Professional Documents
Culture Documents
Retaining_Wall Godang-9/19/2019
Reinforcement Bar Arrangement
( D1 - GODANG )
+ 249.95
D25~200
0.10 D16~250
D16~250
6.10 D16~250
A A
D25~100 D16~125
D16~250
D16~125
D16~200 D16~200
6.00 D25~100 D C D16~250 + 244.85
B B 0.00
1.00
+ 243.85
D16~250 D C
D16~200 D16~250 D16~200
4.50
concrete = 9 m3
reinforcement = 715 kg
cost estimate = 9,000,047
Retaining_Wall Godang-9/19/2019