 cm Panjang Besi (Pjb) = 1.20 M
Jumlah Baris Besi (Jb) = 8.00 M
Bidang X = 1.20 M Jumlah Lapis (Jl) = 2.00 Lapis
Bidang Y = 1.20 M Diameter Besi (d) = 16.00 mm
Tebal Pengecoran = 0.300 M
Diameter Besi = 16.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.150 M = 30.287 Kg

2. Untuk Bidang 1.60 Meter


Panjang Besi (Pjb) = 1.20 M
Jumlah Baris Besi (Jb) = 8.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 16.00 mm

Berat besi Ø 16, = Pjg*Jb*Jl*0.006162*d*d


= 30.287 Kg

Total Berat Besi = 60.57 Kg

Berat Besi Untuk 1 m3 Beton = 140.22 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 3.333 M2 / M3 Beton

13 BALOK LATAI (13 x 15 )

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


4 Balok Lantai ( 0.13 x 0.15 ) M = 1/( b x h)
= 51.282 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 10.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 10, = 126.4615 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.150 M Berat besi Ø 0, = kg
Luas Permukaan Papan = 0.19 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.410 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 341.88 ± -------> 341.00 Btg
342 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


= 55.325 kg

4. Papan mal = Pjg balok utk 1 m3 beton x luas permukaan papan


= 9.744 m2 -------> 50%

Total Berat Besi = 181.79 Kg/M3


Papan mal 2 x Pakai = 4.872 M2/M3
DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO Jenis Barang Satuan Harga


A. UPAH
1 Mandor Orang 150,000.00
2 Kepala Tukang Orang 165,000.00
3 Tukang Orang 135,000.00
4 Pekerja Orang 125,000.00

B. HARGA BAHAN
1 Air Liter 120.00
T Ampelas Lembar 3,500.00
T Besi Strip Tebal 5 mm Kg 150,000.00
T Balok Kayu Kelas II M3 3,900,000.00
2 Batu Bata Buah 950.00
3 Batu Kali/ Batu Belah (Sungai/Gunung) M3 200,000.00
4 Batu Belah 5-7 Cm M3 195,000.00
5 Batu Pecah 2-3 Cm M3 320,000.00
T Besi Baja Profil Kg 150,000.00
6 Besi Beton Polos Kg 16,000.00
7 Besi Beton Ulir Kg 19,000.00
8 Bubungan Genteng M1 50,000.00
9 Bubungan Seng M1 40,000.00
10 Cat Dasar Tembok/Sealer Setara Vinilex Kg 35,000.00
11 Cat Kayu Dasar Kg 50,000.00
12 Cat Kayu Mengkilat Kg 65,000.00
13 Cat Menie Besi Kg 35,000.00
14 Cat Tembok Setara Vinilex Kg 55,000.00
15 Dempul Kayu Kg 18,000.00
16 Dolken Kayu Ф8-10/400 Cm Batang 75,000.00
17 Door Holden Pasang 135,000.00
18 Engsel Jendela Pasang 25,000.00
19 Engsel Pintu Pasang 25,000.00
20 Floor Drain Buah 27,000.00
21 Gypsum Board Tebal 9 mm Lembar 125,000.00
22 Jaring Kawat Baja Kg 36,000.00
23 Hak Nagin Pasang 17,000.00
24 Kaca Bening Uk.2 mm M2 75,000.00
25 Kaca Bening Uk.3 mm M2 85,000.00
26 Kaca Bening Uk. 5 mm M2 120,000.00
27 Kaca Rayband Uk. 3 mm M2 130,000.00
28 kacca Rayband Uk. 5 mm M2 135,000.00
29 Kaso-Kaso (5x7) Cm M3 3,500,000.00
30 Kawat Beton Kg 20,000.00
31 Kawat Duri Kg 50,000.00
32 Kawat Harmonika M2 60,000.00
33 Kawat Nyamuk/Kasa Logam M2 40,000.00
34 Kawat Nyamuk/Kasa Plastik M2 30,000.00
T Kerawang/Rooster Bh 700,000.00
T Kayu Kaso 5 x 7 cm M3 325,000.00
T Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 70,000.00
35 Kayu Bakar M3 750,000.00
36 Kayu Bakau 10 Cm Batang 60,000.00
37 Kayu Kelas I (Seumantok/Ulim/dll) M3 5,500,000.00
38 Kayu Kelas II (Kamper/Kruing/dll) M3 4,800,000.00
39 Kayu Kelas III (Borneo/dll) M3 3,900,000.00
40 Kayu Kelas IV (Semgon/dll) M3 3,750,000.00
41 Keramik Non Pholised 20 x 20 Cm Setara Ikat Bh 3,000.00
42 Keramik Uk. 20 x 20 Cm Bh 3,500.00
43 Keramik Uk. 40 x40 Cm Bh 12,000.00
44 Keramik Uk. 20 x 25 Cm Bh 3,500.00
45 Keramik Uk. 30 x 30 Cm Bh 6,200.00
46 Kertas Amplas Lembar 3,000.00
47 Kloset Duduk Keramik Setara Toto+Tabung Buah 1,500,000.00
48 Kloset Jongkok Keramik Setara Toto Buah 350,000.00
49 Kran Air 3/4" Buah 10,000.00
50 Kuas Cat Buah 15,000.00
51 Kunci Pintu (Standar) Buah 150,000.00
52 Kunci Pintu Biasa Buah 100,000.00
53 Lampu Hemat Energi 11 Watt Setara Hannochs Buah 35,000.00
54 Lampu Hemat Energi 18 Watt Setara Hannochs Buah 40,000.00
55 Lampu Hemat Energi 20 Watt Setara Hannochs Buah 45,000.00
56 Lem Kayu Kg 18,000.00
57 List Eternit Kayu M1 8,000.00
58 Marmer M2 50,000.00
59 Minyak Cat Liter 25,000.00
60 Minyak Bekisting Liter 5,000.00
61 Multypleks 3 mm Lembar 70,000.00
62 Multypleks 4 mm Lembar 75,000.00
63 Multypleks 6 mm Lembar 125,000.00
64 Multypleks 9 mm Lembar 155,000.00
65 Pacok Jendela Dan Ventilasi Pasang 7,500.00
66 Paku Asbes Kg 20,000.00
67 Paku Beton 8 Inchi Kotak 19,000.00
68 Paku Kait Buah 1,000.00
69 Paku Kayu Kg 18,000.00
70 Paku Tripleks Kg 19,000.00
71 Paku semg Kg 20,000.00
72 Paku Sumbat Buah 1,200.00
73 Paku Skrup Kg 23,000.00
74 Pasir Batu (Sirtu) Material Jalan M3 300,000.00
75 Pasir Beton Atau Kerikil M3 200,000.00
76 Pasir Pasang M3 190,000.00
77 Pasir Urug M3 150,000.00
78 Pelumas/Oli Liter 40,000.00
79 Pipa Leading Ф 1" Glavanis Tebal 3,2 mm Batang 75,000.00
80 Pipa Leading Ф 2" Glavanis Tebal 3,2 mm Batang 85,000.00
81 Pipa Leading Ф 3" Glavanis Tebal 3,2 mm Batang 90,000.00
82 Pipa PVC Ф 1" Batang 40,000.00
83 Pipa PVC Ф 2" Batang 50,000.00
84 Pipa PVC Ф 3" Batang 60,000.00
T Plamir Kayu Kg 18,000.00
85 Plamir Tembok Kg 30,000.00
86 Plin Kramik Buah 5,000.00
87 Plywood Tebal 9 mm Lembar 150,000.00
T Profil Aluminium M 80,000.00
T Penjaga Jarak Bekisting / Spacer Bh 30,000.00
T Rabung Seng Genteng M 130,000.00
88 Pemasangan Atap Baja Ringan M2 350,000.00
89 Residu Kg 10,000.00
90 Reservoir Air 500 Liter Buah 1,500,000.00
91 Reservoir Air 1000 Liter Buah 2,500,000.00
92 Reservoir Air 500 Liter Stainless steel Buah 2,000,000.00
93 Schakelar Buah 12,500.00
94 Semen @ 40 Kg Zak 55,000.00
95 Semen @ 40 Kg Kg 1,375.00
96 Semen Putih @ 50 Kg Zak 220,000.00
97 Semen Putih @ 50 Kg Kg 4,400.00
98 Semen Warna Kg 7,500.00
99 Seng Genteng Metal M2 75,000.00
100 Seng BJLS 0,20 Cat Pabrik M2 70,000.00
101 Seng Gelombang BJLS 30 M2 50,000.00
102 Seng Gelombang BJLS 30 Cat Pabrik M2 55,000.00
103 Seng Plat BJLS 20 M2 60,000.00
104 Seng Plat BJLS 30 M2 65,000.00
104 Solar (Industri) Liter 12,500.00
106 Sekrup Fixer Buah 500.00
107 Sealant Kg 15,500.00
108 Sumur+Pompa Tangan Terpasang Unit 2,000,000.00
109 Tanah Timbun M3 75,000.00
110 Tiang Pancang m' 300,000.00
111 Teralis Besi M2 380,000.00
112 Titik Lampu/Instalasi Titik 150,000.00
113 Urinoir Keramik Unit 2,500,000.00
114 Vinyl M2 25,000.00
115 WireMesh (Ulir) Kg 175,000.00
116 Zakering (Kast Lokal 1 Zekering) Unit 350,000.00
C. ALAT
1 Stamper Hari-Sewa 40,000.00
2 Dump Truck Jam 200,000.00
3 Molen Jam 50,000.00
Catatan : Bila Bahan Tidak Tercantum Di tabel ini boleh di Tambah
1
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembersihan Lapangan
Satuan / Unit : M2
Analisa : AHSP PU A.2.2.1.9
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.1000 125,000.00 12,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 20,000.00
1 B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 20,000.00
E Overhead & Profit 10% X D 2,000.00
F Harga Satuan Pekerjaan ( D + E ) 22,000.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengukuran Dan Pemasangan Bowplank
Satuan / Unit : M'
Analisa : AHSP PU A.2.2.1.4
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 125,000 12,500
2 Tukang OH 0.1000 135,000 13,500
3 Kepala Tukang OH 0.0100 165,000 1,650
4 Mandor OH 0.0050 150,000 750
Jumlah Tenaga Kerja 28,400
B. BAHAN
1 Kayu Kelas III M³ 0.0120 3,900,000 46,800
2 2 Paku Kayu Kg 0.0200 18,000 360
3 Papan Kayu Kelas IV M³ 0.0070 3,750,000 26,250
Jumlah Bahan 73,410
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 101,810
E Overhead & Profit 10% X D 10,181
F Harga Satuan Pekerjaan ( D + E ) 111,991

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1-2 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5260 125,000.00 65,750.00
2 Mandor OH 0.0526 150,000.00 7,890.00
Jumlah Tenaga Kerja 73,640.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
3 Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 73,640.0
E. Overhead & Profit 10% X D 7,364.00
F. Harga Satuan Pekerjaan ( D + E ) 81,004.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2-3 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8b
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.7350 125000 91,875.00
2 Mandor OH 0.0735 150,000.00 11,025.00
Jumlah Tenaga Kerja 102,900.00
B. BAHAN
4 Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 102,900.00
E. Overhead & Profit 10% X D 10,290.00
F. Harga Satuan Pekerjaan ( D + E ) 113,190.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.7500 125,000.0 93,750.00
2 Mandor OH 0.0250 150,000.0 3,750.00
Jumlah Tenaga Kerja 97,500.00
B. BAHAN
Jumlah Bahan -
5 C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 97,500.00
E. Overhead & Profit 10% X D 9,750.00
F. Harga Satuan Pekerjaan ( D + E ) 107,250.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Mengurug Kembali Galian
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.2500 125,000.00 31,250.00
2 Mandor OH 0.0833 150,000.00 12,495.00
Jumlah Tenaga Kerja 43,745.00
B. BAHAN
Jumlah Bahan -
6 C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,745.00
E. Overhead & Profit 10% X D 4,374.50
F. Harga Satuan Pekerjaan ( D + E ) 48,119.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memadatkan Tanah ( per 20ncm )
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 125,000.00 62,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 70,000.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
7 Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 140,000.00
E. Overhead & Profit 10% X D 14,000.00
F. Harga Satuan Pekerjaan ( D + E ) 154,000.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Timbunan Tanah Didatangkan Termasuk Perataan dan Pemadatan
Satuan / Unit : M3
Analisa : AHSP PU - T.14 E
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 125,000.00 62,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 70,000.00
B. BAHAN
8 1 Tanah Timbun M3 1.200 75000 90,000.00
Jumlah Bahan 90,000.00
C. PERALATAN
1 Pemadat Timbuanan (Stamper) Sewa-Hari 0.05 40000 2,000.00
Jumlah Peralatan 2,000.00
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 254,000.00
E. Overhead & Profit 10% X D 25,400.00
F. Harga Satuan Pekerjaan ( D + E ) 279,400.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 125,000.00 37,500.00
2 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Tenaga Kerja 39,000.00
B. BAHAN
1 Pasir Urug M3 1.200 150,000.00 180,000.00
9 Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 219,000.00
E. Overhead & Profit 10% X D 21,900.00
F. Harga Satuan Pekerjaan ( D + E ) 240,900.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Timbunan Tanah
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 125,000.00 37,500.00
2 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Tenaga Kerja 39,000.00
B. BAHAN
1 Tanah Timbun M3 1.200 75,000.00 90,000.00
Jumlah Bahan
10 C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 129,000.00
E. Overhead & Profit 10% X D 12,900.00
F. Harga Satuan Pekerjaan ( D + E ) 141,900.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.5000 125,000.00 187,500.00
2 Tukang OH 0.7500 135,000.00 101,250.00
3 Kepala tukang OH 0.0750 165,000.00 12,375.00
4 Mandor OH 0.0750 150,000.00 11,250.00
Jumlah Tenaga Kerja 312,375.00
11 B. BAHAN
1 Batu Gunung / Batu Kali M3 1.200 200,000.00 240,000.00
2 Semen Portland Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 562,925.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 875,300.00
E. Overhead & Profit 10% X D 87,530.00
F. Harga Satuan Pekerjaan ( D + E ) 962,830.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 125,000.00 97,500.00
2 Tukang OH 0.3900 135,000.00 52,650.00
3 Kepala tukang OH 0.0390 165,000.00 6,435.00
4 Mandor OH 0.0390 150,000.00 5,850.00
Jumlah Tenaga Kerja 162,435.00
12 B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 200,000.00 240,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 304,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 467,235.00
E. Overhead & Profit 10% X D 46,723.50
F. Harga Satuan Pekerjaan ( D + E ) 513,958.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
B. BAHAN
1 Semen Portland Kg 247.00 1,375.00 339,625.00
2 Pasir Beton Kg 869.00 142.86 124,142.86
3 Kerikil Kg 999.00 148.15 148,000.00
13 4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 637,567.86
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 898,012.86
E. Overhead & Profit 10% X D 89,801.29
F. Harga Satuan Pekerjaan ( D + E ) 987,814.14
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
B. BAHAN
1 Semen Portland Kg 247.00 1,375.00 339,625.00
2 Pasir Beton Kg 869.00 142.86 124,142.86
3 Kerikil Kg 999.00 148.15 148,000.00
4 Air Liter 215.00 120.00 25,800.00
14
14 Jumlah Bahan 637,567.86
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 898,012.86
E. Overhead & Profit 10% X D 89,801.29
F. Harga Satuan Pekerjaan ( D + E ) 987,814.14
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
B. BAHAN
1 Semen Portland Kg 326.00 1,375.00 448,250.00
2 Pasir Beton Kg 760.00 142.86 108,571.43
3 Kerikil Kg 1,029.00 148.15 152,444.44
4 Air Liter 215.00 120.00 25,800.00
15 Jumlah Bahan 735,065.87
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 995,510.87
E. Overhead & Profit 10% X D 99,551.09
F. Harga Satuan Pekerjaan ( D + E ) 1,095,061.96
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 16,9 Mpa
(K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
16 B. BAHAN
1 Semen Portland Kg 326.00 1,375.00 448,250.00
2 Pasir Beton Kg 760.00 142.86 108,571.43
3 Kerikil Kg 1,029.00 148.15 152,444.44
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 735,065.87
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 995,510.87
E. Overhead & Profit 10% X D 99,551.09
F. Harga Satuan Pekerjaan ( D + E ) 1,095,061.96
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 19,3 Mpa
(K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
17 B. BAHAN
1 Semen Portland Kg 371.00 1,375.00 510,125.00
2 Pasir Beton Kg 698.00 142.86 99,714.29
3 Kerikil Kg 1,047.00 148.15 155,111.11
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 790,750.40
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,051,195.40
E. Overhead & Profit 10% X D 105,119.54
F. Harga Satuan Pekerjaan ( D + E ) 1,156,314.94
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 19,3 Mpa
(K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
18 B. BAHAN
1 Semen Portland Kg 384.00 1,375.00 528,000.00
2 Pasir Beton Kg 692.00 142.86 98,857.14
3 Kerikil Kg 1,039.00 148.15 153,925.93
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 806,583.07
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,067,028.07
E. Overhead & Profit 10% X D 106,702.81
F. Harga Satuan Pekerjaan ( D + E ) 1,173,730.88
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 24,0 Mpa
(K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
B. BAHAN
1 Semen Portland Kg 406.00 1,375.00 558,250.00
19 2 Pasir Beton Kg 684.00 142.86 97,714.29
3 Kerikil Kg 1,026.00 148.15 152,000.00
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 833,764.29
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,094,209.29
E. Overhead & Profit 10% X D 109,420.93
F. Harga Satuan Pekerjaan ( D + E ) 1,203,630.21
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 26,4 Mpa
(K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 125,000.00 206,250.00
2 Tukang OH 0.2750 135,000.00 37,125.00
3 Kepala tukang OH 0.0280 165,000.00 4,620.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Tenaga Kerja 260,445.00
B. BAHAN
1 Semen Portland Kg 413.00 1,375.00 567,875.00
20 2 Pasir Beton Kg 681.00 142.86 97,285.71
3 Kerikil Kg 1,021.00 148.15 151,259.26
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 842,219.97
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,102,664.97
E. Overhead & Profit 10% X D 110,266.50
F. Harga Satuan Pekerjaan ( D + E ) 1,212,931.47
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 125,000.00 8,750.00
2 Tukang OH 0.0700 135,000.00 9,450.00
3 Kepala tukang OH 0.0070 165,000.00 1,155.00
4 Mandor OH 0.0400 150,000.00 6,000.00
Jumlah Tenaga Kerja 25,355.00
21 B. BAHAN
1 Besi Beton Polos Kg 10.500 16,000.00 168,000.00
2 Kawat Beton Kg 0.150 20,000.00 3,000.00
Jumlah Bahan 171,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 196,355.00
E. Per Kg Pembesian = D/10 19,635.50
F. Overhead & Profit 10% X E 1,963.55
G. Harga Satuan Pekerjaan ( E + F ) 21,599.05

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 125,000.00 8,750.00
2 Tukang OH 0.0700 135,000.00 9,450.00
3 Kepala tukang OH 0.0070 165,000.00 1,155.00
4 Mandor OH 0.0400 150,000.00 6,000.00
Jumlah Tenaga Kerja 25,355.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 19,000.00 199,500.00
22 2 Kawat Beton Kg 0.150 20,000.00 3,000.00
Jumlah Bahan 202,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 227,855.00
E. Per Kg Pembesian = D/10 22,785.50
F. Overhead & Profit 10% X E 2,278.55
G. Harga Satuan Pekerjaan ( E + F ) 25,064.05

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 Kg Jaring Kawat Baja/Wire Mesh
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.19
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0250 125,000.000 3,125.000
2 Tukang OH 0.0250 135,000.000 3,375.000
3 Kepala tukang OH 0.0020 165,000.000 330.000
4 Mandor OH 0.0010 150,000.000 150.000
Jumlah Tenaga Kerja 6,980.000
B. BAHAN
1 Jaring Kawat Baja Di Las Kg 1.020 36,000.000 36,720.000
23 2 Kawat Beton Kg 0.050 20,000.000 1,000.000
Jumlah Bahan 37,720.000
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 44,700.000
E. Overhead & Profit 10% X D 4,470.000
F. Harga Satuan Pekerjaan ( D + E ) 49,170.000

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.5200 125,000.00 65,000.00
2 Tukang OH 0.2600 135,000.00 35,100.00
3 Kepala tukang OH 0.0260 165,000.00 4,290.00
4 Mandor OH 0.0260 150,000.00 3,900.00
Jumlah Tenaga Kerja 108,290.00
24 B. BAHAN
1 Kayu Kelas III M³ 0.040 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.300 18,000.00 5,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 161,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 270,190.00
E. Overhead & Profit 10% X D 27,019.00
F. Harga Satuan Pekerjaan ( D+E ) 297,209.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Sloof
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.5200 125,000.00 65,000.00
2 Tukang OH 0.2600 135,000.00 35,100.00
3 Kepala tukang OH 0.0260 165,000.00 4,290.00
4 Mandor OH 0.0260 150,000.00 3,900.00
Jumlah Tenaga Kerja 108,290.00
25 B. BAHAN
1 Kayu Kelas III M³ 0.040 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.300 18,000.00 5,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 161,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 270,190.00
E. Overhead & Profit 10% X D 27,019.00
F. Harga Satuan Pekerjaan ( D+E ) 297,209.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Kolom
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 125,000.00 82,500.00
2 Tukang OH 0.3300 135,000.00 44,550.00
3 Kepala tukang OH 0.0330 165,000.00 5,445.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Tenaga Kerja 137,445.00
26 B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 19,000.00 7,600.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0150 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.0000 70,000.00 140,000.00
Jumlah Bahan 415,600.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 553,045.00
E. Overhead & Profit 10% X D 55,304.50
F. Harga Satuan Pekerjaan ( D+E ) 608,349.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Balok
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 125,000.00 82,500.00
2 Tukang OH 0.3300 135,000.00 44,550.00
3 Kepala tukang OH 0.0330 165,000.00 5,445.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Tenaga Kerja 137,445.00
26 B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0180 3,900,000.00 70,200.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.0000 70,000.00 140,000.00
Jumlah Bahan 426,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 564,345.00
E. Overhead & Profit 10% X D 56,434.50
F. Harga Satuan Pekerjaan ( D+E ) 620,779.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 125,000.00 82,500.00
2 Tukang OH 0.3300 135,000.00 44,550.00
3 Kepala tukang OH 0.0330 165,000.00 5,445.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Tenaga Kerja 137,445.00
27 B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0150 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 6.0000 70,000.00 420,000.00
Jumlah Bahan 695,200.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 832,645.00
E. Overhead & Profit 10% X D 83,264.50
F. Harga Satuan Pekerjaan ( D+E ) 915,909.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Dinding
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 125,000.00 82,500.00
2 Tukang OH 0.3300 135,000.00 44,550.00
3 Kepala tukang OH 0.0330 165,000.00 5,445.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Tenaga Kerja 137,445.00
28 B. BAHAN
1 Kayu Kelas III M³ 0.030 3,900,000.00 117,000.00
2 Paku 5 Cm - 10 Cm Kg 0.400 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.200 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.020 3,900,000.00 78,000.00
5 Plywood Tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 3.000 70,000.00 210,000.00
7 Penjaga Jarak Bekisting / Spacer Bh 4.000 30,000.00 120,000.00
Jumlah Bahan 585,700.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 723,145.00
E. Overhead & Profit 10% X D 72,314.50
F. Harga Satuan Pekerjaan ( D+E ) 795,459.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Tangga
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 125,000.00 82,500.00
2 Tukang OH 0.3300 135,000.00 44,550.00
3 Kepala tukang OH 0.0330 165,000.00 5,445.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Tenaga Kerja 137,445.00
29 B. BAHAN
1 Kayu Kelas III M³ 0.030 3,900,000.00 117,000.00
2 Paku 5 Cm - 10 Cm Kg 0.400 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.150 5,000.00 750.00
4 Balok Kayu Kelas II M³ 0.015 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.000 70000 140,000.00
Jumlah Bahan 375,950.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 513,395.00
E. Overhead & Profit 10% X D 51,339.50
F. Harga Satuan Pekerjaan ( D+E ) 564,734.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0600 125,000.00 7,500.00
2 Tukang OH 0.0600 135,000.00 8,100.00
3 Kepala tukang OH 0.0060 165,000.00 990.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 17,040.00
B. BAHAN
1 Besi Baja Profil Kg 1.150 150,000.00 172,500.00
30 Jumlah Bahan 172,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 189,540.00
E. Overhead & Profit 10% X D 18,954.00
F. Harga Satuan Pekerjaan ( D+E ) 208,494.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan rangka Kuda-Kuda Baja Profil IWF
Satuan / Unit : Kg
Analisa : Taksir
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0600 125,000.00 7,500.0000
2 Tukang OH 0.0600 135,000.00 8,100.00
3 Kepala tukang OH 0.0060 165,000.00 990.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 17,040.00
B. BAHAN
1 Besi Baja Profil IWF Kg 1.150 150,000.00 172,500.00
31 Jumlah Bahan 172,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 189,540.00
E. Overhead & Profit 10% X D 18,954.00
F. Harga Satuan Pekerjaan ( D + E ) 208,494.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan Kusen Pintu Alluminium
Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0430 125,000.00 5,375.00
2 Tukang OH 0.0430 135,000.00 5,805.00
3 Kepala tukang OH 0.0430 165,000.00 7,095.00
4 Mandor OH 0.0021 150,000.00 315.00
Jumlah Tenaga Kerja 18,590.00
32 B. BAHAN
1 Profil Aluminium M 1.100 80,000.00 88,000.00
2 Sekrup Fixer Buah 2.000 500.00 1,000.00
3 Sealant Tube 0.060 15,500.00 930.00
Jumlah Bahan 89,930.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 108,520.00
E. Overhead & Profit 10% X D 10,852.00
F. Harga Satuan Pekerjaan ( D + E ) 119,372.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 125,000.00 75,000.00
2 Tukang OH 0.2000 135,000.00 27,000.00
3 Kepala tukang OH 0.0200 165,000.00 3,300.00
4 Mandor OH 0.0300 150,000.00 4,500.00
Jumlah Tenaga Kerja 109,800.00
33 B. BAHAN
1 Batu Bata Bh 140.000 950.00 133,000.00
2 Semen Portland Kg 43.500 1,375.00 59,812.50
3 Pasir Pasang M3 0.080 190,000.00 15,200.00
Jumlah Bahan 208,012.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 317,812.50
E. Overhead & Profit 10% X D 31,781.25
F. Harga Satuan Pekerjaan ( D + E ) 349,593.75

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 125,000.00 75,000.00
2 Tukang OH 0.2000 135,000.00 27,000.00
3 Kepala tukang OH 0.0200 165,000.00 3,300.00
4 Mandor OH 0.0300 150,000.00 4,500.00
Jumlah Tenaga Kerja 109,800.00
34 B. BAHAN
1 Batu Bata Bh 140.000 950.00 133,000.00
2 Semen Portland Kg 32.950 1,375.00 45,306.25
3 Pasir Pasang M3 0.091 190,000.00 17,290.00
Jumlah Bahan 195,596.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 305,396.25
E. Overhead & Profit 10% X D 30,539.63
F. Harga Satuan Pekerjaan ( D + E ) 335,935.88

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 125,000.00 75,000.00
2 Tukang OH 0.2000 135,000.00 27,000.00
3 Kepala tukang OH 0.0200 165,000.00 3,300.00
4 Mandor OH 0.0300 150,000.00 4,500.00
Jumlah Tenaga Kerja 109,800.00
35 B. BAHAN
1 Batu Bata Bh 140.000 950.00 133,000.00
2 Semen Portland Kg 26.550 1,375.00 36,506.25
3 Pasir Pasang M3 0.093 190,000.00 17,670.00
Jumlah Bahan 187,176.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 296,976.25
E. Overhead & Profit 10% X D 29,697.63
F. Harga Satuan Pekerjaan ( D + E ) 326,673.88
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 125,000.00 75,000.00
2 Tukang OH 0.2000 135,000.00 27,000.00
3 Kepala tukang OH 0.0200 165,000.00 3,300.00
4 Mandor OH 0.0300 150,000.00 4,500.00
Jumlah Tenaga Kerja 109,800.00
36 B. BAHAN
1 Batu Bata Bh 140.000 950.00 133,000.00
2 Semen Portland Kg 22.200 1,375.00 30,525.00
3 Pasir Pasang M3 0.102 190,000.00 19,380.00
Jumlah Bahan 182,905.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 292,705.00
E. Overhead & Profit 10% X D 29,270.50
F. Harga Satuan Pekerjaan ( D + E ) 321,975.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
37 B. BAHAN
1 Batu Bata Bh 70.000 950.00 66,500.00
2 Semen Portland Kg 18.950 1,375.00 26,056.25
3 Pasir Pasang M3 0.038 190,000.00 7,220.00
Jumlah Bahan 99,776.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 154,676.25
E. Overhead & Profit 10% X D 15,467.63
F. Harga Satuan Pekerjaan ( D + E ) 170,143.88

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
38 B. BAHAN
1 Batu Bata Bh 70.000 950.00 66,500.00
2 Semen Portland Kg 14.370 1,375.00 19,758.75
3 Pasir Pasang M3 0.040 190,000.00 7,600.00
Jumlah Bahan 93,858.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 148,758.75
E. Overhead & Profit 10% X D 14,875.88
F. Harga Satuan Pekerjaan ( D + E ) 163,634.63

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
39 B. BAHAN
1 Batu Bata Bh 70.000 950.00 66,500.00
2 Semen Portland Kg 11.500 1,375.00 15,812.50
3 Pasir Pasang M3 0.043 190,000.00 8,170.00
Jumlah Bahan 90,482.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 145,382.50
E. Overhead & Profit 10% X D 14,538.25
F. Harga Satuan Pekerjaan ( D + E ) 159,920.75

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
40 B. BAHAN
1 Batu Bata Bh 70.000 950.00 66,500.00
2 Semen Portland Kg 9.680 1,375.00 13,310.00
3 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 88,360.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 143,260.00
E. Overhead & Profit 10% X D 14,326.00
F. Harga Satuan Pekerjaan ( D + E ) 157,586.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1Pc : 3 pp
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
41 B. BAHAN
1 Kerawang/Roster Bh 30.000 950.00 28,500.00
2 Semen Portland Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 190,000.00 6,650.00
Jumlah Bahan 50,275.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 105,175.00
E. Overhead & Profit 10% X D 10,517.50
F. Harga Satuan Pekerjaan ( D + E ) 115,692.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1Pc : 4 pp
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 54,900.00
42 B. BAHAN
1 Kerawang/Roster Bh 30.000 700,000.00 21,000,000.00
2 Semen Portland Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 190,000.00 6,650.00
Jumlah Bahan 21,021,775.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 21,076,675.00
E. Overhead & Profit 10% X D 2,107,667.50
F. Harga Satuan Pekerjaan ( D + E ) 23,184,342.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Plasteran 1 Pc : 1 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 62,475.00
43 B. BAHAN
1 Semen Portland Kg 15.504 1,375.00 21,318.00
2 Pasir Pasang M3 0.016 190,000.00 3,040.00
Jumlah Bahan 24,358.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 86,833.00
E. Overhead & Profit 10% X D 8,683.30
F. Harga Satuan Pekerjaan ( D + E ) 95,516.30

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 2 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 62,475.00
44 B. BAHAN
1 Semen Portland Kg 10.224 1,375.00 14,058.00
2 Pasir Pasang M3 0.020 190,000.00 3,800.00
Jumlah Bahan 17,858.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 80,333.00
E. Overhead & Profit 10% X D 8,033.30
F. Harga Satuan Pekerjaan ( D + E ) 88,366.30

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 3 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.3
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 62,475.00
45 B. BAHAN
1 Semen Portland Kg 6.240 1,375.00 8,580.00
2 Pasir Pasang M3 0.023 190,000.00 4,370.00
Jumlah Bahan 12,950.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 75,425.00
E. Overhead & Profit 10% X D 7,542.50
F. Harga Satuan Pekerjaan ( D + E ) 82,967.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc :4 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 62,475.00
46 B. BAHAN
1 Semen Portland Kg 6.240 1,375.00 8,580.00
2 Pasir Pasang M3 0.024 190,000.00 4,560.00
Jumlah Bahan 13,140.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 75,615.00
E. Overhead & Profit 10% X D 7,561.50
F. Harga Satuan Pekerjaan ( D + E ) 83,176.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 5 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 125,000.00 37,500.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Tenaga Kerja 62,475.00
47 B. BAHAN
1 Semen Portland Kg 15.504 1,375.00 21,318.00
2 Pasir Pasang M3 0.016 190,000.00 3,040.00
Jumlah Bahan 24,358.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 86,833.00
E. Overhead & Profit 10% X D 8,683.30
F. Harga Satuan Pekerjaan ( D + E ) 95,516.30

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Acian
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 125,000.00 25,000.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Tenaga Kerja 41,650.00
B. BAHAN
1 Semen Portland Kg 3.250 1,375.00 4,468.75
48 Jumlah Bahan 4,468.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 46,118.75
E. Overhead & Profit 10% X D 4,611.88
F. Harga Satuan Pekerjaan ( D + E ) 50,730.63

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 40 x 40 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.34.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 125,000.00 87,500.00
2 Tukang OH 0.3500 135,000.00 47,250.00
3 Kepala tukang OH 0.0350 165,000.00 5,775.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Tenaga Kerja 145,775.00
49 B. BAHAN
1 Keramik Lantai Uk. 40 x 40 Cm Bh 6.630 12,000.00 79,560.00
2 Semen Portland Kg 9.800 1,375.00 13,475.00
3 Semen Warna Kg 1.300 7,500.00 9,750.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 111,335.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 257,110.00
E. Overhead & Profit 10% X D 25,711.00
F. Harga Satuan Pekerjaan ( D + E ) 282,821.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Uk. 30 x 30 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 125,000.00 87,500.00
2 Tukang OH 0.3500 135,000.00 47,250.00
3 Kepala tukang OH 0.0350 165,000.00 5,775.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Tenaga Kerja 145,775.00
50 B. BAHAN
1 Keramik Lantai Uk. 30 x 30 Cm Bh 11.870 6,200.00 73,594.00
2 Semen Portland Kg 10.000 1,375.00 13,750.00
3 Semen Warna Kg 1.500 7,500.00 11,250.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 107,144.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 252,919.00
E. Overhead & Profit 10% X D 25,291.90
F. Harga Satuan Pekerjaan ( D + E ) 278,210.90

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 20 x 20 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 125,000.00 87,500.00
2 Tukang OH 0.3500 135,000.00 47,250.00
3 Kepala tukang OH 0.0350 165,000.00 5,775.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Tenaga Kerja 145,775.00
51 B. BAHAN
1 Keramik Lantai Uk. 20 x 20 Cm Bh 26.500 3,500.00 92,750.00
2 Semen Portland Kg 10.400 1,375.00 14,300.00
3 Semen Warna Kg 1.620 7,500.00 12,150.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 127,750.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 273,525.00
E. Overhead & Profit 10% X D 27,352.50
F. Harga Satuan Pekerjaan ( D + E ) 300,877.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 10 x 10 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.34.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0900 125,000.00 11,250.00
2 Tukang OH 0.0900 135,000.00 12,150.00
3 Kepala tukang OH 0.0350 165,000.00 5,775.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 29,925.00
52 B. BAHAN
1 Piint Keramik Uk.10 x 10 Cm Bh 10.600 5,000.00 53,000.00
2 Semen Portland Kg 1.140 1,375.00 1,567.50
3 Semen Warna Kg 0.050 7,500.00 375.00
4 Pasir Pasang M3 0.003 190,000.00 570.00
Jumlah Bahan 55,512.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 85,437.50
E. Overhead & Profit 10% X D 8,543.75
F. Harga Satuan Pekerjaan ( D + E ) 93,981.25

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 20 x 25 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.9000 125,000.00 112,500.00
2 Tukang OH 0.4500 135,000.00 60,750.00
3 Kepala tukang OH 0.0450 165,000.00 7,425.00
4 Mandor OH 0.0450 150,000.00 6,750.00
Jumlah Tenaga Kerja 187,425.00
53 B. BAHAN
1 Keramik Dinding Uk. 20 x 25 Cm Bh 20.000 3,500.00 70,000.00
2 Semen Portland Kg 9.300 1,375.00 12,787.50
3 Semen Warna Kg 1.940 7,500.00 14,550.00
4 Pasir Pasang M3 0.018 190,000.00 3,420.00
Jumlah Bahan 100,757.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 288,182.50
E. Overhead & Profit 10% X D 28,818.25
F. Harga Satuan Pekerjaan ( D + E ) 317,000.75

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Langit-Langit Tripleks
Ukuran (120x240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 125,000.00 12,500.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 28,400.00
54 B. BAHAN
1 Keramik Dinding Uk. 20 x 25 Cm Bh 0.375 3,500.00 1,312.50
2 Semen Portland Kg 0.030 1,375.00 41.25
Jumlah Bahan 1,353.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,753.75
E. Overhead & Profit 10% X D 2,975.38
F. Harga Satuan Pekerjaan ( D+E ) 32,729.13
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Langit-Langit Multyplek Ukuran 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 125,000.00 12,500.00
2 Tukang OH 0.0500 135,000.00 6,750.00
3 Kepala tukang OH 0.0050 165,000.00 825.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 20,825.00
55 B. BAHAN
1 Multyplek 4 mm Bh 0.3640 75,000.00 27,300.00
2 Semen Portland Kg 0.1100 1,375.00 151.25
Jumlah Bahan 27,451.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 48,276.25
E. Overhead & Profit 10% X D 4,827.63
F. Harga Satuan Pekerjaan ( D+E ) 53,103.8750

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang List Profil kayu
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0500 125,000.00 6,250.00
2 Tukang OH 0.0500 135,000.00 6,750.00
3 Kepala tukang OH 0.0050 165,000.00 825.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 14,275.00
56 B. BAHAN
1 List Profil M 1.0500 8,000.00 8,400.00
2 Paku Kayu Kg 0.0100 18,000.00 180.00
Jumlah Bahan 8,580.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 22,855.00
E. Overhead & Profit 10% X D 2,285.50
F. Harga Satuan Pekerjaan ( D+E ) 25,140.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Atap Seng Genteng
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 125,000.00 25,000.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0010 150,000.00 150.00
Jumlah Tenaga Kerja 40,300.00
57 B. BAHAN
1 Atap Seng Genteng Lbr 1.1500 75,000.00 86,250.00
2 Paku Seng Kg 0.2000 20,000.00 4,000.00
Jumlah Bahan 90,250.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 130,550.00
E. Overhead & Profit 10% X D 13,055.00
F. Harga Satuan Pekerjaan ( D+E ) 143,605.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Rabung Seng Atap
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.39.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1500 125,000.00 18,750.00
2 Tukang OH 0.0700 135,000.00 9,450.00
3 Kepala tukang OH 0.0070 165,000.00 1,155.00
4 Mandor OH 0.0200 150,000.00 3,000.00
Jumlah Tenaga Kerja 32,355.00
58 B. BAHAN
1 Rabung Seng Genteng M 0.3000 130,000.00 39,000.00
2 Paku Seng Kg 0.2160 20,000.00 4,320.00
Jumlah Bahan 43,320.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 75,675.00
E. Overhead & Profit 10% X D 7,567.50
F. Harga Satuan Pekerjaan ( D+E ) 83,242.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Dan Memasang Kusen Pintu Dan
Kusen Jendela, Kayu Kelas 1
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 125,000.00 87,500.00
2 Tukang OH 21.0000 135,000.00 2,835,000.00
3 Kepala tukang OH 2.1000 165,000.00 346,500.00
4 Mandor OH 0.3500 150,000.00 52,500.00
Jumlah Tenaga Kerja 3,321,500.00
59 B. BAHAN
1 Balok Kayu Kelas 1 M3 1.1000 5,500,000.00 6,050,000.00
2 Paku Kayu Kg 1.2500 18,000.00 22,500.00
3 Lem Kayu Kg 1.0000 18,000.00 18,000.00
Jumlah Bahan 6,090,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 9,412,000.00
E. Overhead & Profit 10% X D 941,200.00
F. Harga Satuan Pekerjaan ( D+E ) 10,353,200.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Dan Memasang Daun Pintu Panel, Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 125,000.00 125,000.00
2 Tukang OH 3.0000 135,000.00 405,000.00
3 Kepala tukang OH 0.3000 165,000.00 49,500.00
4 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 587,000.00
60 B. BAHAN
1 Papan Kayu Kelas II M3 0.0400 4,800,000.00 192,000.00
2 Lem Kayu Kg 0.5000 18,000.00 9,000.00
Jumlah Bahan 201,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 788,000.00
E. Overhead & Profit 10% X D 78,800.00
F. Harga Satuan Pekerjaan ( D+E ) 866,800.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Dan Memasang Daun Jendela Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.8000 125,000.00 100,000.00
2 Tukang OH 2.4000 135,000.00 324,000.00
3 Kepala tukang OH 0.2400 165,000.00 39,600.00
4 Mandor OH 0.0400 150,000.00 6,000.00
Jumlah Tenaga Kerja 469,600.00
61 B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 4,800,000.00 115,200.00
2 Lem Kayu Kg 0.3000 18,000.00 5,400.00
Jumlah Bahan 120,600.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 590,200.00
E. Overhead & Profit 10% X D 59,020.00
F. Harga Satuan Pekerjaan ( D+E ) 649,220.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6700 125,000.00 83,750.00
2 Tukang OH 2.0000 135,000.00 270,000.00
3 Kepala tukang OH 0.2000 165,000.00 33,000.00
4 Mandor OH 0.3350 150,000.00 50,250.00
Jumlah Tenaga Kerja 437,000.00
62 B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 5,500,000.00 330,000.00
2 Paku Kayu Kg 0.1500 18,000.00 2,700.00
Jumlah Bahan 332,700.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 769,700.00
E. Overhead & Profit 10% X D 76,970.00
F. Harga Satuan Pekerjaan ( D+E ) 846,670.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.14
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 6.7000 125,000.00 837,500.00
2 Tukang OH 10.1000 135,000.00 1,363,500.00
3 Kepala tukang OH 2.0100 165,000.00 331,650.00
4 Mandor OH 0.3350 150,000.00 50,250.00
Jumlah Tenaga Kerja 2,582,900.00
63 B. BAHAN
1 Balok Kayu Kelas I M3 1.2000 5,500,000.00 6,600,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 150,000.00 2,250,000.00
3 Paku Kayu Kg 5.6000 18,000.00 100,800.00
Jumlah Bahan 8,950,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 11,533,700.00
E. Overhead & Profit 10% X D 1,153,370.00
F. Harga Satuan Pekerjaan ( D+E ) 12,687,070.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Konstruksi Gordeng, Kayu Kelas II
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.15
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 2.4000 125,000.00 300,000.00
2 Tukang OH 7.2000 135,000.00 972,000.00
3 Kepala tukang OH 0.7200 165,000.00 118,800.00
4 Mandor OH 0.1200 150,000.00 18,000.00
Jumlah Tenaga Kerja 1,408,800.00
64 B. BAHAN
1 Balok Kayu Kelas I M3 1.1000 5,500,000.00 6,050,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 150,000.00 2,250,000.00
3 Paku Kayu Kg 3.0000 18,000.00 54,000.00
Jumlah Bahan 8,354,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 9,762,800.00
E. Overhead & Profit 10% X D 976,280.00
F. Harga Satuan Pekerjaan ( D+E ) 10,739,080.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Rangka Langit-Langit Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.20
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 125,000.00 25,000.00
2 Tukang OH 0.3000 135,000.00 40,500.00
3 Kepala tukang OH 0.0300 165,000.00 4,950.00
4 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Tenaga Kerja 71,950.00
65 B. BAHAN
1 Kayu Kaso 5 x 7 cm M3 0.0163 325,000.00 5,297.50
2 Paku Kayu Kg 0.2500 18,000.00 4,500.00
Jumlah Bahan 9,797.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 81,747.50
E. Overhead & Profit 10% X D 8,174.75
F. Harga Satuan Pekerjaan ( D+E ) 89,922.25

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Listplank Uk. 2,5x20 Cm Kayu Kelas I Atau Kelas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 125,000.00 12,500.00
2 Tukang OH 0.2000 135,000.00 27,000.00
3 Kepala tukang OH 0.0200 165,000.00 3,300.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 43,550.00
66 B. BAHAN
1 Kayu Kelas II M3 0.0108 4,800,000.00 51,840.00
2 Paku Kg 0.1000 18,000.00 1,800.00
Jumlah Bahan 53,640.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 97,190.00
E. Overhead & Profit 10% X D 9,719.00
F. Harga Satuan Pekerjaan ( D+E ) 106,909.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Kunci Silinder
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0050 125,000.00 625.00
2 Tukang OH 0.5000 135,000.00 67,500.00
3 Kepala tukang OH 0.0500 165,000.00 8,250.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 76,825.00
67 B. BAHAN
1 Kunci Pintu Standar Bh 1.0000 150,000.00 150,000.00
Jumlah Bahan 150,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 226,825.00
E. Overhead & Profit 10% X D 22,682.50
F. Harga Satuan Pekerjaan ( D+E ) 249,507.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Engsel Pintu
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 125,000.00 1,875.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 1.0008 150,000.00 150,120.00
Jumlah Tenaga Kerja 174,720.00
68 B. BAHAN
1 Engsel Pintu Bh 1.0000 25,000.00 25,000.00
Jumlah Bahan 25,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 199,720.00
E. Overhead & Profit 10% X D 19,972.00
F. Harga Satuan Pekerjaan ( D+E ) 219,692.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 125,000.00 1,875.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 1.0008 150,000.00 150,120.00
Jumlah Tenaga Kerja 174,720.00
69 B. BAHAN
1 Engsel Jendela Bh 1.0000 25,000.00 25,000.00
Jumlah Bahan 25,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 199,720.00
E. Overhead & Profit 10% X D 19,972.00
F. Harga Satuan Pekerjaan ( D+E ) 219,692.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Hak / Kait Angin Jendela
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 125,000.00 1,875.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Tenaga Kerja 24,720.00
70 B. BAHAN
1 Hak Angin Jendela Bh 1.0000 17,000.00 17,000.00
Jumlah Bahan 17,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 41,720.00
E. Overhead & Profit 10% X D 4,172.00
F. Harga Satuan Pekerjaan ( D+E ) 45,892.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Pacok Jendela
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 125,000.00 1,875.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Tenaga Kerja 24,720.00
71 B. BAHAN
1 Pacok Jendela Bh 1.0000 7,500.00 7,500.00
Jumlah Bahan 7,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 32,220.00
E. Overhead & Profit 10% X D 3,222.00
F. Harga Satuan Pekerjaan ( D+E ) 35,442.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Kloset Jongkok Porselen
Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 125,000.00 125,000.00
2 Tukang OH 1.5000 135,000.00 202,500.00
3 Kepala tukang OH 1.5000 165,000.00 247,500.00
4 Mandor OH 0.1600 150,000.00 24,000.00
Jumlah Tenaga Kerja 599,000.00
72 B. BAHAN
1 Kloset Jongkok Porselen Bh 1.0000 350,000.00 350,000.00
2 Semen Portland Kg 6.0000 1,375.00 8,250.00
3 Pasir Pasang M3 0.0100 190,000.00 1,900.00
Jumlah Bahan 360,150.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 959,150.00
E. Overhead & Profit 10% X D 95,915.00
F. Harga Satuan Pekerjaan ( D+E ) 1,055,065.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 Buah Urinoir
Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 125,000.00 125,000.00
2 Tukang OH 1.0000 135,000.00 135,000.00
3 Kepala tukang OH 0.1000 165,000.00 16,500.00
4 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Tenaga Kerja 284,000.00
73 B. BAHAN
1 Urinoir Bh 1.0000 2,500,000.00 2,500,000.00
2 Semen Portland Kg 6.0000 1,375.00 8,250.00
3 Pasir Pasang M3 0.0100 190,000.00 1,900.00
4 Perlengkapan % 30.0000 -
Jumlah Bahan 2,510,150.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 2,794,150.00
E. Overhead & Profit 10% X D 279,415.00
F. Harga Satuan Pekerjaan ( D+E ) 3,073,565.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Floor Drain
Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.14
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0100 125,000.00 1,250.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 17,150.00
74 B. BAHAN
1 Floor Drain Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 44,150.00
E. Overhead & Profit 10% X D 4,415.00
F. Harga Satuan Pekerjaan ( D+E ) 48,565.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Kran Air dia. 1/2" atau 3/4
Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.19
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0100 125,000.00 1,250.00
2 Tukang OH 0.1000 135,000.00 13,500.00
3 Kepala tukang OH 0.0100 165,000.00 1,650.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Tenaga Kerja 17,150.00
75 B. BAHAN
1 Floor Drain Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 44,150.00
E. Overhead & Profit 10% X D 4,415.00
F. Harga Satuan Pekerjaan ( D+E ) 48,565.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 m2 kaca tebal 5 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.17
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 125,000.00 1,875.00
2 Tukang OH 0.1500 135,000.00 20,250.00
3 Kepala tukang OH 0.0150 165,000.00 2,475.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Tenaga Kerja 24,720.00
76 B. BAHAN
1 Kaca Tebal 5 mm M2 1.1000 120,000.00 132,000.00
2 Sealant Tube 0.0500 15,500.00 775.00
Jumlah Bahan 132,775.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 157,495.00
E. Overhead & Profit 10% X D 15,749.50
F. Harga Satuan Pekerjaan ( D+E ) 173,244.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecatan Bidang kayu Lama
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 125,000.00 8,750.00
2 Tukang OH 0.0090 135,000.00 1,215.00
3 Kepala tukang OH 0.0060 165,000.00 990.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 11,405.00
77 B. BAHAN
1 Pengencer/Minyak Cat Liter 0.0300 25,000.00 750.00
2 Cat Kayu Penutup Kg 0.1700 65,000.00 11,050.00
Jumlah Bahan 11,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 23,205.00
E. Overhead & Profit 10% X D 2,320.50
F. Harga Satuan Pekerjaan ( D+E ) 25,525.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecatan Bidang kayu Baru
(1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 125,000.00 8,750.00
2 Tukang OH 0.0090 135,000.00 1,215.00
3 Kepala tukang OH 0.0060 165,000.00 990.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Tenaga Kerja 11,405.00
78 B. BAHAN
1 Cat Menie Kg 0.2000 35,000.00 7,000.00
2 Plamir Kayu Kg 0.1500 18,000.00 2,700.00
3 Cat Dasar Kayu Kg 0.1700 50,000.00 8,500.00
4 Cat Kayu Penutup Kg 0.2600 65,000.00 16,900.00
5 Kuas Bh 0.0100 15,000.00 150.00
6 Pengencer Liter 0.0300 40,000.00 1,200.00
7 Ampelas Lembar 0.2000 3,500.00 700.00
Jumlah Bahan 37,150.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 48,555.00
E. Overhead & Profit 10% X D 4,855.50
F. Harga Satuan Pekerjaan ( D+E ) 53,410.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecetan Tembok Baru
(1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0200 125,000.00 2,500.00
2 Tukang OH 0.0630 135,000.00 8,505.00
3 Kepala tukang OH 0.0063 165,000.00 1,039.50
4 Mandor OH 0.0025 150,000.00 375.00
Jumlah Tenaga Kerja 12,419.50
79 B. BAHAN
1 Plamir Kg 0.1000 18,000.00 1,800.00
2 Cat Dasar Tembok Kg 0.1000 35,000.00 3,500.00
3 Cat Tembok / Penutup 2x Kg 0.2600 55,000.00 14,300.00
Jumlah Bahan 19,600.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 32,019.50
E. Overhead & Profit 10% X D 3,201.95
F. Harga Satuan Pekerjaan ( D+E ) 35,221.45
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecetan Tembok Lama (1 x Cat Dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0280 125,000.00 3,500.00
2 Tukang OH 0.0420 135,000.00 5,670.00
3 Kepala tukang OH 0.0042 165,000.00 693.00
4 Mandor OH 0.0025 150,000.00 375.00
Jumlah Tenaga Kerja 10,238.00
80 B. BAHAN
1 Cat Dasar Tembok Kg 0.1200 35,000.00 4,200.00
2 Cat Tembok/Penutup 2x Kg 0.1800 55,000.00 9,900.00
Jumlah Bahan 14,100.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 24,338.00
E. Overhead & Profit 10% X D 2,433.80
F. Harga Satuan Pekerjaan ( D+E ) 26,771.80
n dan Pemadatan
ump (12 ± 2) cm, W/c = 0,87

ump (12 ± 2) cm, W/c = 0,78


lump (12 ± 2) cm, W/c = 0,66
s I Atau Kelas II
BK1 9800000
BK2 7800000
REKAPITULASI VOLUME

PEKERJAAN : PEMBANGUNAN RUANG KEGIATAN BELAJAR TKN 3


LOKASI : KOTA BANDA ACEH

No. Uraian Pekerjaan Volume Satuan


1 2 3 4
LANTAI 1
1 PEKERJAAN PERSIAPAN
1A Pembersian Lapangan 384.10 M²
1B Pemasangan Bouwplank 71.40 M'

2 PEKERJAAN TANAH DAN PONDASI


2A Galian Pondasi Tapak Sumuran 150X140 99.96 M³
2B Urugan Kembali Pondasi Tapak Sumuran 74.97 M³
2C A (POER TAPAK) 7.34 M³
2D B (PANDESTAL TAPAK) 2.45 M³
2E Volume Total Pondasi Tapak 9.79 M³
2F Alas Pasir 0.10 M³
2G Cor Lantai Kerja 0.20 M³
2H Beton Cor Cyclope 18.44 M³
2I GALIAN PONDASI TANGGA 0.23 M³
2J PASIR URUG 0.03 M³
2K LANTAI KERJA 0.06 M³
2L GALIAN SLOOF GANTUNG 1.06 M³
2M BETON COR 0.53 M³
2N PASIR ALAS 0.26 M³

3 Galian Pondasi Menerus


3A Volume Galian Total Pondasi Menerus 64.73 M³
3B Urugan Kembali Pondasi Menerus 16.18 M³
3C ALAS PASIR PONDASI MENERUS 3.05 M³
3D ASTAMPING 6.10 M³
3E PAS BATU GUNUNG 16.96 M³

4 PEKERJAAN BETON BERTULANG


4A SLOOF 25/40 6.78 M³
4B SLOOF GANTUNG 25/40 1.51 M³
4C KOLOM K1 ( Lantai 1 ) 7.45 M³
4D PLAT TANGGA LT 1 DAN 2 1.31 M³
4E ANAK TANGGA LT 1 DAN 2 0.82 M³
4F PLAT BORDES 0.39 M³
4G RAILING TANGGA LT 1 DAN 2 6.93 M³

5 PEKERJAAN KERAMIK
5A Ruang 1 54.07 M²
5B Ruang 2 54.07 M²
5C Selasar lantai 1 31.91 M²

LANTAI 2
1 PEKERJAAN BETON BERTULANG
1A Kolom K1 (Lantai 2) 7.04 M³
1B Kolom K2 (Lantai 2) 1.40 M³
1C BALOK LANTAI 30/60 2.47 M³
1D BALOK 25/45 10.43 M³
1E BALOK 20/40 1.91 M³
1F BALOK BORDES 20/30 0.32 M³
1G BALOK LATAI 13/15 1.09 M³
1H RENG BALOK 20/35 4.68 M³
1I RENG BALOK 20/30 1.85 M³
1J PLAT LANTAI (Tipe 1) 12.96 M³
1K PLAT LANTAI (TIPE 2) 2.05 M³
1L PLAT LANTAI (Tipe 3) 1.00 M³
1M PLAT LANTAI (Tipe 4) 0.36 M³
1N PLAT LANTAI (Tipe 5) 0.29 M³
1O PLAT LANTAI (Tipe 6) 0.33 M³
1P PLAT LANTAI (Tipe 7) 0.27 M³

2 PEKERJAAN KERAMIK
2A Ruang 1 54.07 M²
2B Ruang 2 54.07 M²
2C Selasar lantai 2 31.91 M²

3 PEKERJAAN PEMASANGAN PINTU, JENDELA, VENTILASI, ETC


3A KUSEN PINTU ALUMINIUM 7.00 M
3B KUSEN JENDELA ALUMINIUM 25.70 M
3C DAUN PINTU ALUMINIUM 2 UNIT
3D DAUN JENDELA ALUMINIUM 30 UNIT
3E KACA JENDELA 8.45 M²
3F KACA PINTU 0.36 M²
3G VENTILASI 2.93 M
3H LOUVER ZET UPVC 4 UNIT

4 PEKERJAAN DINDING
4A LANTAI 2 PAS BATA 1: 40 182.05 M²
4B PLASTERAN 364.09 M²

5 PEKERJAAN ATAP
5A LUAS ATAB KIRI KANAN BAGIAN 1 54.43 M²
5B LUAS ATAB KIRI KANAN BAGIAN 2 54.43 M²
5C ATAB SPANDEK (SETARA) 0.30 108.86 M²
5D LISTPLANK 46 M
5E TAWING LAYAR 19.84 M

6 PEKERJAAN PLAFON
6A RUANG 1 54.07 M²
6B RUANG 2 54.07 M²
6C SELASAR LANTAI 2 31.91 M²
6D PLAFON ATAS TANGGA 24.88 M²
6E TOTAL PLAFON LANTAI 2 164.93 M²

7 PEKERJAAN PENGECATAN
7A PENGECETAN KOLOM 15.88 M²
7B PENGECETAN DINDING 364.1 M²
7C PENGECETAN PLAFON 164.9 M²
7D PENGECETAN LIST PLAFON 91.28 M
7E PENGECETAN LISPLANK 46.00 M

8 PEKERJAAN MEKANIKA DAN ELEKTRIKAL


8A AMPERE METER 1 UNIT
8B MCB 1 UNIT
8C STOP KONTAK 2 UNIT
8D SAKLAR GANDA 3 UNIT
8E LAMPU HE 18 W 8 UNIT
8F LAMPU HE 12 W 3 UNIT
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN RUANG KEGIATAN BELAJAR TKN 3
LOKASI : KOTA BANDA ACEH
A B C D E F
Lantai 1
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA HARGA SATUAN (RP) JUMLAH HARGA (RP)
1 PEKERJAAN LANTAI 1
A PEKERJAAN PERSIAPAN
Pembersihan Lapangan 384.1 M2 AHSP PU A.2.2.1.9 Rp 22,000.00 Rp 8,450,200.00
Pengukuran / Pemasangan Bouplank 71.40 M1 AHSP PU A.2.2.1.4 Rp 111,991.00 Rp 7,996,157.40
Administrasi dan Dokumentasi 1.00 ls TAKSIR Rp 800,000.00 Rp 800,000.00
K3 dan Lain-lain 1.00 ls TAKSIR Rp 200,000.00 Rp 200,000.00
Papan Nama Proyek 1.00 ls TAKSIR Rp 500,000.00 Rp 500,000.00
SUBTOTAL Rp 17,946,357.40
B PEKERJAAN TANAH DAN PONDASI
Galian Tanah pondasi 1 m
Pondasi Menerus
Galian Tanah Pondasi Batu Gunung 64.73 M3 AHSP PU A.2.3.1.8 Rp 107,250.00 Rp 6,942,753.68
Urugan Kembali Galian Pondasi Batu Gunung 16.18 M3 AHSP PU A.2.3.1.9 Rp 48,119.50 Rp 778,745.54
Pasir Alas 3.051 M3 AHSP PU A.2.3.1.11 Rp 240,900.00 Rp 734,985.90
Aanstamping 6.102 M3 AHSP PU A.3.2.1.9 Rp 513,958.50 Rp 3,136,174.77
Pasangan Pondasi Batu Gunung 16.96 M3 AHSP PU A.3.2.1.2 Rp 962,830.00 Rp 16,330,559.63
Pondasi Menerus Tangga
Galian Tanah Pondasi tangga 0.228 M3 AHSP PU A.2.3.1.8 Rp 107,250.00 Rp 24,399.38
pasir urug 0.032 M3 AHSP PU A.2.3.1.9 Rp 48,119.50 Rp 1,515.76
lantai kerja 0.063 M3 AHSP PU A.4.1.1.1 Rp 987,814.14 Rp 62,232.29
Galian Tanah Pondasi 2- 3 m
Galian Pondasi Tapak sumuran
Galian Pondasi Tapak Sumuran 150X140 99.96 M3 AHSP PU A.2.3.1.8b Rp 113,190.00 Rp 11,314,472.40
Urugan Kembali Pondasi Tapak Sumuran 74.97 M3 AHSP PU A.2.3.1.9 Rp 48,119.50 Rp 3,607,518.92
Pasir Alas 0.098 M3 AHSP PU A.2.3.1.11 Rp 240,900.00 Rp 23,608.20
cor lantai kerja 0.196 M3 AHSP PU A.4.1.1.1 Rp 987,814.14 Rp 193,611.57

SUBTOTAL Rp 43,150,578.03
C PEKERJAAN BETON BERTULANG
LANTAI 1
Beton Cor Cyclope
beton k-175 18.437 M3 AHSP PU A.4.1.1.5 Rp 1,095,061.96 Rp 20,190,152.33
besi Tulangan Pokok D 16 - 150 140.2 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 3,514,474.41
Bekesting + Perawatan beton 61.46 Kg AHSP PU A.4.1.1.20 Rp 297,209.00 Rp 18,265,922.24

Beton Tapak Bertulang 1,20 x 1,20


Beton K-250 9.792 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 11,493,172.73
Besi Tulangan Pokok D16-150 140.22 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 3,514,474.41
Bekisting + Perawatan Beton 32.64 Kg AHSP PU A.4.1.1.20 Rp 297,209.00 Rp 9,700,901.76

Beton Bertulang Sloof 25/40 cm


Beton K-250 8.288 M3 AHSP PU A.4.1.8 Rp 1,173,730.88 Rp 9,727,881.50
Besi Tulangan Pokok ø 16 197.9 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 4,959,315.17
Besi Tulangan Sengkang ø 10 - 10 cm 71.61 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 1,794,748.27
Bekisting + Perawatan Beton 33.15 M2 AHSP PU A.4.1.1.21 Rp 297,209.00 Rp 9,853,072.77

Beton Bertulang Kolom K1 - 30/40 cm LT 1


Beton K-250 7.446 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 8,739,600.10
Besi Tulangan Pokok ø 16 196.3 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 4,918,882.47
Besi Tulangan Sengkang ø 10- 10 cm 64.73 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 1,622,458.62
Bekisting + Perawatan Beton 29.78 M2 AHSP PU A.4.1.1.22 Rp 608,349.50 Rp 18,119,081.51

SUBTOTAL Rp 84,443,589.31
D PEKERJAAN TANGGA
Beton plat tangga K250 1.312 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 1,540,169.66
Tulangan Pokok Tangga 110.9 KG AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 2,395,680.23
Bekisting plat Tangga 8.333 KG AHSP PU A.4.1.1.26 Rp 564,734.50 Rp 4,706,120.83
Beton Plat bordes K250 0.389 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 456,346.56
Tulangan pokok balok bordes 217.8 KG AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 4,704,255.27
Bekisting bordes Tangga 6.667 KG AHSP PU A.4.1.1.21 Rp 297,209.00 Rp 1,981,393.33
Relling tangga 6.930 M3 AHSP PU A.4.1.1.1 Rp 987,814.14 Rp 6,845,552.01
SUBTOTAL Rp 22,629,517.90

E PEKERJAAN TIMBUNAN DAN URUGAN


Pekerjaan Timbunan dan Urugan
Timbunan Bawah Selasar dan Ruangan 47.93 M3 AHSP PU - T.14 E Rp 279,400.00 Rp 13,392,955.74
Urugan Pasir Bawah Selasar dan Ruangan 16.36 M3 AHSP PU A.2.3.1.11 Rp 240,900.00 Rp 3,941,246.86
Beton cor bawah selasar dan ruangan 11.45 M3 AHSP PU A.4.1.1.5 Rp 1,095,061.96 Rp 12,541,040.51
SUBTOTAL Rp 29,875,243.10
F PEKERJAAN PEMASANGAN KERAMIK
Pemasangan Keramik LT 1
Pemasangan Keramik Ruangan 108.1 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 30,582,509.45
Pemasangan Keramik Selasar 31.91 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 9,025,864.55
Pemasangan Keramik Anak Tangga 0.820 M2 AHSP PU A.4.4.3.35 Rp 278,210.90 Rp 228,167.71
Pemasangan Keramik Bordes 0.389 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 109,960.80
SUBTOTAL Rp 39,946,502.52
2 PEKERJAAN LANTAI 2
A PEKERJAAN BETON BERTULANG
- Beton Bertulang Kolom K1 30/40 cm LT 2
Beton K-250 7.04 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 8,260,717.90
Besi Tulangan Pokok ø 16 196.3 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 4,918,882.47
Besi Tulangan Sengkang ø 10 - 10 cm 64.73 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,398,160.50
Bekisting + Perawatan Beton 41.06 M2 AHSP PU A.4.1.1.22 Rp 608,349.50 Rp 24,975,788.72
- Beton Bertulang Kolom K2 20/25 cm LT 2
Beton K-250 1.40 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 1,643,223.23
Besi Tulangan Pokok ø 16 248.9 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 5,375,327.93
Besi Tulangan Sengkang ø 8 - 10 cm 59.48 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,284,709.77
Bekisting + Perawatan Beton 12.60 M2 AHSP PU A.4.1.1.22 Rp 608,349.50 Rp 7,665,203.70
- Plat lantai
Beton K-250 17.27 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 20,267,365.03
Besi Tulangan Pokok ø 10 13.69 Kg AHSP PU A.4.1.1.17.a Rp 25,064.05 Rp 343,210.39
Besi Tulangan Sengkang ø 10 - 15 cm 363.8 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 7,858,161.23
Bekisting + Perawatan Beton 143.9 M2 AHSP PU A.4.1.1.24 Rp 915,909.50 Rp 131,795,347.05
- Beton Bertulang Balok Lantai 30/60 cm LT 2
Beton K-250 2.473 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 2,902,871.20
Besi Tulangan Pokok ø 12 154.5 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 3,337,238.98
Besi Tulangan Sengkang ø 10 - 10 cm 57.0 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,230,381.24
Bekisting + Perawatan Beton 8.656 M2 AHSP PU A.4.1.1.23 Rp 620,779.50 Rp 5,373,591.51
- Beton Bertulang Balok Lantai di 25/45 cm LT 2
Beton K-250 10.43 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 12,244,507.21
Besi Tulangan Pokok ø 16 156.1 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 3,372,156.00
Besi Tulangan Sengkang ø 8 - 10 cm 43.89 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 948,085.98
Bekisting + Perawatan Beton 42.19 M2 AHSP PU A.4.1.1.23 Rp 620,779.50 Rp 26,192,021.78
- Beton Bertulang Balok Lantai di 20/40 cm LT 2
Beton K-250 1.907 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 2,238,539.53
Besi Tulangan Pokok ø 16 202.4 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 4,371,581.84
Besi Tulangan Sengkang ø 10 - 10 cm 81.56 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,761,682.24
Bekisting + Perawatan Beton 9.059 M2 AHSP PU A.4.1.1.23 Rp 620,779.50 Rp 5,623,765.65
- Beton Bertulang Balok Latai di 13/15 cm LT 2
Beton K-250 1.085 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 1,273,703.40
Besi Tulangan Pokok ø 10 181.8 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 3,926,420.92
Besi Tulangan Sengkang ø 8 - 15 cm 55.33 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,194,971.83
Bekisting + Perawatan Beton 5.287 M2 AHSP PU A.4.1.1.23 Rp 620,779.50 Rp 3,281,906.02
- Beton Bertulang Balok Bordes 20/30 cm LT 2
Beton K-250 0.324 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 380,288.80
Besi Tulangan Pokok ø 14 217.8 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 4,704,255.27
Besi Tulangan Sengkang ø 10 - 10 cm 87.51 Kg AHSP PU A.4.1.1.17 Rp 9,450.00 Rp 826,990.05
Bekisting + Perawatan Beton 2.160 M2 AHSP PU A.4.1.1.23 Rp 620,779.50 Rp 1,340,883.72
- Beton bertulang ring balok 20/35
Beton K-250 4.680 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 5,493,295.24
Besi Tulangan Pokok ø 14 157.173 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 3,394,786.97
Besi Tulangan Sengkang ø 8 - 10 cm 53.601 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,157,730.16
Bekisting + Perawatan Beton 30.087 M2 AHSP PU A.4.1.1.22 Rp 620,779.50 Rp 18,677,392.82
- Beton bertulang ring balok 20/30
Beton K-250 1.849 M3 AHSP PU A.4.1.1.8 Rp 1,173,730.88 Rp 2,169,758.90
Besi Tulangan Pokok ø 14 156.7 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 3,384,631.44
Besi Tulangan Sengkang ø 8 - 10 cm 56.01 Kg AHSP PU A.4.1.1.17 Rp 21,599.05 Rp 1,209,715.10
Bekisting + Perawatan Beton 12.32 M2 AHSP PU A.4.1.1.22 Rp 620,779.50 Rp 7,650,486.56

SUBTOTAL Rp 305,896,188.68
B PEKERJAAN PASANGAN DAN PLASTERAN
Pasangan Dinding Bata 1 PC : 4PP LT 2 182.0 M2 AHSP PU A.4.4.1.3 Rp 326,673.88 Rp 59,469,998.92
Plasteran Dinding Bata 1 PC : 4PP LT 2 364.1 M2 AHSP PU A.4.4.2.4 Rp 83,176.50 Rp 30,284,064.59
SUBTOTAL Rp 89,754,063.51
C PEKERJAAN PINTU,JENDELA DAN KUNCI
Pemasangan Pintu,jendela,dan Kunci
Pintu
KUSEN PINTU ALUMINIUM 7.0 M Taksir Rp 170,000.00 Rp 1,190,000.00
LOUVER ZET UPVC 2 Buah Taksir Rp 500,000.00 Rp 1,000,000.00
DAUN PINTU ALUMINIUM 2 Buah Taksir Rp 200,000.00 Rp 400,000.00
KACA PINTU 0.365 M2 Taksir Rp 220,000.00 Rp 80,256.00
Kunci pintu slinder 2 Buah AHSP PU A.4.6.2.4 Rp 249,507.50 Rp 499,015.00
Engsel pintu 6 Buah AHSP PU A.4.6.2.5 Rp 219,692.00 Rp 1,318,152.00

Jendela 1
KUSEN JENDELA ALUMINIUM 13.40 M Taksir Rp 170,000.00 Rp 2,278,000.00
LOUVER ZET UPVC 6 Buah Taksir Rp 500,000.00 Rp 3,000,000.00
DAUN JENDELA ALUMINIUM 6 Buah Taksir Rp 200,000.00 Rp 1,200,000.00
KACA JENDELA 1.680 M2 Taksir Rp 220,000.00 Rp 369,600.00
- Engsel Jendela 12 Buah AHSP PU A.4.6.2.6 Rp 219,692.00 Rp 2,636,304.00
- Pacok Jendela 6 Buah AHSP PU A.4.6.2.10 Rp 35,442.00 Rp 212,652.00
- Gagang Jendela J1 6 Buah TAKSIR Rp 12,000.00 Rp 72,000.00

Jendela 2
KUSEN JENDELA ALUMINIUM 48 M Taksir 170,000.00 Rp 8,160,000.00
LOUVER ZET UPVC 24 Buah Taksir 500,000.00 Rp 12,000,000.00
DAUN JENDELA ALUMINIUM 24 Buah Taksir 200,000.00 Rp 4,800,000.00
KACA JENDELA 6.750 M2 Taksir 220,000.00 Rp 1,485,000.00
Engsel Jendela 48 Buah AHSP PU A.4.6.2.6 219,692.00 Rp 10,545,216.00
Pacok Jendela 24 Buah AHSP PU A.4.6.2.10 35,442.00 Rp 850,608.00
Gagang Jendela 24 Buah TAKSIR 15,000.00 Rp 360,000.00

VENTILASI UPVC
VENTILASI 2.930 M Taksir 170,000.00 Rp 498,100.00
LOUVER ZET UPVC 4 Buah Taksir 500,000.00 Rp 2,000,000.00
SUBTOTAL Rp 54,954,903.00
D PEKERJAAN ATAP
Rangka kuda kuda baja ringan 108.9 M2 TAKSIR Rp 350,000.00 Rp 38,102,400.00
Atap Spandek 108.9 M2 AHSP PU A.4.5.2.32 Rp 143,605.00 Rp 15,633,414.72
Papan listplank 46 M AHSP PU A.4.6.1.21 Rp 106,909.00 Rp 4,917,814.00
Bubungan Atap 21.25 M2 AHSP PU A.4.5.2.39.a Rp 83,242.50 Rp 1,768,903.13
SUBTOTAL Rp 60,422,531.85
E PEKERJAAN PEMASANGAN KERAMIK
Pemasangan Keramik Ruangan 108.1 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 30,581,434.73
Pemasangan Keramik Selasar 31.91 M2 AHSP PU A.4.4.3.34.a Rp 282,821.00 Rp 9,025,864.55
SUBTOTAL Rp 39,607,299.28
F PEKERJAAN PLAFOND
Rangka plafond 108.13 M2 AHSP PU A.4.6.1.20 Rp 89,922.25 Rp 9,723,292.89
Plafond 108.13 M2 AHSP PU A.4.5.1.5 Rp 53,103.88 Rp 5,742,323.80
Rangka plafond luar 31.91 M2 AHSP PU A.4.6.1.20 Rp 89,922.25 Rp 2,869,419.00
Plafond luar 31.91 M2 AHSP PU A.4.5.1.5 Rp 53,103.88 Rp 1,694,741.14
list plafond 91.28 M2 AHSP PU A.4.5.1.9 Rp 53,103.88 Rp 4,847,321.71
SUBTOTAL Rp 24,877,098.53
G PEKERJAAN LISTRIK
AMPERE METER 1 Unit Taksir Rp 55,000.00 Rp 55,000.00
MCB 1 Unit Taksir Rp 60,000.00 Rp 60,000.00
STOP KONTAK 2 Unit Taksir Rp 45,000.00 Rp 90,000.00
SAKLAR GANDA 3 Unit Taksir Rp 60,000.00 Rp 180,000.00
LAMPU HE 18 W 8 Unit Taksir Rp 35,000.00 Rp 280,000.00
LAMPU HE 12 W 3 Unit Taksir Rp 30,000.00 Rp 90,000.00
SUBTOTAL Rp 755,000.00
H PEKERJAAN PENGECETAN
Cat Dinding Luar Dan Dalam 364.1 M2 AHSP PU A.4.7.1.10 Rp 35,221.45 Rp 12,823,918.62
PENGECETAN KOLOM 15.88 M2 AHSP PU A.4.7.1.10 Rp 35,221.45 Rp 559,457.51
Cat Plafond 164.9 M2 AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 8,809,015.13
Cat listplank 46 M AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 2,456,883.00
Cat List Profil Plafond 91.28 M2 AHSP PU A.4.7.1.4 Rp 53,410.50 Rp 4,875,310.44
SUBTOTAL Rp 29,524,584.70
TOTAL RAB Rp 843,783,457.79
14 PLAT TANGGA

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 7,30 Meter


14 Plat Lantai tangga tebal = 12 cm Panjang Besi (Pjb) = 8.10 M
Jumlah Baris Besi (Jb) = 6.25 M
Bidang X = 1.25 M Jumlah Lapis (Jl) = 2.00 Lapis
Bidang Y = 8.10 M Diameter Besi (d) = 12.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 12.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.20 M = 89.842 Kg

2. Untuk Bidang 7,30 Meter


Panjang Besi (Pjb) = 1.25 M
Jumlah Baris Besi (Jb) = 40.50 M
Jumlah Lapis (Jl) = 1.00 Lapis
Diameter Besi (d) = 12.00 mm

Berat besi Ø 12, = Pjg*Jb*Jl*0.006162*d*d


= 44.921 Kg

Total Berat Besi = 134.76 Kg

Berat Besi Untuk 1 m3 Beton = 110.92 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 8.333 M2 / M3 Beton


REKAPITULASI
PEMBANGUNAN RUANG KEGIATAN BELAJAR TKN 3
KOTA BANDA ACEH

NO URAIAN PEKERJAAN TOTAL BIAYA


A. PEKERJAAN LANTAI 1
PEKERJAAN PERSIAPAN Rp 17,946,357.40
PEKERJAAN TANAH DAN PONDASI Rp 43,150,578.03
PEKERJAAN BETON BERTULANG Rp 84,443,589.31
PEKERJAAN TANGGA Rp 22,629,517.90
PEKERJAAN PEMASANGAN KERAMIK Rp 39,946,502.52
PEKERJAAN TIMBUNAN DAN URUNGAN Rp 29,875,243.10

B. PEKERJAAN LANTAI 2
PEKERJAAN BETON BERTULANG Rp 305,896,188.68
PEKERJAAN PASANGAN DAN PLASTERAN Rp 89,754,063.51
PEKERJAAN PINTU,JENDELA DAN KUNCI Rp 54,954,903.00
PEKERJAAN ATAP Rp 60,422,531.85
PEKERJAAN PEMASANGAN KERAMIK Rp 39,607,299.28
PEKERJAAN PLAFOND Rp 24,877,098.53
PEKERJAAN LISTRIK Rp 755,000.00
PEKERJAAN PENGECETAN Rp 29,524,584.70
TOTAL BIAYA Rp 843,783,457.79
DIBULATKAN Rp 843,783,000.00

DELAPAN RATUS TIGA BELAS JUTA DUA RATUS TIGA PULUH SEMBILAN RIBU RUPIAH