B. PEKERJAAN REHAB R. ASDA DAN R.

STAFF AHLI

I. PEKERJAAN BONGKARAN
1 Bongkaran Lantai
NO POSISI P L A Q TOTAL

5,60 X 3,15 = 17,64 X 3,00 = 52,92 M2


1 R. ASDA
3,10 X 1,50 = 4,65 X 3,00 = 13,95 M2
2 KM ASDA 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
4,90 X 3,00 = 14,70 X 3,00 = 44,10 M2
3 R. STAFF AHLI
3,00 X 1,50 = 4,50 X 3,00 = 13,50 M2
4 KM STAFF AHLI 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
5 TOILET UMUM 4,35 X 1,85 = 8,05 X 1,00 = 8,05 M2
6 0 - X - = - X 1,00 = - M2
151,55 M2
2 Bongkaran Plafond
VOLUME MENGIKUTI PERHITUNGAN PLAFOND BARU NO II.1 189,72 M2
3 Bongkaran Dinding dan Kusen
HARGA SATUAN LUMPSUM VOLUME MENGIKUTI KONTRAK
4 Pembuangan Puing keluar Lokasi
HARGA SATUAN LUMPSUM VOLUME MENGIKUTI KONTRAK
II. PEKERJAAN PLAFOND
1 Pemasangan 1 m2 Rangka Plafond Besi Hollow Galvanize, Modul 60x60
NO POSISI P L A Q TOTAL

5,60 X 3,15 = 17,64 X 3,00 = 52,92 M2


1 R. ASDA
3,10 X 1,50 = 4,65 X 3,00 = 13,95 M2
2 KM ASDA 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
4,90 X 3,00 = 14,70 X 3,00 = 44,10 M2
3 R. STAFF AHLI
3,00 X 1,50 = 4,50 X 3,00 = 13,50 M2
4 KM STAFF AHLI 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
5 SELASAR 17,35 X 2,20 = 38,17 X 1,00 = 38,17 M2
6 TOILET UMUM 4,35 X 1,85 = 8,05 X 1,00 = 8,05 M2
189,72 M2
2 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran 120x240x8 mm, tebal 9 mm Drop Ceilling
NO POSISI P L A Q TOTAL

5,60 X 3,15 = 17,64 X 3,00 = 52,92 M2


1 R. ASDA
3,10 X 1,50 = 4,65 X 3,00 = 13,95 M2
4,90 X 3,00 = 14,70 X 3,00 = 44,10 M2
2 R. STAFF AHLI
3,00 X 1,50 = 4,50 X 3,00 = 13,50 M2
3 SELASAR 17,35 X 2,20 = 38,17 X 1,00 = 38,17 M2
162,64 M2
3 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran 120x240x8 mm, tebal 9 mm Drop Ceilling
item Pekerjaan dihilangkan karna Penamaan Item Pekerjaan Tidak sesuan dengan Harga satuan pekerjaan

4 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran 120x240x8 mm, tebal 9 mm


NO POSISI P L A Q TOTAL
1 KM ASDA 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
2 KM STAFF AHLI 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
3 TOILET UMUM 4,35 X 1,85 = 8,05 X 1,00 = 8,05 M2
27,08 M2
III. PEKERJAAN LANTAI
1 Pemasangan 1 m2 Lantai Granite ukuran 80x80 Warna/Corak (Polished)
NO POSISI P L A Q TOTAL
5,60 X 3,15 = 17,64 X 3,00 = 52,92 M2
1 R. ASDA
3,10 X 1,50 = 4,65 X 3,00 = 13,95 M2
4,90 X 3,00 = 14,70 X 3,00 = 44,10 M2
2 R. STAFF AHLI
3,00 X 1,50 = 4,50 X 3,00 = 13,50 M2
124,47 M2
2 Pemasangan 1 m2 SPC Flooring Taco 5mm
NO POSISI P L A Q TOTAL
1 SELASAR 17,35 X 2,20 = 38,17 X 1,00 = 38,17 M2
38,17 M2
3 Pemasangan 1 m2 Lantai Keramik ukuran 60x60 (Warna) Unpolish
NO POSISI P L A Q TOTAL
1 KM ASDA 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
2 KM STAFF AHLI 2,35 X 1,35 = 3,17 X 3,00 = 9,52 M2
19,04 M2
4 Pemasangan 1 m2 Lantai Keramik ukuran 60x60 (Warna) Unpolish
NO POSISI P L A Q TOTAL
1 TOILET UMUM 4,35 X 1,85 = 8,05 X 1,00 = 8,05 M2
8,05 M2
5 Pemasangan 1 m' Plin PVC Lantai
NO POSISI P Q TOTAL
1 R. ASDA 5,60 4,65 2,10 1,50 1,50 3,15 = 18,50 X 3,00 = 55,50 M1
2 R. STAFF AHLI 4,90 4,50 1,40 1,50 1,50 3,00 = 16,80 X 3,00 = 50,40 M1
3 SELASAR 14,35 13,35 0,60 0,60 = 28,90 X 1,00 = 28,90 M1
134,80 M1
IV. PEKERJAAN DINDING
1 1 m² Dinding Multipleks Lapis HPL
NO POSISI P T A Q TOTAL
1,65 X 3,00 = 4,95 X 3,00 = 14,85 M2
1 R. ASDA 0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
1,20 X 3,00 = 3,60 X 3,00 = 10,80 M2
1,65 X 3,00 = 4,95 X 3,00 = 14,85 M2
2 R. STAFF AHLI 0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
1,20 X 3,00 = 3,60 X 3,00 = 10,80 M2
3 SELASAR 28,70 X 1,20 = 34,44 X 1,00 = 34,44 M2
88,98 M2
2 Pemasangan 1 m2 Wall Paper
NO POSISI P T A Q TOTAL
2,29 X 3,00 = 6,87 X 3,00 = 20,61 M2
0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
1 R. ASDA 1
4,54 X 3,00 = 13,62 X 3,00 = 40,86 M2
5,70 X 3,00 = 17,10 X 3,00 = 51,30 M2
1,44 X 3,00 = 4,32 X 3,00 = 12,96 M2
0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
2 R. STAFF AHLI
4,54 X 3,00 = 13,62 X 3,00 = 40,86 M2
4,85 X 3,00 = 14,55 X 3,00 = 43,65 M2
3 SELASAR 28,70 X 2,30 = 66,01 X 1,00 = 66,01 M2
279,49 M2
Penurangan Lubang Kusen Jendela 24,31 M2
Jumlah Bersih 255,18 M2
3 Roller Blind Dimout Cover Box
NO POSISI P T A Q TOTAL
1 R. ASDA 1 2,60 X 1,70 = 4,42 X 1,00 = 4,42 M2
2,60 X 1,70 = 4,42 X 1,00 = 4,42 M2
2 R. ASDA 2
0,65 X 1,70 = 1,11 X 1,00 = 1,11 M2
1,30 X 1,70 = 2,21 X 1,00 = 2,21 M2
3 R. ASDA 2
1,30 X 1,70 = 2,21 X 1,00 = 2,21 M2
4 R. STAFF AHLI 1 1,30 X 1,70 = 2,21 X 1,00 = 2,21 M2
0,65 X 1,70 = 1,11 X 1,00 = 1,11 M2
5 R. STAFF AHLI 2
1,30 X 1,70 = 2,21 X 1,00 = 2,21 M2
0,65 X 1,70 = 1,11 X 1,00 = 1,11 M2
6 R. STAFF AHLI 3
1,95 X 1,70 = 3,32 X 1,00 = 3,32 M2
24,31 M2
4 Pemasangan 1 m2 Dinding hebel (7.5x20x60) + Space PM 110
NO POSISI P T A Q TOTAL
- X - = - X 3,00 = - M2
1 0
- X - = - X 3,00 = - M2
- X - = - X 3,00 = - M2
2 0
- X - = - X 3,00 = - M2
189,58 M2
5 Pemasangan plesteran 1PC : 5PP tebal 20 mm
NO POSISI V A Q TOTAL
Pemasangan 1 m2 Dinding hebel (7.5x20x60) + Space PM 110
1 VOLUME
189,58 X 1,00 = 189,58 X 2,00 = 379,16 M2
379,16 M2
Pemasangan 1 m2 Dinding Keramik ukuran 30x60 73,80 M2
Jumlah Bersih 305,36 M2
6 Pemasangan 1 m2 acian
VOLUME MENGIKUTI Pemasangan plesteran 1PC : 5PP tebal 20 mm 305,36 M2
7 Pemasangan 1 m2 Dinding Keramik ukuran 30x60
NO POSISI P T A Q TOTAL
2,40 X 2,80 = 6,72 X 3,00 = 20,16 M2
1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
1 R. ASDA 1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
2,40 X 2,80 = 6,72 X 3,00 = 20,16 M2
1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
2 R. STAFF AHLI 1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
1,40 X 2,80 = 3,92 X 3,00 = 11,76 M2
0,90 X 0,60 = 0,54 X 3,00 = 1,62 M2
3,30 X 2,80 = 9,24 X 2,00 = 18,48 M2
1,40 X 2,80 = 3,92 X 2,00 = 7,84 M2
3 TOILET UMUM 1,40 X 2,80 = 3,92 X 1,00 = 3,92 M2
2,30 X 2,80 = 6,44 X 1,00 = 6,44 M2
1,35 X 2,80 = 3,78 X 2,00 = 7,56 M2
158,36 M2
8 Pemasangan 1 m' Plin PVC Lantai
V. PEKERJAAN PENGECATAN
1 1 m2 Pengecatan Tembok Baru Interior ( 1 lapis Plamur, 1 Lapis Cat dasar. 2 Lapis cat penutup)
VOLUME MENGIKUTI Pemasangan 1 m2 acian 305,36 M2
VOLUME DIKURANGI Pemasangan 1 m2 Wall Paper Acian baru 184,54 M2
PEKERJAAN PENGECATAN 120,82 M2

2 1 m² Pengecatan Plafon (1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Setara Vinilex
VOLUME MENGIKUTI PERHITUNGAN PLAFOND BARU NO II.1 189,72 M2
VI. PEKERJAAN KUSEN
1 Pekerjaan Pintu Utama (Bahan Kayu Jati) uk. 1,8 x 2.5 + Cuting Plat 1,00 unit Selasar
2 Pekerjaan Kusen Pintu Alumunium Type P1 6,00 unit Pintu Masuk Ruangan
3 Pekerjaan Kusen Pintu Alumunium Type P2 1,00 unit Toilet Umum
4 Pintu Km WPC Laminated ex. Duma 7,00 unit KM Mandi
VII. PEKERJAAN ELEKTRIKAL DAN SOUND SYSTEM
a. R. Asda dan Staff Ahli
1 Instalasi Titik Listrik / Stop Kontak
R. ASDA R. STAFF AHLI TOTAL
NO POSISI
A B =A+B
1 Pasangan Lampu Downlight Decorative LED 24 Watt, 4" 3,00 x 3,00 9,00 3,00 x 3,00 9,00 = 18,00 TITIK
2 Pasangan Lampu Gantung Supra Chandelier 6 Pearl 9967 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 TITIK
3 Hidden Lamp LED 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 TITIK
30,00 TITIK
2 Instalasi Titik Listrik / Stop Kontak
R. ASDA R. STAFF AHLI TOTAL
NO POSISI
A B =A+B
1 Pemasangan Stop Kontak Lantai x 3,00 - x 3,00 - = - TITIK
2 Pemasangan Stop Kontak Sek. Panasonic 4,00 x 3,00 12,00 3,00 x 3,00 9,00 = 21,00 TITIK
3 Pemasangan Stop Kontak AC 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 TITIK
Waterheater 1,00 x 3,00 3,00 x 3,00 - = 3,00 TITIK
4 Pasangan Exhaust Fan Type Ceilling 10" 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 TITIK
36,00 TITIK

R. ASDA R. STAFF AHLI TOTAL


NO POSISI
A B =A+B

3 Pemasangan Stop Kontak Lantai - x 3,00 - - x 3,00 - = - bh


4 Pemasangan Stop Kontak Sek. Panasonic 5,00 x 3,00 15,00 3,00 x 3,00 9,00 = 24,00 bh
5 Pemasangan Saklar Engkel/Seri sek. Panasonic 2,00 x 3,00 6,00 2,00 x 3,00 6,00 = 12,00 bh
6 Pemasangan Outlet TV dan Instalasi 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 bh
7 Pemasangan Stop Kontak AC 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 bh
8 Pasangan Lampu Downlight Decorative LED 24 Watt, 4" 3,00 x 3,00 9,00 3,00 x 3,00 9,00 = 18,00 bh
9 Pasangan Lampu Gantung Supra Chandelier 6 Pearl 9967 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 bh
10 Hidden Lamp LED 13,00 x 3,00 39,00 11,90 x 3,00 35,70 = 74,70 bh
11 Pengadaan dan Pemasangan AC Split 1 PK 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 bh
12 Pasangan Exhaust Fan Type Ceilling 10" 1,00 x 3,00 3,00 1,00 x 3,00 3,00 = 6,00 bh
b. Selasar dan Toilet Umum
1 Instalasi Titik Listrik / Stop Kontak
2 Instalasi Titik Listrik / Stop Kontak