ACTUAL CHEK PEKERJAAN ARSITEKTUR

PEMBANGUNAN DC MADIUN ALFA MART

VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

2 WIREHOUSE
2.3 Pekerjaan Architech

2.3.1 Pekerjaan Pas. Bata 1 : 4, Wire House Dan Gudang Kardus


Luas Bidang Kozen Bata
RD2 [ 3.00 x 3.00 ] x 1.00 = 9.00 x 14.00 Bh = 126.00
RD3 [ 3.00 x 3.40 ] x 1.00 = 10.20 x 1.00 Bh = 10.20
PB2 [ 1.60 x 2.40 ] x 1.00 = 3.84 x 2.00 Bh = 7.68
PB3 [ 1.60 x 2.50 ] x 1.00 = 4.00 x 1.00 Bh = 4.00
JK2 [ 1.50 x 1.30 ] x 1.00 = 1.95 x 12.00 Bh = 23.40
JK3 [ 2.00 x 0.90 ] x 1.00 = 1.80 x 4.00 Bh = 7.20
KR1 [ 2.00 x 1.20 ] x 1.00 = 2.40 x 4.00 Bh = 9.60
= 188.08 = 188.08 188.08 M2
A. Pasangan Batu Bata 1 : 4
Wire House
As-1 [ 5.35 x 1.00 ] x 16.00 = 85.60
[ 0.45 x 1.00 ] x 1.00 = 0.45
As-13 [ 5.70 x 3.80 ] x 2.00 = 43.32
As-15 [ 5.70 x 6.40 ] x 16.00 = 583.68
[ 0.80 x 6.40 ] x 1.00 = 5.12
As-A [ 5.83 x 3.80 ] x 1.00 = 22.13
[ 6.00 x 3.80 ] x 1.00 = 22.80
[ 6.00 x 1.00 ] x 6.00 = 36.00
[ 6.00 x 4.60 ] x 5.00 = 138.00
[ 5.83 x 4.60 ] x 1.00 = 26.79
As-B [ 6.00 x 3.80 ] x 2.00 = 45.60
As-C [ 6.00 x 3.80 ] x 2.00 = 45.60
Gudang Kardus
As-1 [ 4.00 x 3.00 ] x 1.00 = 12.00
As-7 [ 4.00 x 3.00 ] x 1.00 = 12.00
As-A' [ 36.00 x 3.00 ] x 1.00 = 108.00
= 1,187.10 - 188.08 = 999.02 = 999.02 999.02 M2
B. Pasangan Bata Roster, (Area Charger forklif)
As-1 [ 2.00 x 1.20 ] x 4.00 = 9.60
= 9.60 = 9.60 9.60 M2
C. Pek. Kolom Praktis Kp Uk. 130 x 130 MM
Beton
Wire Hause
As-1 [ 0.13 x 0.13 ] x 1.20 = 0.02 x 16.00 = 0.32
As-13 [ 0.13 x 0.13 ] x 4.00 = 0.07 x 4.00 = 0.27
As-15 [ 0.13 x 0.13 ] x 3.60 = 0.06 x 30.00 = 1.83
[ 0.13 x 0.13 ] x 6.90 = 0.12 x 1.00 = 0.12
As-A [ 0.13 x 0.13 ] x 4.00 = 0.07 x 2.00 = 0.14
[ 0.13 x 0.13 ] x 1.20 = 0.02 x 6.00 = 0.12
[ 0.13 x 0.13 ] x 4.80 = 0.08 x 6.00 = 0.49
As-B [ 0.13 x 0.13 ] x 4.00 = 0.07 x 3.00 = 0.20
As-C [ 0.13 x 0.13 ] x 4.00 = 0.07 x 4.00 = 0.27
Gudang Kardus
As-A [ 0.13 x 0.13 ] x 3.20 = 0.05 x 2.00 = 0.11
As-A' [ 0.13 x 0.13 ] x 3.20 = 0.05 x 13.00 = 0.70
= 4.56 4.56 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 270.10 x 0.62 = 666.07
Begel [ 1,544.43 x 8.00 ] x 0.46 x 0.39 = 280.31 = 946.38 946.38 Kg

Bekisting [ 0.26 x 1.00 ] x 270.10 x 1.00 = 70.23 = 70.23 70.23 M2

D. Pek. Balok Beton Type rb uk. 13 x 20 cm


Panjang Ring Balok Praktis
As-13 = 5.70 x 2.00 = 11.40
As-15 = 5.70 x 16.00 = 91.20
= 0.80 x 1.00 = 0.80
As-B = 6.00 x 2.00 = 12.00
As-C = 6.00 x 2.00 = 12.00
= 127.40

Beton [ 0.13 x 0.20 ] x 127.40 = 3.31 = 3.31 3.31 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 127.40 x 0.62 = 314.17
Begel [ 729.00 x 8.00 ] x 0.56 x 0.39 = 161.08 = 475.24 475.24 Kg

Bekisting [ 0.30 x 1.00 ] x 127.40 x 1.00 = 38.22 = 38.22 38.22 M2

E. Pek. Balok Beton rbt Uk. 13x20


Panjang Plat Kanopy Beton
As-1 = 5.70 x 16.00 = 91.20
= 0.80 x 1.00 = 0.80
As-A = 6.00 x 14.00 = 84.00
= 176.00

Beton [ 0.13 x 0.20 ] x 176.00 = 4.58


[ 0.18 x 0.10 ] x 176.00 = 3.08 = 7.66 7.66 M3

Pembesian
Tul- utama [ 6.00 x 10.00 ] x 176.00 x 0.62 = 651.02
Begel [ 1,006.71 x 8.00 ] x 0.56 x 0.39 = 222.44
Begel [ 1,006.71 x 10.00 ] x 0.20 x 0.62 = 124.13 = 997.59 997.59 Kg

Bekisting [ 0.58 x 1.00 ] x 176.00 x 1.00 = 101.20 = 101.20 101.20 M2


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
2.3.2 Pekerjaan Finishing Lantai
Finish lantai gudang super flat Floor hardener 3kg/m2 ex Besroc (Type 10)

A. Beton Plat Area Gudang As-1-15/As-A-Q'


As-A-C' = 11.40 x 64.43 = 734.44
As-C-Q' = 80.60 x 84.00 = 6,770.40
Rg. BS = 7.70 x 12.00 = 92.40
= 7,597.24 = 7,597.24 7,597.25 M2

B. Beton Plat Area Loading Dock Include Area Kantor As-15-16/As-A-T


As-15-16 = 3.50 x 107.00 = 374.50
= 374.50 = 374.50 374.50 M2

C. Beton Plat Area Gudang Kardus As-1-8/As-A'-A


As-1-8 = 42.00 x 4.00 = 168.00
= 168.00 = 168.00 168.00 M2

Finish lantai gudang flat Flowfresh MF T=3 mm Ex Flow Creed (type 11) Aplicator bebas
D. Super Flat Flowcreed u/ Parkir Forklif
= 7.58 x 11.58 = 87.68
= 87.68 = 87.68 87.68 M2

E. Super Flat Flowcreed u/ Charger Forklif


= 12.00 x 3.70 = 44.40
= 44.40 = 44.40 44.40 M2

Silen Dilatasi, termasuk material, alat bantu dan tenaga

G. Silen Dilatasi u/ Bawah Rak Sikaflek ex Sika


= 84.00 x 15.00 = 1,260.00
= 1,260.00 = 1,260.00 1,260.00 M'

2.3.3 Pekerjaan Finishing Dinding

A. Plesteran 1 : 4 Termasuk Plesteran Kolom, Balok Dan Reteining Wall


Kolom Pedestal dalam
As 15,A' T= 200 MM = 0.70 x 1.00 x 0.20 x 26.00 = 3.64
= 0.28 x 1.00 x 0.20 x 1.00 = 0.06
= 0.55 x 1.00 x 0.20 x 2.00 = 0.22
As A' T= 900 MM = 0.70 x 1.00 x 0.90 x 1.00 = 0.63
As Q, T= 200 MM = 1.05 x 1.00 x 0.20 x 12.00 = 2.52
As Q, T= 900 MM = 1.05 x 1.00 x 0.90 x 1.00 = 0.94
As 1, T= 900 MM = 0.70 x 1.00 x 0.90 x 16.00 = 10.08
= 0.28 x 1.00 x 0.90 x 1.00 = 0.25
As 3.5.8,10 T= 200 MM = 0.50 x 4.00 x 0.20 x 28.00 = 11.20
As 12 T= 900 MM = 0.50 x 4.00 x 0.90 x 7.00 = 12.60
= 42.14

Kolom Pedestal Luar


As 15, T= 200 MM = 0.70 x 1.00 x 0.20 x 16.00 = 2.24
As A' T= 1100 MM = 0.70 x 1.00 x 1.10 x 5.00 = 3.85
= 1.13 x 1.00 x 1.10 x 1.00 = 1.24
As A' T= 1800 MM = 0.70 x 1.00 x 1.80 x 1.00 = 1.26

As 1, T= 1800 MM = 0.70 x 1.00 x 1.80 x 17.00 = 21.42


= 30.01

Total Afwerking Pedestal = 42.14 + 30.01 = 72.15

Kolom K3 Uk 150 x 400 MM


Dalam T=3700 = 0.40 x 1.00 x 3.30 x 28.00 = 36.96
Dalam T=4000 = 0.40 x 1.00 x 4.00 x 2.00 = 3.20
= 40.16
Luar T=3700 = 0.55 x 1.00 x 3.30 x 28.00 = 50.82
Luar T=4000 = 0.55 x 1.00 x 4.00 x 2.00 = 4.40
= 55.22

Total Balok K3 = 40.16 + 55.22 = 95.38

Balok B3 Uk 150 x 300 MM


Dalam = 0.30 x 1.00 x 5.55 x 15.00 = 24.97
= 24.97
Luar = 0.45 x 1.00 x 3.30 x 15.00 = 22.28
= 22.28

Total Balok B3 = 24.97 + 22.28 = 47.25

Balok rb dan Plat Kanopy Uk 130 x 200 MM


dalam As 1 = 0.53 x 1.00 x 5.70 x 16.00 = 47.88
= 0.53 x 1.00 x 0.80 x 1.00 = 0.42
dalam As 15 = 0.20 x 1.00 x 5.70 x 16.00 = 18.24
= 0.20 x 1.00 x 5.70 x 1.00 = 1.14
dalam As A = 0.53 x 1.00 x 6.00 x 14.00 = 44.10
= 111.78

Luar As 1 = 0.38 x 1.00 x 5.70 x 16.00 = 34.20


= 0.38 x 1.00 x 0.80 x 1.00 = 0.30
Luar As 15 = 0.20 x 1.00 x 5.70 x 16.00 = 18.24
= 0.20 x 1.00 x 5.70 x 1.00 = 1.14
Luar As A = 0.38 x 1.00 x 6.00 x 14.00 = 31.50
= 34.20

Total Balok B3 = 111.78 + 34.20 = 145.98

Retaining Wall
Dalam
As A = 5.65 x 0.65 x 1.00 x 7.00 = 25.71
= 25.71
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Luar
As-A = 5.65 x 0.90 x 1.00 x 7.00 = 35.60
As-1 = 5.35 x 0.90 x 1.00 x 16.00 = 77.04
= 0.45 x 0.90 x 1.00 x 1.00 = 0.41
As-16 = 107.10 x 0.90 x 1.00 x 1.00 = 96.39
= 209.43
Total Retaining Wall = 25.71 + 209.43 = 235.14

Total Afwerking Beton


= 72.15 + 95.38### + 47.25 + 145.98 + 235.14 = 595.89 = 595.89 595.89 M2

Plesteran = 999.02 x 2.00 = 1,998.04


Total Plesteran = 1,998.04 + 595.89 = 2,593.93 = 2,593.93 = 2,593.93 2,593.93 M2

B.. Acian Plesteran


= 2,593.93 = 2,593.93 2,593.93 M2
Pekerjaan Pengecatan
C. Pengecatan dinding Exterior Ex. Propan
Awerking Luar = 351.13
Dinding Luar = 1,296.97
= 1,648.10 = 1,648.10 1,648.10 M2
D. Pengecatan dinding Interior Ex. Propan
Awerking Dalam = 244.76
Dinding Dalam = 1,296.97
= 1,541.73 = 1,541.73 1,541.73 M2

Pekerjaan Clading , include dan installing


E. Pek. Rangka Clading Baja CNP 150.65.20.3,2
As-1 = 92.00 x 1.00 x 11.00 = 1,012.00
As-12 = 92.00 x 1.00 x 3.00 = 276.00
As-Q = 6.25 x 1.00 x 2.00 = 12.50
= 5.85 x 1.00 x 2.00 = 11.70
= 9.20 x 1.00 x 1.00 = 9.20
= 60.70 x 1.00 x 1.00 = 60.70
= 41.15 x 1.00 x 1.00 = 41.15
= 21.60 x 1.00 x 1.00 = 21.60
= 10.00 x 1.00 x 1.00 = 10.00
As-A = 36.20 x 1.00 x 3.00 = 108.60
= 48.25 x 1.00 x 1.00 = 48.25
= 84.45 x 1.00 x 2.00 = 168.90
= 75.70 x 1.00 x 1.00 = 75.70
= 66.55 x 1.00 x 3.00 = 199.65
= 51.80 x 1.00 x 1.00 = 51.80
= 32.65 x 1.00 x 1.00 = 32.65
= 13.80 x 1.00 x 1.00 = 13.80
Gudang Kardus = 4.05 x 2.00 x 4.00 = 32.40
= 36.30 x 1.00 x 2.00 = 72.60
= 12.35 x 1.00 x 2.00 = 24.70
Tiang = 1.25 x 1.00 x 10.00 = 12.50
= 1.95 x 1.00 x 1.00 = 1.95
= 3.95 x 1.00 x 1.00 = 3.95
= 3.25 x 1.00 x 3.00 = 9.75
= 2,312.05 x 7.52 = 17,378.91 17,378.91 Kg

F. Clading MP Deck TCT 0.4 New MP Deck


As-1 = 92.00 x 10.65 x 1.00 = 979.80
As-12 = 92.00 x 1.20 x 1.00 = 110.40
As-Q = 9.05 x 0.50 x 6.15 = 27.83
= 8.85 x 0.50 x 27.20 = 120.36
= 11.10 x 0.50 x 9.15 = 50.78
= 9.30 x 0.50 x 5.60 = 26.04
= 6.30 x 0.50 x 18.50 = 58.28
= 1.90 x 0.50 x 1.25 = 1.19
= 1.90 x 0.50 x 1.25 = 1.19
As-A = 20.80 x 0.50 x 33.20 = 345.28
= 24.50 x 0.50 x 3.05 = 37.36
= 27.95 x 0.50 x 30.05 = 419.95
= 21.75 x 0.50 x 6.00 = 65.25
= 11.70 x 0.50 x 12.30 = 71.96
= 1.90 x 0.50 x 1.25 = 1.19
= 1.90 x 0.50 x 1.25 = 1.19
= 1.90 x 0.50 x 1.25 = 1.19
= 2.55 x 0.50 x 7.90 = 10.07
Gudang Kardus = 12.00 x 1.00 x 3.40 = 40.80
= 24.00 x 1.00 x 1.40 = 33.60
= 4.00 x 2.00 x 3.65 = 29.20
= 4.00 x 1.00 x 1.65 = 6.60
= 2,439.49 = 2,439.49 2,439.49 M2

G. Flasing Dinding Zincalum 0,4 TCT MP Deck


Jack Roof = 68.75 x 1.00 x 1.00 x 2.00 = 137.50
As-1, AS-12, AS-15 = 91.55 x 1.00 x 1.00 x 3.00 = 274.65
= 6.90 x 1.00 x 1.00 x 1.00 = 6.90
AS-Q = 37.35 x 1.00 x 1.00 x 1.00 = 37.35
= 31.35 x 1.00 x 1.00 x 1.00 = 31.35
AS-T = 9.90 x 1.00 x 1.00 x 1.00 = 9.90
AS-A = 43.45 x 1.00 x 1.00 x 1.00 = 43.45
= 12.45 x 1.00 x 1.00 x 1.00 = 12.45
= 553.55 = 553.55 553.55 M'
2.3.4. Pekerjaan Arsitek Pintu
Pekerjaan Pintu dan Jendela include pengadaan, installing dan accessories. Kecuali dijelaskan lain
Pekerjaan Pintu Rolling Door Material SBO, perapian openingan by kontraktor
A. Pintu Rolling Door Type RD2 (3000x3000mm) = 14.00 14.00 Unit

B. Pintu Rolling Door Type RD3 (3000x4000mm) = 1.00 1.00 Unit

C. Pintu Besi Type PB2 (1600x2400mm) = 2.00 2.00 Unit

D. Pintu Besi Type PB3 (1600x2400mm) = 1.00 1.00 Unit


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Pekerjaan Pintu & Jendela Kawat Harmonika
E. Jendela JK2 (Area Gudang Kardus)
= 1.000 x 1.000 x 12.000 = 12.000 = 12.000 12.00 Unit
F. Jendela JK3 (Area Charger Forklif)
= 1.000 x 1.000 x 4.000 = 4.000 = 4.000 4.00 Unit
G. Jendela BN1 (Wirehause)
= 1.000 x 1.000 x 24.000 = 24.000 = 24.000 24.00 Unit
H. Jendela BN2 (Wirehause)
= 1.000 x 1.000 x 32.000 = 32.000 = 32.000 32.00 Unit
I. Jendela BN3 (Wirehause)
= 1.000 x 1.000 x 16.000 = 16.000 = 16.000 16.00 Unit

2.3.5. Pekerjaan Arsitek Protektor & Stopper


Pekerjaan Protektor & stoper include pengadaan, installing dan accessories.
A. Pekerjaan Protector Type 1, Detail Lihat Gambar (''Provesional Sum'') = 13.00 13.00 Unit

B. Pekerjaan Protector Type 2, Detail Lihat Gambar (''Provesional Sum'') = 1.00 1.00 Unit

C. Pekerjaan Protector Type 2A, Detail Lihat Gambar (''Provesional Sum'') = 1.00 1.00 Unit

D. Pekerjaan Protector Type 3, Detail Lihat Gambar (''Provesional Sum'') = 1.00 1.00 Unit

E. Pekerjaan Protector Type 4, Detail Lihat Gambar (''Provesional Sum'') = 13.00 13.00 Unit

F. Pekerjaan Protector Type 5, Detail Lihat Gambar (''Provesional Sum'') = 17.00 17.00 Unit

G. Pekerjaan Stoper Type A Black PIPE Dia 2,5'' T: 3,6 mm


= 9.60 + 8.10### + 1.40 + 5.20 + 1.15 = 25.45 = 25.45 25.45 M'

2.3.6. Pekerjaan Atap


Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,45 TCT klip lock tanpa sambungan (roll on side)
Luas Atap
Jack Roof = 6.55 x 68.75 x 1.00 x 2.00 = 900.63
Gudang +1290 As (A-C)&(O-Q) = 34.45 x 11.40 x 1.00 x 2.00 = 785.46
= 34.95 x 11.40 x 1.00 x 2.00 = 796.86
As (C-O) = 29.35 x 62.70 x 1.00 x 1.00 = 1,840.25
= 29.85 x 62.70 x 1.00 x 1.00 = 1,871.60
Gudang +800 = 19.65 x 91.55 x 1.00 x 1.00 = 1,798.96
Gudang +510 = 8.00 x 91.55 x 1.00 x 1.00 = 732.40
Kanopy Forklif = 2.50 x 12.45 x 1.00 x 1.00 = 31.13
Gudang Kardus = 5.15 x 32.65 x 1.00 x 1.00 = 168.15
= 5.15 x 14.60 x 1.00 x 1.00 = 75.19
= 9,000.61
Atap Skyligt
Jack Roof = 6.55 x 0.63 x 12.00 x 2.00 = 99.51
Gudang +1290 As (A-C)&(O-Q) = 34.45 x 0.63 x 2.00 x 2.00 = 87.23
= 34.95 x 0.63 x 2.00 x 2.00 = 88.49
As (C-O) = 29.35 x 0.63 x 12.00 x 1.00 = 222.94
= 29.85 x 0.63 x 12.00 x 1.00 = 226.74
Gudang +800 = 19.65 x 0.63 x 16.00 x 1.00 = 199.02
= 923.93
Total Luas Atap = 9,000.61 - 923.93 = 8,076.68 = 8,076.68 8,076.68 M2

B. Lisplank Zincalumn T: 0,4 TCT MP Deck


Jack Roof = 0.80 x 68.75 x 1.00 x 2.00 = 110.00
= 0.80 x 6.55 x 2.00 x 2.00 = 20.96
Gudang +1290 = 1.00 x 91.55 x 1.00 x 2.00 = 183.10
= 1.00 x 1.50 x 2.00 x 2.00 = 6.00
Gudang +800 = 1.00 x 91.55 x 1.00 x 1.00 = 91.55
= 1.00 x 1.50 x 1.00 x 2.00 = 3.00
Gudang +510 = 0.80 x 91.55 x 1.00 x 1.00 = 73.24
Kanopy Forklif = 0.40 x 12.45 x 1.00 x 1.00 = 4.98
= 0.40 x 2.50 x 1.00 x 2.00 = 2.00
Gudang Kardus = 0.80 x 32.65 x 1.00 x 1.00 = 26.12
= 0.80 x 14.60 x 1.00 x 1.00 = 11.68
= 0.80 x 5.15 x 1.00 x 3.00 = 12.36
= 544.99 = 544.99 544.99 M2
C. Flasing Zincalum 0,4 TCT
Jack Roof = 6.55 x 2.00 x 1.00 x 2.00 = 26.20
Gudang +1290 = 34.45 x 1.00 x 1.00 x 2.00 = 68.90
= 34.95 x 1.00 x 1.00 x 2.00 = 69.90
Gudang +800 = 19.65 x 1.00 x 1.00 x 2.00 = 39.30
Gudang +510 = 8.00 x 1.00 x 1.00 x 2.00 = 16.00
Kanopy Forklif = 2.50 x 1.00 x 1.00 x 2.00 = 5.00
Gudang Kardus = 5.15 x 1.00 x 1.00 x 3.00 = 15.45
= 240.75 = 240.75 240.75 M'

D. Nok Atap Zincalum 0,45 TCT


= 91.55 x 1.00 x 1.00 x 1.00 = 91.55 = 91.55 91.55 M'

E. Sky light t:1,2mm ex Intec, warna putih susu. (lebar efektif 633.3 mm - 3 puncak 2 lembah)
= 923.93 = 923.93 923.93 M'
Pekerjaan Insulation, termasuk material, jasa pemasangan dan alat bantu.
F. Insulation Al- Bubble - AL T; 4mm ex Zeltech type ZT-01B
Luas Atap
Jack Roof = 5.05 x 68.75 x 1.00 x 2.00 = 694.38
Gudang +1290 As (A-C)&(O-Q) = 33.45 x 11.40 x 1.00 x 2.00 = 762.66
= 33.45 x 11.40 x 1.00 x 2.00 = 762.66
As (C-O) = 27.85 x 62.70 x 1.00 x 1.00 = 1,746.20
= 28.35 x 62.70 x 1.00 x 1.00 = 1,777.55
Gudang +800 = 18.15 x 91.55 x 1.00 x 1.00 = 1,661.63
= 7,405.07
Atap Skyligt
Jack Roof = 5.05 x 0.63 x 12.00 x 2.00 = 76.72
Gudang +1290 As (A-C)&(O-Q) = 33.45 x 0.63 x 2.00 x 2.00 = 84.70
= 33.45 x 0.63 x 2.00 x 2.00 = 84.70
As (C-O) = 27.85 x 0.63 x 12.00 x 1.00 = 211.55
= 28.35 x 0.63 x 12.00 x 1.00 = 215.35
Gudang +800 = 18.15 x 0.63 x 16.00 x 1.00 = 183.82
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 856.83
Total Luas Atap = 7,405.07 - 856.83 = 6,548.24 = 6,548.24 6,548.24 M2

Pekerjaan Saluran Air Hujan Atap


G. Pas. Talang Air U dari Fiber T= 4MM, Ex Intec Persada
= 91.55 x 1.00 x 1.00 = 91.55 = 91.55 91.55 M'
H. Pek. Bak Kontrol Saluran Air Hujan Uk. 30x30x30CM
= 1.00 x 1.00 x 17.00 = 17.00 = 17.00 17.00 Unit
2.3.7. Pekerjaan Bumper
A. Bumper Solid Rubber 80 x10x8 cm,
= 1.00 x 2.00 x 15.00 = 30.00 = 30.00 30.00 Unit
B. Siku 70.70.7 Galvanised u/bibir loading dock termasuk pekerjaan angkur
= 107.20 x 1.00 x 1.00 = 107.20 = 107.20 107.20 M'

2.4 Pekerjaan lain-lain


2.4.1. Pekerjaan lain-lain
A. Corner Dinding RG. Obat, Finish Alumunium Curve, include perapian dan alat bantu.
Dinding = 12.00 x 2.70 x 1.00 = 32.40
Lantai = 37.95 x 1.00 x 1.00 = 37.95
= 70.35 = 70.35 70.35 M'

B. List Plafond Model Curve Material Gypsum. Include perapian dan alat bantu.(Ruang Obat)
Plafon = 38.95 x 1.00 x 1.00 = 38.95 = 38.95 38.95 M'

Corner Guard Pintu Rolling Door, pekerjaan include pemasangan, material, alat bantu dan material bantu
C. Besi Siku 50.50.3,8 Termasuk Pengecatan Warna Kuning Dan Hitam
[ 1.50 x 60.00 ] x 1.00 = 90.00 = 90.00 90.00 M'

3 OFFICE
3.5 Pekerjaan Arsitek Lantai I

3.5.1. Pekerjaan Pasangan Brick Wall


Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.

A. Pasangan Batu Bata 1 : 4


Luas Bidang Kozen Bata
PJ1 [ 5.60 x 2.60 ] x 1.00 = 14.56 x 1.00 Bh = 14.56
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 6.00 Bh = 12.74
P2' [ 1.10 x 2.15 ] x 1.00 = 2.36 x 1.00 Bh = 2.36
P3 [ 0.98 x 2.15 ] x 1.00 = 2.10 x 2.00 Bh = 4.20
P4 [ 0.84 x 2.15 ] x 1.00 = 1.80 x 5.00 Bh = 9.01
P5 [ 0.69 x 2.15 ] x 1.00 = 1.48 x 8.00 Bh = 11.84
PB1 [ 1.10 x 2.15 ] x 1.00 = 2.36 x 1.00 Bh posisi=P2' = 2.36
PB2 [ 1.60 x 2.40 ] x 1.00 = 3.84 x 5.00 Bh = 19.20
RD1 [ 1.20 x 2.15 ] x 1.00 = 2.58 x 1.00 Bh = 2.58
J1K [ 1.39 x 1.59 ] x 1.00 = 2.21 x 2.00 Bh = 4.42
J2K [ 1.34 x 1.19 ] x 1.00 = 1.59 x 10.00 Bh = 15.89
J3K [ 1.74 x 1.15 ] x 1.00 = 1.99 x 3.00 Bh = 5.96
J4K [ 1.00 x 1.10 ] x 1.00 = 1.10 x 1.00 Bh = 1.10
BV1 [ 0.69 x 0.49 ] x 1.00 = 0.34 x 7.00 Bh = 2.37
BV2 [ 1.34 x 0.49 ] x 1.00 = 0.65 x 3.00 Bh = 1.96
JK [ 0.30 x 0.34 ] x 1.00 = 0.10 x 4.00 Bh = 0.41
GB1 [ 1.00 x 1.60 ] x 1.00 = 1.60 x 12.00 Bh = 19.20
JK1 [ 1.30 x 1.55 ] x 1.00 = 2.02 x 2.00 Bh = 4.03
JK4 [ 1.60 x 3.70 ] x 1.00 = 5.92 x 1.00 Bh = 5.92
[ 1.13 x 2.50 ] x 1.00 = 2.81 x 1.00 Bh = 2.81
JK5 [ 2.73 x 2.50 ] x 1.00 = 6.81 x 1.00 Bh = 6.81
JK6 [ 5.60 x 2.50 ] x 1.00 = 14.00 x 1.00 Bh = 14.00
JK7 [ 1.60 x 3.70 ] x 1.00 = 5.92 x 1.00 Bh = 5.92
[ 4.00 x 2.50 ] x 1.00 = 10.00 x 1.00 Bh = 10.00
### = 179.65 = 179.65 179.65 M2

Luas Bidang Kozen Partisi


PJ2 [ 2.90 x 2.15 ] x 1.00 = 6.22 x 3.00 Bh = 18.66
PJ3 [ 1.75 x 2.15 ] x 1.00 = 3.75 x 1.00 Bh = 3.75
PJ4 [ 3.75 x 2.15 ] x 1.00 = 8.04 x 1.00 Bh = 8.04
P1 [ 1.20 x 2.15 ] x 1.00 = 2.57 x 2.00 Bh = 5.15
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 8.00 Bh = 16.99
J5K [ 5.25 x 2.15 ] x 1.00 = 11.26 x 1.00 Bh = 11.26
= 63.86 = 63.86 63.86 M2
Luas Pas. Bata
Office
As-T [ 5.60 x 3.55 ] x 13.00 = 258.44 T= 3.55
[ 4.75 x 3.93 ] x 1.00 = 18.64 T= 3.93
[ 3.15 x 1.00 ] x 1.00 = 3.15 T= 3.55
[ 4.50 x 2.75 ] x 1.00 = 12.37 T= 2.75
[ 2.98 x 2.75 ] x 1.00 = 8.18 T= 2.75
[ 5.85 x 4.50 ] x 1.00 = 26.33 T= 4.50
[ 19.38 x 4.50 ] x 1.00 = 87.19 T= 4.50
As-S [ 3.40 x 4.50 ] x 1.00 = 15.30 T= 4.50
[ 5.60 x 4.50 ] x 8.00 = 201.60 T= 4.50
[ 2.80 x 4.50 ] x 1.00 = 12.60 T= 4.50
[ 10.35 x 4.50 ] x 1.00 = 46.57 T= 4.50
[ 3.00 x 4.50 ] x 1.00 = 13.50 T= 4.50
[ 4.65 x 4.50 ] x 1.00 = 20.93 T= 4.50
[ 2.00 x 2.75 ] x 1.00 = 5.50 T= 2.75
As-R [ 2.80 x 4.50 ] x 1.00 = 12.60 T= 4.50
[ 5.60 x 4.50 ] x 2.00 = 50.40 T= 4.50
[ 4.30 x 4.50 ] x 2.00 = 38.70 T= 4.50
As-Q' [ 5.60 x 3.55 ] x 14.00 = 278.32 T= 3.55

As-1 [ 4.60 x 3.55 ] x 3.00 = 48.99 T= 3.55


[ 5.53 x 4.50 ] x 1.00 = 24.86 T= 4.50
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 2.50 x 4.50 ] x 1.00 = 11.25 T= 4.50
As-3 [ 4.60 x 4.50 ] x 3.00 = 62.10 T= 4.50
As-5 [ 10.13 x 4.50 ] x 1.00 = 45.56 T= 4.50
As-7 [ 4.60 x 4.50 ] x 2.00 = 41.40 T= 4.50
[ 10.13 x 4.50 ] x 1.00 = 45.56 T= 4.50
As-8 [ 4.60 x 4.50 ] x 1.00 = 20.70 T= 4.50
As-9 [ 4.60 x 4.50 ] x 1.00 = 20.70 T= 4.50
[ 3.60 x 2.85 ] x 1.00 = 10.26 T= 2.85
As-10 [ 4.60 x 4.50 ] x 1.00 = 20.70 T= 4.50
[ 3.33 x 4.50 ] x 1.00 = 14.96 T= 4.50
[ 3.60 x 4.50 ] x 2.00 = 32.40 T= 4.50
[ 2.28 x 2.75 ] x 2.00 = 12.51 T= 2.75
As-11 [ 4.60 x 4.50 ] x 1.00 = 20.70 T= 4.50
[ 3.33 x 4.50 ] x 1.00 = 14.96 T= 4.50
[ 3.60 x 4.50 ] x 1.00 = 16.20 T= 4.50
As-12 [ 3.60 x 4.50 ] x 1.00 = 16.20 T= 4.50
As-13 [ 4.60 x 4.50 ] x 1.00 = 20.70 T= 4.50
[ 1.28 x 4.50 ] x 1.00 = 5.74 T= 4.50
[ 3.63 x 4.50 ] x 1.00 = 16.31 T= 4.50
As-14 [ 4.60 x 4.50 ] x 2.00 = 41.40 T= 4.50
[ 5.13 x 4.50 ] x 1.00 = 23.06 T= 4.50
[ 5.00 x 2.75 ] x 1.00 = 13.75 T= 2.75
[ 2.63 x 4.50 ] x 1.00 = 11.81 T= 4.50
As-15 [ 4.60 x 3.55 ] x 3.00 = 48.99 T= 3.55
= 1,772.11 - 179.65 = 1,592.46 = 1,592.46 1,592.46 M2

B. Pasangan Batu Bata 1 : 4 (Area Shaft)


PS [ 0.69 x 1.19 ] x 1.00 = 0.82 x 3.00 Bh = 2.46

[ 0.88 x 3.55 ] x 2.00 = 6.21 T= 3.55


[ 1.10 x 3.55 ] x 5.00 = 19.53 T= 3.55
[ 1.45 x 3.55 ] x 1.00 = 5.15 T= 3.55
[ 1.80 x 3.55 ] x 1.00 = 6.39 T= 3.55
[ 2.43 x 3.55 ] x 1.00 = 8.61 T= 3.55
[ 0.65 x 3.55 ] x 1.00 = 2.31 T= 3.55
= 48.19 - 2.46 = 45.73 = 45.73 45.73 M2

C. Pasangan Glass Block Uk. 20x20 Cm, GB1


GB1 [ 1.00 x 1.60 ] x 12.00 = 19.20 = 19.20 19.20 M2

D. Pek. Kolom Praktis Kp1 Uk. 130 x 130 MM


Beton
As-Q' [ 0.13 x 0.13 ] x 3.95 = 0.07 x 11.00 = 0.73
[ 0.13 x 0.13 ] x 1.20 = 0.02 x 3.00 = 0.06
[ 0.13 x 0.13 ] x 4.70 = 0.08 x 8.00 = 0.64
As-R [ 0.13 x 0.13 ] x 4.70 = 0.08 x 9.00 = 0.71
[ 0.13 x 0.13 ] x 4.70 = 0.08 x 19.00 = 1.51
[ 0.13 x 0.13 ] x 2.95 = 0.05 x 1.00 = 0.05
As-S [ 0.13 x 0.13 ] x 4.70 = 0.08 x 12.00 = 0.95
[ 0.13 x 0.13 ] x 4.70 = 0.08 x 28.00 = 2.22
[ 0.13 x 0.13 ] x 2.95 = 0.05 x 6.00 = 0.30
As-T [ 0.13 x 0.13 ] x 4.70 = 0.08 x 48.00 = 3.81
= 10.99 10.99 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 650.50 x 0.62 = 1,604.13
Begel [ 3,718.14 x 8.00 ] x 0.46 x 0.39 = 674.83 = 2,278.97 2,278.97 Kg

Bekisting [ 0.26 x 1.00 ] x 650.50 x 1.00 = 169.13 = 169.13 169.13 M2

E. Pek. Balok Beton Type rb uk. 13 x 20 cm


Panjang Ring Balok Praktis
As-Q = 5.60 x 1.00 = 5.60
= 2.80 x 7.00 = 19.60
= 1.00 x 2.00 = 2.00
As-R = 1.88 x 1.00 = 1.88
= 2.00 x 1.00 = 2.00
As-S = 3.40 x 1.00 = 3.40
= 2.80 x 1.00 = 2.80
= 5.60 x 1.00 = 5.60
= 1.15 x 1.00 = 1.15
= 13.50 x 1.00 = 13.50
= 3.00 x 1.00 = 3.00
= 2.13 x 1.00 = 2.13
= 3.65 x 1.00 = 3.65
As-T = 5.60 x 14.00 = 78.40
= 0.98 x 2.00 = 1.95
= 1.10 x 5.00 = 5.50
= 1.08 x 1.00 = 1.08
= 2.13 x 1.00 = 2.13

As-1 = 4.60 x 3.00 = 13.80


As-8 = 4.60 x 1.00 = 4.60
As-10 = 2.58 x 1.00 = 2.58
As-11 = 3.60 x 1.00 = 3.60
As-14 = 1.30 x 2.00 = 2.60
= 5.13 x 1.00 = 5.13
= 7.61 x 1.00 = 7.61
= 195.26
Beton [ 13.00 x 0.20 ] x 195.26 = 507.68 = 507.68 507.68 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 195.26 x 0.62 = 481.52
Begel [ 1,116.79 x 8.00 ] x 26.34 x 0.39 = 11,606.43 = 12,087.95 12,087.95 Kg

Bekisting [ 0.20 x 2.00 ] x 195.26 x 1.00 = 78.10 = 78.10 78.11 M2


F, Pek. Plat Kanopy Beton T=100 MM L=600 MM
Panjang Plat Kanopy Beton
As-1 = 1.40 x 1.00 = 1.40
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
As-T = 1.40 x 10.00 = 14.00
= 0.90 x 5.00 = 4.50
= 19.90

Beton [ 0.60 x 0.10 ] x 19.90 = 1.19 = 1.19 1.19 M3

Pembesian
Tul- utama [ 5.00 x 8.00 ] x 19.90 x 0.39 = 39.26
Begel [ 200.00 x 8.00 ] x 0.63 x 0.39 = 49.71 = 88.97 88.97 Kg

Bekisting [ 0.70 x 1.00 ] x 19.90 x 1.00 = 13.93 = 13.93 13.93 M2

3.5.2. Pekerjaan Finishing Lantai


Pekerjaan Homogenius tile 600x600mm type Antique White Ex.Sandimas, include material, adukan dan tenaga kerja.
A. Homogenius tile Area Office
1 = 220.30
2 = 292.01
3 = 88.17
4 = 14.30
5 = 9.94
6 = 20.23
7 = 39.29
8 = 15.93
9 = 22.37
= 722.54 = 722.54 722.54 M2

B. Homogenius tile Area Tangga Utama + Stopnozing


Utama [ 1.50 x 0.48 ] x 23.00 = 16.66
= 16.66 = 16.66 16.66 M2
C. Plin Dinding Homogenius Tile
1 = 109.70 - 10.40 = 99.30
2 = 122.60 - 12.23 = 110.38
3 = 38.95 - 0.90 = 38.05
4 = 14.30 - 1.80 = 12.50
5 = 12.90 - 0.90 = 12.00
6 = 19.30 - 0.90 = 18.40
7 = 28.25 - 1.00 = 27.25
8 = 17.80 - 0.90 = 16.90
9 = 19.20 - 1.35 = 17.85
= 352.63 = 352.63 352.63 M'

Pekerjaan Homogenius tile 600x600mm Type Salsa Crystal Black , include material, adukan dan tenaga kerja.
D. Homogenius tile Area Entrance Depan
= 11.18 = 11.18 11.18 M2
E. Homogenius tile Area Tangga Entrance Depan + Stopnozing
[ 6.40 x 0.48 ] x 5.00 = 15.36 = 15.36 15.36 M2

Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
F. Keramik Area Lobby Samping + Tangga
= 13.98 + 4.32 = 18.30 18.30 M2

G. Keramik Area Tangga Samping + Stopnozing


Samping [ 1.50 x 0.48 ] x 23.00 = 16.66
= 16.66 = 16.66 16.66 M2
H. Plin Dinding Keramik
= 9.70 = 9.70 9.70 M'

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
I. Keramik Area Toilet, Pantry dan Janitor
Tempat Wudhuk[ 4.85 x 1.35 ] x 1.00 = 6.55
Pantry [ 2.50 x 2.35 ] x 1.00 = 5.88
[ 3.45 x 1.35 ] x 1.00 = 4.66
Janitor [ 1.85 x 2.35 ] x 1.00 = 4.35
Toilet [ 3.85 x 1.23 ] x 1.00 = 4.72
[ 3.85 x 1.13 ] x 1.00 = 4.33
[ 2.50 x 2.35 ] x 2.00 = 11.75
[ 1.85 x 1.10 ] x 4.00 = 8.14
[ 3.45 x 1.35 ] x 1.00 = 4.66
[ 2.20 x 1.73 ] x 2.00 = 7.57
[ 1.35 x 1.73 ] x 3.00 = 6.99
= 69.58 = 69.58 69.58 M2
Lantai finish Floor hardener, include material, tenaga kerja dan alat bantu
J. Finishing floor hardener area G. MKT, G.GA, G.COKELAT, R. ATK Dan R. Rokok
= 78.69 + 82.51 + 147.99 + 28.64 + 71.48 = 409.31 = 409.31 409.31 M2

3.5.3. Pekerjaan Finishing Dinding


A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran Kolom, Balok Dan Reteining Wall
Plesteran Beton
Kolom 40x40cm (Luar) [ 0.65 x 4.90 ] x 3.00 = 9.56
[ 0.53 x 4.90 ] x 1.00 = 2.57
[ 0.50 x 4.90 ] x 4.00 = 9.80
[ 0.50 x 4.20 ] x 2.00 = 4.20
[ 0.45 x 4.20 ] x 1.00 = 1.89
[ 0.45 x 4.20 ] x 1.00 = 1.89
[ 0.73 x 4.20 ] x 1.00 = 3.05
[ 0.65 x 4.20 ] x 2.00 = 5.46
Kolom 40x40cm (dalam) [ 1.60 x 3.70 ] x 7.00 = 41.44
[ 1.45 x 3.70 ] x 17.00 = 91.21
[ 0.65 x 3.70 ] x 9.00 = 21.65
[ 0.33 x 3.70 ] x 2.00 = 2.41
[ 0.65 x 3.70 ] x 2.00 = 4.81
[ 1.25 x 3.70 ] x 1.00 = 4.63
[ 0.50 x 3.70 ] x 1.00 = 1.85
[ 0.25 x 3.70 ] x 6.00 = 5.55
[ 0.65 x 3.70 ] x 8.00 = 19.24
[ 0.38 x 3.70 ] x 2.00 = 2.78
[ 0.65 x 4.20 ] x 13.00 = 35.49
[ 0.25 x 4.20 ] x 2.00 = 2.10
= 271.55
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Balok 30/40 Luar [ 5.60 x 0.50 ] x 13.00 = 36.40
Dalam [ 5.60 x 0.50 ] x 14.00 = 39.20
Samping [ 4.60 x 0.50 ] x 6.00 = 13.80

= 89.40
Balok Praktis rb [ 195.26 x 0.20 ] x 2.00 = 78.10
Kanopy Beton [ 0.70 x 19.90 ] x 1.00 = 13.93
Reatining wall [ 5.60 x 0.70 ] x 13.00 = 50.96
[ 4.60 x 0.70 ] x 3.00 = 9.66
= 152.65

Total luasPlesteran beton = 271.55 + 89.40 + 152.65 = 513.60

Plesteran 1 : 4 Dinding Bata


= 1,592.46 x 2.00 = 3,184.92 - 182.58 = 3,002.35

Plesteran 1 : 4 Dinding Bata Dinding Syaaf


= 45.73 x 1.00 = 45.73 = 45.73

Plesteran Beton = 513.60


Plesteran 1 : 4 Dinding Bata = 3,002.35
Plesteran 1 : 4 Dinding Bata Dinding Syaaf = 45.73
= 3,561.68 = 3,561.68 3,561.68 M2

B. Acian Plesteran
As-T [ 5.60 x 3.55 ] x 13.00 = 258.44 T= 3.55
[ 4.75 x 3.93 ] x 1.00 = 18.64 T= 3.93
[ 3.15 x 1.00 ] x 1.00 = 3.15 T= 3.55
[ 4.50 x 2.75 ] x 1.00 = 12.37 T= 2.75
[ 2.98 x 2.75 ] x 1.00 = 8.18 T= 2.75
[ 5.85 x 3.85 ] x 1.00 = 22.52 T= 3.85
[ 19.38 x 3.85 ] x 1.00 = 74.59 T= 3.85
As-S [ 3.40 x 3.85 ] x 1.00 = 13.09 T= 3.85
[ 5.60 x 3.85 ] x 8.00 = 172.48 T= 3.85
[ 2.80 x 3.85 ] x 1.00 = 10.78 T= 3.85
[ 10.35 x 3.85 ] x 1.00 = 39.85 T= 3.85
[ 3.00 x 3.85 ] x 1.00 = 11.55 T= 3.85
[ 4.65 x 3.85 ] x 1.00 = 17.90 T= 3.85
[ 2.00 x 2.75 ] x 1.00 = 5.50 T= 2.75
As-R [ 2.80 x 3.85 ] x 1.00 = 10.78 T= 3.85
[ 5.60 x 3.85 ] x 2.00 = 43.12 T= 3.85
[ 4.30 x 3.85 ] x 2.00 = 33.11 T= 3.85
As-Q' [ 5.60 x 3.55 ] x 14.00 = 278.32 T= 3.55

As-1 [ 4.60 x 3.55 ] x 3.00 = 48.99 T= 3.55


[ 5.53 x 3.85 ] x 1.00 = 21.27 T= 3.85
[ 2.50 x 3.85 ] x 1.00 = 9.63 T= 3.85
As-3 [ 4.60 x 3.85 ] x 3.00 = 53.13 T= 3.85
As-5 [ 10.13 x 3.85 ] x 1.00 = 38.98 T= 3.85
As-7 [ 4.60 x 3.85 ] x 2.00 = 35.42 T= 3.85
[ 10.13 x 3.85 ] x 1.00 = 38.98 T= 3.85
As-8 [ 4.60 x 3.85 ] x 1.00 = 17.71 T= 3.85
As-9 [ 4.60 x 3.85 ] x 1.00 = 17.71 T= 3.85
[ 3.60 x 2.85 ] x 1.00 = 10.26 T= 2.85
As-10 [ 4.60 x 3.85 ] x 1.00 = 17.71 T= 3.85
[ 3.33 x 3.85 ] x 1.00 = 12.80 T= 3.85
[ 3.60 x 3.85 ] x 2.00 = 27.72 T= 3.85
[ 2.28 x 2.75 ] x 2.00 = 12.51 T= 2.75
As-11 [ 4.60 x 3.85 ] x 1.00 = 17.71 T= 3.85
[ 3.33 x 3.85 ] x 1.00 = 12.80 T= 3.85
[ 3.60 x 3.85 ] x 1.00 = 13.86 T= 3.85
As-12 [ 3.60 x 3.85 ] x 1.00 = 13.86 T= 3.85
As-13 [ 4.60 x 3.85 ] x 1.00 = 17.71 T= 3.85
[ 1.28 x 3.85 ] x 1.00 = 4.91 T= 3.85
[ 3.63 x 3.85 ] x 1.00 = 13.96 T= 3.85
As-14 [ 4.60 x 3.85 ] x 2.00 = 35.42 T= 3.85
[ 5.13 x 3.85 ] x 1.00 = 19.73 T= 3.85
[ 5.00 x 2.75 ] x 1.00 = 13.75 T= 2.75
[ 2.63 x 3.85 ] x 1.00 = 10.11 T= 3.85
As-15 [ 4.60 x 3.55 ] x 3.00 = 48.99 T= 3.55
= 1,620.01 - 179.65 = 1,440.36

Pasangan Batu Bata 1 : 4 (Area Syaff)


[ 0.88 x 3.55 ] x 2.00 = 6.21 T= 3.55
[ 1.10 x 3.55 ] x 5.00 = 19.53 T= 3.55
[ 1.45 x 3.55 ] x 1.00 = 5.15 T= 3.55
[ 1.80 x 3.55 ] x 1.00 = 6.39 T= 3.55
[ 2.43 x 3.55 ] x 1.00 = 8.61 T= 3.55
[ 0.65 x 3.55 ] x 1.00 = 2.31 T= 3.55
= 48.19 - 2.46 = 45.73

Total Luas Acian - Luas Dinding Keramik


Plesteran Beton = 513.60 x 1.00 = 513.60
Plesteran Dinding = 1,440.36 x 2.00 - 182.58 = 2,698.15
Plesteran Syaff = 45.73 x 1.00 = 45.73
= 3,257.48 = 3,257.48 3,257.48 M2

C. Plesteran 1:4, Opening Kusen + Acian


PJ1 [ 5.60 x 1.00 ] x 1.00 = 5.60 x 1.00 Bh = 5.60
P2 [ 0.99 x 1.00 ] x 1.00 = 0.99 x 6.00 Bh = 5.94
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 6.00 Bh = 25.74
P2' [ 1.10 x 1.00 ] x 1.00 = 1.10 x 1.00 Bh = 1.10
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P3 [ 0.98 x 1.00 ] x 1.00 = 0.98 x 2.00 Bh = 1.96
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 2.00 Bh = 8.58
P4 [ 0.84 x 1.00 ] x 1.00 = 0.84 x 5.00 Bh = 4.20
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 5.00 Bh = 21.45
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
P5 [ 0.69 x 1.00 ] x 1.00 = 0.69 x 8.00 Bh = 5.52
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 8.00 Bh = 34.32
PS [ 0.69 x 2.00 ] x 1.00 = 1.38 x 3.00 Bh = 4.14
[ 1.19 x 3.00 ] x 1.00 = 3.57 x 3.00 Bh = 10.71
PB2 [ 1.60 x 1.00 ] x 1.00 = 1.60 x 7.00 Bh = 11.20
[ 2.40 x 2.00 ] x 1.00 = 4.80 x 7.00 Bh = 33.60
RD1 [ 1.20 x 1.00 ] x 1.00 = 1.20 x 1.00 Bh = 1.20
[ 2.15 x 2.00 ] x 1.00 = 4.30 x 1.00 Bh = 4.30
J1K [ 1.39 x 2.00 ] x 1.00 = 2.78 x 2.00 Bh = 5.56
[ 1.59 x 2.00 ] x 1.00 = 3.18 x 2.00 Bh = 6.36
J2K [ 1.34 x 2.00 ] x 1.00 = 2.67 x 10.00 Bh = 26.70
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 10.00 Bh = 23.80
J3K [ 1.74 x 2.00 ] x 1.00 = 3.47 x 3.00 Bh = 10.41
[ 1.15 x 2.00 ] x 1.00 = 2.29 x 3.00 Bh = 6.87
J4K [ 1.00 x 2.00 ] x 1.00 = 2.00 x 1.00 Bh = 2.00
[ 1.10 x 2.00 ] x 1.00 = 2.20 x 1.00 Bh = 2.20
BV1 [ 0.69 x 2.00 ] x 1.00 = 1.38 x 7.00 Bh = 9.66
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 7.00 Bh = 6.86
BV2 [ 1.34 x 2.00 ] x 1.00 = 2.67 x 3.00 Bh = 8.01
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 3.00 Bh = 2.94
JK [ 0.30 x 2.00 ] x 1.00 = 0.60 x 4.00 Bh = 2.40
[ 0.34 x 2.00 ] x 1.00 = 0.68 x 4.00 Bh = 2.70
JK1 [ 1.30 x 2.00 ] x 1.00 = 2.60 x 2.00 Bh = 5.20
[ 1.55 x 2.00 ] x 1.00 = 3.10 x 2.00 Bh = 6.20
JK4 [ 1.60 x 1.00 ] x 1.00 = 1.60 x 1.00 Bh = 1.60
[ 3.70 x 2.00 ] x 1.00 = 7.40 x 1.00 Bh = 7.40
[ 1.13 x 2.00 ] x 1.00 = 2.25 x 1.00 Bh = 2.25
JK5 [ 2.73 x 2.00 ] x 1.00 = 5.45 x 1.00 Bh = 5.45
[ 2.50 x 2.00 ] x 1.00 = 5.00 x 1.00 Bh = 5.00
JK6 [ 5.60 x 2.00 ] x 1.00 = 11.20 x 1.00 Bh = 11.20
[ 2.50 x 2.00 ] x 1.00 = 5.00 x 1.00 Bh = 5.00
JK7 [ 1.60 x 1.00 ] x 1.00 = 1.60 x 1.00 Bh = 1.60
[ 3.70 x 2.00 ] x 1.00 = 7.40 x 1.00 Bh = 7.40
[ 4.00 x 2.00 ] x 1.00 = 8.00 x 1.00 Bh = 8.00
= 366.62 = 366.62 366.62 M'

D. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan Janitor)


Toilet 1 [ 9.40 x 2.00 ] - 5.13 = 13.67 x 1.00 = 13.67
[ 7.45 x 2.00 ] - 5.13 = 9.77 x 1.00 = 9.77
[ 6.15 x 2.00 ] - 1.38 = 10.92 x 2.00 = 21.84
[ 5.90 x 2.00 ] - 1.38 = 10.42 x 2.00 = 20.84
[ 8.65 x 1.60 ] - 1.10 = 12.74 x 1.00 = 12.74
[ 9.78 x 1.60 ] - - = 15.64 x 1.00 = 15.64
Toilet 2 [ 9.60 x 2.00 ] - 5.13 = 14.07 x 1.00 = 14.07
[ 7.45 x 2.00 ] - 1.68 = 13.22 x 1.00 = 13.22
[ 7.84 x 2.00 ] - 4.44 = 11.24 x 1.00 = 11.24
[ 7.46 x 2.00 ] - 2.22 = 12.70 x 1.00 = 12.70
[ 5.70 x 2.00 ] - 1.38 = 10.02 x 2.00 = 20.04
[ 7.55 x 2.00 ] - 1.38 = 13.72 x 1.00 = 13.72
= 179.49 = 179.49 179.49 M2

E. Pas. Keramik Dinding Uk. 300x300 MM (Pantry)


Toilet 1 [ 2.50 x 0.60 ] = 1.50 x 1.00 = 1.50
Toilet 2 [ 2.65 x 0.60 ] = 1.59 x 1.00 = 1.59
= 3.09 = 3.09 3.09 M2

Pekerjaan Pengecatan
F. Pengecatan dinding Exterior Ex. Propan
Dinding = 3,257.48 x 0.40 = 1,302.99
= 1,302.99 = 1,302.99 1,302.99 M2
G. Pengecatan dinding Interior Ex. Propan
Dinding = 3,257.48 x 0.60 = 1,954.49
= 1,954.49 = 1,954.49 1,954.49 M2

H. Pekerjaan Naad dan Perapian Dinding Atas Keramik Termasuk Plin Dinding
[ 9.40 x 1.00 ] - 2.91 = 6.49 x 1.00 = 6.49
[ 7.45 x 1.00 ] - 2.91 = 4.54 x 1.00 = 4.54
[ 6.15 x 1.00 ] - 0.69 = 5.46 x 2.00 = 10.92
[ 5.90 x 1.00 ] - 0.69 = 5.21 x 2.00 = 10.42
[ 9.78 x 1.60 ] - - = 15.64 x 1.00 = 15.64
[ 8.65 x 1.00 ] - 1.10 = 7.55 x 1.00 = 7.55
[ 9.60 x 1.00 ] - 2.91 = 6.69 x 1.00 = 6.69
[ 7.45 x 1.00 ] - 0.84 = 6.61 x 1.00 = 6.61
[ 7.84 x 1.00 ] - 2.22 = 5.62 x 1.00 = 5.62
[ 7.46 x 1.00 ] - 2.22 = 5.24 x 1.00 = 5.24
[ 5.70 x 1.00 ] - 0.69 = 5.01 x 2.00 = 10.02
[ 7.55 x 1.00 ] - 0.69 = 6.86 x 1.00 = 6.86
[ 2.50 x 1.00 ] = 2.50 x 1.00 = 2.50
[ 2.65 x 1.00 ] = 2.65 x 1.00 = 2.65
Plin Dinidng = 362.33
= 464.07 = 464.07 464.07 M'

I. Pekerjaan Naad dan Pearapian Dinding Luar


[ 5.45 x 2.00 ] = 10.90 x 12.00 = 130.80
[ 3.60 x 2.00 ] = 7.20 x 12.00 = 86.40
[ 4.50 x 1.00 ] = 4.50 x 1.00 = 4.50
[ 4.30 x 2.00 ] = 8.60 x 1.00 = 8.60
[ 4.60 x 1.00 ] = 4.60 x 1.00 = 4.60
[ 4.30 x 2.00 ] = 8.60 x 1.00 = 8.60
[ 4.60 x 2.00 ] = 9.20 x 3.00 = 27.60
[ 3.60 x 2.00 ] = 7.20 x 3.00 = 21.60
= 292.70 = 292.70 292.70 M'
3.5.4. Pekerjaan Dinding Partisi
Pekerjaan Dinding Partisi Gypsum Termasuk Rangka dan Pengecatan
A. Pek. Partisi gypsum Dua Sisi H: 3.700 MM, include rangka dan finishing cat
[ 4.60 x 3.70 ] x 1.00 = 17.02
[ 6.00 x 3.70 ] x 1.00 = 22.20
[ 3.00 x 3.70 ] x 1.00 = 11.10
[ 4.40 x 3.70 ] x 2.00 = 32.56
[ 5.20 x 3.70 ] x 1.00 = 19.24
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 6.13 x 3.70 ] x 1.00 = 22.66
[ 4.60 x 3.70 ] x 2.00 = 34.04
[ 10.13 x 3.70 ] x 1.00 = 37.46
[ 3.53 x 3.70 ] x 2.00 = 26.09
[ 1.20 x 3.70 ] x 2.00 = 8.88
= 231.25 - 17.89 = 213.36 = 213.36 213.36 M2

Kusen Partisi 3.700


P1 [ 1.20 x 2.15 ] x 1.00 = 2.57 x 2.00 Bh = 5.15
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 6.00 Bh = 12.74
= 17.89
B Pek. Partisi gypsum Dua Sisi H: 2.700 MM, include rangka dan finishing cat
[ 18.00 x 2.70 ] x 1.00 = 48.60
[ 2.90 x 2.70 ] x 3.00 = 23.49
[ 3.00 x 2.70 ] x 2.00 = 16.20
[ 5.60 x 2.70 ] x 1.00 = 15.12
[ 5.00 x 2.70 ] x 1.00 = 13.50
= 116.91 - 45.97 = 70.94 = 70.94 70.94 M2
Kusen Partisi 2.700
PJ2 [ 2.90 x 2.15 ] x 1.00 = 6.22 x 3.00 Bh = 18.66
PJ3 [ 1.75 x 2.15 ] x 1.00 = 3.75 x 1.00 Bh = 3.75
PJ4 [ 3.75 x 2.15 ] x 1.00 = 8.04 x 1.00 Bh = 8.04
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 2.00 Bh = 4.25
J5K [ 5.25 x 2.15 ] x 1.00 = 11.26 x 1.00 Bh = 11.26
= 45.97

C Pek. Partisi gypsum Dua Sisi H: 1.200 MM, include rangka dan finishing cat
[ 1.53 x 1.20 ] x 1.00 = 1.83
[ 0.30 x 1.20 ] x 2.00 = 0.72
[ 4.40 x 1.20 ] x 1.00 = 5.28
[ 4.60 x 1.20 ] x 1.00 = 5.52
= 13.35 x 2.00 = 26.70 = 26.70 26.70 M2

D. Pek. Partisi Ruang Lobby Multiplek Fin. HPL dan Kalsi Part T=8 MM Fin.Cat Castle Grey Propan
[ 5.85 x 2.70 ] x 1.00 = 15.80 = 15.80 15.80 M2

E. Plin Bawah Dinding Partisi Multiplek T=18 MM Uk. 18x100 MM, Fin. HPL
[ 24.00 x 1.00 ] x 1.00 = 24.00
[ 4.60 x 1.00 ] x 1.00 = 4.60
[ 3.00 x 1.00 ] x 6.00 = 18.00
[ 4.40 x 1.00 ] x 2.00 = 8.80
[ 5.20 x 1.00 ] x 1.00 = 5.20
[ 6.13 x 1.00 ] x 1.00 = 6.13
[ 4.60 x 1.00 ] x 2.00 = 9.20
[ 10.13 x 1.00 ] x 1.00 = 10.13
[ 3.53 x 1.00 ] x 2.00 = 7.05
[ 5.60 x 1.00 ] x 1.00 = 5.60
[ 5.00 x 1.00 ] x 1.00 = 5.00
= 103.70 - 27.37 = 76.33 x 2.00 = 152.66 152.66 M'
F. Profil U Dinding Partisi Multiplek T=18 MM Uk. 5 x10 Cm, Fin. HPL
[ 1.53 x 1.00 ] x 1.00 = 1.53
[ 0.30 x 1.00 ] x 2.00 = 0.60
[ 4.40 x 1.00 ] x 1.00 = 4.40
[ 4.60 x 1.00 ] x 1.00 = 4.60
= 11.13 x 1.00 = 11.13 = 11.13 11.13 M'

3.5.5. Pekerjaan Arsitek Pintu


Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium
A. Pintu Type P1 = 2.00 2.00 Unit
B. Pintu Type P2 = 14.00 14.00 Unit
C. Pintu Type P2' = 1.00 1.00 Unit
D. Pintu Type P3 = 2.00 2.00 Unit
E. Pintu Type P4 = 5.00 5.00 Unit
F. Pintu Type P5 = 8.00 8.00 Unit
G. Pintu Type PS = 3.00 3.00 Unit

Pekerjaan Pintu Besi


H. Pintu Type PB1 = 1.00 1.00 Unit
I. Pintu Type PB2 = 5.00 5.00 Unit

Pekerjaan Pintu Rolling Door, Material dan pemasangan Supplay By Owner. Perapian openingan include kontraktor
J. Pintu Rolling Door Type RD1 = 1.00 1.00 Unit

Pintu dan Jendela alumunium


Pekerjaan pintu jendela, detail accessories Lihat Di DWS
K. Pintu Dan Jendela Type PJ1 = 1.00 1.00 Unit
L Pintu Dan Jendela Type PJ2 = 3.00 3.00 Unit
M. Pintu Dan Jendela Type PJ3 = 1.00 1.00 Unit
N. Pintu Dan Jendela Type PJ4 = 1.00 1.00 Unit

Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesiries.
O. Jendela Kawat harmonika Type JK1 = 2.00 2.00 Unit
P. Jendela Kawat harmonika Type JK4 = 1.00 1.00 Unit
Q. Jendela Kawat harmonika Type JK5 = 1.00 1.00 Unit
R. Jendela Kawat harmonika Type JK6 = 1.00 1.00 Unit
S. Jendela Kawat harmonika Type JK7 = 1.00 1.00 Unit

3.5.6. Pekerjaan Arsitek Jendela


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1K = 2.00 2.00 Unit
B. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K = 10.00 10.00 Unit
C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J3K = 3.00 3.00 Unit
D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J4K = 1.00 1.00 Unit
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1 = 7.00 7.00 Unit
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV2 = 3.00 3.00 Unit
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type JK = 4.00 4.00 Unit

3.5.7. Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
A. Pekerjaan plafond gypsum tile 600x1200 T: 9 mm Exrd + rangka cross tee main tee.
Rg Server [ 5.00 x 4.00 ] x 1.00 = 20.00
Rg. Utilitas [ 5.00 x 2.00 ] x 1.00 = 10.00
= 30.00 = 30.00 30.00 M2
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
B. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 area lobby
Lobby = 113.14
Dealing, laktasi [ 3.10 x 2.90 ] x 4.00 = 35.96
meting 1 [ 5.90 x 3.10 ] x 1.00 = 18.29
Rg. Panel [ 3.45 x 2.85 ] x 1.00 = 9.83
Meeting 2 [ 3.45 x 5.85 ] x 1.00 = 20.18
Brancas [ 5.85 x 4.85 ] x 1.00 = 28.37
[ 3.00 x 3.45 ] x 1.00 = 10.35
Pantry [ 2.50 x 2.35 ] x 1.00 = 5.88
[ 3.45 x 1.35 ] x 1.00 = 4.66
Janitor [ 1.85 x 2.35 ] x 1.00 = 4.35
Toilet [ 3.85 x 1.23 ] x 1.00 = 4.72
[ 3.85 x 1.13 ] x 1.00 = 4.33
[ 2.50 x 2.35 ] x 2.00 = 11.75
[ 1.85 x 1.10 ] x 4.00 = 8.14
[ 3.45 x 1.35 ] x 1.00 = 4.66
[ 2.20 x 1.73 ] x 2.00 = 7.57
[ 1.35 x 1.73 ] x 3.00 = 6.99
= 299.16 = 299.16 299.16 M2

C. Pekerjaan plafond spandrel alumunium termasuk rangka


[ 9.30 x 5.75 ] x 1.00 = 53.48
= 53.48 = 53.48 53.48 M2

D. Pekerjaan plafond beton exposed area Gudang


G. MKT = 78.69
G.GA = 82.51
G.COKELAT = 147.99
R. ATK = 28.64
R. Rokok = 71.48
G. Obat = 88.17
LP [ 5.85 x 4.85 ] x 1.00 = 28.37
Audit [ 5.90 x 3.10 ] x 1.00 = 18.29
Tif & Gudang [ 2.85 x 2.35 ] x 2.00 = 13.40
C.delivery [ 5.85 x 2.78 ] x 1.00 = 16.23
Mushalla [ 4.85 x 4.35 ] x 1.00 = 21.10
Selasar Toilet [ 4.85 x 1.35 ] x 1.00 = 6.55
Wudhuk [ 4.85 x 1.35 ] x 1.00 = 6.55
= 607.96 = 607.96 607.96 M2

E. Drop Cilling area lobby


= 11.80 + 17.40 = 29.20 = 29.20 29.20 M2

Pekerjaan Pengecatan
F. Pekerjaan cat plafond gypsum board & beton exposed dibawah tangga
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Plafond Gipsum = 299.16
Plafon Expose = 607.96
Bawah Tangga = 26.79
= 933.91 = 933.91 933.91 M2

3.5.8. Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas = 3.00 3.00 Unit
B. Partition Urinal A100 Ex Toto = 8.00 8.00 Unit
C. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hanya pemasangan dan instalasi = 5.00 5.00 Unit
D. Kran Dinding Type Y 20JC Ex San Ei = 5.00 5.00 Unit
E. Floor Drain Dia 4" Type H51 Ex SAN EI = 9.00 9.00 Unit
F. Shower Spray S403SBW Ex. TOTO hanya pemasangan dan instalasi = 5.00 5.00 Unit
G. Closet Duduk Type CW 421 J/SW 420 JP Ex. TOTO hanya pemasangan dan instalasi = 5.00 5.00 Unit
H. Urinoir type U57M Ex TOTO = 5.00 5.00 Unit
I. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran 600mm x 800mm) = 5.00 5.00 Unit
J. Kitchen zick Single Bowl Ex Royal = 2.00 2.00 Unit
K. Kran Pantry Model Leher Angsa A10C Ex SAN EI = 2.00 2.00 Unit

3.5.9. Pekerjaan Entrance


A. Pas. Alumunium Composite panel Ex. Alucopan, Untuk Kanopi Entrance Depan

Tiang [ 2.40 x 3.35 ] x 2.00 = 16.08


Kanopy [ 1.85 x 21.30 ] x 1.00 = 39.41
= 55.49 = 55.49 55.49 M2
B. Pek. Ramp Teras Lobby Include Grove (Pekerjaan Beton T=70 MM, Pembesian Wiremesh M6-150 dan Perapian = 2.00 2.00 Ls

C. Pek. Planter Box + Batu Alam Dinding, (include pekerjaan struktural planter box dan Finishing) = 2.00 2.00 Ls

3.5.10. Pekerjaan Lain-Lain


A. Pek. Hand Railling Tangga Lobby (Pipa Stainlesstell 2,5'' Dan 2")
= 12.90 12.90 M'
B. Pek. Hand Railling Tangga Lobby Samping (Pipa Stainlesstell 2,5'' Dan 2")
= 8.40 8.40 M'
C. Pek. Hand Railling Tangga Samping (Pipa Stainlesstell 2")
= 7.30 7.30 M'
D Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. keramik 300 x300 mm ex. IKAD
Toilet 1 [ 2.50 x 0.60 ] = 1.50 x 1.00 = 1.50
Toilet 2 [ 2.65 x 0.60 ] = 1.59 x 1.00 = 1.59
= 3.09 = 3.09 3.09 M2
E. Tanggulan Janitor dan Tempat Wudhu, include pasangan bata, pasangan keramik, jasa pemasangan dan perapian
Toilet 1 [ 4.35 x 1.00 ] = 4.35 x 1.00 = 4.35
Toilet 2 [ 1.20 x 1.00 ] = 1.20 x 1.00 = 1.20
= 5.55 = 5.55 5.55 M'

F. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu dan perapian.
Toilet 1 [ 0.75 x 1.10 ] = 0.83 x 2.00 = 1.65
Toilet 2 [ 0.75 x 1.35 ] = 1.01 x 1.00 = 1.01
= 2.66 = 2.66 2.66 M2
Corner Guard Pintu Rolling Door RD1, pekerjaan include pemasangan, material, alat bantu dan material bantu
G. Besi Siku 50.50.3.8 Termasuk Pengecatan (dua warna Kuning dan Hitam)
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 1.50 x 2.00 ] x 1.00 = 3.00 = 3.00 3.00 M'

Pekerjaan Atap Kanopy Lobby Depan dan Samping


H. Atap Zincalum 0,45 TCT klip lock
Depan = 5.68 x 9.90 x 1.00 = 56.18
Samping = 2.53 x 9.90 x 1.00 = 25.00
= 81.18 = 81.18 81.18 M2
I. Lisplank Zincalumn T: 0,4 TCT MP Deck
= 9.90 x 0.50 x 1.00 = 4.95
= 2.53 x 0.65 x 2.00 = 3.28
= 8.23 = 8.23 8.23 M2
J. Flasing Zincalum 0,4 TCT
= 9.90 x 2.00 x 1.00 = 19.80
= 5.68 x 2.00 x 1.00 = 11.35
= 9.90 x 1.00 x 1.00 = 9.90
= 2.53 x 2.00 x 1.00 = 5.05
= 46.10 = 46.10 46.10 M2

Pekerjaan Saluran Air Hujan Atap


K. Pas. Talang Air U dari Fiber T= 4MM, Ex Intec Persada
= 9.90 x 1.00 x 1.00 = 9.90 = 9.90 9.90 M'

3.6 Pekerjaan Arsitek Lantai II

3.6.1. Pekerjaan Pasangan Brick Wall


Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
P1 [ 1.20 x 2.15 ] x 1.00 = 2.57 x 1.00 Bh = 2.57
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 1.00 Bh = 2.12
P3 [ 0.89 x 2.15 ] x 1.00 = 1.91 x 1.00 Bh = 1.91
P4 [ 0.84 x 2.15 ] x 1.00 = 1.80 x 5.00 Bh = 9.01
P5 [ 0.69 x 2.15 ] x 1.00 = 1.48 x 8.00 Bh = 11.84
PS [ 0.69 x 1.19 ] x 1.00 = 0.82 x 2.00 Bh = 1.64
J2K [ 1.34 x 1.19 ] x 1.00 = 1.59 x 27.00 Bh = 42.89
J2K' [ 1.14 x 1.19 ] x 1.00 = 1.35 x 1.00 Bh = 1.35
J5K [ 1.34 x 1.19 ] x 1.00 = 1.59 x 28.00 Bh = 44.48
BV1 [ 0.69 x 0.49 ] x 1.00 = 0.34 x 10.00 Bh = 3.38
BV2 [ 1.34 x 0.49 ] x 1.00 = 0.65 x 1.00 Bh = 0.65
GB1 [ 1.00 x 1.60 ] x 1.00 = 1.60 x 1.00 Bh = 1.60
= 123.46 = 123.46 123.46 M2

Luas Bidang Kozen Partisi


PJ5 [ 4.88 x 2.15 ] x 1.00 = 10.46 x 1.00 Bh = 10.46
P2 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 10.00 Bh = 21.24
P3 [ 0.89 x 2.15 ] x 1.00 = 1.91 x 2.00 Bh = 3.82
P6 [ 1.49 x 2.15 ] x 1.00 = 3.20 x 1.00 Bh = 3.20
J4K [ 1.00 x 1.10 ] x 1.00 = 1.10 x 1.00 Bh = 1.10
= 39.81 = 39.81 39.81 M2
Luas Pas. Bata
Office
As-T [ 5.60 x 3.10 ] x 14.00 = 243.04 T= 3.10
[ 6.00 x 1.80 ] x 1.00 = 10.80 T= 1.80
[ 1.15 x 2.70 ] x 1.00 = 3.10 T= 3.55
[ 3.00 x 2.70 ] x 1.00 = 8.10 T= 2.70
[ 6.00 x 1.80 ] x 1.00 = 10.80 T= 1.80
[ 1.15 x 2.70 ] x 1.00 = 3.10 T= 2.70
As-S [ 5.80 x 2.70 ] x 1.00 = 15.66 T= 2.70
[ 1.85 x 2.70 ] x 1.00 = 5.00 T= 2.70
[ 3.00 x 2.70 ] x 2.00 = 16.20 T= 2.70
[ 2.80 x 2.70 ] x 2.00 = 15.12 T= 2.70
[ 1.65 x 2.70 ] x 1.00 = 4.45 T= 2.70
As-R [ 4.20 x 2.70 ] x 1.00 = 11.34 T= 2.70
[ 2.55 x 2.70 ] x 1.00 = 6.88 T= 2.70
As-Q' [ 5.60 x 3.10 ] x 14.00 = 243.04 T= 3.10

As-1 [ 4.60 x 3.10 ] x 3.00 = 42.78 T= 3.10


[ 1.75 x 2.70 ] x 3.00 = 14.17 T= 2.70
As-2 [ 3.15 x 2.70 ] x 1.00 = 8.50 T= 2.70
[ 5.00 x 2.70 ] x 2.00 = 27.00 T= 2.70
[ 1.05 x 2.70 ] x 1.00 = 2.84 T= 2.70
[ 2.00 x 1.80 ] x 1.00 = 3.60 T= 1.80
As-3 [ 1.05 x 1.80 ] x 1.00 = 1.89 T= 1.80
[ 2.00 x 1.80 ] x 1.00 = 3.60 T= 1.80
[ 5.00 x 2.70 ] x 1.00 = 13.50 T= 2.70
As-10 [ 2.95 x 2.70 ] x 1.00 = 7.97 T= 2.70
As-11 [ 4.80 x 2.70 ] x 1.00 = 12.96 T= 2.70
[ 5.00 x 2.70 ] x 1.00 = 13.50 T= 2.70
As-13 [ 5.00 x 2.70 ] x 1.00 = 13.50 T= 2.70
As-14 [ 4.30 x 2.70 ] x 1.00 = 11.61 T= 2.70
[ 1.80 x 2.70 ] x 1.00 = 4.86 T= 2.70
[ 1.05 x 2.70 ] x 2.00 = 5.67 T= 2.70
[ 5.43 x 2.70 ] x 1.00 = 14.65 T= 2.70
[ 2.43 x 1.80 ] x 2.00 = 8.73 T= 1.80
As-15 [ 4.30 x 3.10 ] x 1.00 = 13.33 T= 3.10
[ 4.60 x 3.10 ] x 2.00 = 28.52 T= 3.10
= 821.30 - 123.46 = 697.84 = 697.84 697.84 M2
B. Pasangan Batu Bata 1 : 4 (Area Shaft)
syaf [ 0.98 x 3.10 ] x 1.00 = 3.02 T= 3.10
[ 0.70 x 3.10 ] x 6.00 = 13.02 T= 3.10
[ 2.00 x 3.10 ] x 1.00 = 6.20 T= 3.10
= 22.24 = 22.24 22.24 M2
C. Pasangan Glass Block Uk. 20x20 Cm, GB1
GB1 [ 1.00 x 1.60 ] x 1.00 = 1.60 = 1.60 1.60 M2

D. Pek. Kolom Praktis Kp Uk. 130 x 130 MM


Beton
As-Q' [ 0.13 x 0.13 ] x 3.30 = 0.06 x 16.00 = 0.89
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 0.13 x 0.13 ] x 2.90 = 0.05 x 4.00 = 0.20
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
As-R [ 0.13 x 0.13 ] x 3.30 = 0.06 x 2.00 = 0.11
As-S [ 0.13 x 0.13 ] x 2.90 = 0.05 x 12.00 = 0.59
[ 0.13 x 0.13 ] x 3.30 = 0.06 x 2.00 = 0.11
[ 0.13 x 0.13 ] x 2.90 = 0.05 x 19.00 = 0.93
[ 0.13 x 0.13 ] x 2.40 = 0.04 x 6.00 = 0.24
As-T [ 0.13 x 0.13 ] x 3.30 = 0.06 x 48.00 = 2.68
= 5.75 5.75 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 340.30 x 0.62 = 839.18
Begel [ 1,945.57 x 8.00 ] x 0.46 x 0.39 = 353.12 = 1,192.30 1,192.30 Kg

Bekisting [ 0.26 x 1.00 ] x 340.30 x 1.00 = 88.48 = 88.48 88.48 M2

E. Pek. Balok Beton Type rb uk. 13 x 20 cm


Panjang Ring Balok Praktis
As-Q' = 5.60 x 14.00 = 78.40
= 2.55 x 1.00 = 2.55
= 4.20 x 1.00 = 4.20
As-S = 5.60 x 2.00 = 11.20
= 6.00 x 2.00 = 12.00
= 3.00 x 1.00 = 3.00
= 2.80 x 1.00 = 2.80
= 9.63 x 1.00 = 9.63
As-T = 5.60 x 14.00 = 78.40
= 0.98 x 1.00 = 0.98
= 1.10 x 5.00 = 5.50
= 0.98 x 1.00 = 0.98
= 0.70 x 1.00 = 0.70

As-1 = 4.60 x 3.00 = 13.80


= 1.75 x 2.00 = 3.50
As-2 = 3.15 x 1.00 = 3.15
= 5.00 x 2.00 = 10.00
= 2.08 x 1.00 = 2.08
= 1.05 x 1.00 = 1.05
As-3 = 1.80 x 1.00 = 1.80
= 1.05 x 1.00 = 1.05
= 5.00 x 1.00 = 5.00
As-11 = 5.00 x 2.00 = 10.00
As-13 = 5.00 x 1.00 = 5.00
As-14 = 4.30 x 1.00 = 4.30
= 5.00 x 2.00 = 10.00
= 2.98 x 1.00 = 2.98
As-15 = 4.30 x 1.00 = 4.30
= 4.60 x 2.00 = 9.20
= 297.53

Beton [ 0.13 x 0.20 ] x 297.53 = 7.74 = 7.74 7.74 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 297.53 x 0.62 = 733.70
Begel [ 1,701.14 x 8.00 ] x 0.60 x 0.39 = 402.72 = 1,136.42 1,136.42 Kg

Bekisting [ 0.20 x 2.00 ] x 297.53 x 1.00 = 119.01 = 119.01 119.01 M2

F. Pek. Plat Kanopy Beton T=100 MM L=600 MM


Panjang Plat Kanopy Beton
As-1 = 1.40 x 5.00 = 7.00
As-T = 1.40 x 24.00 = 33.60
= 0.90 x 7.00 = 6.30
As-15 = 1.40 x 1.00 = 1.40
= 0.90 x 2.00 = 1.80
= 50.10

Beton [ 0.60 x 0.10 ] x 50.10 = 3.01 = 3.01 3.01 M3

Pembesian
Tul- utama [ 5.00 x 8.00 ] x 50.10 x 0.39 = 98.84
Begel [ 502.00 x 8.00 ] x 0.63 x 0.39 = 124.78 = 223.62 223.62 Kg

Bekisting [ 0.70 x 1.00 ] x 50.10 x 1.00 = 35.07 = 35.07 35.07 M2

3.6.2. Pekerjaan Finishing Lantai


Pekerjaan Homogenius tile 600x600mm type Antique White Ex.Sandimas, include material, adukan dan tenaga kerja.
A. Homogenius tile Area Office
1 = 1,099.32
2 = 28.93
3 = 14.01 +
= 1,142.26 = 1,142.26 1,142.26 M2

B. Plin Dinding Homogenius Tile


1 = 232.40 - 14.72 = 217.68
2 = 21.85 - 1.35 = 20.50
3 = 15.55 - 0.90 = 14.65
= 252.83 = 252.83 252.83 M'

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
C. Keramik Area Toilet, Pantry dan Janitor
Tempat Wudhuk[ 4.85 x 1.35 ] x 1.00 = 6.55
Pantry [ 2.85 x 2.85 ] x 1.00 = 8.12
Janitor [ 2.85 x 1.93 ] x 1.00 = 5.49
Toilet 3 [ 2.85 x 1.80 ] x 2.00 = 10.26
[ 1.70 x 1.05 ] x 2.00 = 3.57
[ 1.35 x 1.93 ] x 4.00 = 10.40
Toilet 4 [ 2.35 x 1.80 ] x 1.00 = 4.23
[ 2.35 x 1.05 ] x 1.00 = 2.47
[ 2.98 x 1.80 ] x 1.00 = 5.36
[ 1.70 x 1.05 ] x 1.00 = 1.79
[ 1.35 x 2.28 ] x 3.00 = 9.21
[ 1.35 x 1.78 ] x 1.00 = 2.40
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 69.83 = 69.83 69.83 M2
D. Screed Waterproofing,
Tempat Wudhuk [ 5.15 x 1.65 ] x 1.00 = 8.50
Pantry [ 3.15 x 3.15 ] x 1.00 = 9.92
Janitor [ 3.15 x 2.23 ] x 1.00 = 7.01
Toilet 3 [ 3.15 x 2.10 ] x 2.00 = 13.23
[ 2.00 x 1.35 ] x 2.00 = 5.40
[ 1.65 x 2.23 ] x 4.00 = 14.69
Toilet 4 [ 2.65 x 2.10 ] x 1.00 = 5.57
[ 2.65 x 1.35 ] x 1.00 = 3.58
[ 3.28 x 2.10 ] x 1.00 = 6.88
[ 2.00 x 1.35 ] x 1.00 = 2.70
[ 1.65 x 2.57 ] x 3.00 = 12.75
[ 1.65 x 2.07 ] x 1.00 = 3.42
= 93.63 = 93.63 93.63 M2
E. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm
= 93.63 93.63 M2

3.6.3. Pekerjaan Finishing Dinding


A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran Kolom, dan Balok
Plesteran Beton Kolom, Sloof, Balok dan Plat Kanopy
Kolom 40x40cm (Luar) [ 0.65 x 3.70 ] x 5.00 = 12.03
[ 0.53 x 3.70 ] x 1.00 = 1.94
[ 0.50 x 3.70 ] x 7.00 = 12.95
[ 0.60 x 3.70 ] x 1.00 = 2.22
[ 0.73 x 3.70 ] x 1.00 = 2.68
Kolom 40x40cm (dalam) [ 1.60 x 3.20 ] x 1.00 = 5.12
[ 1.55 x 3.20 ] x 1.00 = 4.96
[ 0.50 x 3.20 ] x 2.00 = 3.20
[ 0.65 x 3.20 ] x 13.00 = 27.04
[ 0.65 x 3.20 ] x 4.00 = 8.32
[ 0.80 x 3.20 ] x 8.00 = 20.48
= 100.94

Balok 30/40 Luar [ 5.60 x 0.50 ] x 13.00 = 36.40


Dalam [ 5.60 x 0.50 ] x 14.00 = 39.20
Samping [ 4.60 x 0.50 ] x 6.00 = 13.80
= 89.40

Balok Praktis rb [ 297.53 x 0.20 ] x 2.00 = 119.01


Kanopy Beton [ 0.70 x 50.10 ] x 1.00 = 35.07
= 154.08

Total luas afweking beton = 100.94 + 89.40 + 154.08 = 344.42

Plesteran 1 : 4
= 697.84 x 2.00 = 1,395.69 - 250.00 = 1,145.69

Plesteran 1 : 4 Ruang Shaft = 22.24 x 1.00 = 22.24

Total Plesteran 1 : 4
Plesteran Beton Kolom, Sloof, Balok dan Plat Kano = 344.42
Plesteran 1 : 4 = 1,145.69
Plesteran 1 : 4 Ruang Shaft = 22.24
= 1,167.93 = 1,167.93 1,167.93 M2

B. Acian Plesteran
= 1,167.93 = 1,167.93 1,167.93 M2
C. Plesteran 1:4, Opening Kusen + Acian
P1 [ 1.20 x 1.00 ] x 1.00 = 1.20 x 1.00 Bh = 1.20
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P2 [ 0.99 x 1.00 ] x 1.00 = 0.99 x 1.00 Bh = 0.99
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P3 [ 0.89 x 1.00 ] x 1.00 = 0.89 x 1.00 Bh = 0.89
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P4 [ 0.84 x 1.00 ] x 1.00 = 0.84 x 5.00 Bh = 4.20
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 5.00 Bh = 21.45
P5 [ 0.69 x 1.00 ] x 1.00 = 0.69 x 8.00 Bh = 5.52
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 8.00 Bh = 34.32
PS [ 0.69 x 2.00 ] x 1.00 = 1.38 x 2.00 Bh = 2.76
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 2.00 Bh = 4.76
J2K [ 1.34 x 2.00 ] x 1.00 = 2.67 x 27.00 Bh = 72.09
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 27.00 Bh = 64.26
J2K' [ 1.14 x 2.00 ] x 1.00 = 2.27 x 1.00 Bh = 2.27
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 1.00 Bh = 2.38
J5K [ 1.34 x 2.00 ] x 1.00 = 2.67 x 28.00 Bh = 74.76
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 28.00 Bh = 66.64
BV1 [ 0.69 x 2.00 ] x 1.00 = 1.38 x 10.00 Bh = 13.80
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 10.00 Bh = 9.80
BV2 [ 1.34 x 2.00 ] x 1.00 = 2.67 x 1.00 Bh = 2.67
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 1.00 Bh = 0.98
= 398.61 = 398.61 398.61 M'

D. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan Janitor)


Toilet 3 [ 11.40 x 2.00 ] - 4.44 = 18.36 x 2.00 = 36.72
[ 2.25 x 2.00 ] - - = 4.50 x 1.00 = 4.50
[ 6.55 x 2.00 ] - 1.38 = 11.72 x 4.00 = 46.88
[ 9.78 x 1.60 ] - - = 15.64 x 1.00 = 15.64

Toilet 4 [ 9.55 x 2.00 ] - 1.68 = 17.42 x 1.00 = 17.42


[ 11.40 x 2.00 ] - 5.13 = 17.67 x 2.00 = 35.34
[ 11.40 x 2.00 ] - 4.44 = 18.36 x 2.00 = 36.72
[ 2.25 x 2.00 ] - - = 4.50 x 1.00 = 4.50
[ 7.25 x 2.00 ] - 1.38 = 13.12 x 3.00 = 39.36
[ 6.25 x 2.00 ] - 1.38 = 11.12 x 1.00 = 11.12
= 248.20 = 248.20 248.20 M2

E. Pas. Keramik Dinding Uk. 300x300 MM (Pantry)


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Toilet 4 [ 3.00 x 0.60 ] = 1.80 x 1.00 = 1.80


= 1.80 = 1.80 1.80 M2

Pekerjaan Pengecatan
F. Pengecatan dinding Exterior Ex. Propan
Dinding = 1,167.93 x 0.40 = 467.17
= 467.17 = 467.17 467.17 M2
G. Pengecatan dinding Interior Ex. Propan
Dinding = 1,167.93 x 0.60 = 700.76
= 700.76 = 700.76 700.76 M2

H. Pekerjaan Naad dan Pearapian Dinding Atas Keramik


[ 11.40 x 1.00 ] - 1.53 = 9.87 x 1.00 = 9.87
[ 2.25 x 1.00 ] - - = 2.25 x 1.00 = 2.25
[ 6.55 x 1.00 ] - 0.69 = 5.86 x 4.00 = 23.44
[ 9.78 x 1.00 ] - - = 9.78 x 1.00 = 9.78
[
[ 9.55 x 1.00 ] - 0.84 = 8.71 x 1.00 = 8.71
[ 11.40 x 1.00 ] - 2.91 = 8.49 x 1.00 = 8.49
[ 11.40 x 1.00 ] - 2.22 = 9.18 x 1.00 = 9.18
[ 2.25 x 1.00 ] - - = 2.25 x 1.00 = 2.25
[ 7.25 x 1.00 ] - 0.69 = 6.56 x 2.00 = 13.12
[ 6.25 x 1.00 ] - 0.69 = 5.56 x 1.00 = 5.56
[ 3.00 x 1.00 ] = 3.00 x 1.00 = 3.00
= 95.65 = 95.65 95.65 M'
I. Pekerjaan Naad dan Pearapian Dinding Luar
[ 5.45 x 1.00 ] = 5.45 x 12.00 = 65.40
[ 3.90 x 2.00 ] = 7.80 x 12.00 = 93.60
[ 3.00 x 2.00 ] = 6.00 x 1.00 = 6.00
[ 4.50 x 1.00 ] = 4.50 x 1.00 = 4.50
[ 2.80 x 2.00 ] = 5.60 x 1.00 = 5.60
[ 4.60 x 1.00 ] = 4.60 x 1.00 = 4.60
[ 2.80 x 2.00 ] = 5.60 x 1.00 = 5.60
[ 4.60 x 1.00 ] = 4.60 x 3.00 = 13.80
[ 3.90 x 2.00 ] = 7.80 x 3.00 = 23.40
= 222.50 = 222.50 222.50 M'
3.6.4. Pekerjaan Dinding Partisi
Pekerjaan Dinding Partisi Gypsum Termasuk Rangka dan Pengecatan
A. Pek. Partisi gypsum Dua Sisi H: 2.700 MM, include rangka dan finishing cat
[ 1.60 x 2.70 ] x 1.00 = 4.32
[ 6.45 x 2.70 ] x 1.00 = 17.42
[ 18.40 x 2.70 ] x 1.00 = 49.68
[ 10.63 x 2.70 ] x 1.00 = 28.69
[ 14.60 x 2.70 ] x 1.00 = 39.42
[ 21.00 x 2.70 ] x 1.00 = 56.70
[ 3.00 x 2.70 ] x 1.00 = 8.10
[ 5.08 x 2.70 ] x 3.00 = 41.11
[ 5.78 x 2.70 ] x 2.00 = 31.19
[ 1.75 x 2.70 ] x 1.00 = 4.73
[ 5.98 x 2.70 ] x 1.00 = 16.13
[ 3.53 x 2.70 ] x 1.00 = 9.52
[ 4.60 x 2.70 ] x 1.00 = 12.42
= 319.41 - 39.81 = 279.60 x 2.00 = 559.21 559.21 M2
B. Pek. Partisi gypsum Dua Sisi H: 1.200 MM, include rangka dan finishing cat
[ 9.93 x 1.20 ] x 1.00 = 11.91
[ 3.56 x 1.20 ] x 1.00 = 4.27
[ 0.30 x 1.20 ] x 10.00 = 3.60
[ 10.65 x 1.20 ] x 1.00 = 12.78
[ 10.55 x 1.20 ] x 1.00 = 12.66
[ 7.20 x 1.20 ] x 1.00 = 8.64
[ 9.05 x 1.20 ] x 1.00 = 10.86
[ 12.12 x 1.20 ] x 1.00 = 14.54
[ 10.03 x 1.20 ] x 1.00 = 12.04
[ 8.42 x 1.20 ] x 3.00 = 30.31
= 121.61 x 2.00 = 243.23 = 243.23 243.23 M2
C. Plin Bawah Dinding Partisi Multiplek T=18 MM Uk. 18x100 MM, Fin. HPL
270.00 [ 1.60 x 1.00 ] x 1.00 = 1.60
[ 6.45 x 1.00 ] x 1.00 = 6.45
[ 18.40 x 1.00 ] x 1.00 = 18.40
[ 10.63 x 1.00 ] x 1.00 = 10.63
[ 14.60 x 1.00 ] x 1.00 = 14.60
[ 21.00 x 1.00 ] x 1.00 = 21.00
[ 3.00 x 1.00 ] x 1.00 = 3.00
[ 5.08 x 1.00 ] x 3.00 = 15.23
[ 5.78 x 1.00 ] x 2.00 = 11.55
[ 1.75 x 1.00 ] x 1.00 = 1.75
[ 5.98 x 1.00 ] x 1.00 = 5.98
[ 3.53 x 1.00 ] x 1.00 = 3.53
[ 4.60 x 1.00 ] x 1.00 = 4.60
120.00 [ 9.93 x 1.00 ] x 1.00 = 9.93
[ 3.56 x 1.00 ] x 1.00 = 3.56
[ 0.30 x 1.00 ] x 10.00 = 3.00
[ 10.65 x 1.00 ] x 1.00 = 10.65
[ 10.55 x 1.00 ] x 1.00 = 10.55
[ 7.20 x 1.00 ] x 1.00 = 7.20
[ 9.05 x 1.00 ] x 1.00 = 9.05
[ 12.12 x 1.00 ] x 1.00 = 12.12
[ 10.03 x 1.00 ] x 1.00 = 10.03
[ 8.42 x 1.00 ] x 3.00 = 25.26
= 219.65 - 18.94 = 200.71 x 2.00 = 401.42 401.42 M'
D. Profil U Dinding Partisi Multiplek T=18 MM Uk. 5 x10 Cm, Fin. HPL
[ 9.93 x 1.00 ] x 1.00 = 9.93
[ 3.56 x 1.00 ] x 1.00 = 3.56
[ 0.30 x 1.00 ] x 10.00 = 3.00
[ 10.65 x 1.00 ] x 1.00 = 10.65
[ 10.55 x 1.00 ] x 1.00 = 10.55
[ 7.20 x 1.00 ] x 1.00 = 7.20
[ 9.05 x 1.00 ] x 1.00 = 9.05
[ 12.12 x 1.00 ] x 1.00 = 12.12
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 10.03 x 1.00 ] x 1.00 = 10.03
[ 8.42 x 1.00 ] x 3.00 = 25.26
= 101.35 x 1.00 = 101.35 = 101.35 101.35 M'

3.6.5. Pekerjaan Arsitek Pintu


Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium
A. Pintu Type P1 = 1.00 1.00 Unit
B. Pintu Type P2 = 11.00 11.00 Unit
C. Pintu Type P3 = 3.00 3.00 Unit
D. Pintu Type P4 = 5.00 5.00 Unit
E. Pintu Type P5 = 8.00 8.00 Unit
F. Pintu Type PS = 2.00 2.00 Unit

Pintu dan Jendela alumunium Pekerjaan pintu jendela, detail accessories Lihat Di DWS
G. Pintu Dan Jendela Type PJ5 = 1.00 1.00 Unit

Pintu Lipat, detail accessories Lihat Di DWS


H. Pintu Lipat
[ 8.33 x 2.65 ] x 2.00 = 44.04 = 44.04 44.04 M2

3.6.6. Pekerjaan Arsitek Jendela


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K = 27.00 27.00 Unit
B. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K' = 1.00 1.00 Unit
C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J4K = 1.00 1.00 Unit
D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1 = 10.00 10.00 Unit
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV2 = 1.00 1.00 Unit

3.6.7. Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsum tile 600x1200 T: 9 mm Exrd + rangka cross tee main tee.
Office [ 1,038.14 x 1.00 ] x 1.00 = 1,038.14
Rg. Panel [ 4.85 x 2.85 ] x 1.00 = 13.82
= 1,051.97 = 1,051.97 1,051.97 M2

B. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 area lobby


Selasar dan gudang serbaguna = 73.96
Dealing, laktasi [ 3.10 x 2.90 ] x 4.00 = 35.96
Mushalla [ 4.85 x 4.35 ] x 1.00 = 21.10
Wudhuk [ 4.85 x 1.35 ] x 1.00 = 6.55
Toilet 3 [ 2.85 x 3.88 ] x 1.00 = 11.04
[ 1.05 x 1.70 ] x 1.00 = 1.79
[ 2.85 x 3.88 ] x 1.00 = 11.04
Pantry [ 2.85 x 2.85 ] x 1.00 = 8.12
Janitor [ 2.85 x 2.08 ] x 1.00 = 5.91
Toilet [ 5.27 x 2.85 ] x 1.00 = 15.03
[ 5.27 x 2.98 ] x 1.00 = 15.69
= 206.20 = 206.20 206.20 M2

Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Plafond Gipsum = 206.20
= 206.20 = 206.20 206.20 M2

3.6.8. Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas = 4.00 4.00 Unit
B. Partition Urinal A100 Ex Toto = 2.00 2.00 Unit
C. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hanya pemasangan dan instalasi = 4.00 4.00 Unit
D. Kran Dinding Type Y 20JC Ex San Ei = 10.00 10.00 Unit
E. Floor Drain Dia 4" Type H51 Ex SAN EI = 10.00 10.00 Unit
F. Shower Spray S403SBW Ex. TOTO hanya pemasangan dan instalasi = 4.00 4.00 Unit
G. Closet Duduk Type CW 421 J/SW 420 JP Ex. TOTO hanya pemasangan dan instalasi = 4.00 4.00 Unit
H. Urinoir type U57M Ex TOTO = 4.00 4.00 Unit
I. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran 600mm x 800mm) = 4.00 4.00 Unit
J. Kitchen zick Single Bowl Ex Royal = 1.00 1.00 Unit
K. Kran Pantry Model Leher Angsa A10C Ex SAN EI = 1.00 1.00 Unit

3.6.9. Pekerjaan Lain-Lain


A. Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. keramik 300 x300 mm ex. IKAD
Toilet 4 [ 2.85 x 0.60 ] = 1.71 x 1.00 = 1.71
= 1.71 = 1.71 1.71 M2
B. Tanggulan Janitor dan Tempat Wudhu, include pasangan bata, pasangan keramik, jasa pemasangan dan perapian
Toilet 1 [ 4.35 x 1.00 ] = 4.35 x 1.00 = 4.35
Toilet 2 [ 1.20 x 1.00 ] = 1.20 x 1.00 = 1.20
= 5.55 = 5.55 5.55 M'
C. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu dan perapian.
Toilet 3 [ 0.75 x 1.35 ] = 1.01 x 2.00 = 2.03
Toilet 4 [ 0.75 x 1.35 ] = 1.01 x 2.00 = 2.03
= 4.05 = 4.05 4.05 M2

D. Tangga maintenance include pekerjaan pipa baja dia 5'' + siku 50.50.5, chekered plate T: 5mm, = 1.00 1.00 Unit
Reilling Pipa 1"pengecatan, alat bantu dan material bantu.

3.7 Pekerjaan Arsitek Atap

3.7.1. Pekerjaan Pasangan Brick Wall


Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PB4 [ 1.50 x 2.15 ] x 1.00 = 3.22 x 1.00 Bh = 3.22
= 3.22 = 3.22 3.22 M2

Luas Pas. Bata


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 3.05 x 1.65 ] x 2.00 = 10.07 T= 1.65
[ 1.75 x 1.90 ] x 1.00 = 3.32 T= 1.90
[ 1.75 x 1.40 ] x 1.00 = 2.45 T= 3.55

[ 6.40 x 2.80 ] x 1.00 = 17.92 T= 2.80


[ 5.65 x 2.80 ] x 1.00 = 15.82 T= 2.80
= 49.58 - 3.22 = 46.36 = 46.36 46.36 M2
B. Pek. Kolom Praktis Kp1 Uk. 130 x 130 MM
Beton
[ 0.13 x 0.13 ] x 1.90 = 0.03 x 4.00 = 0.13
[ 0.13 x 0.13 ] x 1.65 = 0.03 x 2.00 = 0.06

[ 0.13 x 0.13 ] x 2.80 = 0.05 x 5.00 = 0.24


= 0.42 0.42 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 24.90 x 0.62 = 61.40
Begel [ 143.29 x 8.00 ] x 0.46 x 0.39 = 26.01 = 87.41 87.41 Kg

Bekisting [ 0.26 x 1.00 ] x 24.90 x 1.00 = 6.47 = 6.47 6.47 M2

C. Pek. Balok Beton Type rb uk. 13 x 20 cm


Panjang Ring Balok Praktis
= 3.05 x 2.00 = 6.10
= 1.75 x 2.00 = 3.50

= 6.40 x 1.00 = 6.40


= 5.65 x 1.00 = 5.65
= 21.65

Beton [ 0.13 x 0.20 ] x 21.65 = 0.56 = 0.56 0.56 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 21.65 x 0.62 = 53.39
Begel [ 124.71 x 8.00 ] x 0.60 x 0.39 = 29.52 = 82.91 82.91 Kg

Bekisting [ 0.20 x 2.00 ] x 21.65 x 1.00 = 8.66 = 8.66 8.66 M2

3.7.2. Pekerjaan Finishing Lantai


Pekerjaan Waterproffing Ex.Sika, include material, adukan dan tenaga kerja.
A. Screed Waterproofing,
[ 16.98 x 6.30 ] x 2.00 = 213.89
[ 16.98 x 7.40 ] x 1.00 = 125.62
[ 36.00 x 1.40 ] x 1.00 = 50.40
[ 30.00 x 1.40 ] x 1.00 = 42.00
= 431.90 = 431.90 431.90 M2
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm
= 431.90 431.90 M2
3.7.3. Pekerjaan Finishing Dinding
A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran parapet Beton
Prapet Beton Dak [ 17.10 x 2.10 ] x 1.00 = 35.91
[ 79.50 x 2.10 ] x 1.00 = 166.95
[ 1.00 x 2.10 ] x 7.00 = 14.70
[ 6.13 x 2.10 ] x 1.00 = 12.86
[ 16.20 x 2.10 ] x 1.00 = 34.02
[ 7.30 x 1.10 ] x 1.00 = 8.03
[ 6.00 x 1.10 ] x 2.00 = 13.20
= 285.67
Plesteran 1 : 4
= 285.67 x 2.00 = 571.34

Total Plesteran
Prapet Beton Dak = 285.67
Plesteran 1 : 4 = 571.34
= 857.02 = 857.02 857.02 M2

B. Acian Plesteran = 857.02 857.02 M2

C. Plesteran 1:4, Opening Kusen + Acian


PB4 [ 1.50 x 1.00 ] x 1.00 = 1.50 x 1.00 Bh = 1.50
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
= 5.79 = 5.79 5.79 M'

Pekerjaan Pengecatan
D. Pengecatan dinding Exterior Ex. Propan
Dinding = 857.02 x 1.00 = 857.02
= 857.02 = 857.02 857.02 M2

3.7.4. Pekerjaan Arsitek Pintu


Pekerjaan Pintu Besi
A. Pintu Type PB4 = 1.00 1.00 Unit

3.7.5. Pekerjaan Atap


Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,45 TCT Klip lock tanpa sambungan (roll on side)
= 37.35 x 16.00 x 1.00 = 597.60
= 31.35 x 16.00 x 1.00 = 501.60
= 4.10 x 2.90 x 1.00 = 11.89
= 1,111.09 = 1,111.09 1,111.09 M2
B. Lisplank Zincalumn T: 0,4 TCT MP Deck
= 37.35 x 0.85 x 1.00 = 31.75
= 31.35 x 0.85 x 1.00 = 26.65
= 4.10 x 0.30 x 1.00 = 1.23
= 2.90 x 0.30 x 1.00 = 0.87
= 15.75 x 0.50 x 4.00 = 31.50
= 91.99 = 91.99 92.00 M2
C. Flasing Zincalum 0,4 TCT
= 37.35 x 1.00 x 1.00 = 37.35
= 31.35 x 1.00 x 1.00 = 31.35
= 4.10 x 1.00 x 2.00 = 8.20
= 16.00 x 1.00 x 6.00 = 96.00
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 172.90 = 172.90 172.90 M'

D. Nok Atap Zincalum 0,45 TCT


= 2.90 x 1.00 x 1.00 = 2.90 = 2.90 2.90 M'

E. Clading MP Deck TCT 0.4 New MP Deck


= 15.75 x 1.85 x 4.00 = 116.55
= 116.55 = 116.55 116.55 M2
Pekerjaan Insulation, termasuk material, jasa pemasangan dan alat bantu.
F. Insulation Al- Bubble - AL T; 4mm ex Zeltech type ZT-01B
Luas Atap Spandek = 1,111.09 = 1,111.09 1,111.09 M2

Pekerjaan Tangga Maintenance


I. Tangga maintenance include pekerjaan Besi IWF 150.75.5.7'' + siku 50.50.5, chekered plate T: 5mm,
Reilling Pipa 2"pengecatan, alat bantu dan material bantu. = 1.00 1.00 Unit

4 SUPPORTING BUILDING
4.1 POS JAGA

4.1.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 8.00 = 4.48 x 1.00 = 4.48 = 4.48 4.48 M3

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 4.48 x 0.25 ] = 1.12 = 1.12 1.12 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Pos Secitity [ 2.35 x 1.35 ] x 1.00 = 3.17
= 3.17 x 0.35 = 1.11 = 1.11 1.11 M3

D. Urugan Pasir Bawah Pondasi Batu Kali


[ 0.80 x 1.00 ] x 8.00 = 6.40 x 0.05 = 0.32 = 0.32 0.32 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 8.00 = 1.28 x 1.00 = 1.28 =
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 8.00 = 2.38 = 3.66 3.66 M3

F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 8.00 : 1.00 ] x 0.50 = 4.00 x 0.62 = 2.47 = 2.47 2.47 Kg

4.1.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 8.00 = 0.30 = 0.30 0.30 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 8.00 x 0.89 = 28.41
Begel [ 46.71 x 8.00 ] x 0.74 x 0.39 = 13.64 = 42.05 42.05 Kg

Bekisting [ 0.25 x 2.00 ] x 8.00 x 1.00 = 4.00 = 4.00 4.00 M2

B. Pek. Kolom Praktis K1 Uk. 200 x 200 mm, Besi 6 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.20 x 0.20 ] x 3.10 = 0.12 x 4.00 = 0.50
= 0.50 0.50 M3
Pembesian
Tul- utama [ 6.00 x 12.00 ] x 12.40 x 0.89 = 66.05
Begel [ 71.86 x 8.00 ] x 0.74 x 0.39 = 20.98 = 87.03 87.03 Kg

Bekisting [ 0.40 x 2.00 ] x 12.40 x 1.00 = 9.92 = 9.92 9.92 M2

C. Pek. Balok Beton Type RB uk. 15 x 25 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.15 x 0.25 ] x 8.00 = 0.30 = 0.30 0.30 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 8.00 x 0.89 = 28.41
Begel [ 46.71 x 8.00 ] x 0.74 x 0.39 = 13.64 = 42.05 42.05 Kg

Bekisting [ 0.25 x 2.00 ] x 8.00 x 1.00 = 4.00 = 4.00 4.00 M2

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 8.00 = 0.13 = 0.13 0.13 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 8.00 x 0.62 = 19.73
Begel [ 46.71 x 8.00 ] x 0.46 x 0.39 = 8.48 = 28.21 28.21 Kg

Bekisting [ 0.15 x 2.00 ] x 8.00 x 1.00 = 2.40 = 2.40 2.40 M2

E. Pek. Beton Plat Lantai Dak T=10 Cm


Beton [ 3.95 x 2.95 ] x 0.10 = 1.17 = 1.17 1.17 M3

Melintang
Tul- utama [ 3.95 x 20.67 ] x 2.00 = 163.27
[ 2.95 x 27.33 ] x 2.00 = 161.27
= 324.53 x 0.62 = 200.07 = 200.07 200.07 Kg

Bekisting [ 3.80 x 2.80 ] x 2.00 = 21.28


[ 2.80 x 2.80 ] x 4.00 = 31.36
= 52.64 = 52.64 52.64 M2
F. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm
Beton [ 0.10 x 0.50 ] x 13.80 = 0.69 = 0.69 0.69 M3

Melintang
Tul- utama [ 13.80 x 3.33 ] x 1.00 = 46.00
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 0.45 x 92.00 ] x 1.00 = 41.40
= 87.40 x 0.62 = 53.88 = 53.88 53.88 Kg

Bekisting [ 1.10 x 1.00 ] x 13.80 = 15.18


= 15.18 = 15.18 15.18 M2

G. Pek. Rabat Beton Lantai T= 5 Cm


= 3.17 x 0.05 = 0.16 = 0.16 0.16 M3
4.1.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PJ1 [ 0.79 x 2.15 ] x 1.00 = 1.69 x 1.00 Bh = 1.69
[ 0.55 x 1.19 ] x 1.00 = 0.65 x 1.00 Bh = 0.65
J1K [ 1.54 x 1.19 ] x 1.00 = 1.83 x 2.00 Bh = 3.65
J2K [ 1.34 x 1.19 ] x 1.00 = 1.59 x 1.00 Bh = 1.59
= 7.59
Luas Pas. Bata
[ 2.35 x 2.60 ] x 2.00 = 12.22 T= 2.60
[ 1.35 x 2.60 ] x 2.00 = 7.02 T= 2.60

= 19.24 - 7.59 = 11.65 = 11.65 11.65 M2


B. Plesteran 1 : 4
Kolom = 0.50 x 2.80 = 1.40 x 4.00 = 5.60
Lisplank = 13.80 x 0.80 = 11.04 x 1.00 = 11.04

Pas. Bata = 11.65 x 2.00 = 23.31 = 23.31


= 39.95 = 39.95 39.95 M2

C. Acian Plesteran
= 39.95 = 39.95 39.95 M2
D. Plesteran 1:4, Opening Kusen + Acian
PJ1 [ 0.79 x 1.00 ] x 1.00 = 0.79 x 1.00 Bh = 0.79
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
[ 0.55 x 2.00 ] x 1.00 = 1.09 x 1.00 Bh = 1.09
J1K [ 1.54 x 2.00 ] x 1.00 = 3.07 x 2.00 Bh = 6.14
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 2.00 Bh = 4.76
J2K [ 1.34 x 2.00 ] x 1.00 = 2.67 x 1.00 Bh = 2.67
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 1.00 Bh = 2.38
= 22.12 = 22.12 22.12 M'

E. Pekerjaan Profil Beton Dinding Luar


[ 2.50 x 2.00 ] = 5.00 x 1.00 = 5.00
[ 1.50 x 1.00 ] = 1.50 x 1.00 = 1.50
[ 0.71 x 1.00 ] = 0.71 x 1.00 = 0.71
= 7.21 = 7.21 7.21 M'
F. Pekerjaan Naad dan Perapian DindinG Plin Keramik
Plin Keramik = 6.66 = 6.66 6.66 M'

Pekerjaan Pengecatan
G. Pengecatan dinding Exterior Ex. Propan
Dinding = 39.95 x 0.60 = 23.97
= 23.97 = 23.97 23.97 M2
H. Pengecatan dinding Interior Ex. Propan
Dinding = 39.95 x 0.40 = 15.98
= 15.98 = 15.98 15.98 M2

4.1.4 Pekerjaan Finishing Lantai


Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Pos Jaga
Pos Secitity [ 2.35 x 1.35 ] x 1.00 = 3.17
= 3.17 x 1.00 = 3.17 = 3.17 3.17 M2
B. Plin Dinidng Keramik
Pos Secitity [ 2.35 + 1.35 ] x 2.00 = 7.40
= 7.40 - 0.90 = 6.66 = 6.66 6.66 M'

4.1.5 Pekerjaan Arsitek Pintu dan Jendela


Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Kaca Rangka dan Kusen alumunium
A. Pintu Type PJ1 = 1.00 1.00 Unit

Pekerjaan Jendela include pengadaan, installing dan accessories.


C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1K = 2.00 2.00 Unit
D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K = 1.00 1.00 Unit

4.1.6 Pekerjaan Lain-Lain


Pekerjaan Waterproofing LantaI Dak Atap
A. Screed Waterproofing,
Lantai [ 3.95 x 2.95 ] x 1.00 = 11.65
= 11.65 = 11.65 11.65 M2
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm
= 11.65 11.65 M2
C. Pek. Pengecatan Plafon Beton Expose
= 11.65 11.65 M2
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2"
= 2.00 2.00 M'
E. Pas. Roof Drain Dia 2"
= 2.00 2.00 Unit

4.2 POS SECURITY DAN RUANG TUNGGU SOPIR

4.2.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 42.00 = 23.52 x 1.00 = 23.52 = 23.52 23.52 M3
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 23.52 x 0.25 ] = 5.88 = 5.88 5.88 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Pos Secitity [ 4.85 x 5.85 ] x 1.00 = 28.37
Locker [ 1.85 x 3.85 ] x 1.00 = 7.12
Rg Sopir [ 3.85 x 5.85 ] x 1.00 = 22.52
Tioliet [ 1.85 x 1.35 ] x 1.00 = 2.50
= 60.52 x 0.35 = 21.18 = 21.18 21.18 M3

D. Urugan Pasir Bawah Lantai T=10 cm


= 60.52 x 0.10 = 6.05 = 6.05 6.05 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 42.00 = 6.72 x 1.00 = 6.72
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 42.00 = 12.50 = 19.22 19.22 M3

F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 42.00 : 1.00 ] x 0.50 = 21.00 x 0.62 = 12.95 = 12.95 12.95 Kg

4.2.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 42.00 = 1.58 = 1.58 1.58 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 42.00 x 0.89 = 149.14
Begel [ 241.00 x 8.00 ] x 0.74 x 0.39 = 70.37 = 219.51 219.51 Kg

Bekisting [ 0.25 x 2.00 ] x 42.00 x 1.00 = 21.00 = 21.00 21.00 M2

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 3.25 = 0.05 x 19.00 = 1.04
= 1.04 1.04 M3
Pembesian
Tul- utama [ 4.00 x 12.00 ] x 61.75 x 0.89 = 219.28
Begel [ 353.86 x 8.00 ] x 0.46 x 0.39 = 64.22 = 283.50 283.50 Kg

Bekisting [ 0.26 x 2.00 ] x 61.75 x 1.00 = 32.11 = 32.11 32.11 M2

C. Pek. Balok Beton Type rb uk. 13 x 20 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.13 x 0.20 ] x 42.00 = 1.09 = 1.09 1.09 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 42.00 x 0.62 = 103.57
Begel [ 241.00 x 8.00 ] x 0.60 x 0.39 = 57.05 = 160.63 160.63 Kg

Bekisting [ 0.20 x 2.00 ] x 42.00 x 1.00 = 16.80 = 16.80 16.80 M2

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 42.00 = 0.69 = 0.69 0.69 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 42.00 x 0.62 = 103.57
Begel [ 241.00 x 8.00 ] x 0.46 x 0.39 = 43.74 = 147.31 147.31 Kg

Bekisting [ 0.15 x 2.00 ] x 42.00 x 1.00 = 12.60 = 12.60 12.60 M2

E. Pek. Rabat Beton Lantai T=5 Cm


= 60.52 x 0.05 = 3.03 = 3.03 3.03 M3
4.2.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
P1 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 1.00 Bh = 2.12
P1' [ 0.99 x 2.15 ] x 1.00 = 2.12 x 1.00 Bh = 2.12
P3 [ 0.69 x 2.15 ] x 1.00 = 1.48 x 1.00 Bh = 1.48
J2K [ 1.49 x 1.19 ] x 1.00 = 1.77 x 2.00 Bh = 3.53
J3K [ 2.24 x 1.19 ] x 1.00 = 2.66 x 1.00 Bh = 2.66
BV1 [ 0.79 x 0.49 ] x 1.00 = 0.39 x 1.00 Bh = 0.39
BV2 [ 1.34 x 0.49 ] x 1.00 = 0.65 x 1.00 Bh = 0.65
KR4 [ 1.60 x 1.20 ] x 1.00 = 1.92 x 2.00 Bh = 3.84
KR5 [ 2.40 x 1.20 ] x 1.00 = 2.88 x 2.00 Bh = 5.76
Pintu Tanpa Kusen [ 1.85 x 2.20 ] x 1.00 = 4.07 x 1.00 Bh = 4.07
= 26.63
Luas Pas. Bata
[ 11.00 x 3.20 ] x 2.00 = 70.40 T= 3.20
[ 6.00 x 3.20 ] x 4.00 = 76.80 T= 3.20
[ 2.00 x 3.20 ] x 1.00 = 6.40 T= 3.55

= 153.60 - 26.63 = 126.97 = 126.97 126.97 M2


B. Pasangan Krawang Uk. 20x40 Cm, KR4 & Kr5
KR4 [ 4.00 x 6.00 ] x 2.00 = 48.00
KR5 [ 6.00 x 6.00 ] x 2.00 = 72.00
= 120.00 = 120.00 120.00 Bh

C. Plesteran 1 : 4
= 126.97 x 2.00 = 253.94 - 11.42 = 242.52 = 242.52 242.52 M2

D. Acian Plesteran
= 242.52 = 242.52 242.52 M2
E. Plesteran 1:4, Opening Kusen + Acian
P1 [ 0.99 x 1.00 ] x 1.00 = 0.99 x 1.00 Bh = 0.99
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P1' [ 0.99 x 1.00 ] x 1.00 = 0.99 x 1.00 Bh = 0.99
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P3 [ 0.69 x 1.00 ] x 1.00 = 0.69 x 1.00 Bh = 0.69
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
J2K [ 1.49 x 2.00 ] x 1.00 = 2.97 x 2.00 Bh = 5.94
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 2.00 Bh = 4.76
J3K [ 2.24 x 2.00 ] x 1.00 = 4.47 x 1.00 Bh = 4.47
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 1.00 Bh = 2.38
BV1 [ 0.79 x 2.00 ] x 1.00 = 1.58 x 1.00 Bh = 1.58
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 1.00 Bh = 0.98
BV2 [ 1.34 x 2.00 ] x 1.00 = 2.67 x 1.00 Bh = 2.67
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 1.00 Bh = 0.98
Pintu Tanpa Kusen [ 1.85 x 1.00 ] x 1.00 = 1.85 x 1.00 Bh = 1.85
[ 2.20 x 2.00 ] x 1.00 = 4.40 x 1.00 Bh = 4.40
= 45.55 = 45.55 45.55 M'

F. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan T. Wudhuk)


Toilet [ 6.40 x 2.00 ] - 1.38 = 11.42 x 1.00 = 11.42
= 11.42 = 11.42 11.42 M2

G. Pekerjaan Naad dan Pearapian Dinding Atas Keramik


[ 6.40 x 1.00 ] - 0.69 = 5.71 x 1.00 = 5.71
Plin Keramik = 47.85
= 53.56 = 53.56 53.56 M'

H. Pekerjaan Profil Beton Dinding Luar


[ 11.00 x 2.00 ] = 22.00 x 1.00 = 22.00
[ 8.16 x 2.00 ] = 16.32 x 1.00 = 16.32
[ 6.00 x 2.00 ] = 12.00 x 2.00 = 24.00
= 62.32 = 62.32 62.32 M'
Pekerjaan Pengecatan
I. Pengecatan dinding Exterior Ex. Propan
Dinding = 0.99 x 0.40 = 0.40
= 0.40 = 0.40 0.40 M2
J. Pengecatan dinding Interior Ex. Propan
Dinding = 0.99 x 0.60 = 0.59
= 0.59 = 0.59 0.59 M2

4.2.4 Pekerjaan Atap


Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Rangka Atap Baja Ringan
= 14.15 x 4.65 x 2.00 = 131.60
= 131.60 = 131.60 131.60 M2

B. Atap Zincalum 0,40 TCT Klip lock


= 14.15 x 4.65 x 2.00 = 131.60
= 131.60 = 131.60 131.60 M2
C. Lisplank Zincalumn T: 0,4 TCT MP Deck
= 14.15 x 0.50 x 2.00 = 14.15
= 4.65 x 0.50 x 4.00 = 9.30
= 23.45 = 23.45 23.45 M2
D. Flasing Zincalum 0,4 TCT
= 4.65 x 2.00 x 2.00 = 18.60
= 18.60 = 18.60 18.60 M'

E. Nok Atap Zincalum 0,40 TCT


= 14.15 x 1.00 x 1.00 = 14.15 = 14.15 14.15 M'

4.2.5 Pekerjaan Finishing Lantai


Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Pos Security, Locker dan Rg, tunggu Sopir
Pos Secitity [ 4.85 x 5.85 ] x 1.00 = 28.37
Locker [ 1.85 x 3.85 ] x 1.00 = 7.12
Rg Sopir [ 3.85 x 5.85 ] x 1.00 = 22.52
= 58.02 x 1.00 = 58.02 = 58.02 58.02 M2

B. Plin Keramik Dinding


Pos Secitity [ 4.85 + 5.85 ] x 2.00 = 21.40
Locker [ 1.85 + 3.85 ] x 2.00 = 11.40
Rg Sopir [ 3.85 + 5.85 ] x 2.00 = 19.40
= 52.20 - 4.35 = 47.85 = 47.85 47.85 M'

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
C. Keramik Area Toilet
Tioliet [ 1.85 x 1.35 ] x 1.00 = 2.50
= 2.50 x 1.00 = 2.50 = 2.50 2.50 M2

4.2.6 Pekerjaan Arsitek Pintu dan Jendela


Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium Dan Pintu Kaca
A. Pintu Type P1 = 1.00 1.00 Unit
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Kaca Rangka Dan Kusen Alumunium
B. Pintu Type P1' = 1.00 1.00 Unit
C. Pintu Type P3 = 1.00 1.00 Unit

Pekerjaan Jendela include pengadaan, installing dan accessories.


D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K = 2.00 2.00 Unit
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J3K = 1.00 1.00 Unit
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1 = 1.00 1.00 Unit
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV2 = 2.00 2.00 Unit

4.2.7 Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40
Pos Secitity [ 4.85 x 5.85 ] x 1.00 = 28.37
Locker [ 1.85 x 3.85 ] x 1.00 = 7.12
Tioliet [ 1.85 x 1.35 ] x 1.00 = 2.50
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 37.99 x 1.00 = 37.99 = 37.99 37.99 M2
B. Pekerjaan plafond Kalsi Link T: 4mm, rangka hollow 40x40 (Bagian Luar)
[ 12.85 x 1.35 ] x 2.00 = 34.70
[ 6.00 x 0.90 ] x 2.00 = 10.80
= 45.50 x 1.00 = 45.50 = 45.50 45.50 M2
Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board & Palfon Kalsi Link
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Plafond Gipsum = 37.99
Kalsi = 45.50
= 83.49 = 83.49 83.49 M2

4.2.8 Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas = 1.00 1.00 Unit
B. Kran Dinding Type Y 20JC Ex San Ei = 1.00 1.00 Unit
C. Floor Drain Dia 4" Type H51 Ex SAN EI = 1.00 1.00 Unit

4.2.9 Pekerjaan Lain-Lain


A. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu dan perapian.
[ 0.75 x 1.35 ] = 1.01 x 1.00 = 1.01
= 1.01 = 1.01 1.01 M2

4.3 RUMAH GENSET, RUANG POMPA, RUANG TANGKI BAHAN BAKAR DAN FIRE WATER TANK

4.3.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
Pondasi Plat Setempat
A. Galian Tanah Pondasi
Tapak P1 [ 1.00 x 1.00 ] x 1.20 = 1.20 x 11.00 = 13.20
= 13.20 13.20 M3
B. Urugan Bekas galian
Tapak P1 [ 1.00 x 0.70 ] x 0.80 = 0.56 x 11.00 = 6.16
[ 0.25 x 0.70 ] x 0.80 = 0.14 x 11.00 = 1.54
= 7.70 7.70 M3
C. Urugan Pasir Alas Pondasi
Tapak P1 [ 1.00 x 1.00 ] x 11.00 = 11.00 x 0.05 = 0.55
= 0.55 0.55 M3
D. Pek. Lantai Kerja pondasi
Tapak P1 [ 1.00 x 1.00 ] x 11.00 = 11.00 x 0.05 = 0.55
= 0.55 0.55 M3
E. Pek. Pondasi Plat Tapak P1
Tapak P1 [ 1.00 x 1.00 ] x 11.00 = 11.00 x 0.30 = 3.30 = 3.30 3.30 M3
Pembesian
Tul- utama [ 7.00 x 16.00 ] x 2.30 x 1.58 = 25.41 x 11.00 = 279.51
Begel [ 7.00 x 16.00 ] x 2.30 x 1.58 = 25.41 x 11.00 = 279.51 = 559.01 559.01 Kg

Bekisting [ 1.00 x 0.30 ] x 4.00 x 11.00 = 13.20 = 13.20 13.20 M2

F. Pek. Stump Beton Pondasi Plat Tapak (K1 ) Uk. 30/30 Cm


Beton [ 0.30 x 0.30 ] x 0.90 = 0.08 x 11.00 = 0.89 = 0.89 0.89 M3
Pembesian
Tul- utama [ 6.00 x 16.00 ] x 9.90 x 1.58 = 93.75
Begel [ 80.20 x 8.00 ] x 1.04 x 0.39 = 32.91 = 126.66 126.66 Kg
Bekisting [ 0.60 x 2.00 ] x 9.90 x 1.00 = 11.88 = 11.88 11.88 M2

Pondasi Batu kali


G. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 12.00 = 6.72 x 1.00 = 6.72 = 6.72 6.72 M3

H. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 6.72 x 0.25 ] = 1.68 = 1.68 1.68 M3

I. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Rg. Genset [ 3.85 x 5.85 ] x 1.00 = 22.52
Pompa [ 5.85 x 5.85 ] x 1.00 = 34.22
Tangki [ 2.85 x 5.85 ] x 1.00 = 16.67
= 73.42 x 0.35 = 25.70 = 25.70 25.70 M3

J. Urugan Pasir Bawah Lantai T=10 cm


= 73.42 x 0.10 = 7.34 = 7.34 7.34 M3

K. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 12.00 = 1.92 x 1.00 = 1.92
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 12.00 = 3.57 = 5.49 5.49 M3

L. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 12.00 : 1.00 ] x 0.50 = 6.00 x 0.62 = 3.70 = 3.70 3.70 Kg

4.3.2 Pekerjaan Beton


Beton Struktur Bangunan
A. Pek. Sloof Beton Type S1 uk. 200 x 400 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton [ 0.20 x 0.40 ] x 34.40 = 2.75 = 2.75 2.75 M3

Pembesian
Tul- utama [ 6.00 x 16.00 ] x 38.00 x 1.58 = 359.84
Begel [ 305.00 x 8.00 ] x 1.14 x 0.39 = 137.19 = 497.03 497.03 Kg

Bekisting [ 0.60 x 2.00 ] x 34.40 x 1.00 = 41.28 = 41.28 41.28 M2

B. Pek. Sloof Beton Type S2 uk. 150 x 250 mm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 12.00 = 0.45 = 0.45 0.45 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 12.00 x 0.62 = 29.59
Begel [ 69.57 x 8.00 ] x 0.74 x 0.39 = 20.31 = 49.91 49.91 Kg

Bekisting [ 0.25 x 2.00 ] x 12.00 x 1.00 = 6.00 = 6.00 6.00 M2


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
C. Pek. Kolom Praktis K1 Uk. 300 x 300 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton
[ 0.30 x 0.30 ] x 3.85 = 0.35 x 11.00 = 3.81
= 3.81 3.81 M3
Pembesian
Tul- utama [ 6.00 x 16.00 ] x 42.35 x 1.58 = 401.03
Begel [ 339.80 x 8.00 ] x 1.14 x 0.39 = 152.84 = 553.87 553.87 Kg

Bekisting [ 0.60 x 2.00 ] x 42.35 x 1.00 = 50.82 = 50.82 50.82 M2

D. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 3.05 = 0.05 x 3.00 = 0.15
[ 0.13 x 0.13 ] x 1.05 = 0.02 x 4.00 = 0.07
= 0.23 0.23 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 13.35 x 0.62 = 32.92
Begel [ 77.29 x 8.00 ] x 0.46 x 0.39 = 14.03 = 46.95 46.95 Kg

Bekisting [ 0.26 x 2.00 ] x 13.35 x 1.00 = 6.94 = 6.94 6.94 M2

E. Pek. Balok Beton Type RB1 uk. 20 x 40 cm , Besi 6 Ø16 (Tump) Besi 5 Ø16 (Lap), Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton [ 0.20 x 0.40 ] x 57.00 = 4.56 - 1.37 = 3.19 3.19 M3

Pembesian
Tul- utama [ 5.50 x 16.00 ] x 57.00 x 1.58 = 494.78
Begel [ 457.00 x 8.00 ] x 1.14 x 0.39 = 205.56 = 700.34 700.34 Kg

Bekisting [ 1.00 x 1.00 ] x 57.00 x 1.00 = 57.00 = 57.00 57.00 M2

F. Pek. Balok Beton Type BL uk. 11 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.11 x 0.15 ] x 29.90 = 0.49 = 0.49 0.49 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 29.90 x 0.62 = 73.73
Begel [ 171.86 x 8.00 ] x 0.46 x 0.39 = 31.19 = 104.93 104.93 Kg

Bekisting [ 0.15 x 2.00 ] x 29.90 x 1.00 = 8.97 = 8.97 8.97 M2

G. Pek. Beton Plat Lantai Dak T=12 Cm


Beton [ 11.50 x 7.50 ] x 0.12 = 10.35 = 10.35 10.35 M3

Melintang
Tul- utama [ 11.50 x 51.00 ] x 2.00 = 1,173.00
[ 7.50 x 77.67 ] x 2.00 = 1,165.00
= 2,338.00 x 0.62 = 1,441.38 = 1,441.38 1,441.38 Kg

Bekisting [ 3.80 x 2.80 ] x 2.00 = 21.28


[ 2.80 x 2.80 ] x 4.00 = 31.36
= 52.64 = 52.64 52.64 M2
H. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm
Beton [ 0.10 x 0.60 ] x 38.00 = 2.28 = 2.28 2.28 M3

Melintang
Tul- utama [ 38.00 x 4.00 ] x 1.00 = 152.00
[ 0.55 x 253.33 ] x 1.00 = 139.33
= 291.33 x 0.62 = 179.61 = 179.61 179.61 Kg

Bekisting [ 1.30 x 1.00 ] x 38.00 = 49.40


= 49.40 = 49.40 49.40 M2
I. Pek. Beton Plat Lantai Dudukan Genset Uk. 120x280 Cm T=60 Cm
Beton [ 1.20 x 2.80 ] x 0.60 = 2.02 = 2.02 2.02 M3

Tul- utama [ 8.00 x 8.00 ] x 6.50 x 0.39 = 20.52 x 1.00 = 20.52


[ 19.00 x 8.00 ] x 3.30 x 0.39 = 24.74 x 1.00 = 24.74 = 45.26 45.26 Kg

Bekisting [ 4.00 x 0.60 ] x 2.00 x 1.00 = 4.80 = 4.80 4.80 M2

J. Pek. Beton Plat Lantai Dudukan Tangki T=20 Cm


Beton [ 2.80 x 4.80 ] x 0.20 = 2.69
[ 0.30 x 10.80 ] x 0.70 = 2.27
[ 0.98 x 3.40 ] x 1.00 = 3.33 = 8.29 8.29 M3

Tul- utama [ 19.00 x 8.00 ] x 7.50 x 0.39 = 56.22 x 1.00 = 56.22


[ 32.00 x 8.00 ] x 9.70 x 0.39 = 122.47 x 1.00 = 122.47
[ 14.00 x 8.00 ] x 9.10 x 0.39 = 50.27 x 1.00 = 50.27
[ 23.00 x 8.00 ] x 5.10 x 0.39 = 46.28 x 1.00 = 46.28 = 275.25 275.25 Kg

Bekisting [ 7.60 x 0.20 ] x 2.00 = 3.04


[ 10.80 x 0.70 ] x 1.00 = 7.56
= 10.60 = 10.60 10.60 M2

K. Pek. Rabat Beton K-175, Lantai Genset Dan Rumah Pompa T=10 Cm
Rumah Genset [ 5.85 x 5.85 ] x 0.10 = 3.42 - 0.34 = 3.09
[ 1.60 x 9.10 ] x 0.10 = 1.46 x 1.00 = 1.46
Rumah Pompa [ 3.85 x 5.85 ] x 0.10 = 2.25 x 1.00 = 2.25 = 6.79 6.79 M3

Beton Struktur Fire Water Tank


L. Pek. Beton Lantai Fire Water Tank T=40 Cm, Besi Ø13-15.
Beton [ 5.95 x 6.20 ] x 0.40 = 14.76 = 14.76 14.76 M3

Tul- utama [ 40.00 x 13.00 ] x 12.90 x 1.04 = 537.61 x 1.00 = 537.61


[ 42.00 x 13.00 ] x 12.40 x 1.04 = 542.61 x 1.00 = 542.61 = 1,080.23 1,080.23 Kg

Bekisting [ 12.15 x 0.40 ] x 2.00 x 1.00 = 9.72 = 9.72 9.72 M2

M. Pek. Beton Dinding Fire Water Tank T=25 Cm & T=20 Cm, Besi Ø13-15 (vertikal), Besi Ø10-15 (Horizontal)
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Beton
Dinding T=25 Cm [ 6.20 x 2.85 ] x 0.25 x 1.00 = 4.42 x 2.00 = 8.84
[ 5.45 x 2.85 ] x 0.25 x 1.00 = 3.88 x 2.00 = 7.77
Dinding T=20 Cm [ 5.45 x 2.85 ] x 0.20 x 1.00 = 3.11 x 1.00 = 3.11
Sudut T=25 Cm [ 5.45 x 0.23 ] x 0.46 x 1.00 = 0.57 x 4.00 = 2.30
[ 5.70 x 0.23 ] x 0.46 x 1.00 = 0.60 x 4.00 = 2.40
Sudut T=25 Cm [ 5.45 x 0.10 ] x 0.20 x 1.00 = 0.11 x 4.00 = 0.44
= 24.84 = 24.84 24.84 M3
Pembesian
Vertikal T=25 [ 40.00 x 13.00 ] x 7.00 x 1.04 = 291.73 x 1.00 = 291.73
[ 42.00 x 13.00 ] x 7.00 x 1.04 = 306.31 x 1.00 = 306.31

Horizontal T=25 [ 20.00 x 10.00 ] x 13.00 x 0.62 = 160.29 x 1.00 = 160.29


[ 20.00 x 10.00 ] x 12.10 x 0.62 = 149.19 x 1.00 = 149.19

Vertikal T=20 [ 40.00 x 13.00 ] x 6.90 x 1.04 = 287.56 x 1.00 = 287.56

Horizontal T=20 [ 20.00 x 10.00 ] x 40.00 x 0.62 = 493.20 x 1.00 = 493.20

Sudut [ 38.00 x 13.00 ] x 1.05 x 1.04 = 41.57 x 4.00 = 166.28


[ 39.00 x 13.00 ] x 1.05 x 1.04 = 42.67 x 4.00 = 170.66
[ 12.92 x 13.00 ] x 3.00 x 1.04 = 40.38 x 2.00 = 80.77

[ 40.00 x 13.00 ] x 0.65 x 1.04 = 27.09 x 2.00 = 54.18


[ 5.95 x 13.00 ] x 2.00 x 1.04 = 12.40 x 2.00 = 24.80
= 2,184.97 = 2,184.97 2,184.97 Kg

Bekisting [ 5.95 x 2.85 ] x 2.00 x 1.00 = 33.92


[ 6.20 x 2.85 ] x 2.00 x 1.00 = 35.34
[ 5.25 x 2.85 ] x 4.00 x 1.00 = 59.85
[ 5.70 x 2.85 ] x 2.00 x 1.00 = 32.49
= 161.60 = 161.60 161.60 M2
N. Pek. Beton Plat Lantai Dak T=15 Cm
Beton [ 6.55 x 5.95 ] x 0.15 = 5.85 - 0.11 = 5.74 = 5.74 5.74 M3

Melintang
Tul- utama [ 45.00 x 5.95 ] x 2.00 = 535.50
[ 41.00 x 6.55 ] x 2.00 = 537.10
= 1,072.60 x 1.04 = 1,117.53 = 1,117.53 1,117.53 Kg

Bekisting [ 2.00 x 4.50 ] x 2.00 = 18.00


[ 5.95 x 0.35 ] x 1.00 = 2.08
[ 6.55 x 0.10 ] x 2.00 = 1.31
[ 5.95 x 0.10 ] x 2.00 = 1.19
= 22.58 = 22.58 22.58 M2
O. Pek. Integral Waterproffing Crystalline Lantai dan Dinding FWT
Lantai = 14.76
Dinding = 24.84
= 39.60 = 39.60 39.60 M3
4.3.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PB1 [ 1.10 x 2.15 ] x 1.00 = 2.36 x 1.00 Bh = 2.36
PB5 [ 2.20 x 2.15 ] x 1.00 = 4.72 x 1.00 Bh = 4.72
PB6 [ 0.90 x 1.95 ] x 1.00 = 1.76 x 1.00 Bh = 1.76
BV3 [ 1.98 x 0.65 ] x 1.00 = 1.29 x 4.00 Bh = 5.15
BV4 [ 1.09 x 0.65 ] x 1.00 = 0.71 x 1.00 Bh = 0.71
BV5 [ 1.34 x 0.65 ] x 1.00 = 0.87 x 1.00 Bh = 0.87
KR6 [ 2.00 x 1.20 ] x 1.00 = 2.40 x 3.00 Bh = 7.20
= 22.76
Luas Pas. Bata
[ 3.70 x 3.05 ] x 2.00 = 22.57 T= 3.05
[ 2.70 x 3.05 ] x 8.00 = 65.88 T= 3.05
[ 8.00 x 1.05 ] x 1.00 = 8.40 T= 1.05
= 96.85 - 22.76 = 74.09 = 74.09 74.09 M2
B. Pasangan Krawang Uk. 20x40 Cm, KR4 & Kr5
KR6 [ 5.00 x 6.00 ] x 3.00 = 90.00
= 90.00 = 90.00 90.00 Bh

C. Plesteran 1 : 4
Plesteran Beton
Kolom [ 1.05 x 42.35 ] x 1.00 = 44.47
Balok [ 0.85 x 57.00 ] x 1.00 = 48.45
Listpalnk [ 0.90 x 38.00 ] x 1.00 = 34.20

Fire WaterTank [ 6.20 x 3.25 ] x 2.00 = 40.30


[ 5.95 x 3.25 ] x 2.00 = 38.68
= 206.09
Plesteran Dinding
= 74.09 x 2.00 = 148.18

Total Plesteran = 206.09 + 148.18 = 354.28 = 354.28 354.28 M2


D. Acian Plesteran = 354.28 354.28 M2

E. Plesteran 1:4, Opening Kusen + Acian


PB1 [ 1.10 x 1.00 ] x 1.00 = 1.10 x 1.00 Bh = 1.10
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
PB5 [ 2.20 x 1.00 ] x 1.00 = 2.20 x 1.00 Bh = 2.20
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
PB6 [ 1.00 x 1.00 ] x 1.00 = 1.00 x 1.00 Bh = 1.00
BV3 [ 1.98 x 2.00 ] x 1.00 = 3.96 x 4.00 Bh = 15.84
[ 0.65 x 2.00 ] x 1.00 = 1.30 x 4.00 Bh = 5.20
BV4 [ 1.09 x 2.00 ] x 1.00 = 2.18 x 1.00 Bh = 2.18
[ 0.65 x 2.00 ] x 1.00 = 1.30 x 1.00 Bh = 1.30
BV5 [ 1.34 x 2.00 ] x 1.00 = 2.67 x 3.00 Bh = 8.01
[ 0.65 x 2.00 ] x 1.00 = 1.30 x 3.00 Bh = 3.90
= 49.31 = 49.31 49.31 M'

F. Pekerjaan Profil Beton Dinding Luar


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 19.00 x 2.00 ] = 38.00 x 1.00 = 38.00
[ 14.80 x 2.00 ] = 29.60 x 1.00 = 29.60
[ 6.00 x 2.00 ] = 12.00 x 2.00 = 24.00
= 91.60 = 91.60 91.60 M'

Pekerjaan Pengecatan
G. Pengecatan dinding Exterior Ex. Propan
Dinding = 354.28 x 0.40 = 141.71
= 141.71 = 141.71 141.71 M2
H. Pengecatan dinding Interior Ex. Propan
Dinding = 354.28 x 0.60 = 212.57
= 212.57 = 212.57 212.57 M2
4.3.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Tiang Kuda-Kuda Besi Pipa Dia-3" T=3 MMFin. Cat, Rg Tangki Bahan Bakar
Tiang = 1.73 x 2.00 x 1.00 = 3.46
= 1.48 x 1.00 x 1.00 = 1.48
= 1.23 x 2.00 x 1.00 = 2.46
Kuda-Kuda = 7.20 x 2.00 x 1.00 = 14.40
= 2.85 x 3.00 x 1.00 = 8.55
= 30.35 x 6.72 = 203.95 203.95 Kg
B. Pek. Gording CNP 150.65.20.3,2
= 3.38 x 7.00 x 1.00 = 23.63
= 7.20 x 1.00 x 1.00 = 7.20
= 30.83 x 7.52 = 231.70 231.70 Kg

C. Atap Zincalum 0,40 TCT Klip lock tanpa sambungan (roll on side)
= 7.38 x 3.53 x 1.00 = 26.00
= 26.00 = 26.00 26.00 M2
4.3.5 Pekerjaan Finishing Lantai
Finish lantai super flat Floor hardener 3kg/m2 ex Besroc (Type 10)
A. Beton Plat Area Rg. Genset Dan Rumah Pompa
Genset [ 5.85 x 5.85 ] x 1.00 = 34.22
Rumah Pompa [ 3.85 x 5.85 ] x 1.00 = 22.52
= 56.75 x 1.00 = 56.75 = 56.75 56.75 M2
4.3.6 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu Besi
A. Pintu Besi Type PB1 (1000x2100mm) = 1.00 1.00 Unit
B. Pintu Besi Type PB5 (2200x2100mm) = 1.00 1.00 Unit
C. Pintu Besi Type PB4 (800x1900mm) = 1.00 1.00 Unit

Pekerjaan Jendela include pengadaan, installing dan accessories.


D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV3 = 4.00 4.00 Unit
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV4 = 1.00 1.00 Unit
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV5 = 1.00 1.00 Unit

Pekerjaan Dinding BRC Rangka Besi Pipa Di-2"


G. Pekerjaan Pagar Type PG1, P=1675 MM, T=1050 MM = 1.00 1.00 Unit
H. Pekerjaan Pagar Type PG2, P=2850 MM, T=1050 MM = 1.00 1.00 Unit
I. Pekerjaan Pagar Type PG3, P=6000 MM, T=1050 MM = 1.00 1.00 Unit

4.3.7 Pekerjaan Lain-Lain


Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap Fire Water tank, Dak Atap Ruang Genset dan Rumah Pompa
A. Screed Waterproofing,
Lantai [ 5.70 x 5.25 ] x 1.00 = 29.93
Dinding [ 5.50 x 2.85 ] x 2.00 = 31.35
[ 5.45 x 2.85 ] x 4.00 = 62.13
Dak Atap [ 6.55 x 5.95 ] x 1.00 = 38.97
genset dan pompa [ 11.50 x 7.50 ] x 1.00 = 86.25
= 248.63 = 248.63 248.63 M2
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm
= 248.63 248.63 M2
C. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5
= 2.00 2.00 Unit
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2.5"
[ 5.00 x 1.00 ] x 4.00 = 20.00 = 20.00 20.00 M'
E. Pas. Roof Drain Dia 2.5"
= 4.00 4.00 Unit
F. Pek. Tangga Maintenance Luar Pipa 2" Fin. Cat
= 1.00 1.00 Unit
G. Pek. Tangga Maintenance Dalam Pipa 2" Satinless Steel
= 2.00 2.00 Unit

4.4 MUSHALLA, TOILET, KANTIN DAN KANTOR TRAC/ASSA/B-LOC

4.4.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 102.00 = 57.12 x 1.00 = 57.12 = 57.12 57.12 M3

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 57.12 x 0.25 ] = 14.28 = 14.28 14.28 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Mushalla [ 10.35 x 5.85 ] x 1.00 = 60.55
Kantin [ 5.85 x 5.85 ] x 1.00 = 34.22
Trac [ 2.85 x 5.85 ] x 1.00 = 16.67
Wuduk [ 1.35 x 3.85 ] x 1.00 = 5.20
[ 1.35 x 1.85 ] x 1.00 = 2.50
Tiolet [ 0.85 x 3.00 ] x 1.00 = 2.55
[ 1.85 x 1.35 ] x 2.00 = 5.00
[ 2.85 x 1.35 ] x 1.00 = 3.85
[ 1.35 x 1.35 ] x 2.00 = 3.65
= 134.18 x 0.35 = 46.96 = 46.96 46.96 M3

D. Urugan Pasir Bawah Lantai T=10 cm


= 134.18 x 0.10 = 13.42 = 13.42 13.42 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 0.20 x 0.80 ] x 102.00 = 16.32 x 1.00 = 16.32
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 102.00 = 30.34 = 46.67 46.67 M3

F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 102.00 : 1.00 ] x 0.50 = 51.00 x 0.62 = 31.44 = 31.44 31.44 Kg

4.4.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 102.00 = 3.82 = 3.82 3.83 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 102.00 x 0.89 = 362.21
Begel [ 583.86 x 8.00 ] x 0.74 x 0.39 = 170.47 = 532.68 532.68 Kg

Bekisting [ 0.25 x 2.00 ] x 102.00 x 1.00 = 51.00 = 51.00 51.00 M2

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm,Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 3.25 = 0.05 x 40.00 = 2.20
= 2.20 2.20 M3
Pembesian
Tul- utama [ 4.00 x 12.00 ] x 130.00 x 0.89 = 461.64
Begel [ 743.86 x 8.00 ] x 0.46 x 0.39 = 135.01 = 596.64 596.64 Kg

Bekisting [ 0.26 x 2.00 ] x 130.00 x 1.00 = 67.60 = 67.60 67.60 M2

C. Pek. Balok Beton Type rb uk. 13 x 20 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.13 x 0.20 ] x 102.00 = 2.65 = 2.65 2.65 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 102.00 x 0.62 = 251.53
Begel [ 583.86 x 8.00 ] x 0.60 x 0.39 = 138.22 = 389.75 389.75 Kg

Bekisting [ 0.20 x 2.00 ] x 102.00 x 1.00 = 40.80 = 40.80 40.80 M2

D. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 54.30 = 0.90 = 0.90 0.90 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 54.30 x 0.62 = 133.90
Begel [ 311.29 x 8.00 ] x 0.46 x 0.39 = 56.50 = 190.40 190.40 Kg

Bekisting [ 0.15 x 2.00 ] x 54.30 x 1.00 = 16.29 = 16.29 16.29 M2

E. Pek. Rabat Beton Lantai T=5 Cm


= 134.18 x 0.05 = 6.71 = 6.71 6.71 M3
4.4.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
P1 [ 0.99 x 2.15 ] x 1.00 = 2.12 x 1.00 Bh = 2.12
P2 [ 0.84 x 2.15 ] x 1.00 = 1.80 x 1.00 Bh = 1.80
P3 [ 0.69 x 2.15 ] x 1.00 = 1.48 x 3.00 Bh = 4.44
J1K [ 1.34 x 1.19 ] x 1.00 = 1.59 x 1.00 Bh = 1.59
BV1 [ 0.79 x 0.49 ] x 1.00 = 0.39 x 4.00 Bh = 1.55
BV1' [ 0.79 x 0.49 ] x 1.00 = 0.39 x 1.00 Bh = 0.39
KR1 [ 1.35 x 1.80 ] x 1.00 = 2.43 x 8.00 Bh = 19.44
KR2 [ 1.60 x 0.60 ] x 1.00 = 0.96 x 3.00 Bh = 2.88
KR3 [ 0.20 x 0.30 ] x 1.00 = 0.06 x 10.00 Bh = 0.60
Pintu Tanpa Kusen [ 1.50 x 2.20 ] x 1.00 = 3.30 x 1.00 Bh = 3.30
[ 1.35 x 2.20 ] x 1.00 = 2.97 x 1.00 Bh = 2.97
[ 0.85 x 2.20 ] x 1.00 = 1.87 x 1.00 Bh = 1.87
[ 1.00 x 2.20 ] x 1.00 = 2.20 x 2.00 Bh = 4.40
= 47.35 = 47.35 47.35 M2
Luas Pas. Bata
[ 24.00 x 3.20 ] x 1.00 = 76.80 T= 3.20
[ 6.00 x 3.20 ] x 6.00 = 115.20 T= 3.20
[ 3.50 x 3.20 ] x 1.00 = 11.20 T= 3.55
[ 5.00 x 2.15 ] x 1.00 = 10.75 T= 2.15
[ 3.00 x 3.20 ] x 1.00 = 9.60 T= 3.20
[ 6.50 x 2.15 ] x 1.00 = 13.98 T= 2.15

= 237.53 - 47.35 = 190.18 = 190.18 190.18 M2


B. Pasangan Krawang Uk. 20x40 Cm, KR2
KR1 [ 4.00 x 3.00 ] x 3.00 = 36.00 = 36.00 36.00 Bh

C. Pasangan Krawang Uk. 20x30 Cm, KR3


[ 1.00 x 1.00 ] x 10.00 = 10.00 = 10.00 10.00 Bh

D. Plesteran 1 : 4
= 190.18 x 2.00 = 380.35 - 81.99 = 298.36 = 298.36 298.36 M2

E. Acian Plesteran
= 298.36 = 298.36 298.36 M2
F. Plesteran 1:4, Opening Kusen + Acian
P1 [ 0.99 x 1.00 ] x 1.00 = 0.99 x 1.00 Bh = 0.99
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P2 [ 0.84 x 1.00 ] x 1.00 = 0.84 x 1.00 Bh = 0.84
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
P3 [ 0.69 x 1.00 ] x 1.00 = 0.69 x 1.00 Bh = 0.69
[ 2.15 x 2.00 ] x 1.00 = 4.29 x 1.00 Bh = 4.29
J1K [ 1.34 x 2.00 ] x 1.00 = 2.67 x 1.00 Bh = 2.67
[ 1.19 x 2.00 ] x 1.00 = 2.38 x 1.00 Bh = 2.38
BV1 [ 0.79 x 2.00 ] x 1.00 = 1.58 x 4.00 Bh = 6.32
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 4.00 Bh = 3.92
BV1' [ 0.79 x 2.00 ] x 1.00 = 1.58 x 1.00 Bh = 1.58
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 0.49 x 2.00 ] x 1.00 = 0.98 x 1.00 Bh = 0.98
Pintu Tanpa Kusen [ 1.50 x 1.00 ] x 1.00 = 1.50 x 1.00 Bh = 1.50
[ 2.20 x 2.00 ] x 1.00 = 4.40 x 1.00 Bh = 4.40
[ 1.35 x 1.00 ] x 1.00 = 1.35 x 1.00 Bh = 1.35
[ 2.20 x 2.00 ] x 1.00 = 4.40 x 1.00 Bh = 4.40
[ 0.85 x 1.00 ] x 1.00 = 0.85 x 1.00 Bh = 0.85
[ 2.20 x 2.00 ] x 1.00 = 4.40 x 1.00 Bh = 4.40
[ 1.00 x 1.00 ] x 1.00 = 1.00 x 2.00 Bh = 2.00
[ 2.20 x 2.00 ] x 1.00 = 4.40 x 2.00 Bh = 8.80
= 60.94 = 60.94 60.94 M'

G. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan T. Wudhuk)


Toilet [ 13.55 x 2.00 ] - 2.76 = 24.34 x 1.00 = 24.34
[ 5.40 x 2.00 ] - 2.76 = 8.04 x 2.00 = 16.08
[ 6.40 x 2.00 ] - 4.44 = 8.36 x 2.00 = 16.72

whuduk [ 8.05 x 1.60 ] = 12.88 x 1.00 = 12.88


[ 5.40 x 1.60 ] = 8.64 x 1.00 = 8.64
= 78.66 = 78.66 78.66 M2

H. Pas. Keramik Dinding Uk. 300x300 MM (Pantry)


Kantin [ 1.85 x 0.60 ] = 1.11 x 3.00 = 3.33
= 3.33 = 3.33 3.33 M2

I. Pekerjaan Naad dan Pearapian Dinding Atas Keramik Termasuk pada Plin Dinding
[ 13.55 x 1.00 ] - 1.38 = 12.17 x 1.00 = 12.17
[ 5.40 x 1.00 ] - 1.38 = 4.02 x 1.00 = 4.02
[ 6.40 x 1.00 ] - 3.06 = 3.34 x 4.00 = 13.36
[
[ 8.05 x 1.00 ] = 8.05 x 1.00 = 8.05
[ 5.40 x 1.00 ] = 5.40 x 1.00 = 5.40
Plin Keramik = 69.80
= 112.80 = 112.80 112.80 M'

J. Pekerjaan Profil Beton Dinding Luar


[ 24.00 x 2.00 ] = 48.00 x 1.00 = 48.00
[ 22.13 x 2.00 ] = 44.26 x 1.00 = 44.26
[ 6.00 x 2.00 ] = 12.00 x 2.00 = 24.00
= 116.26 = 116.26 116.26 M'
Pekerjaan Pengecatan
I. Pengecatan dinding Exterior Ex. Propan
Dinding = 0.99 x 0.40 = 0.40
= 0.40 = 0.40 0.40 M2
J. Pengecatan dinding Interior Ex. Propan
Dinding = 0.99 x 0.60 = 0.59
= 0.59 = 0.59 0.59 M2

4.4.4 Pekerjaan Atap


Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Rangka Atap Baja Ringan
= 27.15 x 4.65 x 2.00 = 252.50
= 252.50 = 252.50 252.50 M2
B. Atap Zincalum 0,40 TCT Klip lock
= 27.15 x 4.65 x 2.00 = 252.50
= 252.50 = 252.50 252.50 M2
C. Lisplank Zincalumn T: 0,4 TCT MP Deck
= 27.15 x 0.50 x 2.00 = 27.15
= 4.65 x 0.50 x 2.00 = 4.65
= 31.80 = 31.80 31.80 M2
D. Flasing Zincalum 0,4 TCT
= 4.65 x 2.00 x 1.00 = 9.30
= 9.30 = 9.30 9.30 M'

E. Nok Atap Zincalum 0,40 TCT


= 27.15 x 1.00 x 1.00 = 27.15 = 27.15 27.15 M'

4.4.5 Pekerjaan Finishing Lantai


Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Mushalla, Kantin Dan Kantor trac
Mushalla [ 10.35 x 5.85 ] x 1.00 = 60.55
Kantin [ 5.85 x 5.85 ] x 1.00 = 34.22
Trac [ 2.85 x 5.85 ] x 1.00 = 16.67
= 111.44 x 1.00 = 111.44 = 111.44 111.44 M2

B. Plin Lantai Keramik


Mushalla [ 10.35 + 5.85 ] x 2.00 = 32.40
Kantin [ 5.85 + 5.85 ] x 2.00 = 23.40
Trac [ 2.85 + 5.85 ] x 2.00 = 17.40
= 73.20 - 3.40 = 69.80 = 69.80 69.80 M'

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
C. Keramik Area Toilet, tempat Wudhuk
Wuduk [ 1.35 x 3.85 ] x 1.00 = 5.20
[ 1.35 x 1.85 ] x 1.00 = 2.50
Tiolet [ 0.85 x 3.00 ] x 1.00 = 2.55
[ 1.85 x 1.35 ] x 2.00 = 5.00
[ 2.85 x 1.35 ] x 1.00 = 3.85
[ 1.35 x 1.35 ] x 2.00 = 3.65
= 22.73 x 1.00 = 22.73 = 22.73 22.73 M2

4.4.6 Pekerjaan Arsitek Pintu dan Jendela


Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Kaca Rangka Dan Kusen Alumunium
A. Pintu Type P1 = 1.00 1.00 Unit
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium
B. Pintu Type P2 = 1.00 1.00 Unit
C. Pintu Type P3 = 3.00 3.00 Unit
D. Pintu Type P4 = 1.00 1.00 Unit
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Pekerjaan Jendela include pengadaan, installing dan accessories.


E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1K = 1.00 1.00 Unit
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1 = 4.00 4.00 Unit
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1' = 1.00 1.00 Unit
H. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type KR1 = 8.00 8.00 Unit

4.4.7 Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40
Mushalla [ 10.35 x 5.85 ] x 1.00 = 60.55
Kantin [ 5.85 x 5.85 ] x 1.00 = 34.22
Trac [ 2.85 x 5.85 ] x 1.00 = 16.67
Wuduk [ 1.35 x 3.85 ] x 1.00 = 5.20
[ 1.35 x 1.85 ] x 1.00 = 2.50
Tiolet [ 0.85 x 3.00 ] x 1.00 = 2.55
[ 1.85 x 1.35 ] x 2.00 = 5.00
[ 2.85 x 1.35 ] x 1.00 = 3.85
[ 1.35 x 1.35 ] x 2.00 = 3.65
= 134.18 x 1.00 = 134.18 = 134.18 134.18 M2
B. Pekerjaan plafond Kalsi Link T= 4mm, rangka hollow 40x40 area Luar
Mushalla [ 25.95 x 1.35 ] x 2.00 = 70.07
Kantin [ 6.00 x 0.90 ] x 2.00 = 10.80
= 80.87 x 1.00 = 80.87 = 80.87 80.87 M2

Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board & beton exposed dibawah tangga
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Plafond Gipsum = 134.18
Plafond Kalsi = 80.87
= 215.04 = 215.04 215.04 M2

4.4.8 Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas = 3.00 3.00 Unit
B. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hanya pemasangan dan instalasi = 1.00 1.00 Unit
C. Kran Dinding Type Y 20JC Ex San Ei = 9.00 9.00 Unit
D. Floor Drain Dia 4" Type H51 Ex SAN EI = 5.00 5.00 Unit
E. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran 600mm x 800mm) = 1.00 1.00 Unit
F. Kitchen zick Single Bowl Ex Royal = 3.00 3.00 Unit
G. Kran Pantry Model Leher Angsa A10C Ex SAN EI = 3.00 3.00 Unit

4.4.9 Pekerjaan Lain-Lain


A. Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. keramik 300 x300 mm ex. IKAD
Kantin [ 1.85 x 0.60 ] = 1.11 x 3.00 = 3.33
= 3.33 = 3.33 3.33 M2
B. Tanggulan Tempat Wudhu, include pasangan bata, pasangan keramik, jasa pemasangan dan perapian
[ 3.20 x 1.00 ] = 3.20 x 1.00 = 3.20
[ 1.35 x 1.00 ] = 1.35 x 1.00 = 1.35
= 4.55 = 4.55 4.55 M'
C. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu dan perapian.
[ 0.75 x 1.35 ] = 1.01 x 3.00 = 3.04
= 3.04 = 3.04 3.04 M2
4.5 TEMPAT CUCI COUNTENER

4.5.1 Pekerjaan Tanah dan Pondasi


Pondasi Batu kali
A. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 2.00 = 1.12 x 1.00 = 1.12
[ 0.80 x 0.70 ] x 10.00 = 5.60 x 1.00 = 5.60
= 6.72 = 6.72 6.72 M3

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 6.72 x 0.25 ] = 1.68 = 1.68 1.68 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Rg. Genset [ 5.00 x 6.00 ] x 1.00 = 30.00
= 30.00 x 0.35 = 10.50 = 10.50 10.50 M3

D. Urugan Pasir Bawah Lantai T=10 cm


= 30.00 x 0.10 = 3.00 = 3.00 3.00 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 2.00 = 0.32 x 1.00 = 0.32
[ 0.05 + 0.36 ] ; 2.00 = 0.21 x 0.70 x 2.00 = 0.29
[ 0.20 x 0.80 ] x 10.00 = 1.60 x 1.00 = 1.60
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 10.00 = 2.98 = 5.18 5.18 M3

F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 10.00 : 1.00 ] x 0.50 = 5.00 x 0.62 = 3.08 = 3.08 3.08 Kg

4.5.2 Pekerjaan Beton


Beton Struktur Bangunan
A. Pek. Kolom K1 Uk. 200 x 200 mm, Besi 6 Ø12, Sengkang Ø8-100 mm
Beton
[ 0.20 x 0.20 ] x 0.50 = 0.02 x 2.00 = 0.04
[ 0.20 x 0.20 ] x 1.70 = 0.07 x 2.00 = 0.14
= 0.18 0.18 M3
Pembesian
Tul- utama [ 6.00 x 12.00 ] x 4.40 x 0.89 = 23.44
Begel [ 45.00 x 8.00 ] x 0.74 x 0.39 = 13.14 = 36.58 36.58 Kg

Bekisting [ 0.40 x 2.00 ] x 4.40 x 1.00 = 3.52 = 3.52 3.52 M2

B. Pek. Kolom KP Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm, Ø8-200 mm
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Beton
[ 0.13 x 0.13 ] x 1.70 = 0.03 x 1.00 = 0.03
[ 0.13 x 0.13 ] x 1.20 = 0.02 x 4.00 = 0.08
= 0.03 0.03 M3
Pembesian
Tul- utama [ 6.00 x 12.00 ] x 1.70 x 0.89 = 9.06
Begel [ 18.00 x 8.00 ] x 0.46 x 0.39 = 3.27 = 12.32 12.32 Kg

Bekisting [ 0.26 x 2.00 ] x 1.70 x 1.00 = 0.88 = 0.88 0.88 M2

C. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 11.00 = 0.18 = 0.18 0.18 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 11.00 x 0.62 = 27.13
Begel [ 63.86 x 8.00 ] x 0.46 x 0.39 = 11.59 = 38.72 38.72 Kg

Bekisting [ 0.15 x 2.00 ] x 11.00 x 1.00 = 3.30 = 3.30 3.30 M2

D. Pek. Rabat Beton K-175, T=5 Cm


[ 5.20 x 6.20 ] x 0.05 = 1.61 = 1.61
= 1.61 1.61 M3

4.5.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Pas. Bata
[ 4.80 x 1.70 ] x 1.00 = 8.16 T= 1.70
[ 6.00 x 1.20 ] x 1.00 = 7.20 T= 1.20

= 15.36 = 15.36 15.36 M2


B. Plesteran 1 : 4
= 4.80 x 1.70 = 8.16 = 8.16 = 8.16 8.16 M2

C. Acian Plesteran
= 8.16 = 8.16 8.16 M2
D. Pas. Keramik Dinding Uk. 200x400 MM (Dinding Belakang Dan Bak Air)
Dinding Belakan[ 5.00 x 1.70 ] = 8.50 x 1.00 = 8.50
Bak Air [ 6.00 x 1.20 ] = 7.20 x 2.00 = 14.40
= 22.90 = 22.90 22.90 M2

Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan
Dinding = 8.16 x 1.00 = 8.16
= 8.16 = 8.16 8.16 M2
4.5.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Tiang Besi Pipa Dia-3" T=3 MM Fin. Cat
Tiang = 3.30 x 2.00 x 1.00 = 6.60
= 1.60 x 2.00 x 1.00 = 3.20
= 9.80 x 6.72 = 65.86 = 65.86 65.86 Kg
B. Pek. Kuda Besi Pipa Dia-3" T=3 MM dan Skor Pipa Besi Dia 2"T=2.8 MM Fin. Cat
Kuda-Kuda 3" = 7.20 x 2.00 x 1.00 = 14.40
= 5.96 x 2.00 x 1.00 = 11.92
= 26.32 x 6.72 = 176.87
Kuda-Kuda 2" = 0.45 x 2.00 x 2.00 = 1.80
= 0.45 x 3.00 x 2.00 = 2.70
= 1.95 x 3.00 x 2.00 = 11.70
= 1.25 x 4.00 x 2.00 = 10.00
= 26.20 x 4.08 = 106.90
= 283.77 = 283.77 283.77 Kg

C. Pek. Gording CNP 150.65.20.3,2


= 6.05 x 7.00 x 1.00 = 42.35
= 7.20 x 2.00 x 1.00 = 14.40
= 56.75 x 7.52 = 426.57 426.57 Kg

D. Atap Zincalum 0,40 TCT Klip lock


= 7.38 x 6.35 x 1.00 = 46.83
= 46.83 = 46.83 46.83 M2
4.5.5 Pekerjaan Finishing Lantai
Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Lantai Tempat Cuci Countener Termasuk Bak Air
[ 5.20 x 6.20 ] x 1.00 = 32.24
= 32.24 x 1.00 = 32.24 = 32.24 32.24 M2

4.5.6 Pekerjaan Lain-Lain


Pekerjaan Saluran Air keliling
A. Pek. Saluran Keliling 2 sisi
[ 6.20 x 2.00 ] x 1.00 = 12.40
= 12.40 = 12.40 12.40 M'

4.6 TEMPAT SAMPAH

4.6.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi
Bt. Kali 1 [ 0.80 x 0.70 ] x 25.00 = 14.00 x 1.00 = 14.00
Bt. Kali 2 [ 0.80 x 0.70 ] x 25.00 = 14.00 x 1.00 = 14.00 = 28.00 28.00 M3

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 28.00 x 0.25 ] = 7.00 = 7.00 7.00 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Sampah [ 3.85 x 2.85 ] x 2.00 = 21.95
B3 [ 3.85 x 2.85 ] x 2.00 = 21.95
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 43.89 x 0.35 = 15.36 = 15.36 15.36 M3

D. Urugan Pasir Bawah Lantai T=10 cm


= 43.89 x 0.10 = 4.39 = 4.39 4.39 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 50.00 = 8.00 x 1.00 = 8.00
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 50.00 = 14.88 = 22.88 22.88 M3

F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 50.00 : 1.00 ] x 0.50 = 25.00 x 0.62 = 15.41 = 15.41 15.41 Kg

4.6.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 50.00 = 1.88 = 1.88 1.88 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 50.00 x 0.89 = 177.55
Begel [ 286.71 x 8.00 ] x 0.74 x 0.39 = 83.71 = 261.27 261.27 Kg

Bekisting [ 0.25 x 2.00 ] x 50.00 x 1.00 = 25.00 = 25.00 25.00 M2

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 3.10 = 0.05 x 10.00 = 0.52
[ 0.13 x 0.13 ] x 2.85 = 0.05 x 6.00 = 0.29
[ 0.13 x 0.13 ] x 1.60 = 0.03 x 4.00 = 0.11
= 0.52 0.52 M3
Pembesian
Tul- utama [ 4.00 x 12.00 ] x 54.50 x 0.89 = 193.53
Begel [ 312.43 x 8.00 ] x 0.46 x 0.39 = 56.71 = 250.24 250.24 Kg

Bekisting [ 0.26 x 2.00 ] x 54.50 x 1.00 = 28.34 = 28.34 28.34 M2

C. Pek. Balok Beton Type rb uk. 13 x 20 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.13 x 0.20 ] x 50.00 = 1.30 = 1.30 1.30 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 50.00 x 0.62 = 123.30
Begel [ 286.71 x 8.00 ] x 0.60 x 0.39 = 67.88 = 191.18 191.18 Kg

Bekisting [ 0.20 x 2.00 ] x 50.00 x 1.00 = 20.00 = 20.00 20.00 M2

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 25.00 = 0.41 = 0.41 0.41 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 25.00 x 0.62 = 61.65
Begel [ 143.86 x 8.00 ] x 0.46 x 0.39 = 26.11 = 87.76 87.76 Kg

Bekisting [ 0.15 x 2.00 ] x 25.00 x 1.00 = 7.50 = 7.50 7.50 M2

E. Pek. Rabat Beton Lantai T=5 Cm


= 43.89 x 0.05 = 2.19 = 2.19 2.19 M3
4.6.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PB7 [ 1.50 x 1.50 ] x 1.00 = 2.25 x 2.00 Bh = 4.50
PB7' [ 1.50 x 2.80 ] x 1.00 = 4.20 x 2.00 Bh = 8.40
JK1 [ 1.03 x 1.46 ] x 1.00 = 1.50 x 4.00 Bh = 5.99
= 18.89
Luas Pas. Bata
[ 8.00 x 1.60 ] x 2.00 = 25.60 T= 1.60
[ 4.00 x 1.60 ] x 3.00 = 19.20 T= 1.60
[ 8.00 x 3.10 ] x 1.00 = 24.80 T= 3.10
[ 8.00 x 2.85 ] x 1.00 = 22.80 T= 2.85
[ 3.00 x 2.98 ] x 3.00 = 26.78 T= 2.98
= 119.18 - 18.89 = 100.29 = 100.29 100.29 M2
B. Plesteran 1 : 4
= 100.29 x 2.00 = 200.58 = 200.58 = 200.58 200.58 M2

C. Acian Plesteran
= 200.58 = 200.58 200.58 M2
D. Plesteran 1:4, Opening Kusen + Acian
PB7 [ 1.50 x 2.00 ] x 1.00 = 3.00 x 2.00 Bh = 6.00
PB7' [ 1.50 x 1.00 ] x 1.00 = 1.50 x 2.00 Bh = 3.00
[ 2.80 x 2.00 ] x 1.00 = 5.60 x 2.00 Bh = 11.20
JK1 [ 1.03 x 2.00 ] x 1.00 = 2.05 x 4.00 Bh = 8.20
[ 1.46 x 2.00 ] x 1.00 = 2.92 x 4.00 Bh = 11.68
= 40.08 = 40.08 40.08 M'
Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan
Dinding = 200.58 x 0.45 = 90.26
= 90.26 = 90.26 90.26 M2
F Pengecatan dinding Interior Ex. Propan
Dinding = 200.58 x 0.55 = 110.32
= 110.32 = 110.32 110.32 M2
4.6.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Tiang Besi Pipa Dia-3" T=3 MM Fin. Cat
Tiang = 0.10 x 15.00 x 1.00 = 1.50
= 1.50 x 6.72 = 10.08 = 10.08 10.08 Kg
B. Pek. Kuda Besi Pipa Dia-3" T=3 MM Fin. Cat
Kuda-Kuda 3" = 4.60 x 3.00 x 1.00 = 13.80
= 5.69 x 3.00 x 1.00 = 17.07
= 30.87 x 6.72 = 207.45
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 207.45 = 207.45 207.45 Kg

C. Pek. Gording CNP 150.65.20.3,2


= 9.45 x 5.00 x 1.00 = 47.25
= 9.45 x 6.00 x 1.00 = 56.70
= 4.60 x 2.00 x 1.00 = 9.20
= 5.69 x 2.00 x 1.00 = 11.38
= 124.53 x 7.52 = 936.05 936.05 Kg

D. Atap Zincalum 0,40 TCT Klip lock


= 9.75 x 4.75 x 1.00 = 46.31
= 9.75 x 5.20 x 1.00 = 50.70
= 97.01 = 97.01 97.01 M2
4.6.5 Pekerjaan Arsitek Pintu
Pekerjaan Pintu Besi
A. Pintu Type PB7, (1500x1500mm) = 2.00 2.00 Unit
B. Pintu Type PB7', (1500x2100mm) = 2.00 2.00 Unit
Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesories.
C. Jendela JK1 (Area Limbab B3) = 4.00 4.00 Unit

4.6.6 Pekerjaan Tempat Sampah Cair


Beton Struktur Limbah Cair
A Pek. Beton Lantai T=15 Cm, Besi Ø10-15.
Beton [ 3.15 x 2.15 ] x 0.15 = 1.02 = 1.02 1.02 M3

Tul- utama [ 22.00 x 10.00 ] x 6.60 x 0.62 = 89.52 x 1.00 = 89.52


[ 15.33 x 10.00 ] x 4.60 x 0.62 = 43.48 x 1.00 = 43.48 = 133.00 133.00 Kg

Bekisting [ 5.30 x 0.15 ] x 2.00 x 1.00 = 1.59 = 1.59 1.59 M2

B. Pek. Beton Dinding T=15 Cm , Besi Ø10-15


Beton
Dinding T=15 Cm [ 3.00 x 1.50 ] x 0.15 x 1.00 = 0.67 x 2.00 = 1.35
[ 2.00 x 1.50 ] x 0.15 x 1.00 = 0.45 x 2.00 = 0.90
= 2.25 = 2.25 2.25 M3
Pembesian
Vertikal T=15 [ 21.33 x 10.00 ] x 3.60 x 0.62 = 47.35 x 1.00 = 47.35
[ 14.67 x 10.00 ] x 3.60 x 0.62 = 32.55 x 1.00 = 32.55

Horizontal T=15 [ 12.00 x 10.00 ] x 6.60 x 0.62 = 48.83 x 1.00 = 48.83


[ 12.00 x 10.00 ] x 4.60 x 0.62 = 34.03 x 1.00 = 34.03

Sudut [ 22.00 x 10.00 ] x 0.60 x 0.62 = 8.14 x 2.00 = 16.28


[ 11.00 x 10.00 ] x 0.60 x 0.62 = 4.07 x 2.00 = 8.14

[ 3.15 x 10.00 ] x 2.00 x 0.62 = 3.88 x 2.00 = 7.77


[ 2.15 x 10.00 ] x 2.00 x 0.62 = 2.65 x 2.00 = 5.30
= 200.24 = 200.24 200.24 Kg

Bekisting [ 3.15 x 1.35 ] x 2.00 x 1.00 = 8.51


[ 2.15 x 1.35 ] x 2.00 x 1.00 = 5.81
[ 2.85 x 1.35 ] x 2.00 x 1.00 = 7.70
[ 1.85 x 1.35 ] x 2.00 x 1.00 = 5.00
= 27.00 = 27.00 27.00 M2
C. Pek. Beton Plat Lantai Dak T=15 Cm, Besi Ø10-15
Beton [ 3.15 x 2.15 ] x 0.15 = 1.02 = 1.02 1.02 M3

Melintang
Tul- utama [ 22.00 x 2.15 ] x 2.00 = 94.60
[ 15.33 x 3.15 ] x 2.00 = 96.60
= 191.20 x 0.62 = 117.87 = 117.87 117.87 Kg

Bekisting [ 3.00 x 2.00 ] x 1.00 = 6.00


[ 3.15 x 0.10 ] x 2.00 = 0.63
[ 2.15 x 0.10 ] x 2.00 = 0.43
= 7.06 = 7.06 7.06 M2
Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap
D. Screed Waterproofing,
Lantai [ 2.85 x 1.85 ] x 1.00 = 5.27
Dinding [ 2.85 x 1.50 ] x 2.00 = 8.55
[ 1.85 x 1.50 ] x 2.00 = 5.55
Dak Atap [ 3.15 x 2.15 ] x 1.00 = 6.77
= 26.15 = 26.15 26.15 M2
E. Waterproofing Liquid Membrant Include Overlap
= 26.15 26.15 M2
4.6.7 Pekerjaan Lain-lain
A. Wall Hung Lavatory Type LW240CJ Include kran Lavatory Ex. TOTO hanya pemasangan dan instalasi = 1.00 1.00 Unit

B. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5


= 1.00 1.00 Unit

4.7 GUDANG ARSIP

4.7.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi
Bt. Kali [ 0.80 x 0.70 ] x 44.00 = 24.64 x 1.00 = 24.64 = 24.64 24.64 M3

B. Urugan Kembali Bekas Galian Tanah


Bt. Kali [ 24.64 x 0.25 ] = 6.16 = 6.16 6.16 M3

C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian


Arsip [ 15.85 x 5.85 ] x 1.00 = 92.72
Teras [ 1.50 x 3.50 ] x 1.00 = 5.25
= 97.97 x 0.35 = 34.29 = 34.29 34.29 M3

D. Urugan Pasir Bawah Lantai T=10 cm


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 97.97 x 0.10 = 9.80 = 9.80 9.80 M3

E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps


[ 0.20 x 0.80 ] x 44.00 = 7.04 x 1.00 = -
[ 0.25 + 0.60 ] ; 2.00 = 0.43 x 0.70 x 44.00 = 13.09 = 13.09 13.09 M3

F. Pek. Pondasi Batu Bata


[ 0.30 x 6.50 ] x 1.00 = 1.95 = 1.95 1.95 M2

G. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM


[ 44.00 : 1.00 ] x 0.50 = 22.00 x 0.62 = 13.56 = 13.56 13.56 Kg

4.7.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.15 x 0.25 ] x 44.00 = 1.65 = 1.65 1.65 M3

Pembesian
Tul- utama [ 4.00 x 12.00 ] x 44.00 x 0.89 = 156.25
Begel [ 252.43 x 8.00 ] x 0.74 x 0.39 = 73.70 = 229.95 229.95 Kg

Bekisting [ 0.25 x 2.00 ] x 44.00 x 1.00 = 22.00 = 22.00 22.00 M2

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm,Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 3.25 = 0.05 x 14.00 = 0.77
= 0.77 0.77 M3
Pembesian
Tul- utama [ 4.00 x 12.00 ] x 45.50 x 0.89 = 161.57
Begel [ 261.00 x 8.00 ] x 0.46 x 0.39 = 47.37 = 208.94 208.94 Kg

Bekisting [ 0.26 x 2.00 ] x 45.50 x 1.00 = 23.66 = 23.66 23.66 M2

C. Pek. Balok Beton Type rb uk. 13 x 20 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.13 x 0.20 ] x 44.00 = 1.14 = 1.14 1.14 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 44.00 x 0.62 = 108.50
Begel [ 252.43 x 8.00 ] x 0.60 x 0.39 = 59.76 = 168.26 168.26 Kg

Bekisting [ 0.20 x 2.00 ] x 44.00 x 1.00 = 17.60 = 17.60 17.60 M2

D. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)

Beton [ 0.11 x 0.15 ] x 16.00 = 0.26 = 0.26 0.26 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 16.00 x 0.62 = 39.46
Begel [ 92.43 x 8.00 ] x 0.46 x 0.39 = 16.78 = 56.23 56.23 Kg

Bekisting [ 0.15 x 2.00 ] x 16.00 x 1.00 = 4.80 = 4.80 4.80 M2

E. Pek. Lantai Beton K-250, T=10 Cm, Tul. Wiremesh MS-8


Arsip [ 15.85 x 5.85 ] x 1.00 = 92.72
Teras [ 1.50 x 3.50 ] x 1.00 = 5.25
= 97.97 x 0.10 = 9.80 = 9.80 9.80 M3
Pembesian
= 97.97 x 5.45 = 533.84 = 533.84 533.84 Kg

4.7.3 Pekerjaan Pasangan dan Finishing Dinding

Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PB3 [ 1.60 x 2.40 ] x 1.00 = 3.84 x 1.00 Bh = 3.84
JK2 [ 1.50 x 1.30 ] x 1.00 = 1.95 x 4.00 Bh = 7.80
= 11.64
Luas Pas. Bata
[ 16.00 x 3.20 ] x 2.00 = 102.40 T= 3.20
[ 6.00 x 3.20 ] x 2.00 = 38.40 T= 3.20
[ 3.00 x 0.72 ] x 2.00 = 4.32 T= 0.72
= 145.12 - 11.64 = 133.48 = 133.48 133.48 M2

B. Plesteran 1 : 4
= 133.48 x 2.00 = 266.96 = 266.96 = 266.96 266.96 M2

C. Acian Plesteran
= 266.96 = 266.96 266.96 M2
D. Plesteran 1:4, Opening Kusen + Acian
PB3 [ 1.60 x 1.00 ] x 1.00 = 1.60 x 1.00 Bh = 1.60
[ 2.40 x 2.00 ] x 1.00 = 4.80 x 1.00 Bh = 4.80
JK2 [ 1.50 x 2.00 ] x 1.00 = 3.00 x 4.00 Bh = 12.00
[ 1.30 x 2.00 ] x 1.00 = 2.60 x 4.00 Bh = 10.40
= 28.80 = 28.80 28.80 M'
Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan
Dinding = 266.96 x 0.50 = 133.48
= 133.48 = 133.48 133.48 M2
F. Pengecatan dinding Interior Ex. Propan
Dinding = 266.96 x 0.50 = 133.48
= 133.48 = 133.48 133.48 M2

4.7.4 Pekerjaan Atap


Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,40 TCT klip lock
= 18.15 x 4.65 x 2.00 = 168.80
= 168.80 = 168.80 168.80 M2
B. Lisplank Zincalumn T: 0,4 TCT MP Deck
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
= 18.15 x 0.50 x 2.00 = 18.15
= 4.65 x 0.50 x 2.00 = 4.65
= 22.80 = 22.80 22.80 M2
C. Flasing Zincalum 0,4 TCT
= 4.65 x 2.00 x 1.00 = 9.30
= 9.30 = 9.30 9.30 M'

D. Nok Atap Zincalum 0,40 TCT


= 18.15 x 1.00 x 1.00 = 18.15 = 18.15 18.15 M'

4.7.5 Pekerjaan Finishing Lantai


Finish lantai Floor hardener 3kg/m2 ex Besroc
A. Beton Plat Lantai Gudang Arsip
[ 15.85 x 5.85 ] x 1.00 = 92.72
[ 1.50 x 3.50 ] x 1.00 = 5.25
= 92.72 x 1.00 = 92.72 = 92.72 92.72 #REF!

4.7.6 Pekerjaan Arsitek Pintu dan Jendela


Pekerjaan Pintu Besi
A. Pintu Type PB3, (1600x2400mm) = 1.00 1.00 Unit

Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesories.
B. Jendela JK2 (Area Gudang Arsip) = 4.00 4.00 Unit

4.8 RUMAH GARDU

4.8.1 Pekerjaan Tanah dan Pondasi


Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
Pondasi Plat Setempat
A. Galian Tanah Pondasi
Tapak P1 [ 1.00 x 1.00 ] x 1.35 = 1.35 x 6.00 = 8.10
= 8.10 8.10 M3
B. Urugan Bekas galian
Tapak P1 [ 1.00 x 0.70 ] x 0.80 = 0.56 x 6.00 = 3.36
[ 0.25 x 0.70 ] x 0.80 = 0.14 x 6.00 = 0.84
= 4.20 4.20 M3
C. Pek. Lantai Kerja pondasi
Tapak P1 [ 1.00 x 1.00 ] x 6.00 = 6.00 x 0.05 = 0.30
= 0.30 0.30 M3
D. Pek. Pondasi Plat Tapak P1
Tapak P1 [ 1.00 x 1.00 ] x 6.00 = 6.00 x 0.30 = 1.80 = 1.80 1.80 M3
Pembesian
Tul- utama [ 7.00 x 16.00 ] x 2.30 x 1.58 = 25.41 x 6.00 = 152.46
Begel [ 7.00 x 16.00 ] x 2.30 x 1.58 = 25.41 x 6.00 = 152.46 = 304.92 304.92 Kg

Bekisting [ 1.00 x 0.30 ] x 4.00 x 6.00 = 7.20 = 7.20 7.20 M2

E. Pek. Stump Beton Pondasi Plat Tapak (K1 ) Uk. 30/30 Cm


Beton [ 0.30 x 0.30 ] x 1.10 = 0.10 x 6.00 = 0.59 = 0.59 0.59 M3
Pembesian
Tul- utama [ 6.00 x 16.00 ] x 6.60 x 1.58 = 62.50
Begel [ 53.80 x 8.00 ] x 1.04 x 0.39 = 22.08 = 84.57 84.57 Kg
Bekisting [ 0.60 x 2.00 ] x 6.60 x 1.00 = 7.92 = 7.92 7.92 M2

4.8.2 Pekerjaan Beton


A. Pek. Sloof Beton Type S1 uk. 200 x 400 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton [ 0.20 x 0.40 ] x 16.40 = 1.31 = 1.31 1.31 M3

Pembesian
Tul- utama [ 6.00 x 16.00 ] x 20.00 x 1.58 = 189.39
Begel [ 161.00 x 8.00 ] x 1.14 x 0.39 = 72.42 = 261.81 261.81 Kg

Bekisting [ 0.60 x 2.00 ] x 16.40 x 1.00 = 19.68 = 19.68 19.68 M2

B. Pek. Kolom Praktis K1 Uk. 300 x 300 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton
[ 0.30 x 0.30 ] x 3.65 = 0.33 x 6.00 = 1.97
= 1.97 1.97 M3
Pembesian
Tul- utama [ 6.00 x 16.00 ] x 21.90 x 1.58 = 207.38
Begel [ 176.20 x 8.00 ] x 1.14 x 0.39 = 79.25 = 286.64 286.64 Kg

Bekisting [ 0.60 x 2.00 ] x 21.90 x 1.00 = 26.28 = 26.28 26.28 M2

C. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton
[ 0.13 x 0.13 ] x 2.85 = 0.05 x 3.00 = 0.14
= 0.14 0.14 M3
Pembesian
Tul- utama [ 4.00 x 10.00 ] x 8.55 x 0.62 = 21.08
Begel [ 49.86 x 8.00 ] x 0.46 x 0.39 = 9.05 = 30.13 30.13 Kg

Bekisting [ 0.26 x 1.00 ] x 8.55 x 1.00 = 2.22 = 2.22 2.22 M2

D. Pek. Balok Beton Type RB1 uk. 20 x 40 cm , Besi 6 Ø16 (Tump) Besi 5 Ø16 (Lap), Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
Beton [ 0.20 x 0.40 ] x 27.30 = 2.18 - 0.66 = 1.53 1.53 M3

Pembesian
Tul- utama [ 5.50 x 16.00 ] x 30.00 x 1.58 = 260.41
Begel [ 241.00 x 8.00 ] x 1.14 x 0.39 = 108.40 = 368.81 368.81 Kg

Bekisting [ 1.00 x 1.00 ] x 27.30 x 1.00 = 27.30 = 27.30 27.30 M2

E. Pek. Balok Beton Type BL uk. 11 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
Beton [ 0.11 x 0.15 ] x 14.50 = 0.24 = 0.24 0.24 M3

Pembesian
Tul- utama [ 4.00 x 10.00 ] x 14.50 x 0.62 = 35.76
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Begel [ 83.86 x 8.00 ] x 0.46 x 0.39 = 15.22 = 50.98 50.98 Kg

Bekisting [ 0.15 x 2.00 ] x 14.50 x 1.00 = 4.35 = 4.35 4.35 M2

F. Pek. Beton Plat Lantai Dak T=12 Cm


Beton [ 7.50 x 5.50 ] x 0.12 = 4.95 = 4.95 4.95 M3

Melintang
Tul- utama [ 7.50 x 37.67 ] x 2.00 = 565.00
[ 5.50 x 51.00 ] x 2.00 = 561.00
= 1,126.00 x 0.62 = 694.18 = 694.18 694.18 Kg

Bekisting [ 7.10 x 5.10 ] x 1.00 = 36.21


= 36.21 = 36.21 36.21 M2
G. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm
Beton [ 0.10 x 0.60 ] x 26.00 = 1.56 = 1.56 1.56 M3

Melintang
Tul- utama [ 26.00 x 4.00 ] x 1.00 = 104.00
[ 0.55 x 173.33 ] x 1.00 = 95.33
= 199.33 x 0.62 = 122.89 = 122.89 122.89 Kg

Bekisting [ 1.30 x 1.00 ] x 26.00 = 33.80


= 33.80 = 33.80 33.80 M2
H. Pek. Beton Plat Lantai T=15 Cm
Beton [ 8.55 x 6.55 ] x 0.15 = 8.40 = 8.40 8.40 M3

Tul- Bawah [ 43.75 x 16.00 ] x 4.05 x 1.58 = 279.64 x 1.00 = 279.64


[ 33.75 x 16.00 ] x 6.05 x 1.58 = 322.26 x 1.00 = 322.26

Tul- Atas [ 43.75 x 13.00 ] x 4.05 x 1.04 = 184.61 x 1.00 = 184.61


[ 33.75 x 13.00 ] x 6.05 x 1.04 = 212.74 x 1.00 = 212.74
= 999.25 999.25 Kg

Bekisting [ 10.70 x 1.35 ] x 1.00 x 1.00 = 14.45 = 14.45 14.45 M2

4.8.3 Pekerjaan Pasangan dan Finishing Dinding


Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4
Luas Bidang Kozen Bata
PV1 [ 1.35 x 2.85 ] x 1.00 = 3.85 x 1.00 Bh = 3.85
BV1 [ 0.95 x 0.60 ] x 1.00 = 0.57 x 3.00 Bh = 1.71
BV2 [ 1.65 x 0.60 ] x 1.00 = 0.99 x 4.00 Bh = 3.96
= 9.52
Luas Pas. Bata
[ 3.70 x 2.85 ] x 2.00 = 21.09 T= 2.85
[ 2.70 x 2.85 ] x 4.00 = 30.78 T= 2.85
= 51.87 - 9.52 = 42.35 = 42.35 42.35 M2

B. Plesteran 1 : 4
Plesteran Beton
Kolom [ 1.05 x 21.90 ] x 1.00 = 23.00
Balok [ 0.85 x 27.30 ] x 1.00 = 23.21
Listpalnk [ 0.90 x 26.00 ] x 1.00 = 23.40
= 69.60
Plesteran Dinding
= 42.35 x 2.00 = 84.71

Total Plesteran = 69.60 + 84.71 = 154.31 = 154.31 154.31 M2


C. Acian Plesteran = 154.31 154.31 M2

D. Plesteran 1:4, Opening Kusen + Acian


PV1 [ 1.35 x 1.00 ] x 1.00 = 1.35 x 1.00 Bh = 1.35
[ 2.85 x 2.00 ] x 1.00 = 5.70 x 1.00 Bh = 5.70
BV1 [ 0.95 x 1.00 ] x 1.00 = 0.95 x 3.00 Bh = 2.85
[ 0.60 x 2.00 ] x 1.00 = 1.20 x 3.00 Bh = 3.60
BV2 [ 1.00 x 1.00 ] x 1.00 = 1.00 x 4.00 Bh = 4.00
= 17.50 = 17.50 17.50 M'

Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan
Dinding = 154.31 x 0.50 = 77.15
= 77.15 = 77.15 77.15 M2
F. Pengecatan dinding Interior Ex. Propan
Dinding = 154.31 x 0.50 = 77.15
= 77.15 = 77.15 77.15 M2
4.8.4 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu Besi
A. Pintu Besi Type PV1 (1350x2850mm) = 1.00 1.00 Unit

Pekerjaan Ventilasi include pengadaan, installing dan accessories.


B. Pekerjaan Ventilasi detail accessories lihat di DWS u/ Jendela Type BV1 = 3.00 3.00 Unit
C. Pekerjaan Ventilasi detail accessories lihat di DWS u/ Jendela Type BV2 = 4.00 4.00 Unit

4.8.5 Pekerjaan Lain-Lain


Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap Fire Water tank, Dak Atap Ruang Genset dan Rumah Pompa
A. Screed Waterproofing,
Lantai [ 7.50 x 5.50 ] x 1.00 = 41.25
= 41.25 = 41.25 41.25 M2
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm
= 41.25 41.25 M2
C. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5
= 4.00 4.00 Unit
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2.5"
[ 4.55 x 1.00 ] x 2.00 = 9.10 = 9.10 9.10 M'
E. Pas. Roof Drain Dia 2.5"
= 2.00 2.00 Unit
F. Pek. Rabat Dan Saluran Keliling
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Lantai [ 13.35 x 2.00 ] x 1.00 = 26.70 = 26.70 26.70 M'

4.9. MENARA TOREN AIR


4.9.1. Pekerjaan Tanah dan Pondasi
A. Pek. Galian
[ 1.10 x 1.10 ] x 1.65 x 4.00 = 7.99 = 7.99 7.99 M3

B. Urugan Kembali Bekas Galian


Galian = 7.99

Pasangan Urugan Pasir tebal 10 cm = 0.48


Lantai Kerja tebal 5 cm = 0.24
Pondasi Tapak Beton uk. 100x100x300 cm = 1.20
Pek. Stump Beton Pondasi Plat Tapak (K) Uk. 25/25 Cm = 0.30
2.23

7.99 - 2.23 = 5.76 = 5.76 5.76 M3

C. Urugan Pasir tebal 10 cm


[ 1.10 x 1.10 ] x 0.10 x 4.00 = 0.48 = 0.48 0.48 M3

D. Lantai Kerja tebal 5 cm


[ 1.10 x 1.10 ] x 0.05 x 4.00 = 0.24 = 0.24 0.24 M3

E. Pondasi Tapak Beton uk. 100x100x300 cm


-, Beton Site MIx K-225
[ 1.00 x 1.00 ] x 0.30 x 4.00 = 1.20 = 1.20 1.20 M3

-, Pembesian
Tulangan Bawah[ 28.00 x 16.00 ] x 1.36 x 1.58 = 60.10
[ 28.00 x 16.00 ] x 1.36 x 1.58 = 60.10
Tulangan Atas [ 28.00 x 13.00 ] x 1.36 x 1.04 = 39.67
[ 28.00 x 13.00 ] x 1.36 x 1.04 = 39.67
199.55 = 199.55 199.55 Kg

-, Bekisting
[ 4.00 x 1.00 ] x 0.30 x 4.00 = 4.80 = 4.80 4.80 M2

F. Pek. Stump Beton Pondasi Plat Tapak (K) Uk. 25/25 Cm


-, Beton Site MIx K-225
[ 0.25 x 0.25 ] x 1.30 x 4.00 = 0.33 = 0.33 0.33 M3

-, Pembesian
Tul- utama [ 32.00 x 13.00 ] x 1.72 x 1.04 = 57.18
Begel [ 36.00 x 8.00 ] x 0.94 x 0.39 = 13.35
= 70.53 = 70.53 70.53 Kg

-, Bekisting
[ 4.00 x 0.25 ] x 1.30 x 4.00 = 5.20 = 5.20 5.20 M2

G. Pek. Sloof Beton uk. 15 x 20 cm


-, Beton Site MIx K-225
[ 0.15 x 0.20 ] x 1.75 x 4.00 = 0.21 = 0.21 0.21 M3

-, Pembesian
Tul- utama [ 16.00 x 13.00 ] x 2.27 x 1.04 = 37.84
Begel [ 48.00 x 10.00 ] x 0.56 x 0.62 = 16.57
= 54.41 = 54.41 54.41 Kg

-, Bekisting
[ 2.00 x 0.20 ] x 1.75 x 4.00 = 2.80 = 2.80 2.80 M2

4.9.2. Pekerjaan Konstruksi Baja


A. Pek. Base Plat T = 15 mm
[ 0.25 x 0.25 ] x 4.00 x 117.75 = 29.44 = 29.44 29.44 Kg

B. Pas. Angkur + baut dia. 16 mm


4.00 x 4.00 = 16.00 = 16.00 16.00 Bh

C. Pek. Besi Siku L 60.60.6


Batang Vertikal 4.53 x 8.00 x 5.42 = 196.47
0.60 x 8.00 x 5.42 = 26.02
Batang Horizontal + 0,20 1.97 x 4.00 x 5.42 = 42.64
+ 1,50 1.75 x 4.00 x 5.42 = 37.94
+ 3,00 1.50 x 4.00 x 5.42 = 32.52
+ 4,50 2.00 x 10.00 x 5.42 = 108.40
+ 5,10 2.00 x 4.00 x 5.42 = 43.36
Bracing Horizontal + 1,50 2.47 x 2.00 x 5.42 = 26.83
+ 3,00 2.12 x 2.00 x 5.42 = 22.99
Bracing Verikal 2.27 x 8.00 x 5.42 = 98.45
2.22 x 8.00 x 5.42 = 96.04
2.04 x 8.00 x 5.42 = 88.40
1.16 x 8.00 x 5.42 = 50.39
870.45 = 870.45 870.45 Kg

D. Pek. Plat Buhul T = 6 mm


[ 0.23 x 0.14 ] x 4.00 x 47.10 = 6.15
[ 0.13 x 0.12 ] x 4.00 x 47.10 = 3.01
[ 0.20 x 0.18 ] x 12.00 x 47.10 = 20.35
[ 0.22 x 0.21 ] x 8.00 x 47.10 = 17.42
[ 0.23 x 0.15 ] x 8.00 x 47.10 = 12.71
[ 0.24 x 0.16 ] x 4.00 x 47.10 = 7.37
[ 0.17 x 0.16 ] x 4.00 x 47.10 = 5.31
[ 0.14 x 0.14 ] x 8.00 x 47.10 = 6.87
[ 0.15 x 0.15 ] x 2.00 x 47.10 = 2.12
81.31 = 81.31 81.31 Kg

E. Pek. Plat Baja T = 3 mm


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 2.00 x 2.00 ] x 1.00 x 23.55 = 94.20 = 94.20 94.20 Kg

4.9.3 Water Tank Atas


A. Pas. Water Tank Kap. 1000 Liter 1.00 = 1.00 1.00 Unit

4.10. TIANG BENDERA


4.10.1 Pekerjaan Tanah dan Pondasi
A. Pek. Galian
[ 0.60 x 0.30 ] x 0.85 x 3.00 = 0.46 = 0.46 0.46 M3

B. Urugan Pasir tebal 5 cm


[ 0.60 x 0.30 ] x 0.05 x 3.00 = 0.03 = 0.03 0.03 M3

C. Urugan Pasir tebal 5 cm di bawah kanstin


[ 3.00 x 0.15 ] x 0.05 x 2.00 = 0.05
[ 1.70 x 0.15 ] x 0.05 x 2.00 = 0.03
0.07 = 0.07 0.07 M3

D. Urugan Pasir dipadatkan tebal 10 cm di bawah paving block


[ 2.70 x 1.70 ] x 0.10 x 1.00 = 0.46 - 0.05 = 0.41 = 0.41 0.41 M3

E. Pek. Stump Beton K-225


[ 0.60 x 0.30 ] x 0.95 x 3.00 = 0.51 = 0.51 0.51 M3

4.10.2 Pekerjaan Tiang Bendera


A. Pipa Besi Dia. 3"
1.70 x 6.00 = 10.20 = 10.20 10.20 M'

B. Besi Angkur dia 10 mm


[ 12.00 x 10.00 ] x 0.40 x 0.62 = 2.96
[ 12.00 x 10.00 ] x 0.22 x 0.62 = 1.59
4.55 = 4.55 4.55 Kg

C. Baut Dia 20 mm
3.00 x 2.00 = 6.00 = 6.00 6.00 Bh

D. Tiang Bendera Pipa Besi Dia 4" panjang 6 m + Dia 3" panjang 3 m include Katrol dan Besi Ka 1.00 = 1.00 1.00 Unit

E. Tiang Bendera Pipa Besi Dia 4" panjang 5 m + Dia 3" panjang 3 m include Katrol dan Besi Ka 2.00 = 2.00 2.00 Unit

5 EXTERNAL

5.1 PAGAR
5.1.1 Pekerjaan Tanah dan Pondasi
A. Pek. Galian Tanah Pondasi
Depan
Type VIII [ 1.10 x 0.40 ] x 22.99 = 10.12
[ 1.10 x 0.40 ] x 22.50 = 9.90
Type VA [ 1.50 x 0.50 ] x 2.50 = 1.88
[ 2.00 x 0.70 ] x 2.50 = 3.50
[ 2.00 x 0.70 ] x 2.00 = 2.80
Type V [ 2.00 x 0.70 ] x 9.87 = 13.82
[ 2.00 x 0.70 ] x 9.84 = 13.78
[ 2.00 x 0.70 ] x 12.50 = 17.50
[ 2.00 x 0.70 ] x 19.73 = 27.62
Type VI [ 2.00 x 0.70 ] x 61.15 = 85.61
[ 2.00 x 0.70 ] x 8.80 = 12.32
[ 2.00 x 0.70 ] x 30.40 = 42.56

Samping Kiri
Type IX [ 2.00 x 0.80 ] x 22.50 = 36.00
Type IIIA [ 2.50 x 0.90 ] x 2.50 = 5.63
[ 2.00 x 0.80 ] x 2.50 = 4.00
[ 2.00 x 0.80 ] x 2.50 = 4.00
Type III [ 2.75 x 0.90 ] x 32.50 = 80.44
Type I [ 3.00 x 0.90 ] x 80.00 = 216.00
Type II [ 3.00 x 0.90 ] x 22.50 = 60.75
Type III [ 2.75 x 0.90 ] x 21.64 = 53.56

Samping Kanan
Type VII [ 1.50 x 0.50 ] x 143.05 = 107.29

Belakang
Type VII [ 1.50 x 0.50 ] x 15.00 = 11.25
Type VI [ 2.00 x 0.70 ] x 27.50 = 38.50
Type V [ 2.00 x 0.70 ] x 40.00 = 56.00
Type IV [ 2.50 x 0.90 ] x 57.45 = 129.26
= 1,044.07 = 1,044.07 1,044.07 M3

B. Pas. Cerucuk Kayu Dolken dia. 10 cm P = 2 m


Depan
Type VIII [ 2.00 x 2.00 ] x 46.00 = 184.00
[ 2.00 x 2.00 ] x 45.00 = 180.00
Type VA [ 2.00 x 4.00 ] x 5.00 = 40.00
[ 2.00 x 4.00 ] x 5.00 = 40.00
[ 2.00 x 4.00 ] x 4.00 = 32.00
Type V [ 2.00 x 4.00 ] x 20.00 = 160.00
[ 2.00 x 4.00 ] x 20.00 = 160.00
[ 2.00 x 4.00 ] x 25.00 = 200.00
[ 2.00 x 4.00 ] x 40.00 = 320.00
Type VI [ 2.00 x 4.00 ] x 123.00 = 984.00
[ 2.00 x 4.00 ] x 18.00 = 144.00
[ 2.00 x 4.00 ] x 61.00 = 488.00

Samping Kiri
Type IX [ 2.00 x 4.00 ] x 45.00 = 360.00
Type IIIA [ 2.00 x 5.00 ] x 5.00 = 50.00
[ 2.00 x 4.00 ] x 5.00 = 40.00
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 2.00 x 4.00 ] x 5.00 = 40.00
Type III [ 2.00 x 5.00 ] x 65.00 = 650.00
Type I [ 2.00 x 6.00 ] x 160.00 = 1,920.00
Type II [ 2.00 x 6.00 ] x 45.00 = 540.00
Type III [ 2.00 x 6.00 ] x 44.00 = 528.00

Samping Kanan
Type VII [ 2.00 x 3.00 ] x 287.00 = 1,722.00

Belakang
Type VII [ 2.00 x 3.00 ] x 30.00 = 180.00
Type VI [ 2.00 x 4.00 ] x 55.00 = 440.00
Type V [ 2.00 x 4.00 ] x 80.00 = 640.00
Type IV [ 2.00 x 5.00 ] x 115.00 = 1,150.00
= 11,192.00 = 11,192.00 11,192.00 M'

C. Pek. Urugan tebal 10 cm


Depan
Type VIII [ 1.10 x 0.10 ] x 22.99 = 2.53
[ 1.10 x 0.10 ] x 22.50 = 2.48
Type VA [ 1.50 x 0.10 ] x 2.50 = 0.38
[ 2.00 x 0.10 ] x 2.50 = 0.50
[ 2.00 x 0.10 ] x 2.00 = 0.40
Type V [ 2.00 x 0.10 ] x 9.87 = 1.97
[ 2.00 x 0.10 ] x 9.84 = 1.97
[ 2.00 x 0.10 ] x 12.50 = 2.50
[ 2.00 x 0.10 ] x 19.73 = 3.95
Type VI [ 2.00 x 0.10 ] x 61.15 = 12.23
[ 2.00 x 0.10 ] x 8.80 = 1.76
[ 2.00 x 0.10 ] x 30.40 = 6.08

Samping Kiri
Type IX [ 2.00 x 0.10 ] x 22.50 = 4.50
Type IIIA [ 2.50 x 0.10 ] x 2.50 = 0.63
[ 2.00 x 0.10 ] x 2.50 = 0.50
[ 2.00 x 0.10 ] x 2.50 = 0.50
Type III [ 2.75 x 0.10 ] x 32.50 = 8.94
Type I [ 3.00 x 0.10 ] x 80.00 = 24.00
Type II [ 3.00 x 0.10 ] x 22.50 = 6.75
Type III [ 2.75 x 0.10 ] x 21.64 = 5.95

Samping Kanan
Type VII [ 1.50 x 0.10 ] x 143.05 = 21.46

Belakang
Type VII [ 1.50 x 0.10 ] x 15.00 = 2.25
Type VI [ 2.00 x 0.10 ] x 27.50 = 5.50
Type V [ 2.00 x 0.10 ] x 40.00 = 8.00
Type IV [ 2.50 x 0.10 ] x 57.45 = 14.36
= 140.07 = 140.07 140.07 M3

D. Pas. Pondasi Batukali 1 : 4


Depan
Type VIII 1.10 x 0.30 x 22.99 = 7.59
[ 0.35 + 0.80 ] : 2.00 = 0.58 x 1.60 x 22.99 = 21.15
1.10 x 0.30 x 22.50 = 7.43
[ 0.35 + 0.80 ] : 2.00 = 0.58 x 1.60 x 22.50 = 20.70
Type VA 1.50 x 0.40 x 2.50 = 1.50
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.50 x 2.50 = 5.47
2.00 x 0.60 x 2.50 = 3.00
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.10 x 2.50 = 4.59
2.00 x 0.60 x 2.00 = 2.40
[ 0.35 + 1.10 ] : 2.00 = 0.73 x 1.90 x 2.00 = 2.76
Type V 2.00 x 0.60 x 9.87 = 11.84
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.90 x 9.87 = 25.05
2.00 x 0.60 x 9.84 = 11.81
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.90 x 9.84 = 24.97
2.00 x 0.60 x 12.50 = 15.00
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.90 x 12.50 = 31.72
2.00 x 0.60 x 19.73 = 23.68
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.90 x 19.73 = 50.06
Type VI 2.00 x 0.60 x 61.15 = 73.38
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.40 x 61.15 = 128.42
2.00 x 0.60 x 8.80 = 10.56
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.40 x 8.80 = 18.48
2.00 x 0.60 x 30.40 = 36.48
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.40 x 30.40 = 63.84

Samping Kiri
Type IX 2.00 x 0.70 x 22.50 = 31.50
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.30 x 22.50 = 45.28
Type IIIA 2.50 x 0.80 x 2.50 = 5.00
[ 0.35 + 1.70 ] : 2.00 = 1.03 x 3.30 x 2.50 = 8.46
2.00 x 0.70 x 2.50 = 3.50
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 3.10 x 2.50 = 6.78
2.00 x 0.70 x 2.50 = 3.50
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.70 x 2.50 = 5.91
Type III 2.75 x 0.80 x 32.50 = 71.50
[ 0.35 + 1.95 ] : 2.00 = 1.15 x 3.70 x 32.50 = 138.29
Type I 3.00 x 0.80 x 80.00 = 192.00
[ 0.35 + 2.20 ] : 2.00 = 1.28 x 4.70 x 80.00 = 479.40
Type II 3.00 x 0.80 x 22.50 = 54.00
[ 0.35 + 2.20 ] : 2.00 = 1.28 x 4.20 x 22.50 = 120.49
Type III 2.75 x 0.80 x 21.64 = 47.61
[ 0.35 + 1.95 ] : 2.00 = 1.15 x 3.70 x 21.64 = 92.08

Samping Kanan
Type VII 1.50 x 0.40 x 143.05 = 85.83
[ 0.35 + 1.10 ] : 2.00 = 0.73 x 2.10 x 143.05 = 217.79
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
Belakang
Type VII 1.50 x 0.40 x 15.00 = 9.00
[ 0.35 + 1.10 ] : 2.00 = 0.73 x 2.10 x 15.00 = 22.84
Type VI 2.00 x 0.60 x 27.50 = 33.00
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.40 x 27.50 = 57.75
Type V 2.00 x 0.60 x 40.00 = 48.00
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 2.90 x 40.00 = 101.50
Type IV 2.50 x 0.80 x 57.45 = 114.90
[ 0.35 + 1.40 ] : 2.00 = 0.88 x 3.20 x 57.45 = 160.86
= 2,758.62 = 2,758.62 2,758.62 M3

E. Pas. Pipa Suling PVC dia. 2" + Ijuk


Depan
Type VIII 1.32 x 10.00 = 13.20
1.32 x 9.00 = 11.88
Type VA 2.85 x 1.00 = 2.85
1.88 x 1.00 = 1.88
1.78 x 1.00 = 1.78
Type V 3.07 x 4.00 = 12.28
3.07 x 4.00 = 12.28
3.07 x 5.00 = 15.35
3.07 x 8.00 = 24.56
Type VI 2.79 x 25.00 = 69.75
2.79 x 4.00 = 11.16
2.79 x 13.00 = 36.27

Samping Kiri
Type IX 2.78 x 9.00 = 25.02
Type IIIA 4.20 x 1.00 = 4.20
2.97 x 1.00 = 2.97
2.97 x 1.00 = 2.97
Type III 5.12 x 13.00 = 66.56
Type I 7.71 x 32.00 = 246.72
Type II 6.66 x 9.00 = 59.94
Type III 5.12 x 9.00 = 46.08

Samping Kanan
Type VII 1.77 x 58.00 = 102.66

Belakang
Type VII 1.77 x 6.00 = 10.62
Type VI 2.79 x 11.00 = 30.69
Type V 3.07 x 16.00 = 49.12
Type IV 4.27 x 23.00 = 98.21
= 959.00 = 959.00 959.00 M'

F. Pek. Urugan Tanah


Depan
Type VIII [ 1.90 + 0.30 ] : 2.00 = 1.10 x 1.60 x 22.99 = 40.46
[ 1.90 + 0.30 ] : 2.00 = 1.10 x 1.60 x 22.50 = 39.60
Type VA [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.50 x 2.50 = 10.31
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.10 x 2.50 = 8.66
[ 1.90 + 0.40 ] : 2.00 = 1.15 x 1.90 x 2.00 = 4.37
Type V [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.90 x 9.87 = 47.23
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.90 x 9.84 = 47.08
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.90 x 12.50 = 59.81
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.90 x 19.73 = 94.41
Type VI [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.40 x 61.15 = 242.15
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.40 x 8.80 = 34.85
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.40 x 30.40 = 120.38

Samping Kiri
Type IX [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.30 x 22.50 = 85.39
Type IIIA [ 3.50 + 0.80 ] : 2.00 = 2.15 x 3.30 x 2.50 = 17.74
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 3.10 x 2.50 = 12.79
[ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.70 x 2.50 = 11.14
Type III [ 4.25 + 0.80 ] : 2.00 = 2.53 x 3.70 x 32.50 = 303.63
Type I [ 4.50 + 0.80 ] : 2.00 = 2.65 x 4.70 x 80.00 = 996.40
Type II [ 4.50 + 0.80 ] : 2.00 = 2.65 x 4.20 x 22.50 = 250.43
Type III [ 4.25 + 0.80 ] : 2.00 = 2.53 x 3.70 x 21.64 = 202.17

Samping Kanan
Type VII [ 1.90 + 0.40 ] : 2.00 = 1.15 x 2.10 x 143.05 = 345.47

Belakang
Type VII [ 1.90 + 0.40 ] : 2.00 = 1.15 x 2.10 x 15.00 = 36.23
Type VI [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.40 x 27.50 = 108.90
Type V [ 2.70 + 0.60 ] : 2.00 = 1.65 x 2.90 x 40.00 = 191.40
Type IV [ 4.00 + 0.80 ] : 2.00 = 2.40 x 3.20 x 57.45 = 441.22
= 3,752.21 = 3,752.21 3,752.21 M3

5.1.2 Pekerjaan Pagar Panel Precast


A. Pek. Panel Precast uk. 5x40x240 cm
Depan
[ 6.00 x 2.40 ] x 9.20 = 22.08
[ 6.00 x 2.40 ] x 9.00 = 21.60
[ 6.00 x 2.40 ] x 1.00 = 2.40
[ 6.00 x 2.40 ] x 1.00 = 2.40
[ 6.00 x 2.40 ] x 0.80 = 1.92
[ 6.00 x 2.40 ] x 3.95 = 9.48
[ 6.00 x 2.40 ] x 3.94 = 9.46
[ 6.00 x 2.40 ] x 5.00 = 12.00
[ 6.00 x 2.40 ] x 7.90 = 18.96

Samping Kiri
[ 6.00 x 2.40 ] x 9.00 = 21.60
[ 6.00 x 2.40 ] x 1.00 = 2.40
[ 6.00 x 2.40 ] x 1.00 = 2.40
[ 6.00 x 2.40 ] x 1.00 = 2.40
[ 6.00 x 2.40 ] x 13.00 = 31.20
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 6.00 x 2.40 ] x 32.00 = 76.80
[ 6.00 x 2.40 ] x 9.00 = 21.60
[ 6.00 x 2.40 ] x 8.66 = 20.78

Samping Kanan
[ 6.00 x 2.40 ] x 57.22 = 137.33

Belakang
[ 6.00 x 2.40 ] x 6.00 = 14.40
[ 6.00 x 2.40 ] x 11.00 = 26.40
[ 6.00 x 2.40 ] x 16.00 = 38.40
[ 6.00 x 2.40 ] x 22.98 = 55.15
= 551.16 = 551.16 551.16 M'

B. Pek. Tiang Panel Precast uk. 18x19x370 cm


Depan
3.70 x 10.00 = 37.00
3.70 x 9.00 = 33.30
3.70 x 1.00 = 3.70
3.70 x 1.00 = 3.70
3.70 x 1.00 = 3.70
3.70 x 4.00 = 14.80
3.70 x 4.00 = 14.80
3.70 x 5.00 = 18.50
3.70 x 8.00 = 29.60

Samping Kiri
3.70 x 9.00 = 33.30
3.70 x 1.00 = 3.70
3.70 x 1.00 = 3.70
3.70 x 1.00 = 3.70
3.70 x 13.00 = 48.10
3.70 x 32.00 = 118.40
3.70 x 9.00 = 33.30
3.70 x 9.00 = 33.30

Samping Kanan
3.70 x 58.00 = 214.60

Belakang
3.70 x 6.00 = 22.20
3.70 x 11.00 = 40.70
3.70 x 16.00 = 59.20
3.70 x 23.00 = 85.10
= 858.40 = 858.40 858.40 M'

C. Pek. Ring Balok Beton Type BL uk. 15 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225
Depan
[ 0.15 x 0.15 ] x 22.99 = 3.45
[ 0.15 x 0.15 ] x 22.50 = 3.38
[ 0.15 x 0.15 ] x 2.50 = 0.38
[ 0.15 x 0.15 ] x 2.50 = 0.38
[ 0.15 x 0.15 ] x 2.00 = 0.30
[ 0.15 x 0.15 ] x 9.87 = 1.48
[ 0.15 x 0.15 ] x 9.84 = 1.48
[ 0.15 x 0.15 ] x 12.50 = 1.88
[ 0.15 x 0.15 ] x 19.73 = 2.96

Samping Kiri
[ 0.15 x 0.15 ] x 22.50 = 3.38
[ 0.15 x 0.15 ] x 2.50 = 0.38
[ 0.15 x 0.15 ] x 2.50 = 0.38
[ 0.15 x 0.15 ] x 2.50 = 0.38
[ 0.15 x 0.15 ] x 32.50 = 4.88
[ 0.15 x 0.15 ] x 80.00 = 12.00
[ 0.15 x 0.15 ] x 22.50 = 3.38
[ 0.15 x 0.15 ] x 21.64 = 3.25

Samping Kanan
[ 0.15 x 0.15 ] x 143.05 = 21.46

Belakang
[ 0.15 x 0.15 ] x 15.00 = 2.25
[ 0.15 x 0.15 ] x 27.50 = 4.13
[ 0.15 x 0.15 ] x 40.00 = 6.00
[ 0.15 x 0.15 ] x 57.45 = 8.62
= 86.11 = 86.11 86.11 M3

-, Pembesian
Tul- utama
Depan
[ 4.00 x 10.00 ] x 22.99 x 0.62 = 56.69
[ 4.00 x 10.00 ] x 22.50 x 0.62 = 55.49
[ 4.00 x 10.00 ] x 2.50 x 0.62 = 6.17
[ 4.00 x 10.00 ] x 2.50 x 0.62 = 6.17
[ 4.00 x 10.00 ] x 2.00 x 0.62 = 4.93
[ 4.00 x 10.00 ] x 9.87 x 0.62 = 24.34
[ 4.00 x 10.00 ] x 9.84 x 0.62 = 24.27
[ 4.00 x 10.00 ] x 12.50 x 0.62 = 30.83
[ 4.00 x 10.00 ] x 19.73 x 0.62 = 48.65
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Samping Kiri
[ 4.00 x 10.00 ] x 22.50 x 0.62 = 55.49
[ 4.00 x 10.00 ] x 2.50 x 0.62 = 6.17
[ 4.00 x 10.00 ] x 2.50 x 0.62 = 6.17
[ 4.00 x 10.00 ] x 2.50 x 0.62 = 6.17
[ 4.00 x 10.00 ] x 32.50 x 0.62 = 80.15
[ 4.00 x 10.00 ] x 80.00 x 0.62 = 197.28
[ 4.00 x 10.00 ] x 22.50 x 0.62 = 55.49
[ 4.00 x 10.00 ] x 21.64 x 0.62 = 53.36

Samping Kanan
[ 4.00 x 10.00 ] x 143.05 x 0.62 = 352.76

Belakang
[ 4.00 x 10.00 ] x 15.00 x 0.62 = 36.99
[ 4.00 x 10.00 ] x 27.50 x 0.62 = 67.82
[ 4.00 x 10.00 ] x 40.00 x 0.62 = 98.64
[ 4.00 x 10.00 ] x 57.45 x 0.62 = 141.67
= 1,415.66
Begel
Depan
[ 155.00 x 8.00 ] x 0.54 x 0.39 = 33.02
[ 151.00 x 8.00 ] x 0.54 x 0.39 = 32.17
[ 18.00 x 8.00 ] x 0.54 x 0.39 = 3.84
[ 18.00 x 8.00 ] x 0.54 x 0.39 = 3.84
[ 15.00 x 8.00 ] x 0.54 x 0.39 = 3.20
[ 67.00 x 8.00 ] x 0.54 x 0.39 = 14.28
[ 67.00 x 8.00 ] x 0.54 x 0.39 = 14.28
[ 85.00 x 8.00 ] x 0.54 x 0.39 = 18.11
[ 133.00 x 8.00 ] x 0.54 x 0.39 = 28.34

Samping Kiri
[ 151.00 x 8.00 ] x 0.54 x 0.39 = 32.17
[ 18.00 x 8.00 ] x 0.54 x 0.39 = 3.84
[ 18.00 x 8.00 ] x 0.54 x 0.39 = 3.84
[ 18.00 x 8.00 ] x 0.54 x 0.39 = 3.84
[ 218.00 x 8.00 ] x 0.54 x 0.39 = 46.45
[ 535.00 x 8.00 ] x 0.54 x 0.39 = 113.99
[ 151.00 x 8.00 ] x 0.54 x 0.39 = 32.17
[ 146.00 x 8.00 ] x 0.54 x 0.39 = 31.11

Samping Kanan
[ 955.00 x 8.00 ] x 0.54 x 0.39 = 203.47

Belakang
[ 101.00 x 8.00 ] x 0.54 x 0.39 = 21.52
[ 185.00 x 8.00 ] x 0.54 x 0.39 = 39.42
[ 268.00 x 8.00 ] x 0.54 x 0.39 = 57.10
[ 384.00 x 8.00 ] x 0.54 x 0.39 = 81.82
= 821.78

1,415.66 + 821.78 = 2,237.44 = 2,237.44 2,237.44 Kg

-, Bekisting
Depan
[ 2.00 x 0.15 ] x 22.99 = 3.45
[ 2.00 x 0.15 ] x 22.50 = 3.38
[ 2.00 x 0.15 ] x 2.50 = 0.38
[ 2.00 x 0.15 ] x 2.50 = 0.38
[ 2.00 x 0.15 ] x 2.00 = 0.30
[ 2.00 x 0.15 ] x 9.87 = 1.48
[ 2.00 x 0.15 ] x 9.84 = 1.48
[ 2.00 x 0.15 ] x 12.50 = 1.88
[ 2.00 x 0.15 ] x 19.73 = 2.96

Samping Kiri
[ 2.00 x 0.15 ] x 22.50 = 3.38
[ 2.00 x 0.15 ] x 2.50 = 0.38
[ 2.00 x 0.15 ] x 2.50 = 0.38
[ 2.00 x 0.15 ] x 2.50 = 0.38
[ 2.00 x 0.15 ] x 32.50 = 4.88
[ 2.00 x 0.15 ] x 80.00 = 12.00
[ 2.00 x 0.15 ] x 22.50 = 3.38
[ 2.00 x 0.15 ] x 21.64 = 3.25

Samping Kanan
[ 2.00 x 0.15 ] x 143.05 = 21.46

Belakang
[ 2.00 x 0.15 ] x 15.00 = 2.25
[ 2.00 x 0.15 ] x 27.50 = 4.13
[ 2.00 x 0.15 ] x 40.00 = 6.00
[ 2.00 x 0.15 ] x 57.45 = 8.62
= 86.11 = 86.11 86.11 M2

D. Pondasi Tapak Beton uk. 50x50x20 cm, Besi Ø12-150 mm (2 Lapis)


-, Beton Site MIx K-225
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Depan
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15
[ 0.50 x 0.50 ] x 0.20 x 1.00 = 0.05
[ 0.50 x 0.50 ] x 0.20 x 1.00 = 0.05
[ 0.50 x 0.50 ] x 0.20 x 2.00 = 0.10
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15

Samping Kiri
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15
[ 0.50 x 0.50 ] x 0.20 x 4.00 = 0.20
[ 0.50 x 0.50 ] x 0.20 x 11.00 = 0.55
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15
[ 0.50 x 0.50 ] x 0.20 x 3.00 = 0.15

Samping Kanan
[ 0.50 x 0.50 ] x 0.20 x 19.00 = 0.95

Belakang
[ 0.50 x 0.50 ] x 0.20 x 2.00 = 0.10
[ 0.50 x 0.50 ] x 0.20 x 4.00 = 0.20
[ 0.50 x 0.50 ] x 0.20 x 5.00 = 0.25
[ 0.50 x 0.50 ] x 0.20 x 8.00 = 0.40
= 3.75 = 3.75 3.75 M3

-, Pembesian
Depan
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85
[ 8.00 x 12.00 ] x 1.26 x 0.89 = 8.95
[ 8.00 x 12.00 ] x 1.26 x 0.89 = 8.95
[ 16.00 x 12.00 ] x 1.26 x 0.89 = 17.90
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85

Samping Kiri
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85
[ 32.00 x 12.00 ] x 1.26 x 0.89 = 35.79
[ 88.00 x 12.00 ] x 1.26 x 0.89 = 98.43
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85
[ 24.00 x 12.00 ] x 1.26 x 0.89 = 26.85

Samping Kanan
[ 152.00 x 12.00 ] x 1.26 x 0.89 = 170.02

Belakang
[ 16.00 x 12.00 ] x 1.26 x 0.89 = 17.90
[ 32.00 x 12.00 ] x 1.26 x 0.89 = 35.79
[ 40.00 x 12.00 ] x 1.26 x 0.89 = 44.74
[ 64.00 x 12.00 ] x 1.26 x 0.89 = 71.59
= 671.15 = 671.15 671.15 Kg

-, Bekisting
Depan
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20
[ 4.00 x 0.50 ] x 0.20 x 1.00 = 0.40
[ 4.00 x 0.50 ] x 0.20 x 1.00 = 0.40
[ 4.00 x 0.50 ] x 0.20 x 2.00 = 0.80
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20

Samping Kiri
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20
[ 4.00 x 0.50 ] x 0.20 x 4.00 = 1.60
[ 4.00 x 0.50 ] x 0.20 x 11.00 = 4.40
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20
[ 4.00 x 0.50 ] x 0.20 x 3.00 = 1.20

Samping Kanan
[ 4.00 x 0.50 ] x 0.20 x 19.00 = 7.60

Belakang
[ 4.00 x 0.50 ] x 0.20 x 2.00 = 0.80
[ 4.00 x 0.50 ] x 0.20 x 4.00 = 1.60
[ 4.00 x 0.50 ] x 0.20 x 5.00 = 2.00
[ 4.00 x 0.50 ] x 0.20 x 8.00 = 3.20
= 30.00 = 30.00 30.00 M2

E. Pek. Kolom Pedestal Beton Type KP uk. 20 x 20 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225
Depan
[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10
[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10
[ 0.20 x 0.20 ] x 0.85 x 1.00 = 0.03
[ 0.20 x 0.20 ] x 0.85 x 1.00 = 0.03
[ 0.20 x 0.20 ] x 0.85 x 2.00 = 0.07
[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10

Samping Kiri
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10


[ 0.20 x 0.20 ] x 0.85 x 4.00 = 0.14
[ 0.20 x 0.20 ] x 0.85 x 11.00 = 0.37
[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10
[ 0.20 x 0.20 ] x 0.85 x 3.00 = 0.10

Samping Kanan
[ 0.20 x 0.20 ] x 0.85 x 19.00 = 0.65

Belakang
[ 0.20 x 0.20 ] x 0.85 x 2.00 = 0.07
[ 0.20 x 0.20 ] x 0.85 x 4.00 = 0.14
[ 0.20 x 0.20 ] x 0.85 x 5.00 = 0.17
[ 0.20 x 0.20 ] x 0.85 x 8.00 = 0.27
= 2.55 = 2.55 2.55 M3

-, Pembesian
Tul- utama
Depan
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78
[ 4.00 x 12.00 ] x 1.20 x 0.89 = 4.26
[ 4.00 x 12.00 ] x 1.20 x 0.89 = 4.26
[ 8.00 x 12.00 ] x 1.20 x 0.89 = 8.52
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78

Samping Kiri
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78
[ 16.00 x 12.00 ] x 1.20 x 0.89 = 17.04
[ 44.00 x 12.00 ] x 1.20 x 0.89 = 46.87
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78
[ 12.00 x 12.00 ] x 1.20 x 0.89 = 12.78

Samping Kanan
[ 76.00 x 12.00 ] x 1.20 x 0.89 = 80.96

Belakang
[ 8.00 x 12.00 ] x 1.20 x 0.89 = 8.52
[ 16.00 x 12.00 ] x 1.20 x 0.89 = 17.04
[ 20.00 x 12.00 ] x 1.20 x 0.89 = 21.31
[ 32.00 x 12.00 ] x 1.20 x 0.89 = 34.09
= 319.59

Begel
Depan
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26
[ 6.00 x 8.00 ] x 0.74 x 0.39 = 1.75
[ 6.00 x 8.00 ] x 0.74 x 0.39 = 1.75
[ 12.00 x 8.00 ] x 0.74 x 0.39 = 3.50
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26

Samping Kiri
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26
[ 24.00 x 8.00 ] x 0.74 x 0.39 = 7.01
[ 66.00 x 8.00 ] x 0.74 x 0.39 = 19.27
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26
[ 18.00 x 8.00 ] x 0.74 x 0.39 = 5.26

Samping Kanan
[ 114.00 x 8.00 ] x 0.74 x 0.39 = 33.29

Belakang
[ 12.00 x 8.00 ] x 0.74 x 0.39 = 3.50
[ 24.00 x 8.00 ] x 0.74 x 0.39 = 7.01
[ 30.00 x 8.00 ] x 0.74 x 0.39 = 8.76
[ 48.00 x 8.00 ] x 0.74 x 0.39 = 14.01
= 131.39

319.59 + 131.39 = 450.98 = 450.98 450.98 Kg

-, Bekisting
Depan
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04
[ 4.00 x 0.20 ] x 0.85 x 1.00 = 0.68
[ 4.00 x 0.20 ] x 0.85 x 1.00 = 0.68
[ 4.00 x 0.20 ] x 0.85 x 2.00 = 1.36
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04

Samping Kiri
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04
[ 4.00 x 0.20 ] x 0.85 x 4.00 = 2.72
[ 4.00 x 0.20 ] x 0.85 x 11.00 = 7.48
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04
[ 4.00 x 0.20 ] x 0.85 x 3.00 = 2.04
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Samping Kanan
[ 4.00 x 0.20 ] x 0.85 x 19.00 = 12.92

Belakang
[ 4.00 x 0.20 ] x 0.85 x 2.00 = 1.36
[ 4.00 x 0.20 ] x 0.85 x 4.00 = 2.72
[ 4.00 x 0.20 ] x 0.85 x 5.00 = 3.40
[ 4.00 x 0.20 ] x 0.85 x 8.00 = 5.44
= 51.00 = 51.00 51.00 M2

F. Pek. Besi Siku L 80.80.8


Depan
1.97 x 3.00 x 9.66 = 57.09
1.97 x 3.00 x 9.66 = 57.09
1.97 x 1.00 x 9.66 = 19.03
1.97 x 1.00 x 9.66 = 19.03
1.97 x 2.00 x 9.66 = 38.06
1.97 x 3.00 x 9.66 = 57.09

Samping Kiri
1.97 x 3.00 x 9.66 = 57.09
1.97 x 4.00 x 9.66 = 76.12
1.97 x 11.00 x 9.66 = 209.33
1.97 x 3.00 x 9.66 = 57.09
1.97 x 3.00 x 9.66 = 57.09

Samping Kanan
1.97 x 19.00 x 9.66 = 361.57

Belakang
1.97 x 2.00 x 9.66 = 38.06
1.97 x 4.00 x 9.66 = 76.12
1.97 x 5.00 x 9.66 = 95.15
1.97 x 8.00 x 9.66 = 152.24
= 1,427.27 = 1,427.27 1,427.27 Kg

G. Pek. Plat T = 8 mm
Depan
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94
[ 0.13 x 0.13 ] x 1.00 x 62.80 = 0.98
[ 0.13 x 0.13 ] x 1.00 x 62.80 = 0.98
[ 0.13 x 0.13 ] x 2.00 x 62.80 = 1.96
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94

Samping Kiri
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94
[ 0.13 x 0.13 ] x 4.00 x 62.80 = 3.93
[ 0.13 x 0.13 ] x 11.00 x 62.80 = 10.79
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94
[ 0.13 x 0.13 ] x 3.00 x 62.80 = 2.94

Samping Kanan
[ 0.13 x 0.13 ] x 19.00 x 62.80 = 18.64

Belakang
[ 0.13 x 0.13 ] x 2.00 x 62.80 = 1.96
[ 0.13 x 0.13 ] x 4.00 x 62.80 = 3.93
[ 0.13 x 0.13 ] x 5.00 x 62.80 = 4.91
[ 0.13 x 0.13 ] x 8.00 x 62.80 = 7.85
= 73.59 = 73.59 73.59 Kg

H. Pas. Angkur + baut dia. 16 mm


Depan
4.00 x 3.00 = 12.00
4.00 x 3.00 = 12.00
4.00 x 1.00 = 4.00
4.00 x 1.00 = 4.00
4.00 x 2.00 = 8.00
4.00 x 3.00 = 12.00

Samping Kiri
4.00 x 3.00 = 12.00
4.00 x 4.00 = 16.00
4.00 x 11.00 = 44.00
4.00 x 3.00 = 12.00
4.00 x 3.00 = 12.00

Samping Kanan
4.00 x 19.00 = 76.00

Belakang
4.00 x 2.00 = 8.00
4.00 x 4.00 = 16.00
4.00 x 5.00 = 20.00
4.00 x 8.00 = 32.00
= 300.00 = 300.00 300.00 Bh
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

I. Pas. Angkur U + baut dia. 16 mm


Depan
2.00 x 3.00 = 6.00
2.00 x 3.00 = 6.00
2.00 x 1.00 = 2.00
2.00 x 1.00 = 2.00
2.00 x 2.00 = 4.00
2.00 x 3.00 = 6.00

Samping Kiri
2.00 x 3.00 = 6.00
2.00 x 4.00 = 8.00
2.00 x 11.00 = 22.00
2.00 x 3.00 = 6.00
2.00 x 3.00 = 6.00

Samping Kanan
2.00 x 19.00 = 38.00

Belakang
2.00 x 2.00 = 4.00
2.00 x 4.00 = 8.00
2.00 x 5.00 = 10.00
2.00 x 8.00 = 16.00
= 150.00 = 150.00 150.00 Bh

J. Pek. Besi Siku L 50.50.5


Depan
0.65 x 10.00 x 3.77 = 24.48
0.65 x 9.00 x 3.77 = 22.04
0.65 x 1.00 x 3.77 = 2.45
0.65 x 1.00 x 3.77 = 2.45
0.65 x 1.00 x 3.77 = 2.45
0.65 x 4.00 x 3.77 = 9.79
0.65 x 4.00 x 3.77 = 9.79
0.65 x 5.00 x 3.77 = 12.24
0.65 x 8.00 x 3.77 = 19.59

Samping Kiri
0.65 x 9.00 x 3.77 = 22.04
0.65 x 1.00 x 3.77 = 2.45
0.65 x 1.00 x 3.77 = 2.45
0.65 x 1.00 x 3.77 = 2.45
0.65 x 13.00 x 3.77 = 31.83
0.65 x 32.00 x 3.77 = 78.35
0.65 x 9.00 x 3.77 = 22.04
0.65 x 9.00 x 3.77 = 22.04

Samping Kanan
0.65 x 58.00 x 3.77 = 142.00

Belakang
0.65 x 6.00 x 3.77 = 14.69
0.65 x 11.00 x 3.77 = 26.93
0.65 x 16.00 x 3.77 = 39.17
0.65 x 23.00 x 3.77 = 56.31
= 568.01 = 568.01 568.01 Kg

K. Pas. Kawat Berduri


Depan
5.00 x 22.99 = 114.95
5.00 x 22.50 = 112.50
5.00 x 2.50 = 12.50
5.00 x 2.50 = 12.50
5.00 x 2.00 = 10.00
5.00 x 9.87 = 49.35
5.00 x 9.84 = 49.20
5.00 x 12.50 = 62.50
5.00 x 19.73 = 98.65

Samping Kiri
5.00 x 22.50 = 112.50
5.00 x 2.50 = 12.50
5.00 x 2.50 = 12.50
5.00 x 2.50 = 12.50
5.00 x 32.50 = 162.50
5.00 x 80.00 = 400.00
5.00 x 22.50 = 112.50
5.00 x 21.64 = 108.20

Samping Kanan
5.00 x 143.05 = 715.25

Belakang
5.00 x 15.00 = 75.00
5.00 x 27.50 = 137.50
5.00 x 40.00 = 200.00
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

5.00 x 57.45 = 287.25


= 2,870.35 = 2,870.35 2,870.35 M'

5.1.3 Pekerjaan Pagar BRC


A. Pek. Kolom Beton Type KB uk. 25 x 25 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225
[ 0.25 x 0.25 ] x 2.60 x 37.00 = 6.01 = 6.01 6.01 M3

-, Pembesian
Tul- utama [ 4.00 x 12.00 ] x 96.20 x 0.89 = 341.61
Begel [ 642.00 x 8.00 ] x 0.94 x 0.39 = 238.11
= 579.72 = 579.72 579.72 Kg

-, Bekisting
[ 2.00 x 0.25 ] x 2.60 x 37.00 = 48.10 = 48.10 48.10 M2

B. Pek. Balok Beton Type BL uk. 15 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225
[ 0.15 x 0.15 ] x 2.40 x 26.00 = 1.40
[ 0.15 x 0.15 ] x 2.50 x 2.00 = 0.11
[ 0.15 x 0.15 ] x 1.95 x 4.00 = 0.18
[ 0.15 x 0.15 ] x 1.65 x 3.00 = 0.11
= 1.80 = 1.80 1.80 M3

-, Pembesian
Tul- utama [ 4.00 x 10.00 ] x 65.00 x 0.62 = 160.29
[ 4.00 x 10.00 ] x 5.20 x 0.62 = 12.82
[ 4.00 x 10.00 ] x 8.20 x 0.62 = 20.22
[ 4.00 x 10.00 ] x 5.25 x 0.62 = 12.95
Begel [ 416.00 x 8.00 ] x 0.54 x 0.39 = 88.63
[ 34.00 x 8.00 ] x 0.54 x 0.39 = 7.24
[ 52.00 x 8.00 ] x 0.54 x 0.39 = 11.08
[ 33.00 x 8.00 ] x 0.54 x 0.39 = 7.03
= 320.27 = 320.27 320.27 Kg

-, Bekisting
[ 2.00 x 0.15 ] x 2.40 x 26.00 = 18.72
[ 2.00 x 0.15 ] x 2.50 x 2.00 = 1.50
[ 2.00 x 0.15 ] x 1.95 x 4.00 = 2.34
[ 2.00 x 0.15 ] x 1.65 x 3.00 = 1.48
= 24.04 = 24.04 24.05 M2

C. Pas. Batu Bata 1 : 4


[ 1.05 x 2.40 ] x 26.00 = 65.52
[ 1.05 x 2.50 ] x 2.00 = 5.25
[ 1.05 x 1.95 ] x 4.00 = 8.19
[ 1.05 x 1.65 ] x 3.00 = 5.20
= 84.16 = 84.16 84.16 M2

D. Pek. Plesteran 1 : 4
[ 1.05 x 2.40 ] x 26.00 x 2.00 = 131.04
[ 1.05 x 2.50 ] x 2.00 x 2.00 = 10.50
[ 1.05 x 1.95 ] x 4.00 x 2.00 = 16.38
[ 1.05 x 1.65 ] x 3.00 x 2.00 = 10.40
= 168.32 = 168.32 168.32 M2

E. Pek. Acian Plesteran


[ 1.05 x 2.40 ] x 26.00 x 2.00 = 131.04
[ 1.05 x 2.50 ] x 2.00 x 2.00 = 10.50
[ 1.05 x 1.95 ] x 4.00 x 2.00 = 16.38
[ 1.05 x 1.65 ] x 3.00 x 2.00 = 10.40
= 168.32 = 168.32 168.32 M2

F. Pengecatan dinding Exterior Ex. Propan


[ 1.05 x 2.40 ] x 26.00 x 2.00 = 131.04
[ 1.05 x 2.50 ] x 2.00 x 2.00 = 10.50
[ 1.05 x 1.95 ] x 4.00 x 2.00 = 16.38
[ 1.05 x 1.65 ] x 3.00 x 2.00 = 10.40
= 168.32 = 168.32 168.32 M2

G. Pas. Pagar BRC


[ 1.20 x 2.40 ] x 26.00 = 74.88
[ 1.20 x 2.50 ] x 2.00 = 6.00
[ 1.20 x 1.95 ] x 4.00 = 9.36
[ 1.20 x 1.65 ] x 3.00 = 5.94
= 96.18 = 96.18 96.18 M2

5.1.4 Pekerjaan Gerbang Pagar


A. Pintu Pagar Dorong Besi uk. 6000 x 2260 MM = 2.00 2.00 Unit

B. Pintu Pagar Besi uk. 1500 x 2260 MM = 1.00 1.00 Unit

5.2 DRAINASE
5.2.1 Pekerjaan Saluran Tipe I Uk. 40x40 (Terbuka)
A. Pekerjaan Galian
1-2 [ 0.45 + 0.52 ] : 2.00 = 0.49 x 0.76 x 33.67 = 12.41
9-7 [ 0.65 + 0.76 ] : 2.00 = 0.71 x 0.76 x 7.80 = 4.18
14 - 5 [ 0.77 + 0.80 ] : 2.00 = 0.78 x 0.76 x 7.35 = 4.39
1 - 15 [ 0.45 + 0.54 ] : 2.00 = 0.50 x 0.76 x 17.73 = 6.67
24a - 24b [ 0.60 + 0.55 ] : 2.00 = 0.58 x 0.76 x 10.00 = 4.37
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

23 - 24 [ 0.55 + 0.73 ] : 2.00 = 0.64 x 0.76 x 35.82 = 17.42


25 - 25a [ 0.55 + 0.64 ] : 2.00 = 0.60 x 0.76 x 18.66 = 8.44
25 - 35 [ 0.55 + 0.67 ] : 2.00 = 0.61 x 0.76 x 19.65 = 9.11
27 - 27a [ 0.55 + 0.59 ] : 2.00 = 0.57 x 0.76 x 20.09 = 8.70
28 - 29 [ 0.55 + 0.59 ] : 2.00 = 0.57 x 0.76 x 8.90 = 3.86
27 - 36 [ 0.55 + 0.66 ] : 2.00 = 0.61 x 0.76 x 21.90 = 10.07
31 - 32 [ 0.55 + 0.55 ] : 2.00 = 0.55 x 0.76 x 5.95 = 2.49
32 - 33 [ 0.55 + 0.58 ] : 2.00 = 0.57 x 0.76 x 10.43 = 4.48
33 - 34 [ 0.58 + 0.65 ] : 2.00 = 0.62 x 0.76 x 12.71 = 5.94
31 - 38 [ 0.55 + 0.55 ] : 2.00 = 0.55 x 0.76 x 5.95 = 2.49
38 - 39 [ 0.55 + 0.73 ] : 2.00 = 0.64 x 0.76 x 33.60 = 16.34
= 121.35 = 121.35 121.35 M3

B. Lantai Kerja Tebal 5 cm


1-2 [ 0.05 x 0.76 ] x 33.67 = 1.28
9-7 [ 0.05 x 0.76 ] x 7.80 = 0.30
14 - 5 [ 0.05 x 0.76 ] x 7.35 = 0.28
1 - 15 [ 0.05 x 0.76 ] x 17.73 = 0.67
24a - 24b [ 0.05 x 0.76 ] x 10.00 = 0.38
23 - 24 [ 0.05 x 0.76 ] x 35.82 = 1.36
25 - 25a [ 0.05 x 0.76 ] x 18.66 = 0.71
25 - 35 [ 0.05 x 0.76 ] x 19.65 = 0.75
27 - 27a [ 0.05 x 0.76 ] x 20.09 = 0.76
28 - 29 [ 0.05 x 0.76 ] x 8.90 = 0.34
27 - 36 [ 0.05 x 0.76 ] x 21.90 = 0.83
31 - 32 [ 0.05 x 0.76 ] x 5.95 = 0.23
32 - 33 [ 0.05 x 0.76 ] x 10.43 = 0.40
33 - 34 [ 0.05 x 0.76 ] x 12.71 = 0.48
31 - 38 [ 0.05 x 0.76 ] x 5.95 = 0.23
38 - 39 [ 0.05 x 0.76 ] x 33.60 = 1.28
= 10.27 = 10.27 10.27 M3

C. Pas. Batako
1-2 [ 0.50 + 0.15 ] = 0.65 x 33.67 = 21.89
9-7 [ 0.50 + 0.15 ] = 0.65 x 7.80 = 5.07
14 - 5 [ 0.50 + 0.15 ] = 0.65 x 7.35 = 4.78
1 - 15 [ 0.50 + 0.15 ] = 0.65 x 17.73 = 11.52
24a - 24b [ 0.50 + 0.15 ] = 0.65 x 10.00 = 6.50
23 - 24 [ 0.50 + 0.15 ] = 0.65 x 35.82 = 23.28
25 - 25a [ 0.50 + 0.15 ] = 0.65 x 18.66 = 12.13
25 - 35 [ 0.50 + 0.15 ] = 0.65 x 19.65 = 12.77
27 - 27a [ 0.50 + 0.15 ] = 0.65 x 20.09 = 13.06
28 - 29 [ 0.50 + 0.15 ] = 0.65 x 8.90 = 5.79
27 - 36 [ 0.50 + 0.15 ] = 0.65 x 21.90 = 14.24
31 - 32 [ 0.50 + 0.15 ] = 0.65 x 5.95 = 3.87
32 - 33 [ 0.50 + 0.15 ] = 0.65 x 10.43 = 6.78
33 - 34 [ 0.50 + 0.15 ] = 0.65 x 12.71 = 8.26
31 - 38 [ 0.50 + 0.15 ] = 0.65 x 5.95 = 3.87
38 - 39 [ 0.50 + 0.15 ] = 0.65 x 33.60 = 21.84
= 175.64 = 175.64 175.64 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
1-2 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 33.67 = 4.88
9-7 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 7.80 = 1.13
14 - 5 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 7.35 = 1.07
1 - 15 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 17.73 = 2.57
24a - 24b [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 10.00 = 1.45
23 - 24 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 35.82 = 5.19
25 - 25a [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 18.66 = 2.70
25 - 35 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 19.65 = 2.85
27 - 27a [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 20.09 = 2.91
28 - 29 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 8.90 = 1.29
27 - 36 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 21.90 = 3.17
31 - 32 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 5.95 = 0.86
32 - 33 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 10.43 = 1.51
33 - 34 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 12.71 = 1.84
31 - 38 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 5.95 = 0.86
38 - 39 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 33.60 = 4.87
39.15 = 39.15 39.15 M3

-, Pembesian
Tul. U
1-2 [ 225.00 x 12.00 ] x 1.50 x 0.89 = 299.62
9-7 [ 53.00 x 12.00 ] x 1.50 x 0.89 = 70.58
14 - 5 [ 50.00 x 12.00 ] x 1.50 x 0.89 = 66.58
1 - 15 [ 119.00 x 12.00 ] x 1.50 x 0.89 = 158.47
24a - 24b [ 68.00 x 12.00 ] x 1.50 x 0.89 = 90.55
23 - 24 [ 240.00 x 12.00 ] x 1.50 x 0.89 = 319.59
25 - 25a [ 125.00 x 12.00 ] x 1.50 x 0.89 = 166.46
25 - 35 [ 132.00 x 12.00 ] x 1.50 x 0.89 = 175.78
27 - 27a [ 135.00 x 12.00 ] x 1.50 x 0.89 = 179.77
28 - 29 [ 60.00 x 12.00 ] x 1.50 x 0.89 = 79.90
27 - 36 [ 147.00 x 12.00 ] x 1.50 x 0.89 = 195.75
31 - 32 [ 41.00 x 12.00 ] x 1.50 x 0.89 = 54.60
32 - 33 [ 71.00 x 12.00 ] x 1.50 x 0.89 = 94.55
33 - 34 [ 86.00 x 12.00 ] x 1.50 x 0.89 = 114.52
31 - 38 [ 41.00 x 12.00 ] x 1.50 x 0.89 = 54.60
38 - 39 [ 225.00 x 12.00 ] x 1.50 x 0.89 = 299.62
2,420.92
Tul. Memanjang
1-2 [ 10.00 x 12.00 ] x 33.67 x 0.89 = 298.91
9-7 [ 10.00 x 12.00 ] x 7.80 x 0.89 = 69.25
14 - 5 [ 10.00 x 12.00 ] x 7.35 x 0.89 = 65.25
1 - 15 [ 10.00 x 12.00 ] x 17.73 x 0.89 = 157.40
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

24a - 24b [ 10.00 x 12.00 ] x 10.00 x 0.89 = 88.78


23 - 24 [ 10.00 x 12.00 ] x 35.82 x 0.89 = 318.00
25 - 25a [ 10.00 x 12.00 ] x 18.66 x 0.89 = 165.66
25 - 35 [ 10.00 x 12.00 ] x 19.65 x 0.89 = 174.44
27 - 27a [ 10.00 x 12.00 ] x 20.09 x 0.89 = 178.35
28 - 29 [ 10.00 x 12.00 ] x 8.90 x 0.89 = 79.01
27 - 36 [ 10.00 x 12.00 ] x 21.90 x 0.89 = 194.42
31 - 32 [ 10.00 x 12.00 ] x 5.95 x 0.89 = 52.82
32 - 33 [ 10.00 x 12.00 ] x 10.43 x 0.89 = 92.59
33 - 34 [ 10.00 x 12.00 ] x 12.71 x 0.89 = 112.83
31 - 38 [ 10.00 x 12.00 ] x 5.95 x 0.89 = 52.82
38 - 39 [ 10.00 x 12.00 ] x 33.60 x 0.89 = 298.29
2,398.82

2,420.92 + 2,398.82 = 4,819.74 = 4,819.74 4,819.74 Kg

-, Bekisting
1-2 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 33.67 = 34.88
9-7 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 7.80 = 9.01
14 - 5 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 7.35 = 8.56
1 - 15 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 17.73 = 18.94
24a - 24b [ 0.43 x 2.00 ] + 0.35 = 1.21 x 10.00 = 11.21
23 - 24 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 35.82 = 37.03
25 - 25a [ 0.43 x 2.00 ] + 0.35 = 1.21 x 18.66 = 19.87
25 - 35 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 19.65 = 20.86
27 - 27a [ 0.43 x 2.00 ] + 0.35 = 1.21 x 20.09 = 21.30
28 - 29 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 8.90 = 10.11
27 - 36 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 21.90 = 23.11
31 - 32 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 5.95 = 7.16
32 - 33 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 10.43 = 11.64
33 - 34 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 12.71 = 13.92
31 - 38 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 5.95 = 7.16
38 - 39 [ 0.43 x 2.00 ] + 0.35 = 1.21 x 33.60 = 34.81
289.54 = 289.54 289.54 M2

5.2.2 Pekerjaan Saluran Tipe IA Uk. 40x40 (Tertutup)


A. Pekerjaan Galian
10 - 11 [ 0.65 + 0.65 ] : 2.00 = 0.65 x 0.76 x 14.71 = 7.27
12 - 11 [ 0.85 + 0.65 ] : 2.00 = 0.75 x 0.76 x 8.45 = 4.82
13a - 13b [ 0.83 + 0.83 ] : 2.00 = 0.83 x 0.76 x 4.17 = 2.63
13 - 14 [ 0.65 + 0.77 ] : 2.00 = 0.71 x 0.76 x 41.58 = 22.44
20 - 18 [ 0.67 + 0.87 ] : 2.00 = 0.77 x 0.76 x 44.16 = 25.84
21 - 22 [ 0.65 + 0.81 ] : 2.00 = 0.73 x 0.76 x 31.18 = 17.30
22 - 30 [ 1.01 + 1.01 ] : 2.00 = 1.01 x 0.76 x 41.59 = 31.92
22a - 24a [ 0.65 + 0.73 ] : 2.00 = 0.69 x 0.76 x 15.40 = 8.08
26a - 26 [ 0.55 + 0.58 ] : 2.00 = 0.57 x 0.76 x 5.35 = 2.30
25 - 35 [ 0.55 + 0.67 ] : 2.00 = 0.61 x 0.76 x 3.41 = 1.58
= 124.17 = 124.17 124.17 M3

B. Lantai Kerja Tebal 5 cm


10 - 11 [ 0.05 x 0.76 ] x 14.71 = 0.56
12 - 11 [ 0.05 x 0.76 ] x 8.45 = 0.32
13a - 13b [ 0.05 x 0.76 ] x 4.17 = 0.16
13 - 14 [ 0.05 x 0.76 ] x 41.58 = 1.58
20 - 18 [ 0.05 x 0.76 ] x 44.16 = 1.68
21 - 22 [ 0.05 x 0.76 ] x 31.18 = 1.18
22 - 30 [ 0.05 x 0.76 ] x 41.59 = 1.58
22a - 24a [ 0.05 x 0.76 ] x 15.40 = 0.59
26a - 26 [ 0.05 x 0.76 ] x 5.35 = 0.20
25 - 35 [ 0.05 x 0.76 ] x 3.41 = 0.13
= 7.98 = 7.98 7.98 M3

C. Pas. Batako
10 - 11 [ 0.33 + 0.33 ] = 0.66 x 14.71 = 9.71
12 - 11 [ 0.33 + 0.33 ] = 0.66 x 8.45 = 5.58
13a - 13b [ 0.33 + 0.33 ] = 0.66 x 4.17 = 2.75
13 - 14 [ 0.33 + 0.33 ] = 0.66 x 41.58 = 27.44
20 - 18 [ 0.33 + 0.33 ] = 0.66 x 44.16 = 29.15
21 - 22 [ 0.33 + 0.33 ] = 0.66 x 31.18 = 20.58
22 - 30 [ 0.33 + 0.33 ] = 0.66 x 41.59 = 27.45
22a - 24a [ 0.33 + 0.33 ] = 0.66 x 15.40 = 10.16
26a - 26 [ 0.33 + 0.33 ] = 0.66 x 5.35 = 3.53
25 - 35 [ 0.33 + 0.33 ] = 0.66 x 3.41 = 2.25
= 138.60 = 138.60 138.60 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
10 - 11 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 14.71 = 2.13
12 - 11 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 8.45 = 1.22
13a - 13b [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 4.17 = 0.60
13 - 14 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 41.58 = 6.02
20 - 18 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 44.16 = 6.40
21 - 22 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 31.18 = 4.52
22 - 30 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 41.59 = 6.03
22a - 24a [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 15.40 = 2.23
26a - 26 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 5.35 = 0.78
25 - 35 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 3.41 = 0.49
30.43 = 30.43 30.43 M3

-, Pembesian
Tul. U
10 - 11 [ 99.00 x 12.00 ] x 1.50 x 0.89 = 131.83
12 - 11 [ 57.00 x 12.00 ] x 1.50 x 0.89 = 75.90
13a - 13b [ 29.00 x 12.00 ] x 1.50 x 0.89 = 38.62
13 - 14 [ 278.00 x 12.00 ] x 1.50 x 0.89 = 370.20
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

20 - 18 [ 295.00 x 12.00 ] x 1.50 x 0.89 = 392.83


21 - 22 [ 209.00 x 12.00 ] x 1.50 x 0.89 = 278.31
22 - 30 [ 278.00 x 12.00 ] x 1.50 x 0.89 = 370.20
22a - 24a [ 104.00 x 12.00 ] x 1.50 x 0.89 = 138.49
26a - 26 [ 37.00 x 12.00 ] x 1.50 x 0.89 = 49.27
25 - 35 [ 24.00 x 12.00 ] x 1.50 x 0.89 = 31.96
1,877.61
Tul. Memanjang
10 - 11 [ 10.00 x 12.00 ] x 14.71 x 0.89 = 130.59
12 - 11 [ 10.00 x 12.00 ] x 8.45 x 0.89 = 75.02
13a - 13b [ 10.00 x 12.00 ] x 4.17 x 0.89 = 37.02
13 - 14 [ 10.00 x 12.00 ] x 41.58 x 0.89 = 369.13
20 - 18 [ 10.00 x 12.00 ] x 44.16 x 0.89 = 392.03
21 - 22 [ 10.00 x 12.00 ] x 31.18 x 0.89 = 276.80
22 - 30 [ 10.00 x 12.00 ] x 41.59 x 0.89 = 369.22
22a - 24a [ 10.00 x 12.00 ] x 15.40 x 0.89 = 136.72
26a - 26 [ 10.00 x 12.00 ] x 5.35 x 0.89 = 47.50
25 - 35 [ 10.00 x 12.00 ] x 3.41 x 0.89 = 30.27
1,864.30

1,877.61 + 1,864.30 = 3,741.91 = 3,741.91 3,741.91 Kg

-, Bekisting
10 - 11 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 14.71 = 15.91
12 - 11 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 8.45 = 9.65
13a - 13b [ 0.43 x 2.00 ] + 0.34 = 1.20 x 4.17 = 5.37
13 - 14 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 41.58 = 42.78
20 - 18 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 44.16 = 45.36
21 - 22 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 31.18 = 32.38
22 - 30 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 41.59 = 42.79
22a - 24a [ 0.43 x 2.00 ] + 0.34 = 1.20 x 15.40 = 16.60
26a - 26 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 5.35 = 6.55
25 - 35 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 3.41 = 4.61
221.98 = 221.98 221.98 M2

E. Tutup Saluran Heavy Duty Uk. 600x530x100 MM


10 - 11 14.71
12 - 11 8.45
13a - 13b 4.17
13 - 14 41.58
20 - 18 44.16
21 - 22 31.18
22 - 30 41.59
22a - 24a 15.40
26a - 26 5.35
25 - 35 3.41
210.00 = 210.00 210.00 M'

5.2.3 Pekerjaan Saluran Tipe IB Uk. 40x40 (Tertutup Gril)


A. Pekerjaan Galian
9-7 [ 0.65 + 0.76 ] : 2.00 = 0.71 x 0.76 x 14.10 = 7.55 = 7.55 7.55 M3

B. Lantai Kerja Tebal 5 cm


9-7 [ 0.05 x 0.76 ] x 14.10 = 0.54 = 0.54 0.54 M3

C. Pas. Batako
9-7 [ 0.33 + 0.33 ] = 0.66 x 14.10 = 9.31 = 9.31 9.31 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
9-7 [ 1.40 x 0.10 ] = 0.14 + 0.0049 = 0.14 x 14.10 = 2.04 = 2.04 2.04 M3

-, Pembesian
Tul. U
9-7 [ 95.00 x 12.00 ] x 1.50 x 0.89 = 126.51

Tul. Memanjang
9-7 [ 10.00 x 12.00 ] x 14.10 x 0.89 = 125.17

126.51 + 125.17 = 251.68 = 251.68 251.68 Kg

-, Bekisting
9-7 [ 0.43 x 2.00 ] + 0.34 = 1.20 x 14.10 = 15.30 = 15.30 15.30 M2

E. Tutup Saluran Besi Gril


9-7 14.10 = 14.10 14.10 M'

5.2.4 Pekerjaan Saluran Tipe II Uk. 40x60 (Terbuka)


A. Pekerjaan Galian
2-3 [ 0.72 + 0.67 ] : 2.00 = 0.70 x 0.76 x 29.65 = 15.66
15 - 16 [ 0.74 + 0.93 ] : 2.00 = 0.84 x 0.76 x 47.85 = 30.37
16 - 17 [ 0.93 + 1.06 ] : 2.00 = 0.99 x 0.76 x 31.05 = 23.48
= 69.51 = 69.51 69.51 M3

B. Lantai Kerja Tebal 5 cm


2-3 [ 0.05 x 0.76 ] x 29.65 = 1.13
15 - 16 [ 0.05 x 0.76 ] x 47.85 = 1.82
16 - 17 [ 0.05 x 0.76 ] x 31.05 = 1.18
= 4.12 = 4.12 4.12 M3

C. Pas. Batako
2-3 [ 0.70 + 0.35 ] = 1.05 x 29.65 = 31.13
15 - 16 [ 0.70 + 0.35 ] = 1.05 x 47.85 = 50.24
16 - 17 [ 0.70 + 0.35 ] = 1.05 x 31.05 = 32.60
= 113.98 = 113.98 113.98 M2
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

D. Saluran Beton Berulang


- Beton Site MIx K-250
2-3 [ 1.80 x 0.10 ] = 0.18 + 0.0049 = 0.18 x 29.65 = 5.48
15 - 16 [ 1.80 x 0.10 ] = 0.18 + 0.0049 = 0.18 x 47.85 = 8.85
16 - 17 [ 1.80 x 0.10 ] = 0.18 + 0.0049 = 0.18 x 31.05 = 5.74
20.07 = 20.07 20.07 M3

-, Pembesian
Tul. U
2-3 [ 199.00 x 12.00 ] x 1.90 x 0.89 = 335.66
15 - 16 [ 320.00 x 12.00 ] x 1.90 x 0.89 = 539.76
16 - 17 [ 208.00 x 12.00 ] x 1.90 x 0.89 = 350.84
1,226.26

Tul. Memanjang
2-3 [ 12.00 x 12.00 ] x 29.65 x 0.89 = 315.87
15 - 16 [ 12.00 x 12.00 ] x 47.85 x 0.89 = 509.75
16 - 17 [ 12.00 x 12.00 ] x 31.05 x 0.89 = 330.78
1,156.40

1,226.26 + 1,156.40 = 2,382.66 = 2,382.66 2,382.66 Kg

-, Bekisting
2-3 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 29.65 = 31.26
15 - 16 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 47.85 = 49.46
16 - 17 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 31.05 = 32.66
113.37 = 113.37 113.37 M2

5.2.5 Pekerjaan Saluran Tipe IIA Uk. 40x60 (Tertutup)


A. Pekerjaan Galian
11 - 6 [ 0.85 + 0.89 ] : 2.00 = 0.87 x 0.76 x 7.90 = 5.22 = 5.22 5.22 M3

B. Lantai Kerja Tebal 5 cm


11 - 6 [ 0.05 x 0.76 ] x 7.90 = 0.30 = 0.30 0.30 M3

C. Pas. Batako
11 - 6 [ 0.53 + 0.53 ] = 1.06 x 7.90 = 8.37 = 8.37 8.37 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
11 - 6 [ 1.80 x 0.10 ] = 0.18 + 0.0049 = 0.18 x 7.90 = 1.46 = 1.46 1.46 M3

-, Pembesian
Tul. U
11 - 6 [ 54.00 x 12.00 ] x 1.90 x 0.89 = 91.08

Tul. Memanjang
11 - 6 [ 12.00 x 12.00 ] x 7.90 x 0.89 = 84.16

91.08 + 84.16 = 175.24 = 175.24 175.24 Kg

-, Bekisting
11 - 6 [ 0.63 x 2.00 ] + 0.34 = 1.60 x 7.90 = 9.50 = 9.50 9.50 M2

E. Tutup Saluran Heavy Duty Uk. 600x530x100 MM


11 - 6 7.90 = 7.90 7.90 M'

5.2.6 Pekerjaan Saluran Tipe III Uk. 60x60 (Terbuka)


A. Pekerjaan Galian
3a - 4 [ 0.72 + 0.82 ] : 2.00 = 0.77 x 0.96 x 39.69 = 29.34
4-5 [ 0.82 + 0.85 ] : 2.00 = 0.84 x 0.96 x 10.82 = 8.67
17 - 18 [ 1.06 + 1.71 ] : 2.00 = 1.38 x 0.96 x 108.78 = 144.63
= 182.65 = 182.65 182.65 M3

B. Lantai Kerja Tebal 5 cm


3a - 4 [ 0.05 x 0.96 ] x 39.69 = 1.91
4-5 [ 0.05 x 0.96 ] x 10.82 = 0.52
17 - 18 [ 0.05 x 0.96 ] x 108.78 = 5.22
= 7.65 = 7.65 7.65 M3

C. Pas. Batako
3a - 4 [ 0.70 + 0.35 ] = 1.05 x 39.69 = 41.67
4-5 [ 0.70 + 0.35 ] = 1.05 x 10.82 = 11.36
17 - 18 [ 0.70 + 0.35 ] = 1.05 x 108.78 = 114.22
= 167.25 = 167.25 167.25 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
3a - 4 [ 2.00 x 0.10 ] = 0.20 + 0.0049 = 0.20 x 39.69 = 8.13
4-5 [ 2.00 x 0.10 ] = 0.20 + 0.0049 = 0.20 x 10.82 = 2.22
17 - 18 [ 2.00 x 0.10 ] = 0.20 + 0.0049 = 0.20 x 108.78 = 22.29
32.64 = 32.64 32.64 M3

-, Pembesian
Tul. U
3a - 4 [ 266.00 x 12.00 ] x 2.10 x 0.89 = 495.90
4-5 [ 73.00 x 12.00 ] x 2.10 x 0.89 = 136.09
17 - 18 [ 726.00 x 12.00 ] x 2.10 x 0.89 = 1,353.48
1,985.48

Tul. Memanjang
3a - 4 [ 13.00 x 12.00 ] x 39.69 x 0.89 = 458.06
4-5 [ 13.00 x 12.00 ] x 10.82 x 0.89 = 124.87
17 - 18 [ 13.00 x 12.00 ] x 108.78 x 0.89 = 1,255.42
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

1,838.35

1,985.48 + 1,838.35 = 3,823.82 = 3,823.82 3,823.82 Kg

-, Bekisting
3a - 4 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 39.69 = 41.30
4-5 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 10.82 = 12.43
17 - 18 [ 0.63 x 2.00 ] + 0.35 = 1.61 x 108.78 = 110.39
164.11 = 164.11 164.11 M2
5.2.7 Pekerjaan Saluran Tipe IIIA Uk. 60x60 (Tertutup)
A. Pekerjaan Galian
3 - 3a [ 0.67 + 0.72 ] : 2.00 = 0.70 x 0.96 x 21.40 = 14.28 = 14.28 14.28 M3

B. Lantai Kerja Tebal 5 cm


3 - 3a [ 0.05 x 0.96 ] x 21.40 = 1.03 = 1.03 1.03 M3

C. Pas. Batako
3 - 3a [ 0.58 + 0.58 ] = 1.16 x 21.40 = 24.82 = 24.82 24.82 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
3 - 3a [ 2.00 x 0.10 ] = 0.20 + 0.0049 = 0.20 x 21.40 = 4.38 = 4.38 4.38 M3

-, Pembesian
Tul. U
3 - 3a [ 144.00 x 12.00 ] x 2.10 x 0.89 = 268.46

Tul. Memanjang
3 - 3a [ 13.00 x 12.00 ] x 21.40 x 0.89 = 246.97

268.46 + 246.97 = 515.43 = 515.43 515.43 Kg

-, Bekisting
3 - 3a [ 0.63 x 2.00 ] + 0.34 = 1.60 x 21.40 = 23.00 = 23.00 23.00 M2

E. Tutup Saluran Heavy Duty Uk. 600x730x140 MM


3 - 3a 21.40 = 21.40 21.40 M'

5.2.8 Pekerjaan Saluran Tipe IV Uk. 60x80 (Terbuka)


A. Pekerjaan Galian
18 - 19 [ 1.91 + 1.27 ] : 2.00 = 1.59 x 0.96 x 44.47 = 67.88 = 67.88 67.88 M3

B. Lantai Kerja Tebal 5 cm


18 - 19 [ 0.05 x 0.96 ] x 44.47 = 2.13 = 2.13 2.13 M3

C. Pas. Batako
18 - 19 [ 0.90 + 0.55 ] = 1.45 x 44.47 = 64.48 = 64.48 64.48 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
18 - 19 [ 2.40 x 0.10 ] = 0.24 + 0.0064 = 0.25 x 44.47 = 10.96 = 10.96 10.96 M3

-, Pembesian
Tul. U
18 - 19 [ 297.00 x 13.00 ] x 2.50 x 1.04 = 773.60

Tul. Memanjang
18 - 19 [ 15.00 x 12.00 ] x 44.47 x 0.89 = 592.18

773.60 + 592.18 = 1,365.78 = 1,365.78 1,365.78 Kg

-, Bekisting
18 - 19 [ 0.83 x 2.00 ] + 0.35 = 2.02 x 44.47 = 46.49 = 46.49 46.49 M2

5.2.9 Pekerjaan Saluran Tipe V Uk. 80x80 (Terbuka)


A. Pekerjaan Galian
5-6 [ 1.05 + 1.21 ] : 2.00 = 1.13 x 1.16 x 53.95 = 70.72
6-7 [ 1.21 + 1.27 ] : 2.00 = 1.24 x 1.16 x 19.87 = 28.58
7-8 [ 1.27 + 1.30 ] : 2.00 = 1.29 x 1.16 x 19.87 = 29.62
= 128.92 = 128.92 128.92 M3

B. Lantai Kerja Tebal 5 cm


5-6 [ 0.05 x 1.16 ] x 53.95 = 3.13
6-7 [ 0.05 x 1.16 ] x 19.87 = 1.15
7-8 [ 0.05 x 1.16 ] x 19.87 = 1.15
= 5.43 = 5.43 5.43 M3

C. Pas. Batako
5-6 [ 0.80 + 0.55 ] = 1.35 x 53.95 = 72.83
6-7 [ 0.80 + 0.55 ] = 1.35 x 19.87 = 26.82
7-8 [ 0.80 + 0.55 ] = 1.35 x 19.87 = 26.82
= 126.48 = 126.48 126.48 M2

D. Saluran Beton Berulang


- Beton Site MIx K-250
5-6 [ 2.60 x 0.10 ] = 0.26 + 0.0100 = 0.27 x 53.95 = 14.57
6-7 [ 2.60 x 0.10 ] = 0.26 + 0.0100 = 0.27 x 19.87 = 5.36
7-8 [ 2.60 x 0.10 ] = 0.26 + 0.0100 = 0.27 x 19.87 = 5.36
25.30 = 25.30 25.30 M3

-, Pembesian
Tul. U
5-6 [ 361.00 x 13.00 ] x 2.70 x 1.04 = 1,015.53
6-7 [ 133.00 x 13.00 ] x 2.70 x 1.04 = 374.14
7-8 [ 133.00 x 13.00 ] x 2.70 x 1.04 = 374.14
1,763.81
VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN

Tul. Memanjang
5-6 [ 17.00 x 12.00 ] x 53.95 x 0.89 = 814.21
6-7 [ 17.00 x 12.00 ] x 19.87 x 0.89 = 299.88
7-8 [ 17.00 x 12.00 ] x 19.87 x 0.89 = 299.88
1,413.96

1,763.81 + 1,413.96 = 3,177.77 = 3,177.77 3,177.77 Kg

-, Bekisting
5-6 [ 0.84 x 2.00 ] + 0.35 = 2.03 x 53.95 = 55.98
6-7 [ 0.84 x 2.00 ] + 0.35 = 2.03 x 19.87 = 21.90
7-8 [ 0.84 x 2.00 ] + 0.35 = 2.03 x 19.87 = 21.90
99.79 = 99.79 99.79 M2

5.2.10 Pekerjaan Saluran Tipe IA x 2 (Tertutup)


A. Pekerjaan Galian
22a - 12a [ 0.65 + 0.83 ] : 2.00 = 0.74 x 1.58 x 36.50 = 42.68 = 42.68 42.68 M3

B. Lantai Kerja Tebal 5 cm


22a - 12a [ 0.05 x 1.58 ] x 36.50 = 2.88 = 2.88 2.88 M3

C. Saluran Beton Bertulang


22a - 12a
- Beton Site MIx K-250
Pelat Alas [ 1.48 x 0.15 ] x 36.55 x 1.00 = 8.11
Pelat Dinding [ 0.15 x 0.55 ] x 36.55 x 2.00 = 6.03
[ 0.18 x 0.55 ] x 36.55 x 1.00 = 3.62
Pelat Penutup [ 1.48 x 0.15 ] x 36.55 x 1.00 = 8.11
25.88 = 25.88 25.88 M3

-, Pembesian
Melintang [ 305.00 x 13.00 ] x 3.20 x 1.04 = 1,016.88
[ 610.00 x 13.00 ] x 2.04 x 1.04 = 1,296.52
[ 305.00 x 13.00 ] x 2.10 x 1.04 = 667.33
[ 305.00 x 13.00 ] x 3.20 x 1.04 = 1,016.88
Memanjang [ 56.00 x 13.00 ] x 36.61 x 1.04 = 2,136.03
[ 24.00 x 13.00 ] x 36.61 x 1.04 = 915.44
7,049.08 = 7,049.08 7,049.08 Kg

-, Bekisting
Pelat Alas [ 2.00 x 0.15 ] x 36.55 x 1.00 = 10.96
Pelat Dinding [ 2.00 x 0.55 ] x 36.55 x 2.00 = 80.41
[ 2.00 x 0.15 ] x 35.55 x 1.00 = 10.67
Pelat Penutup [ 2.00 x 0.15 ] x 36.55 x 1.00 = 10.96
[ 1.00 x 0.40 ] x 35.55 x 1.00 = 14.22
[ 1.00 x 0.60 ] x 34.55 x 1.00 = 20.73
[ 1.00 x 1.18 ] x 1.00 x 1.00 = 1.18
149.14 = 149.14 149.14 M2

5.3 KANSTIN DAN HALAMAN


5.3.1 Pekerjaan Kanstin
A. Pas. Kanstin Taman Uk. 60x30x15/12 Cm
Gerbang = 48.42
Depan = 25.20
= 142.38
= 128.86
= 92.10
Depan Office = 75.01
= 77.05
Sisi Kanan = 137.09
Belakang = 122.48
Sisi Kiri = 166.13
1,014.72 = 1,014.72 1,014.72 M'

B. Pas. Kanstin Car Stoper Uk. 60x15x15/10


Kanan [ 19.00 x 2.00 ] x 0.60 = 22.80
Depan [ 18.00 x 4.00 ] x 0.60 = 43.20
[ 16.00 x 2.00 ] x 0.60 = 19.20
85.20 = 85.20 85.20 M'

C. Pas. Stoper Parkir Roda dua Besi Pipa Dia-2,5"


[ 0.20 x 26.00 ] x 1.00 = 5.20
[ 22.70 x 1.00 ] x 1.00 = 22.70
[ 4.15 x 1.00 ] x 1.00 = 4.15
32.05 = 32.05 32.05 M'
5.3.2 Pekerjaan Paving Block Pedestrian
A. Pas. Paving Block Uk. 20x10x8 Cm
office [ 1.00 x 1.00 ] x 41.97 = 41.97
[ 1.00 x 1.00 ] x 42.86 = 42.86
penujnag [ 1.75 x 1.85 ] x 1.00 = 3.24
[ 0.85 x 65.15 ] x 1.00 = 55.38
[ 6.00 x 1.85 ] x 1.00 = 11.10
[ 6.00 x 0.85 ] x 1.00 = 5.10
[ 1.85 x 18.05 ] x 1.00 = 33.39
Tiang Bendera [ 1.85 x 2.85 ] x 1.00 = 5.27
= 257.21 = 257.21 257.21 M2

5.3.3 Pekerjaan Pengecatan


A. Pengecaran Kanstin Taman Uk. 60x30x15/12 Cm
[ 0.42 x 1.00 ] x 1,014.72 = 426.18 = 426.18 426.18 M2

B. Pengecaran Kanstin Car Stoper Uk. 60x15x15/10 Cm


[ 0.40 x 1.00 ] x 85.20 = 34.08 = 34.08 34.08 M2

C. Pengecatan Stoper Parkir Roda dua Besi Pipa Dia-2,5"


[ 0.24 x 1.00 ] x 32.05 = 7.53 = 7.53 7.53 M2

D. Pengecatan Marka Pedestrian Pejalan Kaki


VOLUME
NO. SKETSA URAIAN PERHITUNGAN VOL DECIMAL STN
[ 6.30 x 2.00 ] x 1.00 = 12.60
[ 32.00 x 2.00 ] x 1.00 = 64.00
= 76.60 = 76.60 76.60 M2

5.4 TAMAN DAN PENGHIJAUAN


5.4.1 Pekerjaan Tanah
A. Pek. Urugan Tanah Humus Taman T= 10 Cm
Depan Office [ 6.90 x 1.00 ] x 1.00 = 6.90
[ 0.93 x 4.00 ] x 4.00 = 14.80
[ 46.60 x 0.60 ] x 2.00 = 55.92
[ 67.90 x 1.00 ] x 1.00 = 67.90
[ 24.90 x 1.35 ] x 1.00 = 33.62
[ 51.80 x 1.20 ] x 1.00 = 62.16
[ 29.50 x 0.53 ] x 1.00 = 15.49
[ 14.90 x 14.80 ] x 1.00 = 220.52

Samping Kanan [ 7.15 x 6.00 ] x 1.00 = 42.90


[ 1.55 x 1.75 ] x 1.00 = 2.71
[ 65.00 x 0.80 ] x 1.00 = 52.00
[ 72.00 x 1.23 ] x 1.00 = 88.20
[ 8.85 x 7.40 ] x 1.00 = 65.49
[ 39.90 x 9.05 ] x 1.00 = 361.09
[ 22.50 x 4.45 ] x 1.00 = 100.13

Belakang [ 139.95 x 1.10 ] x 1.00 = 153.95

Samping Kiri [ 151.90 x 0.95 ] x 1.00 = 144.31


[ 34.05 x 1.15 ] x 1.00 = 39.16

Lokasi Iris [ 2.00 x 5.00 ] x 1.00 = 9.98


[ 3.50 x 2.00 ] x 1.00 = 7.00

Lokasi Lantana [ 13.70 x 1.00 ] x 1.00 = 13.70


[ 36.80 x 1.00 ] x 1.00 = 36.80
[ 60.50 x 1.00 ] x 1.00 = 60.50
[ 10.00 x 1.00 ] x 1.00 = 10.00

Lokasi tehtehan [ 38.50 x 1.00 ] x 1.00 = 38.50


[ 180.65 x 1.00 ] x 1.00 = 180.65
= 1,884.36 x 0.10 = 188.44 = 188.44 188.44 M3

5.4.2 Pekerjaan Tanaman


A. Pek. Penanaman Rumput gajah Mini
Depan Office [ 6.90 x 1.00 ] x 1.00 = 6.90
[ 0.93 x 4.00 ] x 4.00 = 14.80
[ 46.60 x 0.60 ] x 2.00 = 55.92
[ 67.90 x 1.00 ] x 1.00 = 67.90
[ 24.90 x 1.35 ] x 1.00 = 33.62
[ 51.80 x 1.20 ] x 1.00 = 62.16
[ 29.50 x 0.53 ] x 1.00 = 15.49
[ 14.90 x 14.80 ] x 1.00 = 220.52

Samping Kanan [ 7.15 x 6.00 ] x 1.00 = 42.90


[ 1.55 x 1.75 ] x 1.00 = 2.71
[ 65.00 x 0.80 ] x 1.00 = 52.00
[ 72.00 x 1.23 ] x 1.00 = 88.20
[ 8.85 x 7.40 ] x 1.00 = 65.49
[ 39.90 x 9.05 ] x 1.00 = 361.09
[ 22.50 x 4.45 ] x 1.00 = 100.13

Belakang [ 139.95 x 1.10 ] x 1.00 = 153.95

Samping Kiri [ 151.90 x 0.95 ] x 1.00 = 144.31


[ 34.05 x 1.15 ] x 1.00 = 39.16
= 1,527.23 = 1,527.23 1,527.23 M2

B. Pek. Penanaman Tanaman Perdu Iris T= 20-25 Cm


[ 2.00 x 5.00 ] x 16.00 = 159.60
[ 3.50 x 2.00 ] x 16.00 = 112.00
= 271.60 Pembutan = 272.00 = 272.00 272.00 Polibeg

C. Pek. Penanaman Tanaman Perdu Lantana T= 20-25 Cm


[ 13.70 x 1.00 ] x 16.00 = 219.20
[ 36.80 x 1.00 ] x 16.00 = 588.80
[ 60.50 x 1.00 ] x 16.00 = 968.00
[ 10.00 x 1.00 ] x 16.00 = 160.00
= 1,936.00 Pembutan = 1,936.00 = 1,936.00 1,936.00 Polibeg

D. Pek. Penanaman Tanaman Perdu Teh-tehan T= 20-25 Cm


[ 38.50 x 1.00 ] x 16.00 = 616.00
[ 180.65 x 1.00 ] x 16.00 = 2,890.40
= 3,506.40 Pembutan = 3,506.00 = 3,506.00 3,506.00 Polibeg
E. Pek. Penanaman Pohon Buah Mangga Dia-5 Cm, T= 2 M = 15.00 15.00 Btg
F. Pek. Penanaman Pohon Buah Nangka Dia-5 Cm, T= 2 M = 2.00 2.00 Btg
G. Pek. Penanaman Pohon Ketapang Kencana Dia-5 Cm, T= 2 M = 21.00 21.00 Btg
H. Pek. Penanaman Pohon Pucuk Merah Dia-5 Cm, T= 2 M = 37.00 37.00 Btg
I. Pek. Penanaman Pohon Cemara Udang Dia-5 Cm, T= 2 M = 3.00 3.00 Btg
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART


LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPK KERJA : PRELIMINARY

HARGA
NO. URAIAN PEKERJAAN STN VOLUME SATUAN JUMLAH TOTAL (Rp)
(Rp)

Catatan :
Sebelum mengisi harga, pemborong wajib membaca dokumen tender dan
catatan harga dengan seksama agar sudah mengetahui kondisi yang
diminta.

Penyedia Jasa wajib mengecek kembali aritmatika (perkalian, penjumlahan,


dsb) dengan seksama. Kesalahan perhitungan (arithmatikal error)
sepenuhnya menjadi tanggung jawab Penyedia Jasa

1.0 Proyek Manajemen dan biaya-biaya adminstrasi lapangan


Biaya-biaya mengadakan staf dilapangan yang akan mengelola pelaksanaan Ls 1.00
pekerjaan dan mengurus segala hal yang berhubungan dengan tanggung
jawab terhadap kontrak ini termasuk semua biaya-biaya yang dikeluarkan
untuk administrasi yang menjadi beban pemborong ( pemborong harus
melampirkan perincian).

2.0 Fasilitas Pendukung dan Pemeriksaan Ls 1.00


Pemborong wajib atas biaya sendiri mengadakan pegawai, peralatan
(termasuk sarana keselamatan) sebanyak yang diperlukan untuk membantu
MK dalam mengadakan pemeriksaan garis-garis permukaan (level)
pemeriksaan-pemeriksaan, pematokan (setting out), pemeriksaan bahan-
bahan untuk pekerjaan dan segala pekerjaan bahan-bahan untuk pekerjaan
dan segala pekerjaan yang berhubungan dengan kontrak.

3.0 Gambar Kerja (shop Drawing) dan As Build Drawing Ls 1.00


Pembuatan gambar-gambar terlaksana termasuk penyimpangan-
penyimpangan baik itu atas perintah pemberi tugas atau tidak, dan yang
sesuai dengan apa yang telah dilaksanakan (asbuil drawing), yang jelas
memperlihatkan perbedaan antara gambar-gambar kontrak dan pekerjaan
yang dilaksanakan.

4.0 Contoh-contoh bahan Ls 1.00


Pengadaan contoh-contoh bahan yang dikehendaki oleh pemberi tugas dan
MK harus segeran disediakan tanpa keterlambatan, atas biaya pemborong.
Contoh-contoh yang sesuai dengan standard contoh yang sesuai spesifikasi.
Contoh-contoh tersebut ditempatkan di display material contoh di direksi keet.

5.0 Pemeriksaan dan pengujian Bahan Ls 1.00


Dalam pengajuan penawaran, pemborong sudah harus memasukkan segala
keperluan biaya-biaya pengujian berbagai bahan dan pekerjaan. Jumlah
biaya yang dicantumkan adalah menjadi tanggung jawab dan resiko
pemborong. Tanpa mengingat jumlah tersebut, pemborong
tetat[ bertanggung jawab pula atas biaya pengujian kembali dari bahan dan
pekerjaan yg tidak memenuhi syarat.

6.0 Laporan dan Photo-photo Kemajuan Pekerjaan Ls 1.00


Pembuatan laporan bulanan, mingguan dan harian termasuk jadwal kerja
dan laporan-laporan lain, photo-photo berwarna atas kemajuan pekerjaan
dan diserahkan pada Manajemen Konstruksi (MK ) setiap bulan hingga masa
penyerahan pertama. Setiap set terdiri dari 6 lembar photo atau lebih sesuai
keperluan yang dipotret dari berbagai obyek pekerjaan.

7.0 Kebersihan dan Kerapihan Ls 1.00


a. Pemborong harus mengangkut semua sampah secara teratur ketempat-
tempat yang telah ditunjuk MK dan Pemborong berkewajiban secara
teratur membuang keluar lokasi proyek 'kelokasi yang ditunjuk oleh
Pemerintah termasuk biaya retribusi, 'ijin dll dan pada waktu penyelesaian
pekerjaan harus rapih dan bersih. Pemborong berkewajiban dan
bertanggung jawab menjaga jalan umum disekitar Proyek bersih dari
kotoran dan kerusakan akibat pelaksanaan pekerjaan.
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART


LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPK KERJA : PRELIMINARY

HARGA
NO. URAIAN PEKERJAAN STN VOLUME SATUAN JUMLAH TOTAL (Rp)
(Rp)
b. Penyediaan tempat cuci (cleaning pit / washing bay) sebelum kendaraan
keluar Proyek termasuk peralatan dan fasilitasnya disediakan Pemborong.

8.0 Pertanggungan Biaya Ls 1.00


Pemborong bertanggung jawab semua pengeluaran biaya atas peninjauan
lokasi, ijin pemasukan peralatan ke lokasi dan ijin lingkungan termasuk Klaim
Pihak Ketiga/ masyarakat disekeliling Proyek yang disebabkan karena
Pekerjaan Pemborong misalnya debu, kebisingan, air sumur menjadi susah,
kebanjiran dan lain-lain.

9.0 Kantor dan Gudang Sementara Pemborong Ls 1.00


a. Pemborong memelihara dan membersihan Bangunan Direksi Keet selama
pelaksanaan pekerjaan
b. Pembuatan kantor, gudang sementara dan los kerja dilapangan untuk
keperluan Pemborong, pemeliharaannya selama masa pelaksanaan dan
pemindah-mindahannya dalam lokasi pekerjaan bila ada perintah dari MK,
serta pembongkarannya setelah selesai pekerjaan termasuk perbaikan
dan perapihan lokasi.

c. Pembuatan toilet untuk pekerja Pemborong termasuk pembersihan,


pemeliharaan selama pelaksanaan pekerjaan dan pemindah-
mindahannya dalam lokasi pekerjaan bila ada perintah serta
pembongkarannya setelah selesai pekerjaan termasuk perbaikan dan
perapihan kembali lokasinya.
d. Pemborong menyediakan moveable toilet pada tiap 2 lantai untuk pekerja
pemborong termasuk perawatan, pembersihan dan perapihan kembali
lokasinya.

10.0 P 3 K dan Pemadam Kebakaran Ls 1.00


Pengadaan peralatan-peralatan P 3 K, peralatan pencegahan terhadap
bahaya kebakaran, dan yang sesuai dengan anjuran perusahaan asuransi
terhadap pekerjaan dan Instansi Pemerintah yang berwenang dan
menyediakan tenaga-tenaga terlatih untuk maksud di atas.

11.0 Keamanan Proyek, Perlindungan pekerjaan Ls 1.00


a. Pemborong bertanggung jawab atas keamanan (program K3),
penerangan dan perlindungan terhadap pekerjaan baik sebelum dan
sesudah dikerjakan terutama pekerjaan yang penting dan dapat
membahayakan selama pelaksanaan Kontrak siang dan malam. Pemberi
Tugas tidak bertanggung jawab terhadap Pemborong dan Sub-
Pemborong atas keselamatan pekerja dan pekerjaan, kehilangan
ataukerusakan bahan-bahan bangunan atau peralatan atau pekerjaan
yang sedang dalam pelaksanaan.
b. Koordinasi keamanan di lokasi Proyek menjadi tangung jawab Pemborong
c. Pemborong harus menyediakan peralatan dan pengamanan baik 'berupa
topi, sepatu pengaman, jaring pengaman disekeliling gedung, lubang-
lubang yang ada & safety belt (bila diperlukan)

12.0 Pagar Sementara m' 675.00


Pemborong harus membuat pagar keliling sementara dari konstruksi kayu &
seng gelombang dan dicat setinggi 2m termasuk 2 bh intu masuk & keluar.
Selama pekerjaan berloangsung Pemborong harus memperbaiki,
memelihara dan memindah-mindahkan, membongkar serta merapikan
kembali lokasinya apabila Proyek sudah selesai atau jika diperintahkan MK.

13.0 Jalan Masuk Tempat Pekerjaan dan Jalan Sementara Ls 1.00

Perbaikan dan perkuatan jembatan masuk dan jalan masuk ketempat


pekerjaan harus diadakan oleh Pemborong bilamana diperlukan disesuaikan
dengan kepentingan lokasi Proyek tersebut. Selama pekerjaan berlangsung
Pemborong harus mengadakan dan memelihara seluruh jalan-jalan untuk
masuk sementara, jembatan-jembatan dsb yang mungkin diperlukan bagian
pekerjaan dan menyingkirkan/membersihkan kembali pada waktu
penyelesaian atau jika diperintahkan. Juga memperbaiki segala kerusakan
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART


LOKASI : KOTA MADIUN JAWA TIMUR
Perbaikan
KELOMPK dan KERJA
perkuatan jembatan masuk dan jalan masuk ketempat
: PRELIMINARY
pekerjaan harus diadakan oleh Pemborong bilamana diperlukan disesuaikan
dengan kepentingan lokasi Proyek tersebut. Selama pekerjaan berlangsung
Pemborong harus mengadakan dan memelihara seluruh jalan-jalan untuk
HARGA
masuk sementara, jembatan-jembatan dsb yang mungkin diperlukan bagian
NO. URAIAN PEKERJAAN STN VOLUME SATUAN JUMLAH TOTAL (Rp)
pekerjaan dan menyingkirkan/membersihkan kembali pada waktu
(Rp)
penyelesaian atau jika diperintahkan. Juga memperbaiki segala kerusakan

14.0 Pengadaan Sumber Air Bersih Ls 1.00


Air untuk keperluan pekerjaan Pemborong harus diadakan Pemborong dan
apabila mungkin didapat dari sumber yang sudah ada ditiap lokasi Proyek
tersebut,Pemborong harus membuat sambungan sementara yang diperlukan
atau cara lain untukmengalirkan air dan mencabutnya kembali pada waktu
pekerjaan selesai dan membetulkan segala pekerjaan lain yang terganggu.
Tidak diperbolehkan menyambung dan saluran induk, lubang penyedot (tap
point), reservoir dsb, tanpa terlebih dahulu mendapat persetujuan tertulis
dari Direktur Lembaga yang bersangkutan (PAM). Apabila air didapat dari
sumber lain, Pemborong harus membayar segala ongkos penyambungan, air
yang dipakai, dan pembongkarannya kembali. Pemberi Tugas dalam hal ini
tidak bertanggung jawab atau mengganti biaya yang dikeluarkan oleh
Pemborong untuk keperluan itu. 'Pemborong hanya menyediakan sampai di
shaft Bangunan saja, sedangkan ke lokasi Pekerjaan Pemborong oleh
Pemborong sendiri.
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART


LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPK KERJA : PRELIMINARY

HARGA
NO. URAIAN PEKERJAAN STN VOLUME SATUAN JUMLAH TOTAL (Rp)
(Rp)
15.0 Pengadaan Tenaga Listrik Ls 1.00
a. Pengadaan Penerangan sementara/buatan yang dipergunakan oleh
Pemborong untuk penerangan dalam bekerja dan lalu lintas umum di
Proyek termasuk pemindahan & perijinan meteran PLN (bila digunakan)/
Genset disediakan oleh Pemborong Utama. Pengadaan daya listrik dan
panel-panel sementara di tiap-tiap lantai di shaft-shaft Bangunan.

b. Kabel-kabel peralatan serta lampu &perapihan kembali pada waktu


pekerjaan selesai atas beban Pemborong.

16.0 Pengukuran dan Leveling Ls 1.00


Penentuan letak titik patok pengukuran di lapangan dilakukan Pemborong
dan harus dijaga dari kerusakan- kerusakan. Setiap titik patok pengukuran
yang tidak pada tempatnya lagi atau hilang harus dibuat lagi. Penentuan peil-
peil pekerjaan akan diambil dari titik-titik yang menjadi patokan (Bench Mark).
Kesalahan- kesalahan yang timbul dalam pengambilan pengukuran dan
perubahan letak atau hilangnya titik-titik patok pengukuran menjadi tanggung
jawab Pemborong.
a. Pemborong berkewajiban membuat minimum 2 patok permanen di Proyek
(Bench Mark) dengan petunjuk MK.
b. Pemborong secara berkala wajib melakukan pengukuran penurunan dan
kemiringan bangunan (Inclination) dan hasilnya diserahkan ke MK dalam
rangkap 2 (dua)

17.0 Peralatan dan Perlengkapan Kerja Ls 1.00


Peralatan dan perlengkapan kerja yang lengkap serta pengukuran (kalibrasi)
alat-alat, kelancaran pelaksanaan pekerjaan termasuk pemeliharaan dan
pemindahan dalam lokasi pekerjaan serta mengeluarkan setelah
penyelesaian pekerjaan (Pemborong harus melampirkan perinciannya).

18.0 Saluran Sementara Ls 1.00


a. Pengadaan saluran sementara dilakukan Pemborong untuk mencegah
genangan air pada lokasi pekerjaan dan pengalirannya ke tempat yang
dianggap tidak akan mengganggu kelancaran pekerjaan dalam lokasi
pekerjaan dan pengadaan pompa-pompa untuk mengeringkan air yang
disebabkan oleh hujan atau hal-hal lain.
b. Bila ada pekerjaan dewatering harus ada sumur pemantau dan pengisi
selama pekerjaan struktur bawah berlangsung MK mengijinkan berhenti
(sesuai perhitungan Konsultan Struktur)

19.0 Topi Pengaman (helm) dan Sepatu Lapangan Ls 1.00


Penyediaan topi pengaman, jas hujan dan sepatu lapangan sebanyak 10
(sepuluh) set untuk Pemberi Tugas, MK dan Tamu dilakukan Pemborong.

20.0 Penyediaan fasilitas komunikasi (H.T. atau sejenis) Ls 1.00


Penyediaan fasilitas komunikasi (H.T. atau sejenis) sebanyak 3 '(tiga) unit
oleh Pemborong untuk keperluan komunikasi di Proyek dengan Ruang
Direksi termasuk perijinan, pembayaran keinstansi yang berwenang dan
perawatan serta antene dan pengabelannya (bila ada).

21.0 Asuransi Ls 1.00


a. Pemborong Wajib mengasuransikan pekerjaan ( CAR dan TPL )
b. Pemborong wajib mengasuransikan tenaga kerjanya/Astek dan Peralatan kerja.

22.0 Biaya pengurusan semua perizinan, lisensi-lisensi, pekerjaan Pemborong Ls 1.00


yang dilaksanakan oleh Badan Pemerintah atau badan yang berwenang
untuk pekerjaan tersebut sesuai dengan Dokumen Lelang dan Surat
Rekomendasi untuk Pengurusan IPB.

23.0 Biaya untuk menyiapkan dokumen termasuk gambar-gambar, instruksi Ls 1.00


operasi dan pemeliharaan dari semua peralatan yang dipasangkan.
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART


LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPK KERJA : PRELIMINARY

HARGA
NO. URAIAN PEKERJAAN STN VOLUME SATUAN JUMLAH TOTAL (Rp)
Biaya untuk menyiapkan dokumen termasuk gambar-gambar, instruksi (Rp)
operasi dan pemeliharaan dari semua peralatan yang dipasangkan.

24.0 Biaya pengetesan, commissioning dan star-up termasuk operasi lengkap Ls 1.00
dengan instalasi dan penyediaan tenaga listrik, sarana lain yang diperlukan
dan sesuai kondisi Spesifikasi Teknis dan petunjuk dari Pabrik.
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR

HARGA SATUAN SUB TOTAL TOTAL


NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g

2.0 WIREHOUSE
2.3 Pekerjaan Architech
2.3.1 Pekerjaan Pas. Bata 1 : 4, Wire House Dan Gudang Kardus
A. Pasangan Batu Bata 1 : 4 M2 999.02 -
B. Pasangan Bata Roster, (Area Charger forklif) M2 9.60 -
C. Pek. Kolom Praktis Kp Uk. 130 x 130 MM
-, Beton Site MIx K-175 M3 4.56 -
-, Pembesian Kg 946.38 -
-, Bekisting M2 70.23 -
D. Pek. Balok Beton Type rb uk. 13 x 20 cm
-, Beton Site MIx K-175 M3 3.31 -
-, Pembesian Kg 475.24 -
-, Bekisting M2 38.22 -
E. Pek. Balok Beton rbt Uk. 13x20
-, Beton Site MIx K-175 M3 7.66 -
-, Pembesian Kg 997.59 -
-, Bekisting M2 101.20 -
Jumlah -
2.3.2 Pekerjaan Finishing Lantai
Finish lantai gudang super flat Floor hardener 3kg/m2 ex Besroc (Type 10)
A. Beton Plat Area Gudang As-1-15/As-A-Q' M2 7,597.25 -
B. Beton Plat Area Loading Dock Include Area Kantor As-15-16/As-A-T M2 374.50 -
C. Beton Plat Area Gudang Kardus As-1-8/As-A'-A M2 168.00 -

Finish lantai gudang flat Flowfresh MF T=3 mm Ex Flow Creed (type 11) Aplicator bebas
D. Super Flat Flowcreed u/ Parkir Forklif M2 87.68 -
E. Super Flat Flowcreed u/ Charger Forklif M2 44.40 -

Silen Dilatasi, termasuk material, alat bantu dan tenaga


G. Silen Dilatasi u/ Bawah Rak Sikaflek ex Sika M' 1,260.00 -
Jumlah -
2.3.3 Pekerjaan Finishing Dinding
A. Plesteran 1 : 4 Termasuk Plesteran Kolom, Balok Dan Reteining Wall M2 2,593.93 -
B.. Acian Plesteran M2 2,593.93 -

Pekerjaan Pengecatan
C. Pengecatan dinding Exterior Ex. Propan M2 1,648.10 -
D. Pengecatan dinding Interior Ex. Propan M2 1,541.73 -

Pekerjaan Clading , include dan installing


E. Pek. Rangka Clading Baja CNP 150.65.20.3,2 Kg ### -
F. Clading MP Deck TCT 0.4 New MP Deck M2 2,439.49 -
Jumlah -
2.3.4. Pekerjaan Arsitek Pintu
Pekerjaan Pintu dan Jendela include pengadaan, installing dan accessories. Kecuali dijelaskan lain
Pekerjaan Pintu Rolling Door Material SBO, perapian openingan by kontraktor
A. Pintu Rolling Door Type RD2 (3000x3000mm) Unit 14.00 -

B. Pintu Rolling Door Type RD3 (3000x4000mm) Unit 1.00 -

C. Pintu Besi Type PB2 (1600x2400mm) Unit 2.00 -

D. Pintu Besi Type PB3 (1600x2400mm) Unit 1.00 -

Pekerjaan Pintu & Jendela Kawat Harmonika


E. Jendela JK2 (Area Gudang Kardus) Unit 12.00 -

F. Jendela JK3 (Area Charger Forklif) Unit 4.00 -

G. Jendela BN1 (Wirehause) Unit 24.00 -

H. Jendela BN2 (Wirehause) Unit 32.00 -

I. Jendela BN3 (Wirehause) Unit 16.00 -


Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
2.3.5. Pekerjaan Arsitek Protektor & Stopper
Pekerjaan Protektor & stoper include pengadaan, installing dan accessories.
A. Pekerjaan Protector Type 1, Detail Lihat Gambar (''Provesional Sum'') Unit 13.00 -

B. Pekerjaan Protector Type 2, Detail Lihat Gambar (''Provesional Sum'') Unit 1.00 -

C. Pekerjaan Protector Type 2A, Detail Lihat Gambar (''Provesional Sum'' Unit 1.00 -

D. Pekerjaan Protector Type 3, Detail Lihat Gambar (''Provesional Sum'') Unit 1.00 -

E. Pekerjaan Protector Type 4, Detail Lihat Gambar (''Provesional Sum'') Unit 13.00 -

F. Pekerjaan Protector Type 5, Detail Lihat Gambar (''Provesional Sum'') Unit 17.00 -

G. Pekerjaan Stoper Type A Black PIPE Dia 2,5'' T: 3,6 mm M' 25.45 -
Jumlah -
2.3.6. Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,45 TCT klip lock tanpa sambungan (roll on side) M2 8,076.68 -

B. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 544.99 -

C. Flasing Zincalum 0,4 TCT M' 240.75 -

D. Nok Atap Zincalum 0,45 TCT M' 91.55 -

E. Sky light t:1,2mm ex Intec, warna putih susu. (lebar efektif 633.3 mm M' 923.93 -

Pekerjaan Insulation, termasuk material, jasa pemasangan dan alat bantu.


F. Insulation Al- Bubble - AL T; 4mm ex Zeltech type ZT-01B M2 6,548.24 -

Pekerjaan Saluran Air Hujan Atap


G. Pas. Talang Air U dari Fiber T= 4MM, Ex Intec Persada M' 91.55 -

H. Pek. Bak Kontrol Saluran Air Hujan Uk. 30x30x30CM Unit 17.00 -
Jumlah -
2.3.7. Pekerjaan Bumper
A. Bumper Solid Rubber 80 x10x8 cm, Unit 30.00 -

B. Siku 70.70.7 Galvanised u/bibir loading dock termasuk pekerjaan angk M' 107.20 -
Jumlah -
2.4 Pekerjaan lain-lain
A. Corner Dinding RG. Obat, Finish Alumunium Curve, include perapian d M' 70.35 -

B. List Plafond Model Curve Material Gypsum. Include perapian dan alat M' 38.95 -

Corner Guard Pintu Rolling Door, pekerjaan include pemasangan, material, alat bantu dan material bantu
C. Besi Siku 50.50.3,8 Termasuk Pengecatan Warna Kuning Dan Hitam M' 90.00 -
Jumlah -

3 OFFICE
3.5 Pekerjaan Arsitek Lantai I
3.5.1. Pekerjaan Pasangan Brick Wall
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 0 1,592.46 -
B. Pasangan Batu Bata 1 : 4 (Area Shaft) 0 45.73 -
C. Pasangan Glass Block Uk. 20x20 Cm, GB1 M2 19.20 -
D. Pek. Kolom Praktis Kp1 Uk. 130 x 130 MM
-, Beton Site MIx K-175 M3 10.99 -
-, Pembesian Kg 2,278.97 -
-, Bekisting M2 169.13 -
E. Pek. Balok Beton Type rb uk. 13 x 20 cm
-, Beton Site MIx K-175 M3 507.68 -
-, Pembesian Kg ### -
-, Bekisting M2 78.11 -

F, Pek. Plat Kanopy Beton T=100 MM L=600 MM


-, Beton Site MIx K-175 M3 1.19 -
-, Pembesian Kg 88.97 -
-, Bekisting M2 13.93 -
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
3.5.2. Pekerjaan Finishing Lantai
Pekerjaan Homogenius tile 600x600mm type Antique White Ex.Sandimas, include material, adukan dan tenaga kerja.
A. Homogenius tile Area Office M2 722.54 -
B. Homogenius tile Area Tangga Utama + Stopnozing M2 16.66 -
C. Plin Dinding Homogenius Tile M' 352.63 -

Pekerjaan Homogenius tile 600x600mm Type Salsa Crystal Black , include material, adukan dan tenaga kerja.
D. Homogenius tile Area Entrance Depan M2 11.18 -
E. Homogenius tile Area Tangga Entrance Depan + Stopnozing M2 15.36 -

Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
F. Keramik Area Lobby Samping + Tangga M2 18.30 -
G. Keramik Area Tangga Samping + Stopnozing M2 16.66 -
H. Plin Dinding Keramik M' 9.70 -

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
I. Keramik Area Toilet, Pantry dan Janitor M2 69.58 -

Lantai finish Floor hardener, include material, tenaga kerja dan alat bantu
J. Finishing floor hardener area G. MKT, G.GA, G.COKELAT, R. ATK Da M2 409.31 -
Jumlah -

3.5.3. Pekerjaan Finishing Dinding


A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran Kolom, Balok Dan Re M2 3,561.68 -
B. Acian Plesteran M2 3,257.48 -
C. Plesteran 1:4, Opening Kusen + Acian M' 366.62 -
D. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan Janitor) M2 179.49 -
E. Pas. Keramik Dinding Uk. 300x300 MM (Pantry) M2 3.09 -

Pekerjaan Pengecatan
F. Pengecatan dinding Exterior Ex. Propan M2 1,302.99 -
G. Pengecatan dinding Interior Ex. Propan M2 1,954.49 -
H. Pekerjaan Naad dan Perapian Dinding Atas Keramik Termasuk Plin Di M' 464.07 -
I. Pekerjaan Naad dan Pearapian Dinding Luar M' 292.70 -
Jumlah -
3.5.4. Pekerjaan Dinding Partisi
Pekerjaan Dinding Partisi Gypsum Termasuk Rangka dan Pengecatan
A. Pek. Partisi gypsum Dua Sisi H: 3.700 MM, include rangka dan finishin M2 213.36 -
B Pek. Partisi gypsum Dua Sisi H: 2.700 MM, include rangka dan finishin M2 70.94 -
C Pek. Partisi gypsum Dua Sisi H: 1.200 MM, include rangka dan finishin M2 26.70 -
D. Pek. Partisi Ruang Lobby Multiplek Fin. HPL dan Kalsi Part T=8 MM F M2 15.80 -
E. Plin Bawah Dinding Partisi Multiplek T=18 MM Uk. 18x100 MM, Fin. H M' 152.66 -
F. Profil U Dinding Partisi Multiplek T=18 MM Uk. 5 x10 Cm, Fin. HPL M' 11.13 -
Jumlah -
3.5.5. Pekerjaan Arsitek Pintu
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium
A. Pintu Type P1 Unit 2.00 -
B. Pintu Type P2 Unit 14.00 -
C. Pintu Type P2' Unit 1.00 -
D. Pintu Type P3 Unit 2.00 -
E. Pintu Type P4 Unit 5.00 -
F. Pintu Type P5 Unit 8.00 -
G. Pintu Type PS Unit 3.00 -

Pekerjaan Pintu Besi


H. Pintu Type PB1 Unit 1.00 -
I. Pintu Type PB2 Unit 5.00 -

Pekerjaan Pintu Rolling Door, Material dan pemasangan Supplay By Owner. Perapian openingan include kontraktor
J. Pintu Rolling Door Type RD1 Unit 1.00 -

Pintu dan Jendela alumunium


Pekerjaan pintu jendela, detail accessories Lihat Di DWS
K. Pintu Dan Jendela Type PJ1 Unit 1.00 -
L Pintu Dan Jendela Type PJ2 Unit 3.00 -
M. Pintu Dan Jendela Type PJ3 Unit 1.00 -
N. Pintu Dan Jendela Type PJ4 Unit 1.00 -
Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesiries.
O. Jendela Kawat harmonika Type JK1 Unit 2.00 -
P. Jendela Kawat harmonika Type JK4 Unit 1.00 -
Q. Jendela Kawat harmonika Type JK5 Unit 1.00 -
R. Jendela Kawat harmonika Type JK6 Unit 1.00 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
S. Jendela Kawat harmonika Type JK7 Unit 1.00 -
Jumlah -

3.5.6. Pekerjaan Arsitek Jendela


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1 Unit 2.00 -
B. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2 Unit 10.00 -
C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J3 Unit 3.00 -
D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J4 Unit 1.00 -
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 7.00 -
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 3.00 -
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type JK Unit 4.00 -
Jumlah -

3.5.7. Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsum tile 600x1200 T: 9 mm Exrd + rangka cross M2 30.00 -
B. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 area lo M2 299.16 -
C. Pekerjaan plafond spandrel alumunium termasuk rangka M2 53.48 -
D. Pekerjaan plafond beton exposed area Gudang M2 607.96 -
E. Drop Cilling area lobby M2 29.20 -

Pekerjaan Pengecatan
F. Pekerjaan cat plafond gypsum board & beton exposed dibawah tangga M2 933.91 -
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Jumlah -
3.5.8. Pekerjaan Arsitek Sanitary
Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas Unit 3.00 -
B. Partition Urinal A100 Ex Toto Unit 8.00 -
C. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hany Unit 5.00 -
D. Kran Dinding Type Y 20JC Ex San Ei Unit 5.00 -
E. Floor Drain Dia 4" Type H51 Ex SAN EI Unit 9.00 -
F. Shower Spray S403SBW Ex. TOTO hanya pemasangan dan instalasi Unit 5.00 -
G. Closet Duduk Type CW 421 J/SW 420 JP Ex. TOTO hanya pemasangan Unit 5.00 -
H. Urinoir type U57M Ex TOTO Unit 5.00 -
I. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran Unit 5.00 -
J. Kitchen zick Single Bowl Ex Royal Unit 2.00 -
K. Kran Pantry Model Leher Angsa A10C Ex SAN EI Unit 2.00 -
Jumlah -
3.5.9. Pekerjaan Entrance
Pas. Alumunium Composite panel Ex. Alucopan, Untuk Kanopi Entrance Depan
A. Pas. Alumunium Composite panel Ex. Alucopan, Untuk Kanopi Entran M2 55.49 -
B. Pek. Ramp Teras Lobby Include Grove (Pekerjaan Beton T=70 MM, Ls 2.00 -
C. Pek. Planter Box + Batu Alam Dinding, (include pekerjaan struktural pl Ls 2.00 -
Jumlah -
3.5.10. Pekerjaan Lain-Lain
A. Pek. Hand Railling Tangga Lobby (Pipa Stainlesstell 2,5'' Dan 2") M' 12.90 -
B. Pek. Hand Railling Tangga Lobby Samping (Pipa Stainlesstell 2,5'' Da M' 8.40 -
C. Pek. Hand Railling Tangga Samping (Pipa Stainlesstell 2") M' 7.30 -
D Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. ke M2 3.09 -
E. Tanggulan Janitor dan Tempat Wudhu, include pasangan bata, pasang M' 5.55 -
F. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu d M2 2.66 -

Corner Guard Pintu Rolling Door RD1, pekerjaan include pemasangan, material, alat bantu dan material bantu
G. Besi Siku 50.50.3.8 Termasuk Pengecatan (dua warna Kuning dan Hit M' 3.00 -

Pekerjaan Atap Kanopy Lobby Depan dan Samping


H. Atap Zincalum 0,45 TCT klip lock M2 81.18 -
I. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 8.23 -
J. Flasing Zincalum 0,4 TCT M2 46.10 -

Pekerjaan Saluran Air Hujan Atap


K. Pas. Talang Air U dari Fiber T= 4MM, Ex Intec Persada M' 9.90 -
Jumlah -

3.6 Pekerjaan Arsitek Lantai II


3.6.1. Pekerjaan Pasangan Brick Wall
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 697.84 -
B. Pasangan Batu Bata 1 : 4 (Area Shaft) M2 22.24 -
C. Pasangan Glass Block Uk. 20x20 Cm, GB1 M2 1.60 -
D. Pek. Kolom Praktis Kp Uk. 130 x 130 MM
-, Beton Site MIx K-175 M3 5.75 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
-, Pembesian Kg 1,192.30 -
-, Bekisting M2 88.48 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
E. Pek. Balok Beton Type rb uk. 13 x 20 cm
-, Beton Site MIx K-175 M3 7.74 -
-, Pembesian Kg 1,136.42 -
-, Bekisting M2 119.01 -

F. Pek. Plat Kanopy Beton T=100 MM L=600 MM


-, Beton Site MIx K-175 M3 3.01 -
-, Pembesian Kg 223.62 -
-, Bekisting M2 35.07 -
Jumlah -
3.6.2. Pekerjaan Finishing Lantai
Pekerjaan Homogenius tile 600x600mm type Antique White Ex.Sandimas, include material, adukan dan tenaga kerja.
A. Homogenius tile Area Office M2 1,142.26 -
B. Plin Dinding Homogenius Tile M' 252.83 -

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
C. Keramik Area Toilet, Pantry dan Janitor M2 69.83 -
D. Screed Waterproofing, M2 93.63 -
E. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm M2 93.63 -
Jumlah -
3.6.3. Pekerjaan Finishing Dinding
A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran Kolom, dan Balok M2 1,167.93 -
B. Acian Plesteran M2 1,167.93 -
C. Plesteran 1:4, Opening Kusen + Acian M' 398.61 -
D. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan Janitor) M2 248.20 -
E. Pas. Keramik Dinding Uk. 300x300 MM (Pantry) M2 1.80 -

Pekerjaan Pengecatan
F. Pengecatan dinding Exterior Ex. Propan M2 467.17 -
G. Pengecatan dinding Interior Ex. Propan M2 700.76 -
H. Pekerjaan Naad dan Pearapian Dinding Atas Keramik M' 95.65 -
I. Pekerjaan Naad dan Pearapian Dinding Luar M' 222.50 -
Jumlah -
3.6.4. Pekerjaan Dinding Partisi
Pekerjaan Dinding Partisi Gypsum Termasuk Rangka dan Pengecatan
A. Pek. Partisi gypsum Dua Sisi H: 2.700 MM, include rangka dan finishin M2 559.21 -
B. Pek. Partisi gypsum Dua Sisi H: 1.200 MM, include rangka dan finishin M2 243.23 -
C. Plin Bawah Dinding Partisi Multiplek T=18 MM Uk. 18x100 MM, Fin. H M' 401.42 -
D. Profil U Dinding Partisi Multiplek T=18 MM Uk. 5 x10 Cm, Fin. HPL M' 101.35 -
Jumlah -
3.6.5. Pekerjaan Arsitek Pintu
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium
A. Pintu Type P1 Unit 1.00 -
B. Pintu Type P2 Unit 11.00 -
C. Pintu Type P3 Unit 3.00 -
D. Pintu Type P4 Unit 5.00 -
E. Pintu Type P5 Unit 8.00 -
F. Pintu Type PS Unit 2.00 -
Pintu dan Jendela alumunium Pekerjaan pintu jendela, detail accessories Lihat Di DWS
G. Pintu Dan Jendela Type PJ5 Unit 1.00 -
Pintu Lipat, detail accessories Lihat Di DWS
H. Pintu Lipat M2 44.04 -

3.6.6. Pekerjaan Arsitek Jendela


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2 Unit 27.00 -
B. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2K Unit 1.00 -
C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J4 Unit 1.00 -
D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 10.00 -
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 1.00 -
Jumlah -

3.6.7. Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsum tile 600x1200 T: 9 mm Exrd + rangka cross M2 1,051.97 -
B. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 area lo M2 206.20 -

Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board M2 206.20 -
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
3.6.8. Pekerjaan Arsitek Sanitary
Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas Unit 4.00 -
B. Partition Urinal A100 Ex Toto Unit 2.00 -
C. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hany Unit 4.00 -
D. Kran Dinding Type Y 20JC Ex San Ei Unit 10.00 -
E. Floor Drain Dia 4" Type H51 Ex SAN EI Unit 10.00 -
F. Shower Spray S403SBW Ex. TOTO hanya pemasangan dan instalasi Unit 4.00 -
G. Closet Duduk Type CW 421 J/SW 420 JP Ex. TOTO hanya pemasangan Unit 4.00 -
H. Urinoir type U57M Ex TOTO Unit 4.00 -
I. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran Unit 4.00 -
J. Kitchen zick Single Bowl Ex Royal Unit 1.00 -
K. Kran Pantry Model Leher Angsa A10C Ex SAN EI Unit 1.00 -

3.6.9. Pekerjaan Lain-Lain


A. Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. ke M2 1.71 -

B. Tanggulan Janitor dan Tempat Wudhu, include pasangan bata, pasang M' 5.55 -

C. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu d M2 4.05 -

D. Tangga maintenance include pekerjaan pipa baja dia 5'' + siku 50.50.5 Unit 1.00 -
Reilling Pipa 1"pengecatan, alat bantu dan material bantu.
Jumlah -
3.7 Pekerjaan Arsitek Atap
3.7.1. Pekerjaan Pasangan Brick Wall
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 46.36 -
B. Pek. Kolom Praktis Kp1 Uk. 130 x 130 MM
-, Beton Site MIx K-175 M3 0.42 -
-, Pembesian Kg 87.41 -
-, Bekisting M2 6.47 -

C. Pek. Balok Beton Type rb uk. 13 x 20 cm


-, Beton Site MIx K-175 M3 0.56 -
-, Pembesian Kg 82.91 -
-, Bekisting M2 8.66 -
Jumlah -
3.7.2. Pekerjaan Finishing Lantai
Pekerjaan Waterproffing Ex.Sika, include material, adukan dan tenaga kerja.
A. Screed Waterproofing, M2 431.90 -
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm M2 431.90 -
Jumlah -
3.7.3. Pekerjaan Finishing Dinding
A. Plesteran 1 : 4 Dinding Bata, Termasuk Plesteran parapet Beton M2 857.02 -
B. Acian Plesteran M2 857.02 -
C. Plesteran 1:4, Opening Kusen + Acian M' 5.79 -
Pekerjaan Pengecatan
D. Pengecatan dinding Exterior Ex. Propan M2 857.02 -
Jumlah -
3.7.4. Pekerjaan Arsitek Pintu
Pekerjaan Pintu Besi
A. Pintu Type PB4 Unit 1.00 -
Jumlah -
3.7.5. Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,45 TCT Klip lock tanpa sambungan (roll on side) M2 1,111.09 -
B. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 92.00 -
C. Flasing Zincalum 0,4 TCT M' 172.90 -
D. Nok Atap Zincalum 0,45 TCT M' 2.90 -

Pekerjaan Insulation, termasuk material, jasa pemasangan dan alat bantu.


F. Insulation Al- Bubble - AL T; 4mm ex Zeltech type ZT-01B M2 1,111.09 -

Pekerjaan Tangga Maintenance


I. Tangga maintenance include pekerjaan Besi IWF 150.75.5.7'' + siku 50 Unit 1.00 -
Reilling Pipa 2"pengecatan, alat bantu dan material bantu. Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
4 SUPPORTING BUILDING
4.1 POS JAGA
4.1.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi M3 4.48 -
B. Urugan Kembali Bekas Galian Tanah M3 1.12 -
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 1.11 -
D. Urugan Pasir Bawah Pondasi Batu Kali M3 0.32 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 3.66 -
F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 2.47 -
Jumlah -
4.1.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.30 -
-, Pembesian Kg 42.05 -
-, Bekisting M2 4.00 -

B. Pek. Kolom Praktis K1 Uk. 200 x 200 mm, Besi 6 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.50 -
-, Pembesian Kg 87.03 -
-, Bekisting M2 9.92 -

C. Pek. Balok Beton Type RB uk. 15 x 25 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.30 -
-, Pembesian Kg 42.05 -
-, Bekisting M2 4.00 -

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.13 -
-, Pembesian Kg 28.21 -
-, Bekisting M2 2.40 -

E. Pek. Beton Plat Lantai Dak T=10 Cm


-, Beton Site MIx K-175 M3 1.17 -
-, Pembesian Kg 200.07 -
-, Bekisting M2 52.64 -

F. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm


-, Beton Site MIx K-175 M3 0.69 -
-, Pembesian Kg 53.88 -
-, Bekisting M2 15.18 -

G. Pek. Rabat Beton Lantai T= 5 Cm M3 0.16 -


Jumlah -
4.1.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 11.65 -
B. Plesteran 1 : 4 M2 39.95 -
C. Acian Plesteran M2 39.95 -
D. Plesteran 1:4, Opening Kusen + Acian M' 22.12 -
E. Pekerjaan Profil Beton Dinding Luar M' 7.21 -
F. Pekerjaan Naad dan Perapian DindinG Plin Keramik M' 6.66 -

Pekerjaan Pengecatan
G. Pengecatan dinding Exterior Ex. Propan M2 23.97 -
H. Pengecatan dinding Interior Ex. Propan M2 15.98 -
Jumlah -
4.1.4 Pekerjaan Finishing Lantai
Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Pos Jaga M2 3.17 -
B. Plin Dinidng Keramik M' 6.66 -
Jumlah -
4.1.5 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Kaca Rangka dan Kusen alumunium
A. Pintu Type PJ1 Unit 1.00 -

Pekerjaan Jendela include pengadaan, installing dan accessories.


B. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1 Unit 2.00 -
C. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2 Unit 1.00 -
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
4.1.6 Pekerjaan Lain-Lain
Pekerjaan Waterproofing LantaI Dak Atap
A. Screed Waterproofing, M2 11.65 -
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm M2 11.65 -
C. Pek. Pengecatan Plafon Beton Expose M2 11.65 -
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2" M' 2.00 -
E. Pas. Roof Drain Dia 2" Unit 2.00 -
Jumlah -

4.2 POS SECURITY DAN RUANG TUNGGU SOPIR


4.2.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi M3 23.52 -
B. Urugan Kembali Bekas Galian Tanah M3 5.88 -
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 21.18 -
D. Urugan Pasir Bawah Lantai T=10 cm M3 6.05 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 19.22 -
F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 12.95 -
Jumlah -
4.2.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.58 -
-, Pembesian Kg 219.51 -
-, Bekisting M2 21.00 -

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.04 -
-, Pembesian Kg 283.50 -
-, Bekisting M2 32.11 -

C. Pek. Balok Beton Type rb uk. 13 x 20 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.09 -
-, Pembesian Kg 160.63 -
-, Bekisting M2 16.80 -

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.69 -
-, Pembesian Kg 147.31 -
-, Bekisting M2 12.60 -

E. Pek. Rabat Beton Lantai T=5 Cm M3 3.03 -


Jumlah -
4.2.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 126.97 -
B. Pasangan Krawang Uk. 20x40 Cm, KR4 & Kr5 Bh 120.00 -
C. Plesteran 1 : 4 M2 242.52 -
D. Acian Plesteran M2 242.52 -
E. Plesteran 1:4, Opening Kusen + Acian M' 45.55 -
F. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan T. Wudhuk) M2 11.42 -
G. Pekerjaan Naad dan Pearapian Dinding Atas Keramik M' 53.56 -
H. Pekerjaan Profil Beton Dinding Luar M' 62.32 -

Pekerjaan Pengecatan
I. Pengecatan dinding Exterior Ex. Propan M2 0.40 -
J. Pengecatan dinding Interior Ex. Propan M2 0.59 -
Jumlah -
4.2.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Rangka Atap Baja Ringan M2 131.60 -
B. Atap Zincalum 0,40 TCT Klip lock M2 131.60 -
C. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 23.45 -
D. Flasing Zincalum 0,4 TCT M' 18.60 -
E. Nok Atap Zincalum 0,40 TCT M' 14.15 -
Jumlah -
4.2.5 Pekerjaan Finishing Lantai
Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Pos Security, Locker dan Rg, tunggu Sopir M2 58.02 -
B. Plin Keramik Dinding M' 47.85 -

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
B. Keramik Area Toilet M2 2.50 -
Jumlah -
4.2.6 Pekerjaan Arsitek Pintu dan Jendela
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Enginering Door, finish HPL, kusen alumunium Dan Pintu Kaca
A. Pintu Type P1 Unit 1.00 -

Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).


Pintu Kaca Rangka Dan Kusen Alumunium
B. Pintu Type P1' Unit 1.00 -
C. Pintu Type P3 Unit 1.00 -

Pekerjaan Jendela include pengadaan, installing dan accessories.


D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J2 Unit 2.00 -
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J3 Unit 1.00 -
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 1.00 -
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 2.00 -
Jumlah -
4.2.7 Pekerjaan Arsitek Plafond
Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 M2 37.99 -
B. Pekerjaan plafond Kalsi Link T: 4mm, rangka hollow 40x40 (Bagian Lu M2 45.50 -

Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board & Palfon Kalsi Link M2 83.49 -
Pekerjaan cat include material, tenaga kerja, alat bantu dan perapian)
Jumlah -

4.2.8 Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas Unit 1.00 -
B. Kran Dinding Type Y 20JC Ex San Ei Unit 1.00 -
C. Floor Drain Dia 4" Type H51 Ex SAN EI Unit 1.00 -
Jumlah -
4.2.9 Pekerjaan Lain-Lain
A. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu d M2 1.01 -
Jumlah -

4.3 RUMAH GENSET, RUANG POMPA, RUANG TANGKI BAHAN BAKAR DAN FIRE WATER TANK
4.3.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
Pondasi Plat Setempat
A. Galian Tanah Pondasi M3 13.20 -
B. Urugan Bekas galian M3 7.70 -
C. Urugan Pasir Alas Pondasi M3 0.55 -
D. Pek. Lantai Kerja pondasi M3 0.55 -
E. Pek. Pondasi Plat Tapak P1
-, Beton Site MIx K-225 M3 3.30 -
-, Pembesian Kg 559.01 -
-, Bekisting M2 13.20 -

F. Pek. Stump Beton Pondasi Plat Tapak (K1 ) Uk. 30/30 Cm


-, Beton Site MIx K-225 M3 0.89 -
-, Pembesian Kg 126.66 -
-, Bekisting M2 11.88 -

Pondasi Batu kali


G. Pek. Galian Tanah Pondasi M3 6.72 -
H. Urugan Kembali Bekas Galian Tanah M3 1.68 -
I. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 25.70 -
J. Urugan Pasir Bawah Lantai T=10 cm M3 7.34 -
K. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 5.49 -
L. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 3.70 -
Jumlah -
4.3.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 200 x 400 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 2.75 -
-, Pembesian Kg 497.03 -
-, Bekisting M2 41.28 -

B. Pek. Sloof Beton Type S2 uk. 150 x 250 mm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-225 M3 0.45 -
-, Pembesian Kg 49.91 -
-, Bekisting M2 6.00 -

C. Pek. Kolom Praktis K1 Uk. 300 x 300 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 3.81 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
-, Pembesian Kg 553.87 -
-, Bekisting M2 50.82 -

D. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-225 M3 0.23 -
-, Pembesian Kg 46.95 -
-, Bekisting M2 6.94 -

E. Pek. Balok Beton Type RB1 uk. 20 x 40 cm , Besi 6 Ø16 (Tump) Besi 5 Ø16 (Lap), Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 3.19 -
-, Pembesian Kg 700.34 -
-, Bekisting M2 57.00 -

F. Pek. Balok Beton Type BL uk. 11 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-225 M3 0.49 -
-, Pembesian Kg 104.93 -
-, Bekisting M2 8.97 -

G. Pek. Beton Plat Lantai Dak T=12 Cm


-, Beton Site MIx K-225 M3 10.35 -
-, Pembesian Kg 1,441.38 -
-, Bekisting M2 52.64 -

H. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm


-, Beton Site MIx K-225 M3 2.28 -
-, Pembesian Kg 179.61 -
-, Bekisting M2 49.40 -

I. Pek. Beton Plat Lantai Dudukan Genset Uk. 120x280 Cm T=60 Cm


-, Beton Site MIx K-225 M3 2.02 -
-, Pembesian Kg 45.26 -
-, Bekisting M2 4.80 -

J. Pek. Beton Plat Lantai Dudukan Tangki T=20 Cm


-, Beton Site MIx K-225 M3 8.29 -
-, Pembesian Kg 275.25 -
-, Bekisting M2 10.60 -

K. Pek. Rabat Beton K-175, Lantai Genset Dan Rumah Pompa T=10 Cm M3 6.79 -

Beton Struktur Fire Water Tank


L. Pek. Beton Dinding Fire Water Tank T=25 Cm & T=20 Cm, Besi Ø13-15 (vertikal), Besi Ø10-15 (Horizontal)
-, Beton Site MIx K-300 M3 14.76 -
-, Pembesian Kg 1,080.23 -
-, Bekisting M2 9.72 -

M. Pek. Beton Dinding Fire Water Tank T=25 Cm & T=20 Cm, Besi Ø13-15 (vertikal), Besi Ø10-15 (Horizontal)
-, Beton Site MIx K-300 M3 24.84 -
-, Pembesian Kg 2,184.97 -
-, Bekisting M2 161.60 -

N. Pek. Beton Plat Lantai Dak T=15 Cm


-, Beton Site MIx K-300 M3 5.74 -
-, Pembesian Kg 1,117.53 -
-, Bekisting M2 22.58 -

O. Pek. Integral Waterproffing Crystalline Lantai dan Dinding FWT M3 39.60 -


Jumlah -
4.3.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 74.09 -
B. Pasangan Krawang Uk. 20x40 Cm, KR4 & Kr5 Bh 90.00 -
C. Plesteran 1 : 4 M2 354.28 -
D. Acian Plesteran M2 354.28 -
E. Plesteran 1:4, Opening Kusen + Acian M' 49.31 -
F. Pekerjaan Profil Beton Dinding Luar M' 91.60 -

Pekerjaan Pengecatan
G. Pengecatan dinding Exterior Ex. Propan M2 141.71 -
H. Pengecatan dinding Interior Ex. Propan M2 212.57 -
Jumlah -
4.3.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Tiang Kuda-Kuda Besi Pipa Dia-3" T=3 MMFin. Cat, Rg Tangki Kg 203.95 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
B. Pek. Gording CNP 150.65.20.3,2 Kg 231.70 -
C. Atap Zincalum 0,40 TCT Klip lock tanpa sambungan (roll on side) M2 26.00 -
Jumlah -
4.3.5 Pekerjaan Finishing Lantai
Finish lantai super flat Floor hardener 3kg/m2 ex Besroc (Type 10)
A. Beton Plat Area Rg. Genset Dan Rumah Pompa M2 56.75 -
Jumlah -
4.3.6 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu Besi
A. Pintu Besi Type PB1 (1000x2100mm) Unit 1.00 -
B. Pintu Besi Type PB5 (2200x2100mm) Unit 1.00 -
C. Pintu Besi Type PB4 (800x1900mm) Unit 1.00 -

Pekerjaan Jendela include pengadaan, installing dan accessories.


D. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 4.00 -
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 1.00 -
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 1.00 -

Pekerjaan Dinding BRC Rangka Besi Pipa Di-2"


G. Pekerjaan Pagar Type PG1, P=1675 MM, T=1050 MM Unit 1.00 -
H. Pekerjaan Pagar Type PG2, P=2850 MM, T=1050 MM Unit 1.00 -
I. Pekerjaan Pagar Type PG3, P=6000 MM, T=1050 MM Unit 1.00 -
Jumlah -
4.3.7 Pekerjaan Lain-Lain
Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap Fire Water tank, Dak Atap Ruang Genset dan Rumah Pompa
A. Screed Waterproofing, M2 248.63 -
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm M2 248.63 -
C. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5 Unit 2.00 -
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2.5" M' 20.00 -
E. Pas. Roof Drain Dia 2.5" Unit 4.00 -
E. Pek. Tangga Maintenance Luar Pipa 2" Fin. Cat Unit 1.00 -
E. Pek. Tangga Maintenance Dalam Pipa 2" Satinless Steel Unit 2.00 -
Jumlah -

4.4 MUSHALLA, TOILET, KANTIN DAN KANTOR TRAC/ASSA/B-LOC


4.4.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi M3 57.12 -
B. Urugan Kembali Bekas Galian Tanah M3 14.28 -
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 46.96 -
D. Urugan Pasir Bawah Lantai T=10 cm M3 13.42 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 46.67 -
F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 31.44 -
Jumlah -
4.4.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 3.83 -
-, Pembesian Kg 532.68 -
-, Bekisting M2 51.00 -

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm,Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 2.20 -
-, Pembesian Kg 596.64 -
-, Bekisting M2 67.60 -

C. Pek. Balok Beton Type rb uk. 13 x 20 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 2.65 -
-, Pembesian Kg 389.75 -
-, Bekisting M2 40.80 -
D. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.90 -
-, Pembesian Kg 190.40 -
-, Bekisting M2 16.29 -

E. Pek. Rabat Beton Lantai T=5 Cm M3 6.71 -


Jumlah -
4.4.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 190.18 -
B. Pasangan Krawang Uk. 20x40 Cm, KR2 Bh 36.00 -
C. Pasangan Krawang Uk. 20x30 Cm, KR3 Bh 10.00 -
D. Plesteran 1 : 4 M2 298.36 -
E. Acian Plesteran M2 298.36 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
F. Plesteran 1:4, Opening Kusen + Acian M' 60.94 -
G. Pas. Keramik Dinding Uk. 200x400 MM (Toilet dan T. Wudhuk) M2 78.66 -
H. Pas. Keramik Dinding Uk. 300x300 MM (Pantry) M2 3.33 -
I. Pekerjaan Naad dan Pearapian Dinding Atas Keramik Termasuk pada M' 112.80 -
J. Pekerjaan Profil Beton Dinding Luar M' 116.26 -

Pekerjaan Pengecatan
I. Pengecatan dinding Exterior Ex. Propan M2 0.40 -
J. Pengecatan dinding Interior Ex. Propan M2 0.59 -
Jumlah -
4.4.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Rangka Atap Baja Ringan M2 252.50 -
B. Atap Zincalum 0,40 TCT Klip lock M2 252.50 -
C. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 31.80 -
D. Flasing Zincalum 0,4 TCT M' 9.30 -
E. Nok Atap Zincalum 0,40 TCT M' 27.15 -
Jumlah -
4.4.5 Pekerjaan Finishing Lantai
Pekerjaan Keramik 400x400mm (polished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Mushalla, Kantin Dan Kantor trac M2 111.44 -
B. Plin Lantai Keramik M' 69.80

Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
C. Keramik Area Toilet, tempat Wudhuk M2 22.73 -
Jumlah -
4.4.6 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).
Pintu Kaca Rangka Dan Kusen Alumunium
A. Pintu Type P1 Unit 1.00 -

Pekerjaan Pintu include pengadaan, installing dan accessories(ironmongery ex Dekkson).


Pintu Enginering Door, finish HPL, kusen alumunium
B. Pintu Type P2 Unit 1.00 -
C. Pintu Type P3 Unit 3.00 -
D. Pintu Type P4 Unit 1.00 -
Jumlah -
Pekerjaan Jendela include pengadaan, installing dan accessories.
E. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type J1 Unit 1.00 -
F. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV Unit 4.00 -
G. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type BV1 Unit 1.00 -
H. Pekerjaan jendela detail accessories lihat di DWS u/ Jendela Type KR Unit 8.00 -
Jumlah -

4.4.7 Pekerjaan Arsitek Plafond


Pekerjaan Jendela include pengadaan, installing dan accessories.
A. Pekerjaan plafond gypsumboard t: 9mm, rangka hollow 40x40 M2 134.18 -
B. Pekerjaan plafond Kalsi Link T= 4mm, rangka hollow 40x40 area Luar M2 80.87 -

Pekerjaan Pengecatan
C. Pekerjaan cat plafond gypsum board & beton exposed dibawah tangga M2 215.04 -
Jumlah -

4.4.8 Pekerjaan Arsitek Sanitary


Pekerjaan Sanitary include material , installing dan accessories. Unit Ex TOTO . ''Provesional Sum''
A. Closed Jongkok Type CE6 Ex TOTO hanya pemasangan dan instalas Unit 3.00 -
B. Wall Hung Lavatory Type LW240CJ inc keran lavatory Ex. TOTO hany Unit 1.00 -
C. Kran Dinding Type Y 20JC Ex San Ei Unit 9.00 -
D. Floor Drain Dia 4" Type H51 Ex SAN EI Unit 5.00 -
E. Kaca Cermin Tebal 5mm + Bevel Ex. Asahimas by maincon. (ukuran Unit 1.00 -
F. Kitchen zick Single Bowl Ex Royal Unit 3.00 -
G. Kran Pantry Model Leher Angsa A10C Ex SAN EI Unit 3.00 -
Jumlah -
4.4.9 Pekerjaan Lain-Lain
A. Pekerjaan Meja Beton Watafel dan Pantry T= 100mm, include pas. ke M2 3.33 -
B. Tanggulan Tempat Wudhu, include pasangan bata, pasangan keramik, M' 4.55 -
C. Dudukan Closet Jongkok, Pas. Bata H: 200mm, termasuk alat bantu d M2 3.04 -
Jumlah -

4.5 TEMPAT CUCI COUNTENER


4.5.1 Pekerjaan Tanah dan Pondasi
Pondasi Batu kali
A. Pek. Galian Tanah Pondasi M3 6.72 -
B. Urugan Kembali Bekas Galian Tanah M3 1.68 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 10.50 -
D. Urugan Pasir Bawah Lantai T=10 cm M3 3.00 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 5.18 -
F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 3.08 -
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
4.5.2 Pekerjaan Beton
A. Pek. Kolom K1 Uk. 200 x 200 mm, Besi 6 Ø12, Sengkang Ø8-100 mm
-, Beton Site MIx K-175 M3 0.18 -
-, Pembesian Kg 36.58 -
-, Bekisting M2 3.52 -

B. Pek. Kolom KP Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm, Ø8-200 mm
-, Beton Site MIx K-175 M3 0.03 -
-, Pembesian Kg 12.32 -
-, Bekisting M2 0.88 -

C. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.18 -
-, Pembesian Kg 38.72 -
-, Bekisting M2 3.30 -

D. Pek. Rabat Beton K-175, T=5 Cm M3 1.61 -


Jumlah -
4.5.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 15.36 -
B. Plesteran 1 : 4 M2 8.16 -
C. Acian Plesteran M2 8.16 -
D. Pas. Keramik Dinding Uk. 200x400 MM (Dinding Belakang Dan Bak Air M2 22.90 -
Pekerjaan Pengecatan -
E. Pengecatan dinding Exterior Ex. Propan M2 8.16 -
Jumlah -
4.5.4 Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
Pek. Tiang Besi Pipa Dia-3" T=3 MM Fin. Cat
A. Pek. Kuda Besi Pipa Dia-3" T=3 MM dan Skor Pipa Besi Dia 2"T=2.8 M Kg 65.86 -
B. Pek. Gording CNP 150.65.20.3,2 Kg 283.77 -
C. Atap Zincalum 0,40 TCT Klip lock Kg 426.57 -
D. Atap Zincalum 0,40 TCT Klip lock M2 46.83 -
Jumlah -
4.5.5 Pekerjaan Finishing Lantai
Pekerjaan Keramik 400x400mm (Unpolished) Ex.Ikad , include material, adukan dan tenaga kerja.
A. Keramik Lantai Tempat Cuci Countener Termasuk Bak Air M2 32.24 -
Jumlah -
4.5.6 Pekerjaan Lain-Lain
Pekerjaan Saluran Air keliling
A. Pek. Saluran Keliling 2 sisi M' 12.40 -
Jumlah -
4.6 TEMPAT SAMPAH
4.6.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi M3 28.00 -
B. Urugan Kembali Bekas Galian Tanah M3 7.00 -
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 15.36 -
D. Urugan Pasir Bawah Lantai T=10 cm M3 4.39 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 22.88 -
F. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 15.41 -
Jumlah -
4.6.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.88 -
-, Pembesian Kg 261.27 -
-, Bekisting M2 25.00 -

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.52 -
-, Pembesian Kg 250.24 -
-, Bekisting M2 28.34 -

C. Pek. Balok Beton Type rb uk. 13 x 20 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.30 -
-, Pembesian Kg 191.18 -
-, Bekisting M2 20.00 -

D. Pek. Balok Beton Type BL uk. 11 x 15 cm,Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.41 -
-, Pembesian Kg 87.76 -
-, Bekisting M2 7.50 -

E. Pek. Rabat Beton Lantai T=5 Cm M3 2.19 -


HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
Jumlah -
4.6.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 100.29 -
B. Plesteran 1 : 4 M2 200.58 -
C. Acian Plesteran M2 200.58 -
D. Plesteran 1:4, Opening Kusen + Acian M' 40.08 -

Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan M2 90.26 -
F. Pengecatan dinding Interior Ex. Propan M2 110.32 -
Jumlah -
4.6.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Pek. Tiang Besi Pipa Dia-3" T=3 MM Fin. Cat Kg 10.08 -
B. Pek. Kuda Besi Pipa Dia-3" T=3 MM Fin. Cat Kg 207.45 -
C. Pek. Gording CNP 150.65.20.3,2 Kg 936.05 -
D. Atap Zincalum 0,40 TCT Klip lock M2 97.01 -
Jumlah -
4.6.5 Pekerjaan Arsitek Pintu
Pekerjaan Pintu Besi
A. Pintu Type PB7, (1500x1500mm) Unit 2.00 -
B. Pintu Type PB7', (1500x2100mm) Unit 2.00 -

Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesories.
C. Jendela JK1 (Area Limbab B3) Unit 4.00 -
Jumlah -
4.6.6 Pekerjaan Tempat Sampah Cair
Beton Struktur Limbah Cair
A. Pek. Beton Lantai T=15 Cm, Besi Ø10-15.
-, Beton Site MIx K-300 M3 1.02 -
-, Pembesian Kg 133.00 -
-, Bekisting M2 1.59 -

B. Pek. Beton Dinding T=15 Cm , Besi Ø10-15


-, Beton Site MIx K-300 M3 2.25 -
-, Pembesian Kg 200.24 -
-, Bekisting M2 27.00 -

C. Pek. Beton Plat Lantai Dak T=15 Cm, Besi Ø10-15


-, Beton Site MIx K-300 M3 1.02 -
-, Pembesian Kg 117.87 -
-, Bekisting M2 7.06 -

Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap


D. Screed Waterproofing, M2 26.15 -
E. Waterproofing Liquid Membrant Include Overlap M2 26.15 -
Jumlah -
4.6.7 Pekerjaan Lain-lain
A. Wall Hung Lavatory Type LW240CJ Include kran Lavatory Ex. TOTO Unit 1.00 -
B. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5 Unit 1.00 -
Jumlah -

4.7 GUDANG ARSIP


4.7.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
A. Pek. Galian Tanah Pondasi M3 24.64 -
B. Urugan Kembali Bekas Galian Tanah M3 6.16 -
C. Urugan Tanah Bawah Lantai T=35 cm Pakai Bekas Galian M3 34.29 -
D. Urugan Pasir Bawah Lantai T=10 cm M3 9.80 -
E. Pek. Pondasi Batu Kali, 1 Pc : 4 Ps M3 13.09 -
F. Pek. Pondasi Batu Bata M2 1.95 -
G. Pek. Stek Pondasi Dia-10-1000 MM, L= 500MM Kg 13.56 -
Jumlah -
4.7.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 150 x 250 mm , Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.65 -
-, Pembesian Kg 229.95 -
-, Bekisting M2 22.00 -

B. Pek. Kolom Praktis Kp Uk. 130 x 130 mm,Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.77 -
-, Pembesian Kg 208.94 -
-, Bekisting M2 23.66 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
C. Pek. Balok Beton Type rb uk. 13 x 20 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 1.14 -
-, Pembesian Kg 168.26 -
-, Bekisting M2 17.60 -

D. Pek. Balok Beton Type BL uk. 11 x 15 cm , Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-175 M3 0.26 -
-, Pembesian Kg 56.23 -
-, Bekisting M2 4.80 -

E. Pek. Lantai Beton K-250, T=10 Cm, Tul. Wiremesh MS-8


-, Beton Site MIx K-250 M3 9.80 -
-, Pembesian Kg 533.84 -
Jumlah -
4.7.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 133.48 -
B. Plesteran 1 : 4 M2 266.96 -
C. Acian Plesteran M2 266.96 -
D. Plesteran 1:4, Opening Kusen + Acian M' 28.80 -

Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan M2 133.48 -
F. Pengecatan dinding Interior Ex. Propan M2 133.48 -
Jumlah -
4.7.4 Pekerjaan Atap
Pekerjaan atap, termasuk biaya mob de mobilisasi alat bantu, material dan jasa pemasangan.
A. Atap Zincalum 0,40 TCT klip lock M2 168.80 -
B. Lisplank Zincalumn T: 0,4 TCT MP Deck M2 22.80 -
C. Flasing Zincalum 0,4 TCT M' 9.30 -
D. Nok Atap Zincalum 0,40 TCT M' 18.15 -
Jumlah -
4.7.5 Pekerjaan Finishing Lantai
Finish lantai Floor hardener 3kg/m2 ex Besroc
A. Beton Plat Lantai Gudang Arsip M2 92.72 -
Jumlah -
4.7.6 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu Besi
A. Pintu Type PB3, (1600x2400mm) Unit 1.00 -

Pekerjaan Pintu & Jendela Kawat Harmonika, detail lihat digambar. Pekerjaan include accesories.
B. Jendela JK2 (Area Gudang Arsip) Unit 4.00 -
Jumlah -

4.8 RUMAH GARDU


4.8.1 Pekerjaan Tanah dan Pondasi
Pekerjaan tanah menyangkut semua pekerjaan galian dan urugan, penawaran include dengan jasa tenaga kerja, alat bantu dan materil.
Pondasi Plat Setempat
A. Galian Tanah Pondasi M3 8.10 -
B. Urugan Bekas galian M3 4.20 -
C. Pek. Lantai Kerja pondasi M3 0.30 -
D. Pek. Pondasi Plat Tapak P1
-, Beton Site MIx K-225 M3 1.80 -
-, Pembesian Kg 304.92 -
-, Bekisting M2 7.20 -

E. Pek. Stump Beton Pondasi Plat Tapak (K1 ) Uk. 30/30 Cm


-, Beton Site MIx K-225 M3 0.59 -
-, Pembesian Kg 84.57 -
-, Bekisting M2 7.92 -
Jumlah -
4.8.2 Pekerjaan Beton
A. Pek. Sloof Beton Type S1 uk. 200 x 400 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 1.31 -
-, Pembesian Kg 261.81 -
-, Bekisting M2 19.68 -

B. Pek. Kolom Praktis K1 Uk. 300 x 300 mm, Besi 6 Ø16, Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 1.97 -
-, Pembesian Kg 286.64 -
-, Bekisting M2 26.28 -

C. Pek. Kolom Praktis Kp Uk. 130 x 130 mm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-225 M3 0.14 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
-, Pembesian Kg 30.13 -
-, Bekisting M2 2.22 -

D. Pek. Balok Beton Type RB1 uk. 20 x 40 cm , Besi 6 Ø16 (Tump) Besi 5 Ø16 (Lap), Sengkang Ø8-100 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 1.53 -
-, Pembesian Kg 368.81 -
-, Bekisting M2 27.30 -

E. Pek. Balok Beton Type BL uk. 11 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-200 mm (Lap)
-, Beton Site MIx K-225 M3 0.24 -
-, Pembesian Kg 50.98 -
-, Bekisting M2 4.35 -

F. Pek. Beton Plat Lantai Dak T=12 Cm


-, Beton Site MIx K-225 M3 4.95 -
-, Pembesian Kg 694.18 -
-, Bekisting M2 36.21 -

G. Pek. List Plank Beton T=10 Cm Uk. 10x60 Cm


-, Beton Site MIx K-225 M3 1.56 -
-, Pembesian Kg 122.89 -
-, Bekisting M2 33.80 -

H. Pek. Beton Plat Lantai T=15 Cm


-, Beton Site MIx K-225 M3 8.40 -
-, Pembesian Kg 999.25 -
-, Bekisting M2 14.45 -
Jumlah -
4.8.3 Pekerjaan Pasangan dan Finishing Dinding
Pekerjaan pasangan bata ringan dan bata merah alat bantu, perapian dan tenaga kerja.
A. Pasangan Batu Bata 1 : 4 M2 42.35 -
B. Plesteran 1 : 4 M2 154.31 -
C. Acian Plesteran M2 154.31 -
D. Plesteran 1:4, Opening Kusen + Acian M' 17.50 -

Pekerjaan Pengecatan
E. Pengecatan dinding Exterior Ex. Propan M2 77.15 -
F. Pengecatan dinding Interior Ex. Propan M2 77.15 -
Jumlah -
4.8.4 Pekerjaan Arsitek Pintu dan Jendela
Pekerjaan Pintu Besi
A. Pintu Besi Type PV1 (1350x2850mm) Unit 1.00 -
Pekerjaan Ventilasi include pengadaan, installing dan accessories.
B. Pekerjaan Ventilasi detail accessories lihat di DWS u/ Jendela Type B Unit 3.00 -
C. Pekerjaan Ventilasi detail accessories lihat di DWS u/ Jendela Type B Unit 4.00 -
Jumlah -
4.8.5 Pekerjaan Lain-Lain
Pekerjaan Waterproofing Lantai, Dinding dan Dak Atap Fire Water tank, Dak Atap Ruang Genset dan Rumah Pompa
A. Screed Waterproofing, M2 41.25 -
B. Waterproofing Liquid Membrant Include Overlap ke Dinding 30 Cm M2 41.25 -
C. Pas. Tutup Menhole Dengan Besi Plat T= 2 MM rangka Siku 50.50.5 Unit 4.00 -
D. Pek. Saluran Vertikal Air Hujan Pipa Dia-2.5" M' 9.10 -
E. Pas. Roof Drain Dia 2.5" Unit 2.00 -
F. Pek. Rabat Dan Saluran Keliling M' 26.70 -
Jumlah -

4.9. MENARA TOREN AIR


4.9.1.Pekerjaan Tanah dan Pondasi
A.Pek. Galian M3 7.99 -
B.Urugan Kembali Bekas Galian M3 5.76 -
C. Urugan Pasir tebal 10 cm M3 0.48 -
D. Lantai Kerja tebal 5 cm M3 0.24 -
E.Pondasi Tapak Beton uk. 100x100x300 cm
-, Beton Site MIx K-225 M3 1.20 -
-, Pembesian Kg 199.55 -
-, Bekisting M2 4.80 -
F. Pek. Stump Beton Pondasi Plat Tapak (K) Uk. 25/25 Cm
-, Beton Site MIx K-225 M3 0.33 -
-, Pembesian Kg 70.53 -
-, Bekisting M2 5.20 -
G. Pek. Sloof Beton uk. 15 x 20 cm
-, Beton Site MIx K-225 M3 0.21 -
-, Pembesian Kg 54.41 -
-, Bekisting M2 2.80 -
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
4.9.2. Pekerjaan Konstruksi Baja
A. Pek. Base Plat T = 15 mm Kg 29.44 -
B. Pas. Angkur + baut dia. 16 mm Bh 16.00 -
C. Pek. Besi Siku L 60.60.6 Kg 870.45 -
D. Pek. Plat Buhul T = 6 mm Kg 81.31 -
E. Pek. Plat Baja T = 3 mm Kg 1.00 -
Jumlah -
4.9.3 Water Tank Atas
A. Pas. Water Tank Kap. 1000 Liter Unit 1.00 -
Jumlah -

4.10. TIANG BENDERA


4.10.1 Pekerjaan Tanah dan Pondasi
A. Pek. Galian M3 0.46 -
B. Urugan Pasir tebal 5 cm M3 0.03 -
C. Urugan Pasir tebal 5 cm di bawah kanstin M3 0.07 -
D. Urugan Pasir dipadatkan tebal 10 cm di bawah paving block M3 0.41 -
E. Pek. Stump Beton K-225 M3 0.51 -
Jumlah -
4.10.2 Pekerjaan Tiang Bendera
A. Pipa Besi Dia. 3" M' 10.20 -
B. Besi Angkur dia 10 mm Kg 4.55 -
C. Baut Dia 20 mm Bh 6.00 -
D. Tiang Bendera Pipa Besi Dia 4" panjang 6 m + Dia 3" panjang 3 m inclu Unit 1.00 -
E. Tiang Bendera Pipa Besi Dia 4" panjang 5 m + Dia 3" panjang 3 m inclu Unit 2.00 -
Jumlah -

5 EXTERNAL

5.1 PAGAR
5.1.1 Pekerjaan Tanah dan Pondasi
A. Pek. Galian Tanah Pondasi M3 1,044.07 -
B. Pas. Cerucuk Kayu Dolken dia. 10 cm P = 2 m M' ### -
C. Pek. Urugan tebal 10 cm M3 140.07 -
D. Pas. Pondasi Batukali 1 : 4 M3 2,758.62 -
E. Pas. Pipa Suling PVC dia. 2" + Ijuk M' 959.00 -
F. Pek. Urugan Tanah M3 3,752.21 -
Jumlah -
5.1.2 Pekerjaan Pagar Panel Precast
A. Pek. Panel Precast uk. 5x40x240 cm M' 551.16 -
B. Pek. Tiang Panel Precast uk. 18x19x370 cm M' 858.40 -
C. Pek. Ring Balok Beton Type BL uk. 15 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 86.11 -
-, Pembesian Kg 2,237.44 -
-, Bekisting M2 86.11 -
D. Pondasi Tapak Beton uk. 50x50x20 cm, Besi Ø12-150 mm (2 Lapis)
-, Beton Site MIx K-225 M3 3.75 -
-, Pembesian Kg 671.15 -
-, Bekisting M2 30.00 -
E. Pek. Kolom Pedestal Beton Type KP uk. 20 x 20 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 2.55 -
-, Pembesian Kg 450.98 -
-, Bekisting M2 51.00 -
F. Pek. Besi Siku L 80.80.8 Kg 1,427.27 -
G. Pek. Plat T = 8 mm Kg 73.59 -
H. Pas. Angkur + baut dia. 16 mm Bh 300.00 -
I. Pas. Angkur U + baut dia. 16 mm Bh 150.00 -
J. Pek. Besi Siku L 50.50.5 Kg 568.01 -
K. Pas. Kawat Berduri M' 2,870.35 -
Jumlah -
5.1.3 Pekerjaan Pagar BRC
A. Pek. Kolom Beton Type KB uk. 25 x 25 cm, Besi 4 Ø12, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 6.01 -
-, Pembesian Kg 579.72 -
-, Bekisting M2 48.10 -
B. Pek. Balok Beton Type BL uk. 15 x 15 cm, Besi 4 Ø10, Sengkang Ø8-150 mm (Tump), Ø8-150 mm (Lap)
-, Beton Site MIx K-225 M3 1.80 -
-, Pembesian Kg 320.27 -
-, Bekisting M2 24.05 -
C. Pas. Batu Bata 1 : 4 M2 84.16 -
D. Pek. Plesteran 1 : 4 M2 168.32 -
E. Pek. Acian Plesteran M2 168.32 -
F. Pengecatan dinding Exterior Ex. Propan M2 168.32 -
G. Pas. Pagar BRC M2 96.18 -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
Jumlah -
5.1.4 Pekerjaan Gerbang Pagar
A. Pintu Pagar Dorong Besi uk. 6000 x 2260 MM Unit 2.00 -
B. Pintu Pagar Besi uk. 1500 x 2260 MM Unit 1.00 -
Jumlah -

5.2 DRAINASE
5.2.1 Pekerjaan Saluran Tipe I Uk. 40x40 (Terbuka)
A. Pekerjaan Galian M3 121.35 -
B. Lantai Kerja Tebal 5 cm M3 10.27 -
C. Pas. Batako M2 175.64 -
D. Saluran Beton Berulang
- Beton Site MIx K-250 M3 39.15 -
-, Pembesian Kg 4,819.74 -
-, Bekisting M2 289.54 -
Jumlah -
5.2.2Pekerjaan Saluran Tipe IA Uk. 40x40 (Tertutup)
A.Pekerjaan Galian M3 124.17 -
B.Lantai Kerja Tebal 5 cm M3 7.98 -
C.Pas. Batako M2 138.60 -
D.Saluran Beton Berulang
- Beton Site MIx K-250 M3 30.43 -
-, Pembesian Kg 3,741.91 -
-, Bekisting M2 221.98 -
E. Tutup Saluran Heavy Duty Uk. 600x530x100 MM M' 210.00 -
Jumlah -
5.2.3Pekerjaan Saluran Tipe IB Uk. 40x40 (Tertutup Gril)
A.Pekerjaan Galian M3 7.55 -
B.Lantai Kerja Tebal 5 cm M3 0.54 -
C.Pas. Batako M2 9.31 -
D.Saluran Beton Berulang
- Beton Site MIx K-250 M3 2.04 -
-, Pembesian Kg 251.68 -
-, Bekisting M2 15.30 -
E. Tutup Saluran Besi Gril M' 14.10 -
Jumlah -
5.2.4 Pekerjaan Saluran Tipe II Uk. 40x60 (Terbuka)
A. Pekerjaan Galian M3 69.51 -
B. Lantai Kerja Tebal 5 cm M3 4.12 -
C. Pas. Batako M2 113.98 -
D. Saluran Beton Berulang
- Beton Site MIx K-250 M3 20.07 -
-, Pembesian Kg 2,382.66 -
-, Bekisting M2 113.37 -
Jumlah -
5.2.5Pekerjaan Saluran Tipe IIA Uk. 40x60 (Tertutup)
A.Pekerjaan Galian M3 5.22 -
B.Lantai Kerja Tebal 5 cm M3 0.30 -
C.Pas. Batako M2 8.37 -
D.Saluran Beton Berulang
- Beton Site MIx K-250 M3 1.46 -
-, Pembesian Kg 175.24 -
-, Bekisting M2 9.50 -
E. Tutup Saluran Heavy Duty Uk. 600x530x100 MM M' 7.90 -
Jumlah -
5.2.6 Pekerjaan Saluran Tipe III Uk. 60x60 (Terbuka)
A. Pekerjaan Galian M3 182.65 -
B. Lantai Kerja Tebal 5 cm M3 7.65 -
C. Pas. Batako M2 167.25 -
D. Saluran Beton Berulang
- Beton Site MIx K-250 M3 32.64 -
-, Pembesian Kg 3,823.82 -
-, Bekisting M2 164.11 -
Jumlah -
5.2.7Pekerjaan Saluran Tipe IIIA Uk. 60x60 (Tertutup)
A.Pekerjaan Galian M3 14.28 -
B.Lantai Kerja Tebal 5 cm M3 1.03 -
C.Pas. Batako M2 24.82 -
D.Saluran Beton Berulang
- Beton Site MIx K-250 M3 4.38 -
-, Pembesian Kg 515.43 -
-, Bekisting M2 23.00 -
E. Tutup Saluran Heavy Duty Uk. 600x730x140 MM M' 21.40 -
Jumlah -
HARGA SATUAN SUB TOTAL TOTAL
NO. URAIAN PEKERJAAN STN VOLUME
(Rp) (Rp) (Rp)

a b c d e f=dxe g
5.2.8 Pekerjaan Saluran Tipe IV Uk. 60x80 (Terbuka)
A. Pekerjaan Galian M3 67.88 -
B. Lantai Kerja Tebal 5 cm M3 2.13 -
C. Pas. Batako M2 64.48 -
D. Saluran Beton Berulang
- Beton Site MIx K-250 M3 10.96 -
-, Pembesian Kg 1,365.78 -
-, Bekisting M2 46.49 -
Jumlah -
5.2.9 Pekerjaan Saluran Tipe V Uk. 80x80 (Terbuka)
A. Pekerjaan Galian M3 128.92 -
B. Lantai Kerja Tebal 5 cm M3 5.43 -
C. Pas. Batako M2 126.48 -
D. Saluran Beton Berulang
- Beton Site MIx K-250 M3 25.30 -
-, Pembesian Kg 3,177.77 -
-, Bekisting M2 99.79 -
Jumlah -
5.2.10 Pekerjaan Saluran Tipe IA x 2 (Tertutup)
A. Pekerjaan Galian M3 42.68 -
B. Lantai Kerja Tebal 5 cm M3 2.88 -
C. Saluran Beton Bertulang
- Beton Site MIx K-250 M3 25.88 -
-, Pembesian Kg 7,049.08 -
-, Bekisting M2 149.14 -
Jumlah -

5.3 KANSTIN DAN HALAMAN


5.3.1 Pekerjaan Kanstin
A. Pas. Kanstin Taman Uk. 60x30x15/12 Cm M' 1,014.72 -
B. Pas. Kanstin Car Stoper Uk. 60x15x15/10 M' 85.20 -
C. Pas. Stoper Parkir Roda dua Besi Pipa Dia-2,5" M' 32.05 -
Jumlah -
5.3.2 Pekerjaan Paving Block Pedestrian
A. Pas. Paving Block Uk. 20x10x8 Cm M2 257.21 -
Jumlah -
5.3.3 Pekerjaan Pengecatan
A. Pengecaran Kanstin Taman Uk. 60x30x15/12 Cm M2 426.18 -
B. Pengecaran Kanstin Car Stoper Uk. 60x15x15/10 Cm M2 34.08 -
C. Pengecatan Stoper Parkir Roda dua Besi Pipa Dia-2,5" M2 7.53 -
D. Pengecatan Marka Pedestrian Pejalan Kaki M2 76.60 -
Jumlah -
5.4 TAMAN DAN PENGHIJAUAN
5.4.1 Pekerjaan Tanah
A. Pek. Urugan Tanah Humus Taman T= 10 Cm M3 188.44 -
Jumlah -
5.4.2 Pekerjaan Tanaman
A. Pek. Penanaman Rumput gajah Mini M2 1,527.23 -
B. Pek. Penanaman Tanaman Perdu Iris T= 20-25 Cm Polibeg 272.00 -
C. Pek. Penanaman Tanaman Perdu Lantana T= 20-25 Cm Polibeg 1,936.00 -
D. Pek. Penanaman Tanaman Perdu Teh-tehan T= 20-25 Cm Polibeg 3,506.00 -
E. Pek. Penanaman Pohon Buah Mangga Dia-5 Cm, T= 2 M Btg 15.00 -
F. Pek. Penanaman Pohon Buah Nangka Dia-5 Cm, T= 2 M Btg 2.00 -
G. Pek. Penanaman Pohon Ketapang Kencana Dia-5 Cm, T= 2 M Btg 21.00 -
H. Pek. Penanaman Pohon Pucuk Merah Dia-5 Cm, T= 2 M Btg 37.00 -
I. Pek. Penanaman Pohon Cemara Udang Dia-5 Cm, T= 2 M Btg 3.00 -
Jumlah -
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

I Gedung Kantor
A Pekerjaan Pondasi
1 Pengadaan Tiang Pancang □ 25x25 (L.6M + 3M) 1044 M¹
2 Pemancangan Tiang Pancang (HSPD) 1044 M¹
3 Penyambungan Tiang Pancang 116 Titik
4 Bobok Kepala Tiang Pancang 116 Titik
5 PDA Tes 1 Titik

B Pekerjaan Tanah
1 Galian Pondasi 35.36 M³
2 Urug Basecorse 1,057.21 M³
3 Pekerjaan Pemadatan Tanah CBR 90% 1,321.51 M²

C Pekerjaan Beton
Pekerjaan Lantai 1
1 Pek. Lantai Kerja 65.63 M³
2 Pondasi PC-1
a Beton K.300 2.54 M³
b Pembesian 498.04 Kg
c Bekisting Dengan Batako 18.48 M²

2 Pondasi PC-2
a Beton K.300 23.02 M³
b Pembesian 5,847.84 Kg
c Bekisting Dengan Batako 119.14 M²

3 Pondasi PC-3
a Beton K.300 4.15 M³
b Pembesian 813.54 Kg
c Bekisting Dengan Batako 14.20 M²

4 Pekerjaan Retaining wall RW-1


a Beton K.300 7.58 M³
b Pembesian 2,237.10 Kg
c Bekisting 101.11 M²

5 Pekerjaan Retaining wall RW-2


a Beton K.300 3.29 M³
b Pembesian 673.36 Kg
c Bekisting Dengan Batako 37.00 M²

6 Tie Beam TB-1 30/50


a Beton K.300 78.92 M³
b Pembesian 8,308.85 Kg
c Bekisting Dengan Batako 526.18 M²

7 Tie Beam TB-2 20/30


a Beton K.300 7.32 M³
b Pembesian 1,287.72 Kg
c Bekisting Dengan Batako 73.22 M²
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

8 Kolom K1 40/40
a Beton K.300 47.01 M³
b Pembesian 14,437.39 Kg
c Bekisting 485.34 M²

9 Kolom K2 40/60
a Beton K.300 5.02 M³
b Pembesian 1,315.13 Kg
c Bekisting 41.84 M²

10 Kolom K3 15/40
a Beton K.300 0.31 M³
b Pembesian 58.03 Kg
c Bekisting 5.75 M²

11 Balok B1 30/50
a Beton K.300 60.24 M³
b Pembesian 21,518.49 Kg
c Bekisting 414.98 M²

12 Balok B2 20/30
a Beton K.300 15.80 M³
b Pembesian 6,489.18 Kg
c Bekisting 157.87 M²

13 Perkerasan Lantai
a Lantai Type L2
- Beton K.300 107.89 M³
- Pembesian 11,328.90 Kg

b Lantai Type L3
- Beton K.300 73.24 M³
- Pembesian 4,760.44 Kg

14 Pekerjaan Tangga Teras Utama


a Beton K.300 2.04 M³
b Pembesian 284.93 Kg
c Bekisting 0.64 M²

15 Tangga Samping
a Beton K.300 0.86 M³
b Pembesian 81.92 Kg
c Bekisting 3.57 M²

Pekerjaan Lantai 2
1 Kolom K1 40/40
a Beton K.300 22.98 M³
b Pembesian 7,535.24 Kg
c Bekisting 229.82 M²

2 Kolom K2 40/60
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

a Beton K.300 3.63 M³


b Pembesian 1,229.11 Kg
c Bekisting 30.24 M²

3 Balok B1 30/50
a Beton K.300 32.31 M³
b Pembesian 11,525.20 Kg
c Bekisting 300.40 M²

4 Balok B2 20/30
a Beton K.300 7.70 M³
b Pembesian 3,911.04 Kg
c Bekisting 119.84 M²

5 Plat Lantai
a Beton K.300 149.89 M³
b Pembesian 20,984.72 Kg
c Bekisting 1,249.04 M²

6 Tangga Utama
a Beton K.300 3.10 M³
b Pembesian 433.67 Kg
c Bekisting 25.81 M²

7 Tangga Samping
a Beton K.300 2.77 M³
b Pembesian 388.40 Kg
c Bekisting 23.12 M²
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

D Pekerjaan Atap
1 Pekerjaan Plat Atap
a Beton K.300 42.43 M³
b Pembesian 5,939.77 Kg
c Bekisting 353.54 M²
2 Pekerjaan Dinding Parapet
a Beton K.30 17.61 M³
b Pembesian 2,025.15 Kg
c Bekisting 63.40 M²
3 Siku 90.90.7 20,103.13 Kg
4 Siku 60.60.6 4,754.27 Kg
5 Plate t.10 105.15 Kg
6 CNP 150.65.20.3,2 4,880.94 Kg
7 Trekstank ∅12 642.32 Kg
8 Ikatan Angin ∅22 820.68 Kg
9 Zincromate 1 x 35 Microne + 2 x 40 Microne 31,306.49 Kg

10 Teras
a IWF 300.150.6,5.9 447.74 Kg
b Plate t.10 42.34 Kg
c Angkur ∅22 24 Bh
d CNP 150.65.20.3,2 300.68 Kg
e Trekstank ∅12 34.09 Kg
f Pipa Ø 2,5" 65.20 Kg
g Zincromate 1 x 35 Microne + 2 x 40 Microne 890.05 Kg

II Warehouse
A Pekerjaan Pondasi
1 Pengadaan Tiang Pancang □ 25x25 (L.6M + 3M) 1,710.00 M¹
2 Pemancangan Tiang Pancang (HSPD) 1,710.00 M¹
3 Penyambungan Tiang Pancang 190.00 Titik
4 Bobok Kepala Tiang Pancang 190.00 Titik
5 PDA Tes 2.00 Titik

B Pekerjaan Tanah
1 Galian Pondasi 33.92 M³
2 Urug Basecorse 6,433.00 M³
3 Pekerjaan Pemadatan Tanah CBR 90% 8,041.25 M²

C Pekerjaan Beton
1 Pek. Lantai Kerja 401.77 M³
2 Pondasi PC-2
a Beton K.300 47.55 M³
b Pembesian 12,077.07 Kg
c Bekisting Dengan Batako 246.06 M²
3 Pondasi PC-4
a Beton K.300 19.95 M³
b Pembesian 3,012.45 Kg
c Bekisting Dengan Batako 113.99 M²
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

4 Pekerjaan Retaining wall RW-2


a Beton K.300 46.68 M³
b Pembesian 5,367.74 Kg
c Bekisting 233.38 M²
5 Tie Beam TB-1 30/50
a Beton K.300 44.46 M³
b Pembesian 4,940.64 Kg
c Bekisting Dengan Batako 296.41 M²
6 Tie Beam TB-2 20/30
a Beton K.300 3.78 M³
b Pembesian 674.00 Kg
c Bekisting Dengan Batako 37.80 M²
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

7 Pas. Pondasi Batu Kali 24.49 M³


8 Sloof SP 15/25
a Beton K.300 2.01 M³
b Pembesian 202.82 Kg
c Bekisting 26.77 M²

9 Pedestal IWF 350


a Beton K.300 13.99 M³
b Pembesian 7,345.75 Kg
c Bekisting 131.41 M²
2 Pedestal IWF 400
a Beton K.300 2.51 M³
b Pembesian 708.17 Kg
c Bekisting 23.80 M²
3 Pedestal KWF 400
a Beton K.300 13.04 M³
b Pembesian 3,194.19 Kg
c Bekisting 100.80 M²
4 Kolom K3
a Beton K.300 9.22 M³
b Pembesian 1,704.96 Kg
c Bekisting 84.48 M²

5 Balok B3
a Beton K.300 2.74 M³
b Pembesian 489.74 Kg
c Bekisting 45.60 M²

D Pekerjaan Baja
1 Portal A dan Q
a Base Plate 296.25 Kg
b Angkur Ø 22 180.00 Bh
c Kolom IWF 350.175.7.11 19,376.74 Kg
d Sambungan Kolom
- Plate 1,680.42 Kg
- Baut HTB Ø 16 1,920.00 Bh
e Rafter IWF 350.175.7.11 10,148.66 Kg
f Sambungan Rafter
- IWF 350.175.7.11 87.30 Kg
- Plate 617.25 Kg
- Baut HTB Ø 16 832.00 Bh
g Stiffener 5,914.83 Kg
h Pipa Ø 2,5" 108.10 Kg
i Zincromate 1 x 35 Microne + 2 x 40 Microne 38,229.53 Kg

2 Portal B, D, F, H, J, L, N, P
a Base Plate 158.00 Kg
b Angkur Ø 22 96.00 Bh
c Kolom IWF 350.175.7.11 9,174.02 Kg
d Rafter IWF 350.175.7.11 38,947.90 Kg
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

e Sambungan Rafter
- Plate 4,461.27 Kg
- Baut HTB Ø 16 5,472.00 Bh
- IWF 350.175.7.11 69.84 Kg
f Stiffener 36,281.30 Kg
g Pipa Ø 2,5" 432.41 Kg
h Zincromate 1 x 35 Microne + 2 x 40 Microne 89,524.74 Kg

3 Portal C, E, G, I, K, M, O
a Base Plate 954.18 Kg
b Angkur Ø 22 84.00 Bh
c Angkur Ø 32 140.00 Bh
d Kolom IWF 400.200.8.13 4,145.57 Kg
e Kolom KWF 400.200.8.13 24,769.25 Kg
f Kolom IWF 350.175.7.11 2,701.22 Kg
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

g Sambungan Kolom
- Plate 3,798.75 Kg
- Baut HTB Ø 19 1,792.00 Bh
h Rafter IWF 400.200.8.13 32,663.40 Kg
i Rafter IWF 350.175.7.11 13,105.06 Kg
j Sambungan Rafter
- Plate 2,739.52 Kg
- Baut HTB Ø 19 2,240.00 Bh
- Baut HTB Ø 16 420.00 Bh
k Stiffener 18,894.51 Kg
l Pipa Ø 2,5" 378.36 Kg
m Zincromate 1 x 35 Microne + 2 x 40 Microne 63,574.29 Kg

4 Portal T, S, R
a IWF 350.175.7.11 836.75 Kg
b Plate 15.80 Kg
c Angkur Ø 22 32.00 Bh
d Pipa Ø 2,5" 108.10 Kg
e Zincromate 1 x 35 Microne + 2 x 40 Microne 960.65 Kg

5 Balok
a Elevasi + 7.00
- IWF 200.100.5,5.8 722.07 Kg
b Elevasi + 8.00
- IWF 200.100.5,5.8 1,823.28 Kg
c Elevasi + 10.50 - 0
- IWF 350.175.7.11 4,348.93 Kg
d Elevasi + 12.50
- IWF 350.175.7.11 4,348.93 Kg
- IWF 200.100.5,5.8 1,823.28 Kg
e Elevasi + 14.28
- IWF 350.175.7.11 8,697.86 Kg
f Elevasi + 15.76
- IWF 350.175.7.11 8,697.86 Kg
g Elevasi + 16.45
- IWF 200.100.5,5.8 3,871.49 Kg
h Elevasi + 17.72
- IWF 200.100.5,5.8 2,903.62 Kg
h Stiffener 8,120.79 Kg
i Zincromate 1 x 35 Microne + 2 x 40 Microne 42,225.63 Kg

6 Bracing
a Siku 90.90.7 6,548.82 Kg
b Plate t.10 322.88 Kg
c Zincromate 1 x 35 Microne + 2 x 40 Microne 6,871.70 Kg

E Pekerjaan Atap
1 Kolom IWF 200.150.6.9 1,177.49 Kg
2 Rafter IWF 200.100.5,5.8 3,228.65 Kg
3 Base Plate 101.92 Kg
BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN DC MADIUN ALFA MART
LOKASI : KOTA MADIUN JAWA TIMUR
KELOMPOK KERJA : STRUKTUR

No Uraian Pekerjaan Volume Harga Satuan Jumlah Jumlah Total

4 Plate 303.11 Kg
5 Baut HTB Ø 16 1,196.00 Bh
6 CNP 150.65.20.3,2 57,929.01 Kg
7 Trekstank ∅12 4,772.60 Kg
8 Ikatan Angin 4,595.44 Kg
9 Zincromate 1 x 35 Microne + 2 x 40 Microne 72,108.22 Kg

F Pekerjaan Gudang Kardus


1 Plate 39.04 Kg
2 IWF 300.150.6,5.9 1,658.84 Kg
3 Baut HTB Ø 16 48.00 Bh
4 Stiffener 140.69 Kg
5 CNP 150.65.20.3,2 1,082.45 Kg
6 Trekstank ∅12 76.70 Kg
7 Ikatan Angin 135.18 Kg
8 Zincromate 1 x 35 Microne + 2 x 40 Microne 3,132.91 Kg

G Pekerjaan Perkerasan Lantai


1 Lantai Type L1
a Beton K.300 2,318.40 M³
b Pembesian 162,287.92 kg
c Dowel 9,930.16 kg
2 Lantai Type L2
a Beton K.300 33.60 M³
b Pembesian 3,528.07 kg

III Pekerjaan Rigid Pavement


1 Rigid R1
a Beton K.300 530.19 M³
b Pembesian 55,350.92 kg
c Dowel 4,506.24 kg
2 Rigid R2
a Beton K.300 390.36 M³
b Pembesian 54,650.68 kg
c Dowel 4,945.93 kg
4 Rigid R3
a Beton K.300 448.37 M³
b Pembesian 40,353.15 kg
c Dowel 5,149.58 kg
5 Pas Paving T.6 457.01 M²