PROJECT TITLE PROPOSED 2-STOREY RESIDENTIAL HOUSE

LOCATION
AREA 64.00

I. MATERIALS COST
UNIT
ITEM DESCRIPTION QTY. UNIT AMOUNT
COST

SITEWORKS
1 Site Clearing 200.00 sqm 0.00 0.00

2 Earthworks
2a Excavation 106.93 cum 0.00 0.00
2b Backfill 94.03 cum 0.00 0.00

3 Grading and Compaction 97.32 sqm 0.00 0.00

4 Gravel Bedding 12.65 cum 0.00 0.00

4 Soil Poisoning 64.00 cum 0.00 0.00

SUB-TOTAL Php 0.00


CONCRETING WORKS
STRUCTURAL WORKS
Concrete (3000psi) 46.67 cum
Cement 570.00 bags 0.00 0.00
Sand 23.34 cum 0.00 0.00
Gravel 46.67 cum 0.00 0.00
SUB-TOTAL Php 0.00
MASONRY WORKS
6" thk CMU 3,254.00 pcs 0.00 0.00
4" thk CMU 1,188.00 pcs 0.00 0.00
Cement 528.00 bags 0.00
Sand 45.42 cum 0.00
SUB-TOTAL Php 0.00
STEEL WORKS
2.5" x 2.5" x 1/8"thk ANGULAR BAR 44.00 pcs 0.00 0.00
3/16" x 1 1/2" FLAT BAR 9.00 pcs 0.00
C - PURLINS 50 x 100 x 1.24 THK 20.00 pcs 0.00 0.00
RED OXIDE PRIMER 2.00 pail 0.00 0.00
PAINT THINNER 1.00 pail 0.00
WELDING ROD 20.00 kgs 0.00

Rebars
10mm-d (6.0m) 644.00 pcs 0.00 0.00
10mm-d (9.0m) 150.00 pcs 0.00 0.00
12mm-d (6.0m) 113.00 pcs 0.00 0.00
12mm-d (7.5m) 3.00 pcs 0.00 0.00
12mm-d (9.0m) 159.00 pcs 0.00 0.00
16mm-d (6.0m) 103.00 pcs 0.00 0.00
16mm-d (7.5m) 126.00 pcs 0.00 0.00
20mm-d (9.0m) 75.00 pcs 0.00 0.00

ROOFING AND EAVES


GA. 20 GI Long Span Roof Sheet 87.08 lm 0.00 0.00
GA. 24 GI GUTTER 15.60 lm 0.00 0.00
18" RIDGE ROLL 116.70 lm 0.00 0.00
SPANDREL 177.60 lm 0.00
End Mould pcs 0.00
Center Mould pcs 0.00

STAIR AND BALCONY RAILING


4" x 2" x 2.0 THK STAINLESS STEEL TUBULAR (6.0m) 5.00 pcs 0.00 0.00
12mm-d STAINLESS STEEL TUBULAR (6.0m) 56.00 pcs 0.00 0.00
SUB-TOTAL Php 0.00
WOOD& CARPENTRY WORKS
Formworks (20mm thk PHENOLIC BOARD) 94.00 pcs 0.00 0.00
SUB-TOTAL Php 0.00
THERMAL & MOISTURE PROTECTION
ROOF PROTECTION
1" thk POLYOLEFIN double aluminum insulation 4.00 rolls 0.00 0.00

Second floor T&B waterproofing


Brush Applied Flexible Waterproofing (floor&walls) 2.00 gal 0.00 0.00

Ground floor T&B waterproofing


Brush Applied Flexible Waterproofing(floor&walls) 2.00 gal 0.00 0.00

SUB-TOTAL Php 0.00


ARCHITECTURAL FINISHES
Wall Finishes
EXWF Concrete Neutralizer 14.00 gal 0.00
0.00

BOYSEN Skimcoat #7750 25 kg 11.00 gal 0.00 0.00


BOYSEN Permacoat Latex Paint (3 coats) 8.00 pails 0.00 0.00
STONE CLADDING 1,752.00 pcs 0.00
Tile Adhessive 11.00 bag 0.00
INWF Concrete Neutralizer 16.00 gal 0.00
0.00

BOYSEN Skimcoat #7750 25 kg 4.00 pails 0.00 0.00


Latex Wall Paint 8.00 pails 0.00 0.00
Toilet Wall Tiles 513.00 pcs 0.00
Tile Adhessive 10.00 bags 0.00
Tile Grout 10.00 bags 0.00

Floor Finishes
Floor Tiles-1 (General Area= 600x600 Granite Tiles) 228.00 pcs 0.00 0.00
Floor Tiles-2 (T&B 300x300) 446.00 pcs 0.00 0.00
Tile Adhesive 25.00 bags 0.00 0.00
Tile Grout 19.00 bags 0.00 0.00
`
Ceiling Finishes
Ordinary Gypsum Board (12mm) with metal furring & accessories 34.00 pcs 0.00 0.00
Latex Paint 5.00 pails 0.00 0.00

SUB-TOTAL Php 0.00


SPECIALTY WORKS
Kitchen
Kitchen Countertop finish
Granite Slab (0.60m x 2.40m x 20mm thk x single bullnose) 17.00 pcs 0.00 0.00
Tile Adhesive 5.00 bags 0.00 0.00

SUB-TOTAL Php 0.00

TOTAL MATERIALS COST Php 0.00


Overhead & Contingencies 10% 0.00
Labor Cost 40%-60% 0.00

TOTAL DIRECT COST Php 0.00

COST PER SQM Php 0.00