2.00 2.00
= - m1
L
2. Pemasangan Bowplank + Vitzet
L (m) B (m) K = 2 x (( L + 2 ) + ( B + 2 ))
- -
= - m
b. Pondasi Saluran
b b (m) h (m) L (m) V = (bxh)xL
Beton Tumbuk 1 : 3 : 5
Beton Tumbuk 1:3:5 Pasangan Bata 85 P = 0.35
20
= 5.60
Kemiringan 2 % Kemiringan 2 %
15 5.60 m2
20
b. Plesteran Pasangan Bata
15 15 70 40 70 15 15
h = 8 A = [h x p] x n sisi
180
240 P = 0.15
= 2.40
2.40 m2
8. Acian Tembok
= 10.42 m2
NO. SKETS GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
IV PEKERJAAN BETON 1. Cor Dinding Beton tugu kran (1 pc : 3 psr : 5 Krl)
V = LA+LB
x Tinggi x tebal
Lebar Atas (m)Lebar Bawah (m) Tinggi (m) Tebal (m) = 2
T1 0.200 0.400 0.850 0.40 = 0.10
V total = 0.10 m3
= 0.49 m3
Vtotal = 0.518 m3