ESTIMATE FOR CONSTRUCTION OF C.C.

MOTORABLE ROAD AT AMLYMPIANG VEC WITHIN AMLAREM C&RD BLOCK AMLAREM DURING T
YEAR 2017-18 LENGTH 125.00 M

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR BUILDING SCHEDULE OF RATES FOR AREAS UNDER JAINTIA
FOR THE YEAR 2013-14
RC/17728
Excavation in soil in hilly areas including cutting and trimming of side slopes and disposing of
excavated earth with all lift upto 1.5 m and a lead upto 20 m as per drawing and Technical
1/2.1A (i) Specification Clause 1603.1.

1 x 30.00 x 3.50 x 0.15 = 15.75 m3


1 x 30.00 x 3.50 x 0.15 = 15.75 m3
1 x 30.00 x 3.50 x 0.15 = 15.75 m3
1 x 25.00 x 3.50 x 0.15 = 13.13 m3
Total = 60.38 m3
A.In ordinary soil ` 98 = 5916.75
2/5.10 Providing soling stones in bed of side drains, footpaths, slab drain etc. with small boulders of
sizes ranging from 100 mm to 150 mm including filling the interstices with smaller stones and
carriage within 200 m complete as per Technicasl Specifications.

1x 30.00 x 3.50 x 0.15 = 15.75 m3


1x 30.00 x 3.50 x 0.15 = 15.75 m3
1x 30.00 x 3.50 0.15 = 15.75 m3
1x 25.00 x 3.50 0.15 = 13.13 m3
Total = 60.38 m3
= ` 735.00

3/4.3(ii) Providing concrete for plain/reinforced concrete in open foundations complete as per drawing and
Technical Specification Clauses 802, 803, 1202, 1203.

1x 30.00 x 3.50 x 0.10 = 10.50 m3


1x 30.00 x 3.50 x 0.10 = 10.50 m3
1x 30.00 x 3.50 x 0.10 = 10.50 m3
1x 25.00 x 3.50 x 0.10 = 8.75 m3
Total = 40.25 m3
@ ` 4353 = 175208.25
4/39 (b) For shuttring
As per Basic rate of materials from SOR Building 2013-2014 :
Plank: (a)White Pine wood Planks (25 mm thick,
dressed)
2x 30.00 x 0.25 = 15 m2
2x 30.00 x 0.25 = 15 m2
2x 30.00 x 0.25 = 15 m2
2x 25.00 x 0.25 = 12.5 m2
TOTAL = 57.5 m2
@ 598.00 /m2 = 34385
TOTAL = 259885.63
Say Total = 259890.00
37 25 925 175 161875.00 0.62

98015.00 0.38

259890.00

(Rupees four Lakh two thousand six hundred and thirty) only

3.5 M

Plan
3.5 m 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo 0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Assistant Engineer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

Cement = 79 bags 430


F.A = 8 m3 800
C.A = 15.063 m 3
950
Solling Stone = 32.1 m 3
1350

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT KUDENGRIM VEC UNDER MGNREGA 2016-17 WITHIN AMLAREM C&RD BL
AMLAREM LENGTH 530.00 M(Ph.III)

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1 x 30.00 x 1.00 x 0.25 = 7.50 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 20.00 x 1.00 x 0.25 = 5.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
530.00 Total = 129.50 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
Total 79.50 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
Total = 53.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 20.00 x 1.42 = 28.40 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
1 x 30.00 x 1.42 = 42.60 m2
Total = 752.60 m2
ii)Prop 1:4 ` 137.00
Total
125 13 1625 169 274625.00
137600.00 Say Total
Length 530 Ph.III 412225.00
(Rupees Four lakh two thousand four hundred and seventyfive )only

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching
Prepared By Countersigned By:- Approved By:-

Junior Engineer, Assistant Engineer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT KUDENGRIM VEC UNDER MGNREGA 2016-17 WITHIN AMLAREM C&RD BL
AMLAREM LENGTH 477.00 M(Ph.III)

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
RC/9508
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1x 30.00 x 1.00 x 0.25 = 7.50 m3
1x 22.00 x 1.00 x 0.30 = 6.60 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 30.00 x 1.00 x 0.30 = 9.00 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 25.00 x 1.00 x 0.30 = 7.50 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 30.00 x 1.00 x 0.30 = 9.00 m3
1x 20.00 x 1.00 x 0.20 = 4.00 m3
1x 30.00 x 1.00 x 0.30 = 9.00 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 20.00 x 1.00 x 0.25 = 5.00 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 30.00 x 1.00 x 0.30 = 9.00 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 30.00 x 1.00 x 0.20 = 6.00 m3
1x 30.00 x 1.00 x 0.30 = 9.00 m3
477.00 Total = 117.60 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.
1x 30.00 x 1.00 x 0.15 =
4.50 m3

1x 22.00 x 1.00 x 0.15 =


3.30 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 25.00 x 1.00 x 0.15 =


3.75 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 20.00 x 1.00 x 0.15 =


3.00 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 20.00 x 1.00 x 0.15 =


3.00 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

1x 30.00 x 1.00 x 0.15 =


4.50 m3

Total 71.55 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 22.00 x 1.00 x 0.10 = 2.20 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 25.00 x 1.00 x 0.10 = 2.50 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
Total = 47.70 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).

1x 30.00 x 1.42 = 42.60 m2


1x 22.00 x 1.42 = 31.24 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 25.00 x 1.42 = 35.50 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 20.00 x 1.42 = 28.40 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 20.00 x 1.42 = 28.40 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
1x 30.00 x 1.42 = 42.60 m2
Total = 677.34 m2
ii)Prop 1:4 ` 137.00
Total
125 11 1375 169 232375.00

129700.00 Say Total


Length 477 Ph.III 362075.00
(Rupees Three Lakh sixty two thousand and seventy five)only

1.00 M

Plan
Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Assistant Engineer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT LAMIN VEC UNDER MGNREGA 2016-17 WITHIN AMLAREM C&RD BLOC
AMLAREM LENGTH 2000.00 M(Ph.I)

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
RC/9519
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 20.00 x 1.00 x 0.30 = 6.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 20.00 x 1.00 x 0.20 = 4.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 20.00 x 1.00 x 0.30 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.35 = 10.50 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 20.00 x 1.00 x 0.20 = 4.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.25 = 7.50 m3
1 x 30.00 x 1.00 x 0.20 = 6.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
Total = 575.00 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
Total 300.00 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
Total = 200.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 20.00 x 1.40 = 28.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 20.00 x 1.40 = 28.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 20.00 x 1.40 = 28.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 20.00 x 1.40 = 28.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
1 x 30.00 x 1.40 = 42.00 m2
2000.00 Total = 2800.00 m2
ii)Prop 1:4 ` 137.00
Total
384 15 5760 169 973440.00
548300.00 Say Total
1521740.00
(Rupees Fifteen Lakh twentyone thousand seven hundred and forty)only

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai
ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT DARRANG VEC (PH.II) UNDER MGNREGA 2016-17 WITHIN AMLAREM C&
BLOCK AMLAREM LENGTH 980.00 M

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
CODE NO.RC/9502
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.40 = 8.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.50 = 15.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.60 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 20.00 x 1.00 x 0.30 = 6.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.50 = 15.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 20.00 x 1.00 x 0.30 = 6.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 20.00 x 1.00 x 0.50 = 10.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 20.00 x 1.00 x 0.50 = 10.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 20.00 x 1.00 x 0.70 = 14.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 20.00 x 1.00 x 0.30 = 6.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.50 = 15.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.50 = 15.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.55 = 11.00 m3
1 x 30.00 x 1.00 x 0.40 = 12.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1 x 30.00 x 1.00 x 0.30 = 9.00 m3
1980.00 Total = 926.00 M3 926.08
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1980.00 Total 297.00 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1980.00 Total = 198.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 20.00 x 1.80 = 36.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1 x 30.00 x 1.80 = 54.00 m2
1980.00 Total = 3564.00 m2
ii)Prop 1:4 ` 137.00
Total
110 56 6160 169 1041040.00
608900.00 Say Total
1649940.00
(Rupees Sixteen Lakh fortynine thousand nine hundred and forty)only

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6


oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT BAKUR VEC (PH.III) UNDER MGNREGA 2016-17 WITHIN AMLAREM C&RD B
AMLAREM LENGTH 1200.00 M

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
CODE NO.RC/9510
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.60 = 12.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.90 = 18.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 20.00 x 1.00 x 0.70 = 14.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.80 = 16.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 20.00 x 1.00 x 0.80 = 16.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.59 = 11.80 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1200.00 Total = 900.80 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1200.00 Total 180.00 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1200.00 Total = 120.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1200.00 Total = 2160.00 m2
ii)Prop 1:4 ` 137.00
Total
188 21 3948 169 667212.00
366000.00 Say Total
1033212.00
(Rupees Ten Lakh thirtythree thousand two hundred and twelve)

1.00 M
Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT KUDENGRIM VEC (PH.IV) UNDER MGNREGA 2016-17 WITHIN AMLAREM C
BLOCK AMLAREM LENGTH 200.00 M

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
CODE NO.RC/9510
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.60 = 12.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.50 = 15.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
200.00 Total = 129.00 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
200.00 Total 30.00 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
1 x 30.00 x 1.00 x 0.10 = 3.00 m3
200.00 Total = 20.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
200.00 Total = 360.00 m2
ii)Prop 1:4 ` 137.00
Total
127 5 635 169 107315.00
62800.00 Say Total
170115.00
(Rupees One Lakh Seventy thousand one hundred and fifteen)only

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai
ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT SOHKHA PHLANG VEC UNDER NREGA 2016
WITHIN AMLAREM C&RD BLOCK AMLAREM (LENGTH 160.00 M)PH.I
THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
RC/9517
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate

1 x 30.00 x 1.00 x 0.10 = 3.00 m3


1 x 22.00 x 1.00 x 0.25 = 5.50 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 26.00 x 1.00 x 0.20 = 5.20 m3
1 x 24.00 x 1.00 x 0.20 = 4.80 m3
1 x 28.00 x 1.00 x 0.20 = 5.60 m3
Total = 28.60 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 22.00 x 1.00 x 0.15 = 3.30 m3
1 x 30.00 x 1.00 x 0.15 = 4.50 m3
1 x 26.00 x 1.00 x 0.15 = 3.90 m3
1 x 24.00 x 1.00 x 0.15 = 3.60 m3
1 x 28.00 x 1.00 x 0.15 = 4.20 m3
24.00 m3
` 704.00

3/8.6 Supplying fitting and placing TMT bar reinforcement in substructure complete asper
drawing and Technical specification..
10mm dia
Slab Cover 10mm dia
5x 6.00 x 0.62 = 18.60 Rm
30 x 0.90 x 0.62 = 16.74 Rm
Total = 35.34 Rm
or Total = 0.35 qtl
0.04 Ton
@ ` 80637.00
4/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 22.00 x 1.00 x 0.10 = 2.20 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 26.00 x 1.00 x 0.10 = 2.60 m3
1x 24.00 x 1.00 x 0.10 = 2.40 m3
1x 28.00 x 1.00 x 0.10 = 2.80 m3
Slab Cover
1x 6.00 x 1.00 x 0.20 = 1.20 m3
Total = 17.20 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00
5/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
c) Rough cast plaster
1x 30.00 x 1.40 = 42.00 m2
1x 22.00 x 1.40 = 30.80 m2
1x 30.00 x 1.40 = 42.00 m2
1x 26.00 x 1.40 = 36.40 m2
1x 24.00 x 1.40 = 33.60 m2
1x 28.00 x 1.40 = 39.20 m2
Slab Cover
1x 6.00 x 1.40 = 8.40 m2
166.00 Total = 232.40 m2
` 137.00
Wages 10 x 49 x 169 = 82810.00 Total
Materials = 46400.00
Total = 129210.00 Say Total

(Rupees One Lakh twenty nine thousand two hundred and ten)only

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai
ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT NONGTALANG SHNONGTHYMMAI VEC UND
NREGA 2016-17 WITHIN AMLAREM C&RD BLOCK AMLAREM (LENGTH 742.00 M)PH.IV
THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL
HIGHWAY WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.

1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate

5 x 30.00 x 1.00 x 0.20 = 30.00 m3


1 x 18.00 x 1.00 x 0.20 = 3.60 m3
6 x 30.00 x 1.00 x 0.15 = 27.00 m3
1 x 20.00 x 1.00 x 0.20 = 4.00 m3
4 x 30.00 x 1.00 x 0.20 = 24.00 m3
1 x 14.00 x 1.00 x 0.22 = 3.08 m3
5 x 30.00 x 1.00 x 0.20 = 30.00 m3
3 x 30.00 x 1.00 x 0.20 = 18.00 m3
Total = 139.68 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.
5 x 30.00 x 1.00 x 0.15 = 22.50 m3
1 x 18.00 x 1.00 x 0.15 = 2.70 m3
6 x 30.00 x 1.00 x 0.15 = 27.00 m3
1 x 20.00 x 1.00 x 0.15 = 3.00 m3
4 x 30.00 x 1.00 x 0.15 = 18.00 m3
1 x 14.00 x 1.00 x 0.15 = 2.10 m3
5 x 30.00 x 1.00 x 0.15 = 22.50 m3
3 x 30.00 x 1.00 x 0.15 = 13.50 m3
111.30 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification

5 x 30.00 x 1.00 x 0.10 = 15.00 m3


1 x 18.00 x 1.00 x 0.10 = 1.80 m3
6 x 30.00 x 1.00 x 0.10 = 18.00 m3
1 x 20.00 x 1.00 x 0.10 = 2.00 m3
4 x 30.00 x 1.00 x 0.10 = 12.00 m3
1 x 14.00 x 1.00 x 0.10 = 1.40 m3
5 x 30.00 x 1.00 x 0.10 = 15.00 m3
3 x 30.00 x 1.00 x 0.10 = 9.00 m3
Total = 74.20 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00
4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3

c) Rough cast plaster


5x 30.00 x 1.40 = 210.00 m2
1x 18.00 x 1.40 = 25.20 m2
6x 30.00 x 1.40 = 252.00 m2
1x 20.00 x 1.40 = 28.00 m2
4x 30.00 x 1.40 = 168.00 m2
1x 14.00 x 1.40 = 19.60 m2
5x 30.00 x 1.40 = 210.00 m2
3x 30.00 x 1.40 = 126.00 m2
Total = 1038.80 m2
` 137.00
Wages 49 x 43 x 2107 x 169 = 356083.00 Total
Materials = 201200.00
Total = 557283.00 Say Total

(Rupees Five Lakh fifty seven thousand two hundred and eighty three)only

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching
ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.MOTORABLE ROAD AT AMLYMPIANG VEC UNDER NREGA 201
WITHIN AMLAREM C&RD BLOCK AMLAREM (LENGTH 90.00 M)PH.I
THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL HIGH
WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
CODE RC/16362
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
2x 30.00 x 3.00 x 0.30 = 54.00 m3
1x 30.00 x 3.00 x 0.25 = 22.50 m3
Total = 76.50 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.2 x 30.00 x 3.00 x 0.20 = 36.00 m3
1x 30.00 x 3.00 x 0.20 = 18.00 m3
54.00 m3
` 704.00
3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification
2x 30.00 x 3.00 x 0.10 = 18.00 m3
1x 30.00 x 3.00 x 0.10 = 9.00 m3
Total = 27.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00
4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
c) Rough cast plaster
2x 30.00 x 3.30 = 198.00 m2
1x 30.00 x 3.30 = 99.00 m2
Total = 297.00 m2
` 137.00
Wages 37 x 21 x 777 x 169 = 131313.00 Total
Materials = 72400.00
Total = 203713.00 Say Total

(Rupee Two Lakhs three thousand seven hundred and thirteen)only

Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai

3.00 M

Plan
0.10 Cm. C.C.1:3:6
3.00 M
0.20 Cm.Stone Pitching
oooooooooooooooooooooooooooo

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT SOHKHA SHNONG VEC (PH.II) UNDER MGNREGA 2016-17 WITHIN AMLAREM
BLOCK AMLAREM LENGTH 540.00 M

THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS AND BRIDGES WORKS(OTHER THAN NATIONAL HIGH
WORKS)FOR AREAS UNDER JAINTIA HILLS FOR THE YEAR 2012-13.
CODE NO.RC/19009
1/2.1 Excavation in soil in hilly areas including cutting and trimming of side slope and disposing of
excavated earth with all lift upto 1.5 m etc.
Quantity unit Rate
ACT2783 1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.60 = 12.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 20.00 x 1.00 x 0.70 = 14.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.90 = 27.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
1 x 20.00 x 1.00 x 0.60 = 12.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.60 = 18.00 m3
1 x 30.00 x 1.00 x 0.80 = 24.00 m3
1 x 30.00 x 1.00 x 0.70 = 21.00 m3
540.00 Total = 392.00 M3
A.By Manual Means(i)In ordinary soil ` 98.00

2/5.12 Providing stones pitching with one man size stones not less than 25cm × 25cm × 30cm long
including filling the interstices with spoils and carriage of stone within a distance of 200m
complete.
ACT2799 1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 20.00 x 1.00 x 0.15 = 3.00 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
1x 30.00 x 1.00 x 0.15 = 4.50 m3
540.00 Total 81.00 m3
` 704.00

3/6.4 Providing concrete for plain/reinforced concrete in open foundation complete asper drawing and
Technical Specification

ACT2859 1x 30.00 x 1.00 x 0.10 = 3.00 m3


1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 20.00 x 1.00 x 0.10 = 2.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
1x 30.00 x 1.00 x 0.10 = 3.00 m3
540.00 Total = 54.00 m3
A.(ii)Nominal mix 1:3:6(Hand mixing) ` 4353.00

4/9.1 Providing 12mm thick cement plastering including cleaning surface curing and carriage of all
materials etc. including carriage of sand within 200m complete. (no plastering is to be done in
Abutment walls, piers, retaining walls, wing walls).
ii.Prop 1:3
ACT2877 1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 20.00 x 1.80 = 36.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
1x 30.00 x 1.80 = 54.00 m2
540.00 Total = 972.00 m2
ii)Prop 1:4 ` 137.00
Total
125 14 1750 169 295750.00
167900.00 Say Total
463650.00
(Rupees Four Lakhs sixtythree six hundred and fifty)only

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching
Prepared By Countersigned By:- Approved By:-

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Amlarem . Jowai
OCK AMLAREM DURING THE

REAS UNDER JAINTIA HILLS

` 44375.63

40.25 4.025
115 12.075
24.15

Basic rate of ma

2079.085
.1:3:6

Pitching

roved By:-

tive Engineer.
Development Agency
Jowai 14365.5

33970 14310.00
6400
14310
43335 0.00
98015

THIN AMLAREM C&RD BLOCK

HER THAN NATIONAL


3.

Amount
` 12691.00

` 55968.00
` 230709.00

` 103106.20
` 402474.20

` 402475.00

only

.1:3:6
roved By:-

tive Engineer.
Development Agency
Jowai

THIN AMLAREM C&RD BLOCK

HER THAN NATIONAL


3.

Amount
` 11524.80

` 50371.20
` 207638.10

` 92795.58
` 362329.68

` 362075.00

y
.1:3:6

384 40 15360 169 2595840


roved By:- 1460160
4056000 #DIV/0!

tive Engineer.
Development Agency
Jowai

N AMLAREM C&RD BLOCK

HER THAN NATIONAL


3.
Amount
` 56350.00
` 211200.00
` 870600.00
` 383600.00
` 1521750.00

` 1521740.00

y)only

.1:3:6

roved By:-

tive Engineer.
Development Agency
Jowai
17 WITHIN AMLAREM C&RD

HER THAN NATIONAL


3.

Amount
-0.08
` 90748.00
` 209088.00
` 861894.00
` 488268.00
` 1649998.00

` 1649940.00 824.97 833.332323


980
)only 808470.6

.1:3:6
roved By:-

tive Engineer.
Development Agency
Jowai

THIN AMLAREM C&RD BLOCK

HER THAN NATIONAL


3.

Amount
` 88278.40
` 126720.00
` 522360.00

` 295920.00
` 1033278.40

` 1033212.00

ve)
.1:3:6

roved By:-

tive Engineer.
Development Agency
Jowai

6-17 WITHIN AMLAREM C&RD

HER THAN NATIONAL


3.

Amount

` 12642.00

` 21120.00
` 87060.00

` 49320.00
` 170142.00

` 170115.00

nly

.1:3:6

roved By:-

tive Engineer.
Development Agency
Jowai
UNDER NREGA 2016-17

HER THAN NATIONAL


3.
Amount

30
22
30
26
24
28
160
` 2802.80

` 16896.00

` 2849.71

` 74871.60
` 31838.80
129258.91

Rs 129210.00

only

roved By:-

tive Engineer.
Development Agency
Jowai
THYMMAI VEC UNDER
M)PH.IV
HER THAN NATIONAL
3.

Amount

150
18
180
20
120
14
150
90
742
` 13688.64

` 78355.20

` 322992.60
` 142315.60
557352.04

Rs 557283.00 69.04

ee)only

roved By:-

tive Engineer.
Development Agency
Jowai

.1:3:6
C UNDER NREGA 2016-17

HAN NATIONAL HIGHWAY

Amount
60
30
90
` 7497.00

` 38016.00

` 117531.00
` 40689.00
203733.00

Rs 203713.00

only

roved By:-

tive Engineer.
Development Agency
Jowai

.1:3:6

016-17 WITHIN AMLAREM C&RD

HAN NATIONAL HIGHWAY

125
14
1750
Amount 169
295750
166359
462109 536.712398
` 38416.00

` 57024.00
` 235062.00

` 133164.00
` 463666.00

` 463650.00 386.375

.1:3:6
roved By:-

tive Engineer.
Development Agency
Jowai
Basic rate of materials
25 Cm

Stone Pitching C.C.1:3:6


15 cm 10 Cm

2.00 M

Plan

2.00 M 0.10 Cm. C.C.1:3:6


15cm

0.15 Cm.Stone Pitching


oooooooooooooooooooooooooooo

C.C.10cm
55 cm

Side Drain opening 30cm x 30cm


REFERENCES
1 PLAN AND CROSS SECTION OF FOOTPATH
Section of C.C.Footpath AND SIDE DRAIN.
& Side drain 2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

1.00 M

Plan
0.10 Cm. C.C.1:3:6
1.00 M

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching
REFERENCES
1 PLAN AND CROSS SECTION OF
C.C.FOOTPATH & SLAB C0VER
10 mm dia 2 NOT TO SCALE
main bar
10mm dia 0.20cm c/c DRAWN BY :-
C.C.1:3:6 Distribution
1.00 M

Section of C.C.Footpath and Slab Cover Junior Engineer,


Amlarem C&RD Block

1.00 M

Plan
0.10 Cm. C.C.1:3:6
1.00 M

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

REFERENCES
1 PLAN AND CROSS SECTION OF
C.C.FOOTPATH & SLAB C0VER
10 mm dia 2 NOT TO SCALE
main bar
10mm dia 0.20cm c/c DRAWN BY :-
C.C.1:3:6 Distribution
1.00 M

Section of C.C.Footpath and Slab Cover


Junior Engineer,
Amlarem C&RD Block

1.00 M

Plan
0.10 Cm. C.C.1:3:6
1.00 M

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

Section of C.C.Footpath REFERENCES


1 PLAN AND CROSS SECTION OF
C. C.FOOTPATH

2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

1.00 M

Plan
0.10 Cm. C.C.1:3:6
1.00 M
15cm

0.15 Cm.Stone Pitching


oooooooooooooooooooooooooooo

C.C.10cm
55 cm

Side Drain opening 30cm x 30cm


REFERENCES
Section of C.C.Footpath 1 PLAN AND CROSS SECTION OF FOOTPATH
& Side drain AND SIDE DRAIN.
2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

1.00 M

Plan

1.00 M 0.10 Cm. C.C.1:3:6

15cm 0.15 Cm.Stone Pitching


oooooooooooooooooooooooooooo

C.C.10cm
55 cm

Side Drain opening 30cm x 30cm


REFERENCES
1 PLAN AND CROSS SECTION OF FOOTPATH
Section of C.C.Footpath AND SIDE DRAIN.
& Side drain 2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

4.00 M

Plan
4.00 M 0.15 Cm. C.C.1:2:4
15cm

0.15 Cm.Stone Pitching


oooooooooooooooooooooooooooo

C.C.10cm
55 cm

Side Drain opening 30cm x 30cm


REFERENCES
1 PLAN AND CROSS SECTION OF MOTORABLE
Section of C.C.Motorable ROAD AND SIDE DRAIN AT AMDOH VEC.
Road & Side drain 2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

4.00 M

Plan

4.00 M 15 Cm. C.C.1:3:6

15cm 0.15 Cm.Stone Pitching


oooooooooooooooooooooooooooo

C.C.10cm
55 cm

Side Drain opening 30cm x 30cm


REFERENCES
1 PLAN AND CROSS SECTION OF MOTORABLE
Section of C.C.Motorable ROAD AND SIDE DRAIN AT AMDOH VEC.
Road & Side drain 2 NOT TO SCALE
DRAWN BY :-

Junior Engineer,
Amlarem C&RD Block
Amlarem.

Cement Plaster
Dressed Stone Masonry

2.00 M

Plan

2.00 M
20cm

20cmx25cm Dressed Stone Masonry


Stone Pitching 15 cm

C.C.10cm
45 cm

Side Drain opening 20cm x 20cm

1.00 M

Plan

0.10 Cm. C.C.1:3:6


1.00 M

oooooooooooooooooooooooooooo
0.15 Cm.Stone Pitching

REFERENCES
1 PLAN AND CROSS SECTION OF
C.C.FOOTPATH & SLAB C0VER
2 NOT TO SCALE
10 mm dia
main bar * * * * * * *
10mm dia 20 cm c/c
C.C.1:3:6 Distribution
1.00 M
DRAWN BY :-

Section of C.C.Footpath and Slab Cover


Junior Engineer,
Amlarem C&RD Block
0.60 m

12mm dia

2.00m
.60 M
.60 M

G L
6mm dia
0.20CM c/ C.C.1:2:4 .60 m

0.31 m
.60 M
.60 M
Post
1.25m
C/S.R.C.C.Post Railing 9.00 M

1.20 M
Post Decking C.C.1:2:4

0.60 m REFERENCES

1.Drawing for Construction of


Footbridg and R. wall

.70m
1.70m

G L 2.Not to Scale.

1.00m
G L
Drawn By:-
.60 m

0.30 m ELEVATION OF FOOTBRIDGE


Junior Engineer.
Amlarem C&RD Block.Amlarem
1.17m
0.60 m

12mm dia

2.00m
.60 M
.60 M

G L
6mm dia
0.20CM c/ C.C.1:2:4 .60 m

0.31 m
.60 M
.60 M
Post
1.25m
C/S.R.C.C.Post Railing 5.00 M

1.20 M
Post Decking C.C.1:2:4

0.60 m REFERENCES

1.Drawing for Construction of


Footbridg and R. wall

.70m
1.70m

G L 2.Not to Scale.

1.00m
G L
Drawn By:-
.60 m

0.30 m ELEVATION OF FOOTBRIDGE


Junior Engineer.
Amlarem C&RD Block.Amlarem
1.17m
ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT PADUBAH VEC UNDER NREGA 2008-09
WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 4350.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)

Ite
m Quantity
N
Item of works Quantity
o Stone Sand Rod
2/ Stone Pitching ### m3 = 646.50 m3
2
3.
4\ T.S.Rod 10mm dia 2.36 qntl = 2.4 qntl

5\ C.C.1:3:6 ### m3 = 395.10 m3 219.50 m3


2
4
6\ Cement plastering ### m2 = 138.24
3
Total = 1041.60 m3 357.74 m 2.4 qntl
9.

Wages 235 x 77 x 70.00


Materials
Total

ABSTRACT
KYNDONGSHNONG 1041.00 M = Rs. 498243.00
LUTI THANGBRU 995.00 M = Rs. 481830.00
MAWJYLLANG 922.00 M = Rs. 440077.00
SHNONGPDENG 694.00 M = Rs. 332254.00
NONGTHYMMAI 698.00 M = Rs. 333996.00
4350.00 M = Rs. 2086400.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT TWAHUSDIAH VEC UNDER NREGA 2008-
09 WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 963.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/ Stone Pitching #REF! m3 = #REF! m3
2
3.
4\ T.S.Rod 10mm dia #REF! qntl = 0.41 qntl

5\ C.C.1:3:6 #REF! m3 #REF! m3 #REF! m3


=
2
4
6\ Cement plastering #REF! m2 = #REF!
3 #REF! m3 #REF! m 0.41 qntl
Total =
9.

Wages 101 40 70 282800.00


Materials 188464.00
471264.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT SHKENPYRSIT VEC UNDER NREGA 2008-
09 WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 670.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.
4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl
5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4
6\
3 Cement plastering #REF! m2 = #REF!
9. Total = #REF! m3 #REF! m #REF! qntl

Wages 100 29 70 203000.00


Materials 135220.00
338220.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT JONGUSHEN VEC UNDER NREGA 2008-09
WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 1405.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.

4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl

5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4

6\
3 Cement plastering #REF! m2 = #REF!
9.
Total = #REF! m3 #REF! m #REF! qntl

1 DONG AMRYNGKHONG 461 M 222140


2 DONG AMSKU 490 M 235140
3 DONG PRIANG MULAI 454 M 217720
1405 M 675000

Wages 95 61 70 405650.00
Materials 269350.00
675000.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT DAWKI VEC UNDER NREGA 2008-09 WITH
AMLAREM C&RD BLOCK AMLAREM (LENGTH 585.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.

4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl

5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4

6\
3 Cement plastering #REF! m2 = #REF!
9.
Total = #REF! m3 #REF! m #REF! qntl

Wages 68 36 70 171360.00
Materials 112640.00
284000.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT PADU MASKU VEC UNDER NREGA 2008-09
WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 650.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.

4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl

5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4
6\
3 Cement plastering #REF! m2 = #REF!
9.
Total = #REF! m3 #REF! m #REF! qntl

Wages 100 28 70 196000.00


Materials 123320.00
319320.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT AMSOHTAI VEC UNDER NREGA 2008-09
WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 2000.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.

4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl

5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4

6\
3 Cement plastering #REF! m2 = #REF!
9.
Total = #REF! m3 #REF! m #REF! qntl

1 PDENGSHNONG 975 466910


2 DONG MIHNGI 1015 487864
1990 954774
Wages 88 93 70 572880.00
Materials 381920.00
954800.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

ESTIMATE FOR CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT NONGTALANG VEC UNDER NREGA 2008-
09 WITH AMLAREM C&RD BLOCK AMLAREM (LENGTH 1555.00 M)
(THE ESTIMATE WAS BASED ON THE SCHEDULE OF RATES FOR ROADS,BRIDGES
AND E&D WORKS IN JOWAI CIRCLE FOR THE YEAR 2007-08)
Ite
m
Quantity
N Item of works Quantity
o Stone Sand Rod
2/
2 Stone Pitching #REF! m3 = #REF! m3
3.

4\ T.S.Rod 10mm dia #REF! qntl = #REF! qntl

5\
2 C.C.1:3:6 #REF! m3 = #REF! m3 #REF! m3
4

6\
3 Cement plastering #REF! m2 = #REF!
9.
Total = #REF! m3 #REF! m #REF! qntl

1 PDENGSHNONG 975 466910


2 DONG MIHNGI 1015 487864
954774

Wages 104 62 70 451360.00


Materials 294060.00
745420.00
Junior Engineer, Block Development Officer Executive Engineer.
Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai

Sl
. CONSTRUCTION OF INTERNAL C.C.FOOTPATH AT NONGTALANG VEC.
N J.C
o. Name of locality Length .No W.D. Wages Materials Amount
1 DONG CHNONGPDENG 627 306900.00
2 DONG TYMPANG CLUB 490 238700.00
3 DONG CHNONGKLOR 682 330000.00
4 NONGTALANG 1113 541600.00
5 AMLARIANG CLUB 488 237800.00
6 REMMUSAN 400 194100.00
7 KHLACHYMPA 1200 585000.00
8 BANAN 1010 491700.00
Total 6010 562 32 1798400.00 1127400.00 2925800.00

Junior Engineer, Block Development Officer Executive Engineer.


Amlarem C&RD Block . Amlarem C&RD Block . District Rural Development Agency
Amlarem . Jowai
NDER NREGA 2008-09

IDGES

Cement

1932 bags

1303 bags
3235 bags

1266650.00
819750.00
2086400.00

ve Engineer.
evelopment Agency
owai

C UNDER NREGA 2008-


M)
IDGES

Cement
#REF! bags

#REF! bags
#REF! bags

282800.00
188464.00
471264.00

ve Engineer.
evelopment Agency
owai

C UNDER NREGA 2008-


M)
IDGES

Cement

#REF! bags

#REF! bags
#REF! bags

203000.00
135220.00
338220.00

ve Engineer.
evelopment Agency
owai

UNDER NREGA 2008-09

IDGES

Cement

#REF! bags

#REF! bags

#REF! bags

405650.00
269350.00
675000.00

ve Engineer.
evelopment Agency
owai

R NREGA 2008-09 WITH

IDGES
IDGES

Cement

#REF! bags

#REF! bags

#REF! bags

171360.00
112640.00
284000.00

ve Engineer.
evelopment Agency
owai

UNDER NREGA 2008-09

IDGES

Cement

#REF! bags
#REF! bags

#REF! bags

196000.00
123320.00
319320.00

ve Engineer.
evelopment Agency
owai

NDER NREGA 2008-09

IDGES

Cement

#REF! bags

#REF! bags

#REF! bags
572880.00
381920.00
954800.00

ve Engineer.
evelopment Agency
owai

C UNDER NREGA 2008-


M)
IDGES

Cement

#REF! bags

#REF! bags

#REF! bags

451360.00
294060.00
745420.00
ve Engineer.
evelopment Agency
owai
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/NREGA/P.Estt./2009-10/35 Dt.Amlarem the.22nd March.2010

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under NREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of C.C.Footpath at Amkoi VEC 1300000.00


2 Construction of C.C.Footpath at Kharkhana VEC 286000.00
3 Construction of Drainage at Amlari Model VEC 478000.00
4 Construction of Drainage at Kongwang VEC 214000.00

Enclo :- Plan and Estimate in duplicate

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/NREGA/P.Estt./2009-10/35 Dt.Amlarem the.22nd March.2010

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/2 Dt.Amlarem the.24th June 2010

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of C.C.dam for water conservation at Sohkha ShnongVEC 788500.00


2 Construction of Drainage at Hawai Bhoi VEC 2240000.00
3 Construction of Drainage at Nongbareh rim VEC 3447500.00
4 Construction of Drainage at Nongbarehlyntiar VEC 4595000.00
5 Construction of Drainage at Amlari Model VEC 478000.00
6 Construction of Drainage at Kongwang VEC 214000.00
7 Construction of Internal C.C.footpath at Kharkhana VEC 286000.00
Construction of Protection Wall(R.Wall) for
8 rosion Control work at Hawai Sutnga VEC 1140500

Enclo :- Plan and Estimate in duplicate(8 Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/2 Dt.Amlarem the.24th June 2010

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/3 Dt.Amlarem the.29th June 2010

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of Internal C.C.footpath at Pdengshakap VEC 3698000.00


2 Construction of Internal C.C.footpath at Samanong VEC 325000.00

Enclo :- Plan and Estimate in duplicate(2 Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/3 Dt.Amlarem the.29th June 2010

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/4 Dt.Amlarem the.24th August 2010

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of Drainage at Thangbuli VEC 2786000.00


2 Construction of Drainage at Umsalang VEC 304000.00
3 Construction of Drainage at Lamin VEC 3064000.00
4 Construction of C/Dam for Fishery Pond and Washing Platform at Pamtbuh VEC 361000.00
5 Construction of road at Umladkhur VEC 6634000.00
6 Construction of Internal C.C.footpath & R/Wall at Kudengthymmai VEC 1077000.00
7 Construction of Internal C.C.footbridge at Moosakhia VEC 203200.00
Enclo :- Plan and Estimate in duplicate(7 Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/4(A) Dt.Amlarem the.24th August 2010

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/1 Dt.Amlarem the.2nd June 2011

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Constn.of Internal road at Padumasku VEC 951000.00


2 Construction of Drainage at Amtasam VEC 720000.00
3 Construction of Drainage at Shnongpdeng VEC 2383800.00
4 Construction of R.Wall( Land slide protection)at Nongtalang Mission VEC 1518700.00
5 Construction of C.C.footpath at Amjalong VEC 1515600.00
6 Construction of C.C.footpath at Jarain VEC 2140000.00
7 Construction of C.C.footpath at Syndai Mission VEC 1500000.00
8 Construction of C.C.footpath at Amsku VEC 280000.00
9 Construction of C.C.footpath at Nongbarehlyntiar VEC 2571000.00
10 Construction of C.C.footpath at Pdengkarong VEC 1000000.00
11 Construction of C.C.footpath at Syndai Lyngkot VEC 728000.00
12 Construction of C.C.footpath at Syndai Amlamet VEC 264000.00
13 Construction of C.C.footpath at Nongbarehrim VEC 2288000.00
14 Construction of Drainage at Kyrweng VEC 853000.00
15 Constn.of Internal road at Pdengshakap VEC 2274000.00

Enclo :- Plan and Estimate in duplicate(15 Nos)


The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/1 Dt.Amlarem the.2nd June 2011

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/2 Dt.Amlarem the.20th Octr. 2011

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of C.C.footpath at Amtra VEC 280000.00


2 Construction of C.C.footpath at Sohkhashnong VEC 860000.00
3 Construction of Drainage and R Wall (Erosion control work at Pdengkarong VEC 1555800.00
4 Construction of Drainage and R Wall (Erosion control work at Amkoi VEC 2276778.00
5 Construction of Drainage at Shkenpyrsit VEC 836000.00
6 Construction of R.Wall( Erosion Control Work)at Shnongpdeng VEC 47079000.00
7 Construction of R.Wall( Erosion Control Work)at Lamin VEC 8908000.00
8 Construction of R.Wall( Erosion Control Work)at Syndaikmaishong VEC 4028830.00
9 Constn.of Pond for Drinking water source and Checkdam at Smiasyiang VEC 211900.00

Enclo :- Plan and Estimate in duplicate(9 Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2010-11/2(A) Dt.Amlarem the.20th Octr. 2011

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2011-12/3 Dt.Amlarem the.9th February..2011

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of Fishery Pond for water conservation at Amlari Model VEC 1536000.00
2 Construction of 3 Nos C/Dam for Water Conservation at Amsarim VEC 360000.00
3 Construction of Drainage at Amlari Rim VEC 285650.00
4 Construction of Drainage at Pdengshakap VEC 1278000.00
5 Construction of Drainage at Khonglah VEC 5683000.00
6 Construction of Drainage at Kharkhana VEC 1172130.00
7 Construction of C.C.footpath at Amsyrwai VEC 398580.00
8 Construction of C.C.footpath at Lurniang VEC 1436000.00
9 Construction of C.C.footpath at KudengrimVEC 211900.00
10 Construction of C.C.footpath at Lakroh VEC 1020700.00
11 Construction of C.C.footpath at Nongbarehrim VEC 561000.00
12 Construction of road at Laremshyiap VEC. 180000.00
13 Construction of road at Jaralood VEC. 773500.00
Enclo :- Plan and Estimate in duplicate(13Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2011-12/3(A) Dt.Amlarem the.9th February..2011

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2012-13/1 Dt.Amlarem the.15th April.2012

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.
1 Construction of C.C.footpath at Muktapur VEC 1362940.00
2 Construction of C.C.footpath at Kongwang VEC 99882.00
3 Construction of C.C.footpath at Umsalang VEC 835800.00
4 Construction of R Wall (Erosion control work at Sohkhashnong VEC 9599600.00
5 Construction of Drainage and S/C. At Syndai Lyngkot VEC 502200.00
6 Construction of C.C.footpath at Sohkha Mission VEC 2787600.00

Enclo :- Plan and Estimate in duplicate(6Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2012-13/1 Dt.Amlarem the.15th April.2012

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2011-12/2 Dt.Amlarem the 16th July.2012

To,

The Executive Engineer.


District Rural Development Agency.
Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of road at Amjajer Roko VEC 261000.00


2 Construction of road at Amtasam VEC 860000.00
3 Construction of C.C.footpath at Mupyut VEC 2637000.00
4 Construction of C.C.footpath at Hawai Sutnga VEC 686700.00
5 Construction of road at Amtapoh VEC 1484600.00
6 Construction of Drainage at Amsku VEC 568300.00
7 Construction of C.C.footpath at Pdengshakap VEC 844100.00
8 Construction of road at Nongtalang Mission VEC 660000.00
9 Construction of road at Kudengthymmai VEC 968820.00
10 Construction of R/Wall(ECW) at Dawki VEC 910600.00
11 Construction of C.C.footpath at Mawlong VEC 1076800.00
12 Construction of road at Samanong VEC 711860.00
13 Construction of C.C.footpath at Trangblang VEC 1732300.00
14 Construction of Drainage at Satpator VEC 1769500.00
15 Construction of R/Wall(ECW) and Slab Cover at dengkarong VEC 1136400.00
16 Construction of Drainage at Lumpyngngad VEC 1686349.00
17 Construction of R/Wall(ECW) at Pasadwar VEC 1259700.00

Enclo :- Plan and Estimate in duplicate(17Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.
No.ACDB/ENGG/MGNREGA/P.Estt./2011-12/2(A) Dt.Amlarem the 16th July.2012

Copy to:-
1 The Deputy Commissioner,Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2013-14/1 Dt.Amlarem the 17th Septr. 2013

To,

The Executive Engineer.


District Rural Development Agency.
West Jaintia Hills District.Jowai.

SubjeApproval of Plan and Estimates under MGNREGA

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of C.C.footpath at Nongtalang shnongthymmai VEC 1282980.00


2 Construction of C.C.footpath at Kongwang VEC 409200.00
3 Construction of C.C.footpath at Pamtbuh VEC(Group No.I) 1585000.00
4 Construction of C.C.footpath at Pamtbuh VEC(Group No.II) 1583600.00
5 Construction of C.C.footpath at Pamtbuh VEC(Group No.III) 1579800.00
6 Construction of C.C.footpath at Madantyrpait VEC 685200.00
7 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.I) 1999800.00
8 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.II) 1972000.00
9 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.III) 1988600.00
10 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.IV) 1999800.00
11 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.V) 1983100.00
12 Construction of R/Wall (ECW) at Nongbarehlyntiar VEC(Group No.VI) 288500.00
13 Construction of C.C.footpath at Lurniang VEC 735000.00
14 Construction of C.C.footbridge at Amtra VEC 410300.00
15 Construction of C.C.footpath at Krangpamtadong VEC 448130.00
16 Construction of Drainage at Amsarim 692350.00
17 Construction of C.C.footpath at Amsarim 53995.00
18 Construction of Drainage at Padubah VEC (Group No.I) 1998170.00
19 Construction of Drainage at Padubah VEC (Group No.II) 1999869.00
20 Construction of Drainage at Padubah VEC (Group No.III) 1995800.00
21 Construction of Drainage at Padubah VEC (Group No.IV) 1999300.00
22 Construction of Drainage at Padubah VEC (Group No.V) 1998400.00
23 Construction of Drainage at Padubah VEC (Group No.VI) 2000000.00
24 Construction of Drainage at Padubah VEC (Group No.VII) 1993500.00
25 Construction of Drainage at Padubah VEC (Group No.VIII) 1999000.00
26 Construction of Drainage at Padubah VEC (Group No.IX) 1340000.00
27 Construction of internal road at Amjalong VEC 1438500.00
28 Construction of Drainage at Sohkha Model VEC (Group No.I) 1618500.00
29 Construction of Drainage at Sohkha Model VEC (Group No.II) 1502600.00
30 Construction of internal road at Mupyut VEC 1996000.00
31 Construction of C.C.footpath at Laremshyiap VEC 226600.00
32 Construction of C.C.footpath at Amdoh VEC 270600.00
33 Construction of Drainage at Mawngap VEC 1733500.00
34 Construction of C.C.footpath at Sohkha Mission VEC 958900.00
35 Construction of C.C.footpath at Khonglah VEC (Group I) 1993890.00
36 Construction of C.C.footpath at Khonglah VEC (Group II) 1932100.00
37 Construction of C.C.footpath at Khonglah VEC (Group III) 1112170.00

Enclo :- Plan and Estimate in duplicate(37.Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2013-14/1(A) Dt.Amlarem the 17th Septr. 2013

Copy to:-
1 The Deputy Commissioner,West Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.

GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/CRRP/P.Estt./2013-14/1 Dt.Amlarem the 13th February.2014


To,

The Executive Engineer.


District Rural Development Agency.
West Jaintia Hills District.Jowai.

SubjeApproval of Plan and Estimates under CRRP 2013-14

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of C.C.footpath at Mupyut village 100000.00


2 Construction of C.C.footpath at Moosakhia village 100000.00
3 Construction of C.C.footpath at Pdengshakap village 100000.00
4 Construction of C.C.footpath at Pamtadong village 50000.00
5 Construction of C.C.footpath at Amshipai village 50000.00

Enclo :- Plan and Estimate in duplicate(5.Nos)

The same may kindly be returned to the Undersigned after donewith.

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/CRRP/P.Estt./2013-14/2 Dt.Amlarem the 13th February.2014

Copy to:-
1 The Deputy Commissioner,West Jaintia Hills District.Jowai,for
favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2015-16/1 Dt.Amlarem the 15th March.2016

To,

The Executive Engineer.


District Rural Development Agency.
West Jaintia Hills District.Jowai.

SubjeApproval of Plan and Estimates under MGNREGA 2015-16


Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 Construction of R.Wall at Kudengthymmai VEC 591730.00


2 Construction of R.Wall at Shnongpdeng VEC Ph.III 1792690.00
3 Construction of R.Wall and Fencing wall at Nongtalang Mission VEC Ph.II 2015780.00
4 Construction of Drainage at Kudengrim VEC 284175.00
5 Construction of Drainage at Padubah VEC 2054610.00
6 Construction of C.C.footpath at Bakur VEC 1172812.00
7 Construction of Internal road at Amjajer Roko VEC 286034.00
8 Construction of C.C.footpath at Kudengrim VEC 306400.00
9 Construction of C.C.footpath at Kongwang VEC Ph.iii 116100.00
10 Construction of R.Wall at Khonglah VEC Ph.I 2226870.00
11 Construction of Drainage at Rhongkhum VEC 163490.00
12 Construction of R.Wall at Lamin VEC Ph.II 2567500.00
13 Construction of Internal road at Nongbarehrim VEC P.I 1102000.00
14 Construction of R.Wall at Shnongpdeng VEC Ph.II 1792690.00
15 Construction of R.Wall at Kudengrim VEC 956050.00
16 Construction of R.Wall at Khonglah VEC Ph.II 2226870.00
17 Construction of R.Wall and Fencing wall at Nongtalang Mission VEC Ph.I 957900.00
18 Construction of C.C.footpath at Amlympiang VEC 291270.00
19 Construction of C.C.footpath at Nongtalang Shnongthymmai VEC 369020.00
20 Construction of R.Wall and Fencing wall at Sohkha Mission VEC 988010.00
21 Construction of R.Wall at Amkoi VEC P.I 946060.00
22 Construction of R.Wall at Lamin VEC Ph.III 2567500.00
23 Construction of road at Mawngap VEC 334630.00
24 Construction of R.Wall at Nongbarehlyntiar VEC 1195630.00
25 Construction of R.Wall at Sohkha Shnong VEC 1376342.00
26 Constuction of internal roads at Nongbarehrim vec P.II 1840480.00
27 Construction of R/wall (erosion control work) at kudengthymmai vec Ph.I 591730.00
28 Constuction of R/wall (erotion control work at Nongtalang Mission)Ph.III 341130.00
29 Constuction of internal roads at Padu Mawsku vec Ph.II 906490.00
30 Constuction of R/wall(erotion control work )at Mawngap vec Ph.I 639594.00
31 Soling of Road at Mawngap vec 187576.00
32 Construction of Internal road at Amjajer Roko VEC Ph.II 701444.00
33 Construction of R/Wall(erotion control work) at Amkoi VEC Ph.II 697321.00
34 Construction of C.C Check Dam at Kudengrim vec Ph.II 711450.00
35 Construction of R/wall for (erotion control work) at Khonglah vec Ph.III 2226870.00
36 Construction of Internal Road at Lamin vec 2049684.00
37 Construction of Internal Road at Sohkha Shnong vec 2041463.00
38 Construction of R/Wall(e c w) at Nonngbarehlyntiar VEC Ph.II 2788670.00
39 Construction of 3 Nos C.C Check Dam at Sohkha Mission vec 1019810.00
40 Construction of C.C Footbridge at Kudengrim vec 509300.00
41 Construction of R/Wall(erotion control work) at Khonglah VEC Ph.IV 742490.00
42 Construction of R/Wall(erotion control work) at Lamin VEC 1369556.00
43 Construction of Drainage at PadubahVEC Ph.II 1506786.00
44 Construction of Drainage at Amjajer Roko VEC 169636.00
45 Construction of Drainage at Rhongkhum VEC Ph.II 74822.00
Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2015-16/2-3 Dt.Amlarem the 15th March.2016

Copy to:-
1 The Deputy Commissioner,West Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
GOVERNMENT OF MEGHALAYA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER.
AMLAREM C&RD BLOCK.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2016-17/1 Dt.Amlarem the 24 th February..2017

To,

The Executive Engineer.


District Rural Development Agency.
West Jaintia Hills District.Jowai.

SubjApproval of Plan and Estimates under MGNREGA 2016-17

Sir,

With reference to the subject cited above,I am sending herewith (two)


copies each of the following estimate for your kind approval.

1 const of R/wall (ECW) at Kudengthymmai vec Length 113M - Ph III 283282.00


2 const of R/wall (ECW) at Bakur vec - Ph i 463650.00
3 const of Drainage at Bakur vec -Ph ii 332840.00
4 const of Drainage at Darrang vec -Ph ii 1098940.00
5 const of Tourist view point 845000.00
6 Const of compound Fencing at Lamin vec Ph i 4362628.00
7 const of Check Dam at Kudengrim vec Ph iv 402356.00
8 Const of 2nos of Water Tank at Sohkha Shnong vec Ph i 473916.00
9 Const of Drainage at Nongtalang vec -Ph i 3338426.00
10 Bamboo Plantation at Kudengthymmai vec 20713.00
11 const of C.C Check Dam at Kudengrim vec Ph ii 1301657.00
12 const of R/wall (ECW) at Nongbarehlyntier vec - Ph iii 1566546.00
13 Const of Internal C.C footpath at Nongtalang Shnong Thymmai Ph-iv 557283.00
14 Const of Internal C.C footpath at Sohkha Phlang vec Ph-i 129210.00
15 const of R/wall (ECW) at Amkoi vec - Ph iii 1132979.00
16 const of R/wall (ECW) at Nongtalang mission vec - Ph v 579736.00
17 const of (ECW) compound and Fencing at Kudengrim vec Ph-iii 370893.00
18 const of Internal C.C footpath at kudengrim vec Ph-iv 170115.00
19 const of low cost individual household latrine for NBA &SBM beneficiary 12000.00
20 const of R/wall (ECW) at Shnongpdeng vec Ph-iv 735012.00
21 const of R/wall (ECW) at Amsohmeheleng vec Ph-ii 461052.00
22 const of Drainage at Sohkha Mission vec -Ph ii 243290.00
23 const of R/wall (ECW) at Nongbarehrim vec - Ph iii 1309105.00
24 const of poultry shed 40000.00
25 const of R/wall (ECW) at Lymba vec Ph-i 661135.00
26 const of R/wall (ECW) at Kudengthymmai vec Ph-ii 772494.00
27 const of piggery shed 39000.00
28 const of R/wall & Drainage for Football Play ground atAmjajer Roko 662916.00
29 const of C.C footpath at Bakur vec Ph-iii 1033212.00
30 const of internal ,c.c footpath at Darrang vec Ph-ii 1649940.00
31 const of R/wall (ECW) at Darrang vec Ph-i 1845880.00
32 const of R/wall (ECW) at Lamin vec Ph-v 4258132.00
33 const of internal C.C footpath at Lamin vec 1521740.00
34 Const of 2nos of Water Tank at Sohkha Mission vec Ph i 483580.00
35 const of Internal road including R/wall and Culverts at sohkha model ph-i 937672.00
36 const of Drainage and R/wall at Rhongkum vec 290100.00
37 const of internal C.C footpath at Kudengrim vec Ph-iii 362075.00
38 const of internal C.C footpath at Lymba vec Ph-iii 54100.00
39 const of R/wall (ECW) at Kudengrim vec - Ph iii 852050.00
40 const of Drainage at Nongbareh Lyntiar vec -Ph iii 1730188.00
41 const
const of
of C.C Motorable
Internal Road at R/wall
road including Dawki vec
and S. Drain 3 nos at Sohkha Shnong vec ph- 867935.oo
42 ii 1274194.00
43 const of R/wall (ECW) at Nongtalang Mission vec Ph-iv 951628.00
44 const
const of
of Drainage at Darrang
Dam For Drinking & slab
Water cover&vec
source -PhTank
water i at Nongtalang Mission vec 709744.00
45 Ph-i 1930184.00
46 Constn.of Internal Rd at Padumasku VEC 600 m 1081585.00
47 const of internal C.C footpath at Amlympiang vec Ph-iii 391620.00
48 const of Drainage at Amsohmeheleng VEC 110 M Ph.I 243284.00
49 Constn of Football playfield at Amjajer Roko VEC 546979.00
50 const of Drainage at Rhongkum VEC 105 M Ph.III 203730.00
51 const of internal C.C footpath at Kongwang vec 185 M Ph-iv 159200.00
52 Constn. Of Internal rd. at Nongtalang VEC 630 m 3023500.00
53 const of internal C.C footpath at Nongtalang Shnonhthymmai vec 575 M Ph-iii 495120.00

Yours faithfully,

Block Development Officer.


Amlarem C&RD Block.Amlarem.

No.ACDB/ENGG/MGNREGA/P.Estt./2015-16/2-3 Dt.Amlarem the 15th March.2016

Copy to:-
1 The Deputy Commissioner,West Jaintia Hills District.Jowai,for
favour of information.
2 The Project Director DRDA.Jowai, for favour of information.

Block Development Officer.


Amlarem C&RD Block.Amlarem.
2060000

216778
2276778