PERHITUNGAN VOLUME

GEDUNG KANTOR

NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

I PEKERJAAN PONDASI
1 Pembersihan Lapangan 10.00 x 45.00 = 450.00 450.00 M2

2 Pas. Papan Bouplank 27.00 + 35.00 = 62.00 62.00 M1

3 Galian Tanah Pondasi memanjang 0.80 x 0.80 x 42.00 x 2.00 = 53.76 109.76 M3
0.80 x 0.80 x 6.00 x 2.00 = 7.68
0.80 x 0.80 x 7.50 x 1.00 = 4.80

teras 0.80 x 0.80 x 0.80 x 15.00 = 7.68


melintang 0.80 x 0.80 x 4.00 x 2.00 = 5.12
0.80 x 0.80 x 8.00 x 3.00 = 15.36
0.80 x 0.80 x 11.00 x 2.00 = 14.08
0.80 x 0.80 x 2.00 x 1.00 = 1.28 +
= 109.76

5 Pas. Aanstampang Bt. Kali 0.20 x 0.80 x 164.00 = 26.24 26.24 M³

6 Pas. Pondasi Bt. Kali 1:4 0.25 + 0.60 / 2.00 x 0.60 = 0.26 41.82 M3
0.26 x 164.00 = 41.82

7 Urugan Tanah Kembali 0.25 x 109.76 = 27.44 27.44 M3

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian besi 12 tul pokok 4.00 x 167.00 x 0.89 = 594.52 967.38 Kg

pjg begel byk bj besi


besi 8 begel 0.70 x 1,350.00 x 0.39 = 372.86 +
= 967.38

b Pek. Bekisting sloof 0.40 x 164.00 = 65.60 65.60 M2

c Pek. Stamp beton K 175 0.20 x 0.15 x 164.00 = 4.92 4.92 M3


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Pek. Kolom 15/25


a Pek. Pembesian besi 12 6.00 x 4.00 x 0.89 x 44.00 = 939.84 1,186.94 Kg
bnyk begel bj besi
besi 8 begel 0.80 x 18.00 x 0.39 x 44.00 = 247.10 +
= 1,186.94

b Pek. Bekisting kolom 0.80 x 3.30 x 44.00 = 116.16 116.16 M2

c Pek. Stamp beton K 175 0.15 x 0.25 x 3.50 x 44.00 = 5.78 5.78 M3

3 Pek. Kolom 13/13


a Pek. Pembesian besi 12 4.00 x 4.00 x 0.89 x 16.00 = 227.84 284.00 Kg
bnyk begel bj besi
besi 8 begel 0.50 x 18.00 x 0.39 x 16.00 = 56.16 +
= 284.00

b Pek. Bekisting kolom 0.26 x 3.50 x 16.00 = 14.56 14.56 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 3.50 x 16.00 = 0.95 0.95 M3

4 Pek. Balok Late 13/15


a Pek. Pembesian besi 10 tul pokok 4.00 x 40.00 x 0.62 = 99.20 294.20 Kg

pjg begel byk bj besi


besi 8 begel 0.50 x 1,000.00 x 0.39 = 195.00 +
= 294.20

b Pek. Bekisting balok 0.26 x 40.00 = 10.40 10.40 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 40.00 = 0.68 0.68 M3

5 Pek. Reng Balok 13/20


a Pek. Pembesian besi 12 tul pokok 4.00 x 167.00 x 0.89 = 594.52 936.75 Kg

pjg begel byk bj besi


besi 8 begel 0.65 x 1350.00 x 0.39 = 342.23 +
= 936.75
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

b Pek. Bekisting balok 0.40 x 164.00 = 65.60 65.60 M2

c Pek. Stamp beton K 175 0.13 x 0.20 x 167.00 = 4.34 4.34 M3

6 Pas. Dinding Bata 1:2 0.50 x 123.00 = 61.50 61.50 M2

7 Pas. Dinding Bata 1:4 3.00 x 123.00 = 369.00 240.06 M2


Luas kozen
P1=2 Bh 1.50 x 3.00 x 2.00 = 9.00
P2=2 Bh 0.90 x 3.00 x 2.00 = 5.40
P3=4 Bh 0.80 x 3.00 x 4.00 = 9.60
J1=20 Bh 2.65 x 1.80 x 20.00 = 95.40
V=4 Bh 2.65 x 0.90 x 4.00 = 9.54 +
= 128.94

total volume bata 369.00 - 128.94 = 240.06

8 Pas. Dinding Bata 1:4 Rabat / teras 0.55 x 45.00 x 2.00 = 90.00 112.00 M2
0.55 x 11.00 x 2.00 = 22.00 +
= 112.00

9 Pek. Kozen Pintu/Jendela Panjang kozen 2.97 M3


P1=9 Bh 6.64 x 2.00 = 13.28
P2=2 Bh 5.74 x 2.00 = 11.48
P3=2 Bh 5.20 x 4.00 = 20.80
J1=28 Bh 16.95 x 20.00 = 339.00
V=1 Bh 9.80 x 4.00 = 39.20 +
= 423.76

Total 0.05 x 0.14 x 423.76 = 2.97

10 Pas. Angker Kozen 1.50 x 2.97 = 4.45 4.45 Kg

III PEKERJAAN KAP/ATAP byk kk


1 Pek Kuda-kuda Kayu kk utama 0.06 x 0.12 x 38.75 x 11.00 = 3.07 4.28 M3
kk teras 0.06 x 0.12 x 27.45 x 2.00 = 0.40
kk 1/2 0.06 x 0.12 x 19.38 x 4.00 = 0.56
kk jurai 0.06 x 0.12 x 9.00 x 4.00 = 0.26 +
= 4.28

byk gording bdg


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Pek Gording Kayu 0.05 x 0.10 x 45.00 x 11.00 x 2.00 = 4.95 6.64 M3
0.05 x 0.10 x 9.50 x 11.00 x 2.00 = 1.05
0.05 x 0.10 x 5.87 x 11.00 x 2.00 = 0.65 +
= 6.64

6 Pas. Atap Seng BJLS 20 warna 45.00 + 32.00 / 2.00 x 7.50 x 2.00 = 577.50 667.50 M2
12.00 x 7.50 / 2.00 x 2.00 = 90.00 +
= 667.50

6 Pas. Perabung Seng 32.00 x 1.00 = 32.00 62.00 M1


7.50 x 4.00 = 30.00 +
= 62.00

5 Pas. Lesplank Kayu 45.00 x 2.00 = 90.00 114.00 M1


12.00 x 2.00 = 24.00
+
= 114.00

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding 1 : 2 61.50 x 2.00 = 123.00 123.00 M2
2 Pek. Plesteran Dinding 1:4 240.06 x 2.00 = 480.12 480.12 M2
3 Pek. Acian Dinding 480.12 + 123.00 = 603.12 603.12 M2
4 Pek. Acian Beton kolom 0.80 x 3.50 x 44.00 = 123.20 123.20 M2
4 Pas. Dinding Keramik 20x25 cm km/wc t= 1,5 m 1.50 x 6.00 x 4.00 = 36.00 36.00 M2

V PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 12.50 x 46.00 = 575.00 575.00 M2

2 Cat Menie Rangka Plafond 0.15 x 46.00 x 20.00 = 138.00 267.60 M2


0.15 x 12.00 x 72.00 = 129.60 +
= 267.60

3 Pas. Plafond Triplek 4 mm = 575.00 575.00 M2

4 Pas. Les Profil 5x5 cm 46.00 x 4.00 = 184.00 324.00 M1


7.00 x 20.00 = 140.00 +
= 324.00

VI PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai 0.30 x 9.00 x 42.00 = 113.40 113.40 M3
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Urugan Pasir 0.10 x 9.00 x 42.00 = 37.80 37.80 M3

3 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 9.00 x 42.00 = 18.90 18.90 M3

4 Pas. Lantai Keramik 40x40 cm 7.00 x 42.00 = 294.00 294.00 M2

5 Pas. Lantai Keramik 40x40 cm unpolish Teras teras belakang 2.00 x 45.00 = 90.00 162.00 M2
lobby 6.00 x 8.00 = 48.00
teras depan 6.00 x 4.00 = 24.00 +
= 162.00

6 Pas. Lantai Keramik 20x20 cm km/wc 1.35 x 1.85 x 4.00 = 9.99 9.99 M2

VII PEKERJAAN PINTU/JENDELA


1 Pas. Pintu Panil Kayu P1=2 Bh 1.40 x 2.10 x 2.00 = 5.88 9.24 M2
P2=2 Bh 0.80 x 2.10 x 2.00 = 3.36 +
= 9.24

2 Pas. Pintu Panil Kayu Lapis Seng Plat P3=4 Bh 0.70 x 2.10 x 4.00 = 5.88 5.88 M2

2 Pas. Rangka Jendela + Kaca 5 mm 1.15 x 0.60 x 2.00 x 20.00 = 27.60 27.60 M2

3 Pas. Jalusi Kayu J1=20 Bh 0.14 x 0.60 x 8.00 x 4.00 x 20.00 = 53.76 59.14 M2
P1=2 Bh 0.14 x 0.60 x 8.00 x 2.00 x 2.00 = 2.69
P2=2 Bh 0.14 x 0.60 x 8.00 x 2.00 x 2.00 = 2.69 +
= 59.14

4 Pas. Kaca Bening 5 mm 1.15 x 0.70 x 1.00 x 20.00 = 16.10 16.10 M2

5 Pas. Kunci Pintu 2 x Slagh = 8.00 8.00 Bh

6 Pas. Engsel Pintu 4" P1=2 Bh 2.00 x 6.00 = 12.00 30.00 Bh


P2=2 Bh 2.00 x 3.00 = 6.00
P3=4 Bh 4.00 x 3.00 = 12.00 +
= 30.00

7 Pas. Engsel Jendela 3" 20.00 x 2.00 = 40.00 40.00 Bh

8 Pas. Gerendel Jendela 20.00 x 2.00 = 40.00 40.00 Bh


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

9 Pas. Kait Angin Jendela 20.00 x 2.00 = 40.00 40.00 Bh

10 Pas. Tangan-tangan Jendela 20.00 x 1.00 = 20.00 20.00 Bh

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok setara Catylac 603.12 + 123.20 = 726.32 726.32 M2
2 Cat Plafond = 575.00 575.00 M2

3 Cat Minyak Kozen Pintu/Jendela kozen 0.24 x 423.76 = 101.70 258.06 M2


pintu 2.00 x 9.24 = 18.48
jendela 0.18 x 3.50 x 20.00 = 12.60
jalusi jd 0.30 x 0.60 x 8.00 x 4.00 x 20.00 = 115.20
jalusi pt 0.30 x 0.70 x 8.00 x 6.00 = 10.08 +
= 258.06

3 Cat Minyak Lesplank Kayu 0.30 x 114.00 = 34.20 34.20 M2

IX PEK. PERELENGKAPAN DALAM


1 Pas. Instalasi Titik Lampu = 27.00 27.00 Ttk
2 Pas. Instalasi Stop kontak = 25.00 25.00 Ttk
3 Pas. Panel MCB = 1.00 1.00 Bh
4 Pas. Lampu TL Out bouw 2 x 36 watt phillips = 23.00 23.00 Bh
5 Pas. Bola Lampu SL 11 watt phillips = 4.00 4.00 Bh

1 Pas. Pipa Air Kotor PVC dia 3" AW + Acc = 25.00 25.00 M1
1 Pas. Pipa Air Kotor PVC dia 4" AW + Acc = 25.00 25.00 M1
2 Pas. Pipa Air Bersih PVC 3/4" + Acc = 25.00 25.00 Bh
3 Pas. Kloset Jongkok = 4.00 4.00 Bh
3 Pas. Kran Air = 4.00 4.00 Bh
3 Pas. Flour Drain = 4.00 4.00 Bh

X PEK. PERELENGKAPAN LUAR


1 Galian Tanah 0.60 x 0.60 x 45.00 x 2.00 = 32.40 41.04 M3
0.60 x 0.60 x 12.00 x 2.00 = 8.64 +
= 41.04
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Pas. Dinding Bata 1:4 0.50 x 45.00 x 2.00 = 45.00 57.00 M2


0.50 x 12.00 x 2.00 = 12.00 +
= 57.00
3 Pek. Plesteran Dinding 1:4 57.00 x 2.00 = 114.00 114.00 M2
4 Pek. Acian Dinding = 114.00 114.00 M2

5 Timbunan Tanah Bawah Lantai 0.11 x 1.20 x 45.00 x 2.00 = 12.19 15.44 M3
0.11 x 1.20 x 12.00 x 2.00 = 3.25 +
= 15.44

6 Urugan Pasir 0.05 x 1.20 x 45.00 x 2.00 = 5.40 6.84 M3


0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
= 6.84

7 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 1.20 x 45.00 x 2.00 = 5.40 6.84 M3
0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
= 6.84

8 Pek. Acian Lantai 1.20 x 45.00 x 2.00 = 108.00 136.80 M3


1.20 x 12.00 x 2.00 = 28.80 +
= 136.80

9 Pek. Septiktank dan Peresapan Kap 25 orang = 2.00 2.00 Unit


RENCANA ANGGARAN BIAYA
PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PEKERJAAN PENDAHULUAN
a Pembersihan Lapangan m2 56.00 18,000.00 1,008,000.00
b Pas. Papan Bouplank M1 17.00 70,330.00 1,195,610.00
c FASILITAS SMK3
Penyiapan RKB :
Pembuatan Manual,Prosedur, Intruksi Set 1.00 500,000.00 500,000.00
Alat Pendukung :
Topi Pelindung (Safety Helmet) bh 4.00 90,000.00 360,000.00
Rompi Keselamatan (Safety vest) bh 4.00 90,000.00 360,000.00
Sepatu Keselamatan (Boots) psg 4.00 150,000.00 600,000.00
Rambu-Rambu Peringatan (Plang Nama, Spanduk Utama Keselamatan kerja) bh 1.00 50,000.00 50,000.00
Fasilitas Sarana Kesehatan :
Peralatan P3K kotak 1.00 150,153.75 150,153.75
Asuransi Ketenagakerjaan :
BPJS Ketenagakerjaan dan Keselamatan Kerja Ls 1.00 236,210.00 236,210.00
JUMLAH 4,459,973.75

II PEKERJAAN PONDASI
1 Pek. Pondasi
a Galian Tanah Pondasi M3 7.68 82,920.00 636,825.60
b Pas. Aanstampang Bt. Kali M3 2.56 463,250.00 1,185,920.00
c Pas. Pondasi Bt. Kali 1:4 M3 4.32 844,940.00 3,650,140.80
d Urugan Tanah Kembali M3 1.92 38,750.00 74,400.00
e Pas. Pondasi Tapak M3 1.48 1,390,320.00 2,052,894.38
JUMLAH 7,600,180.78

III PEKERJAAN BETON/DINDING


1 Pek. Sloof Praktis 15/20
a Pek. Pembesian Kg 77.07 15,450.00 1,190,787.12
b Pek. Bekisting sloof (bahan 2x pemakaian) M2 6.00 178,920.00 1,073,520.00
c Pek. Stamp beton K 175 M3 0.45 1,010,040.00 454,518.00

2 Pek. Kolom 20/20


a Pek. Pembesian Kg 250.88 15,450.00 3,876,096.00
b Pek. Bekisting kolom (bahan 2x pemakaian) M2 39.20 275,130.00 10,785,096.00
c Pek. Stamp beton K 175 M3 1.74 1,010,040.00 1,753,429.44

3 Pek. Reng Balok 13/20


a Pek. Pembesian Kg 75.24 15,450.00 1,162,458.00
b Pek. Bekisting balok (bahan 2x pemakaian) M2 9.90 275,130.00 2,723,787.00
c Pek. Stamp beton K 175 M3 0.39 1,010,040.00 393,915.60

4 Pek. Kozen Pintu/Jendela


a Pek. Kozen Pintu/Jendela M3 0.08 8,273,430.00 663,115.41

5 Pas. Dinding Bata


a Pas. Dinding Bata 1:2 M2 8.94 150,910.00 1,349,135.40
b Pas. Dinding Bata 1:4 M2 28.35 140,980.00 3,996,078.10
JUMLAH 34,302,347.02

IV PEKERJAAN KAP/ATAP
a Pek Kuda-kuda Baja Ringan C 0.75 M2 47.81 305,190.00 14,591,133.90
b Pas. Atap Seng BJLS 20 warna M2 47.81 69,860.00 3,340,006.60
c Pek Seng Bubung M' 7.38 30,460.00 224,642.50
d Pek Lisplank Seng Superdex M' 14.75 48,210.00 711,097.50
e Pek Talang M' 2.88 88,530.00 254,523.75
f Pek. Singok M2 5.73 55,310.00 316,926.30
JUMLAH 19,438,330.55
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

V PEKERJAAN PLESTERAN
a Pek. Plesteran Dinding 1 : 2 M2 17.88 74,150.00 1,325,802.00
b Pek. Plesteran Dinding 1 : 4 M2 56.69 69,020.00 3,912,743.80
c Pek. Acian Dinding M2 74.57 42,420.00 3,163,259.40
JUMLAH 8,401,805.20

VI PEKERJAAN PLAFOND
a Pemasangan Besi Hollow M2 25.00 305,190.00 7,629,750.00
b Cat Menie Rangka Plafond M2 21.60 42,413.97 916,141.64
c Pas. Plafond Triplek 6 mm M2 25.00 61,130.00 1,528,250.00
d Pas. Les Profil 5x5 cm M1 15.00 15,000.00 225,000.00
JUMLAH 10,299,141.64

VII PEKERJAAN LANTAI


1 Pek. Lantai
a Timbunan Tanah Bawah Lantai M3 43.20 136,260.00 5,886,432.00
b Cor Lantai Beton K 175 tbl 5 cm M3 3.60 1,010,040.00 3,636,144.00
c Pas. Lantai Keramik 40x40 cm M2 56.00 687,870.00 38,520,720.00

JUMLAH 48,043,296.00

VIII PEKERJAAN PINTU/JENDELA


1 Pek. Pintu / Jendela
a Pas. Pintu Panil Kayu M2 3.24 797,070.00 2,582,506.80
b Pas. Rangka Jendela + Kaca 5 mm M2 18.38 560,980.00 10,308,007.50
c Pas. Jalusi Kayu M2 0.98 419,820.00 412,599.10
d Pas. Kaca Bening 5 mm M2 1.47 138,830.00 204,080.10
2 Pengantung/Pengunci
a Pas. Kunci Pintu 2 x Slagh Bh 1.00 326,710.00 326,710.00
b Pas. Engsel Pintu 4" Bh 6.00 47,440.00 284,640.00
c Pas. Engsel Jendela 3" Bh 8.00 38,200.00 305,600.00
d Pas. Gerendel Jendela Bh 8.00 34,790.00 278,320.00
c Pas. Gerendel Pintu Bh 4.00 36,000.00 144,000.00
f Pas. Kait Angin Jendela Bh 8.00 36,000.00 288,000.00
g Pas. Tangan-tangan Jendela Bh 8.00 34,790.00 278,320.00
JUMLAH 15,412,783.50

IX PEKERJAAN PENGECETAN
1 Pengecatan Tembok Baru (1 x Plamir,1 x Cat Dasar,2 x Cat Penutup) M2 113.47 43,800.00 4,969,812.55
2 Pengecatan Tembok Lama ( 1 X Cat Dasar ,2 x Cat Penutup ) M2 80.08 134,090.00 10,737,927.20
JUMLAH 15,707,739.75

X PEKERJAAN INSTALASI LISTRIK


1 Lampu Saving Energi 18 Watt Bh 1.00 101,550.00 101,550.00
2 Saklar Tunggal Bh 3.00 96,290.00 288,870.00

3 Saklar dauble Bh 5.00 108,440.00 542,200.00

4 Stop Kontak Bh 4.00 145,900.00 583,600.00


JUMLAH 1,516,220.00

Dibuat Oleh :
KONSULTAN PERENCANA
CV. JAYA PERMAI CONSULTANT

EDI SURYA, ST
Direktur
REKAPITULASI
PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

JUMLAH HARGA
NO URAIAN PEKERJAAN
( Rp )

I PEKERJAAN PENDAHULUAN 4,459,973.75


II PEKERJAAN PONDASI 7,600,180.78
III PEKERJAAN BETON/DINDING 34,302,347.02
IV PEKERJAAN KAP/ATAP 19,438,330.55
V PEKERJAAN PLESTERAN 8,401,805.20
VI PEKERJAAN PLAFOND 10,299,141.64
VII PEKERJAAN LANTAI 48,043,296.00
VIII PEKERJAAN PINTU/JENDELA 15,412,783.50
IX PEKERJAAN PENGECETAN 15,707,739.75
X PEKERJAAN INSTALASI LISTRIK 1,516,220.00

JUMLAH 165,181,818.19
PPN 10 % 16,518,181.82
TOTAL 181,700,000.00

Terbilang : Seratus delapan puluh satu juta tujuh ratus ribu rupiah

Padang, Mei 2021


Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN KABID CIPTA KARYA KONSULTAN PERENCANA
(PPK) DINAS PU KAB.PADANG PARIAMAN CV. JAYA PERMAI CONSULTANT

EDI SURYA, ST
MAYULIS, S.Pd.MM EFINALDI, ST.MT. Direktur
Nip. 19650208 1988810 1 001 Nip. 19711104 200212 1 004

Disetujui Oleh : Disetujui Oleh :


KEPALA DINAS PEKERJAAN UMUM PLT. KEPALA DINAS PENDIDIKAN DAN KEBUDAAAN
DAN PENATAAN RUANG KAB. PADANG PARIAMAN
KAB. PADANG PARIAMAN

DENI IRWAN, ST.MT. Drs. ANWAR, M.Si.


Nip. 1977020 6200312 1 007 Nip. 19670210 198903 1007
TIME - SCHEDULLE
PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

JUMLAH MINGGU
NO URAIAN PEKERJAAN bobot 1 2 3 4 5 6 7 8 9 10 11 12 Ket.
(%)

I PEKERJAAN PENDAHULUAN 2.70 1.35 1.35

II PEKERJAAN PONDASI 4.60 0.92022 0.92022 0.92022 0.92022 0.92022

III PEKERJAAN BETON/DINDING 20.77 2.9666312 2.96663 2.96663 2.96663 2.96663 2.9666 2.9666

IV PEKERJAAN KAP/ATAP 11.77 1.4709799 1.47098 1.47098 1.47098 1.47098 1.471 1.471 1.471

V PEKERJAAN PLESTERAN 5.09 0.6358 0.6358 0.6358 0.6358 0.6358 0.6358 0.6358 0.6358

VI PEKERJAAN PLAFOND 6.24 1.03917 1.03917 1.03917 1.0392 1.0392 1.0392

VII PEKERJAAN LANTAI 29.09 7.27127 7.2713 7.2713 7.2713


VIII PEKERJAAN PINTU/JENDELA 9.33 4.6654 4.6654
IX PEKERJAAN PENGECETAN 9.51 3.17 3.17 3.17
X PEKERJAAN INSTALASI LISTRIK 0.92 0.92

REN- JUMLAH BOBOT PER MINGGU 100.00 2.2702396 2.2702396 5.3578311 5.99363 7.0328 6.11258 13.3839 13.384 18.049 18.252 3.8056 4.0877

CANA JUMLAH BOBOT AKUMULATIF 0.00 2.2702396 4.5404792 9.8983102 15.8919 22.9247 29.0373 42.4212 55.805 73.854 92.107 95.912 100
Rencana Waktu Pelaksanaan = 120 (Seratus Dua Puluh ) Hari Kalender
PADANG, Mei 2021
DIBUAT OLEH
KONSULTAN PERENCANA
CV. JAYA PERMAI CONSULTANT

EDI SURYA, ST
Direktur
PERHITUNGAN VOLUME

PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR


KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan 8.00 x 7.00 = 56.00 56.00 M2

2 Pas. Papan Bouplank 9.00 + 8.00 = 17.00 17.00 M1

II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 0.80 x 0.60 x 16.00 = 7.68 7.68 M3

2 Pas. Aanstampang Bt. Kali 0.20 x 0.80 x 16.00 = 2.56 2.56 M³

3 Pas. Pondasi Bt. Kali 1:4 0.30 + 0.60 / 2.00 x 0.60 = 0.27 4.32 M3
0.27 x 16.00 = 4.32

4 Urugan Tanah Kembali 0.25 x 7.68 = 1.92 1.92 M3

5 Pas. Pondasi Tapak 0.75 x 0.25 / 1.00 x 0.75 x 0.75 = 1.48 M3

III PEKERJAAN BETON/DINDING


1 Pek. Sloof Praktis 15/20 bj besi
a Pek. Pembesian besi 12 tul pokok 4.00 x 15.00 x 0.89 = 53.40 77.07 Kg

pjg begel byk bj besi


besi 8 begel 0.60 x 100.00 x 0.39 = 23.67 +
= 77.07

b Pek. Bekisting sloof (bahan 2x pemakaian) 0.40 x 15.00 = 6.00 6.00 M2

c Pek. Stamp beton K 175 0.20 x 0.15 x 15.00 = 0.45 0.45 M3

2 Pek. Kolom 20/20 bj besi


a Pek. Pembesian besi 12 3.50 x 4.00 x 0.89 x 14.00 = 174.44 250.88 Kg
bnyk begel bj besi
besi 8 begel 0.60 x 23.33 x 0.39 x 14.00 = 76.44 +
= 250.88

b Pek. Bekisting kolom (bahan 2x pemakaian) 0.80 x 3.50 x 14.00 = 39.20 39.20 M2

c Pek. Stamp beton K 175 0.20 x 0.20 x 3.10 x 14.00 = 1.74 1.74 M3
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

3 Pek. Reng Balok 13/20 bj besi


a Pek. Pembesian besi 12 tul pokok 4.00 x 15.00 x 0.89 = 53.40 75.24 Kg

pjg begel byk bj besi


besi 8 begel 0.56 x 100.00 x 0.39 = 21.84 +
= 75.24

b Pek. Bekisting balok (bahan 2x pemakaian) 0.66 x 15.00 = 9.90 9.90 M2

c Pek. Stamp beton K 175 0.13 x 0.20 x 15.00 = 0.39 0.39 M3

4 Pas. Dinding Bata 1:2 0.30 x 29.80 = 8.94 8.94 M2

5 Pas. Dinding Bata 1:4 3.50 x 8.00 = 28.00 28.35 M2


sofi-sofi 9 x 2.50 : 2.00 x 2.00 = 21.96
49.96

Luas kozen P1=1 Bh 1 x 1.2 x 2.7 = 3.24


j1=5 Bh 5 x 2.1 x 1.75 = 18.38
21.62

total volume bata 49.96 - 21.62 = 28.35

6 Pek. Kozen Pintu/Jendela Panjang kozen 0.08 M3


P1=1 Bh 2.70 x 1.00 = 2.70
j1=5 Bh 1.75 x 5.00 = 8.75
11.45

Total 0.05 x 0.14 x 11.45 = 0.08

7 Pas. Angker Kozen 0.10 x 11.45 = 1.15 1.15 Kg


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

IV PEKERJAAN KAP/ATAP
1 Pek Kuda-kuda Baja Ringan C 0.75 47.81 M2
7.38 x 2.54 x 2.00 = 12.46
22.96 x 6.20 x 2.00 = 35.36

2 Pas. Atap Seng BJLS 20 warna 47.81 M2

3 Pek Seng Bubung 7.38 7.38 M'

4 Pek Lisplank Seng Superdex 2.00 x 7.38 14.75 M'

5 Pek Talang 4.00 : 11.50 2.88 M'

6 Pek. Singok 1.73 x 2.00 x 2.00 = 5.73 5.73 M2

V PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding 1 : 2 8.94 x 2.00 = 17.88 17.88 M2

2 Pek. Plesteran Dinding 1 : 4 28.35 x 2.00 = 56.69 56.69 M2

3 Pek. Acian Dinding 56.69 + 17.88 = 74.57 74.57 M2

VI PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Besi Hollow 9.00 + 8.00 = 25.00 25.00 M2

2 Cat Menie Rangka Plafond 0.16 x 8.00 x 9.00 = 11.52 21.60 M2


0.16 x 9.00 x 7.00 = 10.08 +
= 21.60

3 Pas. Plafond Triplek 6 mm = 25.00 25.00 M2

4 Pas. Les Profil 5x5 cm = 15.00 15.00 M1

VII PEKERJAAN LANTAI


Pek. Lantai
1 Timbunan Tanah Bawah Lantai 9.00 x 8.00 x 0.60 = 43.20 43.20 M3

2 Cor Lantai Beton K 175 tbl 5 cm 9.00 x 8.00 x 0.05 = 3.60 3.60 M3

3 Pas. Lantai Keramik 40x40 cm 8.00 x 7.00 = 56.00 56.00 M2


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

VIII PEKERJAAN PINTU/JENDELA


1 Pas. Pintu Panil Kayu P=1 Bh 1.20 x 2.70 x 1.00 = 3.24 3.24 M2

2 Pas. Rangka Jendela + Kaca 5 mm J1=5 Bh 1.00 x 1.75 x 2.10 x 5.00 = 18.38 18.38 M2

3 Pas. Jalusi Kayu J1=5 Bh 5.00 x 0.14 x 0.60 x 2.10 = 0.88 0.98 M2
P=1 Bh 1.00 x 0.14 x 0.60 x 1.20 = 0.10

4 Pas. Kaca Bening 5 mm J1=5 Bh 0.40 x 1.75 x 2.10 = 1.47 1.47 M2

5 Pas. Kunci Pintu 2 x Slagh = 1.00 1.00 Bh

6 Pas. Engsel Pintu 4" 1.00 x 6.00 = 6.00 6.00 Bh

7 Pas. Engsel Jendela 3" 4.00 x 2.00 = 8.00 8.00 Bh

8 Pas. Gerendel Pintu 1.00 x 4.00 = 4.00 4.00 Bh

9 Pas. Gerendel Jendela 4.00 x 2.00 = 8.00 8.00 Bh

10 Pas. Kait Angin Jendela 4.00 x 2.00 = 8.00 8.00 Bh

11 Pas. Tangan-tangan Jendela 4.00 x 2.00 = 8.00 8.00 Bh


IX PEKERJAAN PENGECATAN
1 Cat Dinding Tembok setara Catylac 7.00 + 8.00 = 80.08 80.08 M2

2 Cat Plafond = 25.00 25.00 M2

1 Cat Minyak Kozen Pintu/Jendela kozen 0.10 x 11.45 = 1.15 6.45 M2


pintu 1.00 x 3.24 = 3.24
jendela 0.18 x 1.75 x 5.00 = 1.58
jalusi jd j1 0.15 x 0.60 x 2.00 x 1.56 = 0.28
jalusi pt 0.15 x 0.70 x 2.00 x 1.00 = 0.21 +
= 6.45

2 Cat Minyak Lesplank Kayu 0.30 x 6.45 = 1.94 1.94 M2


total 113.47 M2
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

IX PEK. PERELENGKAPAN DALAM


1 Pas. Instalasi Titik Lampu = 1.00 1.00 Ttk
2 Pas. Instalasi Stop kontak = 2.00 2.00 Ttk
3 Pas. Panel MCB = 1.00 1.00 Bh
5 Pas. Bola Lampu SL 11 watt phillips = 4.00 4.00 Bh
PERHITUNGAN VOLUME

RUANG LABOR

NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

I PEKERJAAN PONDASI
1 Pembersihan Lapangan 10.00 x 15.00 = 150.00 150.00 M2

2 Pas. Papan Bouplank 9.00 + 15.00 = 24.00 24.00 M1

3 Galian Tanah Pondasi 0.80 x 0.80 x 15.00 x 2.00 = 19.20 37.63 M3


0.80 x 0.80 x 8.00 x 3.00 = 15.36

teras 0.80 x 0.80 x 0.80 x 6.00 = 3.07 +


= 37.63

5 Pas. Aanstampang Bt. Kali 0.20 x 0.80 x 58.80 = 9.41 9.41 M³

6 Pas. Pondasi Bt. Kali 1:4 0.25 + 0.60 / 2.00 x 0.60 = 0.26 14.99 M3
0.26 x 58.80 = 14.99

7 Urugan Tanah Kembali 0.25 x 37.63 = 9.41 9.41 M3

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian besi 12 tul pokok 4.00 x 58.80 x 0.89 = 209.33 264.57 Kg

pjg begel byk bj besi


besi 8 begel 0.70 x 200.00 x 0.39 = 55.24 +
= 264.57

b Pek. Bekisting sloof 0.40 x 58.80 = 23.52 23.52 M2

c Pek. Stamp beton K 175 0.20 x 0.15 x 58.80 = 1.76 1.76 M3


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Pek. Kolom 15/25


a Pek. Pembesian besi 12 6.00 x 4.00 x 0.89 x 15.00 = 320.40 390.60 Kg
bnyk begel bj besi
besi 8 begel 0.80 x 15.00 x 0.39 x 15.00 = 70.20 +
= 390.60

b Pek. Bekisting kolom 0.60 x 3.30 x 15.00 = 29.70 29.70 M2

c Pek. Stamp beton K 175 0.15 x 0.25 x 3.50 x 15.00 = 1.97 1.97 M3

3 Pek. Kolom 13/13


a Pek. Pembesian besi 12 4.00 x 4.00 x 0.89 x 4.00 = 56.96 68.66 Kg
bnyk begel bj besi
besi 8 begel 0.50 x 15.00 x 0.39 x 4.00 = 11.70 +
= 68.66

b Pek. Bekisting kolom 0.13 x 3.50 x 4.00 = 1.82 1.82 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 3.50 x 4.00 = 0.24 0.24 M3

4 Pek. Balok Late 13/15


a Pek. Pembesian besi 10 tul pokok 4.00 x 24.00 x 0.62 = 59.52 88.77 Kg

pjg begel byk bj besi


besi 8 begel 0.50 x 150.00 x 0.39 = 29.25 +
= 88.77

b Pek. Bekisting balok 0.15 x 24.00 = 3.60 3.60 M2


c Pek. Stamp beton K 175 0.13 x 0.13 x 24.00 = 0.41 0.41 M3

5 Pek. Reng Balok 13/20


a Pek. Pembesian besi 12 tul pokok 4.00 x 58.80 x 0.89 = 209.33 260.03 Kg

pjg begel byk bj besi


besi 8 begel 0.65 x 200.00 x 0.39 = 50.70 +
= 260.03

b Pek. Bekisting balok 0.20 x 58.80 = 11.76 11.76 M2


c Pek. Stamp beton K 175 0.13 x 0.20 x 58.80 = 1.53 1.53 M3
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

5 Pek. Meja Beton tbl 8 cm


a Pek. Pembesian besi 10 tul pokok 0.70 x 55.00 x 0.62 = 23.87 43.71 Kg
8.00 x 4.00 x 0.62 = 19.84 +
= 43.71

b Pek. Bekisting balok 0.40 x 8.00 = 3.20 3.20 M2

c Pek. Stamp beton K 175 0.08 x 0.70 x 8.00 = 0.45 0.45 M3

6 Pas. Dinding Bata 1:2 0.50 x 50.16 = 25.08 25.08 M2

7 Pas. Dinding Bata 1:4 3.00 x 50.16 = 150.49 107.20 M2


Luas kozen
P1=1 Bh 1.50 x 3.00 x 1.00 = 4.50
P2=2 Bh 0.90 x 3.00 x 2.00 = 5.40
J1=7 Bh 2.65 x 1.80 x 7.00 = 33.39
= +
= 43.29

total volume bata 150.49 - 43.29 = 107.20

8 Pas. Dinding Bata 1:4 Rabat / teras 0.55 x 12.00 x 2.00 = 24.00 40.00 M2
0.55 x 8.00 x 2.00 = 16.00 +
= 40.00

9 Pek. Kozen Pintu/Jendela Panjang kozen 1.19 M3


P1=1 Bh 6.64 x 1.00 = 6.64
P2=2 Bh 5.74 x 2.00 = 11.48
J1=9 Bh 16.95 x 9.00 = 152.55
= - +
= 170.67

Total 0.05 x 0.14 x 170.67 = 1.19

10 Pas. Angker Kozen 1.50 x 1.19 = 1.79 1.79 Kg


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

III PEKERJAAN KAP/ATAP byk kk


1 Pek Kuda-kuda Kayu kk utama 0.06 x 0.12 x 38.36 x 3.00 = 0.83 1.65 M3
kk 1/2 0.06 x 0.12 x 19.38 x 4.00 = 0.56
kk jurai 0.06 x 0.12 x 9.00 x 4.00 = 0.26 +
= 1.65

byk gording bdg


2 Pek Gording Kayu 0.05 x 0.10 x 10.00 x 11.00 x 2.00 = 1.10 2.15 M3
0.05 x 0.10 x 9.50 x 11.00 x 2.00 = 1.05 +
= 2.15

3 Pas. Atap Seng BJLS 20 warna 18.00 + 4.50 / 2.00 x 7.50 x 2.00 = 168.75 258.75 M2
12.00 x 7.50 / 2.00 x 2.00 = 90.00 +
= 258.75

4 Pas. Perabung Seng 4.50 x 1.00 = 4.50 34.50 M1


7.50 x 4.00 = 30.00 +
= 34.50

5 Pas. Lesplank Kayu 18.00 x 2.00 = 36.00 60.00 M1


12.00 x 2.00 = 24.00 +
= 60.00

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding 1 : 2 25.08 x 2.00 = 50.16 50.16 M2

2 Pek. Plesteran Dinding 1:4 107.20 x 2.00 = 214.40 214.40 M2

3 Pek. Acian Dinding 214.40 + 50.16 = 264.56 264.56 M2

3 Pek. Acian Beton kolom 0.80 x 3.50 x 15.00 = 42.00 42.00 M2

V PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 12.00 x 18.00 = 216.00 216.00 M2

2 Cat Menie Rangka Plafond 0.15 x 15.00 x 20.00 = 45.00 68.40 M2


0.15 x 12.00 x 13.00 = 23.40 +
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

= 68.40

3 Pas. Plafond Triplek 4 mm = 216.00 216.00 M2

4 Pas. Les Profil 5x5 cm 18.00 x 4.00 = 72.00 128.00 M1


7.00 x 8.00 = 56.00 +
= 128.00

VI PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai 0.20 x 10.00 x 15.00 = 30.00 30.00 M3

2 Urugan Pasir 0.10 x 10.00 x 15.00 = 15.00 15.00 M3

3 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 10.00 x 15.00 = 7.50 7.50 M3

4 Pas. Lantai Keramik 40x40 cm 8.00 x 15.00 = 120.00 120.00 M2

5 Pas. Lantai Keramik 40x40 cm meja beton 0.70 x 4.00 x 2.00 = 5.60 5.60 M2

6 Pas. Lantai Keramik 40x40 cm unpolish Teras 2.00 x 15.00 = 30.00 30.00 M2

VII PEKERJAAN PINTU/JENDELA


1 Pas. Pintu Panil Kayu P1=1 Bh 1.60 x 2.10 x 1.00 = 3.36 6.72 M2
P2=2 Bh 0.80 x 2.10 x 2.00 = 3.36 +
= 6.72

2 Pas. Rangka Jendela + Kaca 5 mm J1=9 Bh 1.15 x 0.60 x 2.00 x 9.00 = 12.42 12.42 M2

3 Pas. Jalusi Kayu J1=9 Bh 0.14 x 0.60 x 8.00 x 4.00 x 9.00 = 24.19 28.22 M2
P1=1 Bh 0.14 x 0.60 x 8.00 x 2.00 x 1.00 = 1.34
P2=2 Bh 0.14 x 0.60 x 8.00 x 2.00 x 2.00 = 2.69 +
= 28.22

4 Pas. Kaca Bening 5 mm 1.15 x 0.70 x 2.00 x 9.00 = 14.49 14.49 M2

5 Pas. Kunci Pintu 2 x Slagh = 3.00 3.00 Bh


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

6 Pas. Engsel Pintu 4" 3.00 x 4.00 = 12.00 12.00 Bh

7 Pas. Engsel Jendela 3" 18.00 x 2.00 = 36.00 36.00 Bh

8 Pas. Gerendel Jendela 18.00 x 2.00 = 36.00 36.00 Bh

9 Pas. Kait Angin Jendela 18.00 x 2.00 = 36.00 36.00 Bh

10 Pas. Tangan-tangan Jendela 18.00 x 1.00 = 18.00 18.00 Bh

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok setara Catylac 264.56 + 42.00 = 306.56 306.56 M2
2 Cat Plafond = 216.00 216.00 M2

3 Cat Minyak Kozen Pintu/Jendela kozen 0.24 x 170.67 = 40.96 79.75 M2


pintu 2.00 x 6.72 = 13.44
jendela 0.18 x 3.50 x 9.00 = 5.67
jalusi jd 0.30 x 0.60 x 8.00 x 9.00 = 12.96
jalusi pt 0.30 x 0.70 x 8.00 x 4.00 = 6.72 +
= 79.75

3 Cat Minyak Lesplank Kayu 0.30 x 60.00 = 18.00 18.00 M2

IX PEK. PERELENGKAPAN DALAM


1 Pas. Instalasi Titik Lampu = 9.00 9.00 Ttk
2 Pas. Instalasi Stop kontak = 4.00 4.00 Ttk
3 Pas. Panel MCB = 1.00 1.00 Bh
4 Pas. Lampu TL Out bouw 2 x 36 watt phillips = 8.00 8.00 Bh
5 Pas. Bola Lampu SL 11 watt phillips = 1.00 1.00 Bh

X PEK. PERELENGKAPAN LUAR


1 Galian Tanah 0.60 x 0.60 x 15.00 x 2.00 = 10.80 19.44 M3
0.60 x 0.60 x 12.00 x 2.00 = 8.64 +
= 19.44

2 Pas. Dinding Bata 1:4 0.50 x 15.00 x 2.00 = 15.00 27.00 M2


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

0.50 x 12.00 x 2.00 = 12.00 +


= 27.00

2 Pek. Plesteran Dinding 1:4 27.00 x 2.00 = 54.00 54.00 M2


3 Pek. Acian Dinding = 54.00 54.00 M2

4 Timbunan Tanah Bawah Lantai 0.10 x 1.20 x 15.00 x 2.00 = 3.60 6.48 M3
0.10 x 1.20 x 12.00 x 2.00 = 2.88 +
= 6.48

5 Urugan Pasir 0.05 x 1.20 x 15.00 x 2.00 = 1.80 3.24 M3


0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
= 3.24

6 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 1.20 x 15.00 x 2.00 = 1.80 3.24 M3
0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
= 3.24

7 Pek. Acian Lantai 1.20 x 15.00 x 2.00 = 36.00 64.80 M3


1.20 x 12.00 x 2.00 = 28.80 +
= 64.80
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN UNIT SEKOLAH BARU SMAN 2 LINGGO SARI BAGANTI
PEKERJAAN : PEMBANGUNAN GUDANG DAN KM / WC
LOKASI : 2021

GUDANG DAN KM / WC

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PEKERJAAN PONDASI
1 Pek. Pondasi
a Pembersihan Lapangan M3 24.00 18,000.00 432,000.00
b Pas. Papan Bouplank M1 11.00 70,330.00 773,630.00
c Galian Tanah Pondasi M3 7.56 82,920.00 626,875.20
d Pas. Aanstampang Bt. Kali M3 2.52 463,250.00 1,167,390.00
e Pas. Pondasi Bt. Kali 1:4 M3 4.10 844,940.00 3,460,029.30
f Urugan Tanah Kembali M3 1.89 38,750.00 73,237.50
JUMLAH 6,533,162.00

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian Kg 74.18 15,450.00 1,146,009.31
b Pek. Bekisting sloof M2 4.20 178,920.00 751,464.00
c Pek. Stamp beton K 175 M3 0.63 1,010,040.00 636,325.20

2 Pek. Kolom 13/13


a Pek. Pembesian Kg 150.24 15,450.00 2,321,208.00
b Pek. Bekisting kolom M2 6.24 275,130.00 1,716,811.20
c Pek. Stamp beton K 175 M3 0.81 1,010,040.00 819,344.45

3 Pek. Reng Balok 13/20


a Pek. Pembesian Kg 72.36 15,450.00 1,117,962.00
b Pek. Bekisting balok M2 4.20 #REF! #REF!
c Pek. Stamp beton K 175 M3 0.55 1,010,040.00 551,481.84

4 Pek. Kozen Pintu/Jendela


a Pek. Kozen Pintu/Jendela M3 0.34 8,273,430.00 2,793,771.84
b Pas. Angker Kozen Kg 0.51 20,000.00 10,130.40

5 Pas. Dinding Bata


a Pas. Dinding Bata 1:2 M2 10.50 150,910.00 1,584,555.00
b Pas. Dinding Bata 1:4 M2 29.22 140,980.00 4,119,435.60
JUMLAH #REF!

III PEKERJAAN KAP/ATAP


1 Pek. Kap / Atap
a Pek Kuda-kuda Kayu M3 0.16 #REF! #REF!
b Pek Gording Kayu M3 0.33 #REF! #REF!
c Pas. Atap Seng BJLS 20 warna M2 60.00 69,860.00 4,191,600.00
d Pas. Perabung Seng M2 10.00 - -
e Pas. Lesplank Kayu M1 36.20 #REF! #REF!
JUMLAH #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran
a Pek. Plesteran Dinding 1 : 2 M2 21.00 74,150.00 1,557,150.00
b Pek. Plesteran Dinding 1:4 M2 58.44 69,020.00 4,033,528.80
JUMLAH #REF!

V PEKERJAAN LANTAI
1 Pek. Lantai
a Timbunan Tanah Bawah Lantai M3 2.06 136,260.00 281,240.64
b Urugan Pasir M3 1.20 #REF! #REF!
c Cor Lantai Beton K 175 tbl 5 cm M3 1.20 1,010,040.00 1,212,048.00
JUMLAH #REF!

VI PEKERJAAN PINTU/JENDELA
1 Pek. Pintu / Jendela
a Pas. Pintu Panil Kayu M2 7.28 797,070.00 5,802,669.60
b Pas. Kaca Bening 5 mm M2 0.49 138,830.00 68,026.70

2 Pengantung/Pengunci
a Pas. Kunci Pintu 2 x Slagh Bh 1.00 #REF! #REF!
b Pas. Engsel Pintu 4" Bh 15.00 #REF! #REF!
c Pas. Gerendel Pintu Bh 8.00 #REF! #REF!
JUMLAH #REF!

VII PEKERJAAN PENGECATAN


1 Pek. Pengecatan
a Cat Dinding Tembok setara Catylac M2 58.44 #REF! #REF!
c Cat Minyak Kozen Pintu/Jendela M2 26.14 #REF! #REF!
d Cat Minyak Lesplank Kayu M2 10.86 #REF! #REF!
JUMLAH #REF!

VIII PEK. PERELENGKAPAN DALAM


1 Pek. Sanitasi
a Pas. Pipa Air Kotor PVC dia 3" AW + Acc M1 10.00 #REF! #REF!
b Pas. Pipa Air Kotor PVC dia 4" AW + Acc M1 10.00 #REF! #REF!
c Pas. Pipa Air Bersih PVC 3/4" + Acc M1 10.00 #REF! #REF!
d Pas. Kloset Jongkok Bh 4.00 #REF! #REF!
e Pas. Kran Air Bh 4.00 #REF! #REF!
f Pas. Flour Drain Bh 4.00 #REF! #REF!
g Pas. Bak Air Fiber Bh 2.00 435,000.00
JUMLAH #REF!

IX PEK. PERELENGKAPAN LUAR


1 Pek. Halaman
a Pek. Septiktank dan Peresapan kap 25 orang Unit 1.00 #REF! #REF!
JUMLAH #REF!
PERHITUNGAN VOLUME

GUDANG DAN KM / WC

NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

I PEKERJAAN PONDASI
1 Pembersihan Lapangan 3.00 x 8.00 = 24.00 24.00 M2

2 Pas. Papan Bouplank 3.00 + 8.00 = 11.00 11.00 M1

3 Galian Tanah Pondasi 0.60 x 0.60 x 12.00 = 4.32 7.56 M3


0.60 x 0.60 x 9.00 = 3.24 +
= 7.56

5 Pas. Aanstampang Bt. Kali 0.20 x 0.60 x 21.00 = 2.52 2.52 M³

6 Pas. Pondasi Bt. Kali 1:4 0.25 + 0.40 / 2.00 x 0.60 = 0.20 4.10 M3
0.20 x 21.00 = 4.10

7 Urugan Tanah Kembali 0.25 x 7.56 = 1.89 1.89 M3

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian besi 10 tul pokok 4.00 x 21.00 x 0.62 = 52.08 74.18 Kg

pjg begel byk bj besi


besi 8 begel 0.70 x 80.00 x 0.39 = 22.10 +
= 74.18

b Pek. Bekisting sloof 0.20 x 21.00 = 4.20 4.20 M2

c Pek. Stamp beton K 175 0.20 x 0.15 x 21.00 = 0.63 0.63 M3

3 Pek. Kolom 13/13


a Pek. Pembesian besi 10 4.00 x 3.00 x 0.62 x 16.00 = 119.04 150.24 Kg
bnyk begel bj besi
besi 8 begel 0.50 x 10.00 x 0.39 x 16.00 = 31.20 +
= 150.24
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

b Pek. Bekisting kolom 0.13 x 3.00 x 16.00 = 6.24 6.24 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 3.00 x 16.00 = 0.81 0.81 M3

5 Pek. Reng Balok 13/20


a Pek. Pembesian besi 10 tul pokok 4.00 x 21.00 x 0.62 = 52.08 72.36 Kg

pjg begel byk bj besi


besi 8 begel 0.65 x 80.00 x 0.39 = 20.28 +
= 72.36

b Pek. Bekisting balok 0.20 x 21.00 = 4.20 4.20 M2

c Pek. Stamp beton K 175 0.13 x 0.20 x 21.00 = 0.55 0.55 M3

6 Pas. Dinding Bata 1:2 0.50 x 21.00 = 10.50 10.50 M2

7 Pas. Dinding Bata 1:4 2.00 x 21.00 = 42.00 29.22 M2


Luas kozen
P1=1 Bh 1.50 x 3.00 x 1.00 = 4.50
P3=4 Bh 0.80 x 2.15 x 4.00 = 6.88
V1=4 Bh 0.50 x 0.70 x 4.00 = 1.40
= +
= 12.78

total volume bata 42.00 - 12.78 = 29.22

9 Pek. Kozen Pintu/Jendela Panjang kozen 0.34 M3


P1=1 Bh 6.64 x 1.00 = 6.64
P3=4 Bh 5.20 x 4.00 = 20.80
V1=4 Bh 5.20 x 4.00 = 20.80
= 0.00 +
= 48.24

Total 0.05 x 0.14 x 48.24 = 0.34

10 Pas. Angker Kozen 1.50 x 0.34 = 0.51 0.51 Kg


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

III PEKERJAAN KAP/ATAP byk kk


1 Pek Kuda-kuda Kayu kk utama 0.06 x 0.12 x 7.60 x 3.00 = 0.16 0.16 M3

byk gording bdg


2 Pek Gording Kayu 0.05 x 0.10 x 11.00 x 3.00 x 2.00 = 0.33 0.33 M3

3 Pas. Atap Seng BJLS 20 warna 3.00 x 10.00 x 2.00 = 60.00 60.00 M2

4 Pas. Perabung Seng 10.00 x 1.00 = 10.00 10.00 M1

5 Pas. Bola-bola Atap 3.30 x 4.00 = 13.20 13.20 M1

6 Pas. Lesplank Kayu 11.50 x 2.00 = 23.00 36.20 M1


3.30 x 4.00 = 13.20 +
= 36.20

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding 1 : 2 10.50 x 2.00 = 21.00 21.00 M2

2 Pek. Plesteran Dinding 1:4 29.22 x 2.00 = 58.44 58.44 M2

3 Pas. Dinding Keramik 20x25 cm t = 1.50 m 1.50 x 4.10 x 8.00 = 0.00 M2

V PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 3.00 x 8.00 = 24.00 24.00 M2

2 Cat Menie Rangka Plafond 0.15 x 8.00 x 4.00 = 4.80 9.30 M2


0.15 x 3.00 x 10.00 = 4.50 +
= 9.30

3 Pas. Plafond Triplek 4 mm = 24.00 24.00 M2

4 Pas. Les Profil 5x5 cm 5.00 x 4.00 = 20.00 44.00 M1


3.00 x 8.00 = 24.00 +
= 44.00
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

VI PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai 0.09 x 3.00 x 8.00 = 2.06 2.06 M3

2 Urugan Pasir 0.05 x 3.00 x 8.00 = 1.20 1.20 M3

3 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 3.00 x 8.00 = 1.20 1.20 M3

4 Pas. Lantai Keramik 20x20 cm unpolish Teras 5.00 x 8.00 = 40.00 40.00 M2

VII PEKERJAAN PINTU/JENDELA


1 Pas. Pintu Panil Kayu P1=1 Bh 0.80 x 2.10 x 1.00 = 1.68 7.28 M2
P3=4 Bh 0.70 x 2.00 x 4.00 = 5.60 +
= 7.28

2 Pas. Kunci Pintu 2 x Slagh = 1.00 1.00 Bh


3 Pas. Kaca Bening 5 mm 0.70 x 0.70 x 1.00 x 1.00 = 0.49 0.49 M2

4 Pas. Engsel Pintu 4" 3.00 x 1.00 = 3.00 15.00 Bh


3.00 x 4.00 = 12.00 +
= 15.00

5 Pas. Gerendel Pintu = 8.00 8.00 Bh

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok setara Catylac 58.44 = 58.44 58.44 M2

2 Cat Plafond = 24.00 24.00 M2

3 Cat Minyak Kozen Pintu/Jendela kozen 0.24 x 48.24 = 11.58 26.14 M2


pintu 2.00 x 7.28 = 14.56
= 0.00 +
= 26.14

4 Cat Minyak Lesplank Kayu 0.30 x 36.20 = 10.86 10.86 M2


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

IX PEK. PERELENGKAPAN DALAM


1 Pas. Instalasi Titik Lampu = 6.00 6.00 Ttk
2 Pas. Panel MCB = 1.00 1.00 Bh
3 Pas. Bola Lampu SL 11 watt phillips = 6.00 6.00 Bh

1 Pas. Pipa Air Kotor PVC dia 3" AW + Acc = 10.00 10.00 M1
2 Pas. Pipa Air Kotor PVC dia 4" AW + Acc = 10.00 10.00 M1
3 Pas. Pipa Air Bersih PVC 3/4" + Acc = 10.00 10.00 Bh
4 Pas. Kloset Jongkok = 4.00 4.00 Bh
5 Pas. Kran Air = 4.00 4.00 Bh
6 Pas. Flour Drain = 4.00 4.00 Bh

X PEK. PERELENGKAPAN LUAR


1 Pek. Septiktank dan Peresapan kap 25 orang = 1.00 1.00 Unit
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN UNIT SEKOLAH BARU SMAN 2 LINGGO SARI BAGANTI
PEKERJAAN : PEMBANGUNAN GEDUNG PUSTAKA
LOKASI : 2021

GEDUNG PUSTAKA

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PEKERJAAN PONDASI
1 Pek. Pondasi
a Pembersihan Lapangan M3 120.00 18,000.00 2,160,000.00
b Pas. Papan Bouplank M1 21.68 70,330.00 1,524,754.40
c Galian Tanah Pondasi M3 28.16 82,920.00 2,335,027.20
d Pas. Aanstampang Bt. Kali M3 7.04 463,250.00 3,261,280.00
e Pas. Pondasi Bt. Kali 1:4 M3 11.22 844,940.00 9,480,226.80
f Urugan Tanah Kembali M3 7.04 38,750.00 272,800.00
JUMLAH 19,034,088.40

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian Kg 250.18 15,450.00 3,865,243.92
b Pek. Bekisting sloof M2 8.80 178,920.00 1,574,496.00
c Pek. Stamp beton K 175 M3 1.32 1,010,040.00 1,333,252.80

2 Pek. Kolom 15/25


a Pek. Pembesian Kg 390.60 15,450.00 6,034,770.00
b Pek. Bekisting kolom M2 12.38 275,130.00 3,404,733.75
c Pek. Stamp beton K 175 M3 1.97 1,010,040.00 1,988,516.25

3 Pek. Kolom 13/13


a Pek. Pembesian Kg 68.66 15,450.00 1,060,797.00
b Pek. Bekisting kolom M2 1.82 275,130.00 500,736.60
c Pek. Stamp beton K 175 M3 0.24 1,010,040.00 238,975.46

4 Pek. Balok Late 13/15


a Pek. Pembesian Kg 98.52 15,450.00 1,522,134.00
b Pek. Bekisting balok M2 3.60 #REF! #REF!
c Pek. Stamp beton K 175 M3 0.41 1,010,040.00 409,672.22

5 Pek. Reng Balok 13/20


a Pek. Pembesian Kg 243.37 15,450.00 3,760,066.50
b Pek. Bekisting balok M2 8.80 #REF! #REF!
c Pek. Stamp beton K 175 M3 1.22 1,010,040.00 1,234,268.88

6 Pek. Kozen Pintu/Jendela


a Pek. Kozen Pintu/Jendela M3 0.92 8,273,430.00 7,588,472.73
b Pas. Angker Kozen Kg 1.38 20,000.00 27,516.30

7 Pas. Dinding Bata


a Pas. Dinding Bata 1:2 M2 18.25 150,910.00 2,754,107.50
b Pas. Dinding Bata 1:4 M2 68.91 140,980.00 9,714,931.80
d Pas. Dinding Bata 1:4 Rabat / teras M2 50.00 140,980.00 7,049,000.00
JUMLAH #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

III PEKERJAAN KAP/ATAP


1 Pek. Kap / Atap
a Pek Kuda-kuda Kayu M3 1.38 #REF! #REF!
a Pek Gording Kayu M3 2.15 #REF! #REF!
b Pas. Atap Seng BJLS 20 warna M2 210.75 69,860.00 14,722,995.00
c Pas. Perabung Seng M2 32.10 - -
c Pas. Lesplank Kayu M1 52.00 #REF! #REF!
JUMLAH #REF!

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran
a Pek. Plesteran Dinding 1 : 2 M2 36.50 74,150.00 2,706,475.00
b Pek. Plesteran Dinding 1:4 M2 137.82 69,020.00 9,512,336.40
c Pek. Acian Dinding M2 174.32 42,420.00 7,394,654.40
d Pek. Acian Beton M2 42.00 42,420.00 1,781,640.00
JUMLAH 21,395,105.80

V PEKERJAAN PLAFOND
1 Pek. Plafond
a Pas. Rangka Plafond Kayu M2 196.00 #REF! #REF!
b Cat Menie Rangka Plafond M2 87.68 42,413.97 3,718,644.38
c Pas. Plafond Triplek 4 mm M2 196.00 61,130.00 11,981,480.00
d Pas. Les Profil 5x5 cm M1 104.00 15,000.00 1,560,000.00
JUMLAH #REF!

VI PEKERJAAN LANTAI
1 Pek. Lantai
a Timbunan Tanah Bawah Lantai M3 36.00 136,260.00 4,905,360.00
b Urugan Pasir M3 12.00 #REF! #REF!
c Cor Lantai Beton K 175 tbl 5 cm M3 6.00 1,010,040.00 6,060,240.00
d Pas. Lantai Keramik 40x40 cm M2 84.00 687,870.00 57,781,080.00
e Pas. Lantai Keramik 40x40 cm unpolish Teras M2 24.00 687,870.00 16,508,880.00
JUMLAH #REF!

VII PEKERJAAN PINTU/JENDELA


1 Pek. Pintu / Jendela
a Pas. Pintu Panil Kayu M2 4.62 797,070.00 3,682,463.40
c Pas. Rangka Jendela + Kaca 5 mm M2 9.66 560,980.00 5,419,066.80
d Pas. Jalusi Kayu M2 22.85 419,820.00 9,592,047.36
e Pas. Kaca Bening 5 mm M2 7.14 138,830.00 991,246.20

2 Pengantung/Pengunci
a Pas. Kunci Pintu 2 x Slagh Bh 2.00 #REF! #REF!
b Pas. Engsel Pintu 4" Bh 6.00 #REF! #REF!
c Pas. Engsel Jendela 3" Bh 30.00 #REF! #REF!
d Pas. Gerendel Jendela Bh 30.00 #REF! #REF!
e Pas. Kait Angin Jendela Bh 30.00 #REF! #REF!
f Pas. Tangan-tangan Jendela Bh 15.00 #REF! #REF!
JUMLAH #REF!

VIII PEKERJAAN PENGECATAN


1 Pek. Pengecatan
a Cat Dinding Tembok setara Catylac M2 216.32 #REF! #REF!
b Cat Plafond M2 196.00 #REF! #REF!
c Cat Minyak Kozen Pintu/Jendela M2 55.81 #REF! #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)
d Cat Minyak Lesplank Kayu M2 15.60 #REF! #REF!
JUMLAH #REF!

IX PEK. PERELENGKAPAN DALAM


1 Pek. Listrik
a Pas. Instalasi Titik Lampu Ttk 7.00 235,000.00 1,645,000.00
b Pas. Instalasi Stop kontak Ttk 4.00 235,000.00 940,000.00
c Pas. Panel MCB Bh 1.00 250,000.00 250,000.00
d Pas. Lampu TL Out bouw 2 x 36 watt phillips Bh 6.00 482,000.00 2,892,000.00
e Pas. Bola Lampu SL 11 watt phillips M1 1.00 55,000.00 55,000.00
JUMLAH 5,782,000.00

X PEK. PERELENGKAPAN LUAR


1 Pek. Rabat / Saluran Keliling dan Halaman
a Galian Tanah M3 18.72 82,920.00 1,552,262.40
b Pas. Dinding Bata 1:4 M2 26.00 140,980.00 3,665,480.00
c Pek. Plesteran Dinding 1:4 M2 52.00 69,020.00 3,589,040.00
d Pek. Acian Dinding M2 52.00 42,420.00 2,205,840.00
e Timbunan Tanah Bawah Lantai M3 5.28 136,260.00 719,452.80
f Urugan Pasir M3 2.64 #REF! #REF!
g Cor Lantai Beton K 175 tbl 5 cm M3 2.64 1,010,040.00 2,666,505.60
h Pek. Acian Lantai M2 52.80 42,420.00 2,239,776.00
JUMLAH #REF!
PERHITUNGAN VOLUME

GEDUNG PUSTAKA

NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

I PEKERJAAN PONDASI
1 Pembersihan Lapangan 10.00 x 12.00 = 120.00 120.00 M2

2 Pas. Papan Bouplank 9.68 + 12.00 = 21.68 21.68 M1

3 Galian Tanah Pondasi 0.80 x 0.80 x 12.00 x 2.00 = 15.36 28.16 M3


0.80 x 0.80 x 8.00 x 2.00 = 10.24

teras 0.80 x 0.80 x 0.80 x 5.00 = 2.56 +


= 28.16

5 Pas. Aanstampang Bt. Kali 0.20 x 0.80 x 44.00 = 7.04 7.04 M³

6 Pas. Pondasi Bt. Kali 1:4 0.25 + 0.60 / 2.00 x 0.60 = 0.26 11.22 M3
0.26 x 44.00 = 11.22

7 Urugan Tanah Kembali 0.25 x 28.16 = 7.04 7.04 M3

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian besi 12 tul pokok 4.00 x 47.00 x 0.89 = 167.32 250.18 Kg

pjg begel byk bj besi


besi 8 begel 0.70 x 300.00 x 0.39 = 82.86 +
= 250.18

b Pek. Bekisting sloof 0.20 x 44.00 = 8.80 8.80 M2

c Pek. Stamp beton K 175 0.20 x 0.15 x 44.00 = 1.32 1.32 M3


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Pek. Kolom 15/25


a Pek. Pembesian besi 12 6.00 x 4.00 x 0.89 x 15.00 = 320.40 390.60 Kg
bnyk begel bj besi
besi 8 begel 0.80 x 15.00 x 0.39 x 15.00 = 70.20 +
= 390.60

b Pek. Bekisting kolom 0.25 x 3.30 x 15.00 = 12.38 12.38 M2

c Pek. Stamp beton K 175 0.15 x 0.25 x 3.50 x 15.00 = 1.97 1.97 M3

3 Pek. Kolom 13/13


a Pek. Pembesian besi 12 4.00 x 4.00 x 0.89 x 4.00 = 56.96 68.66 Kg
bnyk begel bj besi
besi 8 begel 0.50 x 15.00 x 0.39 x 4.00 = 11.70 +
= 68.66

b Pek. Bekisting kolom 0.13 x 3.50 x 4.00 = 1.82 1.82 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 3.50 x 4.00 = 0.24 0.24 M3

4 Pek. Balok Late 13/15


a Pek. Pembesian besi 10 tul pokok 4.00 x 24.00 x 0.62 = 59.52 98.52 Kg

pjg begel byk bj besi


besi 8 begel 0.50 x 200.00 x 0.39 = 39.00 +
= 98.52

b Pek. Bekisting balok 0.15 x 24.00 = 3.60 3.60 M2

c Pek. Stamp beton K 175 0.13 x 0.13 x 24.00 = 0.41 0.41 M3

5 Pek. Reng Balok 13/20


a Pek. Pembesian besi 12 tul pokok 4.00 x 47.00 x 0.89 = 167.32 243.37 Kg

pjg begel byk bj besi


besi 8 begel 0.65 x 300.00 x 0.39 = 76.05 +
= 243.37
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

b Pek. Bekisting balok 0.20 x 44.00 = 8.80 8.80 M2

c Pek. Stamp beton K 175 0.13 x 0.20 x 47.00 = 1.22 1.22 M3

6 Pas. Dinding Bata 1:2 0.50 x 36.50 = 18.25 18.25 M2

7 Pas. Dinding Bata 1:4 3.00 x 36.50 = 109.50 68.91 M2


Luas kozen
P1=1 Bh 1.50 x 3.00 x 1.00 = 4.50
P2=1 Bh 0.90 x 3.00 x 1.00 = 2.70
J1=7 Bh 2.65 x 1.80 x 7.00 = 33.39 +
= 40.59

total volume bata 109.50 - 40.59 = 68.91

8 Pas. Dinding Bata 1:4 Rabat / teras 0.55 x 14.00 x 2.00 = 28.00 50.00 M2
0.55 x 11.00 x 2.00 = 22.00 +
= 50.00

9 Pek. Kozen Pintu/Jendela Panjang kozen 0.92 M3


P1=1 Bh 6.64 x 1.00 = 6.64
P2=1 Bh 5.74 x 1.00 = 5.74
J1=7 Bh 16.95 x 7.00 = 118.65 +
= 131.03

Total 0.05 x 0.14 x 131.03 = 0.92

10 Pas. Angker Kozen 1.50 x 0.92 = 1.38 1.38 Kg

III PEKERJAAN KAP/ATAP byk kk


1 Pek Kuda-kuda Kayu kk utama 0.06 x 0.12 x 38.75 x 2.00 = 0.56 1.38 M3
kk 1/2 0.06 x 0.12 x 19.38 x 4.00 = 0.56
kk jurai 0.06 x 0.12 x 9.00 x 4.00 = 0.26 +
= 1.38

byk gording bdg


2 Pek Gording Kayu 0.05 x 0.10 x 10.00 x 11.00 x 2.00 = 1.10 2.15 M3
0.05 x 0.10 x 9.50 x 11.00 x 2.00 = 1.05 +
= 2.15
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

3 Pas. Atap Seng BJLS 20 warna 14.00 + 2.10 / 2.00 x 7.50 x 2.00 = 120.75 210.75 M2
12.00 x 7.50 / 2.00 x 2.00 = 90.00 +
= 210.75

4 Pas. Perabung Seng 2.10 x 1.00 = 2.10 32.10 M1


7.50 x 4.00 = 30.00 +
= 32.10

5 Pas. Lesplank Kayu 14.00 x 2.00 = 28.00 52.00 M1


12.00 x 2.00 = 24.00 +
= 52.00

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding 1 : 2 18.25 x 2.00 = 36.50 36.50 M2

2 Pek. Plesteran Dinding 1:4 68.91 x 2.00 = 137.82 137.82 M2

3 Pek. Acian Dinding 137.82 + 36.50 = 174.32 174.32 M2

4 Pek. Acian Beton kolom 0.80 x 3.50 x 15.00 = 42.00 42.00 M2

V PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 14.00 x 14.00 = 196.00 196.00 M2

2 Cat Menie Rangka Plafond 0.15 x 14.00 x 20.00 = 42.00 87.68 M2


0.15 x 14.50 x 21.00 = 45.68 +
= 87.68

3 Pas. Plafond Triplek 4 mm = 196.00 196.00 M2

4 Pas. Les Profil 5x5 cm 14.00 x 4.00 = 56.00 104.00 M1


8.00 x 6.00 = 48.00 +
= 104.00
VI PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai 0.30 x 10.00 x 12.00 = 36.00 36.00 M3

2 Urugan Pasir 0.10 x 10.00 x 12.00 = 12.00 12.00 M3


NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

3 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 10.00 x 12.00 = 6.00 6.00 M3

4 Pas. Lantai Keramik 40x40 cm 7.00 x 12.00 = 84.00 84.00 M2

5 Pas. Lantai Keramik 40x40 cm unpolish Teras 2.00 x 12.00 = 24.00 24.00 M2

VII PEKERJAAN PINTU/JENDELA


1 Pas. Pintu Panil Kayu P1=1 Bh 1.40 x 2.10 x 1.00 = 2.94 4.62 M2
P2=2 Bh 0.80 x 2.10 x 1.00 = 1.68 +
= 4.62

2 Pas. Rangka Jendela + Kaca 5 mm J1=7 Bh 1.15 x 0.60 x 2.00 x 7.00 = 9.66 9.66 M2

3 Pas. Jalusi Kayu J1=7 Bh 0.14 x 0.60 x 8.00 x 4.00 x 7.00 = 18.82 22.85 M2
P1=1 Bh 0.14 x 0.60 x 8.00 x 2.00 x 1.00 = 1.34
P2=2 Bh 0.14 x 0.60 x 8.00 x 2.00 x 2.00 = 2.69 +
= 22.85

4 Pas. Kaca Bening 5 mm J1=7 Bh 0.60 x 0.85 x 2.00 x 7.00 = 7.14 7.14 M2

5 Pas. Kunci Pintu 2 x Slagh = 2.00 2.00 Bh

6 Pas. Engsel Pintu 4" 1.00 x 6.00 = 6.00 6.00 Bh

7 Pas. Engsel Jendela 3" 15.00 x 2.00 = 30.00 30.00 Bh

8 Pas. Gerendel Jendela 15.00 x 2.00 = 30.00 30.00 Bh

9 Pas. Kait Angin Jendela 15.00 x 2.00 = 30.00 30.00 Bh

10 Pas. Tangan-tangan Jendela 15.00 x 1.00 = 15.00 15.00 Bh

VIII PEKERJAAN PENGECATAN


1 Cat Dinding Tembok setara Catylac 174.32 + 42.00 = 216.32 216.32 M2
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

2 Cat Plafond = 196.00 196.00 M2

3 Cat Minyak Kozen Pintu/Jendela kozen 0.24 x 131.03 = 31.45 55.81 M2


pintu 2.00 x 4.62 = 9.24
jendela 0.18 x 3.50 x 0.00 = 0.00
jalusi jd 0.30 x 0.60 x 8.00 x 7.00 = 10.08
jalusi pt 0.30 x 0.70 x 8.00 x 3.00 = 5.04 +
= 55.81

3 Cat Minyak Lesplank Kayu 0.30 x 52.00 = 15.60 15.60 M2

IX PEK. PERELENGKAPAN DALAM


1 Pas. Instalasi Titik Lampu = 7.00 7.00 Ttk
2 Pas. Instalasi Stop kontak = 4.00 4.00 Ttk
3 Pas. Panel MCB = 1.00 1.00 Bh
4 Pas. Lampu TL Out bouw 2 x 36 watt phillips = 6.00 6.00 Bh
5 Pas. Bola Lampu SL 11 watt phillips = 1.00 1.00 Bh

X PEK. PERELENGKAPAN LUAR


1 Galian Tanah 0.60 x 0.60 x 14.00 x 2.00 = 10.08 18.72 M3
0.60 x 0.60 x 12.00 x 2.00 = 8.64 +
= 18.72

2 Pas. Dinding Bata 1:4 0.50 x 14.00 x 2.00 = 14.00 26.00 M2


0.50 x 12.00 x 2.00 = 12.00 +
= 26.00
2 Pek. Plesteran Dinding 1:4 26.00 x 2.00 = 52.00 52.00 M2

3 Pek. Acian Dinding = 52.00 52.00 M2

4 Timbunan Tanah Bawah Lantai 0.10 x 1.20 x 10.00 x 2.00 = 2.40 5.28 M3
0.10 x 1.20 x 12.00 x 2.00 = 2.88 +
= 5.28

5 Urugan Pasir 0.05 x 1.20 x 10.00 x 2.00 = 1.20 2.64 M3


0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
NO URAIAN KEGIATAN URAIAN PERHITUNGAN VOLUME

= 2.64

6 Cor Lantai Beton K 175 tbl 5 cm 0.05 x 1.20 x 10.00 x 2.00 = 1.20 2.64 M3
0.05 x 1.20 x 12.00 x 2.00 = 1.44 +
= 2.64

7 Pek. Acian Lantai 1.20 x 10.00 x 2.00 = 24.00 52.80 M3


1.20 x 12.00 x 2.00 = 28.80 +
= 52.80
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN PENGUKURAN DAN PEMASANGAN 1 METER BOUPLANK


HARGA SATUAN Rp 70,330 / M1
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Tukang Kayu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.005 Rp 135,300 Rp 677
JUMLAH Rp 24,068
B BAHAN
Kayu 5/7 (kayu klas. IV) M3 0.012 Rp 2,081,000 Rp 24,972
Paku 1 (1/2") Kg 0.020 Rp 16,700 Rp 334
Kayu Papan 3/20 (klas IV) M3 0.007 Rp 2,081,000 Rp 14,567
JUMLAH 39,873
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 63,941
Over Head + Fee 10% Rp 6,394
JUMLAH Rp 70,335
DIBULATKAN Rp 70,330

JENIS PEKERJAAN : PEMBERSIHAN 1 M2 LAPANGAN DAN PEMARATAAN


HARGA SATUAN : Rp 18,000 / M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Mandor L.04 OH 0.050 Rp 135,300 Rp 6,765
JUMLAH Rp 16,365
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 16,365
Over Head + Fee 10% Rp 1,637
JUMLAH Rp 18,002
DIBULATKAN Rp 18,000
JENIS PEKERJAAN : PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 METER
HARGA SATUAN : Rp 82,920 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.750 Rp 96,000 Rp 72,000
Mandor L.04 OH 0.025 Rp 135,300 Rp 3,383
JUMLAH Rp 75,383
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 75,383
Over Head + Fee 10% Rp 7,538
JUMLAH Rp 82,921
DIBULATKAN Rp 82,920

JENIS PEKERJAAN : MENGURUG KEMBALI 1 M3 GALIAN TANAH


HARGA SATUAN : Rp 38,750 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.250 Rp 96,000 Rp 24,000
Mandor L.04 OH 0.083 Rp 135,300 Rp 11,230
JUMLAH Rp 35,230
B BAHAN
JUMLAH
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 35,230
Over Head + Fee 10% Rp 3,523
JUMLAH Rp 38,753
DIBULATKAN Rp 38,750

JENIS PEKERJAAN : PENGURUGAN 1 M3 DENGAN TANAH URUG


HARGA SATUAN : Rp 136,260 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Mandor L.04 OH 0.010 Rp 135,300 Rp 1,353
JUMLAH Rp 30,153
B BAHAN
Tanah urug M.14.c M3 1.200 Rp 78,100 Rp 93,720
JUMLAH 93,720
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 123,873
Over Head + Fee 10% Rp 12,387
JUMLAH Rp 136,260
DIBULATKAN Rp 136,260
JENIS PEKERJAAN : PEMASANGAN 1 M3 PONDASI BATU KOSONG (Aanstampang)
HARGA SATUAN : Rp 463,250 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.780 Rp 96,000 Rp 74,880
Tukang Batu L.02 OH 0.390 Rp 124,900 Rp 48,711
Kepala Tukang L.03 OH 0.039 Rp 130,100 Rp 5,074
Mandor L.04 OH 0.039 Rp 135,300 Rp 5,277
JUMLAH Rp 133,942
B BAHAN
Batu Kali M3 1.200 Rp 192,500 Rp 231,000
Pasir Urug M3 0.432 Rp 130,100 Rp 56,203
JUMLAH 287,203
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 421,145
Over Head + Fee 10% Rp 42,114
JUMLAH Rp 463,259
DIBULATKAN Rp 463,250

JENIS PEKERJAAN : PEMASANGAN 1 M3 PONDASI BATU KALI 1PC : 4 PASIR PASANG


HARGA SATUAN : Rp 844,940 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 1.500 Rp 96,000 Rp 144,000
Tukang Batu L.02 OH 0.750 Rp 124,900 Rp 93,675
Kepala Tukang L.03 OH 0.075 Rp 130,100 Rp 9,758
Mandor L.04 OH 0.075 Rp 135,300 Rp 10,148
JUMLAH Rp 257,580
B BAHAN
Batu Kali M3 1.200 Rp 192,500 Rp 231,000
Pasir Pasang M3 0.520 Rp 130,100 Rp 67,652
Semen Portland PCC 50 kg Kg 163.000 Rp 1,300 Rp 211,900
JUMLAH 510,552
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 768,132
Over Head + Fee 10% Rp 76,813
JUMLAH Rp 844,945
DIBULATKAN Rp 844,940
JENIS PEKERJAAN : MEMBUAT BETON MUTU f3c = 14.5 Mpa (K175), Slump (12±2) cm, w/c 0.66
HARGA SATUAN : Rp 1,010,040 / M3
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 1.650 Rp 96,000 Rp 158,400
Tukang Batu L.02 OH 0.275 Rp 124,900 Rp 34,348
Kepala Tukang L.03 OH 0.028 Rp 130,100 Rp 3,643
Mandor L.04 OH 0.083 Rp 135,300 Rp 11,230
JUMLAH Rp 207,620
B BAHAN
Semen Portland PCC 50 kg Kg 326.000 1,300.00 Rp 423,800
Pasir Beton Kg 760.000 96.79 Rp 73,557
Batu Belah/Kerakal Kg 1,029.000 144.56 Rp 148,748
Air Liter 215.000 300.00 Rp 64,500
JUMLAH 710,604.81
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 918,225
Over Head + Fee 10% Rp 91,823
JUMLAH Rp 1,010,048
DIBULATKAN Rp 1,010,040

JENIS PEKERJAAN : PEMBESIAN 10 Kg DENGAN BESI POLOS ATAU BESI ULIR


HARGA SATUAN : Rp 15,450 /KG
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.070 Rp 96,000 Rp 6,720
Tukang Besi L.02 OH 0.070 Rp 124,900 Rp 8,743
Kepala Tukang L.03 OH 0.007 Rp 130,100 Rp 911
Mandor L.04 OH 0.004 Rp 135,300 Rp 541
JUMLAH Rp 16,915
B BAHAN
Besi beton (polos/ulir) Kg 10.500 Rp 11,500 Rp 120,750
Kawat beton Kg 0.150 Rp 18,800 Rp 2,820
JUMLAH 123,570
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 140,485
Over Head + Fee 10% Rp 14,048
JUMLAH Rp 154,533
UNTUK PEMASANGAN 1 Kg Rp 15,453
DIBULATKAN Rp 15,450
JENIS PEKERJAAN : PEMASANGAN 1 M2 BEGISTING UNTUK SLOOF
HARGA SATUAN : Rp 178,920 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.520 Rp 96,000 Rp 49,920
Tukang Kayu L.02 OH 0.260 Rp 124,900 Rp 32,474
Kepala Tukang L.03 OH 0.026 Rp 130,100 Rp 3,383
Mandor L.04 OH 0.026 Rp 135,300 Rp 3,518
JUMLAH Rp 89,294
B BAHAN
Kayu kelas III M3 0.045 Rp 3,121,500 Rp 140,468
Paku 1 (1/2") Kg 0.300 Rp 16,700 Rp 5,010
Minyak bekisting Liter 0.100 Rp 12,500 Rp 1,250
JUMLAH 146,728
Bahan 2 X Pemakaian 0.500 Rp 146,728 73,364
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 162,658
Over Head + Fee 10% Rp 16,266
JUMLAH Rp 178,924
DIBULATKAN Rp 178,920

JENIS PEKERJAAN : PEMASANGAN 1 M2 BEGISTING UNTUK KOLOM


HARGA SATUAN : Rp 275,130 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.660 Rp 96,000 Rp 63,360
Tukang Kayu L.02 OH 0.330 Rp 124,900 Rp 41,217
Kepala Tukang L.03 OH 0.033 Rp 130,100 Rp 4,293
Mandor L.04 OH 0.033 Rp 135,300 Rp 4,465
JUMLAH Rp 113,335
B BAHAN
Kayu kelas III M3 0.040 Rp 3,121,500 Rp 124,860
Paku 1 (1/2") Kg 0.400 Rp 16,700 Rp 6,680
Minyak bekisting Liter 0.200 Rp 12,500 Rp 2,500
Balok kayu kelas II M3 0.015 Rp 3,641,800 Rp 54,627
Multiplek t 12 mm Lbr 0.350 Rp 188,900 Rp 66,115
Dolken kayu φ 8-10 Cm Batang 2.000 Rp 9,400 Rp 18,800
JUMLAH 273,582
Bahan 2 X Pemakaian 0.500 Rp 273,582 136,791
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 250,126
Over Head + Fee 10% Rp 25,013
JUMLAH Rp 275,139
DIBULATKAN Rp 275,130
JENIS PEKERJAAN : PEMASANGAN 1 M2 DINDING (BATA MERAH 5x11x22) CM TEBAL 1/2 BATA
BATU CAMP. 1PC : 2 PASIR PASANG
HARGA SATUAN : Rp 150,910 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Tukang Batu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.015 Rp 135,300 Rp 2,030
JUMLAH Rp 44,621
B BAHAN
Bata Merah M3 70.000 Rp 900 Rp 63,000
Semen Portland PCC 50 kg Kg 18.950 Rp 1,300 Rp 24,635
Pasir Pasang M3 0.038 Rp 130,100 Rp 4,944
JUMLAH 92,579
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 137,199
Over Head + Fee 10% Rp 13,720
JUMLAH Rp 150,919
DIBULATKAN Rp 150,910

JENIS PEKERJAAN : PEMASANGAN 1 M2 DINDING (BATA MERAH 5x11x22) CM TEBAL 1/2 BATA
BATU CAMP. 1PC : 4 PASIR PASANG
HARGA SATUAN : Rp 140,980 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Tukang Batu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.015 Rp 135,300 Rp 2,030
JUMLAH Rp 44,621
B BAHAN
Bata Merah M3 70.000 Rp 900 Rp 63,000
Semen Portland PCC 50 kg Kg 11.500 Rp 1,300 Rp 14,950
Pasir Pasang M3 0.043 Rp 130,100 Rp 5,594
JUMLAH 83,544
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 128,165
Over Head + Fee 10% Rp 12,816
JUMLAH Rp 140,981
DIBULATKAN Rp 140,980
JENIS PEKERJAAN : PEMASANGAN 1 M2 PLASTERAN 1PC : 2 PASIR PASANG TEBAL 15 MM
HARGA SATUAN : Rp 74,150 /M2

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Tukang Batu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.015 Rp 135,300 Rp 2,030
JUMLAH Rp 51,516
B BAHAN
Semen Portland PCC 50 kg Kg 10.224 Rp 1,300 Rp 13,291
Pasir Pasang M3 0.020 Rp 130,100 Rp 2,602
JUMLAH 15,893
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 67,409
Over Head + Fee 10% Rp 6,741
JUMLAH Rp 74,150
DIBULATKAN Rp 74,150

JENIS PEKERJAAN : PEMASANGAN 1 M2 PLASTERAN 1PC : 4 PASIR PASANG TEBAL 15 MM


HARGA SATUAN : Rp 69,020 /M2

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Tukang Batu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.015 Rp 135,300 Rp 2,030
JUMLAH Rp 51,516
B BAHAN
Semen Portland PCC 50 kg Kg 6.240 Rp 1,300 Rp 8,112
Pasir Pasang M3 0.024 Rp 130,100 Rp 3,122
JUMLAH 11,234
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 62,750
Over Head + Fee 10% Rp 6,275
JUMLAH Rp 69,025
DIBULATKAN Rp 69,020
JENIS PEKERJAAN : PEMASANGAN 1 M2 ACIAN
HARGA SATUAN : Rp 42,420 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.200 Rp 96,000 Rp 19,200
Tukang Batu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.010 Rp 135,300 Rp 1,353
JUMLAH Rp 34,344
B BAHAN
Semen Portland PCC 50 kg Kg 3.250 Rp 1,300 Rp 4,225
JUMLAH 4,225
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 38,569
Over Head + Fee 10% Rp 3,857
JUMLAH Rp 42,426
DIBULATKAN Rp 42,420

JENIS PEKERJAAN : PEMASANGAN 1 M2 ATAP SENG GELOMBANG


HARGA SATUAN : Rp 69,860 /M2

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.120 Rp 96,000 Rp 11,520
Tukang Kayu L.02 OH 0.060 Rp 124,900 Rp 7,494
Kepala Tukang L.03 OH 0.006 Rp 130,100 Rp 781
Mandor L.04 OH 0.006 Rp 135,300 Rp 812
JUMLAH Rp 20,606
B BAHAN
Atap Seng Gelombang Lbr 0.700 Rp 60,400 Rp 42,280
Paku Atap Kg 0.020 Rp 31,300 Rp 626
JUMLAH 42,906
C PERALATAN

JUMLAH TOTAL Rp 63,512


Over Head + Fee 10% Rp 6,351
JUMLAH Rp 69,864
DIBULATKAN Rp 69,860
JENIS PEKERJAAN : PEMASANGAN 1 M2 PLAFOND TRIPLEK 4 mm
HARGA SATUAN : Rp 61,130 /M3

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Tukang Kayu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.005 Rp 135,300 Rp 677
JUMLAH Rp 24,068
B BAHAN
Tripleks Biasa t = 4 mm Lbr 0.375 Rp 72,900 Rp 27,338
Paku Biasa Kg 0.250 Rp 16,700 Rp 4,175
JUMLAH 31,513
C PERALATAN

JUMLAH TOTAL Rp 55,580


Over Head + Fee 10% Rp 5,558
JUMLAH Rp 61,138
DIBULATKAN Rp 61,130

JENIS PEKERJAAN : PEMASANGAN 1 M2 LANTAI KERAMIK UK. 40x40 CM


HARGA SATUAN : Rp 687,870 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.700 Rp 96,000 Rp 67,200
Tukang Batu L.02 OH 0.350 Rp 124,900 Rp 43,715
Kepala Tukang L.03 OH 0.035 Rp 130,100 Rp 4,554
Mandor L.04 OH 0.030 Rp 135,300 Rp 4,059
JUMLAH Rp 119,528
B BAHAN
Keramik 40x40 M2 6.630 Rp 72,900 Rp 483,327
Semen Portland PCC 50 kg Kg 9.800 Rp 1,300 Rp 12,740
Pasir Pasang M3 0.045 Rp 130,100 Rp 5,855
Tepung AFA / Semen Warna Kg 1.300 Rp 2,993 Rp 3,890
JUMLAH 505,812
C PERALATAN

JUMLAH TOTAL Rp 625,339


Over Head + Fee 10% Rp 62,534
JUMLAH Rp 687,873
DIBULATKAN Rp 687,870

JENIS PEKERJAAN : PEMBUATAN DAN PEMASANGAN 1M3 KOZEN PINTU / JENDELA KAYU Kls II
HARGA SATUAN : Rp 8,273,430 /M1

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 6.000 Rp 96,000 Rp 576,000
Tukang kayu L.02 OH 18.000 Rp 124,900 Rp 2,248,200
Kepala Tukang L.03 OH 1.800 Rp 130,100 Rp 234,180
Mandor L.04 OH 0.300 Rp 135,300 Rp 40,590
JUMLAH Rp 3,098,970
B BAHAN
Balok kayu kelas II M3 1.200 Rp 3,641,800 Rp 4,370,160
Paku 10 Cm Kg 1.250 Rp 16,700 Rp 20,875
Lem kayu Kg 1.000 Rp 31,300 Rp 31,300
JUMLAH 4,422,335
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 7,521,305
Over Head + Fee 10% Rp 752,131
JUMLAH Rp 8,273,436
DIBULATKAN Rp 8,273,430

JENIS PEKERJAAN : PEMBUATAN DAN PEMASANGAN 1 M2 DAUN PINTU PANEL KAYU kls II
HARGA SATUAN : Rp 797,070 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 1.000 Rp 96,000 Rp 96,000
Tukang kayu L.02 OH 3.000 Rp 124,900 Rp 374,700
Kepala Tukang L.03 OH 0.300 Rp 130,100 Rp 39,030
Mandor L.04 OH 0.500 Rp 135,300 Rp 67,650
JUMLAH Rp 577,380
B BAHAN
Papan Kayu M3 0.040 Rp 3,641,800 Rp 145,672
Lem Kayu Kg 0.050 Rp 31,300 Rp 1,565
JUMLAH 147,237
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 724,617
Over Head + Fee 10% Rp 72,462
JUMLAH Rp 797,079
DIBULATKAN Rp 797,070

JENIS PEKERJAAN : PEK. RANGKA DAUN JENDELA KAYU Kls II / M2


HARGA SATUAN : Rp 560,980 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.800 Rp 96,000 Rp 76,800
Tukang kayu L.02 OH 2.400 Rp 124,900 Rp 299,760
Kepala Tukang L.03 OH 0.240 Rp 130,100 Rp 31,224
Mandor L.04 OH 0.040 Rp 135,300 Rp 5,412
JUMLAH Rp 413,196
B BAHAN
Kayu papan kelas II M3 0.024 Rp 3,641,800 Rp 87,403
Lem kayu Kg 0.300 Rp 31,300 Rp 9,390
JUMLAH 96,793
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 509,989
Over Head + Fee 10% Rp 50,999
JUMLAH Rp 560,988
DIBULATKAN Rp 560,980

JENIS PEKERJAAN : PEMASANGAN 1 M2 JALUSI KOZEN, KAYU Kls I atau II


HARGA SATUAN : Rp 419,820 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.670 Rp 96,000 Rp 64,320
Tukang kayu L.02 OH 0.200 Rp 124,900 Rp 24,980
Kepala Tukang L.03 OH 0.200 Rp 130,100 Rp 26,020
Mandor L.04 OH 0.335 Rp 135,300 Rp 45,326
JUMLAH Rp 160,646
B BAHAN

Kayu Papan kelas II M3 0.060 Rp 3,641,800 Rp 218,508


Paku 1 Cm - 2,5 Cm Kg 0.150 Rp 16,700 Rp 2,505
JUMLAH 221,013
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 381,659
Over Head + Fee 10% Rp 38,166
JUMLAH Rp 419,824
DIBULATKAN Rp 419,820

JENIS PEKERJAAN : PEMASANGAN KACA BENING 5 mm


HARGA SATUAN : Rp 138,830 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.0075 Rp 135,300 Rp 1,015
JUMLAH Rp 23,141
B BAHAN
Kaca Bening 5 mm M2 1.100 Rp 93,700 Rp 103,070
JUMLAH 103,070
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 126,211
Over Head + Fee 10% Rp 12,621
JUMLAH Rp 138,832
DIBULATKAN Rp 138,830

JENIS PEKERJAAN : PENGECATAN BIDANG KAYU BARU


HARGA SATUAN : Rp 42,410 / M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.070 Rp 96,000 Rp 6,720
Mandor L.04 OH 0.003 Rp 124,900 Rp 312
Tukang Cat L.02 OH 0.009 Rp 130,100 Rp 1,171
Kepala Tukang L.03 OH 0.060 Rp 135,300 Rp 8,118
JUMLAH Rp 16,321
B BAHAN
Cat menie Kg 0.200 Rp 36,500 Rp 7,300
Plamir Bh 0.015 Rp 8,400 Rp 126
Cat Dasar Ltr 0.170 Rp 31,300 Rp 5,321
Cat Penutup Ltr 0.260 Rp 36,500 Rp 9,490
JUMLAH 22,237
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 38,558
Over Head + Fee 10% Rp 3,856
JUMLAH Rp 42,414
DIBULATKAN Rp 42,410

JENIS PEKERJAAN : MEMASANG KUNCI TANAM 2 SLAGH / bh (antik ex BALLEZA)


HARGA SATUAN : Rp 326,710 /unit
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.060 Rp 96,000 Rp 5,760
Tukang Kayu L.02 OH 0.600 Rp 124,900 Rp 74,940
Kepala Tukang L.03 OH 0.060 Rp 130,100 Rp 7,806
Mandor L.04 OH 0.003 Rp 135,300 Rp 406
JUMLAH Rp 88,912
B BAHAN
Kunci Tanam 2 Slagh ex Balleza Bh 1.000 Rp 208,100 Rp 208,100
JUMLAH 208,100
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 297,012
Over Head + Fee 10% Rp 29,701
JUMLAH Rp 326,713
DIBULATKAN Rp 326,710

JENIS PEKERJAAN : MEMASANG ENGSEL PINTU / BH


HARGA SATUAN : Rp 47,440 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Ensel Pintu 4" Bh 1.000 Rp 20,900 Rp 20,900
JUMLAH 20,900
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 43,128
Over Head + Fee 10% Rp 4,313
JUMLAH Rp 47,441
DIBULATKAN Rp 47,440

JENIS PEKERJAAN : MEMASANG ENGSEL JENDELA / BH


HARGA SATUAN : Rp 38,200 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Ensel Jendela 3" Bh 1.000 Rp 12,500 Rp 12,500
JUMLAH 12,500
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 34,728
Over Head + Fee 10% Rp 3,473
JUMLAH Rp 38,201
DIBULATKAN Rp 38,200

JENIS PEKERJAAN : MEMASANG GERENDEL JENDELA / BH


HARGA SATUAN : Rp 34,790 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Grendel Jendela Bh 1.000 Rp 9,400 Rp 9,400
JUMLAH 9,400
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 31,628
Over Head + Fee 10% Rp 3,163
JUMLAH Rp 34,791
DIBULATKAN Rp 34,790

JENIS PEKERJAAN : MEMASANG GERENDEL PINTU / BH


HARGA SATUAN : Rp 36,000 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Gerendel Pintu " Bh 1.000 Rp 10,500 Rp 10,500
JUMLAH 10,500
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 32,728
Over Head + Fee 10% Rp 3,273
JUMLAH Rp 36,001
DIBULATKAN Rp 36,000

JENIS PEKERJAAN : MEMASANG KAIT ANGIN JENDELA / BH


HARGA SATUAN : Rp 36,000 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Kait Angin Jendela Bh 1.000 Rp 10,500 Rp 10,500
JUMLAH 10,500
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 32,728
Over Head + Fee 10% Rp 3,273
JUMLAH Rp 36,001
DIBULATKAN Rp 36,000

JENIS PEKERJAAN : MEMASANG TARIKAN JENDELA / BH


HARGA SATUAN : Rp 34,790 / Buah
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.015 Rp 96,000 Rp 1,440
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.015 Rp 130,100 Rp 1,952
Mandor L.04 OH 0.001 Rp 135,300 Rp 101
JUMLAH Rp 22,228
B BAHAN
Tangan-tangan Jendela Bh 1.000 Rp 9,400 Rp 9,400
JUMLAH 9,400
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 31,628
Over Head + Fee 10% Rp 3,163
JUMLAH Rp 34,791
DIBULATKAN Rp 34,790

JENIS PEKERJAAN : ANALISA MEMASANG RANGKA ATAP BAJA RINGAN / M2


HARGA SATUAN : Rp 305,190 /M3
Kode Analisa : AHSP PU A.4.2.1.24.
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.200 Rp 96,000 Rp 19,200
Tukang Besi L.02 OH 0.450 Rp 124,900 Rp 56,205
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.050 Rp 135,300 Rp 6,765
JUMLAH Rp 83,471
B BAHAN
Baja ringan canai dingin C75 M' 3.720 Rp 20,900 Rp 77,748
Baut (Srew driver) bh 28.000 Rp 500 Rp 14,000
Dynabol dia 12 x 120 mm bh 2.000 Rp 2,100 Rp 4,200
Reng Canai Dingin M' 5.400 Rp 16,200 Rp 87,480
Talang / Jurai Canai Dingin M' 0.124 Rp 44,800 Rp 5,555
JUMLAH 188,983
C PERALATAN
Alat Bantu (ex ; Bor & pemotong listrik) ls 1.000 Rp 5,000 Rp 5,000
JUMLAH Rp 5,000
JUMLAH TOTAL Rp 277,454
Over Head + Fee 10% Rp 27,745
JUMLAH Rp 305,200
DIBULATKAN Rp 305,190

JENIS PEKERJAAN : Pengecatan Tembok Baru (1 x Plamir,1 x Cat Dasar,2 x Cat Penutup)
HARGA SATUAN : M2 / Buah
Kode Analisa : AHSP PU A.4.7.1.10

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.020 Rp 96,000 Rp 1,920
Tukang Cat L.02 OH 0.063 Rp 124,900 Rp 7,869
Kepala Tukang L.03 OH 0.006 Rp 130,100 Rp 820
Mandor L.04 OH 0.003 Rp 135,300 Rp 338
JUMLAH Rp 10,947
B BAHAN
1 Plamir Tembok KG 0.100 Rp 26,100 Rp 2,610
2 Cat Dasar Tembok KG 0.100 Rp 31,300 Rp 3,130
3 Cat Tembok / Penutup 2X KG 0.260 Rp 89,000 Rp 23,140

C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 39,827
Over Head + Fee 10% Rp 3,983
JUMLAH Rp 43,809
DIBULATKAN Rp 43,800

JENIS PEKERJAAN : Pengecatan Tembok Lama ( 1 X Cat Dasar ,2 x Cat Penutup )


HARGA SATUAN : M2 / Buah
Kode Analisa : AHSP PU A.4.7.1.11
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.028 Rp 96,000 Rp 96,000
Tukang Cat L.02 OH 0.042 Rp 124,900 Rp 5,246
Kepala Tukang L.03 OH 0.004 Rp 130,100 Rp 546
Mandor L.04 OH 0.003 Rp 135,300 Rp 338
JUMLAH Rp 102,130
B BAHAN
1 Cat Dasar Tembok KG 0.120 Rp 31,300 Rp 3,756
2 Cat Tembok / Penutup 2X KG 0.180 Rp 89,000 Rp 16,020

C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 121,906
Over Head + Fee 10% Rp 12,191
JUMLAH Rp 134,097
DIBULATKAN Rp 134,090

JENIS PEKERJAAN : Pemasangan Lampu


HARGA SATUAN : Rp 101,550 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.480 Rp 96,000 Rp 46,080
Tukang L.02 OH 0.048 Rp 124,900 Rp 5,995
Kepala Tukang L.03 OH 0.048 Rp 130,100 Rp 6,245
JUMLAH Rp 58,320
B BAHAN
Lampu SL 18 watt+fitting Buah 1.000 Rp 25,000 Rp 25,000
Kabel Listrik NYA 3X2,5 mm M1 2.000 Rp 4,500 Rp 9,000
JUMLAH 34,000
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 92,320
Over Head + Fee 10% Rp 9,232
JUMLAH Rp 101,552
DIBULATKAN Rp 101,550

JENIS PEKERJAAN : Pemasangan Saklar Tunggal


HARGA SATUAN : Rp 96,290 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.400 Rp 96,000 Rp 38,400
Tukang L.02 OH 0.048 Rp 124,900 Rp 5,995
Kepala Tukang L.03 OH 0.048 Rp 130,100 Rp 6,245
JUMLAH Rp 50,640
B BAHAN

Saklar Tunggal bh 1.000 Rp 9,800 Rp 9,800


Over Spaning bh 1.000 Rp 8,650 Rp 8,650
Sekring Kast bh 1.000 Rp 25,000 18,450
JUMLAH Rp 36,900
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 87,540
Over Head + Fee 10% Rp 8,754
JUMLAH Rp 96,294
DIBULATKAN Rp 96,290
JENIS PEKERJAAN : Pemasangan Saklar Ganda
HARGA SATUAN : Rp 108,440 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.400 Rp 96,000 Rp 38,400
Tukang L.02 OH 0.048 Rp 124,900 Rp 5,995
Kepala Tukang L.03 OH 0.048 Rp 130,100 Rp 6,245
JUMLAH Rp 50,640
B BAHAN

Saklar Ganda bh 1.000 Rp 14,300 Rp 14,300


Over Spaning bh 1.000 Rp 8,650 Rp 8,650
Sekring Kast bh 1.000 Rp 25,000 Rp 25,000
JUMLAH Rp 47,950
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 98,590
Over Head + Fee 10% Rp 9,859
JUMLAH Rp 108,449
DIBULATKAN Rp 108,440

JENIS PEKERJAAN : Pemasangan Stop Kontak


HARGA SATUAN : Rp 145,900 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.400 Rp 96,000 Rp 38,400
Tukang L.02 OH 0.048 Rp 124,900 Rp 5,995
Kepala Tukang L.03 OH 0.048 Rp 130,100 Rp 6,245
JUMLAH Rp 50,640
B BAHAN

MCB Box bh 1.000 Rp 70,000 Rp 70,000


Stop Kontak bh 1.000 Rp 12,000 Rp 12,000
JUMLAH Rp 82,000
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 132,640
Over Head + Fee 10% Rp 13,264
JUMLAH Rp 145,904
DIBULATKAN Rp 145,900

JENIS PEKERJAAN : PEMASANGAN 1 M1 LISPLANK SENG SUPERDEX / 10 M'


HARGA SATUAN : Rp 48,210 /M1

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Tukang Kayu L.02 OH 0.200 Rp 124,900 Rp 24,980
Kepala Tukang L.03 OH 0.020 Rp 130,100 Rp 2,602
Mandor L.04 OH 0.005 Rp 135,300 Rp 677
JUMLAH Rp 37,859
B BAHAN
Seng tebal 0.20 11 bd warna setara swan brand lbr 0.083 Rp 60,400 Rp 5,031
Paku (1 1/2 1 )" RRC Kg 0.030 Rp 31,300 Rp 939
JUMLAH 5,970
C PERALATAN

JUMLAH TOTAL Rp 43,829


Over Head + Fee 10% Rp 4,383
JUMLAH Rp 48,212
DIBULATKAN Rp 48,210

JENIS PEKERJAAN : PEKERJAAN TALANG SENG


HARGA SATUAN : Rp 88,530 /M1

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.300 Rp 96,000 Rp 28,800
Tukang Kayu L.02 OH 0.150 Rp 124,900 Rp 18,735
Tukang Besi L.02 OH 0.200 Rp 124,900 Rp 24,980
Kepala Tukang L.03 OH 0.020 Rp 130,100 Rp 2,602
Mandor L.04 OH 0.005 Rp 135,300 Rp 677
JUMLAH Rp 75,794
B BAHAN
Besi Hollow 4x4 (zincalume) M'' 0.008 Rp 4,100 Rp 33
Paku 1 (1/2") Kg 0.750 Rp 16,700 Rp 12,525
Paku (1 1/2 1 )" RRC kg 0.150 Rp 31,300 Rp 4,695
Seng Plat BJLS 30 lbr 0.100 Rp 62,500 Rp 6,250
JUMLAH Rp 23,503
C PERALATAN

JUMLAH TOTAL Rp 80,489


Over Head + Fee 10% Rp 8,049
JUMLAH Rp 88,537
DIBULATKAN Rp 88,530

JENIS PEKERJAAN : PEKERJAAN BUBUNGAN SENG


HARGA SATUAN : Rp 30,460 /M1

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Tukang Besi L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
JUMLAH Rp 23,391
B BAHAN
` Besi Hollow 4x4 (zincalume) M' 1.050 Rp 4,100 Rp 4,305
JUMLAH Rp 4,305
C PERALATAN

JUMLAH TOTAL Rp 27,696


Over Head + Fee 10% Rp 2,770
JUMLAH Rp 30,466
DIBULATKAN Rp 30,460
JENIS PEKERJAAN : PEMASANGAN 1 M2 PONDASI TAPAK
HARGA SATUAN : Rp 1,390,320 /M2
HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.120 Rp 96,000 Rp 11,520
Tukang Besi L.02 OH 0.150 Rp 124,900 Rp 18,735
Kepala Tukang L.03 OH 0.300 Rp 130,100 Rp 39,030
Mandor L.04 OH 0.020 Rp 135,300 Rp 2,706
Tukang Kayu L.02 OH 0.120 Rp 124,900 Rp 14,988
JUMLAH Rp 86,979
B BAHAN
Kayu Kelas III (Kayu Marantih) 2x pakai M3 0.040 Rp 3,121,500 Rp 124,860
Kayu Kelas IV (Beksiting) 2x pakai M3 0.017 Rp 2,081,000 Rp 35,377
Paku 1 (1/2") kg 0.400 Rp 16,700 Rp 6,680
BETON MUTU f3c = 14.5 Mpa (K175) m3 1.000 Rp 1,010,040 Rp 1,010,040
BESI BETON TERPASANG kg 1.000 Rp 15,450 Rp 15,450
JUMLAH Rp 1,176,957
C PERALATAN
JUMLAH
JUMLAH TOTAL Rp 1,263,936
Over Head + Fee 10% Rp 126,394
JUMLAH Rp 1,390,330
DIBULATKAN Rp 1,390,320

JENIS PEKERJAAN : PEKERJAAN SINGOK ATAP KAYU KELAS II


HARGA SATUAN : Rp 55,310 /M1

HARGA
NO. UPAH DAN BAHAN KODE SATUAN KOOFISIEN JUMLAH HARGA
SATUAN
A TENAGA
Pekerja L.01 OH 0.100 Rp 96,000 Rp 9,600
Tukang Kayu L.02 OH 0.100 Rp 124,900 Rp 12,490
Kepala Tukang L.03 OH 0.010 Rp 130,100 Rp 1,301
Mandor L.04 OH 0.005 Rp 135,300 Rp 677
JUMLAH Rp 24,068
B BAHAN
Kaso-Kaso (5x7)cm Kayu Kelas II Marsawa M3 0.014 Rp 3,641,800 Rp 50,985
Paku (1 1/2 1 )" RRC Kg 0.250 Rp 31,300 Rp 7,825
RENG (3x4) Kayu Kelas II Marsawa M3 0.0072 Rp 3,641,800 Rp 26,221
JUMLAH Rp 85,031
C PERALATAN

JUMLAH TOTAL Rp 50,288


Over Head + Fee 10% Rp 5,029
JUMLAH Rp 55,317
DIBULATKAN Rp 55,310
DAFTAR BAHAN DAN UPAH

PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR


KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN : 2021

HARGA SATUAN
NO JENIS BAHAN SATUAN (RP) KET

A DAFTAR HARGA SATUAN UPAH


1 Mandor Hari 135,300.00
2 Kepala Tukang Hari 130,100.00
3 Tukang Hari 124,900.00
4 Pekerja Hari 96,000.00

B DAFTAR HARGA SATUAN DASAR BAHAN


1 Batu Kali Bulat Utuh M3 192,500.00
2 Batu Belah/Kerakal M3 260,200.00 144.56
3 Pasir Pasang M3 130,100.00
4 Pasir Beton M3 135,500.00 96.79
5 Pasir Urug M3 130,100.00
6 Tanah Urug (Bahan Timbunan) M3 78,100.00
7 Batu Bata 10 x 20 x 5 cm Bh 900.00
8 Semen PCC Merah 50 kg Zak 65,000.00 1,300.00
9 Tepung Alpha AA ( Semen Warna ) 40 kg Zak 119,700.00 2,992.50
10 Kayu Kelas I banio : - Papan M3 4,682,300.00
11 : - Balok M3 4,682,300.00
12 Kayu Kelas II Marsawa : - Papan M3 3,641,800.00
13 : - Balok M3 3,641,800.00
14 Kayu Kelas III (Kayu Marantih) : - Papan M3 3,121,500.00
15 : - Balok M3 3,121,500.00
16 Kayu Kelas IV (Beksiting) : - Papan M3 2,081,000.00
17 : - Balok M3 2,081,000.00
18 Dolken Kayu Btg 9,400.00
19 Paku 1 (1/2") Kg 16,700.00
20 Paku (1 1/2 1 )" RRC Kg 31,300.00
21 Besi Beton Kg 11,500.00
22 Kawat Beton Kg 18,800.00
23 Kaca bening t = 5 mm M2 93,700.00
24 Seng tebal 0.20 11 bd warna setara swan brand Lbr 60,400.00
25 Seng Plat BJLS 30 Lbr 62,500.00
26 Tripleks Biasa t = 4 mm Lbr 72,900.00
27 Multiplek t 12 mm Lbr 188,900.00
28 Oli Bekas ( Minyak Bekisting ) Ltr 12,500.00
29 Air Ltr 300.00
30 Lem kayu Kg 31,300.00
31 Kunci Antik SES Set 208,100.00
32 Engsel Pintu 4 " Bh 20,900.00
33 Engsel Jendela 3" Bh 12,500.00
34 Grendel Pintu Bh 10,500.00
35 Kait Angin Bh 10,500.00
36 Tarikan Jendela Antik Bh 15,700.00
37 Grendel Jendela Bh 9,400.00
38 Keramik lantai permukaan licin (polish) 40 cm x 40 cm M2 72,900.00
NO JENIS BAHAN SATUAN HARGA SATUAN KET
(RP)
39 Cat Tembok setara catilac Kg 41,700.00
40 Plamour Tembok Kg 26,100.00
41 Cat Dasar Kg 31,300.00
42 Cat Manie Kg 36,500.00
43 Dempul kayu kg 30,000.00
44 Amplas kayu M 10,500.00
45 Cat (Water Proofing) Kg 89,000.00
46 Kuas Bh 8,400.00
47 Saklar Ganda Bh 14,300.00
48 MCB Box Bh 70,000.00
49 Stop Kontak Bh 12,000.00
50 Kabel Listrik NYA 3X2,5 mm M1 4,500.00
51 Lampu SL 18 watt+fitting Buah 25,000.00
52 Saklar Tunggal Buah 9,800.00
53 Over Spaning M1 8,650.00
54 Sekring Kast buah 25,000.00
55 Rangka Baja Ringan Supertruss C.75.75 kg 20,900.00
56 Besi Hollow 4x4 (zincalume) M' 4,100.00
57 Baut (Srew driver) bh 500.00
58 Dynabol dia 12 x 120 mm bh 2,100.00
59 Reng 28.45 btg 16,200.00
60 Talang / Jurai Canai Dingin Lbr 44,800.00
REKAPITULASI
PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
KEGIATAN : PENGADAAN MEBELUER SARANA DAN PRASARANA PERPUSTAKAAN
PEKERJAAN : PENGADAAAN MEBELUER RUANG MAJELIS GURU SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

JUMLAH HARGA
NO URAIAN PEKERJAAN
( Rp )

I PENGADAAN MEBELUER 16,636,363.64

JUMLAH 16,636,363.64
PPN 10 % 1,663,636.36
TOTAL 18,300,000.00

Terbilang : Delapan belas juta tiga ratus ribu rupiah

Padang, Mei 2021


Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN KABID CIPTA KARYA KONSULTAN PERENCANA
(PPK) DINAS PU KAB.PADANG PARIAMAN CV. JAYA PERMAI CONSULTANT

MAYULIS, S.Pd.MM EFINALDI, ST.MT. EDI SURYA, ST


Nip. 19650208 1988810 1 001 Nip. 19711104 200212 1 004 Direktur

Disetujui Oleh : Disetujui Oleh :


KEPALA DINAS PEKERJAAN UMUM PLT. KEPALA DINAS PENDIDIKAN DAN KEBUDAAAN
DAN PENATAAN RUANG KAB. PADANG PARIAMAN
KAB. PADANG PARIAMAN

Drs. ANWAR, M.Si.


DENI IRWAN, ST.MT. Nip. 19670210 198903 1007
Nip. 1977020 6200312 1 007
RENCANA ANGGARAN BIAYA
PROGRAM : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
KEGIATAN : PENGADAAN MEBELUER SARANA DAN PRASARANA PERPUSTAKAAN
PEKERJAAN : PENGADAAAN MEBELUER RUANG MAJELIS GURU SDN 06 SINTUK TOBOH GADANG
LOKASI : SINTOGA
TAHUN ANGGARAN : 2021

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PENGADAAN MEBELUER
2.00 1,400,000.00 2,800,000.00
1 Lemari Bh
6.00 860,000.00 5,160,000.00
2 Meja Guru Bh
3 Kursi Guru Bh 6.00 321,060.61 1,926,363.64
4 Papan Statistik Bh 1.00 450,000.00 450,000.00
5 Papan Pengumuman Bh 1.00 450,000.00 450,000.00
6 Kursi Tamu Sofa Set Set 1.00 4,500,000.00 4,500,000.00
7 Meja Tamu Set 1.00 1,350,000.00 1,350,000.00
JUMLAH 16,636,363.64
Dibuat Oleh :
KONSULTAN PERENCANA
CV. JAYA PERMAI CONSULTANT

EDI SURYA, ST
Direktur
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN UNIT SEKOLAH BARU SMAN 2 LINGGO SARI BAGANTI
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR
LOKASI : PUNGGASAN KABUPATEN PESISIR SELATAN

GEDUNG KANTOR

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PEKERJAAN PONDASI
1 Pek. Pondasi
a Pembersihan Lapangan M3 450.00 18,000.00 8,100,000.00
b Pas. Papan Bouplank M1 62.00 70,330.00 4,360,460.00
c Galian Tanah Pondasi M3 109.76 82,920.00 9,101,299.20
d Pas. Aanstampang Bt. Kali M3 26.24 463,250.00 12,155,680.00
e Pas. Pondasi Bt. Kali 1:4 M3 41.82 844,940.00 35,335,390.80
f Urugan Tanah Kembali M3 27.44 38,750.00 1,063,300.00
JUMLAH 70,116,130.00

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian Kg 967.38 15,450.00 14,946,008.64
b Pek. Bekisting sloof M2 65.60 178,920.00 11,737,152.00
c Pek. Stamp beton K 175 M3 4.92 1,010,040.00 4,969,396.80

2 Pek. Kolom 15/25


a Pek. Pembesian Kg 1,186.94 15,450.00 18,338,284.80
b Pek. Bekisting kolom M2 116.16 275,130.00 31,959,100.80
c Pek. Stamp beton K 175 M3 5.78 1,010,040.00 5,832,981.00

3 Pek. Kolom 13/13


a Pek. Pembesian Kg 284.00 15,450.00 4,387,800.00
b Pek. Bekisting kolom M2 14.56 275,130.00 4,005,892.80
c Pek. Stamp beton K 175 M3 0.95 1,010,040.00 955,901.86

4 Pek. Balok Late 13/15


a Pek. Pembesian Kg 294.20 15,450.00 4,545,390.00
b Pek. Bekisting balok M2 10.40 #REF! #REF!
c Pek. Stamp beton K 175 M3 0.68 1,010,040.00 682,787.04

5 Pek. Reng Balok 13/20


a Pek. Pembesian Kg 936.75 15,450.00 14,472,710.25
b Pek. Bekisting balok M2 65.60 #REF! #REF!
c Pek. Stamp beton K 175 M3 4.34 1,010,040.00 4,385,593.68

6 Pek. Kozen Pintu/Jendela


a Pek. Kozen Pintu/Jendela M3 2.97 8,273,430.00 24,541,640.88
b Pas. Angker Kozen Kg 4.45 20,000.00 88,989.60

7 Pas. Dinding Bata


a Pas. Dinding Bata 1:2 M2 61.50 150,910.00 9,280,965.00
b Pas. Dinding Bata 1:4 M2 240.06 140,980.00 33,843,658.80
d Pas. Dinding Bata 1:4 Rabat / teras M2 112.00 140,980.00 15,789,760.00
JUMLAH #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

III PEKERJAAN KAP/ATAP


1 Pek. Kap / Atap
a Pek Kuda-kuda Kayu M3 4.28 #REF! #REF!
a Pek Gording Kayu M3 6.64 #REF! #REF!
b Pas. Atap Seng BJLS 20 warna M2 667.50 69,860.00 46,631,550.00
c Pas. Perabung Seng M2 62.00 - -
c Pas. Lesplank Kayu M1 114.00 #REF! #REF!
JUMLAH #REF!

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran
a Pek. Plesteran Dinding 1 : 2 M2 123.00 74,150.00 9,120,450.00
b Pek. Plesteran Dinding 1:4 M2 480.12 69,020.00 33,137,882.40
c Pek. Acian Dinding M2 603.12 42,420.00 25,584,350.40
d Pek. Acian Beton M2 123.20 42,420.00 5,226,144.00
e Pas. Dinding Keramik 20x25 cm km/wc t= 1,5 m M2 36.00 #REF! #REF!
JUMLAH #REF!

V PEKERJAAN PLAFOND
1 Pek. Plafond
a Pas. Rangka Plafond Kayu M2 575.00 #REF! #REF!
b Cat Menie Rangka Plafond M2 267.60 42,413.97 11,349,977.03
c Pas. Plafond Triplek 4 mm M2 575.00 61,130.00 35,149,750.00
d Pas. Les Profil 5x5 cm M1 324.00 15,000.00 4,860,000.00
JUMLAH #REF!

VI PEKERJAAN LANTAI
1 Pek. Lantai
a Timbunan Tanah Bawah Lantai M3 113.40 136,260.00 15,451,884.00
b Urugan Pasir M3 37.80 #REF! #REF!
c Cor Lantai Beton K 175 tbl 5 cm M3 18.90 1,010,040.00 19,089,756.00
d Pas. Lantai Keramik 40x40 cm M2 294.00 687,870.00 202,233,780.00
e Pas. Lantai Keramik 40x40 cm unpolish Teras M2 162.00 687,870.00 111,434,940.00
e Pas. Lantai Keramik 20x20 cm km/wc M2 9.99 #REF! #REF!
JUMLAH #REF!

VII PEKERJAAN PINTU/JENDELA


1 Pek. Pintu / Jendela
a Pas. Pintu Panil Kayu M2 9.24 797,070.00 7,364,926.80
b Pas. Pintu Panil Kayu Lapis Seng Plat M2 5.88 #REF! #REF!
c Pas. Rangka Jendela + Kaca 5 mm M2 27.60 560,980.00 15,483,048.00
d Pas. Jalusi Kayu M2 59.14 419,820.00 24,826,475.52
e Pas. Kaca Bening 5 mm M2 16.10 138,830.00 2,235,163.00

2 Pengantung/Pengunci
a Pas. Kunci Pintu 2 x Slagh Bh 8.00 #REF! #REF!
b Pas. Engsel Pintu 4" Bh 30.00 #REF! #REF!
c Pas. Engsel Jendela 3" Bh 40.00 #REF! #REF!
d Pas. Gerendel Jendela Bh 40.00 #REF! #REF!
e Pas. Kait Angin Jendela Bh 40.00 #REF! #REF!
f Pas. Tangan-tangan Jendela Bh 20.00 #REF! #REF!
JUMLAH #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

VIII PEKERJAAN PENGECATAN


1 Pek. Pengecatan
a Cat Dinding Tembok setara Catylac M2 726.32 #REF! #REF!
b Cat Plafond M2 575.00 #REF! #REF!
c Cat Minyak Kozen Pintu/Jendela M2 258.06 #REF! #REF!
d Cat Minyak Lesplank Kayu M2 34.20 #REF! #REF!
JUMLAH #REF!

IX PEK. PERELENGKAPAN DALAM


1 Pek. Listrik
a Pas. Instalasi Titik Lampu Ttk 27.00 235,000.00 6,345,000.00
b Pas. Instalasi Stop kontak Ttk 25.00 235,000.00 5,875,000.00
c Pas. Panel MCB Bh 1.00 250,000.00 250,000.00
d Pas. Lampu TL Out bouw 2 x 36 watt phillips Bh 23.00 482,000.00 11,086,000.00
e Pas. Bola Lampu SL 11 watt phillips M1 4.00 55,000.00 220,000.00

2 Pek. Sanitasi
a Pas. Pipa Air Kotor PVC dia 3" AW + Acc M1 25.00 #REF! #REF!
b Pas. Pipa Air Kotor PVC dia 4" AW + Acc M1 25.00 #REF! #REF!
c Pas. Pipa Air Bersih PVC 3/4" + Acc M1 25.00 #REF! #REF!
d Pas. Kloset Jongkok Bh 4.00 #REF! #REF!
e Pas. Kran Air Bh 4.00 #REF! #REF!
f Pas. Flour Drain Bh 4.00 #REF! #REF!
g Pas. Bak Air Fiber Bh 2.00 435,000.00 870,000.00
JUMLAH #REF!

X PEK. PERELENGKAPAN LUAR


1 Pek. Rabat / Saluran Keliling dan Halaman
a Galian Tanah M3 41.04 82,920.00 3,403,036.80
b Pas. Dinding Bata 1:4 M2 57.00 140,980.00 8,035,860.00
c Pek. Plesteran Dinding 1:4 M2 114.00 69,020.00 7,868,280.00
d Pek. Acian Dinding M2 114.00 42,420.00 4,835,880.00
e Timbunan Tanah Bawah Lantai M3 15.44 136,260.00 2,103,751.93
f Urugan Pasir M3 6.84 #REF! #REF!
g Cor Lantai Beton K 175 tbl 5 cm M3 6.84 1,010,040.00 6,908,673.60
h Pek. Acian Lantai M2 136.80 42,420.00 5,803,056.00
i Pek. Septiktank dan Peresapan Kap 25 orang Unit 2.00 #REF! #REF!
JUMLAH #REF!
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN UNIT SEKOLAH BARU SMAN 2 LINGGO SARI BAGANTI
PEKERJAAN : PEMBANGUNAN RUANG LABOR
LOKASI : 2021

RUANG LABOR

HARGA JUMLAH JUMLAH


NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

I PEKERJAAN PONDASI
1 Pek. Pondasi
a Pembersihan Lapangan M3 150.00 18,000.00 2,700,000.00
b Pas. Papan Bouplank M1 24.00 70,330.00 1,687,920.00
c Galian Tanah Pondasi M3 37.63 82,920.00 3,120,445.44
d Pas. Aanstampang Bt. Kali M3 9.41 463,250.00 4,358,256.00
e Pas. Pondasi Bt. Kali 1:4 M3 14.99 844,940.00 12,669,030.36
f Urugan Tanah Kembali M3 9.41 38,750.00 364,560.00
JUMLAH 24,900,211.80

II PEKERJAAN BETON/DINDING
1 Pek. Sloof Praktis 15/20
a Pek. Pembesian Kg 264.57 15,450.00 4,087,550.88
b Pek. Bekisting sloof M2 23.52 178,920.00 4,208,198.40
c Pek. Stamp beton K 175 M3 1.76 1,010,040.00 1,781,710.56

2 Pek. Kolom 15/25


a Pek. Pembesian Kg 390.60 15,450.00 6,034,770.00
b Pek. Bekisting kolom M2 29.70 275,130.00 8,171,361.00
c Pek. Stamp beton K 175 M3 1.97 1,010,040.00 1,988,516.25

3 Pek. Kolom 13/13


a Pek. Pembesian Kg 68.66 15,450.00 1,060,797.00
b Pek. Bekisting kolom M2 1.82 275,130.00 500,736.60
c Pek. Stamp beton K 175 M3 0.24 1,010,040.00 238,975.46

4 Pek. Balok Late 13/15


a Pek. Pembesian Kg 88.77 15,450.00 1,371,496.50
b Pek. Bekisting balok M2 3.60 #REF! #REF!
c Pek. Stamp beton K 175 M3 0.41 1,010,040.00 409,672.22

5 Pek. Reng Balok 13/20


a Pek. Pembesian Kg 260.03 15,450.00 4,017,432.60
b Pek. Bekisting balok M2 11.76 #REF! #REF!
c Pek. Stamp beton K 175 M3 1.53 1,010,040.00 1,544,149.15

6 Pek. Meja Beton tbl 8 cm


a Pek. Pembesian Kg 43.71 15,450.00 675,319.50
b Pek. Bekisting balok M2 3.20 #REF! #REF!
c Pek. Stamp beton K 175 M3 0.45 1,010,040.00 452,497.92

7 Pek. Kozen Pintu/Jendela


a Pek. Kozen Pintu/Jendela M3 1.19 8,273,430.00 9,884,184.09
b Pas. Angker Kozen Kg 1.79 20,000.00 35,840.70
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)

8 Pas. Dinding Bata


a Pas. Dinding Bata 1:2 M2 25.08 150,910.00 3,785,049.17
b Pas. Dinding Bata 1:4 M2 107.20 140,980.00 15,112,915.02
c Pas. Dinding Bata 1:4 Rabat / teras M2 40.00 140,980.00 5,639,200.00
JUMLAH #REF!

III PEKERJAAN KAP/ATAP


1 Pek. Kap / Atap
a Pek Kuda-kuda Kayu M3 1.65 #REF! #REF!
b Pek Gording Kayu M3 2.15 #REF! #REF!
c Pas. Atap Seng BJLS 20 warna M2 258.75 69,860.00 18,076,275.00
d Pas. Perabung Seng M2 34.50 - -
e Pas. Lesplank Kayu M1 60.00 #REF! #REF!
JUMLAH #REF!

IV PEKERJAAN PLESTERAN
1 Pek. Plesteran
a Pek. Plesteran Dinding 1 : 2 M2 50.16 74,150.00 3,719,586.45
b Pek. Plesteran Dinding 1:4 M2 214.40 69,020.00 14,797,749.96
c Pek. Acian Dinding M2 264.56 42,420.00 11,222,677.62
d Pek. Acian Beton M2 42.00 42,420.00 1,781,640.00
JUMLAH 31,521,654.03

V PEKERJAAN PLAFOND
1 Pek. Plafond
a Pas. Rangka Plafond Kayu M2 216.00 #REF! #REF!
b Cat Menie Rangka Plafond M2 68.40 42,413.97 2,901,115.21
c Pas. Plafond Triplek 4 mm M2 216.00 61,130.00 13,204,080.00
d Pas. Les Profil 5x5 cm M1 128.00 15,000.00 1,920,000.00
JUMLAH #REF!

VI PEKERJAAN LANTAI
1 Pek. Lantai
a Timbunan Tanah Bawah Lantai M3 30.00 136,260.00 4,087,800.00
b Urugan Pasir M3 15.00 #REF! #REF!
c Cor Lantai Beton K 175 tbl 5 cm M3 7.50 1,010,040.00 7,575,300.00
d Pas. Lantai Keramik 40x40 cm M2 120.00 687,870.00 82,544,400.00
e Pas. Lantai Keramik 40x40 cm meja beton M2 5.60 #REF! #REF!
f Pas. Lantai Keramik 40x40 cm unpolish Teras M2 30.00 687,870.00 20,636,100.00
JUMLAH #REF!

VII PEKERJAAN PINTU/JENDELA


1 Pek. Pintu / Jendela
a Pas. Pintu Panil Kayu M2 6.72 797,070.00 5,356,310.40
b Pas. Rangka Jendela + Kaca 5 mm M2 12.42 560,980.00 6,967,371.60
c Pas. Jalusi Kayu M2 28.22 419,820.00 11,848,999.68
d Pas. Kaca Bening 5 mm M2 14.49 138,830.00 2,011,646.70

2 Pengantung/Pengunci
a Pas. Kunci Pintu 2 x Slagh Bh 3.00 #REF! #REF!
b Pas. Engsel Pintu 4" Bh 12.00 #REF! #REF!
c Pas. Engsel Jendela 3" Bh 36.00 #REF! #REF!
d Pas. Gerendel Jendela Bh 36.00 #REF! #REF!
e Pas. Kait Angin Jendela Bh 36.00 #REF! #REF!
f Pas. Tangan-tangan Jendela Bh 18.00 #REF! #REF!
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA STN TOTAL
(Rp) (Rp) (Rp)
JUMLAH #REF!

VIII PEKERJAAN PENGECATAN


1 Pek. Pengecatan
a Cat Dinding Tembok setara Catylac M2 306.56 #REF! #REF!
b Cat Plafond M2 216.00 #REF! #REF!
c Cat Minyak Kozen Pintu/Jendela M2 79.75 #REF! #REF!
d Cat Minyak Lesplank Kayu M2 18.00 #REF! #REF!
JUMLAH #REF!

IX PEK. PERELENGKAPAN DALAM


1 Pek. Listrik
a Pas. Instalasi Titik Lampu Ttk 9.00 235,000.00 2,115,000.00
b Pas. Instalasi Stop kontak Ttk 4.00 235,000.00 940,000.00
c Pas. Panel MCB Bh 1.00 250,000.00 250,000.00
d Pas. Lampu TL Out bouw 2 x 36 watt phillips Bh 8.00 #REF! #REF!
e Pas. Bola Lampu SL 11 watt phillips M1 1.00 #REF! #REF!
JUMLAH #REF!

X PEK. PERELENGKAPAN LUAR


1 Pek. Rabat / Saluran Keliling dan Halaman
a Galian Tanah M3 19.44 82,920.00 1,611,964.80
b Pas. Dinding Bata 1:4 M2 27.00 140,980.00 3,806,460.00
c Pek. Plesteran Dinding 1:4 M2 54.00 69,020.00 3,727,080.00
d Pek. Acian Dinding M2 54.00 42,420.00 2,290,680.00
e Timbunan Tanah Bawah Lantai M3 6.48 136,260.00 882,964.80
f Urugan Pasir M3 3.24 #REF! #REF!
g Cor Lantai Beton K 175 tbl 5 cm M3 3.24 1,010,040.00 3,272,529.60
h Pek. Acian Lantai M2 64.80 42,420.00 2,748,816.00
JUMLAH #REF!
TIME - SCHEDULLE
KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG MAJELIS GURU BESERTA PARABOTNYA SDN 06 SINTUK TOBOH GADANG
TAHUN ANGGARAN : 2021

M I N G G U K E
NO URAIAN PEKERJAAN Bobot 1 2 3 4 5 6 7 8 Ket.
(%)

1 PEKERJAAN PENDAHULUAN 2.70 2.70

2 PEKERJAAN PONDASI 4.60 2.30 2.30

3 PEKERJAAN BETON/DINDING 20.77 3.46 3.46 3.46 3.46 3.46 3.46

4 PEKERJAAN KAP/ATAP 11.77 1.96 1.96 1.96 1.96 1.96 1.96

5 PEKERJAAN PLESTERAN 5.09 1.70 1.70 1.70

6 PEKERJAAN PLAFOND 6.24 3.12 3.12

7 PEKERJAAN LANTAI 29.09 29.09

8 PEKERJAAN PINTU/JENDELA 9.33 2.33 2.33 2.33 2.33

9 #REF! #REF! #REF! #REF!

10 #REF! #REF! #REF!


11 #REF! #REF! #REF!

REN- JUMLAH BOBOT PER MINGGU #REF! 5.00 5.76 5.42 5.42 12.57 41.65 #REF! #REF!

CANA JUMLAH BOBOT AKUMULATIF 0.00 5.00 10.76 16.18 21.61 34.18 75.83 #REF! #REF!

Rencana Waktu Pelaksanaan = 60 (enam puluh ) Hari Kalender

PADANG, Mei 2021


DIBUAT OLEH
KONSULTAN PERENCANA
CV. JAYA PERMAI CONSULTANT

EDI SURYA, ST
Direktur