PERHITUNGAN VOLUME KRAN UMUM

NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


I PEKERJAAN PERSIAPAN : 1. Pembersihan Lahan
L (m) B (m) A = L + B +L + B

2.00 2.00
= - m1

L
2. Pemasangan Bowplank + Vitzet
L (m) B (m) K = 2 x (( L + 2 ) + ( B + 2 ))

- -
= - m

B 3. Penyediaan Air Kerja 1.000 LS

II PEKERJAAN TANAH DAN URUGAN 1. Galian Tanah


a. Pondasi Tugu Kran
b (m) h (m) L (m) V = (bxh)xL

0.40 0.20 0.40


h = 0.032 m3

b. Pondasi Saluran
b b (m) h (m) L (m) V = (bxh)xL

0.15 0.20 8.00


= 0.240 m3

c. Sumur Resapan Air


b (m) h (m) L (m) V = (bxh)xL

0.50 1.50 0.50


= 0.375 m3
d. Urugan Pasir Sumur Resapan
b (m) h (m) L (m) V = (bxh)xL

0.50 0.20 0.50


= 0.050 m3

Volume Total Urugan Pasir 0.050 m3

Volume Total Galian Tanah 0.647 m3


III PEKERJAAN PASANGAN PONDASI ROLAG DAN PLESTERAN 1. Pasangan Bata
VBatu (m)
V = P x L
p = 8 M
h = 0.10 M = 0.800 m2
1. Pasangan Bata Resapan
VBatu (m)
V = P x L
p = 3 M
h = 0.30 M = 0.960 m2
NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Pipa Gip Ø 20 mm
Beton Tumbuk 1 : 3 : 5
1. Plesteran Tembok Trasraam (1 pc : 5 psr)
20
a. Plesteran Pasangan Bata
h = 8 A = [h x p] x n sisi
Pipa Gip Ø 20 mm

Beton Tumbuk 1 : 3 : 5
Beton Tumbuk 1:3:5 Pasangan Bata 85 P = 0.35

20
= 5.60
Kemiringan 2 % Kemiringan 2 %

15 5.60 m2
20
b. Plesteran Pasangan Bata
15 15 70 40 70 15 15
h = 8 A = [h x p] x n sisi
180
240 P = 0.15
= 2.40
2.40 m2

c. Plesteran Pasangan Bata S. Resapan


h = 2.16 A = [h x p] x n sisi
P = 0.65
= 1.40
1.40 m2

2. Plesteran Tugu Kran (1 pc : 4 psr)

Lebar Atas = 0.2 m A = la + Lb


x h
Lebar Bawah = 0.40 m 2
Tinggi Tugu = 0.85 m = 0.2 x 0.40
x 0.85
2
= 0.300 x 0.85
= 0.255 x 4 sisi
= 1.020 m2

Luas Total Plesteran 10.42 m2

8. Acian Tembok

Apl (m2) AAC = APl

= 10.42 m2
NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
IV PEKERJAAN BETON 1. Cor Dinding Beton tugu kran (1 pc : 3 psr : 5 Krl)
V = LA+LB
x Tinggi x tebal
Lebar Atas (m)Lebar Bawah (m) Tinggi (m) Tebal (m) = 2
T1 0.200 0.400 0.850 0.40 = 0.10
V total = 0.10 m3

2. Rabat Beton (1 pc : 3 Psr : 5 Krl) untuk lantai

Panjang (m) lebar (m) tebal (m) V = PxLxT


0.40 0.40 0.20
1.80 1.80 0.15 = 0.03 m3

= 0.49 m3

Vtotal = 0.518 m3

V PEKERJAAN INSTALASI AIR 1 Pipa GIP 1/2" = 12 M


2 Tee 1/2" = 1 Buah
3 Elbow 90, 1/2" = 6 Buah
4 Socket 1/2" = 3 Buah
5 Water Moor 1/2" = 2 Buah
6 Nipel 1/2" = 4 Buah
7 Kran Air 1/2" = 2 Buah
8 Female Threat Adaptor PE 20 mm x 20 mm = 1 Buah
VI PEKERJAAN FINISHING 1. Cat Tugu Kran
AAC (m2) V = AAC (m2)
V = 11 M
h = 0.55 M = 10.424 m2